SECTION 02110

SITE CLEARING

00000000PART 1 - GENERAL

1.1. SECTION INCLUDES

A. Removal and disposal of vegetation, brush, rubbish, loose rocks, large stones and
metallic debris occurring within the areas to be cleared as well as removal of roots,
matted roots and organic materials to a depth of not less than 300 mm below
original surface level of ground or to natural rock elevation.

B. Removal and satisfactory disposal of any structure that obtrude, encroach upon, or
otherwise obstruct the Work indicated on Drawings.

1.2. Related Work:

A. Section 02200 Earthwork

B. Section 02232 Roadway Base

C. Section 02581 Traffic Signs

D. Section 02900 Landscape Planting

E. Section 02515 Concrete Walks and Paving

F. Section 02529 Concrete Curbs and Gutters

1.3. JOB CONDITIONS

A. Traffic: Conduct site clearing operations to ensure minimum interference with roads,
streets, walks and other adjacent occupied or used facilities. Do not use facilities
without permission from the Engineer or authorities having jurisdiction.

B. Protection of Existing Improvements (If required): Provide protection as necessary


to prevent damage to existing improvements indicated to remain in place.

1. Protect improvements on adjoining properties and on Owner's property.


2. Restore damaged improvements to their original condition, as acceptable to
parties having jurisdiction.

000PART 2 - PRODUCTS

(Not Used)

PART 3 - EXECUTION

Housing for Jazan


Infrastructure & Utility Buildings 02110-1 Site Clearing
P09-67400
3.1. SITE CLEARING

A. General: Remove trees, shrubs, grass and other vegetation, improvements or


obstructions interfering with the execution of the new construction. Remove such
items elsewhere on site or premises as specifically indicated. Removal includes
digging out stumps and roots.
B. Clearing and Grubbing: Remove material to be grubbed, together with logs and
other organic or metallic debris not suitable for foundation purposes to a depth of
not less than 300 mm below the original surface level of the ground in areas
indicated to be grubbed and in areas indicated as construction areas under this
Contract, such as areas for buildings, and areas to be paved. Depressions made
by grubbing shall be filled with suitable material and compacted to make the surface
in conformance with the original adjacent surface of the ground.

C. Removal of Improvements: Remove existing above-grade and below-grade


improvements necessary to permit construction and other works as indicated on
drawings.

3.2. DISPOSAL OF WASTE MATERIALS

A. Transport waste materials and unsuitable topsoil materials to the designated spoil
areas and dispose of as directed by the Engineer at no extra cost.

B. Dust Control: Amount of dust resulting from demolition shall be controlled to prevent
the spread of dust to occupied portions of the construction site and to avoid
creation of a nuisance in the surrounding area. Use of water will not be permitted
when it will result in, or create, hazardous or objectionable conditions.

3.3. BURNING

A. Use of burning at the Project Site for the disposal of refuse and debris shall not be
permitted.

3.4. USE OF EXPLOSIVES

A. Use of explosives shall not be permitted.

END OF SECTION