BAB III LAPORAN 2 PASTI 2 - Rev PDF
BAB III LAPORAN 2 PASTI 2 - Rev PDF
No Month Demand
1 Jan 1,623
2 Feb 1,948
3 Mar 2,338
4 Apr 1,970
5 May 2,085
6 June 2,131
7 July 2,062
8 Aug 2,092
9 Sept 2,095
10 Oct 2,083
11 Nov 2,090
12 Dec 2,089
Table 3.1 Demand Produk
3.1.2 Komponen Kebutuhan Bahan Baku
No Material Harga Per Satuan Biaya Pesan Biaya Simpan Jumlah yang Sumber
diperlukan
1 Lazy Neck Phone Holder Rp 7,603.00 Rp 500,000.00 Rp 380.15 7,158 Buat
2 Bantal Rp 3,250.00 Rp 500,000.00 Rp 162.50 10,948 Buat
3 Benang Rp 5,000.00 Rp 500,000.00 Rp 250.00 8,826 Beli
4 Pengait / Perekat Rp 200.00 Rp 500,000.00 Rp 10.00 44,132 Beli
5 Busa Rp 300.00 Rp 500,000.00 Rp 15.00 36,033 Beli
6 Cover Rp 1,000.00 Rp 500,000.00 Rp 50.00 19,736 Beli
7 Holder Rp 500.00 Rp 500,000.00 Rp 25.00 27,911 Beli
8 Holder Base Rp 700.00 Rp 500,000.00 Rp 35.00 23,589 Beli
9 Hunger / Besi Elastis Rp 650.00 Rp 500,000.00 Rp 32.50 24,480 Beli
Table 3.3 Komponen biaya MRP
Keterangan :
- Biaya Simpan : 5% dari Harga
- Biaya Pesan : Biaya 1 kali pemesanan (fasilitas kerja, admin)
3.1.4 Bill of Material (BOM)
Ringkasan
Waktu
Kegiatan Jumlah
(Menit)
Operasi 6 10.5
Pemeriksaan 3 6
Penyimpanan 1 -
Total 16.5
Gambar 3.2 Operational Process Chart (OPC) Lazy Neck Phone Holder
Data-data asumsi waktu & biaya yang diperlukan seperti ditunjukkan pada
table 3.4 berikut:
No Month Demand
1 Jan 655
2 Feb 655
3 Mar 655
4 Apr 655
5 May 655
6 June 655
7 July 655
8 Aug 655
9 Sept 655
10 Oct 655
11 Nov 655
12 Dec 655
Table 3.6 Jadwal Induk Produksi
RCCP berisikan perbandingan antara kapasitas yang tersedia dan kapasitas yang
dibutuhkan pada setiap work centre, dengan asumsi :
Hari kerja/bulan = 20 hari
Jam kerja/hari = 9 Jam
Jumlah Mesin Jahit = 2 mesin
Berikut adalah perhitungan untuk mengetahui besar kapasitas yang tersedia (Capacity
Available) pada proses pembuatan Lazy Neck Phone Holder :
Capacity Available = 20 hari x 9 jam = 180 jam
Capacity Available (Mesin jahit) = 20 hari x 9 jam x 2 unit= 360 jam
Berikut adalah perhitungan untuk mengetahui besar kapasitas yang dibutuhkan
(Capacity Require) pada proses pembuatan tiap Part Produk serta kapasitas yang
dibutuhkan oleh mesin jahit seperti ditunjukkan pada table 3.7 sampai dengan table 3.12,
dimana keterangan “Tidak Mencukupi” menyatakan kapasitas yang ada masih kurang
dari yang dibutuhkan :
Level 0
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
LAZY NECK PHONE HOLDER
On Hand 0 B. Simpan Rp380.15
Level 1
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
BANTAL
On Hand 0 B. Simpan Rp162.50
Level 1
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
HOLDER BASE
On Hand 0 B. Simpan Rp35.00
Level 2
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
BENANG
On Hand 0 B. Simpan Rp250.00
Level 2
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
BUSA
On Hand 0 B. Simpan Rp15.00
Material Requirement Planning (MRP) dengan metode Economic Order Quantity (EOQ)
Level 0
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
LAZY NECK PHONE HOLDER
On Hand 0 B. Simpan Rp380.15
Rp1,000,000
TOTAL
.00
Level 1
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
BANTAL
On Hand 0 B. Simpan Rp162.50
Rp1,000,000
TOTAL
.00
Level 1
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
HOLDER
On Hand 0 B. Simpan Rp25.00
Rp500,000.0
TOTAL
0
Level 1
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
HOLDER BASE
On Hand 0 B. Simpan Rp35.00
Rp500,000.0
TOTAL
0
Level 1
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
HUNGER / BESI ELASTIS
On Hand 0 B. Simpan Rp32.50
Rp500,000.0
TOTAL
0
Level 2
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
BENANG
On Hand 0 B. Simpan Rp250.00
Rp1,000,000
TOTAL
.00
Level 2
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
PENGAIT / PEREKAT
On Hand 0 B. Simpan Rp10.00
Rp500,000.0
TOTAL
0
Level 2
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
BUSA
On Hand 0 B. Simpan Rp15.00
Rp500,000.0
TOTAL
0
Level 2
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
COVER
On Hand 0 B. Simpan Rp50.00
Rp1,000,000
TOTAL
.00
Material Requirement Planning (MRP) dengan metode Period Order Quantity (POQ)
Level 0
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
LAZY NECK PHONE HOLDER
On Hand 0 B. Simpan Rp380.15
D = 655
EOI = Q/D = 11
Level 1
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
BANTAL
On Hand 0 B. Simpan Rp162.50
D = 7158
EOI = Q/D = 2
Level 1
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
HOLDER
On Hand 0 B. Simpan Rp25.00
D = 7158
EOI = Q/D = 4
Level 1
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
HOLDER BASE
On Hand 0 B. Simpan Rp35.00
D = 7158
EOI = Q/D = 3
Level 1
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
HUNGER / BESI ELASTIS
On Hand 0 B. Simpan Rp32.50
D = 7158
EOI = Q/D = 3
Level 2
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
BENANG
On Hand 0 B. Simpan Rp250.00
D = 1460
EOI = Q/D = 6
Level 2
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
PENGAIT / PEREKAT
On Hand 0 B. Simpan Rp10.00
D = 1825
EOI = Q/D = 24
Level 2
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
BUSA
On Hand 0 B. Simpan Rp15.00
D = 547
EOI = Q/D = 66
Level 2
Rp500,000.0
Lead Time 1 Bulan B. Pesan
0
COVER
On Hand 0 B. Simpan Rp50.00
D = 1825
EOI = Q/D = 11
Dari hasil perhitungan MRP di atas dengan menggunakan tiga metode
yang berbeda, maka dapat kita bandingkan total harga dari tiap-tiap metode
tersebut. Hasil perhitungan total biaya untuk masing-masing metode dapat dilihat
pada table berikut: