ITNL-KMB (JV) UAA09 HAZARD IDENTIFICATION AND RISK ASSESSMENT OF CHENNAI METRO RAIL PROJECT.
TRIAL TRENCHING FOR UTILITY INVESTIGATION FOR
UNDERGROUND STATION’S
Document No : IEINRL017-SHE-F015 Revision : R 0 Date of Revision :0 Issue : 00
JOB : Design Validation and Construction of works of underground station (Excluding Station Diaphragm Walls) & Associated Structures at Concourse, Platform Level, Entry/Exit, Ancillary
Building, Pump house, Water Tanks, Ventilation Shafts, Plumbing and Earthmat etc., and Architectural Finishes, Signage's etc. at Sir Thiyagaraya College & Korukkupet Station, including cut
& cover tunnel and Ramp (UG & Elevated CH.2052 TO CH. 2869)
HAZARD AND RISK IDENTIFICATION RISK ASSESSMENT CONTROL MEASURES
Risk
Condition Over riding factor Likelyhood Seve
rity Scor
Adequacy of Measure
Type of Hazards
e
Hazar Risk
Activity/ Service/ Activity Implementation Competent
S. No H&S Hazard d H&S Risk Classificatio
Product Authority
n Gap (if
L S LXS Existing Control Control Measure
IPC
DE
CE
LC
any)
N/A/E
R/ NR
D/ ID
Common Activity: Trial Trenching for Utility Investigation. ( Initial Survey, Alignment fixing, Utility identification, manual excavation for trench, back filling, Road Excavation by excavators)
Protecting of Surface
encumbrances, Safe
access and egress. No
Adequate lighting prior-
Falling/ slip / Trip
Fractures/ arrangement, Identification drawin Method Site Engineer &
Hazards/ Open drain P ID R A - - - IPC 4 2 8 H
Major Injuries of underground utilities g Statement Survey In charge
& holes, Electrocution
and protection to avoid any availab
damage. Work under le
overhead line with proper
shutdown permit.
Trial
Provision of cautioning and
barricading boards to
avoid Public interference.
Un-noticed hazards ( Ensure administrative
Site Engineer &
after work hrs) at P ID R A Major Injuries - - - - 2 2 4 VL control by Security.
Survey In charge
incomplete work Designated exit / entry.
Checking to ensure no
person is sleeping after
duty hrs.
Abbreviations:
D/ID Direct/Indirect Likelyhood Rating Severity Rating Risk Level Control Plan Categories of Hazards
Probability
R/NR Routine/Non Routine Exposure of Score Severity Score 1 <=4 Very Low Normal Precaution Adhered P Physical Hazards
Risk
Risk
Score =
N/A/E Normal/Abnormal/Emergency Continuous 5 Several Fatality 5 Likelyho 2 05 <=08 Low Prepare OCP if not there, Training & Strict Supervision C Chemical Hazards
od
Score X
DE Domino Effect Daily 4 One Fatality 4 Severity 3 09 <=12 Medium Follow OCP + Step 2 E Ergonomically Hazards
Score
IPC Interested Party Concern Monthly 3 Serious Injury 3 4 13 <=16 High Prepare Risk Control + step3 & bring to Level 3 B Biological Hazards
CE Chronic Effect Yearly 2 Major Injury 2 17 <=25 Very High Alternative: Safe Process / outsource / +Step 4 PS Psycho-Social Hazards
5
More than
LC Legal Concern 1 Minor Injury 1
one year
Signature/ Date