LOKASI PANJANG SEGMEN PANJANG SISA

PELAPISAN BAB 8B - 8C 1042.2 87 190.2


KLAMPOK 20 2
PENGURAS BAB 15 30

BAB 34 15
BAB 78 27
BANGUNAN INSTIU BAB 10 UP
BAB 15 UP
BAB 15 DOWN
BAB 25 UP
BAB 25 DOWN
BAB 34 UP
BAB 34 DOWN
BAB 46 UP 4
BAB 47 DOWN
BAB 48 UP
BAB 49 DOWN
BAB 58 UP
BAB 58 DOWN
BAB 78 UP
BAB 79 DOWN 5
BAB 80 3

39000
91000
60000
190000
60000
KEBUTUHAN
SEGMEN SISAD13 D8 D16 D13 D8 D16 IWAN
16 1419.808 35.872 22,716.93 573.95 62
1191.84 2,383.68 744
54.17 109.2 1,625.10 3,276.00

54.17 109.2 812.55 1,638.00


54.17 109.2 1,462.59 2,948.40

130 180.5232 520.00 722.09

793.31 1,512.67

130 180.5232 650.00 902.62


130 180.5232 390.00 541.57
31,354.16 573.95 11,541.35
12.48 2,512.35 120.07 609.49
18.936 2448 120 523
4.78

61.35 59.15867
3629.384
TUKIYAT
9 22
108 9
KEBUTUHAN PEMBESIAN LAPANGAN

Batang
LOKASI MANDOR PENGAWAS
D13 D8 D16
Pelapisan Iwan Mbah Citro 341 23 0
Tukiyat 1251 83 0
Klampok Bastomi 191 0 0
Bab 15 Up Harlan Pak WO 65 0 87
Bab 34 UP Nur Ali Pak Paryono 65 0 87
Bab 46 Adi 42 0 38
Bab 58 UP Widdy 64 0 80
Bab 78 Widdy 117 0 156
Bab 79 Widdy 52 0 48
Bab 80 WIddy 31 0 29
kebutuhan besi 1.9 0.5 2.4 8 1.578
1.9 1.6 3.5 4 1.578
1 1 27 1.04

balok 1.8 4 1.04 7.488 85

93.492
88.298
1042
239
1474
2755
1530.556
30.2976
22.092 52.3896 146 7,648.88
28.08 28.08 146 4,736.2

636.48 120
51

259.7
239.7
KEBUTUHAN PEMBESIAN LAPANGAN

Kilogram Batang at point X= 568,918 Y= 3,435,515 Z= 0.0000


LOKASI MANDOR PENGAWAS
SEGMEN D13 D8 D16 D13 D8 D16 at point X= 569,683 Y= 3,436,329 Z= 0.0000
KLAMPOK NUR ALI BASTOMI 4736.16 232.339 7648.882 380 49 404 at point X= 590,741 Y= 3,420,699 Z= 0.0000
BAB 15 IN PAK WO 1625.1 3276 130 173 at point X= 577,172 Y= 3,420,699 Z= 0.0000
BAB 80 648.96 52 0 48 at point X= 568,918 Y= 3,435,515 Z= 0.0000
KAMPUNG IWAN M.CITRO 4742.4 380 0
0 0
0 0
0 0
0 0
0 0
0 0