BUATLAH LAPORAN MINGGUAN , AKHIR DAN KURVA S REALISASI DARI PEKERJAAN TERSEBUT JIKA
PEKERJAAN SELESAI DALAM 4 MINGGU
LEBAR 2M
TEBAL 15 CM
4X,Y 43.1
4X,Y 43.1
NO PEKERJAAN ANALISA VOL SAT HARGA SATUAN
1 2 3 4 5 6
A PEKERJAAN PENDAHULUAN
1 PEMBERSIHAN LOKASI TAKSIR 1.00 Ls Rp530,000.00
2 PENGUKURAN DAN PEMASANGAN BOUWPLNK TAKSIR 1.00 Ls Rp600,000.00
TOTAL A
B PEKERJAAN PEMB JALAN BETON
I PEKERJAAN BETON
1 COR BETON MUTU K0175 READY MIX B.13.A1 43.10 M3 Rp963,650.00
2 BEKISTING / MALL (3 KALI PAKAI) A.4.1.1.20 43.10 M2 Rp92,540.00
TOTAL B
C PEKERJAAN LAIN LAIN
1 PEMBERSIHAN TERAKHIR TAKSIR 1.00 Ls Rp422,000.00
2 PERALATAN KERJA TAKSIR 1.00 Ls Rp818,000.00
3 KOMSUMSI TAKSIR 1.00 Ls Rp500,000.00
TOTAL C
JUMLAH A + B + C
PEMBULATAN
JLH HARGA
Rp530,000.00
Rp600,000.00
Rp1,130,000.00
Rp41,533,315.00
Rp3,988,474.00
Rp45,521,789.00
Rp422,000.00
Rp818,000.00
Rp500,000.00
Rp1,740,000.00
Rp48,391,789.00
Rp48,391,789.00
NO PEKERJAAN VOL SAT JLH HARGA WAKTU
A PEKERJAAN PENDAHULUAN
1 PEMBERSIHAN LOKASI 1.00 Ls Rp530,000.00 3 Hari
2 PENGUKURAN DAN PEMASANGAN BOUWPLNK 1.00 Ls Rp600,000.00 4 Hari
B PEKERJAAN PEMB JALAN BETON
I PEKERJAAN BETON
1 COR BETON MUTU K0175 READY MIX 43.10 M3 Rp41,533,315.00 10 Hari
2 BEKISTING / MALL (3 KALI PAKAI) 43.10 M2 Rp3,988,474.00 8 Hari
C PEKERJAAN LAIN LAIN
1 PEMBERSIHAN TERAKHIR 1.00 Ls Rp422,000.00 3 Hari
2 PERALATAN KERJA 1.00 Ls Rp818,000.00 2 Hari
3 KOMSUMSI 1.00 Ls Rp500,000.00 24 Hari
TOTAL Rp48,391,789.00
RENCANA HARIAN
RENCANA KUMULATIF
RENCANA MINGGUAN
KUMULATIF MINGGUAN
MIN1 MIN2
BOBOT 4-Nov 5-Nov 6-Nov 7-Nov 8-Nov 9-Nov 10-Nov 11-Nov 12-Nov 13-Nov 14-Nov
1 2 3 4 5 6 7 8 9 10
85.83%
8.24% 1.03% 1.03% 1.03% 1.03% 1.03% 1.03% 1.03%
0.87%
1.69% 0.85% 0.85%
1.03% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04%
100%
0 1.25% 1.25% 0.41% 1.38% 1.38% 1.38% 0.00% 1.38% 1.07% 1.07% 1.07%
0 1.25% 2.51% 2.91% 4.30% 5.68% 7.06% 7.06% 8.45% 9.52% 10.59% 11.67%
7.06% 14.30%
7.06% 21.37%
MIN2 MIN3 MIN
15-Nov 16-Nov 17-Nov 18-Nov 19-Nov 20-Nov 21-Nov 22-Nov 23-Nov 24-Nov 25-Nov 26-Nov
11 12 13 14 15 16 17 18 19 20
0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04% 0.04%
1.07% 8.63% 0.00% 8.63% 8.63% 8.63% 8.63% 8.63% 8.63% 0.00% 8.63% 8.63%
12.74% 21.37% 21.37% 29.99% 38.62% 47.24% 55.87% 64.50% 73.12% 73.12% 81.75% 90.37%
14.30% 51.75% 26.88
21.37% 73.12% 100.0
MIN4
27-Nov 28-Nov 29-Nov 30-Nov 1-Dec
21 22 23 24 100%
90%
80%
70%
60%
8.58% 50%
40%
30%
0.29% 0.29% 0.29% 20%
10%
0.04% 0.04% 0.04% 0.04%
0%
A PEKERJAAN PENDAHULUAN
1 PEMBERSIHAN LOKASI 1.00 1.10% 100.00% 1.10% 1.10%
2 PENGUKURAN DAN PEMASANGAN BOUWPLNK 1.00 1.24% 100.00% 1.24% 2.34%
A PEKERJAAN PENDAHULUAN
1 PEMBERSIHAN LOKASI 1.00 1.10% 100.00% 1.10% 1.10%
2 PENGUKURAN DAN PEMASANGAN BOUWPLNK 1.00 1.24% 100.00% 1.24% 2.34%
A PEKERJAAN PENDAHULUAN
1 PEMBERSIHAN LOKASI 1.00 1.10% 100.00% 1.10% 1.10%
2 PENGUKURAN DAN PEMASANGAN BOUWPLNK 1.00 1.24% 100.00% 1.24% 2.34%
A PEKERJAAN PENDAHULUAN
1 PEMBERSIHAN LOKASI 1.00 1.10% 100.00% 1.10% 1.10%
2 PENGUKURAN DAN PEMASANGAN BOUWPLNK 1.00 1.24% 100.00% 1.24% 2.34%
A PEKERJAAN PENDAHULUAN
1 PEMBERSIHAN LOKASI 1.00 Ls Rp530,000.00 3 Hari
2 PENGUKURAN DAN PEMASANGAN BOUWPLNK 1.00 Ls Rp600,000.00 4 Hari
B PEKERJAAN PEMB JALAN BETON
I PEKERJAAN BETON
1 COR BETON MUTU K0175 READY MIX 43.10 M3 Rp41,533,315.00 10 Hari
2 BEKISTING / MALL (3 KALI PAKAI) 43.10 M2 Rp3,988,474.00 8 Hari
C PEKERJAAN LAIN LAIN
1 PEMBERSIHAN TERAKHIR 1.00 Ls Rp422,000.00 3 Hari
2 PERALATAN KERJA 1.00 Ls Rp818,000.00 2 Hari
3 KOMSUMSI 1.00 Ls Rp500,000.00 24 Hari
TOTAL Rp48,391,789.00
REALISASI
REALISASI KUMULATIF
BOBOT MINGGU MINGGU MINGGU MINGGU
1 2 3 4
100%
1.10% 1.10% 90%
1.24% 1.24% 80%
70%
60%
85.83% 6.00% 59.00% 20.83% 50%
8.24% 6.20% 1.00% 1.04% 40%
30%
0.87% 0.87%
20%
1.69% 1.69%
10%
1.03% 0.26% 0.26% 0.26% 0.26%
0%
100%
10.48% 7.26% 60.30% 21.96%
0 10.48% 17.74% 78.04% 100.00%