18 RAB Rehab Posyandu
18 RAB Rehab Posyandu
SKETSA PERHITUNGAN
a sa = jarak antar sengkang = 0.10 m ko Jlh Ø pjg 1 Jlh pjg setiap tanda
sb-f = jarak antar tulangan = 0.15 m de btg besi btg Ø6 Ø 8 Ø 10
d' = tebal selimut beton = 0.02 m a 4 6 0.84 3.36
b 4 10 1.14 4.56
b Plat c 4 10 0.72 2.88
Lx = pjg footplat = 0.6 m d 3 10 0.94 2.82
c Ly = lebar footplat = 0.40 m e 4 10 0.72 2.88
T = tebal footplat = 0.25 m f 4 10 0.50 2
d Kolom Jumlah panjang (m) 3.36 0 15.14
bx = pjg kolom = 0.30 m Berat (kg/m) 0.222 0.395 0.617
e hy = lebar kolom = 0.15 m Jumlah kg 0.746 0 9.341
D = tinggi kolom = 0.35 m Total panjang (m) 3.36 0 15.14
Total Berat (kg) 0.746 0 9.341
Kebuthn besi (batang) 0.28 0 1.262
f D bx Volume beton = 0.455 m3
hx Ly
T
Ly Lx
sa = jarak antar sengkang bx = tebal balok ko Jlh pjg 1 Jlh pjg setiap tanda
Ø besi
a d' = tebal selimut beton hy = tinggi balok de btg btg Ø6 Ø 8 Ø 10
pb = pjg besi per btg L = pjg balok a 304 8 0.76 231
ΣB = jumlah item b 2 12 46.16
b bx tp = tebal plat c 1 12 46.29
Page 1 of 28
d 2 12 45.74
c e 0 8 45.56 0
hy
d Jumlah panjang (m) 0 231 0
Berat (kg/m) 0.222 0.395 0.617
e Jumlah kg 0 91.26 0
Total panjang (m) 0 231 0
Total Berat (kg) 0 91.26 0
Kebuthn besi (batang) 0 19.25 0
Volume beton = 0.889 m3
Begisting = 29.64 m2
sa = jarak antar sengkang bx = tebal balok ko Jlh pjg 1 Jlh pjg setiap tanda
Ø besi
a d' = tebal selimut beton hy = tinggi balok de btg btg Ø6 Ø 8 Ø 10
pb = pjg besi per btg L = pjg balok a 80 8 0.66 52.8
ΣB = jumlah item b 2 12 12.46
b bx tp = tebal plat c 0 10 12.53 0
d 2 12 12.14
c e 0 8 11.96 0
hy
d Jumlah panjang (m) 0 52.8 0
Berat (kg/m) 0.222 0.395 0.617
e Jumlah kg 0 20.86 0
Total panjang (m) 0 52.8 0
Total Berat (kg) 0 20.86 0
Kebuthn besi (batang) 0 4.4 0
Volume beton = 0.144 m3
Begisting = 6.6 m2
sa = jarak antar sengkang bx = tebal balok ko Jlh pjg 1 Jlh pjg setiap tanda
Ø besi
a d' = tebal selimut beton hy = tinggi balok de btg btg Ø6 Ø 8 Ø 10
pb = pjg besi per btg L = pjg balok a 122 8 0.56 68.32
ΣB = jumlah item b 2 10 18.74 37.48
b bx c 0 8 18.79 0
d 2 10 18.42 36.84
c e 0 8 18.26 0
hy
d Jumlah panjang (m) 0 68.32 74.32
Berat (kg/m) 0.222 0.395 0.617
e Jumlah kg 0 26.99 45.86
Total panjang (m) 0 68.32 74.32
Total Berat (kg) 0 26.99 45.86
Kebuthn besi (batang) 0 5.693 6.193
Volume beton = 0.146 m3
Begisting = 9.15 m2
Page 2 of 28
sa = jarak antar sengkang bx = tebal balok ko Jlh pjg 1 Jlh pjg setiap tanda
Ø besi
a d' = tebal selimut beton hy = tinggi balok de btg btg Ø6 Ø 8 Ø 10
pb = pjg besi per btg L = pjg balok a 172 6 0.44 75.68
ΣB = jumlah item b 2 8 26.1 52.2
b bx c 0 8 26.15 0
d 2 8 25.88 51.76
c e 0 8 25.76 0
hy
d Jumlah panjang (m) 75.68 104 0
Berat (kg/m) 0.222 0.395 0.617
e Jumlah kg 16.8 41.06 0
Total panjang (m) 75.68 104 0
Total Berat (kg) 16.8 41.06 0
Kebuthn besi (batang) 6.307 8.663 0
Volume beton = 0.387 m3
Begisting = 10.32 m2
sa = jarak antar sengkang bx = tebal balok ko Jlh pjg 1 Jlh pjg setiap tanda
Ø besi
a d' = tebal selimut beton hy = tinggi balok de btg btg Ø6 Ø 8 Ø 10
pb = pjg besi per btg L = pjg balok a 274 6 0.44 120.6
ΣB = jumlah item b 2 8 41.3 82.6
b bx c 0 8 41.31 0
d 2 8 41.18 82.36
c e 0 8 41.06 0
hy
d Jumlah panjang (m) 120.6 165 0
Berat (kg/m) 0.222 0.395 0.617
e Jumlah kg 26.76 65.16 0
Total panjang (m) 120.6 165 0
Total Berat (kg) 26.76 65.16 0
Kebuthn besi (batang) 10.05 13.75 0
Volume beton = 0.617 m3
Begisting = 14.39 m2
Page 3 of 28
g Jumlah kg 0 0 909
Total panjang (m) 0 0 1473
h Total Berat (kg) 0 0 909
Kebuthn besi (batang) 0 0 122.8
Luas void = 0 m2
Volume beton = 6.642 m3
Begisting = 55.35 m2
Page 4 of 28
b lebar anak tangga = 0.25 m a 28 8 0.86 24
b 28 8 0.78 22
c 0.25 c 5 8 4.26 21
d 5 8 4.18 21
0.25
d Jumlah panjang (m) 0 88.12 0
Berat (kg/m) 0.222 0.395 0.617
Jumlah kg 0 34.81 0
Total panjang (m) 0 88.12 0
Total Berat (kg) 0 34.81 0
Kebuthn besi (batang) 0 7.343 0
Volume beton = 0.607 m3
Begisting = 3.62 m2
a sa = jarak antar sengkang = 0.10 m ko Jlh Ø pjg 1 Jlh pjg setiap tanda
sb-f = jarak antar tulangan = 0.15 m de btg besi btg Ø6 Ø 8 Ø 10
d' = tebal selimut beton = 0.02 m a 5 6 0.54 2.70
b 5 10 1.19 5.95
b Plat c 5 10 0.87 4.35
Lx = pjg footplat = 0.75 m d 4 10 0.94 3.76
c Ly = lebar footplat = 0.50 m e 5 10 0.87 4.35
T = tebal footplat = 0.20 m f 4 10 0.70 2.8
d Kolom Jumlah panjang (m) 2.7 0 21.21
bx = pjg kolom = 0.15 m Berat (kg/m) 0.222 0.395 0.617
e hy = lebar kolom = 0.15 m Jumlah kg 0.599 0 13.09
D = tinggi kolom = 0.50 m Total panjang (m) 2.7 0 21.21
Total Berat (kg) 0.599 0 13.09
Kebuthn besi (batang) 0.225 0 1.768
f D bx Volume beton = 0.086 m3
hx Ly
T
Ly Lx
Page 5 of 28
PEKERJAAN PASANGAN
Page 6 of 28
TAKE OF SHEET
PERHITUNGAN
4.56 ΣB = 6 bh
2.88 pb = 12 m
2.82
2.88
2
15.14 0
0.617 0.888
9.341 0
15.14 0
9.341 0
1.262 0
Page 7 of 28
91.48 L = 45.6
d' = 0.02
ΣB = 1 bh
0 230.1 pb = 12 m
0.617 0.888 tp = 0.12
0 204.3
0 230.1
0 204.3
0 19.17
Page 8 of 28
Jlh pjg setiap tanda
Catatan
Ø 10 Ø 12
sa = 0.15
bx = 0.10
hy = 0.15
L = 25.80
d' = 0.02
ΣB = 1 bh
0 0 pb = 12 m
0.617 0.888
0 0
0 0
0 0
0 0
1473 0 Lx = 12.30
0.617 0.888 Ly = 4.50
Page 9 of 28
909 0 tp = 0.12
1473 0 d' = 0.02
909 0 ΣB = 1
122.8 0 pb = 12
685.4 0 Lx = 18.30
0.617 0.888 Ly = 1.50
422.9 0 tp = 0.12
685.4 0 d' = 0.02
422.9 0 ΣB = 1
57.12 0 pb = 12
Page 10 of 28
arah X
sab = 0.15
arah Y
sbc = 0.15
0 0 Lx = 0.70
0.617 0.888 Ly = 4.10
0 0 tp = 0.12
0 0 d' = 0.02
0 0 ΣB = 1
0 0 pb = 12
5.95 ΣB = 1 bh
4.35 pb = 12 m
3.76
4.35
2.8
21.21 0
0.617 0.888
13.09 0
21.21 0
13.09 0
1.768 0
Page 11 of 28
m2
= 107.6 m2
luas dinding - luas kusen
Page 12 of 28
KEBUTUHAN BAHAN, ALAT DAN TENAGA KERJA
I PEKERJAAN BONGKARAN
2.2 1 Kg Pembesian
Besi Ø 6 mm 1.000 x 16.86 =
Besi Ø 8 mm 1.000 x 100.90 =
Besi Ø 10 mm 1.000 x 189.11 =
Besi Ø 12 mm 1.000 x 42.77 =
Kawat Bendrat 0.010 x 2,379.13 =
Pekerja 0.005 x 2,379.13 =
Tukang 0.005 x 2,379.13 =
3.3 1 m2 Acian
Semen Portland (40 Kg) 0.050 x 196.44 =
Pekerja 0.200 x 196.44 =
Tukang 0.100 x 196.44 =
V PEKERJAAN PLAFOND
Total
Selisih
Volume
1 Semen Portland (40 Kg) 205.65 (0.35)
2 Semen Warna 17.40 0.40
3 Pasir Beton 8.39 0.39
4 Pasir Pasang 14.35 0.35
5 Bata Merah 6,875.47 0.47
6 Batu pecah 2/3 12.59 (0.41)
7 Besi Ø 6 mm 16.86 (0.14)
8 Besi Ø 8 mm 100.90 (0.10)
9 Besi Ø 10 mm 189.11 0.11
10 Besi Ø 12 mm 42.77 (0.23)
11 Kawat Bendrat 23.79 (0.21)
12 Papan bekesting 2/20 - 2 m 370.33 0.32
13 Kayu Usuk 4/6 - 4 m 154.58 (0.42)
14 Paku 5 - 12 cm 59.25 0.25
15 Bambu 457.94 (0.06)
16 Minyak bekisting 22.90 (0.10)
17 Hollow 4 x 4 Zincromate 22.97 (0.03)
18 Hollow 2 x 4 Zincromate 8.30 0.30
19 Calsiboard 5 mm 20.15 0.15
20 Paku skrup gypsum 6.09 0.09
21 Dynabolt 8 x 65 (250) pcs 221.40 0.40
22 Kusen Alumunium 4" 39.93 (0.07)
23 Skrup fixer 72.60 (0.40)
24 Sealant 2.18 0.18
25 Kaca Bening 5 mm 5.49 0.49
26 Kaca Bening 8 mm 2.46 0.46
27 Karet penjepit kaca 61.36 0.36
28 Keramik 40x40 cm 86.94 (0.06)
29 Keramik 25x25 cm 4.41 0.41
30 Batu andesit bakar 15x30 cm 17.39 0.39
31 Plamir tembok 19.64 (0.36)
32 Cat Dasar 19.64 (0.36)
33 Cat Tembok 51.07 0.07
34 Kabel NYM 3x2,5 mm 65.00 -
35 PVC 5/8 " Type D - 4m 13.00 -
36 T Dos 7.00 -
37 Embow dos 7.00 -
38 Klem kabel 120.00 -
39 Saklar tunggal 3.00 -
40 Lampu Philip LED 7 W 2.00 -
41 Lampu Philip LED 15 W 4.00 -
42 Stop kontak 2.00 -
43 Engsel Pintu 4.00 -
44 Engsel jendela 16.00 -
45 Hak Angin Jendela 8.00 -
46 Kunci tanam 2.00 -
47 Kunci slot jendela 8.00 -
48 Pekerja 267.72 (0.28)
49 Tukang 141.04 (0.96)
50 Pekerja Langsir Hasil Bongkaran 22.14 (0.86)
Jmlh Sat.
13.19 OH
13.19 OH
8.30 OH
8.30 OH
132.56 zak
8.39 m3
12.59 m3
27.69 OH
4.20 OH
16.86 Lonjor
100.90 Lonjor
189.11 Lonjor
42.77 Lonjor
23.79 kg
11.90 OH
11.90 OH
77.63 Lbr
31.36 btg
12.42 kg
62.10 btg
3.11 ltr
4.66 OH
4.66 OH
90.60 Lbr
36.60 btg
14.50 kg
72.48 btg
3.62 ltr
5.44 OH
5.44 OH
202.10 Lbr
86.61 btg
32.34 kg
16.17 ltr
323.36 btg
12.13 OH
12.13 OH
6,875 Bh
20.38 zak
4.81 m3
14.73 OH
9.82 OH
21.71 zak
5.30 m3
39.29 OH
29.47 OH
9.82 zak
39.29 OH
19.64 OH
13.19 OH
8.79 OH
13.19 OH
8.79 OH
22.97 btg
8.30 btg
20.15 Lembar
6.09 kg
221.40 bh
5.54 OH
2.77 OH
39.93 m
72.60 bh
2.18 tube
1.56 OH
1.56 OH
5.49 m2
42.39 m
0.07 OH
0.75 OH
2.46 m2
18.97 m
0.05 OH
0.51 OH
86.94 m2
15.53 zak
3.48 m3
16.56 kg
20.70 OH
0.99 OH
4.41 m2
0.79 zak
0.18 m3
0.84 Kg
1.05 OH
0.05 OH
17.39 m2
4.86 zak
0.58 m3
10.27 OH
5.80 OH
19.64 kg
19.64 kg
51.07 kg
3.93 OH
12.38 OH
60.00 m
12.00 Lonjor
6.00 bh
6.00 bh
120.00 bh
3.00 bh
2.00 bh
4.00 bh
0.06 OH
1.20 OH
5.00 m
1.00 Lonjor
1.00 bh
1.00 bh
2.00 bh
0.01 OH
0.20 OH
22.14 OH
Dibulatkan
206.00 zak
17.00 kg
8.00 m3
14.00 m3
6,875.00 bh
13.00 m3
17.00 lonjor
101.00 lonjor
189.00 lonjor
43.00 lonjor
24.00 kg
370.00 btg
155.00 btg
59.00 kg
458.00 btg
23.00 kg
23.00 btg
8.00 btg
20.00 lembar
6.00 kg
221.00 bh
40.00 m
73.00 bh
2.00 tube
5.00 m2
2.00 m2
61.00 m
87.00 m2
4.00 m2
17.00 m2
20.00 kg
20.00 kg
51.00 kg
65.00 m
13.00 lonjor
7.00 bh
7.00 bh
120.00 bh
3.00 bh
2.00 bh
4.00 bh
2.00 bh
4.00 bh
16.00 bh
8.00 bh
2.00 bh
8.00 bh
268.00 OH
142.00 OH
23.00 OH
RENCANA ANGGARAN BIAYA
Volume Jumlah
Harga Satuan
Uraian Swa Dana Satuan Swadaya
Total (Rp)
daya Desa (Rp)
a b c d e f =(b) x (e)
I. BELANJA BARANG DAN JASA
A. Belanja Barang 0
1 Papan Proyek 1 - 1 Ls 225,900 -
2 Prasasti + Pemasangan 1 - 1 Ls 557,300 -
B. Belanja Jasa 0
1 Honor Ketua TPK 1 - 1 Orang 3,400,000 -
2 Honor Anggota TPK 2 - 2 Orang 2,825,000 -
Sub Total 1) 0
II. BELANJAN MODAL
A. Bahan 0
1 Semen Portland (40 Kg) 206 - 206 zak 61,300 -
2 Semen Warna 17 - 17 kg 15,000 -
3 Pasir Beton 8 - 8 m3 237,000 -
4 Pasir Pasang 14 - 14 m3 237,000 -
5 Bata Merah 6,875 - 6,875 bh 1,100 -
6 Batu pecah 2/3 13 - 13 m3 446,800 -
7 Besi Ø 6 mm 17 - 17 lonjor 35,900 -
8 Besi Ø 8 mm 101 - 101 lonjor 54,700 -
9 Besi Ø 10 mm 189 - 189 lonjor 76,800 -
10 Besi Ø 12 mm 43 - 43 lonjor 113,200 -
11 Kawat Bendrat 24 - 24 kg 27,100 -
12 Papan bekesting 2/20 - 2 m 370 - 370 btg 21,600 -
13 Kayu Usuk 4/6 - 4 m 155 - 155 btg 37,000 -
14 Paku 5 - 12 cm 59 - 59 kg 23,800 -
15 Bambu 458 - 458 btg 25,000 -
16 Minyak bekisting 23 - 23 kg 15,000 -
17 Hollow 4 x 4 Zincromate 23 - 23 btg 40,000 -
18 Hollow 2 x 4 Zincromate 8 - 8 btg 36,000 -
19 Calsiboard 5 mm 20 - 20 lembar 90,000 -
20 Paku skrup gypsum 6 - 6 kg 15,000 -
21 Dynabolt 8 x 65 (250) pcs 221 - 221 bh 1,300 -
22 Kusen Alumunium 4" 40 - 40 m 120,000 -
23 Skrup fixer 73 - 73 bh 800 -
24 Sealant 2 - 2 tube 90,000 -
25 Kaca Bening 5 mm 5 - 5 m2 95,000 -
26 Kaca Bening 8 mm 2 - 2 m2 120,000 -
27 Karet penjepit kaca 61 - 61 m 8,000 -
28 Keramik 40x40 cm 87 - 87 m2 100,000 -
29 Keramik 25x25 cm 4 - 4 m2 80,000 -
30 Batu andesit bakar 15x30 cm 17 - 17 m2 200,000 -
31 Plamir tembok 20 - 20 kg 21,600 -
32 Cat Dasar 20 - 20 kg 90,000 -
33 Cat Tembok 51 - 51 kg 80,000 -
34 Kabel NYM 3x2,5 mm 65 - 65 m 25,000 -
35 PVC 5/8 " Type D - 4m 13 - 13 lonjor 17,000 -
36 T Dos 7 - 7 bh 12,000 -
37 Embow dos 7 - 7 bh 12,000 -
38 Klem kabel 120 - 120 bh 750 -
39 Saklar tunggal 3 - 3 bh 30,000 -
40 Lampu Philip LED 7 W 2 - 2 bh 50,000 -
41 Lampu Philip LED 15 W 4 - 4 bh 90,000 -
42 Stop kontak 2 - 2 bh 30,000 -
43 Engsel Pintu 4 - 4 bh 75,000 -
44 Engsel jendela 16 - 16 bh 45,000 -
45 Hak Angin Jendela 8 - 8 bh 50,000 -
46 Kunci tanam 2 - 2 bh 400,000 -
47 Kunci slot jendela 8 - 8 bh 50,000 -
B. Alat Kerja 0
1 Benang 1 - 1 roll 16,000 -
2 Ember cor 6 - 6 bh 22,000 -
3 Kawat ayakan 1 - 1 m' 27,000 -
4 Keranjang 2 - 2 bh 22,000 -
5 Kuas 6 - 6 bh 16,000 -
6 Kape 2 - 2 bh 20,000 -
7 Skrape 2 - 2 bh 20,000 -
8 Amplas 2 - 2 roll 75,000 -
9 Meteran 5 m' 1 - 1 bh 22,000 -
C. Sewa Alat 0
1 - - - -
2 - - - -
D. Upah 0
1 Pekerja 268 - 268 OH 90,000 -
2 Tukang 142 - 142 OH 130,000 -
3 Pekerja Langsir Hasil Bongka 23 - 23 OH 90,000 -
Sub Total 2) 0
TOTAL BIAYA 0
Baledono, ................................
Diketahui / Disetujui Dibuat Oleh
Kepala Desa Tim Penyusun RKP Des
................................. .............................
RENCANA ANGGARAN BIAYA
Jumlah
Dana Desa
(Rp)
g = (c) x (e)
783,200
225,900
557,300
9,050,000
3,400,000
5,650,000
9,833,200
118,254,800
12,627,800
255,000
1,896,000
3,318,000
7,562,500
5,808,400
610,300
5,524,700
14,515,200
4,867,600
650,400
7,992,000
5,735,000
1,404,200
11,450,000
345,000
920,000
288,000
1,800,000
90,000
287,300
4,800,000
58,400
180,000
475,000
240,000
488,000
8,700,000
320,000
3,400,000
432,000
1,800,000
4,080,000
1,625,000
221,000
84,000
84,000
90,000
90,000
100,000
360,000
60,000
300,000
720,000
400,000
800,000
400,000
567,000
16,000
132,000
27,000
44,000
96,000
40,000
40,000
150,000
22,000
0
-
-
44,650,000
24,120,000
18,460,000
2,070,000
163,471,800
173,305,000
173,305,000
173,305,000
0
Baledono, .................................2018
Dibuat Oleh
Tim Penyusun RKP Desa
.............................