Nilai Proyek Yang Sedang Berjalan

PT Intan Prima Kalorindo

No. SPMK NAMA PEKERJAAN Nilai Project

Tahun 2017 36.030.000.000


K17005 AIR HEATER PLTU BUKIT ASAM UNIT 3&4 36.030.000.000
Tahun 2018 61.788.559.200
K18006 MAINTENANCE SHELL AND TUBE ELNUSA RAGA 162.000.000
K18009 RETUBING ABP LPH 2.447.100.000
K18011 TUBE BUNDLE FLOATING HEAD 11E15B, 13E8 dan 11E61AB 3.200.000.000
K18013 BANK AIR COOLER TAG NO 101E531 & 84E202BCD 4.800.000.000
K18014 BANK AIR COOLER TAG NO 018E103-1-2-3-4 1.550.000.000
K18015 HEAT EXCHANGER TAG NO 57E201ABCD 790.000.000
K18016 KELOMPOK MEKANIKAL HEAT TRANSFER 10.919.471.000
K18018 AIR COOLER HEAT EXCHANGER PT MEINDO 16.538.128.200
K18022 HEAT EXCHANGER ASSY 813.610.000
K18023 RETUBING CONDENSOR PLTU BUKIT ASAM 20.568.250.000
Tahun 2019 12.526.604.760
K19001 HEAT EXCHANGER WATER COOLER 413.000.000
K19003 OPERASI DAN MAINTENANCE PLTP LAHENDONG 784.966.000
K19004 LP SCRUBBER & CLOSE DRAIN VESSEL 4.041.691.760
K19005 LP AFTER COOLER 7.154.947.000
K19006 VESSEL 132.000.000

Total Nilai Proyek Berjalan 110.345.163.960