Pembangunan Sumu Bor Kapasitas 2 lt/dtk Desa Taman Fajar Kecamatan Purbolinggo Kab

a) Jangan mengubah, mengurangi atau menambahkan nama kolom


b) Silakan isi kolom Harga satuan (D), Pajak (E) dan Keterangan (H)
c) Tidak boleh mengubah dan menambah rincian barang/jasa, satuan, dan volume

Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.)
Pembuatan Papan Nama Bh 1.00 238,000.00 10.00 23,800.00 261,800.00
Pengurusan IMB Unit 1.00 95,000.00 10.00 9,500.00 104,500.00
Pengukuran Ulang dan Ls 1.00 950,000.00 10.00 95,000.00 1,045,000.00
Sewa Direksi Keet Ls 1.00 1,425,000.00 10.00 142,500.00 1,567,500.00
Mobilisasi Peralatan KerLs 1.00 2,375,000.00 10.00 237,500.00 2,612,500.00
Asbuild drawing Ls 1.00 950,000.00 10.00 95,000.00 1,045,000.00
Dokumentasi dan PelapLs 1.00 950,000.00 10.00 95,000.00 1,045,000.00
Pek. Galian Tanah PondM3 12.70 81,207.50 10.00 103,133.53 1,134,468.78
Urugan Tanah Kembali M3 3.17 59,015.00 10.00 18,707.76 205,785.31
Urugan Pasir di bawah M3 0.60 252,551.50 10.00 15,153.09 166,683.99
Pek. Pas. Pondasi TapakM3 2.11 4,762,164.00 10.00 1,004,816.60 11,052,982.64
Pek. Pas. Pondasi Batu M3 2.81 867,574.40 10.00 243,788.41 2,681,672.47
Pek. Lantai tower & LanM3 0.58 1,026,386.53 10.00 59,530.42 654,834.61
Pek. Pas. Dinding Bata M2 56.77 107,688.46 10.00 611,347.39 6,724,821.26
Pek. Plesteran dinding M2 113.53 66,493.68 10.00 754,902.75 8,303,930.24
Pek. Acian dinding M2 113.53 40,320.50 10.00 457,758.64 5,035,345.00
Pek. Sloof 15/20 M3 0.31 5,876,478.30 10.00 182,170.83 2,003,879.10
Pek. Kolom 30/30 M3 6.04 7,332,398.70 10.00 4,428,768.81 48,716,456.96
Pek. Balok 20/30 M3 0.80 7,980,592.40 10.00 638,447.39 7,022,921.31
Pek. Plat Beton ( h=3. M3 4.80 7,379,830.70 10.00 3,542,318.74 38,965,506.10
Pek. Dinding Beton BertM3 1.54 7,113,196.20 10.00 1,095,432.21 12,049,754.36
Pek. Balok 15/25 M3 0.74 7,980,592.40 10.00 590,563.84 6,496,202.21
Pek. Kusen Pintu dan J M3 0.06 10,977,290.50 10.00 65,863.74 724,501.17
Pek. Daun Pintu Panel M2 1.60 743,481.20 10.00 118,956.99 1,308,526.91
Pek. Daun Jendela KacaM2 0.60 553,701.72 10.00 33,222.10 365,443.14
Pek. Kaca Mati t = 5 m M2 0.45 126,303.54 10.00 5,683.66 62,520.25
Pek. Engsel Pintu Bh 3.00 76,935.54 10.00 23,080.66 253,887.28
Pek. Kunci Pintu 2 SlaagBh 1.00 356,020.50 10.00 35,602.05 391,622.55
Pek. Grendel Pintu Bh 2.00 24,000.00 10.00 4,800.00 52,800.00
Pek. Grendel Jendela Bh 2.00 21,200.00 10.00 4,240.00 46,640.00
Pek. Engsel Jendela Bh 2.00 65,072.15 10.00 13,014.43 143,158.73
Pek. Tarikan Jendela Bh 1.00 14,400.00 10.00 1,440.00 15,840.00
Pek. Kait Angin Bh 2.00 33,768.90 10.00 6,753.78 74,291.58
Pek. Pas. Roster Bh 16.00 10,600.00 10.00 16,960.00 186,560.00
Pek Pas. Plat Penutup Unit 1.00 500,000.00 10.00 50,000.00 550,000.00
Pek. Pas. Kemarik 40 x M2 8.12 200,129.42 10.00 162,505.09 1,787,556.02
Pek. Plint Keramik 10 x M 11.40 28,500.00 10.00 32,490.00 357,390.00
Pemasangan Listrik Ba Unit 1.00 2,500,000.00 10.00 250,000.00 2,750,000.00
Pek. Pas. Saklar Ganda Bh 1.00 101,629.00 10.00 10,162.90 111,791.90
Pek. Pas. Stop Kontak Bh 2.00 160,745.20 10.00 32,149.04 353,639.44
Pek. Pas. Titik Lampu Bh 5.00 104,830.00 10.00 52,415.00 576,565.00
Pas. Lampu SL 18 Wat Bh 5.00 55,700.00 10.00 27,850.00 306,350.00
Pas. Box Panel Listrik Unit 1.00 736,771.20 10.00 73,677.12 810,448.32
Pekerjaan Cat dinding M2 169.38 29,204.45 10.00 494,664.97 5,441,314.72
Pek. Pas. Tangga Monyet Unit 1.00 4,750,000.00 10.00 475,000.00 5,225,000.00
Pek. Pas. Dinabol Untu Unit 1.00 238,000.00 10.00 23,800.00 261,800.00
Dari 0 m s.d. 30 m M1 30.00 266,813.30 10.00 800,439.90 8,804,838.90
Dari 30 m s.d. 60 m M1 30.00 268,438.30 10.00 805,314.90 8,858,463.90
Dari 60 m s.d. 80 m M1 20.00 270,063.30 10.00 540,126.60 5,941,392.60
Dari 0 m s.d. 30 m M1 30.00 347,799.20 10.00 1,043,397.60 11,477,373.60
Dari 30 m s.d. 60 m M1 30.00 349,345.30 10.00 1,048,035.90 11,528,394.90
Dari 60 m s.d. 80 m M1 20.00 350,970.30 10.00 701,940.60 7,721,346.60
Pipa PVC, Jenis PipaPV, M1 50.00 522,767.00 10.00 2,613,835.00 28,752,185.00
Pipa PVC, Jenis PipaPV, M1 30.00 450,292.00 10.00 1,350,876.00 14,859,636.00
Reducer PVC Dia. 4 - 6 Buah 1.00 93,200.00 10.00 9,320.00 102,520.00
Filter Gravel M3 0.71 619,335.00 10.00 43,972.79 483,700.64
Semen Grouting, adk. 1M3 0.69 1,026,386.53 10.00 70,820.67 779,027.38
Well Head, adk. 135 M3 0.14 992,685.65 10.00 13,897.60 152,873.59
Pompa Uji termasuk StoJam 24.00 30,410.20 10.00 72,984.48 802,829.28
Pompa Submersible (SPUnit 1.00 8,780,000.00 10.00 878,000.00 9,658,000.00
Kabel Pompa SubmersibM1 50.00 19,200.00 10.00 96,000.00 1,056,000.00
Pipa Naik dan Inlet ke M1 72.50 50,072.55 10.00 363,025.99 3,993,285.86
Double Neple dia. 2 Buah 1.00 80,000.00 10.00 8,000.00 88,000.00
Tee PVC dia. 2 Buah 1.00 10,600.00 10.00 1,060.00 11,660.00
Stop Kran Kuningan dia.Buah 3.00 452,200.00 10.00 135,660.00 1,492,260.00
Knee PVC dia. 2 Buah 4.00 15,400.00 10.00 6,160.00 67,760.00
Reducer PVC 2 - 1.5 Buah 1.00 10,000.00 10.00 1,000.00 11,000.00
Tambang Plastik 8 mm M1 72.50 23,100.00 10.00 167,475.00 1,842,225.00
Pas. Bata Box Sumuran M2 0.54 107,688.46 10.00 5,815.18 63,966.95
Pas.Plesteran +Acian B M2 1.21 106,814.18 10.00 12,924.52 142,169.67
Plat Penutup + Acesori Unit 1.00 1,250,000.00 10.00 125,000.00 1,375,000.00
Galian Tanah untuk Pip M3 63.21 81,207.50 10.00 513,312.61 5,646,438.68
Urugan Kembali M3 15.80 59,015.00 10.00 93,243.70 1,025,680.70
Pek. Pasang Pipa UPVC M1 702.30 176,739.48 10.00 12,412,413.33 136,536,546.62
Pasang Knee PVC 3 Bh 3.00 7,900.00 10.00 2,370.00 26,070.00
Pasang dop 3 Bh 5.00 37,500.00 10.00 18,750.00 206,250.00
Pasang Tee PVC 3 Bh 4.00 18,000.00 10.00 7,200.00 79,200.00
Pasang Stop Kran KuninBh 3.00 658,600.00 10.00 197,580.00 2,173,380.00
Galian Tanah untuk Pip Unit 6.98 81,207.50 10.00 56,682.84 623,511.19
Urugan Kembali M1 1.74 59,015.00 10.00 10,268.61 112,954.71
Pasang Pipa UPVC D1/2M1 124.00 79,564.65 10.00 986,601.66 10,852,618.26
Clamp Sadle 3 Buah 31.00 50,000.00 10.00 155,000.00 1,705,000.00
Double Neple 1/2 Buah 217.00 5,800.00 10.00 125,860.00 1,384,460.00
Knee PVC 1/2 Buah 186.00 15,400.00 10.00 286,440.00 3,150,840.00
Plug Kran 1/2 Buah 31.00 12,500.00 10.00 38,750.00 426,250.00
Meter Air 1/2 Bahan Pl Buah 31.00 250,000.00 10.00 775,000.00 8,525,000.00
Stop Kran Ball Valve 1/ Buah 31.00 64,400.00 10.00 199,640.00 2,196,040.00
Tee PVC 1/2 Buah 31.00 3,900.00 10.00 12,090.00 132,990.00
Dop PVC 1/2 Buah 31.00 5,000.00 10.00 15,500.00 170,500.00
Kran Air 1/2 Stainless Buah 31.00 84,500.00 10.00 261,950.00 2,881,450.00
Box Penutup Meter Air Buah 31.00 98,000.00 10.00 303,800.00 3,341,800.00
Seal Tape Buah 31.00 4,800.00 10.00 14,880.00 163,680.00
Biaya Pemasangan SamUnit 31.00 30,000.00 10.00 93,000.00 1,023,000.00

483,503,761.37
camatan Purbolinggo Kab

Keterangan
PEKERJAAN PERSIAPAN
PEKERJAAN PERSIAPAN
PEKERJAAN PERSIAPAN
PEKERJAAN PERSIAPAN
PEKERJAAN PERSIAPAN
PEKERJAAN PERSIAPAN
PEKERJAAN PERSIAPAN
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
PEMBANGUNAN TOWER PRIMER T = 8.6 M
Pengeboran Sumur termasuk Pengadaan Bentonit dan Lain-lain
Pengeboran Sumur termasuk Pengadaan Bentonit dan Lain-lain
Pengeboran Sumur termasuk Pengadaan Bentonit dan Lain-lain
Pembesaran Lubang/Reaming, uji produksi dia. 8 termasuk Bentonit dan lain - lain
Pembesaran Lubang/Reaming, uji produksi dia. 8 termasuk Bentonit dan lain - lain
Pembesaran Lubang/Reaming, uji produksi dia. 8 termasuk Bentonit dan lain - lain
Pengadaan Instalasi Pipa-pipa dan Saringan
Pengadaan Instalasi Pipa-pipa dan Saringan
Pengadaan Instalasi Pipa-pipa dan Saringan
Pengadaan Gravel, Grouting, Penyemenan, dll
Pengadaan Gravel, Grouting, Penyemenan, dll
Pengadaan Gravel, Grouting, Penyemenan, dll
Pengadaan Gravel, Grouting, Penyemenan, dll
PEMASANGAN POMPA & KELENGKAPAN
PEMASANGAN POMPA & KELENGKAPAN
PEMASANGAN POMPA & KELENGKAPAN
PEMASANGAN POMPA & KELENGKAPAN
PEMASANGAN POMPA & KELENGKAPAN
PEMASANGAN POMPA & KELENGKAPAN
PEMASANGAN POMPA & KELENGKAPAN
PEMASANGAN POMPA & KELENGKAPAN
PEMASANGAN POMPA & KELENGKAPAN
PEMASANGAN POMPA & KELENGKAPAN
PEMASANGAN POMPA & KELENGKAPAN
PEMASANGAN POMPA & KELENGKAPAN
PEKERJAAN PIPA PRIMER
PEKERJAAN PIPA PRIMER
PEKERJAAN PIPA PRIMER
PEKERJAAN PIPA PRIMER
PEKERJAAN PIPA PRIMER
PEKERJAAN PIPA PRIMER
PEKERJAAN PIPA PRIMER
PEKERJAAN INSTALASI SAMBUNGAN RUMAH
PEKERJAAN INSTALASI SAMBUNGAN RUMAH
PEKERJAAN INSTALASI SAMBUNGAN RUMAH
PEKERJAAN INSTALASI SAMBUNGAN RUMAH
PEKERJAAN INSTALASI SAMBUNGAN RUMAH
PEKERJAAN INSTALASI SAMBUNGAN RUMAH
PEKERJAAN INSTALASI SAMBUNGAN RUMAH
PEKERJAAN INSTALASI SAMBUNGAN RUMAH
PEKERJAAN INSTALASI SAMBUNGAN RUMAH
PEKERJAAN INSTALASI SAMBUNGAN RUMAH
PEKERJAAN INSTALASI SAMBUNGAN RUMAH
PEKERJAAN INSTALASI SAMBUNGAN RUMAH
PEKERJAAN INSTALASI SAMBUNGAN RUMAH
PEKERJAAN INSTALASI SAMBUNGAN RUMAH
PEKERJAAN INSTALASI SAMBUNGAN RUMAH

Anda mungkin juga menyukai