Anda di halaman 1dari 2

DAFTAR ISI

ABSTRAK………………………………………………………………………………………i
DAFTAR ISI……………………………………………………………………………………ii
DAFTAR TABEL………………………………………………………………………………iii
DAFTAR GAMBAR…………………………………………………………………………...iv
BAB 1 PENDAHULUAN
1.1 Latar Belakang Pendirian Pabrik………………………………………………..…..1
1.2 Prospek Pasar di Indonesia……………………………………………………….....1
1.3 Penentuan Lokasi Pabrik…………………………………………………………….2
1.4 Pemilihan Proses Pembuatan Kertas Kantong Teh……………….............................3
BAB 2 DESKRIPSI PROSES
2.1 Proses Pembentukan Kertas Kantong Teh……………………………………….….4
2.1.1 Tahap Pembuatan Larutan Suspensi Pulp………………..................................4
2.1.2 Tahap Pemotongan Serat pada Pulp…………………………………………...5
2.1.3 Tahap Preparasi Bahan Aditif………………………………………………....5
2.1.4 Tahap Pencampuran Pulp dengan Bahan Aditif……………………………....7
2.1.5 Tahap Pencucian dan Penyaringan Larutan Suspensi Pulp…………………...7
2.1.6 Tahap Finishing………………………………………………………………..8
2.1.7 Tahap Recycle…………………………………………………………………9
2.2 Tata Letak…………………………………………………………………………...9
BAB 3 SPESIFIKASI PERALATAN UTAMA
3.1 Water Tank…………………………………………………………………………10
3.2 Hydropulper Tank………………………………………………………………….10
3.3 Chest Tank………………………………………………………………………….11
3.4 Storage Tank Bahan Aditif………………………………………………………...12
3.5 Krofta……………………………………………………………………………....12
3.6 White Water Chest…………………………………………………………………13
3.7 Dry Broke Chest…………………………………………………………………...13
3.8 Stock Mixer………………………………………………………………………...14
BAB 4 SISTEM PENGENDALIAN ALAT UTAMA
4.1 Sistem Pengendalian Pada Stock Mixer (A-301)………………………………….16
BAB 5 SARANA PENUNJANG
5.1 Unit Penyediaan Air…………………………………………………………….......17
5.2 Penyediaan Tenaga Listrik………………………………………………………….17
5.3 Penyediaan Bahan Bakar…………………………………………………………...17
5.4 Unit Pengolahan Limbah…………………………………………………………...17
BAB 6 ORGANISASI DAN MANAJEMEN
6.1 Struktur Organisasi Perusahaan…….……………………………….……………...18
6.2 Jumlah Tenaga Kerja……………………………………………………………….18
BAB 7 ANALISA EKONOMI
7.1 Dasar Analisis……………………….……………………………….………...…...20
7.2 Total Capital Investment (TCI)………………………………………………….....21
7.2.1 Fixed Capital Investment (FCI)……………………………………………...21
7.2.2 Working Capital Investment (WCI)………………………………………....22
7.3 Komposisi Permodalan…………………………………………………………….22
7.4 Total Production Cost (TPC)……………………………………………………....23
7.5 Break Event Point (BEP)………………………………………………………......24
7.6 Perhitungan Laba Rugi…………………………………………………………….25
7.7 Minimum Payback Periode (MPP)…………………………………………….......25
7.8 Internal Rate of Return (IRR)……………………………………………………..25
7.9 Kelayakan Proyek………………………………………………………………....26
DAFTAR PUSTAKA…………………………………………………………………………27
LAMPIRAN……….………………………………………………………………………….28

Anda mungkin juga menyukai