Spata Standards Volume Two (1999)

THE SWIMMING POOL

AND ALLIED TRADES

ASSOCIATION

STANDARDS FOR

SWIMMING POOLS

Domestic and Commercial

VOLUME TWO
e
Filtration Systems - Flow Control - Chemical Dosing -
Water Treatment - Heating and Environmental Control -
Covers and Air Enclosures - Electrical - Specialist Pools
- Systems Design - Health and Safety - Operation and
Maintenance
Spata Standards Volume Two (1999)

e i
Spata Standards Volume Two (1999)

Standards for Swimming Pools

Domestic and Commercial

VOLUME I1 CONTENTS

Introduction

SECTION 1 FILTRATION SYSTEMS

General Principles
Filters
Equipment Specification
Filter Media
Water Circulating Pumps
Strainers
Recirculatory Systems and Flow Fittings
Balance Tanks
Pool Pipework, Valves and Fittings

SECTION 2 CHEMICAL DOSING

Water Treatment Methods


Design
Equipment Specification

SECTION 3 HEATING AND ENVIRONMENTAL CONTROL

Outdoor Pool Heating


Indoor Pool Heating
Air Distribution, Ductwork and Grilles
Spata Standards Volume Two (1999)

SECTION 4 COVERS AND AIR ENCLOSURES

Winter Covers
Solar Blankets and Heat Retention Covers
Cover Rollers
Care and Maintenance
Automatic and Motorised Covers
Inflatable Air Enclosures

SECTION 5 ELECTRICAL

General and Special Requirements


Electrical Heating and Underwater Lighting and Equipment

SECTION 6 SPECIALIST POOLS

Types of Pool
Hydrotherapy
Diving
Equine and Canine
Pool Accessories
Specialist and Leisure Activity Equipment

SECTION 7 SYSTEM DESIGN

Pool Criteria
Filtration
Flow Rates
Bathing Loads
Circulation and Water Turnover
Filtration Velocity and Filter Bed
Balance Tank
Pipework Sizing
Facilities for the Disabled
Spata Standards Volume Two (1999)

SECTION 8 HEALTH AND SAFETY

During Construction
During Operation
Legal Requirements

SECTION 9 COMMISSIONING. OPERATION AND MAINTENANCE

Commissioning, Demonstration and Handover


Operation and Maintenance Manuals
Responsibility

a SECTION 10 GLOSSARY AND ACKNOWLEDGEMENTS


Spata Standards Volume Two (1 999)
Spata Standards Volume Two (1999)

a INTRODUCTION

These standards describe and lay down parameters in detail for the specialist items of equipment
necessary to be installed in a properly equipped swimming pool to ensure a clean, safe and inviting
swimming pool. Expressed in its simplest form the filtration, water treatment and recirculating system
is designed to remove water from the pool, filter it, disinfect it and return it back to the pool. Although
often of highly technical complexity, these standards endeavour to describe as simply as possible the
filtration equipment, water treatment equipment, heating and the recirculatory system.

The standards contained in this booklet are recommendationsin the absence of any legal regulations.
They are designed to complement the required rules, regulations and standards of:-

The Health and Safety Executive


The English Sports Council (Sport England)
Pool Water Treatment Advisory Group (PWTAG)
Federacion Internationale (FINA)
Amateur Swimming Association (ASA)

a British Standards Institute (BSI)

As such SPATA recommend that designs of all Swimming Pools either private or public are based on
the parameters indicated as an aid to the goal of achieving safe healthy construction, operation and
maintenance.

To facilitate understanding of these Standards any residential or private pool used solely by a family or
invited guests is classed as a Domestic Pool.

ALL other pools, whether school pools, hotel pools, club pools, health club pools, therapy pools or
leisure pools fall into the category of Commercial (Public) Pools.

In the absence of regulations the standards have been formulated using the experience and knowledge
of a committee of SPATA members. During formulation it was found that in certain areas and for certain
formulae, several quite valid variants were available and in these circumstances the standards shown
are modal. It may be however, that in the interests of design, other formulae than the standards shown
may be applied correctly.

These standards therefore do not preclude the use of alternative formulae or procedures where a
specialist design may require such. SPATA acknowledge that with advances in technology new prod-
ucts and design innovations will of necessity be introduced and procedures are in place to provide for
consideration of these within future amendments to these standards.

It should be noted that in any design for swimming pools either private or public these standards can
only offer recommendationsfor guidance purposes. Notwithstanding anything contained in these
standards, responsibility for specific Health and Safety issues and compliance with legislation of
COSHH, CORGI, HSE etc, must be taken into consideration in relation to any contract during design,
construction and operation and will remain the responsibility of the parties involved. The importance
of defining the requirement, the specification and the responsibilities (for the pool) rest with the reader.

Whilst every effort has been made to ensure the facts and figures in SPATA Swimming Pool Standards
are correct, no individual member nor the Council of SPATA nor SPATA as a corporate entity can
accept any responsibility for any errors or omissions. Nor does SPATA assume any responsibility to
those who supply/provide/purchase/acquire/distribute or use products or systems which comply with
or purport to comply with these standards. SPATA is a trade association. It does not hold itself out to
be a regulatory body.
Spata Standards Volume Two (1999)
Spata Standards Volume Two (1999)

SECTION 1

FILTRATION SYSTEMS

Including

FILTERS
0
WATER CIRCULATING PUMPS

RECIRCULATORY SYSTEMS AND FLOW FITTINGS

BALANCE TANKS

PIPEWORK, VALVES AND FITTINGS


0
Spata Standards Volume Two (1999)
,

Spata Standards Volume Two (1999)

-
SECTION 1 FILTRATION SYSTEMS

GENERAL

Water filtration is the passing of water through a medium which will retain the solids suspended in that
water. In the context of swimming pools, the filtration system is understood to include the filters, the
pumps, the flow fittings and the water circulation pipework valves and fittings all of which contribute
to the filtration system.

This section therefore deals with


1. Filters
2. Pumps
3. Recirculatory systems and Flow fittings
4. Balancetanks
5. Pipework, valves and fittings

FILTERS
There are six forms of filtration, which conform to the principle above.

i) Low rate pressure sand filtration


ii) Medium rate pressure sand filtration
iii) High rate pressure sand filtration
iv) Pre-coat filtration (pressure and vacuum)
v) Disposable cartridge or fibre glass mat filtration
vi) Gravity sand filtration

Of these the last is now rarely, if ever, used in swimming pool applications being generally used in
effluent and potable water treatment and is, therefore not covered in this Standard.

SAND FILTRATION

The three types of sand filtration work on the same basic principle with the major difference being the
water flow rate through the sand as shown on the following table.

Flow rate
Low Rate to 1 0 m w / h r 200g/ft%r
Medium Rate 11-30m3/m2/hr 600g/ft2/hr
High Rate 31-50m3/m2/hr 1OOOg/ftz/hr

Generally the filter vessel contains a bed of graded sand which may or may not be supported on graded
aggregate. The pressure created by the water flow compressing the sand bed to the base of the vessel
creates microscopic gaps between the grains enabling the suspended matter to be trapped by the sand.
A system of collectors at the bottom of the filter allows through passage of water but not sand.

Cleansing of the sand is achieved by reversing the flow through the vessel; the gap between the sand
bed and influent spreader allowing for the sand to be lifted and expanded thus washing off the dirt.
Backwash criteria are similar and this is covered within these standards.

The rates of flow given are guidelines for standard design but where variations may be necessary
advice should be sought from the Manufacturer.

Section 1 Filtration Page 1


Spata Standards Volume Two (1999)

LOW RATE FILTRATION

The filter media is a bed of fine silica sand which is supported on graded aggregate with Low rate
filtration.

A flocculent is added to the sand bed with the object of creating a semi-permeable layer on the top of
that sand bed, thus, stopping the penetration of the sand bed to any great depth. Once the filter reaches
the theoretical saturation point the flow is reversed through the support media and the dirt washed away
to waste. The filter should never reach saturation point and backwashing at least once a week should
assist in this by controlling the TDS levels.
Because of the heavy nature of the supporting media this is not disturbed and only fine silica sand is put
into suspension during the backwash process. Thus the backwashing of the filter is possible at low
flow rates which of necessity requires a large gallonage of water to effect proper cleansing of the media.
The breaking up and lifting of both the flocculent and the sand bed is assisted by the use of an air
scouring device operated pneumatically. This also helps to cut down the backwash time.
The point at which the filter requires backwashing is determined by influent and effluent pressure
gauges which show by means of the pressure differentials at the time of starting up and a pre-deter-
mined pressure rise when it is necessary to effect backwashing.
Low rate sand systems require a particle size of 0.83ml to 1.3ml with a uniformity coefficient of 1.45 -
1.69. The bed should generally be not less than 30Oml of clean uniform gravel or with composite beds
not less than lOOml of each grade. Manufacturers recommendations should be sought.

MEDIUM AND HIGH RATE FILTRATION

Medium and high rate filtration differ from low rate filtration in that the water is passed through it at up
to 50m3/m2hr(1000 gallons per square foot per hour).
The filter is hydraulically designed to permit an even distribution of the water over the whole surface
area of the sand bed. In these systems the dirt is allowed to penetrate the sand bed to a predetermined
depth.
Whilst the increased velocity generally dispenses with the necessity of an air scour to lift the bed, it
should be noted that a reverse flow of approximately 30m3/m2/hrshould be available for backwash.
To enable efficient backwashing to take place there should be a minimum flow rate of not less than
36.70m3 per hour per m2of filter area ( 750 gallons per hour per ft2 of filter area). Flow should be to a
drain or manhole within 12m (50ft).If a further distance then pipe size will need to be increased to
prevent back pressure.
Medium and high rate systems require a particle size of 16/30.

Page 2 Section 1 Filtration


Spata Standards Volume Two (1999)

a. PRE-COAT FILTRATION

A pre-coat filter vessel contains a number of frameworks or septums, which are covered with a
durable, chemical resistant and porous material. The water flow is engineered so that the water enters
the vessel, surrounds the septums and in order to leave the vessel must pass through them. The water
flow characteristic should be such as to ensure the greatest uniformity of flow through each of the
septums and thereby ensuring the filter medium is evenly distributed.

Filtration is achieved by coating the septums with a fine powder, of not less than 1.6mm (.0625ins)
through which the water, of necessity has to pass.

The determination of the total filter area shall be the sum of the area coated on each septum and shall
not be the area of material used to cover the septum.

The medium used is DiatomaceousEarth or Volcanic Ash. When the water flow stops some filter
medium may fall of but the initiation of the water flow will replace it.

a The filter medium is introduced to the filter by means of a ‘slurry pot’ fitted in the suction flow into the
pump. The volume of medium is set by the filter manufacturer and should not be altered.

Backwashing is achieved by the same reversal of flow principle to cast the dirt, and in this case the
medium, into a suitable drain.

A pressure gauge should be fitted and a suitable air purging method incorporated in the design.

Particulate removal to 5 microns can be achieved.

Flow rates of 50m3/m2/hror 1000g/ft2/hrare usual.

CARTRIDGEFILTERS

Cartridge filters use a system where the filter internal is re-usable. Once saturation point has been
reached the cartridge is removed and cleaned or replaced if necessary. Continuing life will depend
upon material of any contamination.
These filters are generally used on small or specialised pools with low bathing loads.
Removal to 5 microns can be achieved.

Section 1 Filtration Page 3

~
Spata Standards Volume Two (1999)

EOUIPMENT SPECIFICATION - mLTERS

STEEL TANKS

1. Filter tanks should be fabricated generally in accordance with BS Standards for pressure vessels
and
tanks should be built to withstand the working pressure equivalent to 1 ?htimes the shut off head of the
pump employed.

2. Pressure vessels should have a safety factor not only with regard to pressure, but also in relation to
vacuum, and should be designed to withstand the crushing pressure developed under a vacuum of
50mm (2in) of mercury, with a safety factor of 3.5 or greater.

3. The filter underdrain should have an effective distribution of at least 25% of the cross section of the
tank.Tanks placed underground should be steel plate designed and reinforced to cope with the addi-
tional stresses in accordance with the manufacturersrecommendations. All filter tanks should have an
approved non-corroding interior and exterior coating, or should be fabricated from a non-corroding
material (stainless steel, glass reinforced plastic, plastic).

4. All filters should be equipped with at least one pressure vacuum or compound gauge as applicable,
which should be positioned in such a way as to determine the pressure rise or differential across the
filter and to determine the need for cleaning.

5. All pressure filter systems should be equipped with pressure gauge(s) and an air relief valve at the
high point of the system. All sand filters should be provided with a waste sight glass or other visual
means to determine when the filter has been restored to its original cleanliness

6. Sand filter systems in accordance with the manufacturers design criteria, should be made and
installed to operate at a minimum amount of backwash water passing through the filter, with or without
the aid of compressed air or other devices to break up the sand bed and/or flocculate the water creating
sufficient turbulence to ensure 100% efficiency within that period. .

7. All valves shall be clearly marked indicating their purpose and operation.

8. The overdrain of the high rate sand filter shall be hydraulically designed to ensure an even flow of
water through the sand at the correct rate without channelling or turbulence taking place.

9. The underdrain system shall be designed to eliminate the possibility of any transference of sand
between the filter and the pool and constructed in non corroding material.

10. All tanks shall be fitted with sufficient access or manholes of correct size to enable safe and correct
servicing and loading of medium.

Page 4 Section 1 Filtration


Spata Standards Volume Two (1999)

GRP PRESSURE VESSELS

With a GRP vessel the resinlglass ratio should not exceed 2 - 2.5 parts resin to 1 part glass by weight
evenly distributed throughout the vessel and its design and method of fabrication shall be such that
there shall be no resin rich area.

Tanks shall be hydraulically pressure tested to a minimum of 1.3 x Design pressure of tank for a period
including a surge test of 60 minutes with a standard production lid or aperture sealing device. GRP
tanks shall also be subjected to a re-cycling implosiodexplosion test to stimulate the switching on an
switching off of the filter.

All glass reinforced plastic swimming pool filter tanks shall be:-

1. Of the permanently jointed type by means of glass and resin (i.e. one piece)
2. With two or more parts suitable jointed by means of gasket or sealing 0 ring and secured by
corrosion resistant bolts, set screws with nuts and washers or a ring.
3. Free from sharp corners thin lips or rims at mating faces such as are commonly found in metal
tanks incorporating quick release type clamping rings for jointing the two halves together.
4. In accordance with BS4994.

PRE COAT FILTERS

Pre-coat filters, both pressure and vacuum, shall be correctly hydraulically designed and engineered so
that there is a pre-coat of not less than 1.6mm (.0625in) of the filter septum. The pressure vessel should
be manufactured from a suitable, durable and non corroding material and should have a suitable,
resealing,jointing system to allow for the removal of the septums.

Both the tank and jointing system should be capable of withstanding a pressure of 1.5 times the shut off
pressure of the pump used. Vacuum filter tanks should be able to withstand the pressure developed by
the weight of the water contained therein and, in addition, should be able to withstand the crushing
pressure developed under a vacuum of 500mm (20 ins) of mercury, both with a safety factor of 3.5 or
the design factor, which ever is greater.

The determination of the filter area shall be made on the basis of a true and effective supported septum
surface. In the case of fabric septum the area computations shall be made on a basis of measurements of
the septum support in a reasonably constant plain. Area allowance shall not be granted for folds in the
septum fabric or deviations in the septum which could easily bridge.

The tank containing the filter elements shall be constructed of steel, plastic, or other material which
will satisfactorily provide resistance to corrosion with or without protective coating. Pressure vessels
shall be designed for a working pressure equal to the shut off head of the pump with a safety factor of
1.5.

The filter elements shall be fabricated of corrosion resistant materials throughout. They shall be
designed to be adequately resistant to a differential pressure between influent and effluent of not less
than the maximum pressure which can be developed by the circulating pump, and shall be of adequate
strength to resist any additional stresses developed during the cleaning operation. The filter septum on
which the filter media is deposited shall be provided with openings, the minimum dimensions of which
shall not be greater than 0.13mm (0.005in).

Provision shall be made to introduce the filter media in to the filter in such a way as to evenly pre-coat
the filter septum before the filter is put into operation. The amount of filter aid shall be selected to
provide at least the same protection to the filter septum as will be provided by the use of 780 grams per
m2 (0.15 lbs per ft2)of diatomaceous earth per filter area. Where crushed volcanic ash, or the equiva-
lent, is used in lieu of diatomaceous earth filter media, then the ratio shall be related to the bulk and not
to the weight. 520 grams per m2 of filter area (0.1 lbs per .)'tf

Section 1 Filtration Page 5


Spata Standards Volume Two (1999)

FILTER MEDIA

LOW RATE SAND SYSTEMS

1. Filter sand should be a hard uniformly graded mineral free silica material with effectively particle
sizes between 1.3mm and .83mm (.05in and .033in) with uniformity co-efficient of 1.45-1.69.
There should be no limestone, or deleterious matter present.
2. Other types of filter media are acceptable providing the particle size is within 0.3mm (0.012in) of
that specified for sand and a uniformity of 1.75 maximum, and will not deteriorate or dissolve
under normal use.
3. Filter and freeboard should be sufficient to enable a satisfactory backwash without loss of sand.
4. There should be not less than three grades of gravel or suitable supporting media which should be
clean, uncrushed, rounded, non-porous incalcareous material.
5. The total depth of the gravel supporting bed should not be less than 30Omm (12in) and each grade
should be lOOmm (4in) or more in depth. Each layer of gravel should be level to prevent the
intermixing of adjacent grades. The top layer should vary in size between 2.5mm and 1.25mm (.lin
and .05in). The next layer should vary in size between 6.4mm and 2.5mm (.25in and .lin) the
bottom layer should vary in size behveen 12.7mm and 6.4mm (.05in and .25).
6. Sand filters with varying depth of filter bed, specially engineered underdrain systems and fewer
layers or less depth of supporting gravel media, will be deemed acceptable providing their field
use and design criteria are in accordance with manufacturers claims.

m D I U M AND HIGH RATE SAND SYSTEMS

With medium rate filtration, the bed consists of a pea gravel base of approx 2530% of total media
supporting the remaining 70-75% of silica sand with high rate filtration the sand bed is of a constant
size particulate grade of silica sand throughout and support media is not used. The filter is hydrauli-
cally designed to permit an even distribution of the water over the whole surface area of the sand bed.
In these systems the dirt is allowed to penetrate the sand bed to a predetermined depth.

Medium and high rate sand filter systems shall be designed and installed to operate at a rate not
exceeding 50m3 per hour per m2of filter area (1000 gallons per hour per ft2of filter area) and capable
of filtering down to approximately 7/10 microns.

Nothing in these standards shall preclude the use of an alternative medium to a silica medium providing
that its use conforms to the requirements laid down by the filter manufacturers and produces the water
quality required.

FILERAIDS

COAGULANTFEEDERS

A pot type coagulant (slurry) feeder or a positive solution feeder may be provided for feeding a
coagulant solution to the filter influent. A flow through the feeder shall be induced proportionate to the
filter influent, for introducing the coagulant to the filters. The pot shall be of approved design and shall
be complete with control valves, one of which should be a needle point type, should be not less than 57
grams (202) or nut alum or sodium aluminate per 0. lm2(lft’) of filter bed area.

Where a coagulant has been used then an air scourer should be provided to assist in the breaking up
and cleansing of the coagulant and sand bed on the backwash cycle, and reduce the backwash water
required.

Page 6 Section 1 Filtration


Spata Standards Volume Two (1999)

WATER CIRCULATING PUMPS


The swimming pool pump is the heart of the circulation system and thus design is of paramount impor-
tance. Design of size, type and capacity should be calculated in accordance with the required flow rate
taking full account of any head loss. Sufficient ventilation must be afforded within the plant room.

Each pump should be mounted on a plinth and the use of anti vibration pads or mountings should be
considered on commercial or sensitive applications.

Each pump should be fitted with isolation valves to permit removal for servicing and non return valves
should be fitted on commercial applications to prevent back pressure. In commercial applications, it is
also good practice to provide a standby pump where 3 50% duty pumps are available. Design should
permit each of the 3 pumps to function with each other for rotational use. Pumps should be manufac-
tured in non corrodable materials with non corrodable impellers and chemical resistant seals. An
integral coarse strainer or a separate prefilter should be incorporated with all swimming pool pump
installations.

Pumps should be sited below water level wherever possible, but where it is necessary to site above
a water level a self priming pump must be fitted and the total lift required should be calculated in the
vertical plane. Where pumps are site above pool water level, pipework should be laid below water
level as far as possible to rise to the pump as closely as possible and minimise vertical water lift.

RECOMMENDEDSTANDARDS

The installation of all circulating pumps shall be in accordance with these standards. Pumps shall not
be over sized in attempt to decrease the turnover period by increased flow rate in excess of the filter
manufacturers design criteria. Calculations shall at all times take into account the friction head loss
throughout the whole system.

1. Units shall be protected against damp and rust.


2. The duty of the pump must be specifically designed to the system head of the complete filter
installation and the design characteristics of the filter.
3. Pumps incorporated into the filtration system should not be required to do other duties where
ancillary equipment fitted. A separate pump should be fitted for any ancillary equipment.
4. The works and services to the pump influent and from the pump effluent point shall be designed to
ensure that the pump operates at all times in accordance with the manufacturers specification,and
within the performance curve. It should be ensured that performance is not adversely affected by
cavitation, restricted return flow or frictional head loss.
5. Noise insulation -Where installations of pumps are made adjacent to or inside residential build-
ings or where noise could be aggravating environmental factor, then insulation against noise shall
be provided in the form of anti vibration mats or insulation.
6. In commercial applications the provision of a standby pump is recommended or alternatively 3 x
50%duty pumps.
7. In level deck design the use of 2 No 50%duty pumps to enable connections to both the main drain
and the balance tank is recommended.
8. The use of a non return valve on the suction side of an undersized pump is unacceptable. The pump
should be replaced with the correct size.
9. The electrical controls and connections of all pumps should be installed in accordance with the
current IEE regulations.

Section 1 Filtration Page 7


Spata Standards Volume Two (1999)

STRAINERS
With all types of filter p n t , a suitable strainer or screen s..all be used to remove solids, debris, hair,
lint etc.

Where a wet well is provided, the strainer shall consist of removable screens through which all water
entering the pump will pass. Where no wet well is provided or where the suction cleaner or any other
suction line is piped directly from the pool to the pump, pot type strainer, with removable strainer
basket, shall be provided.

The strainer basket shall of rigid construction sufficiently strong to prevent collapsing when clogged. It
is recommended that one spare strainer basket shall be provided. Any type of screen or strainer basket
shall be fabricated of a corrosion resistant material or shall have a protective coating of such material.

Screens or strainer baskets shall have a maximum opening not greater than 75% of the maximum
dimensions of the solids which will pass through the pump impeller without clogging and the .total clear
area of all openings shall not less than 10 times the area of the largest size pipe from the pool to the
strainer influent pipe.

BACKWASH
There are 3 main points to be addressed when designing the filter backwash system.

- The ability of the pump to raise the filter bed and correctly cleanse the media. Filtration velocity
for backwash should not normally be below 30m3/m2/hrbut manufacturers instructions should be
taken into account.
- The capacity of the drainage system which should be sized to cope with 10%above the maximum
backwash rate.
- The availability of water for the backwash either from the pool or the balance tank.
- Note -It is recommended that a central drain be sited on the plant room of a commercial installa-
tion floor with an automatic sump pump.

Page 8 Section 1 Filtration


Spata Standards Volume Two (1999)

RECRCULATORY SYSTEMS AND FLOW FITTINGS

Although there are many forms of recirculatory systems these standards will describe only the basic
principles.

Water is drawn both from the surface and from the bottom of the pool, and is returned into the pool at a
predetermined rate. The object is to achieve the greatest possible mixture of the recirculated water,
keeping fine matter suspended and at the same time removing safely both from the surface and the
deeper parts of the pool in a way that will avoid any dead spots (i.e. water which because of the
inefficiency of the recirculatory system is not disturbed by that system).

The removal of the water from the surface of the pool is an important factor as 70-75% of impurities
e.g. body oils, in the water are found within the top 75mm.
This is achieved by one of the undermentioned systems.

1. Use of surface water skimmers which remove the debris from the surface by surface tension.
2. Deck level pools, which operate under the same method. (Various designs are available and shown
~

in detail in Volume 1).

No matter how effective these systems may be, inevitably certain extraneous matter sinks to the bottom.
The generally accepted methods for removal of debris are either an underwater vacuum cleaner or an
automatic mechanical cleaning system.

A properly equipped pool will contain the following recirculatory fittings:-

1. Drains located at the deepest point of the pool (with suction to ensure velocity is not likely to
endanger bathers).
2. Surface water skimmers or
Overflow channels when deck level design is used with suitably designed outlets to the balance
tank (see balance tank).
3. Return inlets, sized accordingly to the flow rate volume and the general design criteria of the
system.
4. Suction point for an Underwater cleaning device.

Note - Siting the flow fittings is of particular importance to ensure maximum circulation and design
needs to address not only water flow, bathing load and filtration factors but also size, shape and depth
of the pool.

These standards require that both flow and return fittings and pipework to the pool operate at 100%of
the water turnover rate. Therefore the total volume of water turning in one hour must be permitted
through the recirculatory system. To ensure this the following criteria are recommended.

RETURN INLETS

Inlets should be capable of passing the total design flow rate (100%)

1. Water inlets and fittings should be constructed of non-corroding material and protected by a
suitable grille with a maximum width between bars of 8mm.
2. Screws and fittings should be tamper proof with secure face plates.
3. Inlets should not protrude in the pool and no sharp edges or corners should be evident.
4. Except when provided as a massage jet or rapid flow inlet, no inlet should provide a velocity
greater than 2.4/2.745m/sec in private pool conditions, 1.5-2dsec in commercial pool conditions
and .5dsec where turbulence may present a problem.

Section 1 Filtration Page 9


Spata Standards Volume Two (1999)

e SKIMMERS

1. The skimmer should be manufactured of a material of lasting quality stressed to withstand concrete
compression where applicable

2. Where more than one skimmer is employed, the pipe sizing shall be so balanced as to ensure the
optimum efficiency of each skimmer at all times.

3. It should be possible to control each individual skimmer at all times.

4. Except where the skimmer is specially designed as a portable separate unit, skimmers should be
built into the pool walls. All skimmers should be designed to substantially assist in the removal of
floating oil and other flotsam and should meet the following requirements.

5. A floating weir (hinged or circular) should be provided which should establish the water level at
which it overflows into the skimmer chamber, and this weir should have a free self adjusting range
in elevation of not less than lOOmm (4")during which range it will be fully effective in acting as a
weir, thus creating a differential in the level of the water in the pool and the level of water in the
skimmer chamber.

6. An easily removable and cleanable skimmer basket, through which all skimmed water must pass
should be provided to trap hair, lint and other large solids which might cause damage, should they
pass through into the pump.

On a skimmer system - recommendationsare for 70% - (surface) 30% (main drain) ratio. 70:30

On a level deck system this recommendation changes to a minimum 50%:50% ratio to a maximum
80%:20% ratio.

A Flow rate of 4.5m3/hris provided on a 1 '/z " suction line, (per skimmer unit), If 2" suction pipe is
used 9.5m3/hrcan be achieved.

OR

CHANNELOUTLETS

Sufficient outlets, dependant on turnover and usage should be introduced into the channel. In commer-
cial pools with heavy bather loads it may be preferable to introduce sufficient outlets to provide for
100%of water turnover. Where the balance tank is connected to the pool additional outlets can be
provided directly above this tank.

Page 10 Section 1 Filtration


Spata Standards Volume Two (1999)

MAIN DRAINS (SUMPS)

1. The main outlet drains should be constructed of non corroding material, and each should be
protected by a suitable grille or similar covering. The maximum distance between the bars of the
grille must not exceed 8mm (6/16in) or the equivalent where a perforated grille is used. The flow
of water through the total effective area of each grille should not exceed 30Omm (lft) per second.
2. At least two outlets should be provided at the lowest point of the floor to drain the entire floor
area completely.
3. The spacing between 2 main drain outlets should not be greater than 2m apart on centres and not
more than 3m from each side wall.
4. Where despite splitting of velocity, any possibility of danger remains to bathers from the main
drains, it is strongly recommended (particularly in shallow teacher pools) that an anti vortex plate
should be fitted over the main drains in place of the grille. This anti vortex plate will preclude any
remaining possibility of suction effect on the human body.
5. Both anti vortex plates and sump grilles should be securely fixed to prevent removal by unauthor-
ised persons.
6. Water flow around the outlets should not exceed 0.5ds.

For safety reasons, it is recommended that the flow rate for the sump is split between at least 2 sumps
to ensure velocity is not such to create a danger to bathers. The size of the grille should be as large as
possible creating a slow even flow through a large area and thus preventing entrapment. A grille gap of
8mm max is advised.
Water flow at the sump should not exceed OSdsec and the following formula can be applied to
calculate this velocity:-

Velocity d s e c = Circulation rate (m3/hr)

Free open area of grille (m2) x 3600

VACUUM FITTINGS

Vacuum fitting(s) shall be located in an accessible position(s) below the water line and shall be
constructed of non corroding material. A sealing plug should be fitted when not in use.

Section 1 Filtration Page 11


Spata Standards Volume Two (1999)

BALANCE TANK
The sizing of the Balance Tank will depend on several, often conflicting, criteria. The tank is provided
to hold a volume of water, in excess of the pool volume, to compensate for the displacement of water
when bathers enter the pool.

It must, therefore be large enough to take the total displacementof the maximum design load entering
the water at one time.

As bathers are prone to moving it must have the capacity of receiving a surge of water which, because
of wave action, may be larger than the displacement volume. An additional volume must be added to
the displacement volume. It is impossible to calculate accurately this volume and of course a safety
margin must be included. The tank must also be large enough to allow access for maintenance and
cleaning.

The position of the tank may well, in part, dictate its dimensions. One built into the pool structure may
be oversized while a separate tank may well be smaller.

Design of the balance tank should take into account:-

- Bathing load
- Use of the pool
- Backwashing requirements
- Health and Safety requirements (2 manhole access points for commercial installations)
- Tank cleaning requirements

It is widely accepted that the average displacement of a ‘standard’ body is about 60 litres and that in
shallow water the displacement is approximately 75% of that figure. Consequently displacement
volume starts to be calculated. There are several formulae for calculating the volume of the balance
tank;none can be totally accurate and some are laid out in the Appendix.

The following formula (Rule of 3) is based on experience but does not preclude the use of others. Both
PWTAG and DIN offer alternative formulae which are equally acceptable subject to specific require-
ments.

The formula base is Length x Width x X. The total of this sum is the base capacity which becomes
1/3 rd of the total required balance tank area.

X can be deduced by using the following table

Commercial pool with excessive activity 75-100 litres


Commercial pool with play/water features 50-75 litres
Commercial pools (swimming only) 25-50 litres
Private pools 15-25 litres
We can therefore substitute X as desired
i.e. 25m x 12.5m = 300 (300 x 50) = 15,000 litres
15,000 = 15m3
The base capacity is therefore one third = 15m3
If we add on a third for surge capacity 15m3
Plus a third safety capacity 15m3
The total capacity 45m3

Page 12 Section 1 Filtration


Spata Standards Volume Two (1999)

e .
It is very important that the tank is adequately sized for the use of the pool.
If selecting a lower capacity within the relevant range, any possible practical problems should be
considered. These include:-

- Heavy bathing activity causes overflow and the displaced water will take time to get back to the
pool. Pump sizing needs to be addressed to ensure sufficient flow is available to return this water
from the balance tank to the pool at a reasonable rate.
- When lengthy backwashing takes place the water level may drop too far down the balance tank.
Unless an automatic low control is fitted to cut off the pumps, air can be pulled through the pumps
or a delay in backwash caused due to automatic shut off.
If all backwash water is to be taken from the balance tank and not the pool, consideration should
be given to fitting a bypass fill line to by pass the automatic top up and fill the balance tank prior to
backwash.
- If the base capacity of the balance tank is insufficient for backwashing purposes then either a top
up tank or a balance line between the main pool and the balance tank can be fitted under control of
a ball valve.
- PumDs - If a single pump is fitted this pump will cut off when the water drops too low in the
balance tank.
- If the design of circulation provides for 50% through the sump and 50% overflow then one pump
can be fitted to the sump and one pump to the balance tank. Should low level cut off the pump to
the balance tank then 50% circulation will remain available from the sump. 100% can still be
achieved if a balance line between the pool and balance tank has been fitted.
- With correct valve design and use, then both pumps can be used from the main pool to ensure
100%pumping capacity.

Once the volume has been decided the design of the tank should take into consideration the construction
criteria laid down in Volume 1 of these Standards.

The balance tank of a commercial pool should be constructed in steel reinforced concrete to the
equivalent strength of the pool (see Volume 1). A residential pool may have a balance tank small
enough to enable the use of a specialist non corroding underground tank.

The tank should preferably be sited between the plant room and the pool, often as an extension to the
deep end of the pool. A commercial installation should be fitted with two easy access manholes where
the tank will exceed 5m in length. It is recommended that consideration be given to siting access traps
over pipework fittings where possible for ease of future maintenance.

Controls should include a safety overflow with outlet to a suitable place,(preferencewould be to site
where any overflow would be noticed) a flow switch to provide for automatic water top up, a level
indicator and a float operated control suction valve. Consideration should be given to a balance line
with a ball valve or a by pass fill line.

Circulation to/from the balance tank should include a Non Return Valve between the tank and the plant
room and connection of one filtration pump directly to the tank to ensure adequate circulation is
achieved from the tank and not simply from the pool sumps. The use of two pumps will also provide
for independent circulation from either the overflow channel or the sump in cases of emergency/
maintenance etc.

It is equally important to ensure that the surge channel and outlets thereto are correctly sized (see
system design).
The surround channel must be of sufficient size to accommodate the overflow and have sufficient drain
off points into the tank to allow for a rapid evacuation of the channel. It is interesting to note that a
25mm rise in a 25 metre by 12.5 metre pool displaces 7.8m3 water and a 300mm by 300mm channel
around such a pool has a capacity of 7.8m3.

Section 1 Filtration Page 13


Spata Standards Volume Two (1999)

POOL PIPEWORK. FITr"GS AND VALVES


Design of the pipework is critical to the correct operation of the pool and plant. Pipework should be of
sufficient size to enable the flow fittings, the pumps and the filtration plant to operate as designed
without causing restriction or friction headloss.

When designing underground pipework, thought should be given to future maintenance and pipework
ducts should be situated as far as possible where inspection can be undertaken.

Similarly, care should be given to ensure thorough cleaning of surfaces before connections and use of
the correct adhesives when solvent welding. When using cleaner and solvents ensure the area is well
ventilated to comply with the health and safety requirements. Ensure also that empty cans are disposed
of safely.

PIPEWORK SIZING

- Suction Velocity (maximum 1.2 metredsec)


- Return Velocity (maximum 2.0 metreslsec)
- Grille Velocity (maximum 0.3 metredsec)

The minimum internal diameter of the pipe to be used for a given flow can be calculated using a single
expression and knowing whether the pipe is on the suction side of the pump.

(See System DesigdAppendix)

WOMMENDED STANDARDS

1. Pool pipework should be sized to permit the rated flow for filtering and cleaning without exceed-
ing the maximum head at which the pump will provide such flows.
2. In general the water velocity in the pool piping should not exceed 3m (loft) per second, unless
summary calculations or measurements are provided to show that rated flows are possible with the
particular pump fitted and pipework installed.
3. All pipework, pool fittings, and works and services generally within the pool project shall be of
non corroding PVCIABS.
4. Class C (6 bar) is considered suitable for standard residential use whilst for underground
pipework for commercial pools and in cases of specific stress Class E (16 bar) should be used.
5. All solvent joints and connections should be cleaned and prepared to ensure a clean, leakproof
resistant seal can be achieved specialistjointing compound is recommended of the type of
pipework should be used.
6. Metal fittings are to be used to connect different types of pipework.
7. Where pipework is to be laid underground or in trenches due regard is to be paid to the bedding
.and backfilling of such trenches, which should be pea gravel or similar to prevent damage or
movement to the pipework.
8. Relevant BS and DIN standards are listed below:-
- Imperial Pipe - BS4346 Part 1
- Imperial Fittings - BS350516
- Metric Pipe - DIN 806112
- Metric Fittings - DIN 8063, IS0 727, KIWA 54, UN1 7442175
- Threaded Fittings - BS21, DIN 2999, IS07
- Solvent Cement - BS4346 Part 3
9. Underground water pipe should be NDPE approved.
10. ABS should not be used when ozone is designed into the system.
11. Pipework should be supported at suitable intervals and in any case not more than l m runs.

Page 14 Section 1 Filtration


Spata Standards Volume Two (1999)

Valves appropriate to the installation shall be fitted throughout to ensure the proper functioning of the
filtration and piping system.
When the pump is below the overflow rim of the pool:-

1. Valves shall be installed on the vacuum, main suction line and main skimmer line, and located in
an accessible position outside the walls of the pool.
2. A valve shall be installed on the main delivery line located in an accessible position outside the
walls of the pool.
3. Valves shall be made using non corroding material and dissimilar metals shall not be used. Where
this is inevitable, a sacrificial anode shall be introduced into the system to prevent electrolysis
taking place.
4. When selecting valves, water treatment particularly ozone should be taken into account.
5 . Combination valves and ‘butterfly’ valves may be installed if the material and the design comply
with the intent of these standards.
6. Multiport valves are acceptable when fitted singly (usually private installations).
7. Automatic backwash valves are acceptable providing their design criteria comply with the
backwash requirements for the filter.

EOUIPMENTSPECIFICATION

Heavy duty plastic pipework in accordance with BS3505 should be incorporated for the pool and plant
room pipework. UPVC or ABS are considered most suitable. Whilst it is preferable to lay underground
circulation pipework in ducts etc. Where underground buried pipework is unavoidable, care must be
taken in the choice of materials to be used.
Fittings should be in accordance with BS4374.

PIPEWORK TESTING

All pipework shall be hydraulically tested to a minimum pressure of 10-15 psi (residential) or 35-45
psi (commercial)with a maximum equivalent to 1 ?4times the shut off head of the pump and this
pressure shall be maintained for a period of 30 minutes. A certificate to this effect shall be provided by
the installing contractor is so requested by the client. (See Appendix B)

Section 1 Filtration Page 15


Spata Standards Volume Two (1999)

H L W T I O N - MISCELLANEOUS

The use of water is controlled by the Water Authority and it is important that current Water regulations
and bye-laws are considered and adhered to. Current regulations include the following:-

1. Direct connection to public utilities, main water supply and main drainage is generally unaccept-
able as no direct mechanical connection shall be made from the source of domestic water supplied
to a swimming pool or to the piping thereof. Some local authorities however will accept the use of
a double check valve, thereby eliminating any connection to what may become a source of con-
tamination.
2. The water supply for filling the pool, when derived from a domestic water supply, shall be by
means of an overfill spout or hose or via a break tank,if no double check valve is permitted.
3. Wherever any waste from the swimming pool is connected to a sewer or to a surface drain, an air
gap or a relief manhole shall be provided which will positively preclude any surge or backflow
from introducing contaminated water into the swimming pool or the water treatment plant.
4. Every circulating system on public swimming pools shall be provided with a rate of flow indica-
tor, with the activating element, installed with adequate clear distance up stream and down stream,
to obtain a degree of accuracy within +5%.
5. In sand filter installations the rate of flow indicator shall be on the pump discharge line leading to
the filters and shall be calibrated for, and provided with a scale reading in litres per minute or
gallons per minute and shall have a range of at least 10% below the established.

Page 16 Section 1 Filtration


Spata Standards Volume Two (1999)

SECTION 2

CHEMICAL DOSING

a
Spata Standards Volume Two (1999)

a
Spata Standards Volume Two (1999)

-
SECTION 2 CHEMICAL DOSING

WATER TREATMENT

The water treatment or chemical dosing of the swimming pool is dealt with in detail in Volume 3.
‘Water Treatment and Chemicals’ where selection of the correct system and chemicals is discussed in
detail. This volume concerns itself purely with the installation, operation and maintenance requirements
applying to type of system using the chosen sanitiser and pH control agent.

WATER TREATMENT METHODS

DOMESTIC POOLS

The water balance of these pools can be controlled by hand dosing, semi automatic or fully automatic
methods.

In all cases, the operator of the pool must be fully conversant with not only safe procedures but with
effectiveness of these procedures. Dosing and Water Testing procedures should be demonstrated
thoroughly and written instruction worded simply and effectively should be provided. Particular
reference should be made to the dangers of:-

1. Mixing Chemicals
2. Incorrect storage
3. Changing chemical containers
4. Permitting children access to chemicals

COMMERCIALPOOLS

These recommendationsare in accordance with PWTAG guidelines, whilst incorporating specific


points directed at those who design, install and operate swimming pool dosing equipment.

Fully automatic dosing is the recommended method for all commercial pools, should other systems be
provided a greater level as management and supervision will be essential.

The selection of sanitiser and pH agents must be considered in conjunction with Volume 3 but with
bearing to the incoming water analysis and prospective use of the pool.

In all cases, the operator of the pool must be fully conversant with not only safe procedures but with
effectiveness of these procedures. Dosing and Water Testing procedures should be demonstrated
thoroughly and written instruction worded simply and effectively should be provided. Particular
reference should be made to the dangers of:-

1. Mixing chemicals and incorrect identification of required chemicals.


2. Incorrect storage and handling
3. Incorrect containers
4. Untrained and inexperienced operators
5. Incorrect, inadequate or inefficient water testing
6. Incorrect ordering
7. Incorrect maintenance, topping up containers, sloppy cleaning up etc.
8. Lack of Maintenance on safety equipment

Section 2 Chemical Dosing Page 1


Spata Standards Volume Two (1999)

RECOMMENDED STANDARDS

DESIGN
Whenever chemicals are in use there is a hazard. To minimise such hazard the following points should
be addressed:-

1. Siting of day (and bund tanks) of different chemicals must be sufficiently separated to prevent
cross contamination and possible explosion, fire or gaseous exchange. Ideally a dividing wall
could be used.
2. They should be bunded (ie walled round) to collect any spillages.
3. All chemical pipework, suction and delivery lines and tanks should be marked to meet regulations
and to identify the exact contents. Pipes should be labelled with the direction of flow as well as
coded for their contents.
4. Pipes and their connections should have different fittings for different chemicals where possible.
5. Dosing equipment should be designed to shut down should the pool circulation system fail.
6. All systems should be installed and identified so that written work procedures can be followed
safely.
7. Suction lines, dosing pumps, delivery lines and injection points should be as close as possible to
the flow and return pipework, to avoid extended systems - but without obstructing routine access.
8. Pipe runs should be as short as possible.
9. Dosing systems should be accessible only to authorised personnel, and not be in a general working
area.
10. All materials should bee corrosion resistant - externally as well as internally - and able to
withstand the pressure in the system.
11. Pipe runs containing aggressive chemicals should be ducted where leakage could cause damage to
people or plant.
12. Chemicals must be labelled and stored to ensure no error can occur with incorrect chemical
addition.
13. Chemical storage should be isolated from the plant room. Different chemicals within such a
chemical store should be isolated from each other.
14. Signs and Notices should be displayed in the chemical store and adjacent to the chemical dosing
system to assist safe practice specifically:-
- Do not mix chemicals
- Identification of chemicals in use
- Emergency Instructions and Procedures
15. The plant room should be provided with full safety apparatus to include:-
- Eyewash station
- Face mask and respirator
- Rubber gloves and boots
- Goggles or face respirator
See Volume 3 for details of chemical selection and design procedures.

Page 2 Section 2 Chemical Dosing


Spata Standards Volume Two (1 999)

INSTALLATION

Sanitiser should be dosed before the filters in the circulation system to avoid mixing with pH control
agents and to provide disinfection to the filters.

agents should be introduced after the heat exchanger to avoid mixing with the sanitiser and avoid
corrosion of the heat exchanger elements.

All chemicals should be introduced at sufficient distance from the return pool to provide adequate
mixing with water.

EOUIPMENT SPECIFICATION

Positive displacement diaphragm pumps should be selected for feeding solutions in pool water al-
though peristaltic pumps can be used on small installations. Pumps must comply with current regula-
tions and directives - eg the machinery regulations and EMC directive - and should carry the CE mark.

The design of pumps, and of the treatment system as a whole, should incorporate features that ensure:

- the self decompression andor flushing of parts containing chemical solutions


- self priqing on start up
- the self dispersal of gases formed by the natural decomposition of pool chemicals
- self pressure relief in the vent of a blocked pipe or injection fitting
- that siphoning is prevented

The materials of the liquid ends of the pumps should withstand the chemical corrosion and physical
pressures. The outside of the pump should also withstand chemical corrosion and be rated to protection
class IP65.

Correct sizing for both the pool water volume and the type of chemical to be used is imperative. See
Volume 3.

Section 2 Chemical Dosing Page 3


.- . .

Spata Standards Volume Two (1999)

DAY AND BUND TANKS

These should be built of UV stabilised polyethylene, although fabricated polypropylene tanks may be
used for chemicals other than hypochlorites and should include:-

- level indicator alarms at high level (overflow), low level (refill) and extra low level (alann and
close down), or clearly visible means of determining the tank contents
- ovefflow (to bund)
- connection to bulk tank,including inlet valves
- water inlet (dilution, mixing) from head tank or pool (water byelaws do not allow direct connec-
tion; it must be a break connection)
- suction pipework to pump, away from the bottom of the tank.This pipework should include a
strainer except where insoluble residues of calcium hypochlorite or carbon slurries are being
dosed j
- a drain for removal of solids and sludge from the bottom of the tank,or be easily disconnected to
_ .
pick up and wash out.
I. .)
They may also need:-

- a liquid dilution device


- a liquid chemical transfer pump from the container the chemical comes in
- an electric s&r for preparing solutions

Day tanks normally have furtures on the top to mount dosing pumps; this keeps suction lines relatively
short, and avoids the possibility of a suction head forcing liquid through the dosing system when a
valve fails.

A bund tank is a safety measure to collect any spillage from the day tank or carboy and thus contain the
hazard. The tank should be at least 110%of the day tank and can be constructed in brick with a chemi-
cally resistant internal finish or in chemically resistant plastic as the day tank.

Bund tanks for acids and alkalis should not be adjacent, but in any event an 8OOmm (or to suit the day
tank) high partition should be provided between adjacent bunds. If the bund wall itself is to be at this
height, then consideration should be given to the lifting of chemicals and suitable lifting apparatus or
arrangements provided.

The bunds should be provided with a sump for emptying and cleaning purposes but in no circumstances
should it be connected to any sewer or surface water drain.

Page 4 Section 2 Chemical Dosing


Spata Standards Volume Two (1999)

e DRY CHEMICAL EOUIPMENT


There are several dry feeding systems which automatically prepare solutions from dry chemicals. The
powder may be transferred to a hopper and then fed, perhaps by means of a volumetric screw, into a
stirred tank of water. From there the prepared solution is pumped to the point of use. Alternatively, the
dry material may be extracted from the drum and carried to the tank. In either case, the system must be
engineered so as to prevent the powder getting damp, which causes caking and blockages, or even (as
with dichlorisocyanurates)a hazard due to fuming.

PIPEWORK

Pipework should be of materials resistant to the chemical being conveyed at the system temperature
and pressure. When working out the maximum pressure the system should allow for failure of all
safeguards.

Calculations must assume that the dosing pump is working at its maximum pressure against a blockage
and pumps must either be unable to produce enough pressure to create danger of explosion or breakage
or there must be a system of pressure relief. Chemical pipes shall be of a suitable compatible material.

Pipework passing across working areas should be protected against physical damage. Where a fracture
could cause damage to people or property (particularly if overhead), the delivery pipe can be run
through a protective sleeve or pipe. The protective pipes should be freely draining and arranged so that
any leakage gets back to that’s chemicals bunded area - or another safe collection point. Pipes should
run as directly as possible between points, without cross connection. Right angle bends should be
avoided and flexible tubing or swept bends used where possible.

Pipework must be sized according to the flow of chemical through it; sizes should not be mixed. It
should run separately for each chemical system, and installed so that interchange is not possible during
maintenance. Changes between the two forms of hypochlorite will often mean changing ID of pipework.

VALVESAND FI7TINGS

Isolating valves should be installed wherever items may need to be removed from the system, as well
as for operational reasons. They should be ball rather than diaphragm valves. Special valves in the
delivery line are usually required to relive excess pressures generated by the dosing systems if valves
are wrongly closed, or blocked. This is normally done with pressure relief valves set safely above the

e system pressure. Alternatively, pumps which stall at a safe pressure may be used, but this pressure
should be verified and the system tested accordingly.

Pressure relief valves should be located close to the pump, and should leak liquid back into the day
tanks -preferably with a signal that this is happening. Calcium hypochlorite can settle and block a
valve or a line, this must be taken into account when siting relief valves.

Back pressure valves operate normally at positive pressure in the delivery line, close to the pump.
They may be needed to provide dosing accuracy where system pressures are low or vary. This would
happen if dosing has to be before the pool water recirculating pump which is not recommended for
liquid chemicals.

A priming valve, or some other means of relieving pressure before breaking joints for maintenance, is
essential.

Section 2 Chemical Dosing Page 5


Spata Standards Volume Two (1999)

INJECTION FITTINGS
These connect the delivery line to the pool water recirculation pipework. Dosing points should be:-

- easily accessible for maintenance


- at least ten pipe diameters from any other dosing or sampling points
- located where any slight leakage from one does not drip on to a lower one, or any other critical
component, causing corrosion and subsequent failure.

All injection fittings should incorporate a non return valve to prevent pool water from entering the
chemical dosing system - particularly when the plant is shut down. Injection points can be fitted with a
stayclean assembly which enables the operator to rod through them to clear blockages.

OPERATION
Written procedures are essential for day tank filling, mixing or diluting chemicals and cleaning injec-
tors etc. There must also be built in safeguards to cover those periods when the plant is not attended.
Operational procedures should include a general survey to make sure the whole system is operating
satisfactorily.

FAULTS
The system must fail safe if a fault develops: the system shuts down and an alarm sounds. There is little
danger in turning off the treatment system for a short period to investigate a problem, as long as there
are adequate reserves of disinfectant in the pool water.

Any disruption to the pool circulation must interrupt chemical treatment to prevent chemical build up in
the system - which could gas pool users when circulation restarts. (The gas is chlorine, formed by the
combination of disinfectant and acid dosed into the water confined in the pipe).

If the dosing plant is water operated, the water should come from the pool system and it too would fail
safe with the circulation failure. Equally, dosing pumps regulated by a water flow meter signal offer a
simple fail safe system. Otherwise there must be at least an electrical interconnection between the main
recirculation pump, motor starter and the dosing system so that the dosing stops on motor failure. But
this is best supplemented by pressure or flow sensors (which themselves fail safe), closing the system
down when the main water system loses pressure or flow. This will overcome problems of loss of
main recirculation pump prime, even when the motor runs.

During shut down periods of more than a few days, valves in filling lines between the day and bulk
tanks should not be closed, as decomposition products from trapped hypochlorite may build up pres-
sure. After such a shut down, the whole of the dosing system should be flushed through gently with low
pressure water.

Page 6 Section 2 Chemical Dosing


Spata Standards Volume Two ( I 999)

COMMISSIONING
Commissioning should be done by trained and experienced engineers from the manufacturer or contrac-
tor. Electrical tests must be conducted so that the system can be commissioned to Institute of Electrical
Engineers (IEE) regulations. The commissioning details should be set down, and added to the written
instructions in the manuals. The whole system should first be tested on water, ensuring that:

- there are no leaks under test pressure


- relief valves do relieve at the correct pressure and in the correct direction
- pumps are calibrated
- pressure peaks do not exceed the maximum specified operating pressure
- all parts are secure and there is no vibration
- suction and delivery pipework is securely fixed, with no mechanical stress to fixed parts (eg pump
discharge is best connected to rigid delivery pipe by means of flexible pipe).

The system can then be commissionedrunning with chemicals, looking at the same points until tests
indicate satisfdctory performance.
I

AUToMATICCONTROL
The chemical treatment of pool water is best automated for both disinfectant and pH control. Such
controllers will optimise chemical treatment in the face of variations in bathing load, pool activity,
even sunshine on the pool. Automatic systems do not. however, replace human operators (though they
may give an alarm when a manual chore, like fdliog a tank. has been missed). They require proper
calibration when fust skt up and regularly the&r. In particular, the choice of sample points is
critical.

DOSING FEEDERS
Dosing feeders are available as either erosion feeders where water flow erodes a dry tablet chemical
(generally one of the different chlorine compounds) or as soaker feeders which dissolve the material
(generally bromine). Generally use is restricted to sanitisers although pH dosing can involve a feeder.

It is extremely important to ensure chemicals added to a feeder are never mixed. The feeder should be
dedicated to the particular chemical material in use. As a safety measure, manufacturers recommenda-
tions must be observed when selecting a suitable feeder for a particular chemical.

FTLTRATION INCOMPA T I B I L W
In no circumstancesshould any flocculating agent, or algaecide, which contains any such flocculating
agent, be used in conjunction with diatomite filtration. Further, no hypochlorite solution, which has an
additive for softening water which in itself is a flocculating agent, shall be used with pre-coat filtra-
tion.

In no circumstances should Treatment by electrolysis using the silver/ion exchange method be used in
conjunction with pre-coat filtration.

Note -See Volume 3 for comprehensive detail on types of dosing and equipment.

Scctiori 2 Chcriiicnl Dosiris Page 7


Spata Standards Volume Two (1999)

I
I

I
I
Spata Standards Volume Two (1999)

SECTION 3

HEATING AND

ENVIRONMENTAL

CONTROL

Including

OUTDOOR SWIMMING POOLS

INDOOR SWIMMING POOLS


~~ ~

Spata Standards Volume Two (1999)


Spata Standards Volume Two (1 999)

a SECTION 3 -HEATING AND ENVIRONMENTAL CONTROL

POOL WATER TEMPERATURES

Swimmers are nowadays requiring higher water temperatures than ever before. Obviously temperatures
should be maintained at a level to suit the optimum amount of pool users. Therefore it is important to
establish client requirements at design stage.

28°C - 30°C (82°F- 86 O F ) appears to be the most common requirement.

Small children, non swimmers and the disabled may find benefit with the higher temperature whereas
training pools may prefer the lower end of the scale.

It is well to bear in mind that chlorine is used rapidly to cope with the increase in micro organisms
caused by the heat and thus chemical costs will rise proportionately, as will energy costs, air tempera-
ture and humidity.

a Temperatures of 38°C - 40°C (100°F- 104°F)are too high for immersion in excess of 10 minutes and
temperatures of 10°C and below likewise restrict usage to 10 minutes.

In all cases of extreme temperatures, swimmers or users should have medical clearance before using
the pool. Alcohol should be avoided. The pool hall should be maintained at 1°Cabove the water
temperature.

OUTDOOR SWIMMING POOLS

DESIGN CONSIDERATIONS

It is generally accepted that outdoor pools built within the U.K. will require a form of heat input in
order for the pool water to be maintained at a comfortable temperature throughout the anticipated
swimming season.

It is important to establish clients expectations of temperature and swimming season before offering a
specific heating system.

a Any chosen system must be compatible with swimming pool water and installed to manufacturers
instructions and relevant standards.

HEAT LOSS

The heat loss for any given pool will depend on the following:-

1. Volume of the pool, depth and surface area


2. Required pool temperature
3. Mean ambient air temperature of the coldest moth of usage
4. Hours per day of operation of the heater - dependant upon the normal hours of use of the filter
pump and, in the case of electric heaters, the number of hours that off peak electricity is
available
5. The time specified to heat the pool from cold in the coldest month
6. The period for which a pool water surface cover is in use and its type
7. Inground or above ground pool
8. Effect of a water table (moving or static) and inadequate drainage around the pool
9. Use of fountain or weir. (These should not be used if economic heating is required. The heat

a 10.
losses from this source could, in certain circumstances, exceed the rating of the heater)
Degree of site exposure PREVAILINGWIND DIRECTION ETC.

Section 3 Heating and Dehumidification Page 1


Spata Standards Volume Two (1999)

The use of pool covers is of considerable help in reducing running costs.

HEATING EOUIPMENT

There are five commonly used systems to provide outdoor pool heating. Each system has differing
characteristics,installation requirements and sizing methods.

FUEL FIRED HEATERS

Gas heaters fall into two categories, specialist (direct) swimming pool heaters where the pool water
flows through the boiler and central heating boilers (indirect) which are connected to the pool water
via a secondary heat exchanger. Gas boilers should only be installedservices by registered Corgi
installers. Direct boilers are normally supplied with thermostatic control. Indirect boilers will require
a control scheme to be designed for the specific site requirements. As a minimum this will include a
pool water temperature sensor to control the boiler/primary water flow.

Gas boilers should be connected to the pool filtration circuit via breakable thermal couplings with the
following considerations.

1. Correct pool water flow


2. A flow switch to stop the boiler in the event of low pool water flow
3. If an automatic chemical feeder is used, installed within the system such that concentrated pool
chemicals cannot enter the boilers heat exchanger.
4. Be installed with service access in mind.
5. Be provided with isolating valves and a bypass for servicing.
6. Be installed for convenient winterising.

If boilers are sited in a plant room, the room must be ventilated to manufacturers recommendations. The
plant room should also comply to Corgihuilding regulations for rooms containing boilers.

As with gas heaters, oil fired heaters are available in either direct or indirect configuration. The design
considerations mentioned in (i) are relevant to oil boilers. Specific appliance installation needs should
be referred to the manufacturersinstallatiodservicing instructions.In the event that an existing house
heating system is linked to a pool heat exchanger, priority should be given to the house heatinghot
water. It is also important to establish that the existing heater is compatible with the pool heating load.

FUEL FIRED HEATING SIZING

Fuel fired heaters are normally sized to heat pool water from cold to design temperature in 60 hours,
assuming no losses. A guide to typical mean monthly unheated pool water temperature is shown in
table (1).

Month J F M A P J J A
OC 3.8 3.8 5.7 7.9 11.2 14.1 16.1 15.8
OF 38.8 38.8 42.3 46.2 52.2 57.4 61.0 60.4

Month S O N D
OC 13.6 10.6 6.5 4.6
O F 56.5 51.1 43.7 40.3

Page 2 Section 3 Heating and Dehumidification


Spata Standards Volume Two (1999)

From this and using known formulae;

Heater (output) size (kW) = Mix 1000 x (T2C - TlCl


H x 860

Where T2C = required swimming pool temp OC


TIC = initial water temp from table (1)
M3 = volumeofpool
1000 = weight in kgs of lm3of water
860 = number of kilo calories per kWhr
H = desired warmuptime

IMPERIAL

Heater (output) in kW = Gallons x 10 (T2F - T l F l


H x 3412

Where T2F = required pool temp in OC


TlF = initial water temp from table (1)
1000 = weight in kgs of lm3of water
H = desired heat up time (hours)
3412 = number of BTUs in 1 kWhr

NOTES

1. These calculations assume the pool is covered during heat up. For uncovered pools or pools sited
in a water table, multiply heater output by 1.4.
2. There is a significant difference between heater input and output capacities. When selecting an
appropriate heater, ensure manufacturers output date is used.
3. In the case of tiled pools, due consideration must be given to thermal expansion (covered by BS
5385 part 4 1992).

Section 3 Heating and Dehumidification Page 3


Spata Standards Volume Two (1999)

ELECTRIC HEATING

ELECTRICAL. RESISTANCE HEATING

Electrical resistance heaters are normally of the direct type encompassing a heater element which is
compatible with swimming pool water. Installation into a pool filtration circuit carries the same
considerations as fuel fired heaters.

It is important that the proposed site has an adequate electrical supply to cater for the heater and due
consideration is given to cable sizing between main supply and plant room. All electric heaters must be
installed in accordance with current I.E.E. regulations.

ELECTRICAL RESISTANCEHEATER SIZING

These heaters are normally sized to provide the pools daily heating needs during night time tariffs. In
selecting an electric heater the surface area of the pool, the temperature required, the months of use and
hours of low cost electricity available establish the required heater size. It is reasonable to allow five
nights at the beginning of May as a reasonable heat up time using 7 hours each night on economy 7, this
means 35 hours of actual heating time. It is advantageous to specify that economy 7 is supplied on a 24
hour available basis so that the equipment may operate during the day if required. This enables a rapid
warm up period if required.

Electric heater size in kW = M2x (kW/hrs/M2max loss per 24 hours)


.............................
Hours of low cost tariff

Table 1

METRIC KW/hrs/M2/24hours kW/hrs/M2/24hours

Pool Temp With Cover No Cover

24°C 3.50 5.25

27°C 4.42 6.63

30°C 5.60 8.40

Example:

Pool size 15m2,covered to be heated from cold to 30°C

= . 15 x 5.6
____-_-
7 = 12kW

Page 4 Section 3 Heating and Dehumidification


Spata Standards Volume Two (1999)

0 HEAT PUMPS

Heat pumps are usually electrically driven but differ from other dynamic heating devices by providing
most of their heat output from energy they have recovered from a low grade source such as outside air.
For an average summer season, the ratio of heat output to electricity consumed is approximately 4:l.
Installation considerations are as electric flow heaters. Consideration for air flow through the heat
pump must be taken into account. If installed within a plant room, the room should be ventilated and air
discharged from the heat pump should be rejected directly outside. The heat pump will also require a
condensate drain to waste. Heat pumps are often sited outside. Under these circumstances they should
not be sited such that air which is drawn through them can recirculate.

HEAT PUMP SIZING

Heat pumps are usually sized to allow for the average pool heat loss over the coldest month of opera-
tion. The formula to show the minimum heater size necessary to maintain the required pool water
temperature.
TABLE 3 Average Daily Heat Loss kWh/m2of Pool Surface (DH)

0 Month of Use April May June September October

AmbientDesign AirTempOC 9 12 15 14 11

P 24 4.66 2.57 1.78 1.99 3.00


0
0 25 5.30 2.93 2.04 2.28 3.43
L
OC 26 6.17 3.39 2.35 2.64 3.98
T
E 27 7.35 4.06 2.81 3.17 4.75
M
P 28 9.12 6.96 3.48 3.91 5.91

Corrections factors (CF) can be applied to the table figures as follows:-


High water table X 1.25 (CF1)
Sheltered location X 0.80 (CF2)
Exposed location X 1.25 (CF3)
No cover* X 1.40 (CF4)

- (May, June and September only) In April and October it would not be practical to heat a pool
without a cover.
Corrected daily heat loss (CDH) = DH x relevant CF’s.
Minimum required heater output = CDH x M2
No of hours/day available for heating

M2 = pool surface area


Example
- Pool size 50m2
- Pool temp 26°C
- Season of use May - September
- Sheltered location
- Covered when not in use
- . Low water table
* Heater available 24 hrs/day

Minimum required heater output (kW) = 13.39 x 0.08) x.50 = 5.63kW


24

Section 3 Heating and Dehumidification Page 5


Spata Standards Volume Two (1999)

SOLAR HEATING
NOTE - Solar heating systems for swimming pools is fully described by BS 6785:1986

A solar heating system will provide a means of passively heating pool water by harnessing energy from
the sun. Solar collectors are connected to the pool filtration circuit (fig 2 & 3 ) such that water flowing
through them is heated as a result of their ability to absorb energy from the sun. Solar heating systems
fall into 'direct' and indirect categories. In both cases a control system must be used, preferably
automatic. It is important to understand that the control of solar heating systems is more complex than
other systems and should be designed such that; the collectors will not act as emitters. It is advisable to
consult with the collector manufacturerbefore choosing a suitable means of control.

STING

The siting position of collectors is critical to their performance. For maximum output they should be
sited in a sheltered area facing between 30" east and 40" west of the south. They should be inclined
from the horizontal between 20" and 50 O.

It should be noted that planning permission may be required and that installations should take into
account wind and snow loadings.

SIZING
It is virtually impossible to practically calculate the size of the panel needed to maintain a specific
pool temperature. It is generally accepted that the following factors will provide a comfortable tem-
perature between May and September providing a pool cover is used.

Location Ratio of collector area to pool area

She1tered 0.5

Exposed 0.8

Should it be deemed necessary to hold constant pool temperatures throughout the swimming season. It
is advisable to fit an auxiliary form of heating, controlled to operate during times when the solar
heating cannot maintain conditions.

Page 6 Section 3 Heating and Dehumidification


Spata Standards Volume Two (1999)

GENERAL HEATING CONSIDERATIONS

1. Heating systems should be installed such that they do not restrict the pool water flow below design
turnover rates. If necessary an auxiliary pump should be fitted.
2. Due consideration must be given to winterisation by fitting breakable couplings to disconnect the
heating during the winter. Alternatively frost stats should be fitted to ensure water is constantly
passing through the heater when outside temperatures fall below 3 "C. If this method is adopted, it
is important to ensure that the pool water chemical balance is maintained throughout the winter.
3. Boilers and electric flow heaters should be fitted with a suitable pressure valve set at 2.1kg/cm2
(3Opsi).
4. Thermostats used to sense pool temperature for the purposes of controlling a heater should have a
maximum differential of 1"C.
5. Wherever possible heaters should be positioned as close as practical to the pool filtration equip-
ment. However this should not compromise noise, heater efficiency and accessibility.
6. In the event that a heater is below the level of the pool,
a) isolating valves must be fitted such that maintenance can be carried out without draining
the pool.
b) If in a plant room, a submersible pump capable of delivering water at a rate equal to the

a full bore flow of the main pump must be fitted.


7. Where a heater is connected to flexible pipes, the heater must be f d y fixed to a solid foundation.
8. Pool chemicals must not be stored in the same space as a conventional flue boiler. Due considera-
tions must be given to the corrosive and toxic nature of chemicals such that controls, heaters and
other associated components are not affected by chemical vapours.
9. Heaters must not be run until fully commissioned in accordance with manufacturers instructions.

Section 3 Heating and Dehumidification Page 7

~~~ ~~~~~~ ~~~~~~~


Spata Standards Volume Two (1999)

INDOOR POOL HEATING AND ENVIRONMENTAL CONTROL e


DESIGN CONSIDERATIONS

Indoor pools contained within a permanent structure provide the design engineer with many factors to
consider before selecting suitable systems. The basis of any system design should address; water
heating, space temperature control, humidity control and fresh air dilution. It is important to understand
that swimming pool halls represent a greater challenge to heating engineers and architects than nor-
mally controlled spaces and consequently choice of building materials, their method of application and
general architectural design will play an important role in the overall effectiveness of an indoor pool
environmental control system.

POOL WATER HEATING

Outdoor pool heating methods and sizing guides apply to indoor pools, although it is important to
realise that temperature expectations of indoor pools is generally higher and in the case of spa pools or
special needs pools (hydrotherapy), temperatures may be as high as 36 "C. Indoor pool water heating is
often supplemented by a heat recovery system which rejects by-products of dehumidificationback to
the pool water as sensible heat. Under these circumstances primary pool heating sizes remain unaf-
fected but thermostatic control should be set such that the heat recovery system has 1 "C higher set point
in order to fully utilise its effect in reducing pool water heating costs.

In the event that space heating is provided by a common boiler, the boiler should be sized such that
water and air heating can be provided simultaneously.

For the comfort of bathers and lower evaporation of moisture from the pool, space temperatures should
generally be 1 "C higher than the pool temperature. If a pool cover is used, the space temperature may
be set back to 22 "C when in place.

In the case of hydrotherapy and spa pools where such high air temperatures may not prove feasible,
higher dehumidification loads should be expected. Space heating capacities are calculated using
conventional heat loss/gain calculations, however it is important to take into account ventilation losses,
which with certain types of environmental control systems may be significant.

SPACECOOLING

Pool halls with large glazed areas facing south and/or high occupancy rates may require cooling during
warmer weather. This is normally affected by introducing controlled quantities of fresh air and/or
mechanical cooling (air conditioning). Heat gain calculations will dictate precise quantities.

FRESH AIR

Other than for small domestic pools, controlled fresh air quantities should be considered in order to
dilute COZ build up from people and prevent excessive airborne chemical levels. For design purposes
10 L/S of fresh air per person and 3 US/mof pool area should be considered. It is considered good
design practice to incorporate a form of heat recovery such that the fresh air is preheated by exhausted
stale air. When selecting dynamic fresh air rates, consideration to providing a slight negative pressure
within the pool hall should be taken into account in order to prevent 'pool hall' air conditions from
migrating to adjacent rooms and to reduce the possibility of airborne moisture being driven into the
building fabric.

In the event that fresh air is used for excessive temperature control and or humidity control, substan-
tially higher quantities of fresh air will be required. These quantities will be dictated by building
design and equipment selection.

Page 8 Section 3 Heating and Dehumidification


Spata Standards Volume Two (1999)

HUMIDlTYCONTROL

Humidity control within an indoor pool hall is necessary to provide a comfortable environment for
occupants, prevent building fabric and humidity related damage to materials within the space. Humidity
control will also assist condensation control on cold surfaces such as glass, providing a suitable air
distribution system is employed. Humidity levels for a typical indoor pool enclosure should be main-
tained at 55 - 65% RH, although levels as low as 40% may be considered acceptable during unoccu-
pied periods when natural infiltration of cold outside air may balance the hall at this point.

Humidity control may be effected by utilising various methods;

The traditional method of humidity control is to preheat fresh air which is swept through the pool hall
and then rejected back to outside after absorbing moisture from the pool hall air. Typically this method
will require 7 air changes per hour. The system is energy inefficient due to the high volumes of heated
air which are thrown away, although may prove suitable for use in pool halls which are used only in
moderate weather. In order to improve the energy efficiency of a fresh air system, a plate heat ex-

a changer should be considered. These units will recover up to 70% of the rejected sensible heat but are
not capable of recovering significant quantities of latent heat. If a recuperator is used, automatic bypass
provisions should be provided in order for it to provide cooler air during warm weather. Fresh air
systems are usually connected to an air distribution system.

HEAT PUMP DEHUMIDIFICATION

Heat pump dehumidifiers recirculated pool hall air removing moisture from it as it passes through the
machine. Good design dictates that they should turn over the air at least three times per hour. These
systems dramatically reduce ventilation losses by predominantly recirculating, rather than discharging
heated air. Heat pump dehumidifiers are capable of providing water and space heating by converting
reclaimed latent energy to sensible heat. Under these circumstances, space and water heating needs
should be calculated by sizing primary heat exchangers to give 100%of the required duty. More
sophisticated heat pump dehumidifiers will provide fresh air needs and summer time cooling. It is
important to consider these factors when sizing machines. As a heat pump dehumidificationsystem may
provide all of the necessary environmental control parameters, sizing and equipment selection should
be verified by the supplier.

Section 3 Heating and Dehumidification Page 9


Spata Standards Volume Two (1999)

Page 10 Section 3 Heating and Dehumidification


Spata Standards Volume Two (1999)

CONDENSATION CONTROL
There are three main considerations in the prevention or minimising of condensation.

L Good Buildinp D e s i g

- High insulation values


- Double glazing - triple glazing or low E glass preferred
- Avoid roof lights if possible
- Where possible windows should be flush with inner surface
- Glazed frames should contain a thermal break
- Avoid cold bridging by structural members
- Incorporate suitable vapour barriers where appropriate (polythene is not generally
considered adequate for a corrosive atmosphere).

2. Keep air moving across potentially cold surfaces

Air moving at a sufficient rate will not be in contact with the surface long enough for it to cool
to its dewpoint.

z Maintain ideal relative humidity (55% - 65%)

INSTALLATION NOTES

NON DUCTED SYSTEMS

For smaller pool halls where a central ducted system may not be incorporated;

Standard domestic radiators should not be used as their pattern of heat convection from low level is not
beneficial for an indoor pool. In addition, when considering that the pool hall floor may be wet and
slippery, they also represent a potential safety hazard. Warm air blowers are preferable and far more
suitable for the application. Equally a warm air heating coil could be incorporated into most dehumidi-
fiers. When using dehumidifiers or other electrical devices within the pool hall;

1. Ensure they are intended for use in swimming pool hall environments. Items not intended for such
use will infringe IEE regulations.
2. Ensure the positioning of any electrical devices is in accordance with IEE regulations.

AIR DISTRIBUTION.DUCTWORK AND GRLLES

Air distribution systems are installed to ensure even distribution and consequently uniform air tempera-
ture and humidity throughout the conditionedspace.

The air distribution scheme should be designed to ensure a curtain of conditioned air encompasses all
area of potential dewpoint condensation such as windows.

Section 3 Heating and Dehumidification Page 11


.
Spata Standards Volume Two (1999)

SYSTEM DESIGN
The methods by which air may be distributed around the indoor pool enclosure are numerous, but
generally fall into one of the following categories:-

Single point supply


Concealed distributed, underground
Concealed distributed, overhead
Exposed, overhead

Single point supply comprises a single grille attempting to throw the entire air volume into the enclo-
sure. This is likely to be completely successful only on very small pools, or pool enclosure that include
either no external glass, or high specification insulated glass.

Concealed distributed, underground schemes required co-ordination with the swimming pool
pipework, building foundations and floor structure. Particular care is required to achieve a successful
scheme where for instance beam and block flooring is to be used.

Grilles could be floor or window sill mounted of a fixed reinforced blade design to withstand weight
of bathers.

Concealed distributed, overhead ductwork can be sub-divided into:-

1. Ductwork run in a false ceiling void, with grille openings piercing the ceiling finish and
the main duct connected to the grille above the false ceiling.
2. Bulkhead style systems where the duct is below the main ceiling line, but is concealed by
being boxed in using building materials

Grilles would be of an adjustable design to allow for direction of air flow as desired.

Exposed, overhead schemes are generally run along the building centre line, although perimeter
systems can provide an attractive alternative on larger buildings. Surface coatings need to be carefully
chosen to provide protection against corrosion. Grilles would be mounted on the side of these ducts
generally facing the required direction. Adjustment of the grille should be allowed to provide adequate
air throw and direction.

DETAILED CONSTRUCTIONALSPFEIFICATION

The standard to which the ductwork is manufactured is covered by the Heating and Ventilation Contrac-
tors Association document DW 142 Specification for sheet metal ductwork.

This document covers matters such as thickness of materials to be used, varying with the duct size, and
methods by which the sheet metal should be jointed. The standard also details maximum distances
between supports. The recommendationsof this standard should be adhered to, with the exception of
the additional thickness recommended in this standard for underground ductwork.

Page 12 Section 3 Heating and Dehumidification


Spata Standards Volume Two (1999)

a DETAILED DESIGN CONSIDERATIONS

The methods by which air flows, pressure drops, and duct sizes are calculated are covered in detail by
the standards of The Chartered Institute of Building Services Engineers (CIBSE). These however
follow the conventions of the building services industry whereby the output of the fan in the air han-
dling system may be chosen to suit the ductwork scheme. It is possible that the air handling unit used for
the dehumidification of an indoor pool will have very few options in terms of fan output, and the
ductwork system may therefore need to be designed to dissipate excess fan pressure.

In general the following guidelines may be adopted as the initial design basis.

Maximum duct velocity 5.5 m/s (where outlet grilles are within 3 metres of duct)
Maximum duct velocity 7.5 m/s (where outlet grilles are in excess of 5 metres)
Maximum return air grille velocity 2.3 m/s
Maximum weather louvre velocity 2.5 m/s
Maximum floor grille velocity 1.5 m/s
Maximum floor grille velocity 0.5 m/s
Maximum double deflection grille velocity 2.5 m/s (unless special circumstances)
a Maximum velocity in grille spigot 2.5 m/s

Manufacturers of air grilles produce selection tables detailing noise levels, air throw distances and
pressure drops. These tables should be consulted to achieve the desired performance from the system.

It should be noted that a system which employs initially the maximum duct velocity, with reducing
velocities approaching the final grille, will be more simple to balance at the commissioning stage due
to an element of static regain.

These figures should be applied to the initial flow schematic, and pressure drop calculations performed
to ensure that the installed fan options and adequate. An allowance should be made at this stage for
increased system pressure losses when air filters become dirty.

The design of the ductwork shall rely upon air flow figures and pressure drops as provided by the
supplier of the air handling system, or air handling specialist.

All systems should include a main duct damper for the regulation of total air flow. The individual grille
dampers are not normally suitable for major air flow regulation.

DETAILED CONSTRUCTIONALREOUIREMENTS

DISTRIBUTEDUNDERGROUND

The use of an underground ductwork system should only be considered once the natural ground water
level is determined. The water tables current and previous levels should be well below the lowest part
of the duct. Water ingress into the duct scheme will hinder air flow. Added water will increase dehu-
midification costs, and heating costs. The water introduced may, at the extreme, completely undermine
the performance of the system.

Where a high water table exists, and no other acceptable location for the duct is possible, then ground
water drainage, or a water proof duct system should be considered. Any water proofing should how-
ever account for the action of the settlement, and potential cracks allowing water to re-appear.

Ground drainage at its simplest could take the form of an over excavated trench, fitted with a perforated
land drain pipe covered in shingle. This would run to a suitable sump location where a pump fitted
with a level switch would drain the duct trench whenever the water level was unacceptable.

Section 3 Heating and Dehumidification Page 13


Spata Standards Volume Two (1999)

Underground ductwork should be fabricated from suitable materials with proven long life, and prefer-
ably a smooth finish surface. Galvanised mild steel ductwork, if used, should be fabricated to DW142
adopting a sheet thickness one gauge higher than recommended in that document. This is in respect of
the weight of back fill material and likely rough handling in such a vulnerable location.

Flexible ductwork should not be used underground where it is to be back filled.

Plenum boxes for the air outlet grilles should be reinforced to resist loading from concrete. Reinforcing
may include

1. Fabrication from 18 gauge steel


2. Angle stiffening to top edge
3. Internal bracing

Particular care should be taken to ensure that adequate bracing of the plenums is provided during
pouring of oversite concrete and screeding.

Floor plenum boxes should be designed to promote even flow to all areas of the supply grilles. Side
entry plenums are therefore to be preferred. Regular air supply plenums should be installed along the
length of large grilles, once again to promote even air supply.

Ductwork which will be surrounded with back fill should also be reinforced with angle sections to
resist the weight. Where flanged interconnection joints are used these can also be considered to act as
this stiffening.

Inground ductwork should be insulated to minimise heat loss to the ground. Insulation should be formed
from rigid board material, which is not capable of absorbing water from the surrounding earth. This
would normally preclude the use of circular ductwork underground where flexible absorbent insulation
would be necessary. The insulation should be protected during the construction stage with a resilient
material to minimise damage and water and debris ingress during construction.

Floor grilles should be of a reinforced grade, suitable for accepting the weight of bathers without
deflecting. Blades should not be adjustable therefore, but should be fixed, ideally at an angle facing the
glass or other areas requiring direct air flow. Blades should be set out to prevent entrapment of toed
fingers etc. A 6mm gap between 6mm wide blades would be seen as typical for an acceptable grille.
Grilles should include an adjustment damper for the balancing of air flows between adjacent outlets.

Grilles may be recessed, below the tiling line, or raised, resting on the tiles. Raised grilles if necessary
should feature bevelled corners to minimise accidental injury to bare feet.

A surface coating should be applied to reduce the risk of corrosion. Standard treatments such as
polyester powder coating and stove enamelling would be suitable finishes, available in most colours to
complement the interior design.

Floor grilles will ideally be the full length of the glazed opening.

Where a suspended beam and block floor is to be used, a co-ordinated design solution will be required
with input from the floor designer and ductwork specialist. Access to the floor grilles may otherwise
be obstructed by the support beams.

Where supporting calculations prove the requirement for attenuation, this should be placed in the plant
room. Under ground attenuators are to be avoided.

Page 14 Section 3 Heating and Dehumidification


Spata Standards Volume Two (1999)

e DISTRIBUTEDOVERHEAD

Overhead distribution ductwork may be formed in galvanised circular, oval or rectangular cross
sections. The ductwork layout should be co-ordinated with the building designer to ensure the minimum
impact on trussed roof designs, and to ensure that locations are available as required in ceilings etc. In
particular centre line locations above external glass may be made available which will improve the
appearance and system performance.

The installer shall ensure that support centres recommended by DW142 are adhered to, as are recom-
mendations in respect of joint sealing and fixing.

Ductwork which is located above the main roof insulation shall be insulated to minimise heat loss to
unheated areas. Insulation would typically include 40mm foil faced mineral wool, or fibreglass slabs
or mattress. This should be securely attached to the ductwork using pins, banding or galvanised wire
netting. Joints between adjacent sections of insulation should be made using wide foil self adhesive
tape. The installer should be aware of the arduous nature of a warm humid pool hall and the additional
requirements this places upon the ductwork insulation.

Where supporting calculation prove the use of attenuators is necessary, these should be placed as close
to the plant room wall as possible, to prevent ‘flanking’ noise breaking into the ductwork after the
attenuator.

Where flexible ductwork is to be used to connect from the main ducts to the grilles, this shall be kept to
the minimum practical length. Where the duct location required insulation, then insulated flexible
ductwork should be used. Flexible ductwork should not be used excessively.

Where an overhead distribution scheme is above the buildings general vapour barrier, then occasional
openings may be required in the vapour barrier for the provision of air introduction into the room.
Openings in the vapour barrier shall be repaired with the grille boxes sealed and fixed firmly to the
barrier to ensure the barrier is not compromised.

Where ducting system are installed above the vapour barrier, then consideration shall be given to
pressure testing the ductwork to prove air tightness. Pressure testing should be to DW143. When ducts
run through non heated voids, condensation may occur and consideration should be given to addressing
this.

Overhead ductwork schemes will require that supply grilles are located as close as possible to
vulnerable areas of the building. Since ceiling joist locations will also need to be considered, it is
likely that a grille offering two way adjustment will be most suitable. These double deflection grilles
should have an adjustable damper for regulating air flow between adjacent outlets.

Grilles should be provided with a surface finish to protect against the pool atmospheres potentially
corrosive nature. Polyester powder coating and stove enamelling are example finishes.

Overhead exposed systems may be constructed from rectangular, circular or oval duct forms. Surface
protection should be provided in the form of polyester powder coating, stove enamelling or fabricating
from plastic coated steel.

Support systems should be coated in the same manner as the ductwork, adopting the support centres,
and material thickness quoted in DW 142.

Due to the often remote nature of over head schemes, air distribution, and grille throws shall be
selected with care. Consideration shall be given to specialist drum jet or jet flow diffusers which offer
long distances over which the air may be projected. Consideration should be given to the location of
these grilles and where possible locating over the pool surface should be avoided to improve access
for adjusting and cleaning.

Section 3 Heating and Dehumidification Page 15


Spata Standards Volume Two (1999)

,PLANTROOM DUCTING

Plant room ductwork should be manufactured from galvanised sheet steel generally in accordance with
DW142. Insulation should be as over head ductwork, 40mm foil faced mineral wool or glass fibre,
wrapped in galvanised wire netting.

All ductwork connections onto air handling plant should include flexible sections which may be
removed in the event of machine malfunction and replacement.

Ductwork design should not impair access to any item of plant nor restrict headroom unnecessarily.

Return air ductwork should be treated against corrosion by the use of a suitable painted treatment such
as acrylated rubber paint. Where calculation prove the requirement, the return air section should
include an attenuator.

As an alternative to return air ductwork providing a plenum chamber within which the equipment is
sited maybe considered.
1. plenum chamber should not be used if either a naturally ventilated boiler is present within the
room
2. the room contains equipment sensitive to pool water sanitisers.
3. The room is used for storage of swimming pool chemicals or dosing equipment which exposes
chemicals to the air.

The return air duct, where extended due to layout limitations, should be sized to reduce suction pres-
sures within the air handling plant. The system designer and plant manufacturer should be consulted
with respect to a suitable pressure drop in this section of ductwork.

The fresh and stale air ductwork terminating at weather louvres should be designed to minimise water
ingress under driving rain conditions.

This would typically involve reduced inlet velocities and designing the first section of ductwork
sloping towards the wall so that any water introduced runs back to outside.

External louvres should be finished with a corrosion resistant coating such as stove enamelling or
polyester powder coating.

HEALTHANDSAFETY

When designing, due attention should be taken to Health and Safety matters with particular regard to:-

- noise attenuation where plant is sited close to the pool or other occupied premises
- the use of specialised fire grilles in fire doors

The completed scheme should be balanced and commissioned in accordance with the intended design
air flows. A commissioning sheet should be presented with the appropriate figures with the handing
over certificate.

Page 16 Section 3 Heating and Dehumidification


Spata Standards Volume Two (1999)

SECTION 4

COVERS AND

AIR ENCLOSURES
~~ ~

Spata Standards Volume Two (1999)


Spata Standards Volume Two (1999)

-
SECTION 4 COVERS AND AIR ENCLOSURES

WINTER COVERS
Covers used on outdoor pools during winter when the pool is no longer in use. Fixings are semi-
permanent and not designed for daily usage. This type of cover should minimise the amount of dirt and
debris getting into the pool but can only offer a minimal degree of safety providing it has been fitted
and maintained correctly. It is not designed as a safety cover and under no circumstances should
children, animals or pets be allowed to walk on the cover. There are two main types as follows.

OPEN MESH POROUS) DEBRIS COVERS

These covers should be of a closely woven polyethylene fabric with maximum ultra light inhibitors and
should allow rain to pass through when suspended across the pool deck. The cover should be tailored
to the shape of the pool with an additional allowance of not less than 30Omm all round. Seams and
fixing straps should be tailored using strong UV resistant thread and fixing straps should be secured at

a intervals of no more than 1Sm(5') by firmly secured pegs into the pool surround. Tension should be
maintained by the use of locking buckles and or stainless steel springs. Fixing hardware should be
made from non corrosive material with spring and pin fixings of high grade stainless steel and screw or
pop up anchors of brass or similar. Fixing straps should be manufactured from high strength webbing
which includes UV inhibitors and should be a minimum of 3Omm wide. Straps should be evenly
positioned at centres of a maximum of 150Omm on straight sides and lOOOmm on curved corners.
Protection to the underside and vulnerable areas (Roman Ends, Walk in Step sections) should be
provided by an anti chaffing strip.

COATED MESH (NON POROUS) DEBRIS COVERS

These covers should be made from non porous reinforced PVC or similar fabric. This type of cover is
not designed to be tensioned across the pool but should instead be allowed to lay on the water surface
and secured with either sand or water bags which are positioned around the edge of the cover. Covers
of this type should be made with an overlap of not less than 60Omm all round. A seepage or filter panel
may be fitted to the cover to allow rain water to penetrate into the pool, but if no such panel is fitted all
rain water and debris must be removed before the cover is taken off. A small submersible pump (not
necessarily supplied) should be used for this purpose.

a Where steps are removable the cover should be made with no cutouts. Where the steps are fixed,
detailed measurements should be given to the manufacturer to obtain as good and close a fit as possible
at step cut outs.

Buckles must be of a non slip adjustable type. The claw type buckle, or buckles that have sharp teeth,
should not be used as they can damage the strappings.

SOLAR BLANKETS (BUBBLE COVERS)

Generally of polyethylene extrusion with individual air cells which heat up when exposed to solar
energy. This heat is transferred into the pool by placing the cover bubble side down to maximise the
surface area in contact with the water. The cover also seals the pool surface almost eliminating heat
and chemical loss through evaporation. Various thicknesses of material with a choice of edge finish are
available. Suitable material should include maximum ultra violet light inhibitors and be compatible to
water temperatures between 15 and 28"c and normal level of pool temperature chemicals. 400 micron
grade is considered to be the most durable and sufficiently robust to provide for a minimum 3-4 years
of continued use.

Section 4 Covers and Air Enclosures Page 1


Spata Standards Volume Two (1999)

HEAT RETENTION COVERS

These can be of PE foam laminated (5mm - 8mm) or flame bonded foam (2mm- 3mm). Bubble covers
can also be included in this category. They are specifically designed to give the maximum insulation to
the surface of the pool when not in use and enable the pool to be maintained at the required temperature
with the minimum of heat loss. The cover should cover as much of the surface area as possible whilst
still being able to be removed and stored, preferably in a roll, with the minimum of effort. The tempera-
ture that the pool is run at should be matched to the cover type.

Indoor private pools which generally have limited usage meaning that they would not benefit from solar
gain. Covers used in instances should have a minimum of 3mm closed cell foam bonded to top and
bottom sheets for strength.

MANUAL POOL COVER ROLLERS

A manual pool cover roller is designed to simplify the removal of the floating cover. Used comctly it
will prolong the life of the cover. The barrel of the roller should be made from extruded aluminium
with a minimum wall thickness of 2mm and a minimum diameter of 6Omm o/d. The barrel may be in
one section or as a telescopic format. Telescopic versions should include a minimum of 30Omm
overlap between the sections when the barrel is extended to its maximum. The unladen barrel should
not show any signs of sagging. When the cover is fully wound on to the barrel slight sagging is consid-
ered possible but this should not increase the overall winding diameter by more than 40% and should
not affect the operation of the equipment. The support brackets can be made from any form of non
corrosive material such as a high grade of stainless steel, or mild steel providing that is corrosive
protected and plastic coated. Toughened moulded plastic may also be used. The winding mechanism
should be of a crank handle or steering wheel type which should be attached to the barrel to provide
ease of movement (without cover). Where the equipment is of a mobile design some form of anchoring
should be supplied, this may consist of locking castors but these must hold the equipment in a stable
position whilst the cover is being wound on.

CARE AND MAINTENANCE


The covers should be regularly maintained and care should be exercised when handling and storing
them. The following points should be observed to ensure good service:-

1. When ordering the cover, check all pool measurements to ensure a good fit
2. Keep the cover in a shed or outhouse so that it is protected from sunlight as this has a degrading
effect on all synthetic materials
3. Keep the cover away from hot water pipes, heaters and fires. Excessive heat will cause damage
4. Keep the cover away from bonfires and fireworks as sparks or burning debris can burn holes in the
material
5. Keep the cover taut at all times, except when there is heavy snow, when the cover should be
allowed to rest on the water to prevent damage to the cover and springs
6. Do not allow the cover to lie in the water, as leaves and debris will collect, decompose and filter
into the pool water
7. Maintain the water level in accordance with the winterisation instructions for the pool
8. Ensure that the flush deck anchors are well greased at all times to prevent grit and dirt from being
washed down in the moving parts. Ensure that all parts move freely
9. When fitting the cover, ensure that the anti chafing strips face the pool water and are not on top of
the cover
10. Do not allow children to play on the cover
11. Do not drag the cover over rough ground. Always fold it up and carry it away. This will prevent
damage by snagging and abrasion
12. Care should be taken to prevent damage by animals. Horses, cattle and other animals have been
known to stray onto a pool cover, causing damage both to the cover and themselves. The remedy is
to maintain fences and hedges in good order.

Page 2 Section 4 Covers and Air Enclosures


These covers should be fitted with

drain holes or an electrically safe pumping system to remove any surface water completely.
Spata Standards Volume Two (1999)

AUTOMATIC AND MOTORISED COVERS

These covers are devised to facilitate a simple fitting and removal of swimming pool covers and
generally consist of a mechanically operated roller or reel together with a floating cover. Reels are
generally fitted either just below or just above the water level although other positions may be used
according to specific requirement.

There are, currently, two basic types of mechanically operated reels:-

1. Electrically operated where the shaft is turned by an electric motor, either fitted within the shaft or
mounted externally on a spindle or chain drive.
2. Hydraulically operated where the shaft is turned by a pumped flow of fluid using the Archimedian
screw principle.
I

The operation of both is controlled by elecmc or electronic signal from which a switch position to a
control point.

COVER MATERIALS
Slatted covers comprise a number of extrusions, which interlock together. In order to roll up each slat
is usually in the order pf 5Omm in width. Each extrusion is capped at either end allowing floatation.
They are pushed and pulled across the water surface by the motor.

Solar slats are made from a material, which attracts solar gain and as a result must be handled with
care when fitting. If left in the sun, off the water, even for a short time they will severely distort. The
solar gain is appreciable but is dependant on the ambient conditions. Nevertheless the cover can be
subjected to high water temperatures and therefore it may be necessary to move the water by additional
pump running time.

Non solar slats are available and can be coloured.

Tarpaulin sheet covers are suspended across the pool from a tracking fixed to the pool wall horizon-
tally or vertically underneath the copings. Movement is achieved by a system of cables and pulleys
fitting in conduits run alongside the pool and under the paving. These covers should be fitted withdrain
holes or an electrically safe pumping system to remove any surface water completely.

Although some cover material is extremely strong and it is possible, in the right conditions to support a
body, these covers are safety covers and children and animals must not be permitted to walk on
them.

Bubble and foam covers can be fitted onto motorised reels to assist with removal of the cover. It is
generally necessary to assist the cover onto the pool with a preformed leading edge and strap system.
These materials will not support weight.

SITING THE REEL

I t is usual although not mandatory to fit the reel on the width of the pool. Manufacturers recommend
various ways in which the roller can be attached to the pool structure depending on site conditions. The
whole cover assembly can be housed in a wet or dry pit. Consideration must be given to:-

I. Access to the cover to reel fixing.


2. Access to the motor.
3. Where a dry pit system is employed adequate drainage facilities must be included.

Section 4 Covers and Air Enclosures Page 3


Spata Standards Volume Two (1999)

4. Where a wet pit system is employed water movement within the pit must be achieved by the
additional flow control fittings. Access to the pit must be allowed for the removal of debris.

Where motors are fitted in pits, consideration must be given to:-

1. Ventilation
2. Water tightness
3. Drainage
4. Access covers to pits should be of the sealed type with ease of opening

Where reel systems are fitted above ground the reel should be covered as a safety precaution and to
prevent UV deterioration. Additionally client MUST be made aware that the cover is not to be used as
a diving platform.

All electrical cables must be of a size compatible to their loading and length and be of a suitable
material as contained in the current IEE Electrical Regulations.

Motors should be of a low voltage type.

All Controls should be sited in the plant room or other adjacent waterproof housing. They should be
installed according to good practice and suitably labelled.

Calibration can be achieved in a number of ways but in any case the method of recalibration must be
accessible.

Cover on or off switching should not be automatic but by a key or button system. As a matter of safety
the switch position should be in sight of the whole pool so that the operator has an unhindered view of
the water thus preventing the cover enveloping a swimmer. The operator should view the whole cover
operation process and where infrared switching is used this is vital.

Any safety feature of mechanically operated reel systems can be minimal and clear guidance should be
issued to prevent their use as a safety cover.

Slatted covers will not stop a body from becoming partially immersed and so the risk of drowning
cannot be ruled out. Even when additional support for the slats are provided in the form of ledges or
stainless steel rails the risk is still there.

Tarpaulin covers have the risk of rainfall building up and so a similar view must be taken.

No matter how much care is taken when installing these covers the primary task is to retain heat by
cutting down on evaporation, and secondary task to prevent debris entering the pool and in some cases
light as well.

Swimmer safety is increased by the use of these covers but safety from immersion cannot be
guaranteed.

Page 4 Section 4 Covers and Air Enclosures


Spata Standards Volume Two (1999)

AIR INFLATABLE ENCLOSURES

A non permanent structure usually with building regulation approval. Dependant upon the height and
situation, planning permission may be required.

This type of enclosure is used to extend the natural swimming season of a outdoor pool. Made of a
translucent material the structure is kept inflated by a continuously rated blower unit. The structure
should have at least two doors at opposite sides for safety. Standing room for an adult must be allowed
for on the sides of the pool where steps are fitted. Warnings regarding what action should be taken
during hot weather or storms should be clearly and permanently marked on the air dome.

Due to the high solar gain effect, ventilation may be required in the summer months to prevent the air
space overheating.

Particular care should be taken to ensure cables and fixings are of the required durability and sited in
such a position as to present minimum risk to users either inside or outside the enclosure.

Foundations should be in accordance with manufacturers instructions and of either an unbroken perim-
eter type or a concrete raft over the entire pool surround area.

Motors for the blower unit should be selected, installed and maintained in accordance with current IEE
regulations.

Section 4 Covers and Air Enclosures Page 5


Spata Standards Volume Two (1999)
Spata Standards Volume Two (1999)

SECTION 5

ELECTRICAL
~ ~~~ ~-

Spata Standards Volume Two (1999)


Spata Standards Volume Two (1999)

-
SECTION 5 ELECTRICAL

GENERAL AND SPECIAL REOUIREMENTS


These standards are recommended and comply with current IEE Wiring Regulations.

It is the responsibility of all contractors to familiarise themselves with the current IEE regulations and
when necessary to use qualified engineers as stated. D e s e notes are for And do not
supersede or ovenide current IEE regulations in any respect.

CLASSIFICATIONOF ZONES

To make it easier to understand the requirements of the Standards or Regulations, the area round the
pool is divided into Zones. The IEE classify these areas as Zone 0,Zone 1, and Zone 2. The IEE
classify them as Zone A, Zone B and Zone C as shown in figures 1 and 2. Zone A covers the pool area,
Zone B is an area extending from the pool edge for a distance of 2 metres and Zone C extends from
Zone B for a further 1.5 metres, anything outside these zones can be considered to be Zone D or Zone 3.
The zones extend upwards for 2.5 metres (this being the limit or arms reach); where diving boards are
installed, the zone is extended by the height of the board above the datum, as shown in figure 1.

ZONE A (0)

Looking first at Zone A (0), which is the pool itself. The only electrical services which can be taken to
the pool are for those appliances which are directly associated with the pool. These are usually the
pool lights. The degree of protection for the equipment should be IPX8. This means that they should be
suitable for total immersion in water under a specified pressure. They must also be designed to resist
the chemicals in the water. The electrical supply to each pool light must be from its own transformer, or
an individual winding on a multi-secondary winding transformer; in each case, the secondary’s open
circuit voltage must not exceed 18v. The electrical supply to any other type of equipment must be from
a SELV source situated outside Zones A,B and C. It must comply with the SELV regulations, and be on
its own circuit and must not exceed 12 volts. The wiring should be of Class I1 construction (i.e. double
insulated) without any metallic covering. No junction boxes or other switchgear or accessories are
permitted in the Zone.

The area immediately adjacent to the pool is equally as dangerous from the electrical point of view.
The area is designated Zone B(l) and needs the same amount of care to be taken as with the installation
to Zone A. The wiring system should be limited to that necessary to supply the appliances that are
required in the zone, should not have any metallic covering, and should be of Class I1 construction.

The supply to the appliances should be from a SELV source situated outside Zones A,B and C. The
source having a nominal voltage not exceeding 12V. Any fixed equipment installed in Zone B must have
been manufactured specifically for swimming pools. The degree of protection required for such
equipment is IPX4, unless water jets are used for cleaning., when the degree of protection required is
IPX5. As with Zone A, no junction boxes, (other than specialised low voltage deck boxes) switchgear
or other appliances are allowed in Zone B, although water heaters are allowed providing they comply
with BS3456.

Where floodlights are installed, each floodlight shall be supplied from its own transformer, or from an
individual winding on a multi-secondary transformer, having an open circuit voltage not exceeding 18
volts.

Section 5 Electrical Page 1


Spata Standards Volume Two (1999)

RELAXATIONOF IEESTANDARDFOR ZONE B

The IEE Standards limits wiring systems in Zone B (l), to those necessary to supply appliances in
Zone B; no switchgear or accessories being allowed. However, there is a relaxation in the IEE Wiring
Regulations for swimming pools concerning socket outlets installed in Zone B. Socket outlets are
allowed in Zone B where it is impossible to install them outside the Zone. Any socket outlets installed
in Zone B must be manufactured to BS4343, be installed at a height of 3 0 0 m from the floor and at
least 1.25 metres from the border of Zone A, i.e. from the edge of the pool. Additionally, the supply to
the socket outlets has to be taken through a 30mA RCD with an opening time not exceeding 40 msec
with a residual current of 150mA.

ZONE c (2)

The installation in Zone C follows the same lines as in the other Zones A and B, except that junction
boxes are allowed and socket outlets are permitted. However, the degree of protection for enclosures
is IPX2 for indoor pools, and IPX4 for outdoor pools. Appliances in Zone C may be Class I or Class I1
construction.

With the exception of instantaneous water heaters manufactured in accordance with BS3456, equip-
ment, switches, accessories or socket outlets have to be protected by one of the following methods:-

1. Individually by electrical separation


2. SELV with a nominal voltage not exceeding 50 v or
3. 30 mA RCD which will disconnect within 40msec with a residual current of 150rnA

A shaver socket outlet complying with BS3535 is allowed in Zone C.

Where socket outlets are installed they have to comply with the environmental conditions and BS4343.

Heating units embedded in the floor are allowed in Zones B and C provided that the units have an
earthed metallic sheath connected to the local supplementary bonding conductors. The units must also
be covered by a metallic grid connected to the same local supplementary bonding conductors.

Only water heaters complying with BS 3456 are allowed in Zone B, unless the equipment is supplied
by a 12 volt SELV circuit; this being part of the relaxation mentioned earlier.

EOUIPMENT OUTSIDE ZONES A,B AND C (ZONED)

Boilers and pumps for swimming pools are sited in the plant room or a garage for outdoor pools on
private property. The pump should be specificallymanufactured for swimming pools. For safety the
supply to the pump is taken through a 30 mA RCD and all motors of .33hp and over should be fitted
with overload protection.

Page 2 Section 5 Electrical


Spata Standards Volume Two (1999)

ADDITIONAL REOUIREMENTS

All other requirements of the current Wiring Regulations should be complied with, such as the require-
ments for overloads, fault currents, voltage drop, and installation design.

Where SELV circuits are used, whatever the nominal voltage, protection against direct contact has to
be provided by barriers or enclosures affording at least IPX2 protection, or insulation capable of
withstanding a test voltage of 500v for 1 minute. The measures of protection by non-conducting loca-
tion, placing out of reach, obstacles and earth free equipotential bonding, are not allowed.

LOCAL SUPPLEMENTARY BONDING


Local supplementary bonding is required to connect all extraneous conductive parts and exposed
conductive parts together. In the case of swimming pools, this means anything in Zones A,B and C.
Additionally, the floor round the pool (Zones B & C ) is an extraneous conductive part and must be
included in the supplementary bonding. This is best achieved, if the floor is not reinforced concrete, by
the installation of an earth rod connected to the supplementarybonding conductors. Where solid floors

a are installed, an equipotential bonded grid has to be provided in the floor, and this used as part of the
equipotential bonding; in practice, the reinforcing mesh in the floor could be used. Where socket outlets
are installed, the earth terminal of the socket outlet must be included in the supplementary bonding.

Supplementarybonding must not, however, be made to those appliances which have been energised by
a SELV source.

SIZE OF SUPPLEMENTARYBONDS

Where there are no exposed conductive parts in Zones A,B and C, the minimum size of supplementary
bonding conductor is 2.5mm2if it is sheathed or otherwise mechanically protected, or 4mm2if it is not
mechanically protected.

Where exposed conductive parts are in Zones A,B and C, then two sets of rules have to be complied
with. One of the rules determines the actual size of the supplementary bonding conductor needed, and
the other specifies the minimum size allowed.

The allowed resistance of the supplementary bonding conductor = 50


-

a Ia

Where Ia is the current which will disconnect an overcurrent protective device within 5 seconds, or is
the residual current of an RCD.

Section 5 Electrical Page 3


Spata Standards Volume Two (1999)

ELECTRICAL INSTALLATIONS - RECOMMENDED STANDARDS


Where a swimming pool contractor is directly responsible for the installation of the electrical equip
ment he shall be required to:-

1. Observe fully IEE current Regulations with regard to electrical installations. He shall ensure that
the earthing of the supply is carried out in accordance with the local Electricity Board’s require-
ment and shall ascertain as to whether the earthing of the equipment shall be by Multiple Earth
Protection.
2. That the earthing of the supply shall be checked during the installation of the equipment for zero
potential by a Mega meter.
3. That the pump and any other electrical outlet points shall not be accessible to those in and around
the pool and no electrical outlet point (other than underwater lighting which shall be protected and
of a low voltage nature) shall be within 3.6m (12ft)of the pool perimeter.
4. That he shall recommend that a high sensitivity earth leakage circuit breaker of a suitable type for
the equipment installed should be installed for all electrical equipment associated with swimming
pools.
5. That all electrical installations shall comply with the current Institute of Electrical Engineers
Regulations and shall be carried out by a qualified electrical engineer.
6. That the Statutory Instrument of 1975No 1366 Consumer Protection the Electrical Equipment
(Safety) Regulations 1975 shall be complied with.
7. Documentation for the operation and maintenance manual should include the necessary electrical
compliance certificate.

Where a pool or a kit is sold for a third party to install (be he the user or the user’s contractor) the
supplier shall bring the user’s attention to the basic precautions which should be taken regarding
electrical safety and shall recommend that the above requirements be observed by the user or his
contractor.

Page 4 Section 5 Electrical


Spata Standards Volume Two (1999)

INSTALLATION

1. All electrical installations shall be carried out by a qualified electrical contractor and the stand-
ards laid down by SPATA shall apply. All electric motors of % hp or more shall be protected from
damage by a suitable starter or some other approved thermal overload device, and adjustable
starters shall be set at the appropriate recommended starting amperage for the kilowatt rating of the
motor (brake horsepower).
2. In three phase installations protection ‘single phasing’ shall be incorporated in the starter or
thermal overload device.
3. In no circumstances shall a direct connection be made to a domestic 13 amp outlet socket.
4. The main’s supply to the plant position shall terminate in an isolation switch.
5. Main line fuses shall be in excess of the starting load of the motor and in no circumstances, shall
adjustable starters be set in excess of the recommended starting amperage. Such practice invali-
dates the manufacturer’s guarantee.

SPECIAL REOUIREMJ5NTS

6. All electrical maintenance shall be carried out by an approved electrical installations contractor
who shall observe all the necessary safety precautions in the course of his service maintenance.

Where it is necessary for a maintenance engineer to enter a confined space for inspection purposes, a
conveniently sited extra low voltage socket of a type non-interchangeablewith any general purpose
outlet in the same installation shall be provided for an inspection lamp. Owing to the difficulty of
obtaining 60 volt bulbs, it is recommended that a 12 volt supply be provided by transformer, or
alternatively a 12 volt DC supply may be used (ie a car battery).

7. Other general purpose outlet sockets shall be of an approved standard waterproof type located at
least lm (3ft) above ground level.

No outlet socket shall be installed for any purpose whatsoever within 4m (12ft) of the pool edge. Any
outlet socket outside this parameter but within the pool hall shall be effectively waterproofed.

8. All live connections shall be properly encased so that it is not possible for contact to be made with
live connections without either switching off the main supply, unlocking or unscrewing the case.

9. A specially designed control cabinet, matched to meet the requirements of the specific installation,
shall be used where multiple electronic equipment is used.

10. Approved starters or thermal overload devices shall be provided for motors rated in accordance
with the information set out in the appropriate appendix ‘AlternatingCurrent’ to these standards
showing the approximate amperage per phase taken by modem induction motors allowing reasonable
efficiencies and power factors.

11. Three phase installation protection against single phasing shall be incorporated within the starter or
the thermal overload device.

Section 5 Electrical Page 5


Spata Standards Volume Two (1999)

ELECTRICAL. HEATING, UNDERWATER LIGHTING AND EOUIPMENT

1. HEATING
2.
The choice of electrical control gear and protective devices is governed by the considerations of
personal safety and protection of the heater from internal or external fault.

Choice of controls must take into account that the heater will be unattended and in many cases will
operate during the night. Therefore, the controls should not make excessive noise.

In the case of electric heaters, these must be protected against a short circuit in the main power circuit.
If the heater is convertible for single or three phase, the protection shall be on each of the three phase
circuits. Either fuses or circuit breakers (rated in relation to the smallest conductor in the circuit they
protect) may be used, and each must be complete within the Heater controls.

In all heaters, the control circuit must have separate protection, which may be by fuse or circuit breaker
and shall be specified by the manufacturer to protect both the smallest conductor and the switching
capacity of the control equipment.

All internal wiring and connections shall be in accordance with the relevant IEE regulations.

CASING

Access to the inside of any casing containing exposed electrical connections shall only be possible by
the deliberate use of tools unless a lockable door, with positive mains isolation upon opening, is
provided.

APPENDIX - ELECTRIC HEATER SUPPLEMENTARY REOUIREMENTS


1. As well as complying with the general requirements of this standard, electric pool heaters shall
also incorporate the following features.
2. CONTROL OF POWER CIRCUIT. The power supply to the elements shall be interrupted when
required by the normal control devices, either by direct switching, if the switches are rated to
carry the full load current, or by means of one or more suitably rated contactors.
3. Unless an isolator, a switch fuse or a circuit breaker is provided as an integral part of the heater, a
hand switch shall be fitted, either on the heater, or mounted on a suitable control panel which shall
be within easy reach and shall be clearly marked. Indicator lamps shall be fitted to show when the
supply is on and also when the elements are energized.
4. Provision must be made to remote control the heater by pump interlock, time switch or hand
switch. Since such equipment may be connected to a different phase to the heater control circuit, no
direct electrical inter connection shall be provided or made. An interposing relay will satisfy this
condition.
5. Where more than three heating element loops are fitted in one heater it is recommended that all
safety devices that require the heater to be switched off until manually reset shall isolate the heater
at the point of supply and shall not rely upon the switches or contactors used for normal control
purposes to break circuit. It is also recommended that a device be fitted in such heaters that will
detect any accumulation of scale or sediment around the elements, giving extra protection where
multiple banks of elements are at risk, by switching off the heater until manually reset.
6. The maximum size of heater bank to be switched as a normal control function shall be 36kw. For
ratings above 36kw a time delay shall be provided between switching successive banks.
7. HEATING ELEMENTS. All heating elements shall comply with BS3456 and it is recommended
that each element loop shall be individually removable for replacement.

Page 6 Section 5 Electrical


Spata Standards Volume Two (1999)

e UNDERWATER LIGHTING

1. All lights shall have comprehensive installation instructions relative to their particular manufacture
and shall be clearly marked as suitable for underwater use.

2. The electrical supply to underwater lighting shall not exceed 12v at the lamp and 18v on open
circuit.

3. No single underwater light shall be of a voltage greater than 12v.

4. A 12v supply shall be derived from a double wound transformer complying to BS3535. The trans-
former shall either be in a protective case or in a control cabinet, the bottom of which shall be located
at least lm (3ft) above ground level. (Class 2 insulation). The supply to the transformer shall be
covered by an RCD.

5 . All underwater lights shall be adequately sealed in order to ensure that they are completely water
tight

6. The junction of the supply cable to the flexible light cable in the deck box shall be sealed completely
with suitable waterproofing and be accessible for future maintenance.

7.All installations shall be earthed as a protection against the insulation of the transformer breaking
down or any other wiring defect occumng.

MISCELLANEOUS EOUIPMENT

Where additional electric or electronic equipment is used within the pool or within 4m of the pool
perimeter, such equipment must be approved specialised Swimming Pool equipment with all electrical
requirements compliant with these standards.

Such equipment may include counter current devices, automatic pool covers, underwater speakers or
camera systems and automatic pool cleaning devices.

~ Section 5 Electrical Page 7


Spata Standards Volume Two (1999)
Spata Standards Volume Two (1 999)

SECTION 6

SPECIALIST POOLS

AND ACCESSORIES
Spata Standards Volume Two (1999)
Spata Standards Volume Two (1999)

0 SECTION 6 - SPECIALIST POOLS AND ACCESSORIES

SPECIALISTPOOLS

The general principles apply to all pools but for design purposes due thought should be given to usage
and the peculiarities associated with each specific contract. The basic types of pool are described
briefly below.

TYPES OF POOL

COMPETITIONPOOLS
a) Half Olympic for short-course championships. Generally 25m long and 12/13m wide, ideally 1-
1.8m deep. ASA recommendations are for central racing lanes of 2m width and outside racing lanes of
2.25 or 2.5m width.

b) Full Olympic pools must be 50m x 25m, minimum depth 2m and with at least 2m wide inner lanes
and 2.5m outer lanes to accord with ASA recommendations.

DECK LEVEL POOLS


The pool water is level with the pool surround, to enable surface water to be removed over the edge
into a transfer channel and on through a balance tank before filtration and water treatment.

DIVING POOLS
Specially designed to allow steep entry dives from springboards and fixed platforms. For competition,
the depth and the area of water is determined by FINA regulations: a lm springboard requires 3.5m
depth; a 1Omplatform requires 5m.

COMMUNITY/SCHOOLOR DUAL USE POOLS


Used at different times by two or more different types of customer. School pools, for example, can be
open for public sessions. Designed to commercial specifications.

HYDROTHERAPY POOLS
Small pools for physiotherapy use. As they are usually up to ten degrees Celsius warmer than conven-
tional pools, and used by people who may have wounds or be incontinent, their water treatment, and its
monitoring must be scrupulous. (See Hydrotherapy Pool section).

LEARNER OR TRAINING POOLS


Shallow pools designed for both learning and some training - typically about 16m by 7m with steps
along length or 1 width depth generally 0.9m - 1.2m approximately. The relatively large surface area to
volume ratio and pollution from young children make bathing load control and water chemistry control
important.

LEISURE POOLS
Infinitely varied, but tend to be irregular in shape and with more shallow areas than conventional
pools, and usually water features. So filtration and disinfection are less predictable and need specific
design. May include freeboard and deck level combination, beach pools, disappearing edge pools.

OUTDOOR POOLS
Often large volumes of water which help pools to cope with fluctuating bathing load; if turnover is
slow, and surrounding areas create dust and debris problems water treatment and care may be difficult
to maintain.

Section 6 Specialist Pools and Accessories Page 1


Spata Standards Volume Two (1999)

OUTDOOR PADDLING POOLS


May be heavily polluted relative to their volume because they are subject to dirt and urine from
children. So their turnover and disinfection need as much attention as conventional pools. Outdoor
paddling pools should normally be no deeper than .8 of a metre and circumstancesmay dictate that
regular emptying is necessary to maintain acceptable standards.

PLUNGE POOLS
Unheated water to cool bathers in a health suite. They need conventional disinfectant etc. Good surface
water draw off and regular water replacement are important. It may be necessary to ensure a tempera-
ture of no less than 100, and an immersion period of no more than 10minutes for safety.

SPLASH POOLS
Splash pools are specially designed areas of water provided to catch a rider after descent of a giant
water slide. Generally a depth of 1.2m and an area of 4.2m in front of the chute can be considered safe
margins. Because bather pollution will be high for the amount of water, turnover and filtration are
important. Design should ensure that riders can clear the area quickly enough to prevent collision and
also ensure that swimmers do not venture into the area.

WAVEPOOLS
Wave pools are generally freeform with a beach opposite a wave generating machine. The volume of
water necessitates a high freeboard within the wave area and an adjacent area should be made avail-
able for lifeguard use to assess swimmers abilities with suitable emergency alarms if required. Alarms
should be sounded before operation of the wave machine.

SPA POOLS (SEE VOLUME 4)


For stimulation or relaxation the chemically treated water is heated to between 32 and 400,. Bathing
load can be high and good disinfectant residuals difficult to maintain. There may be need to be intervals
between sessions and a high turnover of water. Spas may need to be emptied weekly or even more
often and bathing sessions should be limited to 20 minutes as long immersion periods can be detrimen-
tal to health. Safety instructions should prohibit the use of alcohol and require doctors advice before
use should a medical problem be suspected.

SWIMSPA OR EXERCISE POOLS


Swimspa are either small swimming pools with water agitation or linked but separated from swimming
and spa pools.

WHIRLPOOLBATHS
A pool of untreated water (replaced after each user) and water agitation or massage jets of some sort.

WHIRLPOOLSPAS
Has jets as does a spa pool but this water is usually part of the adjacent main pool water. Not actually a
spa having a temperature range 27-300, and water treated as part of main pool filtration. Whirlpool
water flows intotor is part of main pool water contents.

Page 2 Section 6 Specialist Pools and Accessories


Spata Standards Volume Two (1999)

a SPECIALIST POOLS

HYDROTHERAPY

These Standards incorporate many of the requirements of the Hydrotherapy Associates of Chartered
Physiotherapists.

DESIGN

Design of a hydrotherapy pool requires a preliminary assessment of needs and users

The needs of patients using the pool may include:-


- Orthopaedic
- Rheumatological
- Neurological
- Ante and post natal
- Paediatric
- Sports injuries
- Chronic pain syndromes
- Posttrauma
Users which include:-
- Inpatients
- Outpatients
- Individual and group treatments
- Private practitioners
- Sp~rtsclubs
- Disabled groups
- Self help groups
- Maintenance groups
- Ante and post natal groups
- Water exercise and fitness programmes
- Other hospitals and centres
DESIGN CONSIDERATION

a According to the requirements the pool may be raised, semi raised or deck level. The latter if often
preferable for:-
- Ease of emergencyevacuation
- Cleanliness no grease line and
- Decreased turbulence

SIZE OF POOL

The minimum, space required for each patient is 2.50m x 2.25m, e.g. a pool 5m by 9m would accom-
modate 8 patients.

Is again determined by the use required but is generally:-

For adults and children 830mm - 1270mm


For adults only 1000111- 135Omm

Section 6 Specialist Pools and Accessories Page 3


Spata Standards Volume Two (1999)

The pool floor may be flat bottomed, stepped or graded. A graded floor may provide best working
options with a recommended gradient - maximum 1:30 (Davis and Harrison ‘Hydrotherapy in Practice’
1988).

POOL ENTRY

STEPS

Steps should be located outside the therapy working area.

Maximum riser height 15Omm


Maximum tread depth 3OOmm
Maximum step width 600mm (Duffield’s Exercise in Water 1986)

HOISTS

These may be of stretcher type, seat type or a combination of both, either fixed or removable.
They may be:-
- Mechanical
- Electrical
- Hydraulic

Placement of hoist should be at shallow end of pool and unencumbered space for 360 degree turn
should be provided where possible.

RAMPS

If a ramp is included the maximum gradient must be 1:15. Considerationmust be given to non slip floor
surface and weight of wet patient in a transfer chair.

IN POOL FIXED EOUIPMENT

These should be of stainless steel: Marine grade type 316 preferably the rail and the stair hand rail
should be continuous.
Rail should be continuous on at lease three sides of the pool.

Dimensions Approximately 4Omm in diameter


Fixed 5Omm from the pool wall
Fixed 75mm below the surface of the water

High pressure jets can be used to provide:-

- A massage effect
- Resistance to swimming

Placement of jets must consider the turbulence created in terms of visibility and patient stability in the
water. Controls should be accessible from inside and outside the pool.

Page 4 Section 6 Specialist Pools and Accessories


Spata Standards Volume Two (1999)

MATERIALS AND FINISH

In Pool Non slip surfaces


Non abrasive
Easy to clean

Tiles are the best consideration for durability and low maintenance.
Junction between pool walls and floor should have a radius of between 50 and 150mm for ease of
cleaning and to reduce turbulence.

CONCOURSE

Size - a minimum width of 2 metres should be provided on at least 2 sides to allow for stretchers,
wheel chairs and the turning circle of the hoist.
1.5 metres on the other 2 sides allow for emergency access.
Surface - non slip, non abrasive, and easy to clean.
Graded away from pool edge to prevent dirt and debris from entering the pool during cleaning.
a Provision of adequate drainage to waste.
Gratings fixed so as not to cause hazards.
Tile grouting adequate to withstand high pressure hosing during cleaning. Poly resin additives required.

ENVIRONMENT

LIGHTING AND REFLECTION

For staff visibility, windows to be placed to minimise reflection of the water.


Artificial lighting should be indirect and evenly distributed.
Artificial lighting, if directly above the pool, must be accessible from the roof for maintenance pur-
poses.

CONDENSATIONAND CORROSION

These can be kept to a minimum by:-

- well designed ventilation systems (environmentalcontrol)


- well controlled water treatment processes
- provision of pool cover after hours

Suitable non corrosive materials are required for walls, ceilings and fittings.

VENTILATION

Ventilation should be provided to maintain humidity at approximately 50%.


This can be achieved by:-

- Positive and negative air flow to give 10-12 air changes per hour
- Dehumidifying air conditioning

Pool ceiling should be approximately 4.5 metres above the level of the concourse.
Air temperature should be maintained at approximately 25 degree Celsius.
Pool rooms walls and fittings should be constructed from materials not affected by humidity.

Section 6 Specialist Pools and Accessories Page 5


Spata Standards Volume Two (1999)

ACOUSTICS

Pool room walls and ceiling should be constructed from acoustic materials.

WATER TEMPERATURE

Water temperature should be maintained a thermo neutral i.e. 35 degrees Celsius.


Acceptable range 32-37 degrees Celsius.
Facility for rapid change of temperature may be required if different target populations are to use the
pool.

POOL EOUIPMENT

SAFETY AND EMERGENCYEOUIPMENT

Test kit to test for chlorine or bromine


PH, total alkalinity and calcium hardness
Mason's wet/dry bulb hygrometer and tables to measure humidity
Hospital wall aidoxygen system or air via or oxy viva
Alarm system accessible from within the pool and around the concourse
Telephone with access to emergency call system

,INTRA POOL EOUIPMENT

For optimum use of pool space non fixed equipment is preferable and may include:-

- Weighted stools
- Plinths suspended from the rails
- Neck collar, hip float, flippers, bats, buoyancy rings, kick boards
- Polystyrene blocks of various sizes for resistance etc.

Number and layout will be determined by the pool location and the specific number of users.
Minimum of one facility built to standard required for wheelchair usage.
Cubicles with curtain or wall partitions are most versatile.
Provision of bench or chair type seats.
Showers and toilets should be separated from the changing room.
Wet and dry areas should be separate.
Provision of mirrors, clothes hooks, handrails and lockers.

SHOWERS

Number of showers required depend on size and hourly patient turnover.


Minimum requirement : 1 shower per 6 people per hour.
If space is short consider use of pool side drench showers.

Page 6 Section 6 Specialist Pools and Accessories


Spata Standards Volume Two (1999)

Minimum of one shower cubical built to standard required for wheelchair usage, providing
Vertical and horizontal handrails, adjustable height hand held shower rose, thermostatic
Mixing valve with temperature pre set to a maximum of 43 degrees Celsius, and taps
Accessible for wheelchair clients.

WATER CLOSETS

Consideration should be given to provision of sluices and douches. Ratio of 1:6 with a minimum of one
for wheelchair access.

REST AREAS

Provision of seats and minimum of one couch for rest after pool session.
Facilities to provide drinks after pool session.

STAFFFACILITIES

Separate change, shower, lockers, toilet and rest facilities should be provided for staff.

PLANT

The most appropriate type of filter for use with hydrotherapy pools is sand. The filter must be of
sufficient size to handle the turnover rate of the water.

PUMPSPIPES

Pumps and pipe size must have a minimum water turnover rate of 2 hours.
Pumps must be able to operate 24 hours a day.

I WATER PURIFICATION SYSTEM

This should be an automatic system.

Section 6 Specialist Pools and Accessories Page 7


Spata Standards Volume Two (1999)

DIVING POOLS

For the purposes of these standards this section deals with racing diving, leisure diving and competi-
tion diving. The standards are not intended to cover scuba diving, underwater diving or allied activi-
ties. Jumping in from the side of the pool is also excluded.

DOMESTIC

Diving into a domestic pool either from a board or from the poolside should be prohibited unless an
area of water of sufficient size and depth (Cage of Safety) is available at the deep end of the pool. See
Appendix.

In any event diving should not be permitted into a vertical water depth of less than 1.5m with a forward
clearance of 7.6m.

Any diving into a domestic pool which has a depth over 1.5m should be of the flat shallow racing type
and only by competent people and running dives should not be permitted.

Diving spring boards or Jump board should not be fitted to pools with a vertical water depth of less
than 3m.

Diving particularly by children should be accompanied and it is important that where no diving is
possible signage is provided to indicate this.

Diving should not be permitted by persons under the influence of drugs and alcohol.

COMMERCIAL

Diving pools should conform to the document ‘Diving in Swimming Pools’ produced by the ISRM in
conjunction with ASA, RLSS,CCPR, ROSPA, STA and the Sports Council and the HSE. In all areas
where diving may take place, a Risk Assessment should be prepared and constantly reviewed and
revised if necessary.

SPATA standards endorse these recommendationssome of which are shown below.

1. Running dives should not be permitted.


2. Diving should not be permitted into water with a vertical depth of less than 1.5 metre.
3. Diving should not be permitted from pool sides with freeboards (i.e. height of pool edge above the
water level) exceeding 0.38m (i.e. 14.96 inches). Where this occurs the recommendationsfor
recreation standard fixed stages should apply.
4. Only very flat racing dives should be permitted into swimming pools. Steeper entry dives are
allowed only into diving pools designed to FINNASA Standards.
5. Diving should not be allowed in pools where there is a forward clearance of less than 7.6m.
6. ‘No Diving’ notices conforming to current safety sign regulations should be prominently displayed
in all pools or areas of pool where there is a vertical water depth of less than 1.5m or where there
is a freeboard exceeding 0.38m and where diving is unsafe or not permitted.
7. Pictorial and written notices advising on safe diving techniques and dangerous diving actions, be
clearly displayed around poolside, in changing rooms and at any particular vantage point, e.g. pool
entrance areas. Also, in positions where bathers bodies might obscure vision, the notices should
be fixed at a height of at least 1.8 metres (6 feet).
8. Diving should in all cases be prohibited when the waves are in motion.
9. Every reasonable practicable measure should be taken to prevent diving from elevated positions
arising from design features of the equipment used in a pool.
10. Competition standard fixed stages and springboards should comply with the current FINNASA
regulations.

Page 8 Section 6 Specialist Pools and Accessories


Spata Standards Volume Two (1999)

11. Recreational standards fixed stages installed before August 1989 should comply with the recom-
mendations of the ASA given in appendix 8, Table I1 'Safety in Swimming Pools'. Diving facilities
designed or refurbished after 1" September 1989 should comply with current FINNASA regula-
tions. Non standard fixed recreational stages should be subject to the conditions recommended for
the next higher board.
12. Elevated racing starting stages should comply with current FINNASA regulations.
13. Trampets provided for diving practice purpose, or general fun use, should be subject to the
requirements of a 1 metre springboard in current FINNASA regulations.
14. Non standard springboards of less than 1 metre in height above the water surface should be subject
to the requirements for a 1 metre springboard in the current FINNASA regulations.
15. Pools with equipment not meeting official standards of design, water depth and pool bottom
profile etc., should have the equipment removed.
16. Diving areas should be segregated from swimming areas.
17. All future diving stage and springboard provisions should be in specially designed diving pools.
18. New sub regional pools should have approved competition standard diving stages up to 5 metres
in height and regional pools should include diving stages up to 10 metres in height.
19. Permanent starting blocks should not be provided in new swimming pools.
20. That the use of elevated starting blocks not exceeding the FINA maximum of 0.75m above water'
level, during programmed sessions (e.g. club classes), should be restricted solely to persons
skilled in performing flat racing type dives.
21. Notices shall be attached to all starting blocks where there is less than 1.8m of water stating
'DANGER SHALLOW WATER BELOW'.
22. Only swimmers who have been taught to consistently execute a proficient flat racing dive with
shallow entry in deep water to the complete satisfaction of their teacher or coach should be
allowed to execute a racing dive into a minimum water depth of 0.9m.
23. Diving should be prohibited where visibility through the water is unclear and there may be
uncertainty about the diving.
24. Where diving is allowed, after a risk assessment, the conditions should at least conform to the
previous guidance in this document in relation to;-
- the depth of the water
- the height from which the dive takes place
- clearances
- the type of dive allowed
- diving boards
- prominently sited signs indicating where to dive, the depth of water and the type of dive.

Section 6 Specialist Pools and Accessories Page 9


Spata Standards Volume Two (1999)

EOUINE POOLS

Equine pools are for the exercise and hydrotherapy of horses and not for water polo. The pool shape is
usually round (known as a single polo) or Figure 8 (known as a double polo) with either one or two
sloped access ramps. A central island is generally provided for the handler. Because of the usage the
maximum depth is in the order of 3 metres.

Construction should be in concrete. The ramp should be padded with rubber flooring and sheeting to
protect the animal and the internal finish is usually paint due to the risk of damage from hooves. For this
reason liners are not an option and tiles are too much at risk. Internal finish must be durable and slip
resistant with no sharp edges within the shell or immediate access areas.

Filtration is usually medium rate with a large filter bed area and design can be level deck, freeboard or
the traditional scum through design. Whilst it is unusual for horses to defecate while swimming there is
a risk on entering and leaving via the ramp. Due to the make up and the large quantity of faeces and
body contaminants it is advisable (if a freeboard design is used) to increase the size to surface skimmer
baskets in order to catch hay/straw etc. Similarly and level deck channel or scum trough should be
large with easy access for regular cleaning. Particular care should be taken in siting both Flow and
Return fittings to ensure these do not create a hazard to the animal. Consideration should also be given
to an additional inline strainer before pumps.

Pool water heating, if required, is as normal with a general range of 650 - 750 maximum. Water
Treatment control systems are to be encouraged although operators are to be conversant with shock,
hand dosing.

In treadmill pools access is usually by a ramp in, a short flat area of approximately 3 - 4 metres and a
ramp out. Depth usually being in the order of 1.5- 2 metres. This type of pool is smaller in volume but
because of increased problem of faecal contamination due to the animal standing and not swimming
filtration and treatment systems must be oversized.

Much of the above applies to the above but, of course these pools are much, much smaller and access
ramps are not necessary. Heated water is much more likely and the risk of faecal contamination is
almost nil.

Page 10 Section 6 Specialist Pools and Accessories


Spata Standards Volume Two (1999)

a POOL ACCESSORIES

Any accessories used in conjunction or fitted to or within a pool should be manufactured specifically
for such use, using non corrodable, chemical resistant materials of sufficient strength and durability.
Manufacturers/Suppliersof such equipment should provide accurate information for installation of
equipment together with notification of any safety requirements.
Where relevant, any current British Standards should be consulted.
All electrical or electronic equipment must be fitted in accordance with IEE current Edition Regula-
tions (See Electrical).

Standard accessories include:-

POOL ACCESS STEPS

The handrail of access steps should be manufactured in AISI 304 or 316 stainless steel with an outside
diameter of no less than 37.5mm. Fixing anchors where fitted should be solidly bedded. Step Treads
should be manufactured in AISI 304/316 stainless steel or in ABS and should have a width no less than

a 200mm with separation of treads no greater than 25Omm.


Step treads should be non slip for safety, durable and fitted without sharp edges or protrusions. Stain-
less steel treads only should be provided for commercial application.

JUMP BOARDS AND DIVING BOARDS

Diving limitations are shown within the specialist pool section (Diving Pools/Basins). Diving Boards and
Jump Boards should be manufactured using solidly bedded supports sufficiently sited at the pool edge to
ensure no contact can be made by the diver with the pool edge. Boards should be durable and non slip.
Diving Boards must only be used where a specific diving area has been provided (See Diving Pools).

SLIDES AND CHUTES

Slides and water chutes must be solidly anchored to prevent movement, and sited at the pool edge to
prevent risk of collision with the pool edge. The splash down area is subject to the parameters imposed
by the Cage of Safety (see appendix) and the depth of the slide basin within the pool should be no less
than 1.5m. The fabric of the slide should be durable, non corrodable, smooth and non breakable. Water
slides over 2m in height are subject to BSEN1069.

HANDRAIL& GRABRAILS

Handrails should be manufactured in AISI 3041316 with ABS or steel brackets placed at intervals of no
more than lm along the length of the handrail. In commercial applications stainless steel brackets only
should be used.
The distance between the wall and the handrail should be less than 8mm or more than 3Omm to prevent
entrapment of limbs.
Handrail and handrail fittings should be smooth and free from sharp edges, angles or protrusions.

MAINTENANCE EOUIPMENT

All maintenance equipment including vacuum heads, telescopic handles, vacuum hoses, leaf rakes and
nets, brushes etc should be of sufficient strength, durability and design to undertake the purpose for
which they are designed.
Care should be taken to ensure the correct equipment is provided for each independent pool.

Electrical equipment is included in the electrical section.

Section 6 Specialist Pools and Accessories Page 11


Spata Standards Volume Two (1999)

EOUIPMENT RETAIL SALES

Any hazards or risks associated with equipment must be notified to the Client or Client’s Agent together
with control measures to ensure safe use.

MOVABLE AND SUBMERSIBLEBULKHEADS

A bulkhead is any rigid structure, partially submerged, floating or not, designed to modify the configu-
ration of a pool by splitting it into more than one section.

If not specified, the requirements of the standard apply to both types.

STRUCTURALINTEGRITY

If designed to carry swimmerdteaching staff etc. the structure shall be designed to bear when in use, a
vertical load of 4kN/m2uniformly applied on the top surface. If not the load can be reduced to 1.5kN/
m2.

The structure shall also be designed to bear, when in use, a horizontal load of 2kN/m2on both the side
surfaces.

DYNAMICLOADS

Under the influence of the dynamic loads originated by the users (i.e. the start and turns during swim-
ming teaching), the structure shall not move or show permanent deformation.

For movable bulkheads the weight is offset by buoyancy tanks located within the internal structure.
Wheels on pool side and pool walkway are required to prevent tipping and jamming during movement.
Channels in pool walkway not advised due to entrapment when channel cover not being replaced.
A barrier or handrail for pushing the bulkhead and designed to prevent injury to staff having to bend to
push at floor level.

WATERCIRCULATION

Bulkhead must have full length perforated panels to front and rear to minimise change in water circula-
tion system and to prevent build up of foul smelling water in the bulkhead structure.

WALKWAY (WHEREBULKHEADDESIGNED TO CARRY PEOPLE)

For walkable bulkheads a slotted nonslip surface is required to prevent ‘puddling’ and sections must
be removable for easy cleaning.

MATERIAL

A hard wearing material with non splintering surface must be used that withstands total submersion in
chemically treated water i.e. will not delaminate through osmosis. Stainless steel is considered better
than GRP.

Page 12 Section 6 Specialist Pools and Accessories


Spata Standards Volume Two (1999)

PREVENTION OF RISK OF ENTRAPMENT

The distance between a movable bulkhead and the pool walls shall be minimum 8mm, maximum 50mm
in the area in reach of users.
Apertures in the surface in contact with users or officials shall not exceed 8mm in any one dimension.

PREVENTION OF RISK OF PROJECTION

When not in use, submersible bulkheads shall be flush with the pool floor.
When in use, walkable movable bulkheads shall be clearly seen (i.e. protrusion from water level or by
signs).

PREVENTION OF RISKS COMING FROM UNDERSWIMMING

The submerged part shall extend for minimum 0.8m under the water surface.
If it is possible to swim under the structure, the bottom surface shall be continuous and inclined a
minimum 15mm to lead the swimmer to the open surface, or have electronic underwater surveillance to
lifeguards.

PREVENTIONOF RISK OF FALLING

Should the top surface of a walkable structure not be at the same level as the surrounding pool edge, a
step minimum 150mm of difference shall be designed.

PREVENTION OF RISK OF FALLING BACK

If walkable the top surface of the structure shall be no less than 1.2m wide.
Barrier rails must be included to prevent users from falling back from the bulkhead and shall have
minimum two horizontal rails.

VENTION OF RISK OF MISUSE

The operation controls and operation openings in the structure shall be designed such a way to allow
operation or access from the staff only.
If not walkable, specific barriers or warning signals shall be installed to prevent the access of users at
any time.

OPERATIONALSPECIFICATIONS

3.1 Movable bulkheads shall be operated only by the staff and only when the public has no access to
the pool area.
In case of both mechanical or hand operation the operating staff must have a clear sight of the area.

3.2 If the movement of the structure is mechanically operated, an acoustic and light warning signal shall
be provided, to be automatically switched on during operation.

3.3 Handrails to be provided at water level in recess to be flush with front face and comply with the
specifications to prevent risk of entrapment and risk of projection when the pool is open to the public.

Section 6 Specialist Pools and Accessories Page 13


Spata Standards Volume Two (1999)

SPECIALISTAND LEISURE ACTIVITY EQUIPMENT

This includes:-

- flumes and Vortex features


- Wave Machines
- Adjustable Pool Floors
- Water Cannons
- Rapidnazy River Effects

All equipment requires specific detail to the pool construction often with minimum depths, restricted
access for safety purposes, specific attention to water quality and pool water circulation and more
importantly safe and accurate design, construction,operation, maintenance and supervision.

It is recommended that the manufactureris involved with the design of each item to ensure that each
aspect of these requirements is addressed and specific requirements are met.

Page 14 Section 6 Specialist Pools and Accessories


Spata Standards Volume Two (1999)

SECTION 7

SYSTEM DESIGN
-

Spata Standards Volume Two (1999)


Spata Standards Volume Two (1999)

-
SECTION 7 SYSTEM DESIGN

POOL CFUTERIA

Before design, standard criteria should be established to ensure the finished pool will meet the require-
ments expected.

These criteria include:-

1. Usage - leisure, swimming competition or specialist

2. Shape and size - length and width

3. Depths - deep and shallow ends

4. Profile - gradients of pool floor

5. Circulation system - freeboard or level deck

6. Bathing loads -maximum users

7. Temperature requirements

8. Dosing agents - suitability according to mains water analysis

9. Drainage availability - capacities etc

10. Plant - situation and area

11. Excavation - Water Table, rocks, disposal of spoil etc

12. Budget restrictions

The following formulae should be adopted to assist with technical design and worked examples for
assistance are provided.

Section 7 System Design Page 1


Spata Standards Volume Two (1999)

FILTRATION DESIGN

FLOW RATEFORMULA

The standard maximum flow rate and water turnover rates shall be

Flow Rate Water Turnover

Commercial 25m3/m2/hr 3 hours


(500g/ftz/hr)

Private 50m3/m2ihr 8 hours


(lOOOg/ftVhr)

Taking this as basic premise, the following table (when used in conjunction with other design criteria)
should prove helpful in the sizing of a filter plant.

TYPE OF POOL Turnover period in hours

Leisure water bubble pools 0.1 - 0.33


Spas 0.1 - 0.25
Teaching Pools 0.5 - 1
Waterslide splash pools 0.5 - 1
Hydrotherapy Pools 0.5 - 1
Leisure waters up to 0.5m deep 0.2 - 0.6
Leisure waters up to 0.5 - lm deep -
0.6 1.2
Leisure waters 1 - 1.5m deep 1 - 1.8
Leisure waters over 1.5m deep -
1.8 2.5
Conventional public pools up to 25m long with a l m shallow end 2.5 - 3
Competition pools 50m long 3 -4.5
Diving pools 4-8
Domestic pools 4-8

Page 2 Section 7 System Design


. -...

BATHING LOAD FORMULA

The bathing load means the maximum number of persons who can be accommodated safely at any one time. Because
not all bathers are swimmers. the depth of the pool should be included in this formula. The standard guideline is defined
as one bather per 3m2 of surface area but in order to assess this more a m m t e l y PWTAG have suggested a
recommended formula as follows:-

Shallow water (under 1 m) 1 bather per 2.2m'


Standing depth water (1 to 1.5m) 1 bather per 2.7m'
Deep water (over I Sm) 1 batherper4rn'
Very deep water (over 2m) According to usage.

The formula for the bathing load to be assessed (subject to use) is thus

Pool length = L Pool width = W Formula = Bather per mz as above

Bathingload = L x W
I' Formula

i.t. (Icornmacid pool size 25m by 12 m witb dq~&1 m 2.5 m would be:

I 2 x 12 + 13 x 12 = H + 156 = 53.3 + 39 = 92.3 say 92


2.7 4 2.7 4

OVERLOADMG

One -is catain and that is that the number of bathers using a pool must be coatrolled

Overloading brings about the following


1. A breakdown of chlorination,disinfection and pH control.
2. A breakdown in filtration
3. A breakdown of water clarity
4. A brealidown of control and observation of s w i h
5. A breakdown of life guarding services
6. Death bydrowning
Spata Standards Volume Two (1999)

CIRCULATION AND WATER TURNOVER PERIOD

Having established the bather load we can move onto the circulation rate. The PWTAG guidelines,
based on experience over many years recommends that the figure of 1.7 be used to establish the
circulation rate per bather.

The formula then becomes Bathing Load x 1.7 = circulation rate in m3/hr.
i.e.
(BL)92 x 1.7 = 156.4m3/hr
If we now use the pool capacity already determined
e.g. 2Sm x 12m x l m - 2.5 (av 1.75)
we find a capacity of 525m3

We must add on to this figure the capacity of the balance tank at quiet running level
(seeBalance Tank design) and of the surge trough.
In this case we will assume the capacity of the balance tank will be

25 x 12 x 50 litres = 15,000 litres = 15m3

We will assume the surge trough uses 14- pipework with a length of 8Om at a running capacity of

113d i.e. 3.14x7Qx70= 15386=5128.6~80=410.293mm?=4.1m3


3 3 100000

The TOTAL capacity now becomes 525 + 15 + 4.1 = 544m3

To establish the correct water turnover rate, the capacity of the pool should be divided by circulation
rate already achieved.

i.e. 544 = 3.48 hourly turnover

156.4

Page 4 Section 7 System Design

~ ~~~ ~~
Spata Standards Volume Two (1999)

-
FILTRATION VELOCITY AND FILTER BED AREA

The next step is to find the correct velocity and to do this we must apply the information now estab-
lished, to the filter surface area.
The circulation flow rate should now be divided by the filtration velocity selected

i.e. 156.4 m3/hr


= 6.38m2
24.5 m3/m2/hr

The figure indicates to us the filter bed area necessary to achieve our requirements. We can now select
the tank or tanks capable of filtering to the required specification provided the correct size pumps are
used.
As filters and pumps are only manufactured in specific sizes with corresponding bed areas, we must
select the most suitable size for our purpose. Bearing in mind that the water turnover of our calculation
stands at 3.48 hourly, we should aim for a slightly larger filter bed and correspondingpumps to bring
our hourly water turnover to 2.5-3 hours. Thus we must find the filter bed area to meet this.

i.e. Total capacity 544m2 = 194.28


hourly rate say 2.8hr

194.28ml = 7.93m2
filter velocity 24.5m3/m2/hr

We therefore need a bed area of 7.93m2

The use of filter tanks giving a total bed area of 7.93m2would permit us to design for a bathing load of
92 bathers on a 2.8 hourly water turnover rate. All within the recommended standards.

FREEBOARD DESIGN

On a design with a water turnover of 60m3/hra minimum of 30% (18m3)should pass through the main
drains and 70% (42m3)through the skimmers.
A level deck system would require 50% (30m3)through the main drains and a minimum of 50% (30m3)
through the channel outlets, where possible it is preferable to design up to 80% from the top of the
pool.

a Selection and siting of recirculatory fittings must lie with the designer but generally ensure the widest
circulation of water possible. Dead water will stagnate causing problems with both filtration and
chemical treatment.

Section 7 System Design Page 5

~
Spata Standards Volume Two (1999)

BALANCE TANK DESIGN

The following formula (Rule of 3) is based on experience but does not preclude the use of others. Both
PWTAG and DIN offer alternative formulae which are equally acceptable subject to specific require-
ments.

The formula base is Length x Width x X. The total of this sum is the base capacity which becomes
1/3 rd of the total required balance tank area.

X can be deduced by using the following table

Commercial pool with excessive activity 75-100 litres


Commercial pool with playlwater features 50-75 litres
Commercial pools (swimming only) 25-50 litres
Private pools 15-25 litres
We can therefore substitute X as desired
i.e. 25m x 12.5m = 300 (300 x 50) = 15,000 litres
15,000 = 15m3
The base capacity is therefore one third = 15m3
If we add on a third for surge capacity 15m3
Plus a third safety capacity 15m’
The total capacity 45m3

Similarly

25m x 12.5m = 300


300 x 25 = 7500 litres
7500 litres = 7.5m3

Base capacity 7.5m3


Surge capacity 7.5m3
Safety capacity 7.5m3

Total capacity 22.5163

Page 6 Section 7 System Design

-
Spata Standards Volume Two (1 999)

DISABLED FACILITIES

When designing a commercial pool it is necessary to ensure provision for people with disability.
Design should therefore address the changing area, showering and toilet facilities, the swimming pool
and pool surround, access into the building and access between the changing area and the pool.

CHANGING AREA

A minimum of one disabled cubicle should be provided to both male and female changing areas where
separate areas for each sex are provided. In the case of a unisex changing area a single disabled
cubicle would suffice dependant on possible usage. The cubicle should be of sufficient size to allow
for an assistant and should contain a bench of approximately 3m long x 750-9OOmm wide x 500mm
high. Hooks for clothing should be available and a handrail accessible between bench and door.
Access should be suitable for a wheelchair.

A standard disabled toilet cubicle including specialist lavatory, handrailing and washing facilities
should be available sited in an area available to either sex and accessible from the pool and the
changing area with suitable wheelchair access. Showers may be provided as an independent specially
equipped shower cubicle or a single shower within the general shower complex can be adapted with
necessary handrails and a collapsible or removable seat, provided safe access can be assured to the
user.

A commercial swimming pool should be provided with a pool hoist for access to the pool which
should be operated by a trained operator when in use.

During disabled use the depths of the pool should be indicated ensuring that the users and their assist-
ants are aware of the suitable areas within the pool. Identification floating ropes with buoys should be
considered to restrict access to unsuitable depths of pool and to mark any sharp transitions in depth.

Handrailing should be provided to the area suitable for disabled use and swimming aids such as floats
etc should be considered.

Qualified and careful supervision is essential at all times during use.

Section 7 System Design Page 7


Spats Standards Volume T w o (1999) Amendment 01/03

FORMULAE FOR SIZING PIPEWORK

If you have an open ended pipe of internal diarpder D with water flowing through it at a megl velocity of VI metres pu seamd.
Lhen may secaad it will discharge a cylinder of waler v, metres long. The volume of water v2 in this cylinder will be h e produd
of its base multiplied by its length.

This can be rewangal thus:

This will give the pipe diamdcr in metres for millimdrcs subslitule D with lOOOd

Where d= the intemal diam- ofthe pipe in millimetres


VI = limarveloCiinmetrtsper~

V, = flyw in metrescubed pa hour


~o~umetric
I

Given any two ofthe variables we can calculate the third,the volumetric flow = -and the l i velocity =
v, 10'
-
104 d2n9
, Ifwe now substmde the three variables we can delermine the diameter ofthe pipe and evaluate each one.

a. Suction pipe size (using I .2 metres per second velocity)

b. b r n pipe sizes (using 2 metm per second velocity).

d-
J -=v2io4
2x9
4 - v,ioooo
56.56
=( J v2) 13.3

c. Grille velocity (usmg 0.3 mebes per second velocity). The same fcumula will produce the equivalent hole size whicfi will
correspond to the total of the smaller grille holes in the main drain. Convert this to an area and stated m squsre centimetres.. ..

In the case of 0.3 metres per second this turns out to be 18.5 ( J v2
material ratio. To summarise the pipe sizes can be quickly evaluated as follows:
) square centimetres allowing for s 50% hole to

Suction pipe ID in millimetres =( l l -v7!


- 17

Return pipc ID in millimebcs =( $ v2 ) 13.3

Grille area in squm ccntinicm =( \I C',,lX.C

W c r c I/, i s h c hourly flow n t c throirgh thc pipc or Srillc 111 cubic iiictrcx
Spata Standards Volume Two (1999)

HEATING DESIGN

FUEL FIRED HEATING SIZING

Fuel fired heaters are normally sized to heat pool water from cold to design temperature in 60 hours,
assuming no losses. A guide to typical mean monthly unheated pool water temperature is shown in
table (1).

Month J F M A P J J A
"C 3.8 3.8 5.7 7.9 11.2 14.1 16.1 15.8
"F 38.8 38.8 42.3 46.2 52.2 57.4 61.0 60.4

Month S O N D
OC 13.6 10.6 6.5 4.6
OF 56.5 51.1 43.7 40.3

From this and using known formulae;

Heater (output) size (kW) = M3 x 1000 x (T2C - TlCl


H x 860

Where T2C = required swimming pool temp "C


T1C = initial water temp from table (1)
M3 = volumeofpool
1000 = weight in kgs of lm3of water
860 = number of kilo calories per kW/hr
H = desiredwarmuptime

IMPERIAL

Heater (output) in kW = Gallons x 10 (T2F - T 1 n


H x 3412

Where T2F = required pool temp in "F


T1F = initial water temp from table (1)
1000 = weight in kgs of lm3of water
H = desired heat up time (hours)
3412 = number of BTUs in 1 kW/hr

NOTES

1. These calculations assume the pool is covered during heat up. For uncovered pools or pools sited
in a water table, multiply heater output by 1.4.
2. There is a significant difference between heater input and output capacities. When selecting an
appropriate heater, ensure manufacturers output date is used.
3. In the case of tiled pools, due consideration must be given to thermal expansion (covered by BS
5385 part 4 1992).

Section 7 System Design Page 9


Spata Standards Volume Two (1999)

HEAT PUMP SIZING


Heat pumps are usually sized to allow for the average pool heat loss over the coldest month of opera-
tion. The formula to show the minimum heater size necessary to maintain the required pool water
temperature.

TABLE 3 Average Daily Heat Loss kWh/m2of Pool Surface @H)

Month of Use April May June September October

Ambient Design Air Temp OC 9 12 15 14 11

P 24 4.66 2.57 1.78 1.99 3.00


0
0 25 5.30 2.93 2.04 2.28 3.43

OC 26 6.17 3.39 2.35 2.64 3.98

e
T
E . 27 7.35 4.06 2.81 3.17 4.75
M
P 28 9.12 6.96 3.48 3.91 5.91

Corrections factors (CF) can be applied to the table figures as follows:-

High water table X 1.25 (CFl)


Sheltered location X 0.80 (CF2)
Exposed location X 1.25 (CF3)
No cover* X 1.40 (CF4)

- (May, June and September only) In April and October it would not be practical to heat a pool
without a cover.
Corrected daily heat loss (CDH) = DH x relevant CF’s.
Minimum required heater output = CDH x M2
No of hours/day available for heating

M2 = pool surface area

Example

- Pool size 50m2


- Pool temp 26 OC
- Season of use May - September
- Sheltered location
- Covered when not in use
- Low water table
- Heater available 24 hrdday

Minimum required heater output (kW) = f3.39 x 0.08) x 5Q = 5.63kW


24

Page 10 Section 7 System Design

-~ ~~
Spata Standards Volume Two (1999)

DEHUMIDIFICATION DESIGN

CALCULATIONFOR DEHUMIDIFICATIONFRESH AIR REOUIREMENT

Assume pool conditions of 3OoC and 60% RH. This is 21.4 OC Dew point and equates to (1) O.O16Kg/
Kg moisture content.
Assume British summer outdoor conditions of 18 OC Dew point.

Typically 23 "C at 73% RH,a specific volume of 0.855 m3/Kg.


And equates to (2) 0.013Kg/Kg moisture content

Therefore the Natural Fresh Air dehumidificationcapacity =


(1) - (2) that is:- O.O16Kg/Kg - 0.013Kg/Kg =

A busy swimming pool can be expected to evaporate at a rate of circa 22 litres (Kg)/100m2

That is 0.22Kg of evaporation per m2 of pool wetted area.

So 0.22Kdm2 x 0.855m3/Kg -
-
0.003KgKg

62.7m3of fresh air per/m2of pool area

This is an exact figure and should be rounded up to:-

65m3of fresh air per hour per lm2of pool wetted area.

Section 7 System Design Page 11


Spata Standards Volume Two (1999)
~~

Spata Standards Volume Two (1 999)

SECTION 8

a
HEALTH AND SAFETY

a
~~~ ~ ~~~~ ~ ~

Spata Standards Volume Two (1999)


SECTION 8 - HEALTH AND SAFETY

This section deals with both the Health and Safety requirements for construction of a pool and the
Health and Safety requirements for operation.

Whilst there are no mandatory swimming pool regulations laid down by any official body, The Swim-
ming Pool and Allied Trades Association makes the following recommendationsas a basis for safety
precautions to control swimming and save life in an emergency as far as all swimming pools are
concerned. These standards are designed to compliment the recommendationsof the Health and Safety
Executive and the English Sports Council. Readers are advised to familiarise themselves with ‘manag-
ing Health and Safety in swimming pools (1999)’.

Leisure activities can be dangerous and personal safety is the priority!

The swimming pool area must be designed to suit the use or activity, especially where recreational
diving and sliding is involved. Pools for the general public must be supervised. Strict design standards
apply to competitive diving, activity accessories such as fluming and wave making, and to hygiene
control.

Although modem design of facilities may be highly satisfactory, it is nearly always the misuse of
equipment and provisions that causes accidents. The operation of all mechanical equipment should be
assessed and full training provided to ensure against such misuse.

Appropriate training, planning and effective and trained supervision at all times will ensure this. Pools
and plant rooms need to be secured against unauthorised access at all times. It is the responsibility of
the Pool Contractor to control all hazards during construction and it is the responsibility of the pool
owner or pool management to prevent accidents during operation.

Section 8 Health and Safety Page 1


Spata Standards Volume Two (1999)

DURING OPERATION

LIFESAVING (DOMESTICPOOLS)

Whilst it is not possible to enforce rigid standards for domestic pools the following safety aids should
be considered.

One throw bag (DTI approved) with a 30mm (1.25in) circumference.


Courlene or equivalent heavy line, diameter 5mm (0.25in), of a length not less than 1.5 times
the maximum width of the pool, with a breaking strain not less than 550 kilograms (12201bs).
Alternatively a rescue quoit and line may be substituted provided the above criteria are met.
- One life pole or hook with a minimum handle length of 3.5m (12ft).
A suitable Fire extinguisher of a size suitable to deal with the area concerned.
Suitable signage eg. No diving, accurate water depth.
One pair of large sharp scissors

The above items should be sited adjacent to the pool and readily available in case of an emergency.

LIFEGUARDING(COMMERCIALPOOLS)

HSE considers any pool or combination of pools with an area greater than 17Om2 or a depth greater
than 1.5m at any point requires continuous lifeguard provision.

Any such public swimming pool shall be under the supervision of a person or persons qualified in the
field of lifeguarding, first aid, filter operation and sanitisation, or under whose direct supervision are
employed persons qualified in lifeguarding. Each such person should be responsible for no more than
17Om2. of pool surface area and to avoid lack of concentration it is recommended that station changes
are instituted every 20 minutes. Where flumes or wave machines are in operation at least one lifeguard
should be stationed with this sole responsibility.

Individuals shall be considered qualified:-


in lifeguarding if they hold qualificationmeeting HSE/ESC guidance
in pool and plant operation if they hold the appropriate I S M L A M Certificate or similar
approved certificate

The safety aids which should be installed in each public pool are as follows:-

At least one elevated lifeguard chair for 185m2(2000ft2)of pool surface area or any major
fraction thereof. Where a pool is provided with more than one lifeguard chair and the pool
width is 12m (40ft)or more they shall be located on either side of the pool.

One DTI approved throw bag, the internal diameter of which shall be 0.5m (1.5ft) with a
3Omm (1.25in) circumference.
Courlene or the equivalent heavy line -diameter 5mm (0.25in) of a length not less than 1.5
times the maximum width of the pool, which line shall have a breaking strain of not less than
550 kilograms (12201bs).

- A life pole or life hook with a minimum handle length of 3.5m (12ft).

Comprehensive First Aid Kit.


There may be a need for more specialised equipment eg. Resuscitation masks (with or without
0 2 reinforcement), spine boards, emergency defibrillation equipment. It should be noted
however each of these requires the associated high level of training for staff.

Page 2 Section 8 Health and Safety


*.L b'.,
..
Spata Standards Volume Two (1999)

a Note: The HSE does not recommended the provision of mechanical resuscitation equipment other than
for parmedically qualified staff.

Life guarding equipment shall be mounted in conspicuous places distributed around the pool edge at
lifeguard chairs or elsewhere, readily accessible with its function plainly marked. It is recommended
that a cut out system should be installed adjacent to the pool to permit immediate switch off of pumps
and consequent suction within the pool.
A clearly labelled means of summoning assistance shall be provided at each guard chair andor in the
immediate pool surround area for possible emergency use. These telephone andor alarms shall be
housed in weatherproof easily accessible cabinets painted green, which shall be vandal proof.
It is recommended that it should be mandatory for the responsible supervisor on duty to notify his
immediate superior if:

1. The clarity of water becomes less than that laid down in these standards.
2. The chlorine and pH levels at any time are outside the limits set by the Supervisory Board, or in
general are not in accordance with the levels laid down in these standards or any other recognised
Authority.
3. Any substance including diarrhoea or vomit are introduced into the pool water. It should be noted
that normal faeces in correctly balanced and sanitised water will not be harmful and can simply be
removed.
4. When there is entrapment or drowning.

In the interests of health and safety, when such conditions as described above occur, the pool should be
closed until such time as it is bought back to an acceptable condition as laid down in these standards.

The number of bathers permitted to use any public pool should be controlled within the limits of the
pool capacity by the use of turnstiles andor locker space, designed to limit the number of people
permitted to have access to the pool at any one time.

Commercial swimming pools shall be protected from unauthorised entry. Access to the pool by bathers
shall be provided either through the pool hall, the dressing room or some other controlled entry.

SAFETY PRECAUTIONS

The filter house of all commercial swimming pools shall be provided with approved type fire extin-
guishers of a size suitable to deal with the area concerned, which extinguishers shall be particularly
suitable for the extinguishing of electrical fires and not incompatible with the chemicals in use for
sterilisation of the swimming pool.

The local Fire Prevention Officer should be contacted and his recommendationsfollowed when
designing and equipping the filter house and chlorine compartment and in particular and the swimming
pool complex generally.

Such fire fighting apparatus shall be sited outside the area of the potential fire and shall be readily
accessible.

Fire fighting points should be clearly marked, and alarm bells and switches installed in strategic places.

The pool management staff shall be trained in fire fighting duties and a roster shall be kept designating
the fire point to which each of the personnel shall proceed in the event of an alarm being sounded.

Section 8 Health and Safety Page 3


Spata Standards Volume Two (1999)

CHEMICALS

Incompatiblechemicals shall not be stored in the same compartment where inadvertentmixing may
cause an explosion or the production of poisonous gases, with the possibility of serious injury or death.
Chemicals in common use in pool water treatment are listed in SPATA Standards for swimming pools
Volume 3 - water and chemicals which also designates their incompatibility.

Note - As far as the use of chlorine gas is concerned, it should be noted that suppliers of chlorine gas
cylinders will not deliver these unless they are satisfied that the chlorine compartment and equipment is
in accordance with current regulations.

ELECTRICAL

All the recommendations set out in the electrical section shall be complied with in the interests of
safety.

DURING CONSTRUCTION

It is the responsibility of all individuals concerned with the design, planning construction, operation
and maintenance of a swimming pool and its associated facilities to identify and assess hazards, to
minimise risks to all persons and to regularly monitor review such procedures.

LEGAL REOUREMENTS

CONSTRUCTIONAND INSTALLATION

It is the responsibility of all parties involved in the construction and operation of a swimming pool to
be fully conversant with current Health and Safety Regulations and to undertake any necessary condi-
tions these regulations may impose. This summary provides only a guide and the importance of famil-
iarisation with all current legal requirements is emphasised.

1. The Health and Safety requirements fall predominantly under the following legalisation:-
The Health and Safety at Work Act 1974
COSHH (Control of Substances Hazardous to Health) 1994
CHIPS (Chemicals Hazard, Information and Packaging Regulations) 1994
Electricity at Work Regulations 1989 (IncorporatingIEE 16'"Edition)
But also requires that operations conform with:-
Construction Design Management Regulations 1994
Provision and Use of Work Equipment Regulations 1992
Manual Handling Regulations 1992

2. A summary of the relevant requirementsof these regulations is:-


The employer must protect his employees, fellow workers and the public from danger.
The employee has the same responsibility
All electrical equipment should be inspected and tested before use and serviced regularly.
All electrical works should comply with IEE 16"'Edition or its successor.

Page 4 Section 8 Health and Safety


Spata Standards Volume Two (1999)

PERMIT TO WORK

When working in a confined space - specifically a balance tank, possibly a small poorly ventilated
plant room and certainly underwater, it is legally necessary to provide a Permit to Work. This docu-
ment should contain:-
Identification of the site
Identification of the work involved
Names of operators and qualifications
Date and approx time of work
Equipment to be used
Safety measures to be taken
Controls to be enforced
Signature of authorised person
SEE SPECIMEN 1

RISK ASSESSMENTS
For every physical feature, activityhsk and user group with an associated risk a Risk Assessment
should be produced. This should show:-
The Hazards
Who may be at risk
The level of risks
What controls are to be introduced to reduce the risk
The level of risk after control

SEE SPECIMEN 2

Section 8 Health and Safety Page 5


Spata Standards Volume Two (1999)

COSHH DATA SHEETS


For every chemical supply it is necessary to supply a Safety Data Sheet which identifies:-
The chemical components
The hazards associated therewith
The application of the chemical
Safety controls to be instituted
The action to be taken in case of accidents.
Movement and action

6. All safety controls should be regularly monitored, recorded and reviewed.

7. CDM requirements are summarised as follows:-

THE CONSTRUCTION (DESIGN AND MANAGEMENT)REGULATIONS 1994 introduce and


control covering design, commissioningof work, planning and execution, and apply to all construction
work likely to pose significant risks to workers and other parties. This summary provides only a guide
to the Regulations and thorough knowledge of the CDM regulations is recommended for all parties
where construction work is subject to the Regulations.

The Regulations apply to construction work which:

- lasts for more than 30 days, or


- will involve more than 500 person days of work, or
- includes any demolition work (regardless of duration or size), or
- involves five or more workers being on site at any one time.
- All design work for construction

The Regulations do not apply where the work is minor in nature i.e. done by people who normally
work on the premises. It is either not notifiable, or entirely internal, or carried out in an area which is
not physically segregated, normal work is carrying on and the contractor has no authority to exclude
people while it is being done, or where it is carried out in premises normally inspected by the local
authority (sports premises). Maintaining or removing insulation on pipes or boilers, or other parts of
heating and hot water systems is not classed as ‘minor work’.

DEFINITIONS under these Regulations should be noted carefullv.

‘Agent’ means any person who acts as agent for a client in connection with the carrying on by the
person of a trade, business or other undertaking, whether for profit or not.

‘Client’ means any person for whom a project is carried out, whether the project is carried out in-
house or by another person.

‘Construction Work’ means the carrying out of any building, civil engineering construction work, and
includes any of the following:

1. Construction, alteration, conversion, fitting out, commissioning,renovation, repair, upkeep,


redecoration or other maintenance (including cleaning which involves the use of water or an
abrasive at high pressure or the use of corrosive or toxic substances,) decommissioning,demoli-
tion or dismantling of a structure;
2. Preparation for an intended structure including site clearance, exploration, investigation (but not
site survey) and excavation, and laying or installing the foundations of the structure;
3. Assembly or disassembly of prefabricated elements of a structure;
4. Removal of a structure or part of a structure, or of any product or waste resulting from demolition
or dismantling of a structure or disassembly of prefabricated elements of a structure;

Page 6 Section 8 Health and Safety


. .
’ . ., .. . ’. . .
. I’ ,

Spata Standards Volume Two (1999)

e 5. Installation, commissioning,maintenance, repair or removal of mechanical, electrical, gas,


compressed air,hydraulic, telecommunications,computer or similar services which are normally
fixed within or to a structure.

‘Contractor’ means any person who carries on a trade or business or other undertaking, whether for
profit or not, in connection with which he undertakes to or does manage construction work, or arranges
for any person at work under his control (including any employee, where he is an employer) to carry
out or manage construction work. This definition can therefore be applied to the self employed.

‘Design’ in relation to any structure includes drawing, design details, specification and bill of quanti-
ties (including specification of articles or substances) in relation to the structure.

‘Designer’ means any person who carries on a trade, business or other undertaking in connection with
which he prepares a design or arranges for any person under his control to prepare a design relating to
a structure or part of a structure.

‘Health and Safety fide’ means a file or other record in permanent form containing the information
required by Regulation 14(d) - about the design, methods and materials used in the construction of a
e structure which may be necessary for appropriate third parties to know about for their health or safety.

‘Project’ means a project which includes or is intended to include construction work.

‘Structure’ in this context means any building, steel or reinforced concrete structure (not being a
building), dock, harbour, waterworks, reservoir, pipe or pipeline (regardless of intended or actual
contents), cable, aqueduct, sewer, sewage works, river works, drainage works, earth works, lagoon,
dam, underground tank, earth retaining structure or structure designed to preserve or alter any natural
feature, and any similar structure to these, and any form work, false work, scaffold or other structure
designed or used to provide support or means of access during construction work, and any fixed plant
in respect of work which is installation, commissioning,decommissioning,or dismantling and where
that work involves a risk of falling more than 2m.

Section 8 Health and Safety Page 7


Spata Standards Volume Two (1999)

THE REQUIREMENTS OF THE REGULATIONS


Regulation 4 covers clients who when appointing agents must be reasonably satisfied about their
competence to carry out the duties given to the clients by the Regulations. A declaration is sent to the
HSE, which is required to acknowledge and date the receipt of it.

Regulation 6 requires every client to appoint a planning supervisor and principal contractor in respect
of each project

Regulation 7 requires the planning supervisor to give written notice of notifiable projects to the HSE,
as soon as practicable after his appointment as planning supervisor (PartsI and 11) and as soon as
practicable after the appointment of the principal contractor (Parts I and 111), and in any event before
the start of the construction work. Where work which is notifiable is done for a domestic client and a
developer is not involved, then the contractor(s) doing the work have the responsibility of notifying the
HSE, and one of these can notify on behalf of any others. Again, notification must be made before any
work starts.

Regulation 8 + 9 covers the requirements for competence of planning supervisor, designers and
contractors. The client must take necessary steps to be reasonably satisfied that a potential planning
supervisor is competent and has adequate resources to perform the functions required by these Regula-
tions, before any person is appointed to the role (Regulation 8(1)).

The client is required by Regulation 10 to ensure so far as is reasonably practicable that a health and
safety plan which complies with Regulation 15 (4) has been prepared in respect of the project before
the construction phase starts.

Regulation 11 obliges the client to ensure that the planning supervisor is provided as soon as practica-
ble and before work starts with information relevant to his functions about the state or condition of any
premises where relevant construction work will be carried out.

The client is required by Regulation 12 to take reasonable steps to ensure that the information in any
health and safety file which is given to him is kept available for inspection.

Designers’ duties are given in Regulation 13. Except where the design is prepared in house, employ-
ers cannot allow employees to prepare a design, and no self employed person can prepare a design,
unless the employer has taken reasonable steps to make the client for the project aware of the duties of
the client within these Regulations and any practical HSC guidance on how to comply.

The designer is firstly to ensure that any design he prepares and which he knows will be used for
construction work includes adequate regard to three needs:

1. to avoid foreseeable risks to health and safety of those constructing or cleaning the structure at any
time and anyone who may be affected by that work
2. that risks to constructors or cleaners of the structure at any time, or to anyone who may be affected
by that work, are combated at source, and
3. that priority is given to measures which will protect all such persons over measures which only
protect each person at work.

Secondly, the designer is to ensure the design includes adequate information about any aspect of the
project, structure or materials to be used which might affect the health and safety of constructors,
cleaners or anyone who may be affected by their work.,

Thirdly, a (stronger) duty to co-operate with the planning supervisor and any other designer is placed
on a designer, so far as is necessary to enable each of them to comply with health and safety laws.

Page 8 Section 8 Health and Safety


Spata Standards Volume Two (1999)

a Regulation 14 details the main duties of the planning supervisor. This duty holder must:

a) ensure as far as is reasonably practicable the design of any structure in the project complies with
the needs specified in Regulation 13 and includes adequate information.
b) Take reasonable steps to ensure co-operation between designers to enable each to comply with
Regulation 13.
c) Be in a position to advise any client and any contractor to enable them to comply with Regulations
8(2) and 9(2) - competence of designer - and to advise any client on compliance with Regulations
8(3), 9(3) and lO(competence of contractor and readiness of the health and safety plan), and
d) Ensure that a health and safety file is prepared in respect of each structure in the project, reviewing
and amending it over time, and finally delivering it to the client on completion of construction
work on each structure.

Regulation 15 sets out the specific requirements for the health and safety plan. This is to be prepared
by the appointed planning supervisor so as to contain the required information and be available for
provision to any contractor before arrangements are made for the contractor to carry out or manage
construction work on the project.

The required information to go into the plan is:

- a general description of the construction work


- details of the intended timescale for the project and any intermediate stages
- details of any risks known to the planning supervisor or which are reasonably foreseeable risks to
the health and safety of constructors
- any other information which the planning supervisor has or could reasonably get which a contrac-
tor would need to show he has the necessary competence or has or will get the adequate resources
required by Regulation 9, and
- information which the principal contractor and other contractors could reasonably need to satisfy
their own duties under the Regulations.

The principal contractor must take reasonable steps to ensure the plan contains until the end of the
construction phase the required features, which are:

- arrangements for the project which will ensure so far as is reasonably practicable the health and
safety of all constructors and those who may be affected by the work, taking account of the risks
involved in the work and any activity in the premises which could put any people at risk
- sufficient information about welfare arrangements to enable any contractor to understand how he
can comply with any duties placed on him in respect of welfare
- arrangementswhich will include where necessary the method of managing the construction work
and monitoring of compliance with health and safety regulations.

Regulation 16 specifies the duties and powers of the principal contractor to take reasonable steps to
ensure co-operation between contractors so far as is necessary to enable each to comply with require-
ments imposed and to ensure so far is reasonably practicable that every contractor and every employee
complies with any rules in the health and safety plan. The principal contractor must also take reason-
able steps to ensure that only authorised persons are allowed where construction work is being carried
out and ensure that required particulars are displayed in a readable condition in notice covered by
Regulation 7.

He must also provide the planning supervisor promptly with any information he possesses or could
reasonably find out from a contractor which the planning supervisor does not already possess and
which could reasonably be believed necessary to include in the health and safety plan.

Section 8 Health and Safety Page 9


Spata Standards Volume Two (1999)

Duties on the giving of information and training requirements are set out in Regulation 17. The princi-
pal contractor must (as far as is reasonably practicable) ensure that every contractor is provided with
comprehensible information on the risks to himself and any employees or persons under his control
which are present as a result of the work.
Provision is made by Regulation 18for receipt of advice from employees and the self employed by the
principal contractor, who must ensure that discussion and advice on health and safety matters is
provided.

Contractors’ duties are covered by Regulation 19 (l),where in relation to a project they must co-
operate with the principal contractor as necessary, provide the principal contractor with any relevant
information which might affect anyone’s health or safety whilst on the project. This includes relevant
risk assessments, and any information which might prompt a review of the safety plan for the project.

The Regulation requires contractors to provide the principal contractor with any information which is
notifiable by the contractor to the enforcing authority under RIDDOR - details of injuries, diseases and
dangerous occurrences as defined which are related to the project.

Regulation 19 contains in parts (2), (3) and (4) general requirements to be observed by employers with
employees working on construction work, and the self employed including the names of the planning
supervisor, principal contractor and the health and safety plan or relevant parts of it.

The Regulations have the same coverage as the Health and Safety at Work etc. Act 1974 by Regulation
20, and, except for hvo of them, do not confer a right of civil action (Regulation 21).

Five duties of designers:

Avoid foreseeable risks


Combat risks at source
Protect all people rather than individuals
Include information
Co-operate with the Planning Supervisor

Five duties of the client:

Appoint the Planning Supervisor and Principal Contractor


Be satisfied about their competence
Give information about the structure
Establish the safety plan is in place before work starts
Keep the safety file available for inspection

Page 10 Section 8 Health and Safety


~~~~~~~

Spata Standards Volume Two (1 999)

SECTION 9

COMMISSIONING

OPERATION AND

MAINTENANCE
~~ ~

Spata Standards Volume Two (1999)


Spata Standards Volume Two (1999)

0 SECTION 9 - COMMISSIONING OPERATION AND MAINTENANCE

COMMISSIONING. DEMONSTRATION AND HANDOVER

COMMISSIONING

1. Where a contract provides for the supply only of equipment for installation by others the supplier
shall provide full written instructions for the safe and correct installation of the equipment together
with instructions for its operation for onward transmission to the end user.
2. Where a contract provides for the supply and installation of equipment forming a part of a com-
plete pool plant installation the installer must ensure that the equipment is suitable for its purpose
and is installed in accordance with the makers instructions and all relevant standards and codes of
practice.
3. Where a contract provides for the complete installation of a pool with its associated water treat-
ment system the contractor must ensure that all equipment is properly installed, in working order
and fully commissioned before attempting to hand over the installation to the end user. In the case
of a swimming pool this means ensuring that (save only for minor ‘snagging items’):-

- The walls and floor of the pool are thoroughly cleaned.


- The water is clear and free from suspended matter.
- The pool water chemistry is correctly adjusted and balanced.
- The filter is operating correctly and has been recently backwashed.
- The water header (if fitted) is operating and (unless otherwise agreed with the client) has
raised the water to the required temperature.
- The chemical dosing system (if fitted) is fully charged with appropriate reagents and working
correctly.
- The environmental control system (if fitted) is working correctly and has achieved the re-
quired air temperature and relative humidity in the pool hall.

PEMONSTRATION

The Contractor should provide a fully operational demonstration to the Client/Client’s Agent before
handover. This demonstration should include a thorough introduction to all elements of the pool
equipment, pool water, pool area and health and safety requirements. The Operation and Maintenance
Manual should be available for familiarisation and any questions should be fully explained (in writing
if reauired).

Section 9 Commissioning, Operation and Maintenance Page 1


Spata Standards Volume Two (1999)

“DOVER

1. Before any hand over is attempted all goods and services, maintenance equipment and water
treatment chemicals required by the Contract must be delivered to site and (where appropriate)
installed and working.
2. The Contractor shall then provide such oral and written instruction as may be necessary to ensure
that the client or the client’s agent understands all aspects of the operation of the pool and its
associated equipment and chemical dosing system.
3. Written instructions must be in a coherent form specially drafted and appropriate for the complete
installation in question. On completion of the hand over the contractor and client shall sign and
exchange duplicate copies of a ‘handover certificate’ in a form not less satisfactory than the
standard SPATA Handover Certificate. This certificate shall list any minor snagging work which
remains outstanding and the contractor’sproposals for its completion and should constitute
‘practical completion’ insofar as Insurance cover, maintenance liability and warranties are
concerned.
4. The contractor shall, where appropriate, include in the Operation and Maintenance Manual copies
of the Electrical Completion Certificate in the form specified by BS7671 (The IEE Wiring Regula-
tions) together with evidence of Consents under Planning and Building and any other relevant
Regulations.
5. In the case of public swimming pools, the contractor should, unless totally satisfied that the Plant
Operating Engineer has sufficient relevant past experience, require and request the Client to
provide satisfactory basic training in plant operation (ideally the Pool and Plant Operators Course
by the ISRM) and water treatment before final completion of the handover.
6. In commercial pool contracts the contractor shall also supply to the Client required safety informa-
tion for inclusion in the Project Safety File. This information should include:-
- Risk Assessments
- COS” Data Sheets
- Emergency Procedures
In so far as they apply to the pool and plant.
7. Further risk assessment, COSHH assessment and emergency procedures are required to be devel-
oped and instituted by the operator taking into account specific peculiarities of the operation.

Page 2 Section 9 Commissioning, Operation and Maintenance


Spata Standards Volume Two (1999)

OPERATION AND MAINTENANCE MANUALS

A comprehensive Operation and Maintenance Manual should be supplied to the Client on handover. A
private pool should be provided with a single copy and a public pool with 4 copies. Each manual
should be specific to the installation and bound in a looseleaf, hardwearing binder and should contain:-

1. Specification of contract equipment including serial numbers and manufacturers name & address
2. Specification of pool with dimensions and capacity and construction detail
3. Day to day running instructions in a concise and understandableformat
4. Maintenance requirements
5. Servicing requirements
6. Emergency plant procedures
7. Manufacturers guides and maintenance manuals
8. Water treatment guide with testing procedures
9. Notice of chemicals to be used
10. Guarantees and warranties

Manuals for public pools should also contain:-

1. As built drawings-
2. Spares requirement list
3. Safety file with safety data sheets
4. Copies of all test certificates

During demonstration the Operation and MaintenanceManual should be made available to the pool
plant operator and the contents explained in detail. One set in plant room and one set in managers
office.

It is recommended that a subsequent visit after sufficient time has lapsed for the operator to familiarise
himherself with the contents of the manual and the pool equipment should be made.

Commercial Contracts must also be supplied with a Safety File containing:-

- Risk Assessments for any potential hazard


- COS" Safety Data Sheets for all chemicals likely to be used
- Safety procedures and precautions

Section 9 Commissioning, Operation and Maintenance Page 3

~~~
~~ ~
Spata Standards Volume Two (1999)

RESPONSIBILITIES

NUFACTURER AND SUPPLIERS RESPONSIBILITY

It is a requirement that all manufacturers or suppliers of filters or filtration ancillary equipment to


supply with their filters andor equipment the following:-

1. Name and address of manufacturers andor supplier or service agent.


2. Full operating instructions for the specific equipment with schematic drawings and performance
curves etc.
3. Maintenance instructions with identification of spare parts.
4. Guarantees and warranty details.

RESPONSIBILITYOF THE POOL OWNEWOPERATOR

Although the following requirementsare not enforceable of the owner, neither the manufacturer nor the
installer can accept any responsibility for damage, accident or injury arising from the owners failure to
conform with these recommendations. It is therefore recommended that the following requirements are
reproduced and explained within the Operation and Maintenance Manuals.

1. The owner, or his agent or his representative should read the Operation and Maintenance Manual
including the manufacturersoperating and maintenance instructionscarefully, and attend a demon-
stration of the normal operating procedure with the installer before taking over the operation of the
pool.
2. He should pay particular care to chemical treatment of the water with special regard to chlorine
limits and control of pH values. Where automatic or semi automatic chlorine addition is provided
it is essential that this only occurs when the pump is running, otherwise high concentrationsbuild
up in the pipework and heating plant.
3. Pool chemicals must be stored in a dry position away from the heating and electrical equipment.
4. Water leaks from pipework or fittings must be attended to at once.
5. Heaters must not become cluttered up with oddments which can restrict ventilation or cause
overheating and fire risk, as can happen if the heater is used to dry out clothing or towels.
6. Maintenance should be carried out regularly in accordance with the manufacturersinstructions.
7. The equipment of outdoor pools should be fully winterised each year as described by the supplier
and in accordance with SPATA recommendations.
8. The identificationplate details should be quoted when communicating with the manufacturer.
9. Running costs are entirely in the hands of the owner. For maximum economy of fuel or power, the
owner should consider the regular use of a pool cover.
10. Where the installer, or owner, shall decide to use heating equipment not specifically designed or
adapted for swimming pool heating (or where equipment is used which does not comply with these
standards) they shall assume the responsibility of the manufacturer as set out above and shall
ensure that the final installation is so adapted as to comply with these standards.
11. No electrical appliances other than specialist swimming pool equipment correctly installed by a
qualified Electrician in accordance with IEE Regulations should be permitted in the pool hall area.
12. The owner has a ‘Duty of Care’ 1932 to ensure the safety of any persons coming into contact with
the swimming pool. SPATA recommend therefore that suitable signage should be provided to
prevent danger or accident which may be caused by slipping, tripping, broken glass or other
debris, and general use of the pool. I.e. No Diving etc.

Page 4 Section 9 Commissioning, Operation and Maintenance


Spata Standards Volume Two (1999)

SECTION 10

GLOSSARY

ACKNOWLEDGEMENTS
Spata Standards Volume Two (1999)

a
.
.. . .
. I , 4 -...
Spata Standards Volume Two (1999)

SECTION 10 - GLOSSARY AND ACKNOWLEDGEMENTS

The text of these standards refers to and explains many of the terms usedin connection with the swimmingpool installation.The
followingglossary is included however to givehandy non-technicalreference to termsin common use:-

Air Change Rate: The proportion of fresh air which is introduced into the pool hall within aspecific period of time.

Air Curtain: The term used when air is intentionallydistlibuutedoverasurface,typicallyglazing withinthe pool
hall, in order to achieve a localisedenvironmentto assist in preventingthe formationof surface
condensation or where asingleopen space may have differing temperature Zones.

Air Filter: A filterto remove dust and small particles from the.air stream,prior to entering the environmental
controlunit or duct work.

Air Handling Unit: Any product that mechanically ventilatesair.


(A.H.U.)

Air Scour: A device operated pneumatically to break up, lift and help cleanseasand bed and flocculating agent
in the sand filters by agitatingthe bed on the backwash. It also reduces the backwash time and
consequently the backwash water required

Anti-vortex Fitting: A cover for a water suction fiuing within the swimmingpool which is designedto minimise the
formation of vortices and the risk of entrapment of partsof the human M y .

Attenuator: A deviceused to reduce noise transfer,usually positioned within the air ductwork channels leading to
the environmentalcontrolequipment.

Backwash: The process of flowreversal to clean a pool water filter and restore it to the normal clean condition
offilteringwithaminimumresistancetoflowthroughthemedia

Backwash Cycle: The operating time, after the filter cycle, required to completelyclean the filter.

Backwash Rate: The rate of applicationof water through a filterduring the cleaning cycle expressed in capacity per
minute.per effectivefilter surface area

Balance Pipe: Pipe which transferspool water either between two adjacent pools (i.e. main pool and children's
pool) or between pool and auto water level unit.

Balance %nk: A vessel which is used to control water level.

Balance valve: Float operated valve within balance tank to control volume of water for pool floor outlets,sumps,

Body Feed: The continuous additionof small amountsof filter aid during the operation of adiatemaceousearth
mm.

Boiler: A product which releases heat energy throughcombustion of a fossil fuel. The heat released can then
be used as a heating medium.

-
Boiler Balanced A boiler equipped with a balanced flue takes the air ventilation it requires
Flue: from the flue pipe and not from the room in which it is positioned.

-
Boiler Conventional Aboilerequippedwithaconventional fluetakestheairventilationit
Flue: requires from immediatesurrounding area. Such boilers should not be used in conjunction with plant
room air plenum chambers.

-
Boiler Direct Fired: A direct fired boiler enables the pool water passed through the boiler to pick up the heat directly
from the pool combustion process.

Boiler-Indirect Fired: With an indirect f d boiler, the.heat from the combustion process is passed into an additional
medium, usually a LPHW circuit,and then transfemedinto the pool water via a heat exchanger.

-
Boiler By Pass Pipe: When the flow of LPHW from the boiler is diverted so that it returns back to the boiler without
passing through any heater.

-
Boiler Condensing A typeofboilerwhichcanobtainimprovedoper;llingefficiencybycooling
5pe: the flue gases and returning the heat to the system. Can be used in place of normal boiler types.

Boiler - Pressurised: When the heating deviceor boiler circulating pump continuesto Over Run: intentionally operate for
Over Run: a timed period after the heating requirement has been satisfied in order to dissipate residual heat from
the.boiler.
Spata Standards Volume Two (1999)

Boiler -System: A type of boiler system where the entire pipework system is maintained at pressure. Can be used in
place of normal boiler types.

Boiler Thermostat: The thermostatnormally located within the boiler which regulates the outlet temperatureof the
LPHW from the boiler. Typically around 82d.

Boiler Demand Signal: Normally a switch electrical feed provided from the heating control motorised valves to enable the
boiler to be shut down completely when no heating demand is present.

BTU: An abbreviationof‘BritishlhermalUnit’.Commonlyusedtoindicatetheheatcapacityofboilers
and heat exchangersetc.
3412.14BTU’s=lkwBTU/hr=KW.

Glorifier: An alternativeterm for heating coil or heat exchanger.

Cartridge Filter: Afilterusingadisposableorrenewablefilterelement

Compressor Motor: The main motor of any refrigerationcircuit (i.e. heat pump or dehumidifier).The compressor,which
is invariablyelectricallydriven,pumps refrigerant increasing both its pressure and temperature.

Condensation - When condensationoccu~sactuallywithin the material of the pool hall


Interstitial: building strucl~re,as opposedto condensationonly forming on the surface.

Condensate: The condensed water vapour which will be apparent on any surfacecold enough to be below the
dew point temperature. Within adehumidification unit the condensateis normally collected in atray
and drained away.

Condenser (Air): Often similarin appearance to a m radiator coil, an air condenser of this type is positioned within
the pool hall air stream,usually within an environmentalcontrol unit.The purpose of an aircondenser
coil is to transfer heat from arefigeration circuit (heat pump) into the air stream.The term condenser
is derived from the effect on the refrigerant as it passes through the coil - it enters as a hot gas which,
as it is cooled by the air, condensesto a liquid.

Condenser (Water): The purpose of a water condenser coil is to transfer heat fkom arefigeration circuit(Heatpump)
intowater,usuallythepool wateritselfwhichispumpedthroughthewatercondenser.

Condenser (Remote): A condenser of this type positioned outside the building in fresh air. The plupose of aremote air
condenser coil is to transfer heat from the refrigerationcircuit (heat pump) into fresh air. Usually this
would dissipateheat which was not required anywhere else and can be used as part of an ‘air
conditioning’cooling system

Convection: Transfer of heat by air movement

Corrosion: The loss of material due to chemicaldischarge.

Corrosion Resistant A material with an exceptional resistance to the comsion factorsto which it
Material: issubjected.

Counter Current Unit: A pumping system mounted within or on the pool shell wall which pmduces acurrentof water,
sufficientlystrong enough to enablebathers to swim against it without moving in the pool.

cross Connection: An unprotected connection between a domestic water system and any pool or other non-potable
water whereby back flow to the domesticsystem could occur.Appropriate protection may be air
gaps, non-return valves or other methods.

Damper: A seriesof metal plates positioned within the air stream duct work which can be closed together to
restrictandor prevent the passing air flow.

Damper Actuator: An electronic motor which can be used to automate the openingklosingmovement of an air damper.

Deck Level Pools: Where the pool water level is at pool surround level.

Deck Level Grating: The covering positioned over U5 periphery overflow channel of adeck level pool.

De-frost: Under opation in cold temperatures, it is possible that the evaporator coil of arefrigerationcircuit,
heat pump or dehumidifier, may become frozen over with ice. To clear the ice, hot refrigerant gas can
be periodically divertedinto the cold evaporatorcoil to clear the ice. This is known as ade-frost
cycle.
Spata Standards Volume Two (1999)

Dehumidifier: A refrigerationsystem, driven by an elecuic motor, which creates acold surface on which excess
humidity within the pool hall air is condensed to water. Adehumidifier also provides a heat pump
effect whereby heat can also be transfedrecovered.

Design Rate of Flow or The average rate of a flow system which is used for designcalculations.
Design Filter Rate: (usually the flow in volume per minute divided by the effectivefilter surfacearea).

Dew Point: The surface temperaturebelow which the water vapour, i.e. humidity, contained within air of a
certain temperature and humidity condenses back to water. The dew point will vary in a line with the
temperatureand humidity in the air in question.

Direct Fired Heat: A fuel fired heater which supplies heat directly into the airor water without necessity to use a heat
exchanger.

Distributor: (Top Spreader or Bottom Collector) The device in a filter designed to divert the incoming water to
prevent erosionof the filterexchanger.

Dry Niche: A normally weatherpmf fixtureplaced in an opening behind the pool wall which illuminates the
pool through a watertightwindow in the pool wall.

Emuent: The outflow of water from a filter or other device.

Environmental Control A product which is able to govern and control the environmentalconditions
Unit (ECU): within the pool hall such as humidity, air temperature,pool water temperature and fresh air rates.

ElectricFlowHeater: A direct flow heater which hears pool water via electric elements.

Evaporator Coil: Often similar in appearance to a car radiator coil, an air evaporate or of this type is positioned within
the pool hall air stream usually within an environmentalcontrol unit. The purpose of an air evaporator
coil is to transfer heat from the air stream into arefrigeration circuit(heat pump). The evaporator coil
will thereforebe chilled and moisturecontained within the pool hall air will condense over the
evaporator coil to achieve adehumidification effect. The term evaporator is derived from the effect
on the refrigerant as it passes through the coil -it enters as cold liquid which, as it absorbs heat from
the air, evaporates to a gas.

ExhaustAir: The pool hall air being discharged to m s p h e r e via ventilation facilities.

Face Piping: Thepipingwithallvalvesandfittingswhichisusedtoconnectthefiltersystem togetherwithaunit


This includes all valves and piping necessary for the filterplant to perform the functions of filtering
and backwashing,either by the plant as a whole or any unit operating singly.

Fan -Axial: An air ventilation fan which resembles propeller in appearance.

Fan -Indirect Drive: This indicatesthat the electric motor which drives the air ventilation fan is mounted separatelyand the
power is transfemd to the fan viadrive belts.

Fan -Centrifugal: A ‘mll’type airventilationfan,similarinshapetoasnailshell,whichhousesarotatingcylindrical


impeller.

Fan -Direct Drive: This is when the elecuic motor isconnecteddireclly to the shaft of the air ventilation fan impeller.

Fan -Coil Unit: A heat exchanger coil which is directly connected to the fan. The fan blows air through the coil to
transfer heat to the surrounding area

Filter-Pool Water: An apparatus,positioned within the pool water filtrationpipe circuit, used to extract, mechanically,
insolublesolidsfrom the swimmingpool water.

Filter Aid: A type of finely divided media used to coat a septum type filter, usually diatemaceous earth or
volcanic ash. (Note: Alum, as used on the bed of sand filter, is also referred to as a filter aid).

Filter A multiport valve with at least four, usually six positions for variousfilter
Control Valve: operations, which combines in one unit the function of two or more single direct valves. @ial select
valve).

Filter Cycle: The operating times between pool water back wash cycles.

-
Filter Pre Coat: Designed to filter pool water througha thin layer of filter aid such as diatemaceous earth or volcanic
ash.F‘recoated filters may be of the pressure type, gravity type or suction and vacuum types.
Spata Standards Volume Two (1999)

Filter Element: The part of the pool water filter which supports the surface upon which the filter aid is deposited
(usually in preaat filters).

Filter-Gravity Sand: A pool water filter with a layer of filter media(usual1y silicasand) supported on graded gravel
through which water flows by gravity.

Filter Gravel: Graded washed mineral fire gravel which supportsthe top filtermedia

Filter Laterals: Filter internalcollector tubeunderneath media.

Filter Media: The material which entrapssuspended particles (sand, anthracite etc.)

Filter Nozzle: Filter internal slotted nozzle in a plate underneath media.

Filter Pressure Sand: A sand filter enclosed in a tank to operate under pressure.

Filter Rate: The rate of application of water to a filterexpressed in capacity per minute per effective filter surface
area.

Filter Rock: Graded,rock andor gravel used to supportfilter media.

Filter Sand: A type of filter media composed of hard sharp silica, quartz or similar pruticles with proper grading
for size and uniformity.

Filter Septum: The part of the filter element consisting ofcloth, wire screen or other porous material on which the
filtercakeisdeposited.

-
Filter Vacuum A filterwhich operatesundera vacuum or from the suction side of a pump.
(or suction):

Flow Meter: A device for measurementof water flow in pipes.

Fluve (Skimmer Fluve): The tapered orifice in the pool wall into which surface.skimmers are affixed.

Foot Head: A basis for indicating the resistance in a hydraulic system which isequivalenlto the height of a
column of water which would cause the same resistance. (100ftof head is the equivalentto 43 psi).
The ‘Total Dynamic Head’ is the sum of all the resistance in acompletesystem when in operation.
The principle factorsof ‘Head‘are vertical distances and resistance due to friction of the flow against
the walls of the pipe or vessel. ‘Friction Head’ is the head lost due to friction only.

Freeboard Pool: Where the pool water is below pool surround usually 150mm (‘6’).

Galvanic Action: Creation of an electrical current by Elecm-chemicalaction.

Heat Exchanger: A device used to transfer heal from one medium to another. Heat transfer takes place via direct
conduction as each medium flows through the heat exchanger.

Heat Pump: A refrigeration system, driven by an electricmotor, used to transfer heat between different medium.
A ‘swimmingpool heat pump’ will typicallybe used to transfer heat from ambient airand place this
heat into the pool water.

Heat Recovery A product which incoprates a plate and fans to provide air movement.
Ventilator:

Heat Wheel: A seriesof rotating metal plates which can be used to transfer heat fromone air stream to an
adjoining air stream. Can be used to transfer heat from the pool hall to fresh airbeing introduced.

Heater Battery: Analternativetermforheatingcoilorheatexchanger.

Hose Connector: The fitting used to COM&the hose to the vacuum wall fitting. (Usually acombinationhose sleeve
and nut).

Hygrostat: An electrical switch which responds to changes in humidity.

Influent: The inflow or enteringwater to a filter or other devices.

Inlet Spreaders - ’ihisisafittinglhrwghwhichfilleredwaterflowswhenenteringthepool


Pool Inlet: via the return line. Three standard types are in common use, these being fixed flow, variable flow and
variabledirection. Dependenton the application involved,any of thesefittings orcombinationsof
fittings wouldbeused
Spata Standards Volume Two (1 999)

Louvre: A series of metal plates positioned within the air stream which can be closed together to restrict and/
or prevent the passing air flow.

LPHW: An abbreviation for ‘Low Pressure Hot Water’, the term used to describe the condition of the water
circulationviaa typical boiler pipe work installation, as commonlyused within domestic central
heating systems.

LPHW Heat Coil: A heat exchanger which transformsheat from the LPHW heating circuit.

Main Outlet: (Sump Outlet) The outlet fitting at the bottom of aswimming pool through which the main flow of
water passes to the recirculating pump. (Often referred to as the ‘Main Drain’).

Manifold Piping: The piping with all valves and fittings which is to he used to connect the filter system together as a
unil

Manometer: An instrument fitted to the floe pipework to measure water pressure.

N.R.V.: Non Return Valve.

Nozzle: See filternozzles.

Nozzle Plate: Supportplate within filtervessel to hold filter nozzles.

Orifice Plate: A disc, placed in a water flow line, with aconcentric, sharp edged circular opening in the centre,
which creates a differentialpressure to measure flow and to operate feeders and instruments or other
hydraulic equipment.

OverflowSystem: A system with perimeter overllow channels for the removal of surfacewater forming apart of the
recirculation system.

pH. A logarithmic scale of unit, 0-14, which measures the balance between acidic and alkali compounds
in the water.

Plate Recuperator: A series of adjoining metal plates which forms channels through which two independentairstreams
can be passed to transfer heat from one air stream to the adjoining airstream. Can be used as a
method of heat recovery on air being ventilated from the pool hall to fresh air being introduced.

Plenum Chamber: A chamber through which air is able to pass.

Potable Water: Any water, such as an approved domestic water supply, which is bacteriologicallysafe and
otherwisesuitablefor drinking.

Primary Circuit: The pipe circuit carrying the heating source.

Pre-Coat: Thepre-coator initialcoatingof filter aidon theseptumofdiatemaceousearthfilter.

Precoat Feeder: Adeviceused tocalculateamountoffilteraidatthestartofadiatemaceousearth filtercycle-


following the cleaning operation.

Pressure Differential: The difference in pressure between two parts of a hydraulic system. (Influent and effluentof a filter,
suction and discharge of a pump, the up and down stream sides of a venturi or orifice).

P.S.I.: Pressure reading i.e. Pound per Square Inch.

Puddle Flange: Wall pipe with flange to prevent water seepage along wall pipe.

PumpStrainer: A device placed on the suction side of a pump, which contains aremovable strainer basket designed
to trap debris in the water flow with a minimum flow restrictions. Also known as coarse strainer or
pre filter.

RateOf Flow: The measurement of the volume of flow per unit of time, usually expressed in volume per minute or
per hour.

Rate of Flow Indicator: A device to indicate the rate or flow in a pipe line. (sometimes referred to as arate of flow meter).

Recirculating System: The e n t k system includingthe suctionpiping, pump, strainer,filter, face piping and return pipe.

Return Air: Theairwhichisbeingsuckedfromthepool hall.


Spata Standards Volume Two (1999)

Return Piping: The part of the pool pipework between the filterand the pool through which passes the filtered
water.

Run Around Coil: A method of reclaiming heat from one air stream to another. A heat exchangecoil is positioned in
each of the air streams and water is pumped between the two coils to cany the heat to be
transferred

Salinity: The total salt content of the water.

Scaling: Hard depositswhich can block pool pipework and form on pool water surfaces.Caused by the
precipitationof calcium and magnesium carbonate from hard water.

Secondary Circuit: The pipe circuit into which the heat from the primary circuitis to be transferred.

Service Factor: A factor indicating the degree to which an electricmotor can be operated over a specifiedhorse
power without danger ofoverloadfailure.

Silver h t e i n : A solutioncontaining silver ions, used as agermicide.

Skimmer: Adevice designed to continuouslyremovesurface film and water and return it through the filter as
part of the recirculationsystem.Usually incorporatingaself adjusting weir, acollectiontank and
means to prevent air lockof the pump.

Skimmer Filter: Arecirculatings~mmerwithafilterforminganinte~partofthedevice.

Skimmer Weir: The surfaceover which the water flows to the circulatingsystem (usuallyselfadjusting for water
level changes).

Slurry Feeder: Adevice tofeedavariableamountoffilteraidduringthefiltercycle.

soft start: An electrical device which can be used to reduce the load on the mains electricalsupply on the
startingof large motors.

Solar Heating: Heating of the pool water using energy collected from the sun, usually via solarpanels. Such systems
can heat the pool water eitherdirectly or via a heat exchanger.

SuctionPiping: That part of the pool pipework between the pool and the suction side of the pump, usually consisting
of the main suction, vacuum cleanersuction,the skimmersuctionandor ovemow gutter suction.

SupplyAir: The air which is beiig blown into the pool hall.

Thermostat: An electrical switch which responds to changes in temperature.

'hmover Rate: The period of time, usually hours, required to circulate a volume of water equal to the pool capacity.

Under Drain: Thedistributionsystematthebottomofthefilter whichcollectsthewateruniformlyduringthefdter


cycle, and which distributesthe backwash water uniformly during cleaningoperation Normally
appliesto sand filters.

Underwater Lights: A low voltage light designed to illuminatea pool from beneath the water surface.

Vacuum Filters: Rlter tanksworking on a vacuum rather than a pressure principles, where a precoat is used as the
filtermedium

Vacuum Wall Fitting: The fitting in the wall of the pool which is used as aconvenientoutlet for connecting the underwater
suction cleaningequipmentor a recirculatingskimmer,and piping to the pump suction.

Velocity: The measurementof the motion of liquids,expressed in feet per second,or metres per seconds.

Venturi 'hk A tube, which has aconsuicted throat, which causesdifferencesin pressure and can be used to
operate feedingdevices,instruments and to measure the flow.

Water Displacement: The volume of water displaced by each bather enteringthe pool or spa

Water Level Control: A device to automatically keep pool water level at its desired level incorporating an ovemow facility.

Water Testing Anapparatusformeasuringlevelsofchemicalsinabody


Equipment: of water.

Water Meter: Measures water flow and amount of water used.

Wet Niche: A watertight and water cooled unit submerged and placed in a niche in the pool wall.
Spata Standards Volume Two (1999)

MINIMUM DIMENSIONS OF THE


-CAGE OF SAFETY-
FOR THE APPROPRIATE CATEGORY OF DIVING

... . .. ... - .i .

SECTION A-A

%'
U C/

A
Spata Standards Volume Two (1999)

ACKNOWLEDGEMENTS
SPATA Swimming PoolStandards

wm!a
First published 1963by Association of Swimming Pool Contractors, Croydon

Revised with additions 1967

Second edition 1976 by SPATA, Croydon

Third edition in booklet sections by SPATA, Caterham ISBN 0 948824-00-X

SPATA Standardsfor swimming pools Water and Chemicals 1990

SPATA Standards for Spa Pools Installation, Chemicals and Water lkatment 1989

SPATA Standards for Swimming Pools Residential & Semi-Public Construction & Installation 1991

SYSTEMS SUPPLEMENTto Construction and Installation Volume 11: Standardsfor Swimming Pools
Filtration and Heating, Covers and Enclosures, Sauna Baths, Electrical, Safety and Operation
with Appendices 1985

J999 REVISIONS include

Volume 1 Construction and Installation

Volume 2 Filtration
Chemical Dosing
Heating and EnvironmentalControl
Covers and Air Enclosures
Electrical
Specialist Pools
System Design
Health and Safety
Operation and Maintenance

Volume 3 Chemical Dosing and Water Treatment

Volume 4 Spas, Saunas and Steam Rooms

Volume 5 SUPPLEMENTARYSPATA PUBLICATIONS:


Winterising guide for swimming pools
Practical guide to outdoor swimming pool heating
Pool Owner's Handbook

This revision has been carried out by two sub-committees. Firstly, under the Chairmanship of Ron
Stempfer (Aqua Blue Designs), and comprising :

Paul Scott Heatstar


Bob White Climatec Ltd
Ben Studdy Certikin InternationalLtd
Gerry Williams Thermalec
John Scott EPS Ltd
Gerry Stevens Aquatech (UK)Ltd
John Fowler SPATA
______~ ~~~ ~~

Spata Standards Volume Two (1999)

With thanks to Aquatech for use of their boardroom facilities.

Secondly, incorporating the work of the above committee, by Penny Tuttey (Beaver International Ltd)
with the assistance of the 1998/1999 SPATA National Council, Peter Lang, and many others, whose
help is gratefully acknowledged.

All rights reserved. No part of this publication may be reproduced, stored in a


retrieval system, or transmitted in any form or by any means, without the prior
permission of SPATA.