1 PDF
1 PDF
II PEKERJAAN TANAH
1 Galian tanah pondasi
- galian pondasi batu belah
panjang total = 18,000 M'
lebar rata2 = 0,700 M'
tinggi rata2 = 0,500 M'
Volume = 6,300 M3
IV PEKERJAAN BETON
V PEKERJAAN PASANGAN
Total = 16,840
Luas 1 = 12,630
-
tinggi = 0,080
panjang 1 = 1,000
jmlh antar kolom = 4,000
Luas 2 = 0,320
- Kolom
tinggi = 1,050
Lebar = 0,800
jmlh kolom = 4,000
Luas = 3,360
- pondasi
panjang = 18,000
lebar = 0,300
luas 5,400
Volume = 21,00 Bh
Volume = 4,00 Bh
5 Cor Jalan
Panjang = 38,000 M'
Lebar = 3,000 M'
Tebal = 0,160 M'
= 18,24 M3