CL
DATUM 110.000
:
Point v u t s rq p o n m l k j i hg f e d c b 18 1716
a 21 20 19 15 14 13 12 11 10 9 8 7 6 5 4 3 2 ! @ # $ % ^ &
143.820
169.379
167.713
1,73 142.866
3,88 142.383
142.685
5,75 141.990
4,50 142.289
141.914
141.969
5,16 141.807
4,76 141.694
4,96 141.053
5,12 141.162
1,97 136.350
5,19 136.192
2,95 136.083
138.317
138.317
139.849
5,80 141.685
141.098
140.749
141.054
5,77 140.897
141.083
3,45 141.117
143.820
138.494
142.266
4,90 141.187
135.642
142.767
3,08 143.122
142.579
141.731
4,79 141.731
142.346
3,13 142.509
142.125
4,64 144.099
148.816
159.991
161.516
162.884
164.189
143.820
136.591
142.851
Elevasi (m)
6,43
6,98
6,14
2,83
6,70
6,32
Jarak Datar (m) 12,09 23,89 25,34 61,89 10,78 9,14 8,83 6,93 7,62 12,46 6,44 7,80 7,27 10,51 8,96 9,67 10,41 34,07 38,10 17,99 8,77 9,79 14,32
STA. 07
0 20 40 60 80 100 m
SKALA
SKALA 1 : 1250
KEMENTERIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
PROPINSI JAWA TIMUR
DIREKTORAT JENDERAL SUMBER DAYA AIR
BALAI BESAR WILAYAH SUNGAI BENGAWAN SOLO
KABUPATEN PONOROGO
SNVT PEMBANGUNAN BENDUNGAN BENGAWAN SOLO
PPK PEMBANGUNAN BENDUNGAN I PEKERJAAN :
KETERANGAN : jl. Solo - Kartosuro km.7 PO. BOX 267 telp./fax (0271) 7654256 Pabean, Kartasura, Sukoharjo 57162 PROYEK PEMBANGUNAN
WADUK BENDO
1. max. 30cm - timbunan inti (clay) GAMBAR :
KABUPATEN PONOROGO
POTONGAN MELINTANG
2a. max. 40cm - timbunan filter (pasir) BENDUNGAN UTAMA BENDUNGAN STA. 07 Construction Drawing