SITE CLEARING
00000000PART 1 - GENERAL
A. Removal and disposal of vegetation, brush, rubbish, loose rocks, large stones and
metallic debris occurring within the areas to be cleared as well as removal of roots,
matted roots and organic materials to a depth of not less than 300 mm below
original surface level of ground or to natural rock elevation.
B. Removal and satisfactory disposal of any structure that obtrude, encroach upon, or
otherwise obstruct the Work indicated on Drawings.
A. Traffic: Conduct site clearing operations to ensure minimum interference with roads,
streets, walks and other adjacent occupied or used facilities. Do not use facilities
without permission from the Engineer or authorities having jurisdiction.
000PART 2 - PRODUCTS
(Not Used)
PART 3 - EXECUTION
A. Transport waste materials and unsuitable topsoil materials to the designated spoil
areas and dispose of as directed by the Engineer at no extra cost.
B. Dust Control: Amount of dust resulting from demolition shall be controlled to prevent
the spread of dust to occupied portions of the construction site and to avoid
creation of a nuisance in the surrounding area. Use of water will not be permitted
when it will result in, or create, hazardous or objectionable conditions.
3.3. BURNING
A. Use of burning at the Project Site for the disposal of refuse and debris shall not be
permitted.
END OF SECTION