PROSEDURE PAINTING DOME - Rev
PROSEDURE PAINTING DOME - Rev
SPACE
PROSEDURE PAINT AT SITE
FRAME
PT.GEASINDO TEKNIK PRIMA | DOME/SHELTER COAL PLTU Pangkalansusu-Medan project
Project
Dome Shelter Coal PLTU Pangkalan Susu-Medan
Name
Dwi Dwi
Istyawan Darmawan Miswanto
DOCUMENT NUMBER :
CONST/HBP-PD/PSS/2019/002
Project
Dome Shelter Coal PLTU Pangkalan Susu-Medan
Name
A. RUANG LINGKUP
Prosedur ini digunakan sebagai acuan dalam proses pekerjaan pengecatan untuk material Space Frame di workshop
pada proyek Pembangunan DOME COAL YARD PLTU PANGKALAN SUSU.
B. STANDAR PRODUKSI
a. Manufacture Standard (Technical Data Sheet)
b. SSPC-SP2 (Hand Tool Cleaning)
c. SSPC-SP3 (Power Tool Cleaning)
C. GENERAL
Permukaan yang telah teraplikasi pengecatan intermediate ,harus dijaga dalam proses pengangkatan dan
penurunan material dari truk
Permukaan yang telah dilakukan pengecatan,harus dijaga dalam proses transportasi pengiriman material.
1. SCOPE
1.1 Prosedure ini akan digunakan untuk acuan dalam proses pekerjaan pengecatan finish/top coat untuk space frame
material di lapangan.
3,1 Pengecatan finish/top coat menggunakan Deep Blue Sea IV product dari Century paint
3.2 Dalam pelaksanaan pengecatan finish dilapangan,kita akan menggunakan Hand spray system/semprot sesuai
dengan gambar berikut :
Project
Dome Shelter Coal PLTU Pangkalan Susu-Medan
Name
5.Painting Inspeksi
6.Repair Pengecatan
6.1 Pada permukaan yang mengalami cacat akibat,pengangkatan,transportasi/lansir lapangan ,ataupun akibat
cacat/kerusakan yang lain.maka proses repair yang akan kita lakukan adalah dengan system touch up,untuk
langkah pengerjaannya adalah sbb:
7.Painting Storage
7.1 Tempat penyimpanan material cat dan thiner,harus terlindung langsung dari sinar matahari langsung.
7.2 Sediakan APAR [alat pemadam api ringan].
Project
Dome Shelter Coal PLTU Pangkalan Susu-Medan
Name
2.COMPOSITION/INFORMATION ON INGREDIENTS
3.HAZARDS IDENTIFICATION
5.FIRE-FIGHTING MEASURES
Handling
Keep ignition sources away, dot not smoke.
Protect against electrostatic charges.
Avoid contact with skin and eyes. Use only in well-
ventilated areas. Avoid breathing vapors and/or aerosols. Emergency showers
and eye wash stations should be readily
accessible. Adhere to work practice rules established by
government regulations. Avoid contact with eyes. Use
personal protective equipment. When using, do not eat,
drink, or smoke.
Project
Dome Shelter Coal PLTU Pangkalan Susu-Medan
Name
Storage
Store in cool, dry place with adequate ventilation, Keep away from opened
flame and high temperature. Do not
to remove vapor.
Form : Liquids.
Color : Blue.
Specific gravity : 0.95 - 1.05.
PH : Not available.
11.TOXICOLOGICAL INFORMATION
of the conjunctiva.
Acute dermal : Mild skin irritation.
Irritation/corrosion
12.ECOLOGICAL INFORMATION
Ecotoxicity effects
Aquatic toxicity : No data is available on the product
itself.
Toxicity to other : No data available.
Organisms
Persistence and degradability
Mobility : No data available.
Bioaccumulation : No data is available on the product
itself.
13.DISPOSAL CONSIDERATIONS
This product is NOT suitable for disposal by either landfill or via municipal
sewers, drains, natural streams or rivers.
14.TRANSPORT INFORMATION
Not available
15.REGULATORY INFORMATION
Project
Dome Shelter Coal PLTU Pangkalan Susu-Medan
Name
Not available
16.OTHER INFORMATION
This information relates only to the specific material designated and may not be
valid for such material used combination with any other materials or in any
process. Such information is to the best of PT MUSTIKA CARAKA LAKSANA’s knowledge
and believed
accurate and reliable as of the data indicated. However, no representation,
warranty or guarantee is made as to its accuracy, reliability or completeness. It
is the user’s responsibility to himself as to the suitability and completeness of
such information for his own particular use.
Project
Dome Shelter Coal PLTU Pangkalan Susu-Medan
Name
2.COMPOSITION/INFORMATION ON INGREDIENTS
Components % Weight
Epoxy Varnish 18 - 24
Colorant 3 29 – 35
Additive 5 – 5.6
Matting Agent 40 - 45
Thinner 6 – 12
Project
Dome Shelter Coal PLTU Pangkalansusu-Medan
Name
3.HAZARDS IDENTIFICATION
5.FIRE-FIGHTING MEASURES
Suitable extinguishing media:
Water fog.
Carbon dioxide (CO2).
Dry chemical.
Foam.
Handling
Storage
Store in cool, dry place with adequate ventilation, Keep away from
opened flame and high temperature. Do not pressurize containers to
empty them.
Form : Liquid.
Color : White.
11.TOXICOLOGICAL INFORMATION
12.ECOLOGICAL INFORMATION
Ecotoxicity effects
PRODUCT DESCRIPTION
Duco Deep Blue Sea iv is a single pack air dry, a pigmented Nitrocellulose
lacquer, based on Nitrocellulose and Alkyd resin. It is good adhesion, hardness
and flexibility properties.
CHARACTERISTICS
O Color : Blue.
O Flash point : 25 ˚C.
O Solid content (% weight) : 30 ± 2
O Theoretical coverage : NA.
O Supply viscosity, NK2 Cup : 250-300 seconds
O Density, gram/ml : 1.2-1.3.
O Gloss level (BYK Gardner) 60°, on Steel : 70 - 80.
O Pencil Hardness (Mitsubishi-Uni) : HB.
O Adhesion on metal(Cross cutting) : 85-90%.
O Mix-ratio (by volume) : Single component.
O Applied viscosity : 12-15 seconds.
O Recommended film thickness : 25-30 µ.
O Reducer/Thinner : Thinner HG.
O Application method : Spray.
O Self life (30°C) : 6 months in sealed
containers
O Drying schedule (30°C)
Surface dry : 30 minutes.
Hard dry : 2 hours.
Cured : 24 hours.
Project
Dome Shelter Coal PLTU Pangkalan Susu-Medan
Name
EPOXY INTERMEDIATE
TECHNICAL INFORMATION
PRODUCT DESCRIPTION
CHARACTERISTICS
O Color : White.
O Solid content (% weight) : 70 ± 2.
O Hid.Power (theoretical, no loss) : 5 - 7 m²/L.
O Supply viscosity, Sec (NK2) : 90-100
O Specific gravity, gram/ml : 1.13 – 1.18
O Gloss level : 10 – 15 %.
O Flash Point : 30 ºC ± 2.
O Flexibility : Good.
O Abrasion test : Good.
O Water : Good.
O Adhesion (Cross cutting) : 95-100%.
O Mix-ratio (by volume) : 4 part Base : 1 part Hardener.
O Pot life (30 ºC) : 8 hours(reduced at higher temperature).
O Recommended film thickness : 20 - 30 µ (DFT).
O Thinner/Cleaner : Century Epoxy Thinner .
O Application method : Roll or Brush.
O Applied viscosity, sec (Nk2) : 10 – 15
O Self life (30°C) : 12 months in sealed containers.
O Drying schedule (30°C)
Surface dry : 3 hours.
Hard dry : 8 hours.
Cured : 4 days.
O Dry to recoat
Minimum : 8 hours.
Maximum : 4 days (exterior)
O Packaging
Base : 20 L and 5 L.
Hardener : 4 L and 1 L.
Thinner : 200 L, 20 L and 5 L.
Project
Dome Shelter Coal PLTU Pangkalan Susu-Medan
Name
EPOXY GALVANIZED
TECHNICAL INFORMATION
PRODUCT DESCRIPTION
CHARACTERISTICS
O Color : White.
O Solid content (% weight) : 70 ± 2.
O Hid.Power (theoretical, no loss) : 5 - 7 m²/L.
O Supply viscosity, Sec (NK2) : 90-100
O Specific gravity, gram/ml : 1.23 – 1.28
O Gloss level : 5 – 10 %.
O Flash Point : 30 ºC ± 2.
O Flexibility : Good.
O Abrasion test : Good.
O Water : Good.
O Adhesion (Cross cutting) : 95-100%.
O Mix-ratio (by volume) : 4 part Base : 1 part Hardener.
O Pot life (30 ºC) : 8 hours(reduced at higher temperature).
O Recommended film thickness : 20 - 30 µ (DFT).
O Thinner/Cleaner : Century Epoxy Thinner .
O Application method : Roll or Brush.
O Applied viscosity, sec (Nk2) : 10 – 15
O Self life (30°C) : 12 months in sealed containers.
O Drying schedule (30°C)
Surface dry : 3 hours.
Hard dry : 8 hours.
Cured : 4 days.
O Dry to recoat
Minimum : 8 hours.
Maximum : 4 days (exterior)
O Packaging
Base : 20 L and 5 L.
Hardener : 4 L and 1 L.
Thinner : 200 L, 20 L and 5 L