Kebutuhan Besi
Kebutuhan Besi
BAB 34 15
BAB 78 27
BANGUNAN INSTIU BAB 10 UP
BAB 15 UP
BAB 15 DOWN
BAB 25 UP
BAB 25 DOWN
BAB 34 UP
BAB 34 DOWN
BAB 46 UP 4
BAB 47 DOWN
BAB 48 UP
BAB 49 DOWN
BAB 58 UP
BAB 58 DOWN
BAB 78 UP
BAB 79 DOWN 5
BAB 80 3
39000
91000
60000
190000
60000
KEBUTUHAN
SEGMEN SISAD13 D8 D16 D13 D8 D16 IWAN
16 1419.808 35.872 22,716.93 573.95 62
1191.84 2,383.68 744
54.17 109.2 1,625.10 3,276.00
793.31 1,512.67
61.35 59.15867
3629.384
TUKIYAT
9 22
108 9
KEBUTUHAN PEMBESIAN LAPANGAN
Batang
LOKASI MANDOR PENGAWAS
D13 D8 D16
Pelapisan Iwan Mbah Citro 341 23 0
Tukiyat 1251 83 0
Klampok Bastomi 191 0 0
Bab 15 Up Harlan Pak WO 65 0 87
Bab 34 UP Nur Ali Pak Paryono 65 0 87
Bab 46 Adi 42 0 38
Bab 58 UP Widdy 64 0 80
Bab 78 Widdy 117 0 156
Bab 79 Widdy 52 0 48
Bab 80 WIddy 31 0 29
kebutuhan besi 1.9 0.5 2.4 8 1.578
1.9 1.6 3.5 4 1.578
1 1 27 1.04
93.492
88.298
1042
239
1474
2755
1530.556
30.2976
22.092 52.3896 146 7,648.88
28.08 28.08 146 4,736.2
636.48 120
51
259.7
239.7
KEBUTUHAN PEMBESIAN LAPANGAN