TERMINOLOGY ENVIRONMENTAL DECISION - MAKING DEFINITION OF EIA TYPES OF EIA SCREENING SCOPING TERMS OF REQUIREMENTS ALTERNATIVES INSTITUTIONAL DISSEMINATION CITIZEN ENVIRONMENTAL MONITORING REPORTING EIA LEGISLATION
AUTHORITIES RESPONSIBILITY INSTRUMENTS REFERENCE COORDINATION PARTICIPATION MANAGEMENT PLAN
(TORs) (EMP)
Abbreviations (in national language) as Entities and authorities with Authority responsible for Characteristics of EIA according to Different types of EIA Procedure to determine Procedure by which EIA’s scope Who defines the content of the Requirements in the TORs Analysis of various Consultation with public Public notification and Provisions for the involvement of Planned measures to apply Monitoring regarding fulfillment Provisions regarding the Regulations and norms related to EIA
used in country regulations responsibilities in the EIA process the evaluation of studies legal framework instruments, their level of whether an activity is subject to and focus are defined (through TORs and who conducts the related to the impacts that the alternatives to the entities and organizations dissemination of information the general community or during project of the requirements subject to information that those
and final decision in the complexity, and their focus. EIA and the extent of the early consultation on planned corresponding study EIS must take into account planned activity, in the EIA process generated in the EIA process specific parts of the community implementation to address EIA undertaking an activity have to The Environmental Authority Web site
Common abbreviations: EIA process Category classification as in respective study activity with stakeholders and including not carrying it as well as those directly issues and impacts, and submit to the authority or to
EIA: Environmental Impact country regulation dissemination of information on out interested in the EIA process meet requirements the public throughout the
Assessment the proposed activity); if there is identified in EIA process activity’s development
EIS: Environmental Impact Study no specific procedure, the
SEA: Strategic Environmental regulations define the minimum
Assessment scope of the EIS

EIA: Environmental Impact Assessment Provincial authorities Sectoral and provincial agencies Instrument of environmental policy and Only EIA: provincial and sectoral Determined by provincial and sectoral No provision; the scope includes analyzing Specific laws determine requirements LGA mandates that sectoral and No provisions at the federal level; No provisions in LGA. Authorities must allow public access LGA mandates citizen participation. In accordance with LGA, the EIS must No provisions at the level of the LGA; The LGA requires that all parties submit General Environmental Law, No. 25675, 2002.
EIS: Environmental Impact Study Sectoral authorities management. regulations determine the use of regulations. There is a limited use of actions that damage the environment or for EIS. provincial laws establish EIA some provincial regulations to any unclassified environmental Consultation requirements vary among include actions to mitigate negative however, national, sectoral and provincial information on the environmental http://www.ambiente.gov.ar
Argentina LGA: General Law on the Environment specific instruments. screening tools to determine, based
on the level of risk that a project may
that significantly affect the population’s
quality of life.
requirements. There are differences
across provincial EIA regulations, such
require analysis of alternatives. information that they manage. provinces; in some cases, a single
consultation is required once the EIA
impacts; similar prevention-related
requirements are included in the
laws can request specific monitoring
measures as part of projects’ EMPs.
quality of activities they undertake,
with the exception of legally protected
Note: There are sectoral and provincial EIA present, the type and depth of EIA that as definitions of area of influence, has been completed; in other cases, sectoral and provincial regulations. Mining operations might be required to information. National sectoral and
regulations, but no EIA legislation at the developers will be required to provide. requirement of consultation, analysis of consultation is optional. submit monitoring plans for air, water, and provincial regulations specify reporting
federal level. Only one province does not have indirect or cumulative impacts, others. soil emissions. requirements for their jurisdictions.
EIA legislation.
EC: Environmental Clearance DOE: Department of the Environment DOE Instrument to identify and evaluate the Schedule I: EIA Regulations list the types of projects Scoping required. Requires consultation, Proponent must submit draft TORs for Must include direct, indirect, cumulative EIA must include analysis of NEAC, which is an interagency body, After EIA has been presented, it must The public must be consulted during Proponent must summit to DOE a Developers are required to prepare and A report is required for all EIA. EIA Environmental Protection Act, Chapter 328 (No. 22
ECP: Environmental Compliance Plan Ministry of Forestry, Fisheries, and effects of specific developments and to Schedule II: EIA or LLES that require, do not require, and may meetings with DOE and other agencies. EIA to DOE for review and evaluation. and short- and long-term impacts reasonable alternative sites (if reviews the EIA and submits its be announced to the public through preparation of EIA. DOE sets procedures Mitigation Plan and Monitoring Plan. submit a monitoring plan as part of the EIA regulations define its content. of 1992), Amendment 2009 (No. 5); Environmental
EIA: Environmental Impact Assessment Sustainable Development recommend mitigation measures. Schedule III: Guidelines for permitting require EIA, depending on size and Scope includes identification and analysis Once the developer and DOE have on humans, flora, fauna, soil, water, any) and reasons for rejecting views to DOE. national newspapers. Proponents for public consultation and submission of DOE and proponent must agree on an report. Impact Assessment Regulations 1995 (No. 107),
Belize LLES: Limited Level Environmental Study NEAC: National Environmental Appraisal agencies location. Proponents should apply of impacts on human beings, flora and agreed upon the TORs, the developer air, climatic factors, material goods, them, including the analysis must present an EIA summary, comments. A public hearing can be held if Environmental Compliance Plan (ECP). Amendment 2007 (No. 24); Procedures Manual for
Committee early on to the DOE to determine fauna, soil, water, air, cultural heritage, may begin the EIA, which must be cultural heritage, landscape, natural of the option selected for reflecting the contents of the EIA recommended by NEAC. DOE is responsible for monitoring the the Preparation of an EIA, 2011.
whether project requires an EIA or landscape, and other environmental conducted by a suitably qualified resources, and ecological balance. implementation. report and highlighting the conclusions ECP. http://www.doe.gov.bz
LLES. DOE will make the final decision. factors; it also includes analysis of person. and issues remaining to be resolved.
alternatives.
CD: Waiver Certificate MMAyA: Ministry of Environment and Vice-Ministry of Environment, Group of administrative procedures, studies, Category 1: full analytical EIA Based on FA, the relevant authority No formal scoping procedure. Regulations establish basic content; for Must consider positive and negative, EIA must include analysis of Sectoral agencies issue reports on Summary of EIA required. Synthesis of Any individual can present observations and PPM includes prevention and PASA establishes methods and times of PASA must include presentation of annual Environmental Law, No. 1333, 1992; Regulation of
DIA: Environmental Impact Statement Water Biodiversity, and Climate and technical systems to estimate the Category 2: specific analytical EIA of one applies criteria set by regulations to Proponents must consult the community Category 2, the responsible authority direct and indirect, temporary and alternatives and justification of the FA and EIA. If there are cross- DIA published in Ministry’s Bulletin. proposals through OTB during the stages mitigation measures, contingency inspection and supervision during the technical reports. Prevention and Environmental Control, Decree
EIA: Environmental Impact Study Vice-Ministry of Environment, Change potential effects that works, activities, or or more factors determine EIA category. Regulations during the project classification stage and defines the scope of the EIA. An permanent, reversible and irreversible selected option. sectoral repercussions, a cross- Public can access information on of FA review, classification, EIA review, and plan, and accident prevention phases of implementation, operation, and No. 24176, 1995 (amended by Decree No. 28592,
Bolivia FA: Environmental Form Biodiversity, Climate Change, Departmental governments projects might cause on the environment. Category 3: requires PPM and PASA include list of exempted activities, for before carrying out the EIA. interdisciplinary team of registered cumulative, and synergistic impacts sectoral working group is formed project classification and execution of authorization of the DIA. program. PASA includes supervision closure. 2006; Decree 1485, 2013); sectoral environmental
OTB: Registered Local Grassroots Organization Management and Forest Development Municipal governments Category 4: does not require EIA, PPM, which a CD is issued. consultants must prepare the EIA. on physical, chemical, biological, to provide reports on classification EIA, except when it is legally protected. and monitoring activities. regulations.
PASA: Environmental Implementation and Departmental governments or PASA social, and cultural conditions and and EIA. http://www.mmaya.gob.bo/
Monitoring Plan Municipal governments environments.
PPM: Prevention and Mitigation Program
EIA: (Estudo de Impacto Ambiental) CONAMA: National Environmental States Requirement for a permit prior to Preliminary License: LP (Licencia previa) CONAMA’s regulations include a list of No scoping procedure. Regulations Regulations define general guidelines Analyze positive, negative, direct, EIA must consider and compare Public agencies that are interested The information in the RIMA must be Citizens can present observations on EIA/RIMA must include mitigation EIA/RIMA includes preparation of a Support No provisions. Law 6.938/81 National Environmental Policy, 1981
PBA: Environmental Management Plan (Projeto Council Municipalities construction, installation, expansion, or Construction License: LI (Licencia de projects that require an environmental specify the scope of the EIA. Relevant and technical activities. IBAMA or other indirect, short-term, medium-term, alternative technologies and in, or directly related to, the project comprehensible. The public must the RIMA within a specified period; the measures and support a Monitoring and Monitoring Program that defines the (Amended by Law 140/11); CONAMA Resolutions
Básico Ambiental) IBAMA: Brazilian Institute for the IBAMA (sometimes) operation of facilities and activities, as instalación) license; based on the list, the authority will specify additional guidelines responsible agencies define TORs. long-term, temporary, permanent, locations for the project, receive a copy of the RIMA for their have access to the RIMA in locations responsible authority can hold a public Program. Proponents must submit a parameters that must be considered. 001/86, 1986, and 237/97, 1997; Interministerial
Brazil RIMA: Environmental Impact Report (Relatório
de Impacto Ambiental)
Environment and Renewable Natural
Resources
defined in regulations. Operating License: LO (Licencia de
operación)
responsible authorities define the
criteria used to determine whether an
for preparation of the EIA, according
to project’s features and the area’s
The responsible authority determines
which studies are necessary. EIA
cumulative, and synergistic impacts
on health, safety, well-being, social
including the option of not
carrying out the project.
information and comment. determined by regulation. The license
request must be published.
hearing if deemed necessary; civil entities,
fifty or more citizens, and the Office of
PBA. Ordinance No. 60, 2015. Sectoral and state
legislation.
Municipal governments EIA/RIMA is required. environmental characteristics. must be conducted by a qualified and economic activities, biota, the Public Prosecutor (Ministério Público) can http://www.mma.gov.br
State governments multidisciplinary team that is not linked environment, and natural resources. request a public hearing.
to the proponent.
DIA: Environmental Impact Statement ME: Ministry of Environment SEA Procedure to determine if the environmental DIA: description of impacts and Environmental law defines the type of No formal scoping process. Minimum Regulations establish minimum content. Legislation specifies minimum contents No provisions. Legislation requires coordination Summaries of the EIA and DIA must be SEA determines mechanisms for community The RCA defines norms, measures, and EIA must include an Environmental The Environmental Superintendency will Environmental Law, No. 19300, 2010; Law No. 20417,
EAE: Strategic Environmental Assessment SEA: Environmental Assessment Service Evaluating Commissions impact of an activity or project complies declaration of compliance with projects or activities that require an scope, specified in legislation, includes There is no specific provision for who can for EIA and DIA, with contents to among SEA, regional, and sectoral submitted to SEA and file is disclosed participation. Citizens can submit conditions for the implementation Monitoring Indicator Plan. This plan oversee ongoing compliance with the 2010; Regulation of the EIA System Decree 95, 2001;
EIA: Environmental Impact Study Environmental Superintendency Executive Director of with national regulations. environmental legislation EIA, but only if these might represent analysis of potential impacts on conduct the study. include evaluation of direct, indirect, agencies. Agencies that participate to the public. Indigenous peoples who comments on EIA within a specified period. of the project, including Mitigation, must be prepared in accordance with conditions, rules, and measures set out Decree No. 40, 2012 (amended by Decree No. 63,
Chile RCA: Environmental Qualification Resolution
SEIA: Environmental Impact Assessment
Evaluation Commissions
Other agencies with environmental and
Environmental Evaluation
Service
Mandatory for the type of projects defined
by legislation.
EIA: full impact study risk to human health or cause human health, natural resources,
significant impact on natural resources, social conditions, protected areas,
cumulative, and synergistic impacts on
physical, biotic, social environments,
in the EIA process must provide
input on project qualification,
participated in the EIA process are
informed of the scope and effects of
SEA must carry out a consultation process
if indigenous peoples might be affected.
Remediation, Compensation, and
Monitoring Plan. The Environmental
the general instructions issued by the
Superintendency, and must include the
in the RCA. 2014; Decree 8, 2014).
http://www.sea.gob.cl
System sectoral responsibilities resettlement, or communities’ and landscapes; and on cultural, land use, landscapes, and historic and environmental impacts, and the RCA. Public access to a project’s Superintendency supervises period and frequency of delivery of
livelihoods; otherwise, only a DIA is archaeological, and historical heritage. cultural heritage. compliance with the environmental environmental assessment information compliance with the RCA. reports evaluating the results.
needed. law. provided in the SEIA.
AAUs: Urban Environmental Authorities MINAMBIENTE: Ministry of Environment MINAMBIENTE Basic instrument for decision-making EIA Law and decrees list the type of No formal scoping process. Scope includes MINAMBIENTE issues TORs for each Identification and evaluation of impacts Responsible authority determines Law establishes period for Responsible authority must publish a Any individual may intervene in PMA includes measures for preventing, Environmental authorities are responsible Environmental authority in charge can Law No. 99, 1993; Decree No. 2820, 2010; Decree No.
DAA: Diagnostic of Environmental Alternatives and Sustainable Development ANLA regarding projects, works, or activities that DAA projects, works, and activities that impact on elements of the biotic, abiotic, sector, and they are publish on the on biotic, abiotic, and socioeconomic if DAA is required, defines responsible authority to request notice when it initiates the EIA process, an administrative procedure for mitigating, remediating, and for supervision and monitoring at all request reports during the supervision 2041, 2014.
EIA: Environmental Impact Study ANLA: National Authority for CARs require environmental license, which will be PMA (mainly for mining and oil require EIA. and socioeconomic environments that can web site. Environmental authorities elements, both adverse and beneficial, TORs, and determines which technical input or reports from and its decision, in the official bulletin. environmental permits and licenses. compensating for environmental stages of compliance with the and monitoring process. http://www.anla.gov.co
Colombia PMA: Environmental Management Plan Environmental Licenses
CARs: Regional Autonomous Corporations
AAUs required according to law and regulations. operations) suffer degradation, including significant
changes to landscapes.
can adapt TORs or create new ones if total or partial, that can be attributed
needed. MINAMBIENTE defines general to a project, civil work, or activity.
alternatives must be included in
the EIA.
other entities.
ANLA, CARs, or AAUs can hold
Anyone can request to be notified of
the decision. Information is public
Certain authorities and members of the
public may request a public hearing. In
impacts. PMA also includes
supervision, monitoring, contingency,
environmental license and PMA.
Supervision is performed according to the
(including Sustainable Development methodology and structure for EIA. No a meeting with the proponent throughout the process. indigenous territories, prior consultation is and closure plans. EIA Supervision Manual.
Corporations) regulation on who can carry out study. to make a one-time request for required.
AAUs (in cities larger than 1 million) additional information.
CBPA: Manual of Good Environmental Practices MINAE: Ministry of Environment and SETENA Technical Instrument with a format defined Category A and B1 (without approved Two-stage screening: (i) legislation No scoping procedure by consultation. SETENA defines guidelines and TORs for Identification of positive and negative, The EsIA must include an analysis The public, sectoral agencies, and Access to all types of EIA instruments Citizens have right to present comments to EsIA must include an EMP that provides SETENA establishes procedures for Developers must (i) hire an environmental Environmental Law, No. 7554, 1995; Decree No.
DJCA: Affidavit on Environmental Energy by SETENA and signed by the developer. regulatory plan): EsIA lists the type of activities, projects, SETENA defines scope in TORs for the the preparation of EsIA and P-PGA. It direct and indirect, cumulative, and of different alternatives and local governments have right to in SETENA is open to any citizen. SETENA at any stage of the EIA process and a comprehensive plan to prevent, supervision and oversight, and it is professional to be legally responsible 31849, 2004; Decree No. 37803, 2013.
Commitments SETENA: National Environmental Instrument describes activities, works, and Category B2 (without approved and works that require EsIA; and (ii) EsIA. also defines team composition required synergistic impacts on physical, the rationale for selecting the provide comments about EsIA to SETENA must periodically disseminate during the operation stage. Citizens also mitigate, correct, compensate for, responsible for enforcing compliance with (Regente Ambiental) for project’s https://www.setena.go.cr
Costa Rica D1, D2: Preliminary Evaluation Forms
EAE: Strategic Environmental Assessment
Technical Secretariat projects, the environmental impact and
the required prevention, mitigation, and
regulatory plan): P-PGA
Category B2 (with approved regulatory
application of Form D1 or Form D2,
depending of project category.
to prepare studies, which must be
conducted by consultants who have
chemical, biological, social, and cultural alternative that was chosen
conditions and environments. EsIA as the one having the highest
SETENA during EsIA evaluation and
during operation of the project.
in print media the list of EsIAs under
evaluation. Proponents must send
have right to provide comments after the or restore environmental impacts
publication of notice in national newspaper that could occur. The EMP must
EIA license. Developer’s environmental
consultants must be registered with
environmental compliance with license;
(ii) report project performance in a
EsIA: Environmental Impact Study compensation measures. plan) and C: DJCA been registered by SETENA. must predict and evaluate potential environmental benefit. Local governments and institutions copies of EsIA to municipalities. inviting comments, and during public also include a budget, timelines, and SETENA and must provide progress sealed log (Bitácora) record signed by
P-PGA: Environmental Management Plan EEA: Evaluation of Cumulative Impact impact; and proposed prevention, related to the project must be hearings for Category A and some Category definitions of responsibilities for reports to this agency. SETENA can also SETENA; and (iii) send periodic progress
EPR: Evaluation of Regulatory Plans mitigation, or compensation measures. consulted. B projects. implementing these measures. make announced audits to the projects. reports to SETENA.
DIA: Environmental Impact Statement MIMARENA: Ministry of Environment and MIMARENA Instrument for environmental policy and Category A: ESIA (project requiring LA) Law defines the types of projects, No formal scoping procedure. Scope MIMARENA defines TORs or can ask Identification, prediction, and control Project alternatives must be The responsible sectoral agencies Proponents must inform the public Proponents publish project information PMAA, which includes the prevention, MIMARENA conducts inspections As part of PMAA, periodic reports based General Law of Environment and Natural
EP: Environmental Permit Natural Resources management that consists of procedures, Category B: DIA (project requiring EP) works, and activities that require EsIA determined by MIMARENA and proponents to propose these. ESIA of environmental impacts. “Impact” considered in the ESIA. and local governments must be through media of their intention to and organize at least one public visit to mitigation, and compensation and environmental audits to assure on self-monitoring are required. Resources, No. 64-00; Regulations of the System of
Dominican ESIA: Environmental Impact Study
LA: Environmental License
studies, and technical systems to estimate
the effects that works, activities, or projects
Category C: Environmental Certificate
(Constancia Ambiental)
– and determines the type of study
required for each category – according
includes impacts on natural resources,
environmental quality, health, and on
must be prepared by registered
consultants operating in an
is defined as any significant alteration,
positive or negative, of environmental
consulted prior to issuance of
environmental permits or licenses.
carry out the project and must provide
pertinent information about it.
the project site. MIMARENA publishes the
environmental study to receive comments.
measures identified in the EIS.
Includes self-monitoring program,
compliance with conditions attached to
permit or license. PMAA must include an
Environmental Authorizations (Resolution 02, 2011).
http://www.ambiente.gob.do
Republic PMAA: Environmental Management and
Adaptation Program
may have on the environment. Category D: Certificate and Registry of
Minimum Impact
to the potential environmental impact; other factors.
for projects not included in the list,
interdisciplinary team. categories and natural resources,
caused by human activity or natural
The ESIA must be available to the
public once it has been submitted.
MIMARENA can hold a public hearing prior
to issuing an authorization if considered
risk-management program, and
contingency plan.
oversight subprogram and self-monitoring
program.
SEA: Strategic Environmental Assessment MIMARENA determines if EsIA needed. events. necessary.

CR: Certificate of Registration MAE: Ministry of Environment (also MAE, Subsecretary of Instrument to prevent or minimize Category I: CR and GBPA Legislation defines the type of projects No scoping procedure. Proponents submit Proponents submit draft TORs to MAE, Identification and evaluation of impacts EIA must include analysis of MAE coordinates with AAAr. Release of draft EIA and PMA must be Public consultation is required only for PMA includes measures for mitigation, Monitoring mechanisms include (i) Proponents must send reports to the Environmental Law, 1999; Consolidated Text
DIA: Environmental Impact Statement National Environmental Authority of Environmental Quality environmental damage caused by public Category II: FA, PMA, and LA that require EIA. Proponents must draft TORs to MAE for EIA. For Category which revises, rejects, or approves. on people and biodiversity; economic alternatives. AAAr can request Provincial governments (that are published in several media with broad projects in Categories II, III, and IV. control, and compensation self-monitoring by proponent, (ii) appropriate AAAr, providing EMP results of Environmental Management (TULA), 2003,
GBPA: Manual of Good Practices Application, AAA) AAAr accredited by SUMA and/or private investments. Ensures Category III: DIA, PMA, and LA register the project in the online III projects, MAE has guidelines for TORs Study to be conducted by proponent, valuation of impacts, PMA, and modification of alternatives or accredited) have the authority to dissemination in the project area. Proponents, in coordination with AAAr for impacts; plans for waste environmental control by AAAR, (iii) and fulfilling all other commitments, amended by Ministerial Agreement No. 006, 2014;
Ecuador EIA: Environmental Impact Study
FA: Environmental Form (Ficha Ambiental)
AAAr: Responsible Environmental
Enforcement Authority
(Unified System of
Environmental Management)
access for public officials and the public
to relevant environmental information
Category IV: EIA, PMA, and LA Environmental System (SUIA) of
MAE, to request a certification of
on its Web site. and by professionals who have been
evaluated by the Authority.
mechanisms for citizen participation. inclusion of new ones. assess and approve EIA, PMA, FA,
and LA.
Draft EIA must be available at locations and registered facilitators, must execute
where public can consult EIA, or on mechanisms for citizen participation
management, communication, health
and safety, and monitoring.
environmental auditing and supervision
by the community, and (iv) audits
consistent with the schedule and level of
detail established in the LA.
Regulations of Mechanisms for Citizen Participation,
Decree No. 1040, 2008 and Agreement No. 066,
LA: Environmental License AAAc: Cooperating Environmental National Council for Sustainable about a proposed project or activity prior the project’s location (Certificado de Web site. Information provided to the (meetings, workshops, hearings, performed by consultants. In addition, 2013.
PMA: Environmental Management Plan Enforcement Authority Development (when MAE is the to a decision on the implementation or Intersección) in relation to conservation community must be in native language, information centers, and Internet) the General Accounting Office can audit http://www.ambiente.gob.ec/
project proponent) execution of the activity or project. areas and forest protected areas. when applicable. according to legislation. projects directly or through contractors. http://suia.ambiente.gob.ec/
AA: Environmental Audit MARN: Ministry of Environment and MARN Ensures that activities, works, and projects EsIA Legislation defines the type of projects MARN defines the scope of the EsIA in the MARN establishes TORs and guidelines Must consider positive and negative EsIA and EAE must include a MARN, central and regional units, Before an EsIA is approved, developers If the quality of life, human health, and well- PMA must be incorporated into the Law and regulations establish a process of Supervision of projects, activities, and Environmental Law, Decree No. 233, 1998;
EsIA: Environmental Impact Study Natural Resources follow procedures to identify and quantify EAE: Strategic Environmental that require EsIA. TORs. Scope includes potential impacts for the EsIA. EIA has to be conducted by impacts on physical, chemical, description of alternatives to the and municipal environmental units. must publicly disclose it, in a format being could be affected by a project, work, construction, operation, and closure AA to ensure developer’s compliance with works is done through the monitoring Regulations of the Environmental law, Decree No.
FA: Environmental Form impacts and mitigation measures. Assessment Group A: does not require the and risks during construction, operation, a multidisciplinary team of consultants biological, socioeconomic, and cultural policy, plan, program, or project. designated by MARN, through or activity, a public hearing must be held in of the activity. PMA must include the conditions set in the environmental plan. MARN or certified consultant can 17, 2000 and its amendments Decree No. 17, 2007
El Salvador PMA: Environmental Management Program ERMA: Environmental and Risk
Management Plan
presentation of any information to
MARN
and closure on the environment’s
and population’s physical, biological,
registered and certified with MARN. conditions at the site and in the site’s
area of influence. EsIA must include a
publication in print media having
national circulation.
the affected municipality. Civil society has
a specific time period to submit comments
measures to prevent, mitigate, and permit for the project. The AA process
compensate for impacts; a budget and can be carried out on the project, work,
also perform periodic AA. and Decree No. 39, 2009.
http://www.marn.gob.sv/
Group B-1: FA socioeconomic, and cultural resources. PMA. to MARN. plans for restoration and monitoring; or activity by MARN, or by certified and
Group B-2: EsIA (ERMA might be and an ERMA if required by MARN. registered auditors.
requested)
EIA: Environmental Impact Assessment Ministry of Economic Development, Trade, Physical Planning Development Instrument that may be required with any Only EIA PPDA lists different types of activities No formal scoping in the law. The Minister PPDA indicates that the Minister will The EIA report is assessed before Analysis of alternatives is not PPDCA include representatives from No provisions in the law. Public consultation is not a requirement, but EMPs are not mentioned in the PPDA, There are no provisions in the law, but A report is required for certain projects of Physical Planning and Development Control Act,
PPDA: Physical Planning and Development Planning and Cooperatives Control Authority (PPDCA) application to develop land in Grenada; that require an EIA, including hotels responsible for planning may make make regulations regarding procedures any permission is granted for land required. public sectors such as Ministry of the Act states that the Minister responsible but measures to prevent and reduce monitoring guidelines are elaborated a nature defined under the Act. No. 25, 2002; amended by Act No. 24, 2008; Waste
Control Act Ministry of Communications, Works, Physical Planning Unit (PPU) of to ensure sustainable land use, maintain of a certain size, marinas, desalination regulations that specify details related to to decide the scope and minimum development. Public Works, Health, Agriculture, for planning may make regulations impacts of activities on natural in the Guide: Le guide des directives Management Act No. 16, 2001.
Grenada Physical Development, Public Utilities, ICT the MCWPD
& Community Development (MCWPD)
and improve the quality of the physical
environment, protect health, and conserve
plants, hydroelectric projects, and
coastal development.
the content, criteria, and procedures for
public participation and review.
contents of the EIA, and regarding the
qualifications, skills, and experience that
Housing, and others.
PPU coordinates with Land
providing for public participation in the EIA
process.
resources and cultural heritage areas
must be implemented by developers.
d’évaluation d’impact sur l’environnement. http://www.gov.gd
Land Development Authority the natural and cultural heritage of an individual must possess to conduct Development Authority and other
Grenada. the EIA. agencies.

EAI: Initial Environmental Evaluation MARN: Ministry of Environment and DIGARN Predictive Environmental Instrument that Category A: EIA Legislation lists the types of projects No formal scoping procedure. Scope DIGARN defines and determines, with Identification, prediction, and evaluation No provision made. Regulations request that DIGARN MARN will specify in the TORs the Proponents must consult the public during PGA includes measures by proponents Mandatory supervision by DIGARN and Regulation establishes mechanism Law for the Protection of the Environment, Decree
EIA: Environmental Impact Assessment Study Natural Resources (including regional MARN delegations / regional identifies and predicts the effects on the Category B: EIA (B1) or EAI with PGA (B2) that require EIA. Proponents present includes evaluation of potential impacts ministerial agreement, TORs and of environmental impacts of a project, coordinate actions with, and mechanism for disclosing information environmental assessment. The public to mitigate projects’ environmental Voluntary Audits done by proponent. (audits) for environmental control and No. 68-86, amended in 1993; Regulations for
FAMI: Form for Activities of Minimum Initial offices) offices environment that a project, work, industry, Category C: EAI (C1), FAMI (C2), evaluation instrument according to on the physical, biological, social, specific technical procedures for each work, industry, or activity. consult with, other public entities about the project. Public is informed can summit comments and opinions impacts. supervision of the project during its Evaluation, Control, and Environmental Supervision,
Guatemala Impact
FAR: Form for Activities to Register
DIGARN: General Directorate of
Environmental and Natural Resources
or activity considered of high environmental
impact according to regulations.
FAR (C3)
DIGARN can request: EEA (Evaluation
category and MARN reviews category,
environmental report, and resolves.
economic, and cultural environments. category. Multidisciplinary teams of
registered consultants must develop
and municipalities. Regulations set
period during which public entities
about project in print media and,
depending on project location, in
during project evaluation. MARN defines
consultation requirements in the TORs.
A PGA may be required as a
complement to the EAI.
implementation. Governmental Agreement No. 60, 2015.
http://www.marn.gob.gt
PGA: Environmental Management Plan (EMP) Management of Cumulative Impacts), SEA (Strategic environmental studies. can submit comments. Mayan language.
Environmental Assessment), or an ERA
(Environmental Risk Assessment)
AF: Application Form for Environmental EPA: Environmental Protection Agency EPA Study to be carried out at the planning stage EIA: for projects, construction works, or Legislation defines types of projects that Scoping required. After EPA reviews the AF Consultant hired by proponent to carry Identify, describe, and evaluate the It is required. In the EIA, the EAB, EPA, and sectoral agencies. Proponents must announce project in Citizens are entitled to participate in the EIA must describe measures to EPA and sectoral agencies supervise and No provision for reports. Environment Protection Act, 1996; Environmental
Authorization EAB: Environmental Assessment Board EAB to ensure that any developmental activity any other installations require an EIA or ESIA (as determined and confirms to developer that an EIA is out the EIA and EPA sets the terms and proposed project’s direct and indirect proponent describes the main EAB revises EIA and recommends a a daily newspaper and make available EIA process during scoping, preparation, reduce adverse impacts; and plans monitor projects. Protection (Authorisations) Regulations 2000;
EIA: Environmental Impact Assessment Sectoral agencies Sectoral agencies that may cause an adverse effect on the by the sectoral agency). EAB and EPA required, proponents announce project scope of the environmental impact effects on the environment, including alternatives studied and states decision to EPA. a summary of the project. EAB and and review of the EIS. Citizens can send for emergencies, rehabilitation, and Environmental Impact Assessment Guidelines, 2000;
EIS: Environmental Impact Statement natural environment will be assessed before set criteria for determining if a project intention in a national newspaper and assessment, taking into account any effects on human beings, flora and the reasons for the alternative EIS final recommendations are made comments to EPA or to sectoral agencies restoration of the environment. Environmental Guidelines for Preparation of an
Guyana EMP: Environmental Management Plan
EP: Environmental Permit
such activity is commenced, and to ensure
these effects will be taken into account
requires EIA. make a summary available to the public.
The EAB is responsible to ensure public
submissions made by the EPA and the fauna, air and soil, cultural heritage,
public during the scoping. Independent, and the landscape.
selected, taking environmental
factors into account.
public. EPA places some EIAs on its
Web site.
to appeal an EAB decision. EAB decides if a
public hearing is required.
Proponents must consult EPA
guidelines for preparation of EMP
Environmental Management Plan, 2013.
http://www.epaguyana.org
in deciding whether the developmental hearings and to review with EPA the scope qualified individual approved by EPA (2013).
activity should be authorized. of the TORs for the EIA. must conduct the EIA.
EIA: Environmental Impact Study MDE: Le Ministère de l’Environnement MDE Instrument for analyzing impacts and risks, EIA No screening procedure defined in No formal scoping in legislation; further There is no specific provision in the Not defined in legislation. The Analysis of alternatives is not There are no requirements for cross- MDE must periodically publish the list Public consultation is required by the EIA requires an assessment of impacts The Ministry of the Environment The Ministry of the Environment issued Decree of Environmental Management, 2006 (Décret
EIS: Environmental Impact Statement (The Ministry of the Environment) BNEE and for recommending mitigation measures. EIS legislation. Legislation requires EIA details on scope provided in the EIA legislation about the scope of the EIA or Ministry of Environment issued the required. sectoral coordination. of non-environmental objections that Decree for Environmental Management and a description of potential will perform, in a timely manner, the EIA guidelines (2011) that describe portant sur la Gestion de l’Environnement et de
COTIME: Commissions Techniques BNEE: Bureau National des Evaluations COTIME and reporting for projects that have Guideline (Générale de Réalisation who is entitled to conduct the study. EIA Guideline (2011) that describes have been granted and denied, and of (2006). mitigation measures. environmental audits to ensure the reporting requirements for the Régulation de la Conduite des Citoyens et Citoyennes
Interministérielles de Haut Niveau sur Environnementales (National Office for potentially negative impact, and d’une Etude d’ Impact Environnemental, the scope for an EIA, classification the private and legal persons that have proponents adhere to the environmental environmental assessment. pour un Développement Durable).
Haiti l’Environnement (Intersectoral Technical
Commissions)
Environmental Assessment) defines procedures for environmental
management.
Ministère de l’Environnement, Direction
des Ressources en Eau, Service d’Etude
of projects, and administrative
requirements for doing an EIA, and lists
been sanctioned administratively or
judicially.
permit. http://www.mde-h.gouv.ht
Impact Environnemental, 2011). potential negative impacts and possible
mitigation measures.
AAs: Environmental Audits SERNA: Ministry of Natural Resources and SERNA Process aims to identify, predict, and EsIA Law and regulations list the types of Regulations establish scoping procedure. For Category 4 (high impact) projects, Description of project’s components and The EsIA must include an analysis SERNA can consult (i) other After initiating the SINEIA process, Once project has been registered in PGA must include mitigation and DECA is in charge of monitoring and Proponent must hire an environmental Environmental Law, 1993; Regulations of the National
CBPAH: Manual of Good Environmental Environment DECA describe positive and negative impacts of EAE: Strategic Environmental projects and activities that require an Proponent publishes information about TORs are prepared by a DECA project site; alternatives considered; of alternatives for site selection institutions relevant to the project, public is informed of project through SERNA, public must be informed by print preventive measures; contingency and oversight of the project’s environmental professional who is responsible for the System of Environmental Assessment (SINEIA),
Practices DECA: Office of Environmental Evaluation UMA projects, works, activities, and programs Assessment EsIA; the project in print media and the multidisciplinary team. EsIA must be results of consultations; evaluation and project design. (ii) SERNA-Technical Committee, print media, and EsIA is made available media, and public has 15 days to submit monitoring plans; and other plans, performance through visits and AAs. The project and must present environmental Agreement 189-2009; Agreement 1178-2012.
EsIA: Environmental Impact Study and Control proposed by the private or public sector; EIAC: Environmental Cumulative Category 1: SINEIA F-01 form and public, and NGOs have 15 days to submit prepared by qualified and registered of potential impacts on the physical and (iii) the UMA from the in the municipality where the project comments. For Category 4 projects, as needed. PGA can be requested local municipality’s UMA is responsible for reports to DECA. SERNA will perform http://www.serna.gob.hn
Honduras PGA: Environmental Management Plan
SINEIA: National Environmental Impact
UMA: Municipal Environmental Unit and aims to propose measures to mitigate
impacts and plans for oversight and
Assessment
EAE: Strategic Environmental
CBPAH
Category 2 or 3: SINEIA F-02 form and
comments to SERNA. DECA decides which
comments need to be included in the
consultants. and social environment; and plans
for mitigation, contingency, and risk
applicable municipality. is sited. According to regulations, all
information from the EIA process is
stakeholders are consulted by means of a
public hearing; proponents provide notice
for projects, activities, and works in
Category 2, 3, or 4.
supporting overall supervision. supervision visits and audits as needed.
Assessment System monitoring. Assessment PGA TORs. management. public. of hearing by radio and print media.
Category 4: EsIA
EIA: Environmental Impact Assessment Ministry of Water, Land, Environment and NEPA The critical appraisal of the likely effects of Only EIA Proponent submits PAF and PIF to Scoping required. NEPA provides generic Proponents submit draft TORs to NEPA, Must include potential environmental EIA must include analysis of NEPA coordinates review of EIA Proponents must publish two public Regulations request citizen participation, NEPA guidelines request the NEPA guidelines indicate parameters such Regulations require to save all Natural Resources Conservation Authority Act, 1991;
PAF: Permit Application Form Climate Change NRCA a policy, plan, program, project, or activity, NEPA, which will screen application TORs. Proponent publishes the first public which reviews TORs and decides if impacts of the proposed activity and alternatives and justification of with other public agencies, and notices in national newspapers: during scoping for the EIA and review of the preparation of a mitigation action as water and air quality, noise, wildlife, documents of the operation, including Natural Resources Conservation (Permits and
PIF: Project Information Form NEPA: National Environment and Planning on the environment. To assist the decision- and determine if an EIA is needed. notice to the public and takes into account acceptable. Study to be conducted by alternatives, including the following: selected option. coordinates public consultations. (i) the first to inform the public of the draft EIA presented to NEPA. Public review plan to reduce impact of project and health and safety, among others. environmental monitoring reports. Licences) Regulations, 1996, amended 2004;
Agency making authority, assessments are carried Regulations also list type of project that comments in the preparation of the TORs. proponent and consultants. direct, indirect, cumulative, and project proposal and (ii) the second can be held if requested by NEPA. development. The regulations do not present details. Natural Resources (Prescribed Areas; Prohibition
Jamaica NRCA: Natural Resources Conservation
Authority
out independently of the proponent. must prepare an EIA. short and long-term effects; and
identification of measures available
when submitting the draft EIA to NEPA.
Proponent must make available the EIA
of Categories of Enterprise, Construction and
Development) Order, 1996; NEPA Guidelines for
to mitigate adverse environmental in public places such as libraries. conducting EIA, 1997, revised 2005.
impacts of the proposed activity. http://www.nepa.gov.jm
IP: Preventive Report SEMARNAT: Ministry of Environment and SEMARNAT Procedure to protect environment, and Category 1: requires regional MIA Law and regulations list the types of No formal scoping procedure. Scope SEMARNAT provides guidelines for the Environmental forecasts, and Local and regional MIA must SEMARNAT is entitled to request SEMARNAT publishes weekly list of IP MIA is available to public. SEMARNAT can Specific MIA must include measures to SEMARNAT must inspect and monitor SEMARNAT can require responsible General Law of Ecological Equilibrium and
MIA: Environmental Impact Assessment Natural Resources avoid or reduce negative impacts by setting Category 2: requires specific MIA works and activities that require MIA. includes consideration of ecosystems, presentation of IP and MIA. IP and MIA identification, description, and include environmental technical opinions from other and MIA. Files of MIA are available to conduct public consultations if requested prevent and mitigate impacts. compliance with regulations and parties to present information on Environmental Protection, 1998, amended by DOF
(Manifestación de Impacto Ambiental) conditions for infrastructure projects or Category 3: only requires IP States and Federal District (DF) can their preservation and restoration, and can be prepared by any individual. evaluation of the following impacts: projections and evaluation of federal agencies. In some cases, public. by member of affected community. In Regional MIA must include strategies environmental authorizations. compliance with environmental 09-01-2015; Regulations of the General Law of
activities that could disrupt ecological When activity is considered of high risk demand MIA under certain conditions. protection of the environment. environmental, cumulative, synergistic, alternatives. state and municipal governments special cases, public meetings are held for to prevent and mitigate impacts provisions. Ecological Equilibrium, 2000, amended by DOF 31-
Mexico balance, or violate established limits and
conditions.
by law, a risk environmental study must
be included in the MIA
significant or relevant, and residual. must be notified and have
opportunity to comment.
information and feedback. (cumulative and residual) on regional
environment.
10-2014
http://www.semarnat.gob.mx

DIA: Environmental Impact Document MARENA: Ministry of Environment and MARENA Administrative instrument consisting of Category I or II: EIA Law lists types of projects that require No formal scoping procedure. Scope Specific TORs developed by MARENA and Identification, prediction, and oversight The EIA must include an analysis MARENA must consult on the EIA MARENA publishes, in two national MARENA publishes a notice in newspapers Final Resolution issued by MARENA The environmental permit defines No provisions in law or regulations. General Law of Environment and Natural Resources,
EA: Environmental Assessment Natural Resources SERENA procedures, studies, and technical systems Category III: EV an EIA, EV, or DIA includes activities that can damage the proponent in coordination with sectoral of environmental impacts of projects of alternatives to the project. with UGAS (Sectoral Environmental newspapers, the DIA’s availability for to inform public about the project, DIA, establishes mitigation measures, monitoring requirements. Auditors paid No. 217, 1996, and amended by Law No. 647,
EIA: Environmental Impact Study DGCA: General Office of Environmental Regional Councils for predicting the impacts of a specific FA: for low-impact projects environment or natural resources, or authority. The EIA must be developed and of their alternatives. Management Units), municipal public examination, and the place and date and location of hearing, and time monitoring requirements, and by developer but registered in MARENA 2008; Regulations for Permits and Environmental
EV: Environmental Evaluation Quality Municipalities work, activity, or project for which an EAE: Strategy Environmental that can have negative socioeconomic, by individuals or corporations certified governments, and Regional schedule for consultation. frame for submitting opinions. implementation of the PGA. will perform environmental audits and Impact Evaluation, Decree No. 45, 1994; System of
Nicaragua FA: Environmental Form
PGA: Environmental Management Program
SERENA: Regional Secretaries of Natural
Resources and Environment
environmental permit is being sought. Assessment; for plans and programs
(including municipal plans)
cultural, biotic, abiotic, or aesthetic
impacts.
and registered by the DGCA. Councils in the Autonomous
Regions.
report on compliance with environmental
permits.
Environmental Assessment, Decree No. 76, 2006.
http://www.marena.gob.ni
http://www.sinia.net.ni/multisites/renea

DJ: Sworn Statement MINAM: Ministry of Environment MINAM Early warning system based on continuous EsIA-Category I: requires only a DJ Law and regulations list the types of No scoping procedure in legislation. Regulations set minimum contents of Identification, analysis, evaluation, and No provision made in law or Regulations obligate MINAM to MINAM, through AR, discloses and Proponents must involve the public during PMA must include identification, MINAM certifies environmental auditors Proponents must submit reports to General Law of Environment, No. 14, 1998 and
EsIA: Environmental Impact Study AR: Regional Administration AR analysis that enables preventive decision EsIA-Category II: requires mitigation and activities, works, and projects that During EsIA preparation, proponents EsIA; MINAM and UAS issue scope, ranking of all negative and positive regulations. request opinions from public makes EsIA presentation available EsIA preparation. The environmental analysis, evaluation, and ranking of to evaluate and support monitoring and MINAM on results of compliance with amended by Law No. 8, 2015; Decree No. 123, 2009.
PMA: Environmental Management Plan UAS: Sectoral Environmental Unit UAS (after being trained and making to protect environment; required prevention measures require an EsIA, depending on the risks must develop and implement a plan for guidelines, and TORs. Study conducted impacts and induced risks. sectoral agencies related to to the public. Proponents publish authority must undertake a formal public all negative and positive impacts and oversight program. PMA and environmental monitoring. http://www.anam.gob.pa
RA: Environmental Resolution qualified by MINAM) prior to beginning specified activities, EsIA-Category III: requires a PMA associated with the project and its final citizen participation (meetings, surveys) by multidisciplinary team of qualified environmental components or summary of EsIA and facilitate public hearing during evaluation of Category III induced risks. MINAM, AR, and UAS
Panama SIA: Social Impact Assessment works, or projects. SEA: Strategic Environmental
Assessment (to be regulated)
category. MINAM can modify this list. and respond to inquiries about project
components from those who would be
professionals who are registered and
certified by MINAM.
impacts of the project. access to EsIA and other documents. projects. A hearing might be required for
Category II projects.
monitor, control, and supervise the
implementation of PMA.
affected.

DIA: Environmental Impact Statement DGCCARN: General Directorate for SEAM Environmental Law refers to EIA as a DIA; EDE; EIA Regulations determine the types of Scoping defined by regulation. Proponent SEAM sets specific TORs for completion Analysis of potential positive and EIA must describe alternative SEAM can consult institutions and Information is disclosed on SEAM’s Web SEAM sets rules for community participation EMP includes measures for prevention SEAM conducts monitoring by means Regulation requires submission of audit Environmental Law 294, 1993; Decree No. 13.418,
EDE: Effluents, Solid Waste, and Air Pollution Environmental Quality Control and DGCCARN scientific study aiming to identify, prevent, EIAP; EMP (generic) works and activities that require EIA or submits EIAP or EDE to SEAM, which of the EIAP, if needed. Studies must negative, direct, indirect, permanent, designs and locations for agencies likely to be affected by site and in mass media (newspaper) in and consultation of project. SEAM can and mitigation of impacts, and of audits (fiscalizaciones). Generic and reports every five years. The audit 2001; Decree No. 453, 2013.
Disposal Study Natural Resources and estimate the environmental impacts RIMA (Environmental Impact Report) EDE. Depending on the activity, SEAM determines if local people are to be be conducted by environmental temporary, reversible, irreversible, the project, and analyze projects. some cases. hold hearings to get community feedback, methods for monitoring and control. specific EMPs include technical measures reports on compliance with the project’s http://www.seam.gov.py
EIA: Environmental Impact Assessment SEAM: Secretary of Environment that activities, works, and projects might might require an EIA, EIAP, or EDE; if consulted. Scope includes impacts on consultants listed in the Technical continuous, discontinuous, regular, consequences of not depending on the project’s type. EDE and EDE includes measures to prevent to ensure monitoring and control. EMP.
Paraguay EIAP: Preliminary Environmental Impact Study cause. Changes made by Decree No. 453,
2013.
an EIAP or EDE is not required, then
the activity will need to comply with a
biodiversity, health, security, cultural
heritage, and community livelihoods.
Registry (Catastro Técnico). irregular, cumulative, and synergistic
impacts.
implementing the project. EIAP reports are disclosed on SEAM’s Web
site or in mass media.
and monitor pollution. Project
must have a person responsible for
generic EMP. implementing the EMP.

AC: Responsible authority in each sector MINAM: Ministry of Environment SENACE: EIA-d Participatory, technical, and administrative Category I: DIA Environmental regulations list types of Scoping define in legislation. Proponent Developers propose TORs with EP and Identification of possible direct and EIA-d must include an analysis of Responsible authorities can establish EIA available to public and must include Proponents must consult public during EIA-d or EIA-sd includes plans for EIA-sd and EIA-d include a Monitoring and Proponents issue reports on General Environmental Law, No. 28611, 2005; Law
DIA: Environmental Impact Statement SEIA: National System of Environmental Sectoral agencies: EIA-sd process aiming to prevent, minimize, and Category II: EIA-sd investment projects that are subject to proposes scope, and AC makes public authority approves. Studies prepared indirect impacts on physical and social alternatives and the selection review mechanisms with sectoral, brief summary. EIA-d and EIA-sd preparation of EIA. Responsible authority environmental management, Supervision Plan. OEFA or Responsible environmental monitoring to the AC. of the National System for Environmental Impact
EIA-d: Full Environmental Impact Assessment Impact Evaluation OEFA: Agency for Assessment mitigate potential environmental impacts Category III: EIA-d EIA, criteria for classifying projects into EP and requests comments from by authorized organizations with environment, community livelihoods, of the most efficient one from regional, or local authorities. are available in regional office of the conducts formal consultation for EIA-d mitigation, emergencies, authority does follow-up, evaluation, OEFA monitor compliance with permits Evaluation, No. 27446, 2001, amended by Decree
EIA-sd: Partial Environmental Impact SENACE: National Service of and Environmental Control, that can be generated by policies, plans, SEA: Strategic Environmental categories, and guidelines for EIA-sd stakeholders. Regulations also define the multidisciplinary team. and historic architectural heritage, environmental, social, and Participation must be sought from sectoral agency and on the Web site. or EIA-sd. Public hearings are mandatory compensation, monitoring, public and oversight, either directly or through and regulations. No. 1078, 2008.
Peru Assessment
EP: Preliminary Evaluation
Environmental Certification for
Sustainable Investments
supervises project compliance programs, and investment projects; and to
enhance the positive effects.
Assessment and EIA-d TORs. scope’s mandatory themes for the EIA. among others. economic perspectives. officials responsible for relevant
fields.
for EIA-d and optional for EIA-sd, and the
public can comment.
participation, and supervision. qualified and registered firms and
institutions.
Regulation of SEIA, Decree No. 019, 2009; Resolution
No. 157-2011-MINAM; Law No. 29968, 2012;
Sectoral and subnational agencies Resolution No. 016-2015 OEFA/CD
http://www.minam.gob.pe
AAP: Prior Environmental Authorization MVOTMA: Ministry of Housing, Regional DINAMA Technical and participatory process for Requirements: Regulations list the types of activities No scoping process. Scope includes Regulations define minimum content of Anticipate, identify, evaluate, and Alternatives must be considered MVOTMA requires guidance from Project IAR is made available to the Interested parties can express opinions Environmental management, risk EsIA must include a monitoring plan for No provisions. Environmental Protection Law No. 17.283, 2000;
COM: Communication (summary of project) Planning, and Environment the identification and assessment of the Category A: COM and AAP is granted by and works that require AAP and EsIA. impacts on public health, security, or EsIA. Suitable professional registered in quantify potential negative, positive, only when the EIA is required national or departmental agencies public, at MVOTMA, for a set period during evaluation; public hearings held in mitigation, and accident prevention follow-up, supervision, and auditing Regulations of Environmental Impact Assessment
EIA: Environmental Impact Assessment DINAMA: National Environment environmental consequences of a project a Ministerial order The executive branch, per agreement quality of life; aesthetic, cultural, or DINAMA must be responsible for study. direct, indirect, individual, and to include an evaluation of the involved with works or projects. prior to approval by environmental special cases. A summary of the EIA (IAR) is plans required. EsIA includes compliance with action commitments and Environmental Authorizations, Decree No.
EsIA: Environmental Impact Study Directorate not yet implemented, in order to eliminate, Category B: COM, sectoral EsIA, and an between the President and the sanitary conditions; and composition, cumulative impacts and risks. project site’s environmental Regulations set the timelines for authority. Notice about project is made public for consultation. mitigation, compensation, or associated to project phases (construction, 349/005, 2005.
Uruguay IAR: Environmental Report Summary mitigate, or compensate for negative
environmental impacts.
AAP
Category C: COM, full EsIA, and AAP
Minister of MVOTMA, can include
additional types of activities, projects,
quality, and diversity of natural resources. feasibility; this is mandatory
when submitting a VAL
submitting opinions. published in Diario Oficial and other
newspapers. Public hearing might be
restoration measures; site or project
closure programs; and monitoring
operation, and abandonment) and
relevant environmental factors.
http://www.mvotma.gub.uy
or works that require AAP. (Viabilidad ambiental de la held for Category C projects. plan.
localización).
DI: Document of Intent MINAEVH: Ministry of People’s Power MINEHV Process for incorporating environmental EsIA Proponents present a DI to MINEHV, No scoping process. Legislation defines Developer proposes TORs and MINEHV Identification of potential impacts on EsIA must describe alternative No provisions in the regulations. Approved EsIA will remain available to MINEHV can order public consultations EsIA includes an Environmental Environmental Monitoring Plan must MINEHV analyzes the reports presented Environmental Law, 2006; Norms on Environmental
EAE: Specific Environmental Study for Ecosocialism, Habitat and Housing concerns in policies, plans, programs, EAE which revises and defines instrument. scope, which includes analysis of impacts approves. Study prepared by various environmental components. designs, locations, and the public at MINEHV. during the review and evaluation of the Supervision Program. be presented to MINEHV. Proponent by developer or environmental Evaluation for Activities that Can Degrade the
EsIA: Environmental Impact Study. Also (Ministerio del Poder Popular para and projects; for predicting and assessing Regulations also define activities on physical, natural, and socioeconomic interdisciplinary team of registered technologies, and justify selected study. or environmental consultant reports consultant, and makes recommendations Environment, Decree No. 1.257, 1996; Decree No.
referred in the country as the Environmental Ecosocialismo, Hábitat y Vivienda) impacts; and for verifying compliance with requiring EsIA. MINEHV may require an environments. consultants. alternatives. monitoring results to MINEHV, which or establishes additional conditions. 1.127, 2014; Decree No. 1.293, 2014.
Venezuela and Sociocultural Impact Study (EIAySC) legislation. EsIA, based on review of DI and type of also carries out inspections to verify MINEHV can carry out inspections http://www.minamb.gob.ve
PMA: Environmental Management Plan project. compliance with authorizations. and audits to verify implementation
of the measures contained in the
authorizations.

Authors: Ruth Tiffer-Sotomayor, Ernesto Sánchez-Triana, Marcelo Acerbi, Ana Luisa Gomes Lima, Rosario Navarro, Santiago Enriquez, Katharina Siegmann, and Pilar Clemente Fernández. 2015. The findings, interpretations, and conclusions in this matrix are those of the authors and should not be attributed to the World Bank, its affiliated organizations, members of its Board of Executive Directors, or the countries they represent.
Acknowledgments: Emilia Battaglini, Glenn Morgan, Abdelaziz Lagnaoui, Raúl Tolmos, Keiko Ashida, Gunars Platais, Gabriela Encalada, Rafael Corral, Margarita Caso, Sebastián Valdés, Marcelo Morandi, Roque Bogado, and Gabriela Vinales.
Editor: Stan Wanat. Design: LCRDE, Knowledge and Learning - Miguel Barreto. Photo by: Trey Ratcliff, CC.
http://www.worldbank.org/en/topic/environment

Anda mungkin juga menyukai