DAFTAR HARGA TENAGA KERJA DAN BAHAN

KABUPATEN/KOTA : KOTA JAMBI


TAHUN ANGGARAN : 2014

Harga Satuan
No. Uraian Satuan
(Rp.)
1 2 3 4

I HARGA TENAGA KERJA

1 Pekerja Org/hr 70,000.00


2 Tukang Org/hr 90,000.00
3 Kepala tukang Org/hr 100,000.00
4 Mandor Org/hr 95,000.00

II HARGA BAHAN

A. BAHAN PASANGAN
1 Pasir beton M3 77,000.00
2 Pasir pasang M3 77,000.00
3 Pasir urug M3 75,000.00
4 Kerikil M3 330,000.00
5 Tanah urug biasa M3 50,000.00
6 Tanah urug pilihan M3 60,000.00
7 Semen PC ( 50 Kg ) Zak 72,000.00
8 Semen putih Zak 104,000.00
9 Semen warna Kg 12,000.00
10 Air Ltr 52.50

B. BAHAN PONDASI
1 Batu kali/batu belah/batu gunung M3 287,000.00
2 Split 2/3 & 3/4 M3 300,000.00

C. BAHAN LANTAI
1 Keramik 30x30 cm polos Ktk 46,000.00
2 Keramik 30x30 cm motif/warna Ktk 55,000.00
3 Keramik 30x30 cm anti slip / motif kulit jeruk Ktk 57,000.00
4 Keramik 10x20 cm warna Ktk 52,000.00
5 Keramik 20x20 cm polos Ktk 54,000.00
6 Keramik 20x20 cm warna Ktk 57,000.00
7 Keramik 20x25 cm polos Ktk 54,000.00
8 Keramik 20x25 cm warna Ktk 65,000.00
9 Keramik 40x40 cm motif Ktk 97,000.00
10 Keramik 40x40 cm polos Ktk 79,000.00
11 Keramik 10 x 40 cm polos Bh 3,000.00
12 Cincin Keramik M1 8,000.00

D. BAHAN DINDING
1 Batu bata kecil Bh 600.00
2 Batu bata kecil M3 441,000.00
3 Batu bata bolong besar Bh 740.00
4 Batu Tempel Andesit M2 175,000.00

E. BAHAN PENUTUP LANGIT-LANGIT


1 Triplek 3.6 mm Lbr 72,000.00
2 Triplek 2.7 mm Lbr 56,000.00
Harga Satuan
No. Uraian Satuan
(Rp.)
1 2 3 4
3 Plywood 6 mm Lbr 110,000.00
4 Plywood 9 mm Lbr 150,000.00
5 GRC 3.6 mm Lbr 75,000.00
6 Lisplank GRC 8 mm Lbr 58,000.00
7 Lisplank GRC 10 mm Lbr 75,000.00
8 Teakwood 4 mm Lbr 95,000.00
9 Lis profil no. 7 Btg 17,250.00
10 Tepung gipsum Kg 4,600.00
11 List propil gipsum M1 35,000.00

F. BAHAN PENUTUP ATAP


1 Genteng metal zincalume t. 0,25 mm M2 65,000.00
2 Genteng metal zincalume t. 0,30 mm M2 70,000.00
3 Bubungan genteng beton Bh 5,500.00
4 Bubungan genteng mantili Bh 5,750.00
5 Bubungan g.metal zincalume t. 0,30 mm M1 32,500.00
6 Seng datar BJLS 0,3 mm / seng plat M1 18,000.00
7 Seng gelombang BJLS 20, 6' Kodi 897,000.00
8 Seng gelombang BJLS 20, 7" Kodi 970,000.00
9 Seng Metal Asoka Kodi 1,150,000.00

G. BAHAN KAYU
1 Kayu balok klas I M3 6,000,000.00
2 Kayu balok klas II M3 1,800,000.00
3 Kayu reng klas II M3 1,800,000.00
4 Kayu balok klas III M3 1,600,000.00
5 Kayu papan klas I ( lisplank ) M3 8,400,000.00
6 Kayu papan klas I M3 5,750,000.00
7 Kayu papan tembesu M3 12,000,000.00
8 Kayu papan lambesering klas II M3 2,400,000.00
9 Kayu papan klas II M3 1,950,000.00
10 Kayu papan klas III M3 1,600,000.00
11 Kayu papan klas IV M3 1,500,000.00
12 Dolken kayu Ø 8-10/400 Cm Btg 8,000.00
13 Kayu gelam Ø 12/400 Cm Btg 20,000.00
14 Formtie/penjaga jarak bekisting/spacer Btg 5,750.00
15 Lis propil M1 4,500.00

H. BAHAN BESI / BAJA


1 Besi beton ulir kg 13,000.00
2 Besi beton polos kg 11,000.00
3 Kawat ikat beton kg 18,000.00
4 Besi baja IWF kg 18,000.00
5 Besi baja siku kg 18,000.00
6 Besi Holo M1 6,900.00
7 Kawat bronjong kg 11,500.00
8 Baja profil kg 18,000.00
9 Rangka atap baja ringan M2 165,000.00
10 Paku biasa Kg 18,000.00
11 Paku triplek Kg 25,000.00
12 Paku sekrup Kg 25,000.00
13 Paku bulian Kg 25,000.00
14 Paku seng Kg 25,000.00
15 Paku genteng Kg 25,000.00
16 Skrup Fixer Ktk 25,000.00
17 Paku GRC Kg 25,000.00
Harga Satuan
No. Uraian Satuan
(Rp.)
1 2 3 4
18 Mour dan baut 10 mm x 12 " Bh 6,900.00
19 Mour dan baut 12 mm x 12 ' Bh 7,500.00
20 Kawat duri Kg 13,800.00
21 Besi Strip 2 x 3 Kg 13,800.00
22 Folding door M2 575,000.00
23 Rolling door M2 175,000.00
24 Pagar Besi Hollo M2 575,000.00
25 Pintu Pagar Besi Hollo M2 600,000.00
26 Profil Aluminium M1 34,000.00
27 Pintu Alluminium M1 40,000.00
28 Aluminium Strip M1 7,000.00
29 Tralis pintu dan jendela besi begel M2 400,000.00
30 Sunscreen alluminium M2 175,000.00

I. BAHAN SANITAIR / SALURAN AIR


1 Instalasi Titik Air Bersih Titik 55,000.00
2 Instalasi Titik Air Kotor Titik 55,000.00
3 Bak mandi fibre glass ( 0.3 M3 ) Bh 350,000.00
4 Tangki air fibre glass 1 m3 Bh 1,500,000.00
5 Pipa PVC dia. 1/2" AW 1 (4 m') Btg 14,000.00
6 Pipa PVC dia. 3/4" AW 1 (4 m') Btg 18,000.00
7 Pipa PVC dia. 1" AW 1 (4 m') Btg 30,000.00
8 Pipa PVC dia. 1 1/2" AW 1 (4 m') Btg 51,000.00
9 Pipa PVC dia. 2" AW 1 (4 m') Btg 66,000.00
10 Pipa PVC dia. 2 1/2" AW 1 (4 m') Btg 97,000.00
11 Pipa PVC dia. 3" AW 1 (4 m') Btg 100,000.00
12 Pipa PVC dia. 4" AW 1 (4 m') Btg 105,000.00
13 Closed duduk keramik (otomatis) Bh 2,010,000.00
14 Closed jongkok biasa Bh 184,000.00
15 Closed jongkok keramik standar Bh 210,000.00
16 Wastafel lengkap Unit 400,000.00
17 Kran biasa, uk. 1/2 & 3/4 Bh 12,000.00
18 Kran stainless, uk. 1/2 & 3/4 Bh 42,000.00
19 Sambungan paralon "L" Bh 3,500.00
20 Sambungan paralon "Shock" Bh 3,500.00
21 Sambungan paralon "T" Bh 4,600.00
22 Lem paralon Tube 4,200.00
23 Selotip paralon / seal tape Bh 3,500.00
24 Floor drain Bh 17,000.00
25 Water drain + acsesories Bh 48,000.00
26 Penyambungan Baru PDAM Unit 1,500,000.00
27 Septicktank Unit 3,000,000.00

J BAHAN INSTALASI LISTRIK


1 Box zekering (panel box + MCB ) Unit 145,000.00
2 Instalasi listrik titik 150,000.00
3 Saklar tunggal Bh 18,000.00
4 Saklar ganda Bh 25,000.00
5 Saklar tripel Bh 30,000.00
6 Stop kontak Bh 18,500.00
7 Lampu XL 20 watt Bh 54,000.00
8 Lampu XL 25 Watt Bh 65,000.00
Harga Satuan
No. Uraian Satuan
(Rp.)
1 2 3 4
9 Sambung Baru PLN Daya 1300 watt Unit 2,500,000.00

K BAHAN FINISHING
1 Cat besi Kg 54,000.00
2 Cat genteng Kg 31,000.00
3 Cat tembok Kg 25,000.00
4 Cat kayu Kg 44,800.00
5 Cat dasar tembok Kg 22,000.00
6 Cat dasar kayu Kg 34,000.00
7 Minyak cat Ltr 12,000.00
8 Minyak bekisting Ltr 12,500.00
9 Dempul kayu Kg 20,000.00
10 Meni Kg 52,000.00
11 Plamir tembok Kg 8,200.00
12 Ter/residu Ltr 6,900.00
13 Plitur Ltr 55,000.00
14 Tiner Ltr 23,000.00
15 Lem aibon Kg 38,000.00
16 Lem vinyl Kg 38,000.00
17 Amplas Lbr 6,000.00
18 Lem kayu ( fox ) Kg 18,000.00
19 Sabun Kg 25,000.00
20 Kuas Bh 28,000.00

L BAHAN LAIN-LAIN
1 Kaca bening 5 mm M2 138,000.00
2 Kaca rayban 5 mm M2 90,000.00
3 Kaca biru 5 mm M2 110,000.00
4 Kaca Cermin, Tebal 5 mm M2 85,000.00
5 Kaca "Wireglass", Tebal 5 mm M2 98,000.00
6 Pintu kamar mandi PVC Bh 240,000.00
7 Kunci pintu 2 slaag kualitas Bh 190,000.00
8 Kunci pintu 2 slaag biasa Bh 95,000.00
9 Kunci Silinder Bh 52,000.00
10 Kunci selot Bh 42,000.00
11 Engsel pintu Bh 14,300.00
12 Engsel jendela Bh 9,000.00
13 Tarikan pintu Bh 115,000.00
14 Hak angin Bh 7,000.00
15 Tarikan jendela Bh 6,000.00
16 Grendel pintu Bh 11,500.00
17 Grendel jendela Bh 6,000.00
18 Kunci lemari Bh 11,500.00
19 Sealent Kg 15,500.00
20 Pompa air Bh 400,000.00
21 Papan nama proyek Unit 200,000.00
22 Barak kerja Unit 3,000,000.00
23 Sewa barak kerja Unit 750,000.00
24 Huruf Stainless Tinggi 20 cm Hrf 198,000.00
25 Logo Fiber Uk. 70 x 70 cm M2 780,000.00
Harga Satuan
No. Uraian Satuan
(Rp.)
1 2 3 4

Jambi, 2014
Konsultan Perencana
PT. MULT STRUKTUR AROYA

ILKI REPELITA, ST
Team Leader
DAN BAHAN
sdn 150 - -
sdn 26 -

2012 Rata-2 TOKO 15% dekat final


Ket.

5
1,800.00
Harga tidak
termasuk PPN
50,000.00 50,000.00 50,000.00
65,000.00 65,000.00 70,000.00
70,000.00 70,000.00 80,000.00
60,000.00 60,000.00 65,000.00

85,000.00 80,000.00 12,000.00 90,000.00


85,000.00 80,000.00 12,000.00 90,000.00
70,000.00 70,000.00 10,500.00 80,000.00
270,000.00 275,000.00 41,250.00 315,000.00
46,000.00 40,000.00 6,000.00 46,000.00
57,000.00 50,000.00 7,500.00 57,000.00
72,500.00 64,500.00 9,675.00 74,000.00
104,000.00 90,000.00 13,500.00 104,000.00
12,000.00 - 12,000.00
52.50 - 52.50
-
-
287,000.00 250,000.00 37,500.00 287,000.00
300,000.00 260,000.00 39,000.00 300,000.00
-
-
43,000.00 40,000.00 6,000.00 46,000.00
49,000.00 48,000.00 7,200.00 55,000.00
54,000.00 50,000.00 7,500.00 57,000.00
52,000.00 - 52,000.00
48,000.00 47,000.00 7,050.00 54,000.00
52,000.00 50,000.00 7,500.00 57,000.00
50,000.00 47,000.00 7,050.00 54,000.00
54,000.00 50,000.00 7,500.00 57,000.00
55,000.00 55,000.00 8,250.00 63,000.00
48,000.00 50,000.00 7,500.00 57,000.00

-
-
630.00 550.00 82.50 630.00
441,000.00 - 441,000.00
740.00 650.00 97.50 740.00

-
-
66,000.00 58,000.00 8,700.00 66,000.00
51,000.00 43,000.00 6,450.00 51,000.00
2012 Rata-2 TOKO 15% dekat final
Ket.

5
110,000.00 80,000.00 12,000.00 110,000.00
150,000.00 120,000.00 18,000.00 150,000.00
64,000.00 58,000.00 8,700.00 66,000.00
132,000.00 50,000.00 7,500.00 58,000.00
280,000.00 65,000.00 9,750.00 75,000.00
95,000.00 77,000.00 11,550.00 95,000.00
17,250.00 15,000.00 2,250.00 17,250.00
4,600.00 4,000.00 600.00 4,600.00
35,000.00 30,000.00 4,500.00 35,000.00

-
65,000.00 54,000.00 8,100.00 65,000.00
82,000.00 71,300.00 10,695.00 82,000.00
5,500.00 - 5,500.00
5,750.00 5,000.00 750.00 5,750.00
60,000.00 42,000.00 6,300.00 48,000.00
18,000.00 - 18,000.00
750,000.00 630,000.00 94,500.00 750,000.00
870,000.00 730,000.00 109,500.00 870,000.00
1,150,000.00 960,000.00 144,000.00 1,150,000.00
-
-
5,750,000.00 5,500,000.00 825,000.00 6,300,000.00
1,950,000.00 1,700,000.00 255,000.00 1,950,000.00
2,500,000.00 - 2,500,000.00
1,600,000.00 1,400,000.00 210,000.00 1,600,000.00
8,400,000.00 7,200,000.00 1,080,000.00 8,400,000.00
5,750,000.00 5,500,000.00 825,000.00 5,750,000.00
5,290,000.00 4,600,000.00 690,000.00 5,290,000.00
2,400,000.00 - 2,400,000.00
1,950,000.00 1,700,000.00 255,000.00 1,950,000.00
1,600,000.00 1,400,000.00 210,000.00 1,600,000.00
1,500,000.00 1,300,000.00 195,000.00 1,500,000.00
5,750.00 5,000.00 750.00 5,750.00
20,000.00 18,000.00 2,700.00 20,000.00
5,750.00 5,000.00 750.00 5,750.00
4,500.00 4,000.00 600.00 4,500.00

-
14,375.00 12,500.00 1,875.00 14,375.00
13,800.00 12,000.00 1,800.00 13,800.00
18,500.00 16,000.00 2,400.00 18,500.00
18,000.00 - 18,000.00
18,000.00 - 18,000.00
5,750.00 6,000.00 900.00 6,900.00
11,500.00 - 11,500.00
18,000.00 - 18,000.00
184,000.00 145,000.00 21,750.00 165,000.00
16,750.00 14,500.00 2,175.00 16,750.00
21,500.00 18,000.00 2,700.00 21,500.00
23,000.00 - 23,000.00
23,000.00 20,000.00 3,000.00 23,000.00
22,000.00 20,000.00 3,000.00 23,000.00
23,000.00 20,000.00 3,000.00 23,000.00
23,000.00 - 23,000.00
23,000.00 20,000.00 3,000.00 23,000.00
2012 Rata-2 TOKO 15% dekat final
Ket.

5
4,800.00 5,000.00 750.00 5,700.00
7,200.00 6,500.00 975.00 7,500.00
132,000.00 - 13,800.00
13,800.00 - 13,800.00
575,000.00 500,000.00 75,000.00 575,000.00
175,000.00 150,000.00 22,500.00 175,000.00

34,000.00 30,000.00 4,500.00 34,000.00


40,000.00 - 40,000.00
7,000.00 - 7,000.00

175,000.00 - 175,000.00

-
-

350,000.00 200,000.00 30,000.00 350,000.00


1,500,000.00 1,200,000.00 180,000.00 1,500,000.00
16,000.00 15,000.00 2,250.00 17,000.00
23,000.00 20,000.00 3,000.00 23,000.00
30,000.00 25,000.00 3,750.00 30,000.00
52,000.00 45,000.00 6,750.00 51,000.00
66,000.00 55,000.00 8,250.00 66,000.00
97,000.00 83,000.00 12,450.00 97,000.00
132,000.00 110,000.00 16,500.00 132,000.00
217,000.00 185,000.00 27,750.00 217,000.00
1,500,000.00 1,750,000.00 262,500.00 2,010,000.00
120,000.00 100,000.00 15,000.00 120,000.00
200,000.00 185,000.00 27,750.00 210,000.00
360,000.00 350,000.00 52,500.00 400,000.00
12,000.00 10,000.00 1,500.00 12,000.00
42,000.00 35,000.00 5,250.00 42,000.00
3,000.00 3,000.00 450.00 3,500.00
1,800.00 3,000.00 450.00 3,500.00
2,400.00 4,000.00 600.00 4,600.00
4,200.00 3,500.00 525.00 4,200.00
2,400.00 3,000.00 450.00 3,500.00
13,000.00 15,000.00 2,250.00 17,000.00
48,000.00 40,000.00 6,000.00 48,000.00

-
-
75,000.00 - 75,000.00
115,000.00 - 115,000.00
18,000.00 15,000.00 2,250.00 18,000.00
20,000.00 18,000.00 2,700.00 20,000.00
26,000.00 22,000.00 3,300.00 26,000.00
19,000.00 16,000.00 2,400.00 19,000.00
50,000.00 45,000.00 6,750.00 50,000.00
55,000.00 50,000.00 7,500.00 55,000.00
2012 Rata-2 TOKO 15% dekat final
Ket.

-
-
45,000.00 47,000.00 7,050.00 54,000.00
31,000.00 26,000.00 3,900.00 31,000.00
17,800.00 20,000.00 3,000.00 23,000.00
45,000.00 47,000.00 7,050.00 54,000.00
19,000.00 16,000.00 2,400.00 19,000.00
19,000.00 30,000.00 4,500.00 34,000.00
11,500.00 10,000.00 1,500.00 11,500.00
8,600.00 - 8,600.00
18,400.00 17,000.00 2,550.00 19,000.00
18,400.00 16,000.00 2,400.00 19,000.00
8,200.00 7,000.00 1,050.00 8,200.00
10,300.00 9,000.00 1,350.00 10,300.00
42,000.00 48,000.00 7,200.00 55,000.00
18,400.00 20,000.00 3,000.00 23,000.00
38,000.00 31,000.00 4,650.00 38,000.00
38,000.00 - 38,000.00
3,500.00 3,500.00 525.00 4,000.00
20,000.00 16,000.00 2,400.00 20,000.00
25,000.00 - 25,000.00
24,000.00 25,000.00 3,750.00 28,000.00
-

-
97,000.00 - 97,000.00
90,000.00 - 90,000.00
110,000.00 - 110,000.00
85,000.00 71,000.00 10,650.00 85,000.00
98,000.00 82,000.00 12,300.00 98,000.00
240,000.00 210,000.00 31,500.00 240,000.00
190,000.00 160,000.00 24,000.00 190,000.00
90,000.00 80,000.00 12,000.00 95,000.00
42,000.00 45,000.00 6,750.00 52,000.00
42,000.00 35,000.00 5,250.00 42,000.00
12,000.00 12,500.00 1,875.00 14,300.00
9,000.00 7,500.00 1,125.00 9,000.00
9,000.00 100,000.00 15,000.00 115,000.00
5,000.00 6,000.00 900.00 7,000.00
6,000.00 5,000.00 750.00 6,000.00
9,000.00 10,000.00 1,500.00 11,500.00
6,000.00 5,000.00 750.00 6,000.00
9,500.00 10,000.00 1,500.00 11,500.00
15,500.00 13,000.00 1,950.00 15,500.00
400,000.00 335,000.00 50,250.00 400,000.00
200,000.00 - 200,000.00
1,500,000.00 - 1,500,000.00
750,000.00 - 750,000.00

0.16
2012 Rata-2 TOKO 15% dekat final
Ket.

i, 2014 4,687,500.00
Konsultan Perencana
MULT STRUKTUR AROYA
750,000.00
120,000.00

0.24
750,000.00
65,740,000.00 0.6864 1.4568764569

DEKAT SEDANG JAUH

0.16
6.25

92,000.00 95,000.00 94,500.00 99,000.00 99,000.00


92,000.00 95,000.00 94,500.00 99,000.00 99,000.00
80,500.00 84,000.00 84,000.00 88,000.00 88,000.00
316,250.00 330,000.00 330,750.00 347,000.00 346,500.00
46,000.00 48,000.00 48,300.00 51,000.00 50,600.00
57,500.00 59,000.00 59,850.00 63,000.00 62,700.00
74,175.00 77,500.00 77,700.00 82,000.00 81,400.00
103,500.00 109,000.00 109,200.00 115,000.00 114,400.00
- 12,500.00 12,600.00 13,200.00 13,200.00
- 55.00 55.13 57.50 57.75
- - -
- - -
287,500.00 301,000.00 301,350.00 316,000.00 315,700.00
299,000.00 315,000.00 315,000.00 330,000.00 330,000.00
- - -
- - -
46,000.00 48,000.00 48,300.00 51,000.00 50,600.00
55,200.00 57,500.00 57,750.00 60,000.00 60,500.00
57,500.00 59,000.00 59,850.00 63,000.00 62,700.00
- 54,500.00 54,600.00 58,000.00 57,200.00
54,050.00 56,000.00 56,700.00 60,000.00 59,400.00
57,500.00 59,000.00 59,850.00 63,000.00 62,700.00
54,050.00 56,000.00 56,700.00 60,000.00 59,400.00
57,500.00 59,000.00 59,850.00 63,000.00 62,700.00
66,000.00 57,500.00 66,150.00 70,000.00 69,300.00
57,500.00 59,000.00 59,850.00 63,000.00 62,700.00

- - -
- - -
632.50 660.00 661.50 700.00 693.00
- 463,000.00 463,050.00 485,000.00 485,100.00
747.50 775.00 777.00 815.00 814.00

- - -
- - -
66,700.00 69,000.00 69,300.00 73,000.00 72,600.00
49,450.00 53,500.00 53,550.00 56,500.00 56,100.00
DEKAT SEDANG JAUH

92,000.00 115,000.00 115,500.00 121,000.00 121,000.00


138,000.00 157,000.00 157,500.00 165,000.00 165,000.00
66,700.00 69,000.00 69,300.00 73,000.00 72,600.00
57,500.00 61,000.00 60,900.00 64,000.00 63,800.00
74,750.00 79,000.00 78,750.00 83,000.00 82,500.00
88,550.00 99,000.00 99,750.00 105,000.00 104,500.00
17,250.00 18,100.00 18,112.50 19,000.00 18,975.00
4,600.00 4,830.00 4,830.00 5,100.00 5,060.00
34,500.00 36,750.00 36,750.00 39,000.00 38,500.00

- - -
62,100.00 68,250.00 68,250.00 72,000.00 71,500.00
81,995.00 86,100.00 86,100.00 90,500.00 90,200.00
- 5,750.00 5,775.00 6,100.00 6,050.00
5,750.00 6,000.00 6,037.50 6,400.00 6,325.00
48,300.00 50,000.00 50,400.00 53,000.00 52,800.00
- 18,900.00 18,900.00 20,000.00 19,800.00
724,500.00 787,000.00 787,500.00 825,000.00 825,000.00
839,500.00 913,000.00 913,500.00 960,000.00 957,000.00
1,104,000.00 1,207,000.00 1,207,500.00 1,265,000.00 1,265,000.00 897000
- - -
- - -
6,325,000.00 6,600,000.00 6,615,000.00 6,930,000.00 6,930,000.00
1,955,000.00 2,000,000.00 2,047,500.00 2,145,000.00 2,145,000.00
- 2,625,000.00 2,625,000.00 2,750,000.00 2,750,000.00
1,610,000.00 1,680,000.00 1,680,000.00 1,760,000.00 1,760,000.00
8,280,000.00 8,820,000.00 8,820,000.00 9,240,000.00 9,240,000.00
6,325,000.00 6,025,000.00 6,037,500.00 6,325,000.00 6,325,000.00
5,290,000.00 5,550,000.00 5,554,500.00 5,820,000.00 5,819,000.00
- 2,520,000.00 2,520,000.00 2,640,000.00 2,640,000.00
1,955,000.00 2,000,000.00 2,047,500.00 2,145,000.00 2,145,000.00
1,610,000.00 1,680,000.00 1,680,000.00 1,760,000.00 1,760,000.00
1,495,000.00 1,575,000.00 1,575,000.00 1,650,000.00 1,650,000.00
5,750.00 6,000.00 6,037.50 6,500.00 6,325.00
20,700.00 21,000.00 21,000.00 22,000.00 22,000.00
5,750.00 6,000.00 6,037.50 6,350.00 6,325.00
4,600.00 4,700.00 4,725.00 4,950.00 4,950.00

- - -
14,375.00 15,100.00 15,093.75 15,850.00 15,812.50
13,800.00 14,500.00 14,490.00 15,200.00 15,180.00
18,400.00 19,425.00 19,425.00 20,350.00 20,350.00
- 18,900.00 18,900.00 19,800.00 19,800.00
- 18,900.00 18,900.00 19,800.00 19,800.00
6,900.00 7,250.00 7,245.00 7,590.00 7,590.00
- 12,075.00 12,075.00 12,650.00 12,650.00
- 18,900.00 18,900.00 19,800.00 19,800.00
166,750.00 173,000.00 173,250.00 181,500.00 181,500.00
16,675.00 17,550.00 17,587.50 18,500.00 18,425.00
20,700.00 22,500.00 22,575.00 24,000.00 23,650.00
- 24,150.00 24,150.00 25,500.00 25,300.00
23,000.00 24,000.00 24,150.00 25,500.00 25,300.00
23,000.00 24,000.00 24,150.00 25,500.00 25,300.00
23,000.00 24,150.00 24,150.00 25,500.00 25,300.00
- 24,150.00 24,150.00 25,500.00 25,300.00
23,000.00 24,150.00 24,150.00 25,500.00 25,300.00
DEKAT SEDANG JAUH

5,750.00 6,000.00 5,985.00 6,300.00 6,270.00


7,475.00 7,900.00 7,875.00 8,250.00 8,250.00
- 14,500.00 14,490.00 15,200.00 15,180.00
- 14,500.00 14,490.00 15,200.00 15,180.00
575,000.00 603,000.00 603,750.00 633,000.00 632,500.00
172,500.00 183,000.00 183,750.00 193,000.00 192,500.00

34,500.00 35,700.00 35,700.00 37,500.00 37,400.00


- 42,000.00 42,000.00 44,000.00 44,000.00
- 7,350.00 7,350.00 7,700.00 7,700.00

- 183,000.00 183,750.00 193,000.00 192,500.00

- - -
- - -

230,000.00 367,000.00 367,500.00 385,000.00 385,000.00


1,380,000.00 1,575,000.00 1,575,000.00 1,650,000.00 1,650,000.00
17,250.00 18,000.00 17,850.00 19,000.00 18,700.00
23,000.00 24,000.00 24,150.00 25,500.00 25,300.00
28,750.00 31,500.00 31,500.00 33,000.00 33,000.00
51,750.00 54,500.00 53,550.00 56,000.00 56,100.00
63,250.00 69,300.00 69,300.00 73,000.00 72,600.00
95,450.00 101,500.00 101,850.00 107,000.00 106,700.00
126,500.00 138,500.00 138,600.00 146,000.00 145,200.00
212,750.00 227,500.00 227,850.00 240,000.00 238,700.00
2,012,500.00 2,110,000.00 2,110,500.00 2,210,000.00 2,211,000.00
115,000.00 126,000.00 126,000.00 132,000.00 132,000.00
212,750.00 220,000.00 220,500.00 231,000.00 231,000.00
402,500.00 420,000.00 420,000.00 440,000.00 440,000.00
11,500.00 12,500.00 12,600.00 13,200.00 13,200.00
40,250.00 44,000.00 44,100.00 46,200.00 46,200.00
3,450.00 3,700.00 3,675.00 3,900.00 3,850.00
3,450.00 3,700.00 3,675.00 3,900.00 3,850.00
4,600.00 4,800.00 4,830.00 5,100.00 5,060.00
4,025.00 4,400.00 4,410.00 4,700.00 4,620.00
3,450.00 3,700.00 3,675.00 3,900.00 3,850.00
17,250.00 18,000.00 17,850.00 18,700.00 18,700.00
46,000.00 50,400.00 50,400.00 53,000.00 52,800.00

- - -
- - -
- 78,500.00 78,750.00 83,000.00 82,500.00
- 120,000.00 120,750.00 127,000.00 126,500.00
17,250.00 18,900.00 18,900.00 20,000.00 19,800.00
20,700.00 21,000.00 21,000.00 22,000.00 22,000.00
25,300.00 27,700.00 27,300.00 29,000.00 28,600.00
18,400.00 20,150.00 19,950.00 21,000.00 20,900.00
51,750.00 52,500.00 52,500.00 55,000.00 55,000.00
57,500.00 57,500.00 57,750.00 61,000.00 60,500.00
DEKAT SEDANG JAUH

- - -
- - -
54,050.00 57,000.00 56,700.00 60,000.00 59,400.00
29,900.00 32,500.00 32,550.00 34,000.00 34,100.00
23,000.00 24,000.00 24,150.00 25,300.00 25,300.00
54,050.00 56,000.00 56,700.00 60,000.00 59,400.00
18,400.00 20,000.00 19,950.00 21,000.00 20,900.00
34,500.00 35,500.00 35,700.00 37,500.00 37,400.00
11,500.00 12,000.00 12,075.00 12,700.00 12,650.00
- 9,000.00 9,030.00 9,500.00 9,460.00
19,550.00 20,000.00 19,950.00 21,000.00 20,900.00
18,400.00 19,300.00 19,950.00 21,000.00 20,900.00
8,050.00 8,600.00 8,610.00 9,050.00 9,020.00
10,350.00 10,800.00 10,815.00 11,350.00 11,330.00
55,200.00 57,000.00 57,750.00 60,500.00 60,500.00
23,000.00 24,000.00 24,150.00 25,300.00 25,300.00
35,650.00 39,900.00 39,900.00 42,000.00 41,800.00
- 39,900.00 39,900.00 42,000.00 41,800.00
4,025.00 4,200.00 4,200.00 4,400.00 4,400.00
18,400.00 21,000.00 21,000.00 22,000.00 22,000.00
- 26,200.00 26,250.00 27,500.00 27,500.00
28,750.00 30,000.00 29,400.00 31,000.00 30,800.00
- - -

- - -
- 101,800.00 101,850.00 107,000.00 106,700.00
- 94,500.00 94,500.00 99,000.00 99,000.00
- 115,500.00 115,500.00 121,000.00 121,000.00
81,650.00 89,250.00 89,250.00 94,000.00 93,500.00
94,300.00 102,500.00 102,900.00 108,000.00 107,800.00
241,500.00 252,000.00 252,000.00 264,000.00 264,000.00
184,000.00 200,000.00 199,500.00 210,000.00 209,000.00
92,000.00 100,000.00 99,750.00 105,000.00 104,500.00
51,750.00 54,500.00 54,600.00 58,000.00 57,200.00
40,250.00 44,100.00 44,100.00 56,500.00 46,200.00
14,375.00 15,000.00 15,015.00 15,750.00 15,730.00
8,625.00 9,450.00 9,450.00 9,900.00 9,900.00
115,000.00 120,000.00 120,750.00 127,000.00 126,500.00
6,900.00 7,350.00 7,350.00 7,700.00 7,700.00
5,750.00 6,300.00 6,300.00 6,600.00 6,600.00
11,500.00 12,000.00 12,075.00 12,650.00 12,650.00
5,750.00 6,300.00 6,300.00 6,600.00 6,600.00
11,500.00 12,000.00 12,075.00 12,650.00 12,650.00
14,950.00 16,000.00 16,275.00 17,050.00 17,050.00
385,250.00 420,000.00 420,000.00 440,000.00 440,000.00
- 210,000.00 210,000.00 220,000.00 220,000.00
- 1,575,000.00 1,575,000.00 1,650,000.00 1,650,000.00
- 800,000.00 787,500.00 825,000.00 825,000.00
79062.5

0.16
6.25 79062.5
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN : 2014
L O K A S I : KOTA JAMBI

Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5

PEKERJAAN PERSIAPAN

1 M' Pagar Sementara Dari Seng Gelombang Tinggi 2 Meter ( ** )


Kayu Dolken Btg 1.2500 8,000.00
Semen portland Kg 2.5000 1,440.00
Seng gelombang Lbr 1.2000 44,850.00
Bahan Pasir beton M3 0.0050 77,000.00
kerikil M3 0.0090 330,000.00
Kayu kelas II M3 0.0720 1,800,000.00
Paku biasa Kg 0.0500 18,000.00
Paku seng Kg 0.0100 25,000.00
Meni besi Kg 0.4500 52,000.00
Pekerja Oh 0.4000 70,000.00
Tukang kayu Oh 0.2000 90,000.00
Tenaga Kerja
Kepala tukang Oh 0.0200 100,000.00
Mandor Oh 0.0200 95,000.00
Jumlah harga persatuan pekerjaan
1 M' Pengukuran dan Pemasangan Bowplank ( ** )
Kayu kelas II M3 0.0120 1,800,000.00
Bahan Paku biasa 2"-5" Kg 0.0200 18,000.00
Kayu papan kelas III M3 0.0070 1,600,000.00
Pekerja Oh 0.1000 70,000.00
Tukang kayu Oh 0.1000 90,000.00
Tenaga Kerja
Kepala tukang Oh 0.0100 100,000.00
Mandor Oh 0.0050 95,000.00
tuan pekerjaan

PEKERJAAN TANAH

1 M3 Galian Tanah Biasa Sedalam 1 M (*)


Pekerja Oh 0.7500 70,000.00
Tenaga Kerja
Mandor Oh 0.0250 95,000.00
Jumlah harga persatuan pekerjaan
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
1 M3 Galian Tanah Biasa Sedalam 2 M (*)
Pekerja Oh 0.9000 70,000.00
Tenaga Kerja
Mandor Oh 0.0450 95,000.00
Jumlah harga persatuan pekerjaan
1 M3 Urugan Tanah Kembali (*)
Galian tanah sedalam 1 M M3 0.3330 54,875.00
Jumlah harga persatuan pekerjaan

1 M3 Timbunan Tanah dipadatkan ( pemadatan per 20 Cm ) (*)


Bahan Tanah M3 1.2500 50,000.00
Pekerja Oh 0.5000 70,000.00
Tenaga Kerja
Mandor Oh 0.0500 95,000.00
Jumlah harga persatuan pekerjaan
1 M3 Urugan Pasir (*)
Bahan Pasir Urug M3 1.2000 75,000.00
Pekerja Oh 0.3000 70,000.00
Tenaga Kerja
Mandor Oh 0.0100 95,000.00
Jumlah harga persatuan pekerjaan
1 M1 Pemancangan diatas tanah lunak ( *** )
Pekerja Oh 1.1700 70,000.00
Tenaga Kerja
Mandor Oh 0.6790 95,000.00
Jumlah harga persatuan pekerjaan
1 Btg Pemancangan Cerucuk Dia 12 Panjang 2M' ( *** )
Bahan Kayu Gelam dia. 12cm - 4 m Btg 0.5000 20,000.00
Tenaga Kerja Upah Pemancangan 0.5000 146,405.00
Jumlah harga persatuan pekerjaan

PEKERJAAN PONDASI

1 M3 Pasang pondasi batu bata, 1 Pc : 3 Ps ( *** )


Batu bata Bh 700.0000 600.00
Bahan Semen portland Zak 3.1820 72,000.00
Pasir Pasang M3 0.3780 77,000.00
Pekerja Oh 6.0000 70,000.00
Tukang Batu Oh 2.0000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.2000 100,000.00
Mandor Oh 0.3000 95,000.00
Jumlah harga persatuan pekerjaan
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5

PEKERJAAN BETON

1 M3 Membuat Beton Tumbuk, 1 Pc : 3 Ps : 5 Kr ( ** )


Semen portland Kg 218.0000 1,440.00
Bahan Pasir beton M3 0.5200 77,000.00
Kerikil M3 0.8700 330,000.00
Pekerja Oh 1.6500 70,000.00
Tukang Batu Oh 0.2500 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0250 100,000.00
Mandor Oh 0.0800 95,000.00
Jumlah harga persatuan pekerjaan

1 M3 Membuat Beton Mutu K 100 (*)


Semen portland Kg 247.0000 1,440.00
Pasir beton M3 0.6200 77,000.00
Bahan
Kerikil M3 0.7400 330,000.00
Air Ltr 215.0000 52.50
Pekerja Oh 1.6500 70,000.00
Tukang Batu Oh 0.2750 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0280 100,000.00
Mandor Oh 0.0830 95,000.00
Jumlah harga persatuan pekerjaan
1 M3 Membuat Lantai Kerja Beton Mutu K 100 (*)
Semen portland Kg 230.0000 1,440.00
Pasir beton M3 0.6378 77,000.00
Bahan
Kerikil M3 0.7614 330,000.00
Air Ltr 200.0000 52.50
Pekerja Oh 1.2000 70,000.00
Tukang Batu Oh 0.2000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0200 100,000.00
Mandor Oh 0.0600 95,000.00
Jumlah harga persatuan pekerjaan
1 M3 Membuat Beton Mutu K 125 (*)
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Semen portland Kg 276.0000 1,440.00
Pasir beton M3 0.5910 77,000.00
Bahan
Kerikil M3 0.7496 330,000.00
Air Ltr 215.0000 52.50
Pekerja Oh 1.6500 70,000.00
Tukang Batu Oh 0.2750 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0280 100,000.00
Mandor Oh 0.0830 95,000.00
Jumlah harga persatuan pekerjaan
1 M3 Membuat Beton Mutu K 150 (*)
Semen portland Kg 299.0000 1,440.00
Pasir beton M3 0.5707 77,000.00
Bahan
Kerikil M3 0.7533 330,000.00
Air Ltr 215.0000 52.50
Pekerja Oh 1.6500 70,000.00
Tukang Batu Oh 0.2750 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0280 100,000.00
Mandor Oh 0.0830 95,000.00
Jumlah harga persatuan pekerjaan

1 M3 Membuat Beton Mutu K 200 (*)


Semen portland Kg 352.0000 1,440.00
Pasir beton M3 0.5221 77,000.00
Bahan
Kerikil M3 0.7637 330,000.00
Air Ltr 215.0000 52.50
Pekerja Oh 1.6500 70,000.00
Tukang Batu Oh 0.2750 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0280 100,000.00
Mandor Oh 0.0830 95,000.00
Jumlah harga persatuan pekerjaan
1 Kg Pembesian Dengan Besi Polos (*)
Besi Beton (polos) Kg 1.0500 11,000.00
Bahan
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Bahan
Kawat beton Kg 0.0150 18,000.00
Pekerja Oh 0.0070 70,000.00
Tukang Besi Oh 0.0070 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0007 100,000.00
Mandor Oh 0.0004 95,000.00
Jumlah harga persatuan pekerjaan
1 Kg Pembesian Dengan Besi Ulir (*)
Besi Beton (ulir) Kg 1.0500 13,000.00
Bahan
Kawat beton Kg 0.0150 18,000.00
Pekerja Oh 0.0070 70,000.00
Tukang Besi Oh 0.0070 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0007 100,000.00
Mandor Oh 0.0004 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Bekisting Untuk Pondasi (*)
Kayu Papan kelas III M3 0.0400 1,600,000.00
Bahan Paku biasa 2" - 5" Kg 0.3000 18,000.00
Minyak bekisting Ltr 0.1000 12,500.00
Pekerja Oh 0.5200 70,000.00
Tukang Kayu Oh 0.2600 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0260 100,000.00
Mandor Oh 0.0260 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Bekisting Untuk Sloof (*)
Kayu Papan kelas III M3 0.0450 1,600,000.00
Bahan Paku biasa 2" - 5" Kg 0.3000 18,000.00
Minyak bekisting Ltr 0.1000 12,500.00
Pekerja Oh 0.5200 70,000.00
Tukang Kayu Oh 0.2600 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0260 100,000.00
Mandor Oh 0.0260 95,000.00
Jumlah harga persatuan pekerjaan

1 M2 Pasang Bekisting Untuk Kolom (*)


Kayu Papan kelas III M3 0.0400 1,600,000.00
Paku biasa 2" - 5" Kg 0.4000 18,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Minyak bekisting Ltr 0.2000 12,500.00
Bahan
Kayu Balok Kelas III M3 0.0150 1,600,000.00
Plywood tebal 9 mm Lbr 0.3500 150,000.00
Dolken kayu galam Ø 8 - 10/4 m Btg 2.0000 8,000.00
Pekerja Oh 0.6600 70,000.00
Tukang Kayu Oh 0.3300 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0330 100,000.00
Mandor Oh 0.0330 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Bekisting Untuk Balok (*)
Kayu Papan kelas III M3 0.0400 1,600,000.00
Paku biasa 2" - 5" Kg 0.4000 18,000.00
Minyak bekisting Ltr 0.2000 12,500.00
Bahan
Kayu Balok Kelas III M3 0.0180 1,600,000.00
Plywood tebal 9 mm Lbr 0.3500 150,000.00
Dolken kayu galam Ø 8 - 10/4 m Btg 2.0000 8,000.00
Pekerja Oh 0.6600 70,000.00
Tukang Kayu Oh 0.3300 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0330 100,000.00
Mandor Oh 0.0330 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Bekisting Untuk Plat Lantai (*)
Kayu Papan kelas III M3 0.0400 1,600,000.00
Paku biasa 2" - 5" Kg 0.4000 18,000.00
Minyak bekisting Ltr 0.2000 12,500.00
Bahan
Kayu Balok Kelas III M3 0.0150 1,600,000.00
Plywood tebal 9 mm Lbr 0.3500 150,000.00
Dolken kayu galam Ø 8 - 10/4 m Btg 6.0000 8,000.00
Pekerja Oh 0.6600 70,000.00
Tukang Kayu Oh 0.3300 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0330 100,000.00
Mandor Oh 0.0330 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Bekisting Untuk Dinding (*)
Kayu Papan kelas III M3 0.0300 1,600,000.00
Paku biasa 2" - 5" Kg 0.4000 18,000.00
Minyak bekisting Ltr 0.2000 12,500.00
Bahan
Kayu Balok Kelas III M3 0.0200 1,600,000.00
Plywood tebal 9 mm Lbr 0.3500 150,000.00
Dolken kayu galam Ø 8 - 10/4 m Btg 3.0000 8,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Formtie/penjaga jarak bekisting/spacer Bh 4.0000 5,750.00
Pekerja Oh 0.6600 70,000.00
Tukang Kayu Oh 0.3300 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0330 100,000.00
Mandor Oh 0.0330 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Bekisting Untuk Tangga (*)
Kayu Papan kelas III M3 0.0300 1,600,000.00
Paku biasa 2" - 5" Kg 0.4000 18,000.00
Minyak bekisting Ltr 0.1500 12,500.00
Bahan
Kayu Balok Kelas III M3 0.0150 1,600,000.00
Plywood tebal 9 mm Lbr 0.3500 150,000.00
Dolken kayu galam Ø 8 - 10/4 m Btg 2.0000 8,000.00
Pekerja Oh 0.6600 70,000.00
Tukang Kayu Oh 0.3300 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0330 100,000.00
Mandor Oh 0.0330 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Jembatan Untuk Pengecoran Beton (*)
Kayu Papan kelas III M3 0.0264 1,600,000.00
Bahan Paku biasa 2" - 5" Kg 0.6000 18,000.00
Dolken kayu galam Ø 8 - 10/4 m Btg 0.5000 8,000.00
Pekerja Oh 0.1500 70,000.00
Tukang Kayu Oh 0.0500 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0050 100,000.00
Mandor Oh 0.0080 95,000.00
Jumlah harga persatuan pekerjaan
1 M3 Membuat Pondasi Beton Bertulang (150 Kg besi + bekisting) (*)
Kayu kelas III M3 0.2000 1,600,000.00
Paku biasa 2" - 5" Kg 1.5000 18,000.00
Minyak bekisting Ltr 0.4000 12,500.00
Besi beton polos Kg 157.5000 11,000.00
Bahan
Kawat beton Kg 2.2500 18,000.00
Semen portland Kg 336.0000 1,440.00
Pasir beton M3 0.5400 77,000.00
Kerikil M3 0.8100 330,000.00
Pekerja Oh 5.3000 70,000.00
Tukang Batu Oh 0.2750 90,000.00
Tukang Kayu Oh 1.3000 90,000.00
Tenaga Kerja
Tukang Besi Oh 1.0500 90,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Kepala Tukang Oh 0.2620 100,000.00
Mandor Oh 0.2650 95,000.00
Jumlah harga persatuan pekerjaan

1 M3 Membuat Sloof Beton Bertulang (110 Kg besi + bekisting) (*)


Kayu kelas III M3 0.2700 1,600,000.00
Paku biasa 2" - 5" Kg 2.0000 18,000.00
Minyak bekisting Ltr 0.6000 12,500.00
Besi beton polos Kg 115.5000 11,000.00
Bahan
Kawat beton Kg 1.7325 18,000.00
Semen portland Kg 336.0000 1,440.00
Pasir beton M3 0.5400 77,000.00
Kerikil M3 0.8100 330,000.00
Pekerja Oh 5.6500 70,000.00
Tukang Batu Oh 0.2750 90,000.00
Tukang Kayu Oh 1.5600 90,000.00
Tenaga Kerja
Tukang Besi Oh 1.4000 90,000.00
Kepala Tukang Oh 0.3230 100,000.00
Mandor Oh 0.2830 95,000.00
Jumlah harga persatuan pekerjaan
1 M3 Membuat Kolom Beton Bertulang (130 Kg besi + bekisting) (*)
Kayu kelas III M3 0.4000 1,600,000.00
Paku biasa 2" - 5" Kg 4.0000 18,000.00
Minyak bekisting Ltr 2.0000 12,500.00
Besi beton polos Kg 135.5000 11,000.00
Bahan
Kawat beton Kg 2.0325 18,000.00
Semen portland Kg 336.0000 1,440.00
Pasir beton M3 0.5400 77,000.00
Kerikil M3 0.8100 330,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Kayu kelas II M3 0.1500 1,800,000.00
Plywood 9 mm Lbr 3.5000 150,000.00
Dolken Ø 8 cm/4 m Btg 20.0000 8,000.00
Pekerja Oh 7.0500 70,000.00
Tukang Batu Oh 0.2750 90,000.00
Tenaga Kerja Tukang Kayu Oh 1.6500 90,000.00
Tukang Besi Oh 2.1000 90,000.00
Kepala Tukang Oh 0.4030 100,000.00
Mandor Oh 0.3530 95,000.00
Jumlah harga persatuan pekerjaan

1 M3 Membuat Kolom Beton Bertulang (150 Kg besi + bekisting) (*)


Kayu kelas III M3 0.4000 1,600,000.00
Paku biasa 2" - 5" Kg 4.0000 18,000.00
Minyak bekisting Ltr 2.0000 12,500.00
Besi beton polos Kg 157.5000 11,000.00
Bahan
Kawat beton Kg 2.2500 18,000.00
Semen portland Kg 336.0000 1,440.00
Pasir beton M3 0.5400 77,000.00
Kerikil M3 0.8100 330,000.00
Kayu kelas II M3 0.1500 1,800,000.00
Plywood 9 mm Lbr 3.5000 150,000.00
Dolken Ø 8 cm/4 m Btg 20.0000 8,000.00
Pekerja Oh 7.0500 70,000.00
Tukang Batu Oh 0.2750 90,000.00
Tenaga Kerja Tukang Kayu Oh 1.6500 90,000.00
Tukang Besi Oh 2.1000 90,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Kepala Tukang Oh 0.4030 100,000.00
Mandor Oh 0.3530 95,000.00
Jumlah harga persatuan pekerjaan
1 M3 Membuat Balok Beton Bertulang (190 Kg besi + bekisting) (*)
Kayu kelas III M3 0.3200 1,600,000.00
Paku biasa 2" - 5" Kg 3.2000 18,000.00
Minyak bekisting Ltr 1.6000 12,500.00
Besi beton polos Kg 195.5000 11,000.00
Bahan
Kawat beton Kg 2.9325 18,000.00
Semen portland Kg 336.0000 1,440.00
Pasir beton M3 0.5400 77,000.00
Kerikil M3 0.8100 330,000.00
Kayu kelas II M3 0.1400 1,800,000.00
Plywood 9 mm Lbr 2.8000 150,000.00
Dolken Ø 8 cm/4 m Btg 16.0000 8,000.00
Pekerja Oh 6.3500 70,000.00
Tukang Batu Oh 0.2750 90,000.00
Tenaga Kerja Tukang Kayu Oh 1.6500 90,000.00
Tukang Besi Oh 1.4000 90,000.00
Kepala Tukang Oh 0.3330 100,000.00
Mandor Oh 0.3180 95,000.00
Jumlah harga persatuan pekerjaan

1 M3 Membuat Balok Beton Bertulang (170 Kg besi + bekisting) (*)


Kayu kelas III M3 0.3200 1,600,000.00
Paku biasa 2" - 5" Kg 3.2000 18,000.00
Minyak bekisting Ltr 1.6000 12,500.00
Besi beton polos Kg 175.5000 11,000.00
Bahan
Kawat beton Kg 2.6325 18,000.00
Semen portland Kg 336.0000 1,440.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Pasir beton M3 0.5400 77,000.00
Kerikil M3 0.8100 330,000.00
Kayu kelas II M3 0.1400 1,800,000.00
Plywood 9 mm Lbr 2.8000 150,000.00
Dolken Ø 8 cm/4 m Btg 16.0000 8,000.00
Pekerja Oh 6.3500 70,000.00
Tukang Batu Oh 0.2750 90,000.00
Tenaga Kerja Tukang Kayu Oh 1.6500 90,000.00
Tukang Besi Oh 1.4000 90,000.00
Kepala Tukang Oh 0.3330 100,000.00
Mandor Oh 0.3180 95,000.00
Jumlah harga persatuan pekerjaan
1 M3 Membuat Balok Beton Bertulang (150 Kg besi + bekisting) (*)
Kayu kelas III M3 0.3200 1,600,000.00
Paku biasa 2" - 5" Kg 3.2000 18,000.00
Minyak bekisting Ltr 1.6000 12,500.00
Besi beton polos Kg 157.5000 11,000.00
Bahan
Kawat beton Kg 2.2500 18,000.00
Semen portland Kg 323.0000 1,440.00
Pasir beton M3 0.5400 77,000.00
Kerikil M3 0.8100 330,000.00
Kayu kelas II M3 0.1400 1,800,000.00
Plywood 9 mm Lbr 2.8000 150,000.00
Dolken Ø 8 cm/4 m Btg 16.0000 8,000.00
Pekerja Oh 6.3500 70,000.00
Tukang Batu Oh 0.2750 90,000.00
Tenaga Kerja Tukang Kayu Oh 1.6500 90,000.00
Tukang Besi Oh 1.4000 90,000.00
Kepala Tukang Oh 0.3330 100,000.00
Mandor Oh 0.3180 95,000.00
Jumlah harga persatuan pekerjaan
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5

1 M3 Membuat Balok Beton Bertulang (100 Kg besi + bekisting) (*)


Kayu kelas III M3 0.3200 1,600,000.00
Paku biasa 2" - 5" Kg 3.2000 18,000.00
Minyak bekisting Ltr 1.6000 12,500.00
Besi beton polos Kg 105.5000 11,000.00
Bahan
Kawat beton Kg 1.5825 18,000.00
Semen portland Kg 323.0000 1,440.00
Pasir beton M3 0.5400 77,000.00
Kerikil M3 0.8100 330,000.00
Kayu kelas II M3 0.1400 1,800,000.00
Plywood 9 mm Lbr 2.8000 150,000.00
Dolken Ø 8 cm/4 m Btg 16.0000 8,000.00
Pekerja Oh 6.3500 70,000.00
Tukang Batu Oh 0.2750 90,000.00
Tenaga Kerja Tukang Kayu Oh 1.6500 90,000.00
Tukang Besi Oh 1.4000 90,000.00
Kepala Tukang Oh 0.3330 100,000.00
Mandor Oh 0.3180 95,000.00
Jumlah harga persatuan pekerjaan
1 M3 Membuat Balok Beton Bertulang (110 Kg besi + bekisting) (*)
Kayu kelas III M3 0.3200 1,600,000.00
Paku biasa 2" - 5" Kg 3.2000 18,000.00
Minyak bekisting Ltr 1.6000 12,500.00
Besi beton polos Kg 115.5000 11,000.00
Bahan
Kawat beton Kg 1.7325 18,000.00
Semen portland Kg 323.0000 1,440.00
Pasir beton M3 0.5400 77,000.00
Kerikil M3 0.8100 330,000.00
Kayu kelas II M3 0.1400 1,800,000.00
Plywood 9 mm Lbr 2.8000 150,000.00
Dolken Ø 8 cm/4 m Btg 16.0000 8,000.00
Pekerja Oh 6.3500 70,000.00
Tukang Batu Oh 0.2750 90,000.00
Tenaga Kerja Tukang Kayu Oh 1.6500 90,000.00
Tukang Besi Oh 1.4000 90,000.00
Kepala Tukang Oh 0.3330 100,000.00
Mandor Oh 0.3180 95,000.00
Jumlah harga persatuan pekerjaan
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5

1 M3 Membuat Dinding Beton Bertulang (150 Kg besi + bekisting) (*)


Kayu kelas III M3 0.2400 1,600,000.00
Paku biasa 2" - 5" Kg 3.2000 18,000.00
Minyak bekisting Ltr 1.6000 12,500.00
Besi beton polos Kg 157.5000 11,000.00
Bahan
Kawat beton Kg 2.2500 18,000.00
Semen portland Kg 336.0000 1,440.00
Pasir beton M3 0.5400 77,000.00
Kerikil M3 0.8100 330,000.00
Kayu kelas II M3 0.1600 1,800,000.00
Plywood 9 mm Lbr 2.8000 150,000.00
Dolken Ø 8 cm/4 m Btg 24.0000 8,000.00
Pekerja Oh 5.3000 70,000.00
Tukang Batu Oh 0.2750 90,000.00
Tenaga Kerja Tukang Kayu Oh 1.3000 90,000.00
Tukang Besi Oh 1.0500 90,000.00
Kepala Tukang Oh 0.2620 100,000.00
Mandor Oh 0.2650 95,000.00
Jumlah harga persatuan pekerjaan
1 M3 Membuat Dinding Beton Bertulang (200 Kg besi + bekisting) (*)
Kayu kelas III M3 0.2500 1,600,000.00
Paku biasa 2" - 5" Kg 3.0000 18,000.00
Minyak bekisting Ltr 1.2000 12,500.00
Besi beton polos Kg 210.0000 11,000.00
Bahan
Kawat beton Kg 3.0000 18,000.00
Semen portland Kg 336.0000 1,440.00
Pasir beton M3 0.5400 77,000.00
Kerikil M3 0.8100 330,000.00
Kayu kelas II M3 0.1050 1,800,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Plywood 9 mm Lbr 2.5000 150,000.00
Dolken Ø 8 cm/4 m Btg 14.0000 8,000.00
Pekerja Oh 5.6500 70,000.00
Tukang Batu Oh 0.2750 90,000.00
Tenaga Kerja Tukang Kayu Oh 1.5600 90,000.00
Tukang Besi Oh 1.4000 90,000.00
Kepala Tukang Oh 0.3230 100,000.00
Mandor Oh 0.2820 95,000.00
Jumlah harga persatuan pekerjaan

1 M' Membuat Kolom Praktis Beton Bertulang (11 x 11) Cm (*)


Kayu kelas III M3 0.0020 1,600,000.00
Paku biasa 2" - 5" Kg 0.0100 18,000.00
Besi beton polos Kg 3.0000 11,000.00
Bahan
Kawat beton Kg 0.4500 18,000.00
Semen portland Kg 4.0000 1,440.00
Pasir beton M3 0.0060 77,000.00
Kerikil M3 0.0090 330,000.00
Pekerja Oh 0.1800 70,000.00
Tukang Batu Oh 0.0200 90,000.00
Tenaga Kerja Tukang Kayu Oh 0.0200 90,000.00
Tukang Besi Oh 0.0200 90,000.00
Kepala Tukang Oh 0.0060 100,000.00
Mandor Oh 0.0090 95,000.00
Jumlah harga persatuan pekerjaan
1 M' Membuat Rink Balok Beton Bertulang (10 x 15) Cm (*)
Kayu kelas III M3 0.0030 1,600,000.00
Paku biasa 2" - 5" Kg 0.0200 18,000.00
Besi beton polos Kg 3.6000 11,000.00
Bahan
Kawat beton Kg 0.0500 18,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Semen portland Kg 5.5000 1,440.00
Pasir beton M3 0.0090 77,000.00
Kerikil M3 0.0150 330,000.00
Pekerja Oh 0.2970 70,000.00
Tukang Batu Oh 0.0330 90,000.00
Tenaga Kerja Tukang Kayu Oh 0.0330 90,000.00
Tukang Besi Oh 0.0330 90,000.00
Kepala Tukang Oh 0.0100 100,000.00
Mandor Oh 0.0150 95,000.00
Jumlah harga persatuan pekerjaan
1 M3 Membuat Plat Beton Bertulang (150 kg besi + bekisting)
Kayu papan Kelas III M3 0.3200 1,600,000.00
Paku 5 cm - 12 cm Kg 3.2000 18,000.00
Minyak Bekisting Ltr 1.6000 12,500.00
Besi Beton Polos Kg 157.5000 11,000.00
Bahan
Kawat Beton Kg 2.2500 18,000.00
Semen portland Kg 336.0000 1,440.00
Pasir beton M3 0.5400 77,000.00
Kerikil M3 0.8100 330,000.00
Kayu Kelas II balok M3 0.1200 1,800,000.00
Plywood 9 mm Lbr 2.8000 150,000.00
Dolken Kayu Galam Btg 32.0000 8,000.00
Pekerja Oh 5.3000 70,000.00
Tukang Batu Oh 0.2750 90,000.00
Tenaga Kerja Tukang Kayu Oh 1.3000 90,000.00
Tukang Besi Oh 1.0500 90,000.00
Kepala Tukang Oh 0.2650 100,000.00
Mandor Oh 0.2650 95,000.00
Jumlah harga persatuan pekerjaan

PEKERJAAN DINDING

1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 2 Ps (*)


Bata merah 5x11x22 Cm Bh 70.0000 600.00
Bahan Semen portland Kg 18.9500 1,440.00
Pasir pasang M3 0.0380 77,000.00
Pekerja Oh 0.3000 70,000.00
Tukang Batu Oh 0.1000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0100 100,000.00
Mandor Oh 0.0150 95,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Jumlah harga persatuan pekerjaan
1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 3 Ps (*)
Bata merah 5x11x22 Cm Bh 70.0000 600.00
Bahan Semen portland Kg 14.3700 1,440.00
Pasir pasang M3 0.0400 77,000.00
Pekerja Oh 0.3000 70,000.00
Tukang Batu Oh 0.1000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0100 100,000.00
Mandor Oh 0.0150 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasangan Bata Merah Tebal 1/2 Bata, 1 Pc : 4 Ps (*)
Bata merah 5x11x22 Cm Bh 70.0000 600.00
Bahan Semen portland Kg 11.5000 1,440.00
Pasir pasang M3 0.0430 77,000.00
Pekerja Oh 0.3000 70,000.00
Tukang Batu Oh 0.1000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0100 100,000.00
Mandor Oh 0.0150 95,000.00
Jumlah harga persatuan pekerjaan

PEKERJAAN PLESTERAN

1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm (*)


Semen portland Kg 10.2240 1,440.00
Bahan
Pasir Pasang M3 0.0200 77,000.00
Pekerja Oh 0.3000 70,000.00
Tukang Batu Oh 0.1500 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0150 100,000.00
Mandor Oh 0.0150 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Plesteran 1 Pc : 3 Ps, Tebal 15 mm (*)
Semen portland Kg 7.7760 1,440.00
Bahan
Pasir Pasang M3 0.0230 77,000.00
Pekerja Oh 0.3000 70,000.00
Tukang Batu Oh 0.1500 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0150 100,000.00
Mandor Oh 0.0150 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm (*)
Semen portland Kg 6.2400 1,440.00
Bahan
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Bahan
Pasir Pasang M3 0.0240 77,000.00
Pekerja Oh 0.3000 70,000.00
Tukang Batu Oh 0.1500 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0150 100,000.00
Mandor Oh 0.0150 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Acian (*)
Bahan Semen portland Kg 3.2500 1,440.00
Pekerja Oh 0.2000 70,000.00
Tukang Batu Oh 0.1000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0100 100,000.00
Mandor Oh 0.0100 95,000.00
Jumlah harga persatuan pekerjaan

PEKERJAAN KAYU

1 M3 Pasang Kusen Pintu dan Jendela Kayu Kelas I (*)


Kayu kelas I, balok M3 1.1000 6,000,000.00
Bahan Paku biasa Kg 1.2500 18,000.00
Lem kayu Kg 1.0000 18,000.00
Pekerja Oh 7.0000 70,000.00
Tukang Kayu Oh 21.0000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 2.1000 100,000.00
Mandor Oh 0.3500 95,000.00
Jumlah harga persatuan pekerjaan
1 M3 Pasang Kusen Pintu dan Jendela Kayu Kelas II (*)
Kayu kelas II, balok M3 1.2000 1,800,000.00
Bahan Paku biasa Kg 1.2500 18,000.00
Lem kayu Kg 1.0000 18,000.00
Pekerja Oh 6.0000 70,000.00
Tukang Kayu Oh 18.0000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 1.8000 100,000.00
Mandor Oh 0.3000 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Pintu Panel Kayu Kelas I (*)
Kayu kelas I, papan M3 0.0400 8,400,000.00
Bahan
Lem kayu Kg 0.5000 18,000.00
Pekerja Oh 1.0000 70,000.00
Tenaga Kerja Tukang Kayu Oh 3.0000 90,000.00
Kepala Tukang Oh 0.3000 100,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Mandor Oh 0.0500 95,000.00
Jumlah harga persatuan pekerjaan

1 M2 Pasang Pintu Panel Kayu Kelas II (*)


Kayu Kelas II, papan M3 0.0400 1,950,000.00
Bahan
Lem kayu Kg 0.5000 18,000.00
Pekerja Oh 1.0000 70,000.00
Tukang Kayu Oh 3.0000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.3000 100,000.00
Mandor Oh 0.0500 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Pintu dan Jendela Kaca Kayu Kelas I (*)
Papan kelas I M3 0.0240 8,400,000.00
Bahan Lem kayu Kg 0.3000 18,000.00
Kaca 5 mm M2 0.8100 138,000.00
Pekerja Oh 0.8100 70,000.00
Tukang Kayu Oh 2.5200 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.2520 100,000.00
Mandor Oh 0.0460 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Pintu dan Jendela Kaca Kayu Kelas II (*)
Papan kelas II M3 0.0240 1,950,000.00
Bahan Lem kayu Kg 0.3000 18,000.00
Kaca 5 mm M2 0.8100 138,000.00
Pekerja Oh 0.8100 70,000.00
Tukang Kayu Oh 2.5200 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.2520 100,000.00
Mandor Oh 0.0460 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Jalusi Mati Kusen Kayu Kelas II (*)
Papan kelas II M3 0.0150 1,950,000.00
Bahan
Paku triplek Kg 0.1500 25,000.00
Pekerja Oh 0.6700 70,000.00
Tukang Kayu Oh 2.0000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.2000 100,000.00
Mandor Oh 0.3350 95,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
tuan pekerjaan
1 M3 Pasang Konstruksi Kuda-Kuda Konvensional, Kayu Kelas II (*)
Balok klas II M3 1.1000 1,800,000.00
Bahan Besi strip tebal 5 mm Kg 15.0000 13,800.00
Paku biasa Kg 5.6000 18,000.00
Pekerja Oh 4.0000 70,000.00
Tukang Kayu Oh 12.0000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 1.2000 100,000.00
Mandor Oh 0.2000 95,000.00
Jumlah harga persatuan pekerjaan

1 M3 Pasang Konstruksi Gordeng, Kayu Kelas II (*)


Balok klas II M3 1.1000 1,800,000.00
Bahan Besi strip tebal 5 mm Kg 15.0000 13,800.00
Paku biasa Kg 3.0000 18,000.00
Pekerja Oh 2.4000 70,000.00
Tukang Kayu Oh 7.2000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.7200 100,000.00
Mandor Oh 0.1200 95,000.00
Jumlah harga persatuan pekerjaan
1 M' Pasang Listplank Ukuran (2 x 20) Cm Kayu Kelas I
papan Kayu klas I M3 0.0086 8,400,000.00
Bahan
Paku biasa 2" - 5" Kg 0.0600 18,000.00
Pekerja Oh 0.1000 70,000.00
Tukang Kayu Oh 0.1000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0100 100,000.00
Mandor Oh 0.0500 95,000.00
Jumlah harga persatuan pekerjaan
1 M' Pasang Listplank GRC 8 mm
Lisplank GRC Kpg 0.9500 58,000.00
Bahan
Paku biasa Kg 0.0600 18,000.00
Pekerja Oh 0.1000 70,000.00
Tukang Kayu Oh 0.1000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0100 100,000.00
Mandor Oh 0.0500 95,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Jumlah harga persatuan pekerjaan

PEKERJAAN PENUTUP ATAP

1 M2 Pasang Atap Genteng Metal ( ** )


Genteng Metal M2 1.0200 70,000.00
Bahan
Paku Kg 0.2000 25,000.00
Pekerja Oh 0.2000 70,000.00
Tukang Kayu Oh 0.1000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0100 100,000.00
Mandor Oh 0.0010 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 ATAP SENG GELOMBANG BJLS 20 ( ** )
Seng gelombang BJLS 20 Lbr 0.7000 44,850.00
Bahan
Paku seng Kg 0.0200 25,000.00
Pekerja Oh 0.1200 70,000.00
Tukang Kayu Oh 0.0600 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0060 100,000.00
Mandor Oh 0.0060 95,000.00
Jumlah harga persatuan pekerjaan

1 M2 Pasang Atap Seng Metal ( ** )


Seng Metal Lbr 0.7000 57,500.00
Bahan
Paku Kg 0.0200 25,000.00
Pekerja Oh 0.1200 70,000.00
Tukang Kayu Oh 0.0600 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0060 100,000.00
Mandor Oh 0.0060 95,000.00
Jumlah harga persatuan pekerjaan
1 M' Pasang Nok Genteng Metal ( ** )
Nok genteng metal M1 1.1000 32,500.00
Bahan
Paku genteng Kg 0.1000 25,000.00
Pekerja Oh 0.2500 70,000.00
Tukang Kayu Oh 0.1500 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0150 100,000.00
Mandor Oh 0.0130 95,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Jumlah harga persatuan pekerjaan
1 M' Pasang Bubungan Seng BJLS 30 ( *** )
Seng plat BJLS 30 M1 1.1000 18,000.00
Bahan Paku seng Kg 0.1000 25,000.00
Papan kelas II M3 0.0030 1,950,000.00
Pekerja Oh 0.0250 70,000.00
Tukang Oh 0.0025 90,000.00
Tenaga Kerja
Mandor Oh 0.0250 95,000.00
Jumlah harga persatuan pekerjaan
1 M' Pasang Nok Seng Metal
Nok seng metal M1 1.1000 32,500.00
Bahan Paku Kg 0.1000 25,000.00
Papan kelas II M3 0.0030 1,950,000.00
Pekerja Oh 0.0250 70,000.00
Tukang Oh 0.0025 90,000.00
Tenaga Kerja
Mandor Oh 0.0250 95,000.00
Jumlah harga persatuan pekerjaan
1 M' Pasang Talang 1/2 Lingkaran D-15 Cm, Seng BJLS 28 (*)
Seng plat M1 1.0500 18,000.00
Paku biasa Kg 0.0100 18,000.00
Bahan
Kayu papan kelas II M3 0.0190 1,950,000.00
Besi strip Kg 0.5000 13,800.00
Pekerja Oh 0.1500 70,000.00
Tukang kayu Oh 0.3000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0300 100,000.00
Mandor Oh 0.0080 95,000.00
Jumlah harga persatuan pekerjaan

PEKERJAAN LANGIT-LANGIT

1 M2 Pasang Rangka Langit-Langit (50 x 100) Cm (*)


Balok kayu klas II M3 0.0154 1,800,000.00
Bahan
Paku biasa Kg 0.2000 18,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Pekerja Oh 0.1500 70,000.00
Tukang Kayu Oh 0.3000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0300 100,000.00
Mandor Oh 0.0750 95,000.00
tuan pekerjaan
1 M2 Pasang Langit-Langit Triplek 3.6 mm (*)
Triplek Lbr 0.3750 72,000.00
Bahan
Paku Halus Kg 0.0300 25,000.00
Pekerja Oh 0.1000 70,000.00
Tukang Kayu Oh 0.1000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0100 100,000.00
Mandor Oh 0.0050 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Langit-Langit GRC 3.6 mm (*)
GRC Lbr 0.3750 72,500.00
Bahan
Paku GRC Kg 0.0300 25,000.00
Pekerja Oh 0.1000 70,000.00
Tukang Kayu Oh 0.1000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0100 100,000.00
Mandor Oh 0.0050 95,000.00
tuan pekerjaan
1 M' List Plafond Gipsum Propil (*)
List propil gipsum M1 1.0500 35,000.00
Bahan
Tepung gipsum Kg 0.1500 4,600.00
Pekerja Oh 0.0600 70,000.00
Tukang Kayu Oh 0.0600 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0060 100,000.00
Mandor Oh 0.0030 95,000.00
Jumlah harga persatuan pekerjaan
1 M' List Langit-Langit Kayu Profil (*)
List kayu profil M' 1.0500 4,500.00
Bahan
Paku Kg 0.0100 18,000.00
Pekerja Oh 0.0500 70,000.00
Tukang Kayu Oh 0.0500 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0050 100,000.00
Mandor Oh 0.0030 95,000.00
Jumlah harga persatuan pekerjaan
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5

PEK. PENUTUP LANTAI

1 M2 Pasang Lantai Keramik 20 x 20 Cm Putih (*)


Keramik 20 x 20 Cm Bh 26.5000 2,160.00
Semen portland Kg 10.4000 1,440.00
Bahan
Pasir pasang M3 0.0450 77,000.00
Semen warna Kg 1.6200 2,600.00
Pekerja Oh 0.7000 70,000.00
Tukang batu Oh 0.3500 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0350 100,000.00
Mandor Oh 0.0350 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Lantai Keramik 20 x 20 Cm Warna (*)
Keramik 20 x 20 Cm Bh 26.5000 2,280.00
Semen portland Kg 10.4000 1,440.00
Bahan
Pasir pasang M3 0.0450 77,000.00
Semen warna Kg 1.6200 2,600.00
Pekerja Oh 0.7000 70,000.00
Tukang batu Oh 0.3500 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0350 100,000.00
Mandor Oh 0.0350 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Lantai Keramik 30 x 30 Cm Putih (*)
Keramik 30 x 30 Cm Bh 11.8700 4,181.82
Semen portland Kg 10.0000 1,440.00
Bahan
Pasir pasang M3 0.0450 77,000.00
Semen warna Kg 1.5000 2,600.00
Pekerja Oh 0.7000 70,000.00
Tukang batu Oh 0.3500 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0350 100,000.00
Mandor Oh 0.0350 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Lantai Keramik 30 x 30 Cm Warna (*)
Keramik 30 x 30 Cm Bh 11.8700 5,000.00
Semen portland Kg 10.0000 1,440.00
Bahan
Pasir pasang M3 0.0450 77,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Semen warna Kg 1.5000 2,600.00
Pekerja Oh 0.7000 70,000.00
Tukang batu Oh 0.3500 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0350 100,000.00
Mandor Oh 0.0350 95,000.00
Jumlah harga persatuan pekerjaan

1 M2 Pasang Lantai Keramik 30 x 30 Cm Motif Jeruk (*)


Keramik 30 x 30 Cm Bh 11.8700 5,181.82
Bahan Semen portland Kg 10.0000 1,440.00
Pasir pasang M3 0.0450 77,000.00
Semen warna Kg 1.5000 2,600.00
Pekerja Oh 0.7000 70,000.00
Tenaga Kerja Tukang batu Oh 0.3500 90,000.00
Kepala Tukang Oh 0.0350 100,000.00
Mandor Oh 0.0350 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Lantai Keramik 40 x 40 Cm Polos (*)
Keramik 40 x 40 Cm Bh 6.6300 13,166.67
Semen portland Kg 9.8000 1,440.00
Bahan
Pasir pasang M3 0.0450 77,000.00
Semen warna Kg 1.3000 2,600.00
Pekerja Oh 0.2500 70,000.00
Tukang batu Oh 0.1250 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0130 100,000.00
Mandor Oh 0.0130 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Dinding Keramik 20 x 25 Cm (*)
Keramik 20 x 25 Cm Bh 20.0000 3,250.00
Semen portland Kg 9.3000 1,440.00
Bahan
Pasir pasang M3 0.0180 77,000.00
Semen warna Kg 2.7500 2,600.00
Pekerja Oh 0.9000 70,000.00
Tukang batu Oh 0.4500 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0450 100,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Mandor Oh 0.0450 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Dinding Keramik 20 x 20 Cm (*)
Keramik 20 x 20 Cm Bh 26.5000 28,500.00
Bahan Semen portland Kg 9.3000 1,440.00
Pasir pasang M3 0.0180 77,000.00
Semen warna Kg 1.9400 2,600.00
Pekerja Oh 0.9000 70,000.00
Tenaga Kerja Tukang batu Oh 0.4500 90,000.00
Kepala Tukang Oh 0.0450 100,000.00
Mandor Oh 0.0450 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Dinding Batu Tempel Hitam (*)
Batu tempel Andesit M2 1.1000 175,000.00
Bahan Semen portland Kg 11.7500 1,440.00
Pasir pasang M3 0.0350 77,000.00
Pekerja Oh 0.6200 70,000.00
Tukang batu Oh 0.3500 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0350 100,000.00
Mandor Oh 0.0350 95,000.00
Jumlah harga persatuan pekerjaan
1 M' Pasang Plint Keramik 10 x 40 Cm Polos (*)
Plint keramik 10 x 40 Cm Bh 2.6500 3,000.00
Semen portland Kg 1.1400 1,440.00
Bahan
Pasir pasang M3 0.0030 77,000.00
Semen warna Kg 0.1000 2,600.00
Pekerja Oh 0.0900 70,000.00
Tukang batu Oh 0.0900 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0090 100,000.00
Mandor Oh 0.0050 95,000.00
Jumlah harga persatuan pekerjaan

PEKERJAAN SANITAIR

Memasang 1 Buah Kloset Jongkok Keramik Biasa ( ** )


Kloset jongkok keramik biasa Bh 1.0000 184,000.00
Batu Bata Bh 7.0000 600.00
Bahan
Semen portland Kg 6.0000 1,440.00
Pasir pasang M3 0.0100 77,000.00
Pekerja Oh 1.0000 70,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Tukang Batu Oh 1.5000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.3000 100,000.00
Mandor Oh 0.1100 95,000.00
tuan pekerjaan
Memasang 1 Buah Kloset Jongkok Keramik Standar ( ** )
Kloset jongkok keramik standar Bh 1.0000 210,000.00
Batu Bata Bh 7.0000 600.00
Bahan
Semen portland Kg 6.0000 1,440.00
Pasir pasang M3 0.0100 77,000.00
Pekerja Oh 1.0000 70,000.00
Tukang Batu Oh 1.5000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.3000 100,000.00
Mandor Oh 0.1100 95,000.00
Jumlah harga persatuan pekerjaan
Memasang 1 M' Pipa PVC Tipe AW Diameter 1/2" ( ** )
Bahan Pipa PVC M1 1.2000 3,500.00
Perlengkapan (35% harga pipa) Kg 0.3500
Pekerja Oh 0.0360 70,000.00
Tenaga Kerja Tukang Batu Oh 0.0600 90,000.00
Kepala Tukang Oh 0.0060 100,000.00
Mandor Oh 0.0018 95,000.00
Jumlah harga persatuan pekerjaan
Memasang 1 M' Pipa PVC Tipe AW Diameter 3/4" ( ** )
Pipa PVC M1 1.2000 4,500.00
Bahan
Perlengkapan (35% harga pipa) Kg 0.3500
Pekerja Oh 0.0360 70,000.00
Tukang Batu Oh 0.0600 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0060 100,000.00
Mandor Oh 0.0018 95,000.00
Jumlah harga persatuan pekerjaan
Memasang 1 M' Pipa PVC Tipe AW Diameter 1" ( ** )
Pipa PVC M1 1.2000 7,500.00
Bahan
Perlengkapan (35% harga pipa) Kg 0.3500
Pekerja Oh 0.0360 70,000.00
Tukang Batu Oh 0.0600 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0060 100,000.00
Mandor Oh 0.0018 95,000.00
Jumlah harga persatuan pekerjaan
Memasang 1 M' Pipa PVC Tipe AW Diameter 1 1/2" ( ** )
Pipa PVC M1 1.2000 12,750.00
Bahan
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Bahan
Perlengkapan (35% harga pipa) Kg 0.3500
Pekerja Oh 0.0360 70,000.00
Tukang Batu Oh 0.0600 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0060 100,000.00
Mandor Oh 0.0018 95,000.00
Jumlah harga persatuan pekerjaan
Memasang 1 M' Pipa PVC Tipe AW Diameter 2" ( ** )
Pipa PVC M1 1.2000 16,500.00
Bahan
Perlengkapan (35% harga pipa) Kg 0.3500
Pekerja Oh 0.0540 70,000.00
Tukang Batu Oh 0.0900 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0090 100,000.00
Mandor Oh 0.0027 95,000.00
Jumlah harga persatuan pekerjaan
Memasang 1 M' Pipa PVC Tipe AW Diameter 2 1/2" ( ** )
Pipa PVC M1 1.2000 24,250.00
Bahan
Perlengkapan (35% harga pipa) Kg 0.3500
Pekerja Oh 0.0360 70,000.00
Tukang Batu Oh 0.0600 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0060 100,000.00
Mandor Oh 0.0018 95,000.00
Jumlah harga persatuan pekerjaan
Memasang 1 M' Pipa PVC Tipe AW Diameter 3" ( ** )
Pipa PVC M1 1.2000 25,000.00
Bahan
Perlengkapan (35% harga pipa) Kg 0.3500
Pekerja Oh 0.0810 70,000.00
Tukang Batu Oh 0.1350 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0135 100,000.00
Mandor Oh 0.0041 95,000.00
Jumlah harga persatuan pekerjaan
Memasang 1 M' Pipa PVC Tipe AW Diameter 4" ( ** )
Pipa PVC M1 1.2000 26,250.00
Bahan
Perlengkapan (35% harga pipa) Kg 0.3500
Pekerja Oh 0.0810 70,000.00
Tukang Batu Oh 0.1350 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0135 100,000.00
Mandor Oh 0.0041 95,000.00
Jumlah harga persatuan pekerjaan

Memasang 1 Bh Kran Diameter 1/2" ( ** )


Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Kran air Bh 1.0000 12,000.00
Bahan
Seal tape Bh 0.0250 3,500.00
Pekerja Oh 0.0100 70,000.00
Tukang Batu Oh 0.1000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0100 100,000.00
Mandor Oh 0.0050 95,000.00
Jumlah harga persatuan pekerjaan
Memasang 1 Bh Floor drain ( ** )
Bahan Floor drain Bh 1.0000 17,000.00
Pekerja Oh 0.0100 70,000.00
Tukang Batu Oh 0.1000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0100 100,000.00
Mandor Oh 0.0050 95,000.00
tuan pekerjaan

PEK. BESI DAN ALLUMINIUM

1 Kg Pasang Besi Profil (*)


Bahan Besi profil Kg 1.1500 18,000.00
Pekerja Oh 0.0600 70,000.00
Tukang besi Oh 0.0600 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0060 100,000.00
Mandor Oh 0.0030 95,000.00
tuan pekerjaan
1 Kg Pasang Rangka Kuda-kuda Baja IWF (*)
Bahan Besi profil WF Kg 1.1500 18,000.00
Pekerja Oh 0.0600 70,000.00
Tukang besi Oh 0.0600 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0060 100,000.00
Mandor Oh 0.0030 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Rolling Door Besi (*)
Bahan Pintu gulung besi M2 1.0000 175,000.00
Pekerja Oh 1.2000 70,000.00
Tukang besi konstruksi Oh 1.2000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.1200 100,000.00
Mandor Oh 0.0060 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Pintu Lipat ( Folding Door ) Besi (*)
Bahan Pintu lipat besi M2 1.0000 575,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Pekerja Oh 0.4400 70,000.00
Tukang besi konstruksi Oh 0.4400 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0440 100,000.00
Mandor Oh 0.0220 95,000.00
Jumlah harga persatuan pekerjaan

1 M1 Pasang Kusen Alluminium (*)


Profil alluminium M1 1.1000 34,000.00
Bahan Skrup fixer Buah 2.0000 25,000.00
Sealant Tube 0.0600 13,800.00
Pekerja Oh 0.0430 70,000.00
Tukang besi konstruksi Oh 0.4300 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0043 100,000.00
Mandor Oh 0.0021 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Pintu Alluminium Strip Lebar 8 Cm (*)
Profil alluminium M1 4.4000 34,000.00
Bahan
Alluminium strip M1 14.6000 7,000.00
Pekerja Oh 0.0850 70,000.00
Tenaga Kerja Tukang besi konstruksi Oh 0.0850 90,000.00
Kepala Tukang Oh 0.0085 100,000.00
Mandor Oh 0.0042 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Pintu Kaca Rangka Alluminium (*)
Pintul alluminium M1 4.4000 40,000.00
Bahan Propil kaca M1 4.5000 7,000.00
Sealant Tube 0.2700 13,800.00
Pekerja Oh 0.0850 70,000.00
Tenaga Kerja Tukang besi konstruksi Oh 0.0850 90,000.00
Kepala Tukang Oh 0.0090 100,000.00
Mandor Oh 0.0050 95,000.00
tuan pekerjaan

PEK. KUNCI DAN KACA

1 Buah Pasang Kunci Tanam Kualitas ( ** )


Bahan Kunci Tanam Bh 1.0000 190,000.00
Pekerja Oh 0.0100 70,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Tukang kayu Oh 0.5000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0100 100,000.00
Mandor Oh 0.0050 95,000.00
Jumlah harga persatuan pekerjaan
1 Buah Pasang Kunci Tanam Biasa ( ** )
Bahan Kunci Tanam Biasa Bh 1.0000 95,000.00
Pekerja Oh 0.0100 70,000.00
Tukang kayu Oh 0.5000 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0100 100,000.00
Mandor Oh 0.0050 95,000.00
Jumlah harga persatuan pekerjaan

1 Buah Pasang Engsel Pintu ( ** )


Bahan Engsel pintu Bh 1.0000 14,300.00
Pekerja Oh 0.0150 70,000.00
Tukang kayu Oh 0.1500 85,800.00
Tenaga Kerja
Kepala Tukang Oh 0.0150 100,000.00
Mandor Oh 0.00075 90,000.00
Jumlah harga persatuan pekerjaan
1 Buah Pasang Engsel Jendela ( ** )
Bahan Engsel jendela Bh 1.0000 9,000.00
Pekerja Oh 0.0100 70,000.00
Tukang kayu Oh 0.1000 85,800.00
Tenaga Kerja
Kepala Tukang Oh 0.0100 100,000.00
Mandor Oh 0.0005 90,000.00
Jumlah harga persatuan pekerjaan
1 Buah Pasang Kait Angin/Hak Angin ( ** )
Bahan Hak angin Bh 1.0000 7,000.00
Pekerja Oh 0.0150 70,000.00
Tukang kayu Oh 0.1500 85,800.00
Tenaga Kerja
Kepala Tukang Oh 0.0150 100,000.00
Mandor Oh 0.00075 90,000.00
Jumlah harga persatuan pekerjaan
1 Buah Pasang Tarikan Jendela ( ** )
Bahan Tarikan jendela Bh 1.0000 6,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Pekerja Oh 0.0100 70,000.00
Tenaga Kerja Tukang kayu Oh 0.1000 85,800.00
Kepala Tukang Oh 0.0100 100,000.00
Mandor Oh 0.0005 90,000.00
Jumlah harga persatuan pekerjaan
1 Buah Pasang Gerendel Jendela ( ** )
Bahan Gerendel jendela Bh 1.0000 6,000.00
Pekerja Oh 0.0100 70,000.00
Tenaga Kerja Tukang kayu Oh 0.1000 85,800.00
Kepala Tukang Oh 0.0100 100,000.00
Mandor Oh 0.0005 90,000.00
Jumlah harga persatuan pekerjaan
1 Buah Pasang Gerendel Pintu ( ** )
Bahan Gerendel pintu Bh 1.0000 11,500.00
Pekerja Oh 0.0100 70,000.00
Tukang kayu Oh 0.1000 85,800.00
Tenaga Kerja
Kepala Tukang Oh 0.0100 100,000.00
Mandor Oh 0.0005 90,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pasang Kaca Bening, Tebal 5 mm ( ** )
Bahan Kaca M2 1.1000 138,000.00
Pekerja Oh 0.0150 70,000.00
Tukang kayu Oh 0.1500 85,800.00
Tenaga Kerja
Kepala Tukang Oh 0.0150 100,000.00
Mandor Oh 0.00075 90,000.00
Jumlah harga persatuan pekerjaan

1 M2 Pasang Kaca Es, Tebal 5 mm ( ** )


Bahan Kaca es M2 1.1000 98,000.00
Pekerja Oh 0.0150 70,000.00
Tukang kayu Oh 0.1500 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0150 100,000.00
Mandor Oh 0.00075 95,000.00
Jumlah harga persatuan pekerjaan

PEKERJAAN PENGECATAN

1 M2 Pengecatan Bidang Kayu Lama ( ** )


Dempul Kg 0.1500 20,000.00
Bahan Cat Dasar Kg 0.1700 19,000.00
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Cat penutup Kg 0.1700 44,800.00
Pekerja Oh 0.0700 70,000.00
Tukang cat Oh 0.0750 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0075 100,000.00
Mandor Oh 0.0025 95,000.00
Jumlah harga persatuan pekerjaan

1 M2 Pengecatan Bidang Kayu Baru ( 1x plamir, 1x cat dasar, 2x cat penutup) ( ** )

Cat meni Kg 0.2000 52,000.00


Dempul Kg 0.1500 20,000.00
Bahan
Cat Dasar Kg 0.1700 19,000.00
Cat penutup Kg 0.2600 44,800.00
Pekerja Oh 0.0700 70,000.00
Tenaga Kerja Tukang cat Oh 0.0090 90,000.00
Kepala Tukang Oh 0.0060 100,000.00
Mandor Oh 0.0025 95,000.00
Jumlah harga persatuan pekerjaan

1 M2 Pengecatan Bidang Kayu Baru ( 1x plamir, 1x cat dasar, 3x cat penutup) ( ** )

Cat meni Kg 0.2000 52,000.00


Dempul Kg 0.1500 20,000.00
Bahan
Cat Dasar Kg 0.1700 19,000.00
Cat penutup Kg 0.3500 44,800.00
Pekerja Oh 0.0700 70,000.00
Tukang cat Oh 0.1050 90,000.00
Tenaga Kerja
Kepala Tukang Oh 0.0040 100,000.00
Mandor Oh 0.0025 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pelaburan Bidang Kayu Dengan Politur ( ** )
Politur Ltr 0.1500 55,000.00
Bahan Politur jadi Ltr 0.3720 55,000.00
Ampelas Lbr 2.0000 6,000.00
Tukang cat Oh 0.0600 90,000.00
Tenaga Kerja Kepala Tukang Oh 0.0160 100,000.00
Mandor Oh 0.0025 95,000.00
Jumlah harga persatuan pekerjaan

1 M2 Pelaburan Bidang Kayu Dengan Cat Residu Dan Ter ( ** )


Bahan Residu atau ter Ltr 0.3500 6,900.00
Pekerja Oh 0.1000 70,000.00
Tenaga Kerja
Harga Satuan
Kebutuhan Satuan Indeks Bahan/Upah
(Rp)
2 3 4 5
Tenaga Kerja
Mandor Oh 0.0060 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pengecatan Tembok Baru (1x plamir, 1x cat dasar, 2x cat penutup) ( ** )
Plamir Kg 0.1000 8,200.00
Bahan Cat dasar Kg 0.1000 22,000.00
Cat penutup 2x Kg 0.2600 25,000.00
Pekerja Oh 0.0200 70,000.00
Tenaga Kerja Tukang cat Oh 0.0630 90,000.00
Kepala Tukang Oh 0.0063 100,000.00
Mandor Oh 0.0025 95,000.00
Jumlah harga persatuan pekerjaan
1 M2 Pengecatan Tembok Lama (1x cat dasar, 2x cat penutup) ( ** )
Bahan Cat dasar Kg 0.1200 22,000.00
Cat penutup 2x Kg 0.1800 25,000.00
Pekerja Oh 0.0280 70,000.00
Tenaga Kerja Tukang cat Oh 0.0420 90,000.00
Kepala Tukang Oh 0.0042 100,000.00
Mandor Oh 0.0025 95,000.00
Jumlah harga persatuan pekerjaan
LISA HARGA SATUAN PEKERJAAN

Jumlah (Rp)

10,000.00
3,600.00
53,820.00
385.00
2,970.00
129,600.00
900.00
250.00
23,400.00
28,000.00
18,000.00
2,000.00
1,900.00
274,825.00

21,600.00
360.00
11,200.00
7,000.00
9,000.00
1,000.00
475.00
50,635.00

52,500.00
2,375.00
54,875.00
Jumlah (Rp)

63,000.00
4,275.00
67,275.00

18,273.38
18,273.38

62,500.00
35,000.00
4,750.00
102,250.00

90,000.00
21,000.00
950.00
111,950.00

81,900.00
64,505.00
146,405.00

10,000.00
73,202.50
83,202.50

420,000.00
229,104.00
29,106.00
420,000.00
180,000.00
20,000.00
28,500.00
1,326,710.00
Jumlah (Rp)

313,920.00
40,040.00
287,100.00
115,500.00
22,500.00
2,500.00
7,600.00
789,160.00

355,680.00
47,740.00
244,200.00
11,287.50
115,500.00
24,750.00
2,800.00
7,885.00
809,842.50

331,200.00
49,110.60
251,262.00
10,500.00
84,000.00
18,000.00
2,000.00
5,700.00
751,772.60
Jumlah (Rp)

6
397,440.00
45,507.00
247,368.00
11,287.50
115,500.00
24,750.00
2,800.00
7,885.00
852,537.50

430,560.00
43,943.90
248,589.00
11,287.50
115,500.00
24,750.00
2,800.00
7,885.00
885,315.40

506,880.00
40,201.70
252,021.00
11,287.50
115,500.00
24,750.00
2,800.00
7,885.00
961,325.20

11,550.00
Jumlah (Rp)

6
270.00
490.00
630.00
70.00
38.00
13,048.00

13,650.00
270.00
490.00
630.00
70.00
38.00
15,148.00

64,000.00
5,400.00
1,250.00
36,400.00
23,400.00
2,600.00
2,470.00
135,520.00

72,000.00
5,400.00
1,250.00
36,400.00
23,400.00
2,600.00
2,470.00
143,520.00

64,000.00
7,200.00
Jumlah (Rp)

6
2,500.00
24,000.00
52,500.00
16,000.00
46,200.00
29,700.00
3,300.00
3,135.00
248,535.00

64,000.00
7,200.00
2,500.00
28,800.00
52,500.00
16,000.00
46,200.00
29,700.00
3,300.00
3,135.00
253,335.00

64,000.00
7,200.00
2,500.00
24,000.00
52,500.00
48,000.00
46,200.00
29,700.00
3,300.00
3,135.00
280,535.00

48,000.00
7,200.00
2,500.00
32,000.00
52,500.00
24,000.00
Jumlah (Rp)

6
23,000.00
46,200.00
29,700.00
3,300.00
3,135.00
271,535.00

48,000.00
7,200.00
1,875.00
24,000.00
52,500.00
16,000.00
46,200.00
29,700.00
3,300.00
3,135.00
231,910.00

42,240.00
10,800.00
4,000.00
10,500.00
4,500.00
500.00
760.00
73,300.00

320,000.00
27,000.00
5,000.00
1,732,500.00
40,500.00
483,840.00
41,580.00
267,300.00
371,000.00
24,750.00
117,000.00
94,500.00
Jumlah (Rp)

6
26,200.00
25,175.00
3,576,345.00

432,000.00
36,000.00
7,500.00
1,270,500.00
31,185.00
483,840.00
41,580.00
267,300.00
395,500.00
24,750.00
140,400.00
126,000.00
32,300.00
26,885.00
3,315,740.00

640,000.00
72,000.00
25,000.00
1,490,500.00
36,585.00
483,840.00
41,580.00
267,300.00
Jumlah (Rp)

6
270,000.00
525,000.00
160,000.00
493,500.00
24,750.00
148,500.00
189,000.00
40,300.00
33,535.00
4,941,390.00

640,000.00
72,000.00
25,000.00
1,732,500.00
40,500.00
483,840.00
41,580.00
267,300.00
270,000.00
525,000.00
160,000.00
493,500.00
24,750.00
148,500.00
189,000.00
Jumlah (Rp)

6
40,300.00
33,535.00
5,187,305.00

512,000.00
57,600.00
20,000.00
2,150,500.00
52,785.00
483,840.00
41,580.00
267,300.00
252,000.00
420,000.00
128,000.00
444,500.00
24,750.00
148,500.00
126,000.00
33,300.00
30,210.00
5,192,865.00

512,000.00
57,600.00
20,000.00
1,930,500.00
47,385.00
483,840.00
Jumlah (Rp)

6
41,580.00
267,300.00
252,000.00
420,000.00
128,000.00
444,500.00
24,750.00
148,500.00
126,000.00
33,300.00
30,210.00
4,967,465.00

512,000.00
57,600.00
20,000.00
1,732,500.00
40,500.00
465,120.00
41,580.00
267,300.00
252,000.00
420,000.00
128,000.00
444,500.00
24,750.00
148,500.00
126,000.00
33,300.00
30,210.00
4,743,860.00
Jumlah (Rp)

512,000.00
57,600.00
20,000.00
1,160,500.00
28,485.00
465,120.00
41,580.00
267,300.00
252,000.00
420,000.00
128,000.00
444,500.00
24,750.00
148,500.00
126,000.00
33,300.00
30,210.00
4,159,845.00

512,000.00
57,600.00
20,000.00
1,270,500.00
31,185.00
465,120.00
41,580.00
267,300.00
252,000.00
420,000.00
128,000.00
444,500.00
24,750.00
148,500.00
126,000.00
33,300.00
30,210.00
4,272,545.00
Jumlah (Rp)

384,000.00
57,600.00
20,000.00
1,732,500.00
40,500.00
483,840.00
41,580.00
267,300.00
288,000.00
420,000.00
192,000.00
371,000.00
24,750.00
117,000.00
94,500.00
26,200.00
25,175.00
4,585,945.00

400,000.00
54,000.00
15,000.00
2,310,000.00
54,000.00
483,840.00
41,580.00
267,300.00
189,000.00
Jumlah (Rp)

6
375,000.00
112,000.00
395,500.00
24,750.00
140,400.00
126,000.00
32,300.00
26,790.00
5,047,460.00

3,200.00
180.00
33,000.00
8,100.00
5,760.00
462.00
2,970.00
12,600.00
1,800.00
1,800.00
1,800.00
600.00
855.00
73,127.00

4,800.00
360.00
39,600.00
900.00
Jumlah (Rp)

6
7,920.00
693.00
4,950.00
20,790.00
2,970.00
2,970.00
2,970.00
1,000.00
1,425.00
91,348.00

512,000.00
57,600.00
20,000.00
1,732,500.00
40,500.00
483,840.00
41,580.00
267,300.00
216,000.00
420,000.00
256,000.00
371,000.00
24,750.00
117,000.00
94,500.00
26,500.00
25,175.00
4,706,245.00

42,000.00
27,288.00
2,926.00
21,000.00
9,000.00
1,000.00
1,425.00
Jumlah (Rp)

6
104,639.00

42,000.00
20,692.80
3,080.00
21,000.00
9,000.00
1,000.00
1,425.00
98,197.80

42,000.00
16,560.00
3,311.00
21,000.00
9,000.00
1,000.00
1,425.00
94,296.00

14,722.56
1,540.00
21,000.00
13,500.00
1,500.00
1,425.00
53,687.56

11,197.44
1,771.00
21,000.00
13,500.00
1,500.00
1,425.00
50,393.44

8,985.60
Jumlah (Rp)

6
1,848.00
21,000.00
13,500.00
1,500.00
1,425.00
48,258.60

4,680.00
14,000.00
9,000.00
1,000.00
950.00
29,630.00

6,600,000.00
22,500.00
18,000.00
490,000.00
1,890,000.00
210,000.00
33,250.00
9,263,750.00

2,160,000.00
22,500.00
18,000.00
420,000.00
1,620,000.00
180,000.00
28,500.00
4,449,000.00

336,000.00
9,000.00
70,000.00
270,000.00
30,000.00
Jumlah (Rp)

6
4,750.00
719,750.00

78,000.00
9,000.00
70,000.00
270,000.00
30,000.00
4,750.00
461,750.00

201,600.00
5,400.00
111,780.00
56,700.00
226,800.00
25,200.00
4,370.00
631,850.00

46,800.00
5,400.00
111,780.00
56,700.00
226,800.00
25,200.00
4,370.00
477,050.00

29,250.00
3,750.00
46,900.00
180,000.00
20,000.00
31,825.00
Jumlah (Rp)

6
311,725.00

1,980,000.00
207,000.00
100,800.00
280,000.00
1,080,000.00
120,000.00
19,000.00
3,786,800.00

1,980,000.00
207,000.00
54,000.00
168,000.00
648,000.00
72,000.00
11,400.00
3,140,400.00

72,240.00
1,080.00
7,000.00
9,000.00
1,000.00
4,750.00
95,070.00

55,100.00
1,080.00
7,000.00
9,000.00
1,000.00
4,750.00
Jumlah (Rp)

6
77,930.00

71,400.00
5,000.00
14,000.00
9,000.00
1,000.00
95.00
100,495.00

31,395.00
500.00
8,400.00
5,400.00
600.00
570.00
46,865.00

40,250.00
500.00
8,400.00
5,400.00
600.00
570.00
55,720.00

35,750.00
2,500.00
17,500.00
13,500.00
1,500.00
1,235.00
Jumlah (Rp)

6
71,985.00

19,800.00
2,500.00
5,850.00
1,750.00
225.00
2,375.00
32,500.00

35,750.00
2,500.00
5,850.00
1,750.00
225.00
2,375.00
48,450.00

18,900.00
180.00
37,050.00
6,900.00
10,500.00
27,000.00
3,000.00
760.00
104,290.00

27,720.00
3,600.00
Jumlah (Rp)

6
10,500.00
27,000.00
3,000.00
7,125.00
78,945.00

27,000.00
750.00
7,000.00
9,000.00
1,000.00
475.00
45,225.00

27,187.50
750.00
7,000.00
9,000.00
1,000.00
475.00
45,412.50

36,750.00
690.00
4,200.00
5,400.00
600.00
285.00
47,925.00

4,725.00
180.00
3,500.00
4,500.00
500.00
285.00
13,690.00
Jumlah (Rp)

57,240.00
14,976.00
3,465.00
4,212.00
49,000.00
31,500.00
3,500.00
3,325.00
167,218.00

60,420.00
14,976.00
3,465.00
4,212.00
49,000.00
31,500.00
3,500.00
3,325.00
170,398.00

49,638.18
14,400.00
3,465.00
3,900.00
49,000.00
31,500.00
3,500.00
3,325.00
158,728.18

59,350.00
14,400.00
3,465.00
Jumlah (Rp)

6
3,900.00
49,000.00
31,500.00
3,500.00
3,325.00
168,440.00

61,508.18
14,400.00
3,465.00
3,900.00
49,000.00
31,500.00
3,500.00
3,325.00
170,598.18

87,295.00
14,112.00
3,465.00
3,380.00
17,500.00
11,250.00
1,300.00
1,235.00
139,537.00

65,000.00
13,392.00
1,386.00
7,150.00
63,000.00
40,500.00
4,500.00
Jumlah (Rp)

6
4,275.00
199,203.00

755,250.00
13,392.00
1,386.00
5,044.00
63,000.00
40,500.00
4,500.00
4,275.00
887,347.00

192,500.00
16,920.00
2,695.00
43,400.00
31,500.00
3,500.00
3,325.00
293,840.00

7,950.00
1,641.60
231.00
260.00
6,300.00
8,100.00
900.00
475.00
25,857.60

184,000.00
4,200.00
8,640.00
770.00
70,000.00
Jumlah (Rp)

6
135,000.00
30,000.00
10,450.00
443,060.00

210,000.00
4,200.00
8,640.00
770.00
70,000.00
135,000.00
30,000.00
10,450.00
469,060.00

4,200.00
1,225.00
2,520.00
5,400.00
600.00
171.00
14,116.00

5,400.00
1,575.00
2,520.00
5,400.00
600.00
171.00
15,666.00

9,000.00
2,625.00
2,520.00
5,400.00
600.00
171.00
20,316.00

15,300.00
Jumlah (Rp)

6
4,462.50
2,520.00
5,400.00
600.00
171.00
28,453.50

19,800.00
5,775.00
3,780.00
8,100.00
900.00
256.50
38,611.50

29,100.00
8,487.50
2,520.00
5,400.00
600.00
171.00
46,278.50

30,000.00
8,750.00
5,670.00
12,150.00
1,350.00
389.50
58,309.50

31,500.00
9,187.50
5,670.00
12,150.00
1,350.00
389.50
60,247.00
Jumlah (Rp)

6
12,000.00
87.50
700.00
9,000.00
1,000.00
475.00
23,262.50

17,000.00
700.00
9,000.00
1,000.00
475.00
28,175.00

20,700.00
4,200.00
5,400.00
600.00
285.00
31,185.00

20,700.00
4,200.00
5,400.00
600.00
285.00
31,185.00

175,000.00
84,000.00
108,000.00
12,000.00
570.00
379,570.00

575,000.00
Jumlah (Rp)

6
30,800.00
39,600.00
4,400.00
2,090.00
651,890.00

37,400.00
50,000.00
828.00
3,010.00
38,700.00
430.00
199.50
130,567.50

149,600.00
102,200.00
5,950.00
7,650.00
850.00
399.00
266,649.00

176,000.00
31,500.00
3,726.00
5,950.00
7,650.00
900.00
475.00
226,201.00

190,000.00
700.00
Jumlah (Rp)

6
45,000.00
1,000.00
475.00
237,175.00

95,000.00
700.00
45,000.00
1,000.00
475.00
142,175.00

14,300.00
1,050.00
12,870.00
1,500.00
67.50
29,787.50

9,000.00
700.00
8,580.00
1,000.00
45.00
19,325.00

7,000.00
1,050.00
12,870.00
1,500.00
67.50
22,487.50

6,000.00
Jumlah (Rp)

6
700.00
8,580.00
1,000.00
45.00
16,325.00

6,000.00
700.00
8,580.00
1,000.00
45.00
16,325.00

11,500.00
700.00
8,580.00
1,000.00
45.00
21,825.00

151,800.00
1,050.00
12,870.00
1,500.00
67.50
167,287.50

107,800.00
1,050.00
13,500.00
1,500.00
71.25
123,921.25

3,000.00
3,230.00
Jumlah (Rp)

6
7,616.00
4,900.00
6,750.00
750.00
237.50
26,483.50

10,400.00
3,000.00
3,230.00
11,648.00
4,900.00
810.00
600.00
237.50
34,825.50

10,400.00
3,000.00
3,230.00
15,680.00
4,900.00
9,450.00
400.00
237.50
47,297.50

8,250.00
20,460.00
12,000.00
5,400.00
1,600.00
237.50
47,947.50

2,415.00
7,000.00
Jumlah (Rp)

6
570.00
9,985.00

820.00
2,200.00
6,500.00
1,400.00
5,670.00
630.00
237.50
17,457.50

2,640.00
4,500.00
1,960.00
3,780.00
420.00
237.50
13,537.50
REKAPITULASI DAFTAR ANALIS
DINAS PEKERJAAN
TAHUN ANG

NO SATUAN

HARGA SATUAN PEK

1 1M'
2 1M'
3 1M2
4 1M2
5 1M2
6 1M2
7 1 Buah
8 1M3
9 1M3

Harga Satuan PEK

1 1M3
2 1M3
3 1M3
4 1M3
5 1M3
6 1M3
7 1M2
8 1M3
9 1M3
10 1M3
11 1M3
12 1M3
13 1M1
14 1 Btg
15 1M3
16 1M3

Harga Satuan PEKE

1 1M3
NO SATUAN

2 1M3
3 1M3
4 1M3
5 1M3
6 1M3
7 1M3
8 1M3
9 1M3
10 1M3
11 1M3

ANALISA BIAYA KO
PEKERJAA
1 1M3
2 1M2

Harga Satuan PEK

1 1M3
2 1M3
3 1M3
4 1M3
5 1M3
6 1M3
7 1M3
8 1M3
9 1M3
10 1M3
11 1M3
12 1M3
13 1M3
14 1M'
15 1M'
16 1M'
17 10 Kg
18 10 Kg
19 10 Kg
20 1M2
NO SATUAN

21 1M2
22 1M2
23 1M2
24 1M2
25 1M2
26 1M2
27 1M2
28 1M3
29 1M3
30 1M3
31 1M3
32 1M3
33 1M3
34 1M3
35 1M3
36 1M3
37 1M3
38 1M3
39 1M3
40 1M3
41 1M3
42 1M3
43 1M'
44 1M'
45 1M3

Harga Satuan PEKERJAA

1 1M2
2 1M2
3 1M2
4 1M2
5 1 Bh
6 1 Bh
7 1 Bh
8 1 Bh
9 1 Bh
10 1 Bh
NO SATUAN

11 1 Ttk
12 1 Ttk
13 1 Ttk
NO SATUAN

Harga Satuan PEKERJAAN

1 1M2
2 1M2
3 1M2
4 1M2
5 1M2
6 1M2
7 1M2
8 1M2
9 1M2
10 1M2
11 1M2
12 1M2
13 1M2
14 1M2
15 1M2

Harga Satuan PEKER

1 1M2
2 1M2
3 1M2
4 1M2
5 1M2
6 1M2
7 1M2
8 1M2
9 1M2
10 1M2
11 1M2
12 1M2
13 1M2
14 1M2
15 1M2
16 1M2
17 1M2
18 1M2
NO SATUAN

19 1M2
20 1M'
21 1M2
22 1M2
23 1M2
24 1M2
25 1M2
26 1M2
NO SATUAN

Harga Satuan PEK

1 1M3
2 1M3
3 1M2
4 1M2
5 1M2
6 1M2
7 1M2
8 1M2
9 1M2
10 1M2
11 1M2
12 1M2
13 1M2
14 1M3
15 1M3
16 1M3
17 1M2
18 1M2
19 1M2
20 1M2
21 1M2
22 1M'
23 1M'
24 1M'
25 1M'
26 1M2
27 1M2
28 1M2
29 1M2
30 1M2
HARGA SATUAN PEKERJAAN PE

1 1M2
2 1M2
3 1M2
4 1M2
NO SATUAN

5 1M2
6 1M2
7 1M2
8 1M2
9 1M2
10 1M2
NO SATUAN

Harga Satuan PEKERJAAN L

1 1M2
2 1M2
3 1M2
4 1M2
5 1M'
6 1M2

Harga Satuan PEKERJAAN

1 1Kg
2 1Kg
3 1M2
4 1M2
5 1M'
6 1M2
7 1M2
8 1M'
9 1M2
10 1M2

HARGA SATUAN PEKER

1 1M2
2 1M2
3 1M2
4 1M2
5 1M2
6 1M2
7 1M2
8 1M2
9 1M2
10 1M2
11 1M2
12 1M2
13 1M2
NO SATUAN

14 1M2
15 1M2
16 1M2
17 1M2
18 1M'
19 1M'
20 1M2
21 1M2
22 1M2
NO SATUAN

HARGA SATUAN PEKERJAAN

1 1 Bh
2 1 Bh
3 1 Bh
4 1 Bh
5 1 Bh
6 1 Bh
7 1 Bh
8 1 Bh
9 1 Bh
10 1 Bh
11 1 Bh
12 1 Bh
13 1 M'
14 1 M'
15 1 M'
16 1 M'
17 1 M'
18 1 Bh
19 1 Bh
20 1 Bh
21 1 Bh

HARGA SATUAN PEKERJ

1 1 Bh
2 1 Bh
3 1 Bh
4 1 Bh
5 1 Bh
6 1 Bh
7 1 Bh
8 1 Bh
9 1 Bh
10 1 Bh
11 1 Bh
12 1 Bh
NO SATUAN

HARGA SATUAN PEKE

1 1M2
2 1M2
3 1M2
4 1M2
5 1M2
6 1M2
7 1M2
8 1M2
9 1M2
10 1M2
11 1M2

HARGA SATUAN PEKERJAAN

1 1M2

HARGA SATUAN PEKERJA

1 1M
2 1 M2
3 1 Unit
4 1 Set
5 1M
REKAPITULASI DAFTAR ANALISA BIAYA KONSTRUKSI SNI 2008
DINAS PEKERJAAN UMUM KOTA JAMBI
TAHUN ANGGARAN 2016

NAMA ANALISA

HARGA SATUAN PEKERJAAN PERSIAPAN

PAGAR SEMENTARA DARI KAYU Tinggi 2 Meter


PENGUKURAN DAN PEMASANGAN BOUWPLANK
PEMBUATAN GUDANG SEMEN DAN ALAT-ALAT
PEMBUATAN RUMAH JAGA /KONTRUKSI KAYU
MEMBERSIHKAN LAPANGAN DAN PERATAAN
PEMBUATAN BEDENG BURUH
PEMBUATAN KOTAK ADUKAN Ukuran (40x50x25) cm
BONGKARAN BETON BERTULANG
BONGKARAN DINDING TEMBOK BATA

Harga Satuan PEKERJAAN TANAH

Menggali TANAH BIASA Sedalam 1 Meter


Menggali TANAH BIASA Sedalam 2 Meter
Menggali TANAH BIASA Sedalam 3 Meter
Menggali TANAH KERAS Sedalam 1 Meter
Menggali TANAH CADAS Sedalam 1 Meter
Menggali TANAH LUMPUR Sedalam 1 Meter
Mengerjakan STRIPPING TEBING Setinggi 1 Meter
Membuang TANAH SEJAUH 30 Meter
Urugan Tanah Kembali Sedalam 1 m
Urugan Tanah Kembali Sedalam 2 m
Memadatkan TANAH Per 20 cm
Timbunan Tanah dipadatkan ( pemadatan per 20 Cm )
Pemancangan diatas tanah lunak
Pemancangan Cerucuk Dia. 12 Panjang 2 M¹
Mengurug PASIR URUG
Mengurug TANAH DIPADATKAN (**)

Harga Satuan PEKERJAAN PONDASI

Memasang PONDASI BATU BELAH, Campuran 1 Pc : 3 PP


NAMA ANALISA

Memasang PONDASI BATU BELAH, Campuran 1 Pc : 4 PP


Memasang PONDASI BATU BELAH, Campuran 1 Pc : 5 PP
Memasang PONDASI BATU BELAH, Campuran 1 Pc : 6 PP
Memasang PONDASI BATU BELAH, Campuran 1 Pc : 8 PP
Memasang PONDASI BATU BELAH,Campuran 1 Kp : 1 Sm : 2 Pp
Memasang PONDASI BATU BELAH,Campuran 1 Pc : 3 Kp : 10 Pp
Memasang PONDASI BATU BELAH,Campuran 1/4 Pc : 1 Kp : 4 Pp
Memasang PONDASI BATU KOSONG (Anstamping)
MEMASANG PONDASI SIKLOP 60% BETON CAMPURAN 1 Pc : 2 Pb : 3 Kr Dan 40 % BATU BELAH
Memasang PONDASI SUMURAN Diameter 100 cm

ANALISA BIAYA KONSTRUKSI SNI 2002


PEKERJAAN BETON
MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr
MEMBUAT LANTAI KERJA BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr tebal 5 cm

Harga Satuan PEKERJAAN BETON

MEMBUAT BETON MUTU f'c = 7,4 Mpa (K 100), SLUMP (12 + 2) cm, w/c = 0,87
MEMBUAT BETON MUTU f'c = 9,8 Mpa (K 125), SLUMP (12 + 2) cm, w/c = 0,78
MEMBUAT BETON MUTU f'c = 12,2 Mpa (K 150), SLUMP (12 + 2) cm, w/c = 0,72
MEMBUAT BETON MUTU f'c = 7,4 Mpa (K 100), SLUMP (3 - 6) cm, w/c = 0,87
MEMBUAT BETON MUTU f'c = 14,5 Mpa (K 175), SLUMP (12 + 2) cm, w/c = 0,66
MEMBUAT BETON MUTU f'c = 16,9 Mpa (K 200), SLUMP (12 + 2) cm, w/c = 0,61
MEMBUAT BETON MUTU f'c = 19,3 Mpa (K 225), SLUMP (12 + 2) cm, w/c = 0,58
MEMBUAT BETON MUTU f'c = 21,7 Mpa (K 250), SLUMP (12 + 2) cm, w/c = 0,56 (Ready Mix Mobile)
MEMBUAT BETON MUTU f'c = 24,0 Mpa (K 275), SLUMP (12 + 2) cm, w/c = 0,53
MEMBUAT BETON MUTU f'c = 26,4 Mpa (K 300), SLUMP (12 + 2) cm, w/c = 0,52
MEMBUAT BETON MUTU f'c = 28,8 Mpa (K 325), SLUMP (12 + 2) cm, w/c = 0,49
MEMBUAT BETON MUTU f'c = 31,2 Mpa (K 350), SLUMP (12 + 2) cm, w/c = 0,48
MEMBUAT BETON KEDAP AIR DENGAN STROROX- 100.
MEMASANG PVC WATERSTOP LEBAR 150 MM
MEMASANG PVC WATERSTOP LEBAR 200 MM
MEMASANG PVC WATERSTOP LEBAR 230 - 320 MM
PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR
MEMASANG KABEL PRESSTRESSED POLOS / STRANDS
MEMASANG JARING KAWAT BAJA / WIRE MESH
MEMASANG BEKISTING UNTUK PONDASI
NAMA ANALISA

MEMASANG BEKISTING UNTUK SLOOF


PASANG BEKISTING UNTUK KOLOM
PASANG BEKISTING UNTUK BALOK
PASANG BEKISTING UNTUK LANTAI
PASANG BEKISTING UNTUK DINDING
PASANG BEKISTING UNTUK TANGGA
PASANG JEMBATAN COR
MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEGISTING)
MEMBUAT SLOOF BETON BERTULANG (110 KG BESI + BEGISTING)
MEMBUAT SLOOF BETON BERTULANG (200 KG BESI + BEGISTING)
MEMBUAT KOLOM BETON BERTULANG (130 KG BESI + BEGISTING)
MEMBUAT KOLOM BETON BERTULANG (150 KG BESI + BEGISTING)
MEMBUAT KOLOM BETON BERTULANG (300 KG BESI + BEGISTING)
MEMBUAT BALOK BETON BERTULANG (100 KG BESI + BEGISTING)
MEMBUAT BALOK BETON BERTULANG (110 KG BESI + BEGISTING)
MEMBUAT BALOK BETON BERTULANG (150 KG BESI + BEGISTING)
MEMBUAT BALOK BETON BERTULANG (170 KG BESI + BEGISTING)
MEMBUAT BALOK BETON BERTULANG (190 KG BESI + BEGISTING)
MEMBUAT BALOK BETON BERTULANG (200 KG BESI + BEGISTING)
MEMBUAT KOLOM BETON BERTULANG (150 KG BESI + BEGISTING)
MEMBUAT DINDING BETON BERTULANG (150 KG BESI + BEGISTING)
MEMBUAT DINDING BETON BERTULANG (200 KG BESI + BEGISTING)
MEMBUAT KOLOM BETON BERTULANG (11 X 11) CM
MEMBUAT RING BALOK BETON BERTULANG (10 X 15) CM
MEMBUAT PLAT BETON BERTULANG ( 150 KG BESI + BEKISTING )

Harga Satuan PEKERJAAN BETON PRACETAK

LAHAN PRODUKSI TEBAL 8 Cm BETON F'c 14,5 Mpa (K 175) slump (12 ± 2)
LAHAN PRODUKSI TEBAL 10 Cm BETON F'c 14,5 Mpa (K 175) slump (12 ± 2)
LAHAN PRODUKSI TEBAL 12 Cm BETON F'c 14,5 Mpa (K 175) slump (12 ± 2)
LAHAN PRODUKSI TEBAL 15 Cm BETON F'c 14,5 Mpa (K 175) slump (12 ± 2)
Pemasangan dan membuka Bekisting Komponen Plat Beton Pracetak
Pemasangan dan membuka Bekisting Komponen Balok Beton Pracetak
Pemasangan dan membuka Bekisting Komponen Kolom Beton Pracetak
Penuangan/menebar Beton untuk Komponen Plat Pracetak
Penuangan/menebar Beton untuk Komponen Balok Pracetak
Penuangan/menebar Beton untuk Komponen Kolom Pracetak
NAMA ANALISA

Upah melakukan Groting pada Pracetak


Pemasangan Bekisting Join Pracetak
Upah join dengan Sling
NAMA ANALISA

Harga Satuan PEKERJAAN PASANGAN DINDING

Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 Bata, 1 Pc : 2 Pp


Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 Bata, 1 Pc : 3 Pp
Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 Bata, 1 Pc : 4 Pp
Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 Bata, 1 Pc : 5 Pp
Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 Bata, 1 Pc : 6 Pp
Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 Bata, 1 Pc : 3Kp : 10Pp
Memasang Dinding Bata Merah uk. (5x11x22) cm Tebal 1/2 Bata, 1 Pc : 2Pp
Memasang Dinding Bata Merah uk. (5x11x22) cm Tebal 1/2 Bata, 1 Pc : 3 Pp
Memasang Dinding Bata Merah uk. (5x11x22) cm Tebal 1/2 Bata, 1 Pc : 4 Pp
Memasang Dinding Bata Merah uk. (5x11x22) cm Tebal 1/2 Bata, 1 Pc : 5 Pp
Memasang Dinding Bata Merah uk. (5x11x22) cm Tebal 1/2 Bata, 1 Pc : 6 Pp
Memasang Dinding Bata Merah uk. (5x11x22) cm Tebal 1/2 Bata, 1 Pc : 8 Pp
Memasang Dinding Bata Merah uk. (5x11x22) cm Tebal 1/2 Bata, 1 Pc : 3Kp : 10 Pp
Memasang Dinding Bata Merah uk. (5x11x22) cm Tebal 1/2 Bata, 1 Kp : 1 Sm : 1 Pp
Memasang Dinding Bata Merah uk. (5x11x22) cm Tebal 1/2 Bata, 1 Kp : 1 Sm : 2 Pp

Harga Satuan PEKERJAAN PLESTERAN

Memasang PLESTERAN 1 Pc : 1 Pp, Tebal 15 mm.


Memasang PLESTERAN 1 Pc : 2 Pp, Tebal 15 mm.
Memasang PLESTERAN 1 Pc : 3 Pp, Tebal 15 mm.
Memasang PLESTERAN 1 Pc : 4 Pp, Tebal 15 mm.
Memasang PLESTERAN 1 Pc : 5 Pp, Tebal 15 mm.
Memasang PLESTERAN 1 Pc : 6 Pp, Tebal 15 mm.
Memasang PLESTERAN 1 Pc : 7 Pp, Tebal 15 mm.
Memasang PLESTERAN 1 Pc : 8 Pp, Tebal 15 mm.
Memasang PLESTERAN 1 Pc : 1/2 Kp : 3 Pp, Tebal 15 mm.
Memasang PLESTERAN 1 Pc : 2 Kp : 8 Pp, Tebal 15 mm.
Memasang PLESTERAN 1 Sm : 1 Kp : 1 Pp, Tebal 15 mm.
Memasang PLESTERAN 1 Sm : 1 Kp : 2 Pp, Tebal 15 mm.
Memasang PLESTERAN 1 Pc : 2 Pp, Tebal 20 mm.
Memasang PLESTERAN 1 Pc : 3 Pp, Tebal 20 mm.
Memasang PLESTERAN 1 Pc : 4 Pp, Tebal 20 mm.
Memasang PLESTERAN 1 Pc : 5 Pp, Tebal 20 mm.
Memasang PLESTERAN 1 Pc : 6 Pp, Tebal 20 mm.
Memasang PLESTERAN 1 Sm : 1 Kp : 2 Pp, Tebal 20 mm
NAMA ANALISA

Memasang BERAPEN 1 Pc : 5 Pp, Tebal 15 mm


Memasang PLESTERAN SKONING 1 Pc : 2 Pp, Lebar 10 mm
Memasang PLESTERAN CIPRAT. 1 Pc : 2 Pp
Memasang Finishing siar Pasangan Bata Merah
Memasang Finishing siar Pasangan Conblock Ekspose
Memasang Finishing siar Pasangan Conblock Ekspose
Memasang Finishing siar Pasangan Batu Kali adukan 1 Pc : 2 Pp
Memasang Acian
NAMA ANALISA

Harga Satuan PEKERJAAN KAYU

Membuat dan Memasang Kusen Pintu dan Jendela, Kayu Kelas I


Membuat dan Memasang Kusen Pintu dan Kusen Jendela, Kayu Kelas II atau III
Membuat dan Memasang Pintu Klamp Standar, Kayu Kelas II
Membuat dan Memasang Pintu Klamp Sederhana, Kayu Kelas III
Membuat dan memasang Daun Pintu Panel, Kayu Kelas I atau II
Membuat dan memasang Daun Pintu Panel, Kayu Tembesu
Membuat dan Memasang Pintu dan Jendela Kaca, Kayu Kelas I atau II
Membuat dan Memasang Pintu dan Jendela Jalusi, Kayu Kelas I atau II
Membuat daun Pintu plywood rangkap, rangka tertutup kayu kelas II (lebar s/d 90 cm)
Membuat Pintu Plywood rangkap, rangka Ekspose kayu kelas I atau II
Memasang Jalusi Kusen, Kayu Kelas I atau II
Memasang Teakwood rangkap, rangka Ekspose kayu kelas I
Memasang Pintu Teakwood rangkap Lapis Formika, rangka Ekspose kayu kelas II
Memasang Konstruksi Kuda - Kuda Konvensional, Kayu Kelas I, II dan III bentang 6 m
Memasang Konstruksi Kuda - Kuda Ekspose, Kayu Kelas I
Memasang Konstruksi Gordeng, Kayu Kelas II
Memasang Rangka Atap Genteng Keramik Kayu Kelas II
Memasang Rangka Atap Genteng Beton, Kayu Kelas II
Memasang Rangka Atap Sirap, Kayu Kelas II
Memasang Rangka Langit - langit (50 x 100) cm, Kayu Kelas II atau III
Memasang Rangka Langit - langit (60 x 60) cm, Kayu Kelas II atau III
Memasang Lisplank Ukuran (3 x 20) cm, Kayu Kelas I atau II
Memasang Lisplank Ukuran (3 x 30) cm, Kayu Kelas I atau II
Memasang Lisplank GRC Lebar 20 cm
Memasang Lisplank GRC Lebar 8 mm
Memasang Rangka Dinding Pemisah (60 x 120) cm, Kayu Kelas II atau III
Memasang Dinding pemisah Teakwood Rangkap, Rangka Kayu Kelas II
Memasang Dinding pemisah Plywood Rangkap, Rangka Kayu Kelas II
Memasang Dinding Lambriziring dari Papan Kayu kelas I
Memasang Dinding Lambriziring dari Plywood ukuran (120 x 240) cm
HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING

Memasang LANTAI KERAMIK ukuran 40 x 40 cm (Polos)


Memasang LANTAI KERAMIK ukuran 40 x 40 cm (Warna)
Memasang LANTAI KERAMIK ukuran 30 x 30 cm (Polos)
Memasang LANTAI KERAMIK ukuran 30 x 30 cm (Warna)
NAMA ANALISA

Memasang LANTAI KERAMIK ukuran 20 x 20 cm (Polos)


Memasang LANTAI KERAMIK ukuran 20 x 20 cm (WARNA)
MEMASANG LANTAI PARQUET
Memasang DINDING KERAMIK 20 x 20 cm
Memasang DINDING KERAMIK 20 x 25 Cm (Polos)
Memasang DINDING KERAMIK 20 x 25 Cm (Warna)
NAMA ANALISA

Harga Satuan PEKERJAAN LANGIT - LANGIT (Plafond)

Pasang Rangka Langit - Langit ( 50 x 100 ) Cm


Memasang Langit - langit Tripleks uk. 120 x 240 cm, tebal 3 mm, 4 mm dan 6 mm
Memasang Langit - langit Lambriziring Kayu , tebal 9 mm
Memasang Langit - langit Gypsum Board uk. (1200x 2400x 9 mm)
Memasang List Langit - langit Kayu Profil
Memasang Langit - langit GRC tebal 4 mm

Harga Satuan PEKERJAAN BESI dan ALUMINIUM

Memasang Besi Profil


Memasang Rangka Kuda - Kuda Baja IWF
Memasang Rolling Door Aluminium
Memasang Pintu Lipat ( Folding Door ) Besi
Memasang Kusen Pintu Aluminium
Memasang Pintu Aluminium Strip lebar 8 cm
Memasang Jendela Nako dan Teralis
Memasang Talang Datar/ Jurai Seng Bjls 28 lebar 90 cm
Memasang Rangka Besi Hollow 1x40.40.2mm, Modul 60x120Cm, Dinding Partisi
Memasang Rangka Besi Hollow 1x40.40.2mm, Modul 60 x 60Cm, Plafond

HARGA SATUAN PEKERJAAN PENUTUP ATAP

PASANG ATAP ASBES GELOMBANG ( 2.50 X 0.92 ) X 5 MM


PASANG ATAP ASBES GELOMBANG ( 2.25 X 0.92 ) X 4 MM
PASANG ATAP ASBES GELOMBANG ( 2.00 X 0.92 ) X 5 MM
PASANG ATAP ASBES GELOMBANG ( 1.80 X0.92 ) X 5 MM
PASANG ATAP ASBES GELOMBANG ( 3.00 X 1.05 ) X 4 MM
PASANG ATAP ASBES GELOMBANG ( 2.70 X 1.05 ) X 4 MM
PASANG ATAP ASBES GELOMBANG ( 2.40X 1.05) X 4 MM
PASANG ATAP ASBES GELOMBANG ( 2.1X 1.05) X 4 MM
PASANG ATAP ASBES GELOMBANG (1.5 X 1.05) X 4 MM
PASANG ATAP ASBES GELOMBANG ( 3.00X 1.08 ) X 6 MM
PASANG ATAP ASBES GELOMBANG ( 2.70 X 1.08 ) X 6 MM
PASANG ATAP ASBES GELOMBANG ( 2.4 X 1.08 ) X 6 MM
PASANG ATAP ASBES GELOMBANG ( 2.1 X 1.08 ) X 6 MM
NAMA ANALISA

PASANG ATAP ASBES GELOMBANG ( 1.8 X 1.08 ) X 6 MM


PASANG ATAP GENTENG BETON
PASANG ATAP GENTENG METAL
PASANG ATAP SIRAP KAYU
PASANG NOK GENTENG BETON
PASANG NOK GENTENG METAL
PASANG ATAP SENG GELOMBANG
PASANG ATAP SENG GELOMBANG (**BOW)
PASANG ATAP NOK SENG
NAMA ANALISA

HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

MEMASANG KLOSET DUDUK/MONOBLOK


MEMASANG KLOSET JONGKOK PORSELEN
MEMASANG KLOSET JONGKOK TERASO
MEMASANG KLOSET JONGKOK KERAMIK STANDAR
MEMASANG URINOIR
MEMASANG WASTAFEL
MEMASANG BAK MANDI TERASO VOLUME 0.30 M3
MEMASANG BAK MANDI FIBREGLASS VOLUME 0.30 M3
MEMASANG BAK FIBREGLASS VOLUME 1M3 AIR
MEMASANG BAK KONTROL PAS. BATU BATA UKURAN (30 X30) CM Tinggi 35 Cm
MEMASANG BAK KONTROL PAS. BATU BATA UKURAN (45 X45) CM Tinggi 50 Cm
MEMASANG BAK KONTROL PAS. BATU BATA UKURAN (60 X60) CM Tinggi 65 Cm
MEMASANG PIPA PVC TIPE AW DIAMETER 1/2''
MEMASANG PIPA PVC TIPE AW DIAMETER 3/4''
MEMASANG PIPA PVC TIPE AW DIAMETER 2 1/2''
MEMASANG PIPA PVC TIPE AW DIAMETER 3''
MEMASANG PIPA PVC TIPE AW DIAMETER 4''
MEMASANG KRAN DIAMETER 3/4 ATAU 1/2
MEMASANG KRAN DIAMETER 1/2''
MEMASANG FLOOR DRAIN (BESI)
MEMASANG FLOOR DRAIN (PLASTIK)

HARGA SATUAN PEKERJAAN KUNCI DAN KACA

PASANG KUNCI TANAM ANTIK


PASANG KUNCI TANAM BIASA
PASANG KUNCI TANAM KAMAR MANDI
PASANG ENGSEL PINTU
PASANG ENGSEL JENDELA KUPU-KUPU
PASANG TARIKAN JENDELA
PASANG KAIT ANGIN
PASANG GRENDEL PINTU
PASANG GRENDEL JENDELA
PASANG PEGANGAN PINTU/ DOOR HOLDER
PASANG KACA, TEBAL 3 MM
PASANG KACA, TEBAL 5 MM
NAMA ANALISA

HARGA SATUAN PEKERJAAN PENGECATAN

MENGIKIS / MENGEROK PERMUKAAN CAT TEMBOK LAMA


PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR , 2 LAPIS CAT PENUTUP)
PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR , 3 LAPIS CAT PENUTUP)
PELABURAN BIDANG KAYU DENGAN POLITUR
PELABURAN BIDANG KAYU DENGAN CAT RESIDU DAN TER
PENGECATAN TEMBOK BARU ( 1 LAPIS PLAMIR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
PENGECATAN TEMBOK LAMA (1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP)
PENGECATAN PERMUKAAN BAJA DENGAN MENI BESI
PENGECATAN PERMUKAAN BAJA GALVANIS SECARA MANUAL 4 LAPIS
PENGECATAN PERMUKAAN BAJA GALVANIS SECARA MANUALSISTEM 1 LAPIS CAT MUTAKHIR
PENGECATAN PERMUKAAN BAJA GALVANIS SECARA SEMPROT DENGAN SISTIM 1 LAPIS CAT MUTAKHIR

HARGA SATUAN PEKERJAAN KUDA - KUDA BAJA RINGAN

Total Biaya Pemasangan , Total Biaya Bahan Material, Perkiraaan Alat Bantu Peralatan, Perkiraan Material Bantu
Kerja Dan Resiko Over head Cost

HARGA SATUAN PEKERJAAN KUSEN ALLUMINIUM

MEMASANG KUSEN PINTU ALLUMINUM


MEMASANG DAUN JENDELA KACA 5 MM RANGKA ALLUMINIUM
MEMASANG DAUN PINTU KACA 8 MM RANGKA ALLUMINIUM
MEMASANG HANDLE STAINLESS
MEMASANG KARET ALLUMINIUM
ISA BIAYA KONSTRUKSI SNI 2008
N UMUM KOTA JAMBI
GGARAN 2016

JUMLAH
HARGA
KERJAAN PERSIAPAN

Rp 288,329.00
Rp 69,823.00
Rp 891,065.00
Rp 1,148,940.00
Rp 14,000.00
Rp 1,108,930.00
Rp 127,832.00
Rp 1,146,640.00
Rp 573,320.00

KERJAAN TANAH

Rp 63,000.00
Rp 77,400.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Rp 21,000.00
Rp 25,800.00
Rp 46,000.00
Rp 97,562.50
Rp 175,080.00
Rp 97,040.00
Rp 130,800.00
Rp 72,762.50

KERJAAN PONDASI

Rp 1,093,635.00
JUMLAH
HARGA
Rp 1,044,465.00
Rp 1,010,409.00
Rp 986,451.00
Rp 953,649.00
Rp 821,454.00
Rp 909,035.40
Rp 884,566.20
Rp 726,621.00
Rp 2,187,175.00
Rp 1,009,546.00

ONSTRUKSI SNI 2002


AN BETON
Rp 901,845.00
Rp 130,698.00

KERJAAN BETON

Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
JUMLAH
HARGA
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Rp 3,452,021.25
Rp 3,989,891.26
Err:509
Rp 5,202,611.26
Rp 5,453,480.00
Rp 6,829,355.00
Rp 4,708,704.93
Rp 4,508,663.81
Rp 5,063,858.88
Rp 5,100,441.25
Rp 5,275,391.25
Rp 5,399,755.00
Rp 4,812,990.00
Rp 4,711,385.00
Rp 5,008,695.00
Rp 69,942.00
Rp 90,515.00
Rp 4,812,990.00

AAN BETON PRACETAK

Rp 89,243.60
Rp 111,587.00
Rp 124,565.40
Rp 167,363.00
Rp 6,820.00
Rp 11,020.00
Rp 8,920.00
Rp 59,390.00
Rp 61,075.00
Rp 54,945.00
JUMLAH
HARGA
Rp 54,800.00
Rp 70,040.60
Rp 67,320.00
JUMLAH
HARGA
AN PASANGAN DINDING

Rp 209,000.00
Rp 195,800.00
Rp 187,484.00
Rp 182,336.00
Rp 178,772.00
Rp 165,908.60
Rp 100,672.00
Rp 94,758.40
Rp 91,168.00
Rp 88,897.60
Rp 87,366.40
Rp 85,030.00
Rp 82,498.00
Rp 74,764.60
Rp 75,329.80

ERJAAN PLESTERAN

Rp 65,846.28
Rp 59,140.68
Rp 56,107.32
Rp 54,145.80
Rp 52,883.88
Rp 51,936.12
Rp 51,368.52
Rp 50,800.92
Rp 54,262.80
Rp 51,096.00
Rp 46,587.30
Rp 46,935.90
Rp 79,116.24
Rp 62,791.76
Rp 72,434.40
Rp 70,773.84
Rp 69,488.16
Rp 66,411.30
JUMLAH
HARGA
Rp 30,848.88
Rp 57,798.00
Rp 44,248.40
Rp 26,392.56
Rp 12,582.00
Rp 120,470.00
Rp 53,485.80
Rp 33,840.00
JUMLAH
HARGA
EKERJAAN KAYU

Rp 6,679,750.00
Rp 6,206,750.00
Rp 275,005.00
Rp 242,005.00
Rp 590,150.00
Rp 948,750.00
Rp 610,390.00
Rp 665,390.00
Rp 491,762.00
Rp 539,128.00
Rp 514,710.00
Rp 531,487.00
Rp 555,747.00
Rp 5,878,240.00
Rp 7,424,290.00
Rp 4,805,300.00
Rp 75,136.00
Rp 85,432.00
Rp 500,120.00
Rp 105,174.00
Rp 104,718.00
Rp 65,728.00
Rp 68,555.00
Rp 65,500.00
Rp 51,024.00
Rp 150,925.00
Rp 231,115.00
Rp 262,050.00
Rp 299,635.00
Rp 49,020.00
PENUTUP LANTAI DAN DINDING

Rp 281,382.00
Rp 169,574.76
Rp 211,113.75
Rp 213,784.50
JUMLAH
HARGA
Rp 199,853.00
Rp 219,993.00
Rp 3,405,075.00
Rp 235,089.00
Rp 243,814.00
Rp 257,814.00
JUMLAH
HARGA
LANGIT - LANGIT (Plafond)

Rp 105,174.00
Rp 44,297.50
Rp 210,720.00
Rp 46,455.00
Rp 39,630.00
Rp 51,310.00

AN BESI dan ALUMINIUM

Rp 36,490.00
Rp 36,490.00
Rp 809,500.00
Rp 858,880.00
Rp 184,312.50
Rp 2,335,961.50
Rp 597,320.00
Rp 194,221.00
Rp 112,845.00
Rp 142,425.00

ERJAAN PENUTUP ATAP

Rp 47,126.00
Rp 50,721.00
Rp 50,721.00
Rp 57,321.00
Rp 39,721.00
Rp 42,801.00
Rp 43,681.00
Rp 46,761.00
Rp 59,521.00
Rp 40,601.00
Rp 41,041.00
Rp 44,561.00
Rp 45,881.00
JUMLAH
HARGA
Rp 49,401.00
Rp 144,412.00
Rp 76,430.00
Rp 669,195.00
Rp 136,138.00
Rp 68,905.00
Rp 45,120.00
Rp 77,400.00
Rp 43,830.00
JUMLAH
HARGA
N SANITASI DALAM GEDUNG

Rp 3,164,235.00
Rp 535,030.00
Rp 525,330.00
Rp 1,661,530.00
Rp 1,165,975.00
Rp 580,869.20
Rp 446,730.00
Rp 811,010.00
Rp 360,335.00
Rp 395,420.00
Rp 569,945.00
Rp 676,334.00
Rp 20,052.00
Rp 75,993.75
Rp 29,126.80
Rp 74,879.38
Rp 94,716.88
Rp 80,910.00
Rp 43,860.00
Rp 52,250.00
Rp 19,800.00

RJAAN KUNCI DAN KACA

Rp 395,510.00
Rp 211,150.00
Rp 137,510.00
Rp 52,821.00
Rp 35,210.00
Rp 29,710.00
Rp 30,821.00
Rp 35,210.00
Rp 22,010.00
Rp 94,860.00
Rp 110,290.00
Rp 186,746.00
JUMLAH
HARGA

KERJAAN PENGECATAN

Rp 28,705.50
Rp 28,211.00
Rp 42,359.00
Rp 60,478.00
Rp 11,345.00
Rp 29,962.50
Rp 18,047.00
Rp 30,547.50
Rp 62,327.00
Rp 29,126.00
Rp 134,053.50

N KUDA - KUDA BAJA RINGAN

Rp 156,700.00

AAN KUSEN ALLUMINIUM

Rp 184,312.50
Rp 993,165.00
Rp 1,963,520.00
Rp 1,016,050.00
Rp 36,120.00
DAFTAR ANALISA
PEKERJAAN
TAHUN ANGGARAN 2015
PEMERINTAH KOTA JAMBI
DINAS PEKERJAAN UMUM
BIDANG CIPTA KARYA
Jalan H. ZAINIR HAVIZ No. 04 Kota Baru telp. (0741) 40553
JAMBI
NO URAIAN

1 2
1 Kepala Tukang
2 Mandor
3 Tukang Batu
4 Tukang Besi
5 Tukang Kayu
6 Pekerja
7 Sopir
8 Operator
9 Mekanik
10 Teknisi
11 Pembantu Sopir
12 Pembantu Operator
13 Pembantu Mekanik

DAFTAR HARGA MATERIAL / BARANG

NO NAMA/JENIS BARANG

1 2

MATERIAL
A. BAHAN PONDASI DAN PASANGAN
1 Batu Bata
2 Batu Belah
3 Batu Keduk
4 Batu Kerikil
NO NAMA/JENIS BARANG

1 2
5 Batu Kerikil
6 Batu Puru
7 Pasir Beton
8 Pasir Beton
9 Pasir Pasangan
10 Pasir Urug
11 Semen 40 Kg
12 Semen 50 Kg
13 Semen 50 Kg
14 Semen Perekat Glass Block
15 Semen Putih
16 Semen warna
17 Batu Koral beton (KERACAL)
18 Batu Kali
19 Super Bata
20 Tanah
21 Tanah Latrik

B. BAHAN LANTAI
1 Cincin Keramik
2 Keramik 40 x 40 cm (Warna)
3 Keramik 40 x 40 cm
4 Keramik 40 x 40 cm (Polos)
5 Keramik 40 x 40 cm
6 Keramik Mulia 10 x 20 cm
7 Keramik Mulia 20 x 20 cm (Warna)
8 Keramik Mulia 20 x 20 cm
9 Keramik Mulia 20 x 20 cm (Polos)
10 Keramik Mulia 20 x 20 cm
11 Keramik Mulia 30 x 30 cm (Warna)
NO NAMA/JENIS BARANG

1 2
12 Keramik Mulia 30 x 30 cm
13 Keramik Mulia 30 x 30 cm (Polos)
14 Keramik Mulia 30 x 30 cm
15 Keramik 20/25 (Warna)
16 Keramik 20/25
17 Keramik 20/25 (Polos)
18 Keramik 20/25
19 Tegel 20 x 20 cm
20 Tegel Plin 10 x 20 cm
21 Tegel Plin Mar-mar 40 x 60 cm
22 Tegel Plin Teraso 10 x 10 cm
23 Tegel Porselin 11 x 11 cm
24 Tegel Porselin 15 x 15 cm
25 Tegel Plin Teraso 30 x 30 cm
26 Granit 60 x 60
27 Granit 60 x 60
28 Keramik 60 x 60 cm
29 Keramik 60 x 60 cm
30 Tekwood

C. BAHAN PENUTUP LANGIT - LANGIT


1 Bubungan Genteng Beton
2 Bubungan Genteng Beton Munir
3 Bubungan Genteng Metal
4 Bubungan Genteng Pres
5 Eternit 3 mm
6 Genteng Beton
7 Genteng Impresario Coklat
8 Genteng Keramik
9 Genteng Metal
NO NAMA/JENIS BARANG

1 2
10 Genteng Monier
11 Genteng Multi Roof
12 Genteng Pres Kodok
13 Genteng Sakura Roof
14 GRC Board 4 mm
15 GRC Board 5 mm
16 GRC Board 6 mm
17 Super Plank GRC 9 mm lebar 10 cm
18 Super Plank GRC 9 mm lebar 20 cm
19 Super Plank GRC 9 mm lebar 30 cm
20 Gypsum 9 mm
21 Teakwood t .4 mm
22 Triplek 2,8 mm
23 Triplek 3,6 mm

D. BAHAN PENUTUP ATAP


1 Seng Gelombang BJLS 20 ( 6 feet )
2 Seng Gelombang warna
3 Seng Plat
4 Plat Talang (100 x 52 cm)
5 Seng Plastik
6 Asbes Gelombang
7 Asbes Nok
8 Atap Metal Polos Surya Roof (0,30 mm )
9 Seng Datar Plat BJLS 28 lebar 90
10 Seng Datar Plat BJLS 30 lebar 45
11 Atap Sirap
12 Nok Metal Polos Surya Roof (0,30 mm )
13 Baja Smustruss C.75.100
14 Baja Smustruss C.75.75
NO NAMA/JENIS BARANG

1 2
15 Reng/Topspan
16 Baut/Screw
17 L-Plate
18 Dynabolt

E. BAHAN KAYU
1 Kayu Balok Klas I
2 Kayu Balok Klas II
3 Kayu Balok Klas III
4 Kayu Balok Kulim
5 Kayu Bulian
6 Kayu Papan Bekisting
7 Kayu Papan Klas I
8 Kayu Papan Kelas I Parquite Tangga
9 Kayu Papan klass II
10 Kayu Papan klass III
11 Kayu Papan Tembesu
12 Kayu Papan Bulian
13 Papan Kayu Klass II ( Meranti )
14 List Plapond 1 x 3
15 List Profil Kayu P = 4 m
16 Multiplek t = 2 cm
17 Papan Mal
18 Plywood 4 mm
19 Plywood 9 mm
20 Kayu Bulat (Dolken)
21 Kayu Gelam
22 Papan Lisplank GRC L = 20 Cm
23 Papan Lisplank GRC L = 30 Cm
NO NAMA/JENIS BARANG

1 2
F. BAHAN BESI
1 Aluminium Strip
2 Baut/ Paku
3 Besi Beton
4 Besi dia. 8 mm
5 Besi dia. 10 mm
6 Besi dia. 12 mm
7 Besi dia. 14 mm
8 Besi dia. 16 mm
9 Besi Ulir dia. 8 mm
10 Besi Ulir dia. 10 mm
11 Besi Ulir dia. 12 mm
12 Besi Ulir dia. 14 mm
13 Besi Ulir dia. 16 mm
14 Besi Ulir dia. 25 mm
15 Besi Ulir dia. 32 mm
16 Besi Plat ( 120 x 240 ) cm tebal 10 mm
17 Besi Plat ( 120 x 240 ) cm tebal 5 mm
18 Besi Profil
19 Besi Strip (3/4 x 4) mm
20 Kawat beton
21 Kawat Bronjong
22 Kawat Ikat
23 Kawat Las
24 Mour Baut/Begel/Besi
25 Paku Asbes
26 Paku Beton 3 ''
27 Paku Biasa
28 Paku Bulian
29 Paku GRC
NO NAMA/JENIS BARANG

1 2
30 Paku Halus
31 Paku Payung Ulir Pakai Karet
32 Paku Seng
33 Paku Sirap
34 Paku Sumbat
35 Paku Pancing 60 x 230
36 Paku Sekrup
37 Pintu Lipat (Folding Door) Besi
38 Plat Strip 4 x 40
39 Profil Aluminium
40 Rolling Door Alumunium
41 Sealent
42 Sewa Alat
43 Skrup Fixer
44 Hollow Galvanis 2 x 4
45 Hollow Galvanis 4 x 4
46 Hollow Zincromat 2 x 4
47 HollowZincromat 4 x 4
48 Hollow Meni 2 x 4
49 Besi Jaring Kawat Baja (Wiremesh)
50 Baja Profil/ Baja Prestres/ Baja Seling

G. BAHAN INSTALASI LISTRIK


1 Instalasi Titik dan Stop Kontak
2 Lampu XC 15 watt
3 Lampu XL 20 watt
4 MCB 1 Phase + BOX
5 Saklar ganda Merk Broco
6 Saklar tunggal Merk Broco
7 Stop kontak Merk Broco
NO NAMA/JENIS BARANG

1 2
8 Pek. Pasang Meteran Baru 1300 watt + Gorunding Meteran

H. BAHAN SANITAIR
1 Bak Cuci Piring Stainles Stell
2 Bak Mandi Fiver Glass 0.3 M3
3 Bak Mandi Teraso 0.3 M3
4 Closet Jongkok Standar
5 Daun Pintu Fiber Wc/Km Terpasang
6 Floor Drain Besi
7 Floor Drain Plastik
8 Isolatif
9 Closet Jongkok
10 Closet Duduk (America Standart Lengkap)
11 Kran 1/2 ''
12 Kran Air San Standar
13 Lem Pipa
14 Pintu Fiber
15 Pipa Hitam 3"
16 Pipa Hitam 4"
17 Pipa Hitam, Dia 3"
18 Pipa Hitam, Dia 4"
19 Pipa PVC, Dia 1/2"
20 Pipa PVC, Dia 3/4"
21 Pipa PE, Dia. 1/2"
22 Pipa PE, Dia. 3/4"
23 Pipa PE, Dia. 2 1/2"
24 Pipa PE, Dia. 3"
25 Pipa PE, Dia. 4"
26 Pipa PE, Dia. 6"
27 Pipa PE, Dia. 8"
NO NAMA/JENIS BARANG

1 2
28 Pipa PE, Dia. 12"
29 Pipa PE, Dia. 16"
30 Seal Tape
31 Wastafel
32 Reducer
33 Bend
34 Dop 1/2"
35 Tee 1/2"
36 Flange 4"
37 Stop valve 1/2"
38 Elbow
39 Gate valve 1/2"
40 Instalasi Titik Air Bersih
41 Instalasi Titik Air Kotor
42 Pek. Penyambungan Baru PDAM
43 Uriniour
44 Waterstop 150 mm
45 Waterstop 200 mm
46 Waterstop 230-320 mm
47 Pek. Septicktank dan Resapan

I. BAHAN FINISHING
1 Amplas
2 Cat Dasar/Menie Kayu dan Besi
3 Cat Kilat/Cat Kayu
4 Cat Tembok Metrolit
5 Dempul
6 Kapur Padam
7 Lem Fox
8 Lem Aibon
NO NAMA/JENIS BARANG

1 2
9 Lem Kayu
10 Minyak Bekisting
11 Thiner (Minyak Cat)
12 Minyak Tanah
13 Plamour

J. BAHAN KUNCI DAN PENGGANTUNG


1 Elbow 1/2 ''
2 Engsel Jendela
3 Engsel Pintu
4 Grendel Jendela
5 Grendel Pintu
6 Hak angin
7 Kunci Pintu Standar
8 T 1/2
9 Tarikan Jendela
10 Tarikan Jendela 4"
11 Kunci Tanam Antik
12 Kunci Tanam Biasa
13 Kunci Tanam Kamar Mandi
14 Door Holder
15 Tarikan Pintu
16 Karet Kusen Alumunium
17 Kunci Tanam Jendela
18 Handle Stainless
19 Handle Stainless 2
20 Handle Alluminium

K. BAHAN - BAHAN LAIN


1 Conblok cacing
NO NAMA/JENIS BARANG

1 2
2 Conblok segi enam
3 Conblok bata
4 Gorong-gorong dia. 100 cm
5 Gorong-gorong dia. 80 cm
6 Gorong-gorong dia. 60 cm
7 Gorong-gorong dia. 40 cm
8 Gorong-gorong dia. 30 cm
9 Gorong-gorong dia. 20 cm
10 Kaca Polos 3 mm
11 Kaca Polos 5 mm
12 Kaca Polos 8 mm
13 Kaca Tempered 12 mm
14 Pasir Kasar
15 Aspal
16 Aspal Hot mix
17 Solar
18 Bensin
19 Abu Batu
20 Agregat Klas A
21 Agregat Klas B
22 Agregat Klas C
23 Agregat Pecah Mesin 0 - 5 mm
24 Agregat Pecah Mesin 5 - 10 mm
25 Agregat Pecah Mesin 10 - 20 mm
26 Bahan Tanah Timbunan
27 Bahan Pilihan
28 Plastik Filter
29 Agregat Kasar
30 Agregat Halus
31 Air
NO NAMA/JENIS BARANG

1 2
32 Filler/Abu Batu
33 Baja Tulangan (Ulir) D32
34 Belangkin
35 Glass Block
36 Minyak Pelumas
37 Mozaik 30 x 30 cm
38 Pelumas
39 Residu
40 Sirlak
41 Spritus
42 Wallpaper
43 Cat Meni
44 Cat Antara
45 Politur
46 Kuas
47 Strotox
48 Kapur Padam
49 Floor Hings
50 List Gutter Aluminium
51 Portal Pintu

Catatan :
-
Adanya perbedaan Harga Bahan, Material dan Upah di Analisa SNI karena naiknya Harga BBM d
-
Di Bulan Maret 2015 inflasinya berkisar 15 % karena BBM Premium berkisar Rp 7300 dan Solar R
-
Dibulan Januari 2016 inflasinya berkisar 10 % karena BBM Premium berkisar Rp. 6950 Dan Sola
DAFTAR UPAH

Orang/Hari (OH) 2015

3
135,000.00
120,000.00
110,000.00
110,000.00
110,000.00
80,000.00
95,000.00
120,000.00
150,000.00
110,000.00
80,000.00
80,000.00
80,000.00

HARGA HASIL SURVEY


KECAMATAN
1 2 4 7
SATUAN

Kota Baru Jambi Selatan Jambi Timur Jelutung

3 4 5 7 10

Bh 450.00 375.00 385.00 450.00


M3 - - - -
M3 - - - -
M3 400,000.00 300,000.00 300,000.00 350,000.00
HARGA HASIL SURVEY
KECAMATAN
1 2 4 7
SATUAN

Kota Baru Jambi Selatan Jambi Timur Jelutung

3 4 5 7 10
Kg - - - 285.71
M3 - - - -
M3 50,000.00 80,000.00 50,000.00 75,000.00
Kg - - - -
M3 - - 50,000.00 60,000.00
M3 50,000.00 80,000.00 50,000.00 60,000.00
Zak - - - 50,000.00
Zak 65,000.00 65,000.00 63,500.00 65,000.00
Kg 2,000.00 1,300.00 1,270.00 1,300.00
Kg - - - -
40 Kg 80,000.00 80,000.00 80,000.00 110,000.00
Kg 15,000.00 15,000.00 15,000.00 15,000.00
M3 - - - -
M3 - - - -
Bh - 380.00 - -
M3 - 37,500.00 - -
M3 - - - -

6.25
M' 10,000.00 5,000.00 7,000.00 6,000.00
M2 55,000.00 55,000.00 57,000.00 60,000.00
Bh 8,800.00 8,800.00 9,120.00 9,600.00
M2 - - 48,500.00 -
Bh - - 7,760.00 -
Bh 15,000.00 1,100.00 1,060.00 -
M2 60,000.00 55,000.00 53,000.00 55,000.00
Bh 2,400.00 2,200.00 2,120.00 2,200.00
M2 - - - -
Bh - - - -
M2 60,000.00 50,000.00 48,000.00 50,000.00
HARGA HASIL SURVEY
KECAMATAN
1 2 4 7
SATUAN

Kota Baru Jambi Selatan Jambi Timur Jelutung

3 4 5 7 10
Bh 5,400.54 4,500.45 4,320.43 4,500.45
M2 - - - -
Bh - - - -
M2 60,000.00 54,000.00 55,000.00 60,000.00
Bh 3,000.00 2,700.00 2,750.00 3,000.00
M2 - - - -
Bh - - - -
Bh - - - -
Bh - 3,500.00 3,500.00 -
Bh - 15,000.00 15,000.00 -
Bh - - - -
Bh - - - -
Bh - - - -
Bh - - - -
M2 - - - -
Bh - - - -
M2 - - - -
Bh - - - -
Kpg 75,000.00 70,000.00 70,000.00 -

Bh - - - -
Bh - - - -
Kpg - 22,000.00 17,000.00 18,000.00
Kpg - - - -
Kpg - - - -
Kpg - - - -
Lbr - - - -
Kpg - - - -
Kpg - 50,500.00 50,000.00 40,000.00
HARGA HASIL SURVEY
KECAMATAN
1 2 4 7
SATUAN

Kota Baru Jambi Selatan Jambi Timur Jelutung

3 4 5 7 10
Bh - - - -
Kpg 90,000.00 26,000.00 25,500.00 100,000.00
Bh - - - -
Lbr 40,000.00 30,000.00 29,000.00 40,000.00
Lbr 70,000.00 72,000.00 68,500.00 69,000.00
Lbr - - - -
Lbr - - - -
Kpg - - - -
Kpg - - - -
Kpg - - - -
Lbr 75,000.00 69,000.00 65,000.00 75,000.00
Lbr 75,000.00 64,000.00 70,000.00 -
Lbr 55,000.00 52,000.00 43,000.00 50,000.00
Lbr 65,000.00 55,000.00 63,000.00 60,000.00

Kodi 700,000.00 660,000.00 635,000.00 660,000.00


Kodi 1,200,000.00 940,000.00 950,000.00 1,200,000.00
Lbr 45,000.00 65,000.00 60,000.00 -
Lbr
Lbr 95,000.00 85,000.00 55,000.00 65,000.00
Lbr 40,000.00 36,250.00 36,000.00 -
Kpg 20,000.00 21,000.00 20,000.00 -
M2 35,000.00 16,500.00 16,000.00 70,000.00
M1 35,000.00 85,000.00 - 30,000.00
M1 15,000.00 - - 15,000.00
Lbr - - - -
M1 25,000.00 16,500.00 16,000.00 -
M1
M1
HARGA HASIL SURVEY
KECAMATAN
1 2 4 7
SATUAN

Kota Baru Jambi Selatan Jambi Timur Jelutung

3 4 5 7 10
M1
Bh
Bh
Bh

M3 2,500,000.00 2,850,000.00 2,800,000.00 -


M3 1,700,000.00 2,600,000.00 2,500,000.00 -
M3 1,600,000.00 1,850,000.00 1,800,000.00 2,500,000.00
M3 4,000,000.00 3,500,000.00 - -
M3 16,000,000.00 18,000,000.00 - -
M3 1,700,000.00 1,850,000.00 1,800,000.00 2,500,000.00
M3 2,500,000.00 2,850,000.00 2,800,000.00 -
M2 2,500,000.00 2,850,000.00 2,800,000.00 -
M3 - 2,600,000.00 2,500,000.00 -
M3 1,700,000.00 1,850,000.00 1,800,000.00 -
M3 11,000,000.00 - - -
M3 16,000,000.00 18,000,000.00 - -
M3 6,000,000.00 1,850,000.00 1,800,000.00 -
Lbr 25,000.00 - 25,000.00 -
Lbr 25,000.00 - 25,000.00 -
Lbr
M3 1,750,000.00 1,850,000.00 1,800,000.00 2,000,000.00
Lbr - - - -
Lbr 100,000.00 - 100,000.00 -
Btg - 6,000.00 - 6,000.00
Btg - - - -
M1 - - - -
M1 - - - -
HARGA HASIL SURVEY
KECAMATAN
1 2 4 7
SATUAN

Kota Baru Jambi Selatan Jambi Timur Jelutung

3 4 5 7 10

M1 - - - -
Kg 14,000.00 - - -
Kg - - - -
Btg 32,000.00 32,000.00 30,000.00 35,000.00
Btg 52,000.00 53,000.00 50,000.00 50,000.00
Btg 72,000.00 61,000.00 70,000.00 75,000.00
Btg 100,000.00 95,000.00 90,000.00 110,000.00
Btg 75,000.00 - 77,000.00 135,000.00
Btg 150,000.00 - - 37,000.00
Btg 150,000.00 - - 55,000.00
Btg 50,000.00 - - 80,000.00
Btg 85,000.00 - - 120,000.00
Btg 90,000.00 - - 150,000.00
Btg - - - -
Btg - - - -
Lbr - - - -
Lbr - - - -
Kg - - - -
Btg - - - -
Kg 15,000.00 15,000.00 12,000.00 15,000.00
Rol (10m) - 90,000.00 85,000.00 -
Kg - 15,000.00 12,000.00 20,000.00
Kg 30,000.00 25,000.00 25,000.00 20,000.00
Bh - - - -
Kg 25,000.00 21,000.00 20,000.00 -
Kg 20,000.00 15,000.00 15,000.00 12,000.00
Kg 14,000.00 13,000.00 12,000.00 14,000.00
Kg 20,000.00 25,000.00 20,000.00 35,000.00
Bungkus 20,000.00 15,000.00 15,000.00 20,000.00
HARGA HASIL SURVEY
KECAMATAN
1 2 4 7
SATUAN

Kota Baru Jambi Selatan Jambi Timur Jelutung

3 4 5 7 10
Ktk 20,000.00 10,000.00 15,000.00 17,000.00
Ktk - 16,000.00 - -
Ktk 20,000.00 12,000.00 20,000.00 20,000.00
Kg - - 15,000.00 -
Kg - - - -
Kg - - - -
Kg - - - -
M2 - - - -
Btg - - - -
M1 - - - -
M2 - - - -
Tube 25,000.00 35,000.00 30,000.00 -
Jam - - - -
Bh - 22,000.00 - -
Btg - - - -
Btg - - - -
Btg - - - -
M1 - - - -
M1 - - - -
Kg - - - -
Kg - - - -

Titik - - - -
Unit - - - -
Unit - - - -
bh 25,000.00 35,000.00 - 30,000.00
Unit 20,000.00 42,500.00 - 20,000.00
Unit 15,000.00 35,000.00 - 15,000.00
Bh 15,000.00 14,000.00 14,000.00 20,000.00
HARGA HASIL SURVEY
KECAMATAN
1 2 4 7
SATUAN

Kota Baru Jambi Selatan Jambi Timur Jelutung

3 4 5 7 10
Bh - - - -

Bh 200,000.00 155,000.00 150,000.00 140,000.00


Bh 250,000.00 225,000.00 220,000.00 150,000.00
Bh - - - -
Bh 150,000.00 95,000.00 100,000.00 220,000.00
Bh 350,000.00 190,000.00 185,000.00 250,000.00
Bh 10,000.00 35,000.00 30,000.00 15,000.00
Bh - 5,500.00 5,000.00 5,000.00
Bh 4,000.00 3,500.00 3,000.00 4,000.00
Bh 150,000.00 235,000.00 235,000.00 120,000.00
Bh - - - -
Bh 10,000.00 9,500.00 10,000.00 20,000.00
Bh 2,000.00 36,500.00 35,000.00 -
Kg 40,000.00 37,000.00 40,000.00 40,000.00
Set 200,000.00 190,000.00 185,000.00 -
Btg 10,000.00 45,000.00 40,000.00 35,000.00
Btg 15,000.00 60,000.00 55,000.00 45,000.00
Btg 10,000.00 - 40,000.00 -
Btg 15,000.00 - 55,000.00 -
Btg 95,000.00 18,000.00 23,000.00 35,000.00
Btg 140,000.00 27,000.00 26,000.00 55,000.00
M' - - 35,000.00 -
M' - - 45,000.00 -
M' - - - -
M' - - - -
M' - - - -
M' - - - -
M' - - - -
HARGA HASIL SURVEY
KECAMATAN
1 2 4 7
SATUAN

Kota Baru Jambi Selatan Jambi Timur Jelutung

3 4 5 7 10
M' - - - -
M' - - - -
Bh - 3,500.00 3,000.00 4,000.00
Set - 255,000.00 250,000.00 -
Bh - 25,000.00 20,000.00 -
Bh - - - -
Bh 2,000.00 3,000.00 2,500.00 -
Bh 125,000.00 3,500.00 3,000.00 3,000.00
Bh - 35,000.00 30,000.00 -
Bh - 25,500.00 30,000.00 20,000.00
Bh 2,000.00 2,500.00 2,000.00 2,500.00
Bh - 3,000.00 2,500.00 -
Titik - - - -
Titik - - - -
Unit - - - -
Bh - - - -
M' - - - -
M' - - - -
M' - - - -
Unit - - - -

Lbr 6,000.00 5,000.00 7,000.00 6,000.00


Kg 40,000.00 28,000.00 25,000.00 40,000.00
Kg 55,000.00 56,000.00 57,000.00 60,000.00
Kg 23,750.00 24,000.00 23,750.00 23,750.00
Kg - 4,000.00 - 75,000.00
Bks (3kg) - 7,500.00 7,000.00 -
Kg - 16,000.00 15,000.00 -
Kg - 32,000.00 35,000.00 40,000.00
HARGA HASIL SURVEY
KECAMATAN
1 2 4 7
SATUAN

Kota Baru Jambi Selatan Jambi Timur Jelutung

3 4 5 7 10
Kg 15,000.00 - - -
Ltr - - - -
Btl 10,000.00 9,000.00 8,000.00 10,000.00
Ltr - - - -
Pl 120,000.00 200,000.00 195,000.00 -

Bh 2,500.00 2,500.00 2,000.00 23,750.00


Bh 15,000.00 8,000.00 15,000.00 20,000.00
Bh 25,000.00 18,000.00 17,500.00 30,000.00
Bh 5,000.00 7,000.00 7,000.00 8,000.00
Bh 20,000.00 8,500.00 15,000.00 15,000.00
Bh 10,000.00 5,000.00 7,000.00 10,000.00
Bh 125,000.00 35,000.00 120,000.00 150,000.00
Bh 15,000.00 2,500.00 2,000.00 10,000.00
Bh 5,000.00 3,000.00 5,000.00 10,000.00
Bh 10,000.00 4,000.00 - 15,000.00
Bh - - - -
Bh - - -
Bh - - - -
Bh - - - -
Bh - - - -

Bh

Pcs
Pcs

Bh - - - -
HARGA HASIL SURVEY
KECAMATAN
1 2 4 7
SATUAN

Kota Baru Jambi Selatan Jambi Timur Jelutung

3 4 5 7 10
Bh - - - -
Bh - - - -
Bh - - - -
Bh - - - -
Bh - - - -
Bh - - - -
Bh - - - -
Bh - - - -
M2 - - - -
M2 - - - -
M2 - - - -
M2
M3 - - - -
Kg - - - -
Ton - - - -
Ltr - 14,000.00 - -
Ltr - - - -
M3 - - - -
Unit Price - - - -
Unit Price - - - -
Unit Price - - - -
M3 - - - -
M3 - - - -
M3 - - - -
M3 - - - -
M3 - - - -
M2 - - - -
M3 - - - -
M3 - - - -
Kg - - - -
HARGA HASIL SURVEY
KECAMATAN
1 2 4 7
SATUAN

Kota Baru Jambi Selatan Jambi Timur Jelutung

3 4 5 7 10
M3 - - - -
Kg - - - -
Ltr - - - -
Bh 20,000.00 - - -
Ltr - - - -
Bh - - - -
Ltr - - - -
Ltr - - - -
Kg - - - -
Btl - 8,000.00 8,500.00 -
M2 - - - -
Kg - - - -
Kg - - - -
Ltr - - - -
Bh - - - -
Kg - - - -

pcs
m'

an Upah di Analisa SNI karena naiknya Harga BBM di Bulan Maret 2015 dan turunnya harga BBM di bulan Januari 2016.

karena BBM Premium berkisar Rp 7300 dan Solar Rp. 6900

% karena BBM Premium berkisar Rp. 6950 Dan Solar Rp. 5650
Orang/Hari (OH) 2015

3
135,000.00
120,000.00
110,000.00
110,000.00
110,000.00
80,000.00
95,000.00
120,000.00
150,000.00
110,000.00
80,000.00
80,000.00
80,000.00

HARGA HASIL SURVEY


Harga Survey
Bahan Sept + 10 %
Harga Survey (Overhead + Profit) Harga Satuan KETERANGAN
Bahan Januari & Harga Bensin Bahan Untuk
2016 Pada 5 Januari Tahun 2016
2016 Rp. 6950 dan
Solar Rp. 5650

4 6

450.00 495.00 500.00 0.15


- 477,800.00 477,800.00 112.50
- - - 637.50
400,000.00 440,000.00 440,000.00
HARGA HASIL SURVEY
Harga Survey
Bahan Sept + 10 %
Harga Survey (Overhead + Profit) Harga Satuan KETERANGAN
Bahan Januari & Harga Bensin Bahan Untuk
2016 Pada 5 Januari Tahun 2016
2016 Rp. 6950 dan
Solar Rp. 5650

4 6
285.71 314.29 400.00
- - -
80,000.00 88,000.00 88,000.00
- - 100.00
60,000.00 66,000.00 66,000.00
80,000.00 88,000.00 88,000.00
50,000.00 55,000.00 55,000.00
65,000.00 71,500.00 71,500.00
2,000.00 2,200.00 2,200.00
- 7,800.00 7,800.00
110,000.00 121,000.00 121,000.00
15,000.00 16,500.00 16,500.00
- 325,000.00 325,000.00
- 350,000.00 350,000.00
380.00 418.00 500.00
37,500.00 41,250.00 41,250.00
- 77,600.00 77,600.00

10,000.00 11,000.00 11,000.00


60,000.00 66,000.00 66,000.00
9,600.00 10,560.00 10,600.00
48,500.00 53,350.00 53,350.00
7,760.00 8,536.00 8,600.00
15,000.00 16,500.00 16,500.00
60,000.00 66,000.00 66,000.00
2,400.00 2,640.00 2,700.00
- 48,000.00 48,000.00
- 1,920.00 2,000.00
60,000.00 66,000.00 66,000.00
HARGA HASIL SURVEY
Harga Survey
Bahan Sept + 10 %
Harga Survey (Overhead + Profit) Harga Satuan KETERANGAN
Bahan Januari & Harga Bensin Bahan Untuk
2016 Pada 5 Januari Tahun 2016
2016 Rp. 6950 dan
Solar Rp. 5650

4 6
5,400.54 5,940.59 5,950.00
- 62,500.00 62,500.00
- 5,625.00 5,700.00
60,000.00 66,000.00 66,000.00
3,000.00 3,300.00 3,300.00
- 52,000.00 52,000.00
- 2,600.00 2,600.00
- - -
3,500.00 3,850.00 3,850.00
15,000.00 16,500.00 16,500.00
- - -
- - -
- - -
- - -
- 184,000.00 184,000.00
- 66,240.00 66,300.00
- 140,000.00 140,000.00
- 50,400.00 50,400.00
75,000.00 82,500.00 82,500.00

- 12,400.00 12,400.00
- 8,600.00 8,600.00
22,000.00 24,200.00 24,200.00
- 10,400.00 10,400.00
- 70,200.00 70,200.00
- 10,400.00 10,400.00
- 13,000.00 13,000.00
- 14,300.00 14,300.00
50,500.00 55,550.00 55,550.00
HARGA HASIL SURVEY
Harga Survey
Bahan Sept + 10 %
Harga Survey (Overhead + Profit) Harga Satuan KETERANGAN
Bahan Januari & Harga Bensin Bahan Untuk
2016 Pada 5 Januari Tahun 2016
2016 Rp. 6950 dan
Solar Rp. 5650

4 6
- 9,780.00 9,780.00
100,000.00 110,000.00 110,000.00
- 1,150.00 1,150.00
40,000.00 44,000.00 44,000.00
72,000.00 79,200.00 79,200.00
- 115,000.00 115,000.00
- 172,000.00 172,000.00
- 40,300.00 40,300.00
- 57,500.00 57,500.00
- 80,500.00 80,500.00
75,000.00 82,500.00 82,500.00
75,000.00 82,500.00 82,500.00
55,000.00 60,500.00 60,500.00
65,000.00 71,500.00 71,500.00

700,000.00 770,000.00 770,000.00


1,200,000.00 1,320,000.00 1,320,000.00 66,000.00
65,000.00 71,500.00 71,500.00
20,100.00 20,100.00
95,000.00 104,500.00 104,500.00
40,000.00 44,000.00 44,000.00
21,000.00 23,100.00 23,100.00
70,000.00 77,000.00 77,000.00
85,000.00 93,500.00 93,500.00
15,000.00 16,500.00 16,500.00
- 10,350.00 10,350.00
25,000.00 27,500.00 27,500.00
20,500.00 20,500.00
14,250.00 14,300.00
HARGA HASIL SURVEY
Harga Survey
Bahan Sept + 10 %
Harga Survey (Overhead + Profit) Harga Satuan KETERANGAN
Bahan Januari & Harga Bensin Bahan Untuk
2016 Pada 5 Januari Tahun 2016
2016 Rp. 6950 dan
Solar Rp. 5650

4 6
15,000.00 15,000.00
500.00 500.00
3,500.00 3,500.00
1,000.00 1,000.00

2,850,000.00 3,135,000.00 3,135,000.00


2,600,000.00 2,860,000.00 2,860,000.00
2,500,000.00 2,750,000.00 2,750,000.00
4,000,000.00 4,400,000.00 4,400,000.00
18,000,000.00 19,800,000.00 19,800,000.00
2,500,000.00 2,750,000.00 2,750,000.00
2,850,000.00 3,135,000.00 3,135,000.00
2,850,000.00 3,135,000.00 3,135,000.00
2,600,000.00 2,860,000.00 2,860,000.00
1,850,000.00 2,035,000.00 2,035,000.00
11,000,000.00 12,100,000.00 12,100,000.00
18,000,000.00 19,800,000.00 19,800,000.00
6,000,000.00 6,600,000.00 6,600,000.00
25,000.00 27,500.00 27,500.00 per 4 m
25,000.00 27,500.00 27,500.00 per 4 m
- 77,000.00 77,000.00
2,000,000.00 2,200,000.00 2,200,000.00
- 92,000.00 92,000.00
- 187,000.00 187,000.00
6,000.00 6,600.00 6,600.00
- 19,000.00 19,000.00
- 25,000.00 25,000.00
- 36,000.00 36,000.00
HARGA HASIL SURVEY
Harga Survey
Bahan Sept + 10 %
Harga Survey (Overhead + Profit) Harga Satuan KETERANGAN
Bahan Januari & Harga Bensin Bahan Untuk
2016 Pada 5 Januari Tahun 2016
2016 Rp. 6950 dan
Solar Rp. 5650

4 6

- 119,600.00 119,600.00
14,000.00 15,400.00 15,400.00
- 8484.961 8,500.00
35,000.00 38,500.00 38,500.00 P=11,5 M
53,000.00 58,300.00 58,300.00 P=11,5 M
75,000.00 82,500.00 82,500.00 P=11,5 M
110,000.00 121,000.00 121,000.00 P=11,5 M
135,000.00 148,500.00 148,500.00 P=11,5 M
150,000.00 165,000.00 165,000.00
150,000.00 165,000.00 165,000.00
80,000.00 88,000.00 88,000.00
120,000.00 132,000.00 132,000.00
150,000.00 165,000.00 165,000.00
- 437,000.00 437,000.00
- 920,000.00 920,000.00
- 3,055,000.00 3,055,000.00
- 1,495,000.00 1,495,000.00
- - -
- 34,500.00 34,500.00
15,000.00 16,500.00 16,500.00
90,000.00 99,000.00 99,000.00
20,000.00 22,000.00 22,000.00
30,000.00 33,000.00 33,000.00
- 6,500.00 6,500.00
25,000.00 27,500.00 27,500.00
20,000.00 22,000.00 22,000.00
14,000.00 15,400.00 15,400.00
35,000.00 38,500.00 38,500.00
20,000.00 22,000.00 22,000.00 per 1 kg
HARGA HASIL SURVEY
Harga Survey
Bahan Sept + 10 %
Harga Survey (Overhead + Profit) Harga Satuan KETERANGAN
Bahan Januari & Harga Bensin Bahan Untuk
2016 Pada 5 Januari Tahun 2016
2016 Rp. 6950 dan
Solar Rp. 5650

4 6
20,000.00 22,000.00 22,000.00
16,000.00 17,600.00 17,600.00
20,000.00 22,000.00 22,000.00
15,000.00 16,500.00 16,500.00
- 26,000.00 26,000.00
- 30,300.00 30,300.00
- 15,000.00 15,000.00
- 766,700.00 766,700.00
- 27,400.00 27,400.00
- 130,000.00 130,000.00
- 600,000.00 600,000.00
35,000.00 38,500.00 38,500.00
- 109,200.00 109,200.00
22,000.00 24,200.00 24,200.00
- 6,475.00 6,480.00
- 8,625.00 8,630.00
- 6,000.00 6,000.00
- 7,500.00 7,500.00
- 20,200.00 20,200.00
- 15,000.00 15,000.00
- 20,800.00 20,800.00

- 162,500.00 162,500.00
- 46,000.00 46,000.00
- 63,300.00 63,300.00
35,000.00 38,500.00 38,500.00
42,500.00 46,750.00 46,750.00
35,000.00 38,500.00 38,500.00
20,000.00 22,000.00 22,000.00
HARGA HASIL SURVEY
Harga Survey
Bahan Sept + 10 %
Harga Survey (Overhead + Profit) Harga Satuan KETERANGAN
Bahan Januari & Harga Bensin Bahan Untuk
2016 Pada 5 Januari Tahun 2016
2016 Rp. 6950 dan
Solar Rp. 5650

4 6
- 3,500,000.00 3,500,000.00

200,000.00 220,000.00 220,000.00


250,000.00 275,000.00 275,000.00
- 165,000.00 165,000.00
220,000.00 242,000.00 242,000.00 KIA
350,000.00 385,000.00 385,000.00
35,000.00 38,500.00 38,500.00
5,500.00 6,050.00 6,050.00
4,000.00 4,400.00 4,400.00
235,000.00 258,500.00 258,500.00
- 2,750,000.00 2,750,000.00
20,000.00 22,000.00 22,000.00
36,500.00 40,150.00 40,150.00
40,000.00 44,000.00 44,000.00
200,000.00 220,000.00 220,000.00
45,000.00 49,500.00 49,500.00 Pipa Besi
60,000.00 66,000.00 66,000.00 Pipa Besi
40,000.00 44,000.00 44,000.00 Pipa Besi
55,000.00 60,500.00 60,500.00 Pipa Besi
95,000.00 104,500.00 104,500.00 per 4 m
140,000.00 154,000.00 154,000.00 per 4 m
35,000.00 38,500.00 38,500.00
45,000.00 49,500.00 49,500.00
- 14,075.00 14,080.00
- 38,750.00 38,750.00
- 53,750.00 53,750.00
- 92,500.00 92,500.00
- 150,000.00 150,000.00
HARGA HASIL SURVEY
Harga Survey
Bahan Sept + 10 %
Harga Survey (Overhead + Profit) Harga Satuan KETERANGAN
Bahan Januari & Harga Bensin Bahan Untuk
2016 Pada 5 Januari Tahun 2016
2016 Rp. 6950 dan
Solar Rp. 5650

4 6
- 381,250.00 381,250.00
- 417,500.00 417,500.00
4,000.00 4,400.00 4,400.00
255,000.00 280,500.00 280,500.00
25,000.00 27,500.00 27,500.00
- 10,400.00 10,400.00
3,000.00 3,300.00 3,300.00
125,000.00 137,500.00 137,500.00
35,000.00 38,500.00 38,500.00
30,000.00 33,000.00 33,000.00
2,500.00 2,750.00 2,750.00
3,000.00 3,300.00 3,300.00
- 55,000.00 55,000.00
- 55,000.00 55,000.00
- 2,500,000.00 2,500,000.00
- 862,500.00 862,500.00
- 110,745.00 110,750.00
- 144,831.00 144,900.00
- 982,100.00 982,100.00
- 10,000,000.00 10,000,000.00

7,000.00 7,700.00 7,700.00


40,000.00 44,000.00 44,000.00
60,000.00 66,000.00 66,000.00
24,000.00 26,400.00 26,400.00
75,000.00 82,500.00 82,500.00
7,500.00 8,250.00 8,250.00 per 3 kg
16,000.00 17,600.00 17,600.00
40,000.00 44,000.00 44,000.00
HARGA HASIL SURVEY
Harga Survey
Bahan Sept + 10 %
Harga Survey (Overhead + Profit) Harga Satuan KETERANGAN
Bahan Januari & Harga Bensin Bahan Untuk
2016 Pada 5 Januari Tahun 2016
2016 Rp. 6950 dan
Solar Rp. 5650

4 6
15,000.00 16,500.00 16,500.00
- 11,700.00 11,700.00
10,000.00 11,000.00 11,000.00
- 12,900.00 12,900.00
200,000.00 220,000.00 220,000.00

23,750.00 26,125.00 26,130.00


20,000.00 22,000.00 22,000.00
30,000.00 33,000.00 33,000.00
8,000.00 8,800.00 8,800.00
20,000.00 22,000.00 22,000.00
10,000.00 11,000.00 11,000.00
150,000.00 165,000.00 165,000.00
15,000.00 16,500.00 16,500.00
10,000.00 11,000.00 11,000.00
15,000.00 16,500.00 16,500.00
- 316,250.00 316,250.00
- 148,000.00 148,000.00
- 75,000.00 75,000.00
- 28,750.00 28,750.00
- 86,250.00 86,250.00
24,700.00 24,700.00
11,200.00 11,200.00
950,000.00 950,000.00
1,016,050.00 1,016,050.00
350,000.00 350,000.00

- 2,200.00 2,200.00
HARGA HASIL SURVEY
Harga Survey
Bahan Sept + 10 %
Harga Survey (Overhead + Profit) Harga Satuan KETERANGAN
Bahan Januari & Harga Bensin Bahan Untuk
2016 Pada 5 Januari Tahun 2016
2016 Rp. 6950 dan
Solar Rp. 5650

4 6
- 2,200.00 2,200.00
- 2,200.00 2,200.00
- 517,500.00 517,500.00
- 402,500.00 402,500.00
- 287,500.00 287,500.00
- 149,500.00 149,500.00
- 126,500.00 126,500.00
- 115,000.00 115,000.00
- 80,500.00 80,500.00
- 150,000.00 150,000.00
- 207,000.00 207,000.00
850,000.00 850,000.00
- 86,300.00 86,300.00
- 13,000.00 13,000.00
- 1,200,000.00 1,200,000.00
14,000.00 15,400.00 15,400.00
- 12,500.00 12,500.00
- 437,000.00 437,000.00
- 647,300.00 647,300.00
- 555,300.00 555,300.00
- 326,984.00 326,990.00
- 533,000.00 533,000.00
- 533,000.00 533,000.00
- 533,000.00 533,000.00
- 35,000.00 35,000.00
- 40,000.00 40,000.00
- 5,000.00 5,000.00
- 455,000.00 455,000.00
- 455,000.00 455,000.00
- 57.50 100.00
HARGA HASIL SURVEY
Harga Survey
Bahan Sept + 10 %
Harga Survey (Overhead + Profit) Harga Satuan KETERANGAN
Bahan Januari & Harga Bensin Bahan Untuk
2016 Pada 5 Januari Tahun 2016
2016 Rp. 6950 dan
Solar Rp. 5650

4 6
- 209.09 300.00
- 12,500.00 12,500.00
- 10,400.00 10,400.00
20,000.00 22,000.00 22,000.00
- 30,000.00 30,000.00
- - -
- - -
- 7,500.00 7,500.00
- 107,700.00 107,700.00
8,500.00 9,350.00 9,350.00
- 56,900.00 56,900.00
- 28,750.00 28,750.00
- 28,750.00 28,750.00
- 69,000.00 69,000.00
- 17,250.00 17,250.00
- 6,900.00 6,900.00
7,200.00 7,200.00
750,000.00 750,000.00
105,000.00 105,000.00
5,326,718.00 5,326,800.00

Dinas Pekerjaan Umum Kota Jambi


BBM di bulan Januari 2016.
Kabid Bina Program
HARGA HASIL SURVEY
Harga Survey
Bahan Sept + 10 %
Harga Survey (Overhead + Profit) Harga Satuan KETERANGAN
Bahan Januari & Harga Bensin Bahan Untuk
2016 Pada 5 Januari Tahun 2016
2016 Rp. 6950 dan
Solar Rp. 5650

4 6

GUSPURNOMO, ST BUDI HARTONO, ST


NIP. 19590816 198503 1 006
Asumsi Perhitungan Pekerjaan Pedestrian dengan Pasangan Conblok

No Uraian Volume Satuan Harga Satuan

I Pekerjaan Persiapan
1 Pembersihan Lokasi 1.00 Ls 375,000.00
2 Penyiapan Badan Jalan 1.00 Ls 750,000.00
3 Mobilisasi dan Demobilisasi 1.00 Ls 1,000,000.00
4 Pengukuran 1.00 Ls 300,000.00
5 Pelaporan 1.00 Ls 300,000.00

II Pekerjaan Tanah dan Pasir


1 Pembentukan Badan Jalan dengan Timbunan Tanah 75.00 M3 79,637.50
2 Urugan Pasir 6.25 M3 121,800.00
3 Pekerjaan Lantai Kerja 12.50 M3 930,129.00

III Pekerjaan Conblok


1 Pasangan Rist Batu Bata 1: 3 60.00 M2 99,488.68
2 Plesteran Rist Batu Bata 1 : 3 140.00 M2 58,708.46
3 Pasangan Conblok 125.00 M2 105,470.00

Jumlah
Ppn 10 %
Total
Total Dibulatkan

Harga per meter persegi


Pembulatan
angan Conblok

Jumlah Harga Keterangan

375,000.00
750,000.00
1,000,000.00
300,000.00
300,000.00
2,725,000.00

5,972,812.50
761,250.00
11,626,612.50
18,360,675.00

5,969,320.80
8,219,184.96
13,183,750.00
27,372,255.76

48,457,931
4,845,793
53,303,724
53,304,000

533,040.00
533,100.00
URAIAN ANALISA ALAT

No. URAIAN

A. URAIAN PERALATAN
1. Jenis Peralatan
2. Tenaga
3. Kapasitas
4. Alat Baru :

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat =

2. Faktor Angsuran Modal =

3. Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

Biaya Pasti per Jam =

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar =

2. Pelumas =

Biaya bengkel =

3. Perawatan dan
perbaikan =

4. Operator =
5. Pembantu Operator =

Biaya Operasi per Jam =


D. TOTAL BIAYA SEWA ALAT / JAM =

E. LAIN - LAIN
1. Tingkat Suku Bunga
2. Upah Operator / Sopir
3. Upah Pembantu Operator / Pmb.Sopir
4. Bahan Bakar Bensin
5. Bahan Bakar Solar
6. Minyak Pelumas
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

KODE KOEF. SATUAN

WATER TANKER 3000-4500 L.


Pw 100.00 HP
Cp 4,000.00 Liter
a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 185,000,000.00 Rupiah

10 % x B C 18,500,000.00 Rupiah

(i/100 x (1 + i/100)^A / ((1 + i/100)^A - 1) D 0.26 -

(B-C)xD/W E 21,961.14 Rupiah

0,002 x B / W F 185.00 Rupiah

(E+F) G 22,146.14 Rupiah

(12%-15%) x Pw x Ms H 172,800.00 Rupiah

(2.5%-3%) x Pw x Mp I 75,000.00 Rupiah

(6.25% dan 8.75%) x B / W J 8,093.75 Rupiah

(12,5 % - 17,5 %) x B / W K 11,562.50 Rupiah

( 1 Orang / Jam ) x U1 L 17,290.00 Rupiah


( 1 Orang / Jam ) x U2 M 11,580.00 Rupiah

H+I+J+K+L+M P 296,326.25 Rupiah


(G+P) S 318,472.39 Rupiah

i 10.00 % / Tahun
U1 17,290.00 Rp./Jam
U2 11,580.00 Rp./Jam
Mb 12,500.00 Liter
Ms 14,400.00 Liter
Mp 30,000.00 Liter
KET.

E23
URAIAN ANALISA ALAT
No. URAIAN
A. URAIAN PERALATAN
1. Jenis Peralatan
2.
3. Kapasitas
4. Alat Baru :

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat =

2. Faktor Angsuran Modal =

3. Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

Biaya Pasti per Jam =

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar =

2. Pelumas =

Biaya bengkel

3. Perawatan dan
perbaikan =

4. Operator =
5. Pembantu Operator =

Biaya Operasi per Jam =


D. TOTAL BIAYA SEWA ALAT / JAM =

E. LAIN - LAIN
1. Tingkat Suku Bunga
2. Upah Operator / Sopir
3. Upah Pembantu Operator / Pmb.Sopir
4. Bahan Bakar Bensin
5. Bahan Bakar Solar
6. Minyak Pelumas
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
KODE KOEF. SATUAN

CONCRETE PUMP
Pw 100.00 HP
Cp 8.00 M3
a. Umur Ekonomis A 6.00 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 185,000,000.00 Rupiah

10 % x B C 18,500,000.00 Rupiah

(i/100 x (1 + i/100)^A / ((1 + i/100)^A - 1) D 0.23 -

(B-C)xD/W E 19,114.81 Rupiah

0,002 x B / W F 185.00 Rupiah

(E+F) G 19,299.81 Rupiah

(12%-15%) x Pw x Ms H 172,800.00 Rupiah

(2.5%-3%) x Pw x Mp I 75,000.00 Rupiah

(6.25% dan 8.75%) x B / W J 8,093.75 Rupiah

(12,5 % - 17,5 %) x B / W K 11,562.50 Rupiah

( 1 Orang / Jam ) x U1 L 17,290.00 Rupiah


( 1 Orang / Jam ) x U2 M 11,580.00 Rupiah

H+I+J+K+L+M P 296,326.25 Rupiah


(G+P) S 315,626.06 Rupiah

i 10.00 % / Tahun
U1 17,290.00 Rp./Jam
U2 11,580.00 Rp./Jam
Mb 12,500.00 Liter
Ms 14,400.00 Liter
Mp 30,000.00 Liter
KET.

E28
URAIAN ANALISA ALAT
No. URAIAN

A. URAIAN PERALATAN
1. Jenis Peralatan
2. Tenaga
3. Kapasitas
4. Alat Baru :

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat =

2. Faktor Angsuran Modal =

3. Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

Biaya Pasti per Jam =

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar =

2. Pelumas =

Biaya bengkel =

3. Perawatan dan =
perbaikan
4. Operator =
5. Pembantu Operator =

Biaya Operasi per Jam =


D. TOTAL BIAYA SEWA ALAT / JAM =

E. LAIN - LAIN
1. Tingkat Suku Bunga
2. Upah Operator / Sopir
3. Upah Pembantu Operator / Pmb.Sopir
4. Bahan Bakar Bensin
5. Bahan Bakar Solar
6. Minyak Pelumas
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT
KODE SATUAN

CONCRETE PAN MIXER


Pw 134.00 HP
Cp 600.00 Liter
a. Umur Ekonomis A 10.00 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.00 Jam
c. Harga Alat B 1,000,000,000.00 Rupiah

10 % x B C 100,000,000.00 Rupiah

(i/100 x (1 + i/100)^A / ((1 + i/100)^A - 1) D 0.16 -

(B-C)xD/W E 97,647.24 Rupiah

0,002 x B / W F 1,333.33 Rupiah

(E+F) G 98,980.57 Rupiah

(12%-15%) x Pw x Ms H 289,440.00 Rupiah

(2.5%-3%) x Pw x Mp I 120,600.00 Rupiah

(6.25% dan 8.75%) x B / W J 58,333.33 Rupiah

(12,5 % - 17,5 %) x B / W K 116,666.67 Rupiah

( 1 Orang / Jam ) x U1 L 17,290.00 Rupiah


( 1 Orang / Jam ) x U2 M 11,580.00 Rupiah

H+I+J+K+L+M P 613,910.00 Rupiah


(G+P) T 712,890.57 Rupiah

i 10.00 % / Tahun
U1 17,290.00 Rp./Jam
U2 11,580.00 Rp./Jam
Mb 12,500.00 Liter
Ms 14,400.00 Liter
Mp 30,000.00 Liter
KET.

E43
URAIAN ANALISA ALAT

No. URAIAN

A. URAIAN PERALATAN
1. Jenis Peralatan
2. Tenaga
3. Kapasitas
4. Alat Baru :

B. BIAYA PASTI PER JAM KERJA


1. Nilai Sisa Alat =

2. Faktor Angsuran Modal =

3. Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

Biaya Pasti per Jam =

C. BIAYA OPERASI PER JAM KERJA

1. Bahan Bakar =

2. Pelumas =

Biaya bengkel =

3. Perawatan dan =
perbaikan
4. Operator =
5. Pembantu Operator =

Biaya Operasi per Jam =


D. TOTAL BIAYA SEWA ALAT / JAM =

E. LAIN - LAIN
1. Tingkat Suku Bunga
2. Upah Operator / Sopir
3. Upah Pembantu Operator / Pmb.Sopir
4. Bahan Bakar Bensin
5. Bahan Bakar Solar
6. Minyak Pelumas
7. PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
URAIAN ANALISA ALAT

KODE KOEF. SATUAN

TRUK MIXER (AGITATOR)


Pw 220.00 HP
Cp 5.00 M3
a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,500.00 Jam
c. Harga Alat B 750,000,000.00 Rupiah

10 % x B C 75,000,000.00 Rupiah

(i/100 x (1 + i/100)^A / ((1 + i/100)^A - 1 D 0.26 -

(B-C)xD/W E 71,225.32 Rupiah

0,002 x B / W F 600.00 Rupiah

(E+F) G 71,825.32 Rupiah

(12%-15%) x Pw x Ms H 380,160.00 Rupiah

(2.5%-3%) x Pw x Mp I 165,000.00 Rupiah

(6.25% dan 8.75%) x B / W J 26,250.00 Rupiah

(12,5 % - 17,5 %) x B / W K 37,500.00 Rupiah

( 1 Orang / Jam ) x U1 L 17,290.00 Rupiah


( 1 Orang / Jam ) x U2 M 11,580.00 Rupiah

H+I+J+K+L+M P 637,780.00 Rupiah


(G+P) T 709,605.32 Rupiah

i 10.00 % / Tahun
U1 17,290.00 Rp./Jam
U2 11,580.00 Rp./Jam
Mb 12,500.00 Liter
Ms 14,400.00 Liter
Mp 30,000.00 Liter
KET.

E49
DAFTAR ANALISA BAHAN DAN UPAH

URAIAN INDEKS HARGA

HARGA SATUAN PEKERJAAN PERSIAPAN

1M' PENGUKURAN DAN PEMASANGAN BOUWPLANK

Bahan kayu 5/7 m3 0.0120 Rp. 2,860,000.00 Rp.


Paku 2" - 3" kg 0.0200 Rp. 15,400.00 Rp.
kayu papan 3/20 m3 0.0070 Rp. 2,035,000.00 Rp.

Upah pekerja Oh 0.1000 Rp. 80,000.00 Rp.


tukang Oh 0.1000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0100 Rp. 135,000.00 Rp.
mandor Oh 0.0050 Rp. 120,000.00 Rp.

Total >>> Rp.

Harga Satuan PEKERJAAN TANAH

1M3 Menggali TANAH BIASA Sedalam 1 Meter

Upah pekerja Oh 0.7500 Rp. 80,000.00 Rp.


mandor Oh 0.0250 Rp. 120,000.00 Rp.

Total >>> Rp.

1M3 Menggali TANAH BIASA

Upah pekerja Oh 0.9000 Rp. 80,000.00 Rp.


mandor Oh 0.0450 Rp. 120,000.00 Rp.

Total >>> Rp.

1M3 Mengurug KEMBALI Galian

Mengurug kembali 1 M3 galian dihitung dari 1/3 kali indeks pekerjaan Galian

1M3 Urugan Tanah Kembali


Galian tanah sedalam 1 M m3 0.3333 Rp. 63,000.00 Rp.

Total >>> Rp.

1M3 Urugan Tanah Kembali


Galian tanah sedalam 2 M m3 0.3333 Rp. 77,400.00 Rp.

Total >>> Rp.

Page 183 of 262


URAIAN INDEKS HARGA

1M3 Memadatkan TANAH Per 20 cm

Upah pekerja Oh 0.5000 Rp. 80,000.00 Rp.


mandor Oh 0.0500 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 184 of 262


URAIAN INDEKS HARGA
1 M3 Timbunan Tanah dipadatkan ( pemadatan per 20 Cm )

Bahan Tanah M3 1.2500 Rp. 41,250.00 Rp.


Upah Pekerja Oh 0.5000 Rp. 80,000.00 Rp.
Mandor Oh 0.0500 Rp. 120,000.00 Rp.

Total >>> Rp.

1 M1 Pemancangan diatas tanah lunak


Upah Pekerja Oh 1.1700 Rp. 80,000.00 Rp.
Mandor Oh 0.6790 Rp. 120,000.00 Rp.

Total >>> Rp.

1M3 Mengurug PASIR URUG

Bahan pasir urug m3 1.2000 Rp. 88,000.00 Rp.

Upah pekerja Oh 0.3000 Rp. 80,000.00 Rp.


mandor Oh 0.0100 Rp. 120,000.00 Rp.

Total >>> Rp.

1M3 Mengurug TANAH DIPADATKAN (**)

Bahan tanah m3 1.2500 Rp. 41,250.00 Rp.

Upah pekerja Oh 0.2500 Rp. 80,000.00 Rp.


mandor Oh 0.0100 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 185 of 262


URAIAN INDEKS HARGA

ANALISA BIAYA KONSTRUKSI SNI 2002


PEKERJAAN BETON

1M3 MEMBUAT BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr

Bahan semen portland kg 218.0000 Rp. 1,320.00 Rp.


pasir beton m3 0.5200 Rp. 88,000.00 Rp.
koral beton m3 0.8700 Rp. 455,000.00 Rp.

Upah pekerja Oh 1.6500 Rp. 80,000.00 Rp.


tukang batu Oh 0.2500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0250 Rp. 135,000.00 Rp.
mandor Oh 0.0800 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 MEMBUAT LANTAI KERJA BETON TUMBUK, 1 Pc : 3 Ps : 5 Kr tebal 5 cm

Bahan semen portland kg 10.0000 Rp. 1,320.00 Rp.


pasir beton m3 0.0260 Rp. 88,000.00 Rp.
koral beton m3 0.0440 Rp. 455,000.00 Rp.

Upah pekerja Oh 1.1500 Rp. 80,000.00 Rp.


tukang batu Oh 0.0200 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0020 Rp. 135,000.00 Rp.
mandor Oh 0.0060 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 186 of 262


URAIAN INDEKS HARGA

Harga Satuan PEKERJAAN BETON

1M3 MEMBUAT PONDASI BETON BERTULANG (150 KG BESI + BEGISTING)

Bahan Kayu Kelas III m3 0.2000 Rp. 2,035,000.00 Rp.


Paku 5 cm - 12 cm kg 1.5000 Rp. 15,400.00 Rp.
minyak bekisting lt 0.4000 Rp. 11,700.00 Rp.
besi beton polos kg 157.5000 Rp. 8,500.00 Rp.
kawat beton kg 2.3625 Rp. 16,500.00 Rp.
semen portland kg 336.0000 Rp. 1,320.00 Rp.
pasir beton m3 0.5400 Rp. 88,000.00 Rp.
koral beton m3 0.8100 Rp. 455,000.00 Rp.

Upah pekerja Oh 5.3000 Rp. 80,000.00 Rp.


tukang batu Oh 0.2750 Rp. 110,000.00 Rp.
tukang kayu Oh 1.3000 Rp. 110,000.00 Rp.
tukang besi Oh 1.0500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.2620 Rp. 135,000.00 Rp.
mandor Oh 0.2650 Rp. 120,000.00 Rp.

Total >>> Rp.


1M3 MEMBUAT SLOOF BETON BERTULANG (180 KG BESI + BEGISTING)
Bahan Kayu Kelas III m3 0.2700 Rp. 2,035,000.00 Rp.
Paku 5 cm - 12 cm kg 2.0000 Rp. 15,400.00 Rp.
minyak bekisting lt 0.6000 Rp. 11,700.00 Rp.
besi beton polos kg 189.4960 Rp. 8,500.00 Rp.
kawat beton kg 2.8424 Rp. 16,500.00 Rp.
semen portland kg 336.0000 Rp. 1,320.00 Rp.
pasir beton m3 0.5400 Rp. 88,000.00 Rp.
koral beton m3 0.8100 Rp. 455,000.00 Rp.

Upah pekerja Oh 5.6500 Rp. 80,000.00 Rp.


tukang batu Oh 0.2750 Rp. 110,000.00 Rp.
tukang kayu Oh 1.5600 Rp. 110,000.00 Rp.
tukang besi Oh 1.4000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.3230 Rp. 135,000.00 Rp.
mandor Oh 0.2830 Rp. 120,000.00 Rp.

Total >>> Rp.


1M3 MEMBUAT KOLOM BETON BERTULANG (120 KG BESI + BEGISTING)

Bahan kayu Kelas III m3 0.4000 Rp. 2,035,000.00 Rp.


Paku 5 cm - 12 cm kg 4.0000 Rp. 15,400.00 Rp.
minyak bekisting lt 2.0000 Rp. 11,700.00 Rp.
besi beton polos kg 128.6089 Rp. 8,500.00 Rp.
kawat beton kg 1.9291 Rp. 16,500.00 Rp.
semen portland kg 336.0000 Rp. 1,320.00 Rp.
pasir beton m3 0.5400 Rp. 88,000.00 Rp.
koral beton m3 0.8100 Rp. 455,000.00 Rp.
kayu Kelas II balok m3 0.1500 Rp. 2,860,000.00 Rp.
plywood 9 mm lbr 3.5000 Rp. 187,000.00 Rp.
dolken kayu gelam Dia. 8-10/4 m btg 20.0000 Rp. 6,600.00 Rp.

Page 187 of 262


URAIAN INDEKS HARGA
Upah pekerja Oh 7.0500 Rp. 80,000.00 Rp.
tukang batu Oh 0.2750 Rp. 110,000.00 Rp.
tukang kayu Oh 1.6500 Rp. 110,000.00 Rp.
tukang besi Oh 2.1000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.4030 Rp. 135,000.00 Rp.
mandor Oh 0.3530 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 188 of 262


URAIAN INDEKS HARGA
1M3 MEMBUAT KOLOM BETON BERTULANG (120 KG BESI + BEGISTING)

Bahan kayu Kelas III m3 0.4000 Rp. 2,035,000.00 Rp.


Paku 5 cm - 12 cm kg 4.0000 Rp. 15,400.00 Rp.
minyak bekisting lt 2.0000 Rp. 11,700.00 Rp.
besi beton polos kg 133.9920 Rp. 8,500.00 Rp.
kawat beton kg 2.0099 Rp. 16,500.00 Rp.
semen portland kg 336.0000 Rp. 1,320.00 Rp.
pasir beton m3 0.5400 Rp. 88,000.00 Rp.
koral beton m3 0.8100 Rp. 455,000.00 Rp.
kayu Kelas II balok m3 0.1500 Rp. 2,860,000.00 Rp.
plywood 9 mm lbr 3.5000 Rp. 187,000.00 Rp.
dolken kayu gelam Dia. 8-10/4 m btg 20.0000 Rp. 6,600.00 Rp.

Upah pekerja Oh 7.0500 Rp. 80,000.00 Rp.


tukang batu Oh 0.2750 Rp. 110,000.00 Rp.
tukang kayu Oh 1.6500 Rp. 110,000.00 Rp.
tukang besi Oh 2.1000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.4030 Rp. 135,000.00 Rp.
mandor Oh 0.3530 Rp. 120,000.00 Rp.

Total >>> Rp.


1M3 MEMBUAT BALOK BETON BERTULANG (130 KG BESI + BEGISTING)

Bahan Kayu Kelas III m3 0.3200 Rp. 2,035,000.00 Rp.


Paku 5 cm - 12 cm kg 3.2000 Rp. 15,400.00 Rp.
minyak bekisting lt 1.6000 Rp. 11,700.00 Rp.
besi beton polos kg 131.0247 Rp. 8,500.00 Rp.
kawat beton kg 2.8424 Rp. 16,500.00 Rp.
semen portland kg 323.0000 Rp. 1,320.00 Rp.
pasir beton m3 0.5400 Rp. 88,000.00 Rp.
koral beton m3 0.8100 Rp. 455,000.00 Rp.
Kayu Kelas II Balok m3 0.1400 Rp. 2,860,000.00 Rp.
plywood 9 mm lbr 2.8000 Rp. 187,000.00 Rp.
dolken kayu gelam Dia. 8-10/4 m btg 16.0000 Rp. 6,600.00 Rp.

Upah pekerja Oh 6.3500 Rp. 80,000.00 Rp.


tukang batu Oh 0.2750 Rp. 110,000.00 Rp.
tukang kayu Oh 1.6500 Rp. 110,000.00 Rp.
tukang besi Oh 1.4000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.3330 Rp. 135,000.00 Rp.
mandor Oh 0.3180 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 189 of 262


URAIAN INDEKS HARGA
1M3 MEMBUAT BALOK BETON BERTULANG (110 KG BESI + BEGISTING)

Bahan Kayu Kelas III m3 0.3200 Rp. 2,035,000.00 Rp.


Paku 5 cm - 12 cm kg 3.2000 Rp. 15,400.00 Rp.
minyak bekisting lt 1.6000 Rp. 11,700.00 Rp.
besi beton polos kg 109.8107 Rp. 8,500.00 Rp.
kawat beton kg 1.6472 Rp. 16,500.00 Rp.
semen portland kg 323.0000 Rp. 1,320.00 Rp.
pasir beton m3 0.5400 Rp. 88,000.00 Rp.
koral beton m3 0.8100 Rp. 455,000.00 Rp.
Kayu Kelas II Balok m3 0.1400 Rp. 2,860,000.00 Rp.
plywood 9 mm lbr 2.8000 Rp. 187,000.00 Rp.
dolken kayu gelam Dia. 8-10/4 m btg 16.0000 Rp. 6,600.00 Rp.

Upah pekerja Oh 6.3500 Rp. 80,000.00 Rp.


tukang batu Oh 0.2750 Rp. 110,000.00 Rp.
tukang kayu Oh 1.6500 Rp. 110,000.00 Rp.
tukang besi Oh 1.4000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.3330 Rp. 135,000.00 Rp.
mandor Oh 0.3180 Rp. 120,000.00 Rp.

Total >>> Rp.

1M3 MEMBUAT BALOK BETON BERTULANG (170 KG BESI + BEGISTING)

Bahan Kayu Kelas III m3 0.3200 Rp. 2,035,000.00 Rp.


Paku 5 cm - 12 cm kg 3.2000 Rp. 15,400.00 Rp.
minyak bekisting lt 1.6000 Rp. 11,700.00 Rp.
besi beton polos kg 173.2797 Rp. 8,500.00 Rp.
kawat beton kg 2.5992 Rp. 16,500.00 Rp.
semen portland kg 323.0000 Rp. 1,320.00 Rp.
pasir beton m3 0.5400 Rp. 88,000.00 Rp.
koral beton m3 0.8100 Rp. 455,000.00 Rp.
Kayu Kelas II Balok m3 0.1400 Rp. 2,860,000.00 Rp.
plywood 9 mm lbr 2.8000 Rp. 187,000.00 Rp.
dolken kayu gelam Dia. 8-10/4 m btg 16.0000 Rp. 6,600.00 Rp.

Upah pekerja Oh 6.3500 Rp. 80,000.00 Rp.


tukang batu Oh 0.2750 Rp. 110,000.00 Rp.
tukang kayu Oh 1.6500 Rp. 110,000.00 Rp.
tukang besi Oh 1.4000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.3330 Rp. 135,000.00 Rp.
mandor Oh 0.3180 Rp. 120,000.00 Rp.

Total >>> Rp.


1M' MEMBUAT KOLOM BETON BERTULANG (11 X 11) CM

Bahan Kayu Kelas III m3 0.0020 Rp. 2,035,000.00 Rp.


Paku 5 cm - 12 cm kg 0.0100 Rp. 15,400.00 Rp.
besi beton polos kg 3.0000 Rp. 8,500.00 Rp.
kawat beton kg 0.4500 Rp. 16,500.00 Rp.
semen portland kg 4.0000 Rp. 1,320.00 Rp.

Page 190 of 262


URAIAN INDEKS HARGA
pasir beton m3 0.0060 Rp. 88,000.00 Rp.
koral beton m3 0.0090 Rp. 455,000.00 Rp.

Upah pekerja Oh 0.1800 Rp. 80,000.00 Rp.


tukang batu Oh 0.0200 Rp. 110,000.00 Rp.
tukang kayu Oh 0.0200 Rp. 110,000.00 Rp.
tukang besi Oh 0.0200 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0060 Rp. 135,000.00 Rp.
mandor Oh 0.0090 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 191 of 262


URAIAN INDEKS HARGA
1M' MEMBUAT RING BALOK BETON BERTULANG (10 X 15) CM

Bahan kayu Albasiah m3 0.0030 Rp. 2,035,000.00 Rp.


Paku 5 cm - 12 cm kg 0.0200 Rp. 15,400.00 Rp.
besi beton polos kg 3.6000 Rp. 8,500.00 Rp.
kawat beton kg 0.0500 Rp. 16,500.00 Rp.
semen portland kg 5.5000 Rp. 1,320.00 Rp.
pasir beton m3 0.0090 Rp. 88,000.00 Rp.
koral beton m3 0.0150 Rp. 455,000.00 Rp.

Upah pekerja Oh 0.2970 Rp. 80,000.00 Rp.


tukang batu Oh 0.0330 Rp. 110,000.00 Rp.
tukang kayu Oh 0.0330 Rp. 110,000.00 Rp.
tukang besi Oh 0.0330 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0100 Rp. 135,000.00 Rp.
mandor Oh 0.0150 Rp. 120,000.00 Rp.

Total >>> Rp.

1M3 MEMBUAT BALOK PINGGANG BETON BERTULANG (13 X 20) CM

Bahan kayu Albasiah m3 0.0030 Rp. 2,035,000.00 Rp.


Paku 5 cm - 12 cm kg 0.0200 Rp. 15,400.00 Rp.
besi beton polos kg 137.2754 Rp. 8,500.00 Rp.
kawat beton kg 2.0591 Rp. 16,500.00 Rp.
semen portland kg 5.5000 Rp. 1,320.00 Rp.
pasir beton m3 0.0090 Rp. 88,000.00 Rp.
koral beton m3 0.0150 Rp. 455,000.00 Rp.

Upah pekerja Oh 0.2970 Rp. 80,000.00 Rp.


tukang batu Oh 0.0330 Rp. 110,000.00 Rp.
tukang kayu Oh 0.0330 Rp. 110,000.00 Rp.
tukang besi Oh 0.0330 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0100 Rp. 135,000.00 Rp.
mandor Oh 0.0150 Rp. 120,000.00 Rp.

Total >>> Rp.

1M3 MEMBUAT PLAT BETON BERTULANG ( 150 KG BESI + BEKISTING )


Bahan Kayu Kelas III m3 0.3200 Rp. 2,035,000.00 Rp.
Paku 5 cm - 12 cm kg 3.2000 Rp. 15,400.00 Rp.
minyak bekisting lt 1.6000 Rp. 11,700.00 Rp.
besi beton polos kg 157.5000 Rp. 8,500.00 Rp.
kawat beton kg 2.2500 Rp. 16,500.00 Rp.
semen portland kg 336.0000 Rp. 1,320.00 Rp.
pasir beton m3 0.5400 Rp. 88,000.00 Rp.
koral beton m3 0.8100 Rp. 455,000.00 Rp.
Kayu Kelas II Balok m3 0.1200 Rp. 2,860,000.00 Rp.
plywood 9 mm lbr 2.8000 Rp. 187,000.00 Rp.
dolken kayu gelam Dia. 8-10/4 m btg 32.0000 Rp. 6,600.00 Rp.

Page 192 of 262


URAIAN INDEKS HARGA

Upah pekerja Oh 5.3 Rp. 80,000.00 Rp.


tukang batu Oh 0.275 Rp. 110,000.00 Rp.
tukang kayu Oh 1.3 Rp. 110,000.00 Rp.
tukang besi Oh 1.05 Rp. 110,000.00 Rp.
kepala tukang Oh 0.265 Rp. 135,000.00 Rp.
mandor Oh 0.265 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 193 of 262


URAIAN INDEKS HARGA

Harga Satuan PEKERJAAN PASANGAN DINDING

1M2 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 Bata, 1 Pc : 3 Pp

Bahan bata merah 5 x 11 x 22 cm bh 140.0000 Rp. 500.00 Rp.


Semen Portland (PC) kg 32.9500 Rp. 1,320.00 Rp.
pasir pasang (PP) m3 0.0910 Rp. 66,000.00 Rp.

Upah pekerja Oh 0.6000 Rp. 80,000.00 Rp.


tukang batu Oh 0.2000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0200 Rp. 135,000.00 Rp.
mandor Oh 0.0300 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 Memasang Dinding Bata Merah uk. (5x11x22) cm Tebal 1/2 Bata, 1 Pc : 4 Pp

Bahan bata merah 5 x 11 x 22 cm bh 70.0000 Rp. 500.00 Rp.


Semen Portland (PC) kg 11.5000 Rp. 1,320.00 Rp.
pasir pasang (PP) m3 0.0430 Rp. 66,000.00 Rp.

Upah pekerja Oh 0.3000 Rp. 80,000.00 Rp.


tukang batu Oh 0.1000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0100 Rp. 135,000.00 Rp.
mandor Oh 0.0150 Rp. 120,000.00 Rp.

Total >>> Rp.

Harga Satuan PEKERJAAN PLESTERAN

1M2 Memasang PLESTERAN 1 Pc : 4 Pp, Tebal 15 mm.

Bahan Semen Portland (PC) kg 6.2400 Rp. 1,320.00 Rp.


pasir pasang (PP) m3 0.0240 Rp. 66,000.00 Rp.

Upah pekerja Oh 0.3000 Rp. 80,000.00 Rp.


tukang batu Oh 0.1500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0150 Rp. 135,000.00 Rp.
mandor Oh 0.0150 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 Memasang Acian

Bahan Semen Portland (PC) kg 3.2500 Rp. 1,320.00 Rp.

Upah pekerja Oh 0.2000 Rp. 80,000.00 Rp.

Page 194 of 262


URAIAN INDEKS HARGA
tukang batu Oh 0.1000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0100 Rp. 135,000.00 Rp.
mandor Oh 0.0100 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 195 of 262


URAIAN INDEKS HARGA

Harga Satuan PEKERJAAN KAYU

1M3 Membuat dan Memasang Kusen Pintu dan Jendela, Kayu Kelas I

Bahan Balok Kayu m3 1.1000 Rp. 3,135,000.00 Rp.


paku 10 cm Kg 1.2500 Rp. 15,400.00 Rp.
Lem Kayu Kg 1.0000 Rp. 16,500.00 Rp.

Upah pekerja Oh 7.0000 Rp. 80,000.00 Rp.


tukang kayu Oh 21.0000 Rp. 110,000.00 Rp.
kepala tukang Oh 2.1000 Rp. 135,000.00 Rp.
mandor Oh 0.3500 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 Membuat dan memasang Daun Pintu Panel, Kayu Kelas II

Bahan Papan Kayu m3 0.0400 Rp. 3,135,000.00 Rp.


Lem Kayu Kg 0.5000 Rp. 16,500.00 Rp.

Upah pekerja Oh 1.0000 Rp. 80,000.00 Rp.


tukang kayu Oh 3.0000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.3000 Rp. 135,000.00 Rp.
mandor Oh 0.0500 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 Membuat dan memasang Daun Pintu Panel, Kayu Tembesu

Bahan Papan Kayu Tembesu m3 0.0400 Rp. 12,100,000.00 Rp.


Lem Kayu Kg 0.5000 Rp. 16,500.00 Rp.

Upah pekerja Oh 1.0000 Rp. 80,000.00 Rp.


tukang kayu Oh 3.0000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.3000 Rp. 135,000.00 Rp.
mandor Oh 0.0500 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 Membuat dan Memasang Pintu dan Jendela Kaca, Kayu Kelas I atau II

Bahan Papan Kayu m3 0.0240 Rp. 3,135,000.00 Rp.


Lem Kayu Kg 0.3000 Rp. 16,500.00 Rp.
kaca tebal 5mm m2 1.1000 Rp. 150,000.00 Rp.

Upah pekerja Oh 0.8000 Rp. 80,000.00 Rp.


tukang kayu Oh 2.4000 Rp. 110,000.00 Rp.

Page 196 of 262


URAIAN INDEKS HARGA
kepala tukang Oh 0.2400 Rp. 135,000.00 Rp.
mandor Oh 0.0400 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 197 of 262


URAIAN INDEKS HARGA
1M' Memasang Lisplank GRC Lebar 20 cm

Bahan Papan Listplank GRC L=20 cm m 1.2000 Rp. 25,000.00 Rp.


Paku GRC kg 0.1000 Rp. 22,000.00 Rp.

Upah pekerja Oh 0.1000 Rp. 80,000.00 Rp.


tukang kayu Oh 0.2000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0200 Rp. 135,000.00 Rp.
mandor Oh 0.0050 Rp. 120,000.00 Rp.

Total >>> Rp.

1M' Memasang Lisplank GRC Lebar 8 mm

Bahan Lisplank GRC Kpg 0.9500 Rp. 25,000.00 Rp.


Paku biasa Kg 0.0600 Rp. 15,400.00 Rp.

Upah Pekerja Oh 0.1000 Rp. 80,000.00 Rp.


Tukang Kayu Oh 0.1000 Rp. 110,000.00 Rp.
Kepala Tukang Oh 0.0100 Rp. 135,000.00 Rp.
Mandor Oh 0.0500 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 198 of 262


URAIAN INDEKS HARGA
HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING

1M2 Memasang Lantai Granite ukuran 60 x 60 cm

Bahan Granite Bh 3.1000 Rp. 66,300.00 Rp.


semen portland (PC) Kg 9.6000 Rp. 1,320.00 Rp.
pasir pasang (PP) m3 0.0450 Rp. 66,000.00 Rp.
semen warna Kg 1.5000 Rp. 16,500.00 Rp.

Upah pekerja Oh 0.2400 Rp. 80,000.00 Rp.


tukang batu Oh 0.1200 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0120 Rp. 135,000.00 Rp.
mandor Oh 0.0120 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 Memasang LANTAI KERAMIK ukuran 40 x 40 cm (Warna)

Bahan ubin keramik Bh 6.6300 Rp. 14,352.00 Rp.


semen portland (PC) Kg 9.8000 Rp. 1,320.00 Rp.
pasir pasang (PP) m3 0.0450 Rp. 66,000.00 Rp.
semen warna Kg 1.3000 Rp. 16,500.00 Rp.

Upah pekerja Oh 0.2500 Rp. 80,000.00 Rp.


tukang batu Oh 0.1250 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0130 Rp. 135,000.00 Rp.
mandor Oh 0.0130 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 Memasang LANTAI KERAMIK ukuran 40 x 40 cm (Polos)

Bahan ubin keramik Bh 6.6300 Rp. 8,536.00 Rp.


semen portland (PC) Kg 9.8000 Rp. 1,320.00 Rp.
pasir pasang (PP) m3 0.0450 Rp. 66,000.00 Rp.
semen warna Kg 1.3000 Rp. 16,500.00 Rp.

Upah pekerja Oh 0.2500 Rp. 80,000.00 Rp.


tukang batu Oh 0.1250 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0130 Rp. 135,000.00 Rp.
mandor Oh 0.0130 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 Memasang LANTAI KERAMIK ukuran 30 x 30 cm (Warna)

Page 199 of 262


URAIAN INDEKS HARGA
Bahan ubin keramik Bh 11.8700 Rp. 5,850.00 Rp.
semen portland (PC) Kg 10.0000 Rp. 1,320.00 Rp.
pasir pasang (PP) m3 0.0450 Rp. 66,000.00 Rp.
semen warna Kg 1.5000 Rp. 16,500.00 Rp.

Upah pekerja Oh 0.7000 Rp. 80,000.00 Rp.


tukang batu Oh 0.3500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0350 Rp. 135,000.00 Rp.
mandor Oh 0.0350 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 200 of 262


URAIAN INDEKS HARGA
1M2 Memasang LANTAI KERAMIK ukuran 20 x 20 cm (Polos)

Bahan Keramik 20 x20 Cm Bh 26.5000 Rp. 2,000.00 Rp.


semen portland (PC) Kg 10.4000 Rp. 1,320.00 Rp.
pasir pasang (PP) m3 0.0450 Rp. 66,000.00 Rp.
semen warna Kg 1.6200 Rp. 16,500.00 Rp.

Upah pekerja Oh 0.7000 Rp. 80,000.00 Rp.


tukang batu Oh 0.3500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0350 Rp. 135,000.00 Rp.
mandor Oh 0.0350 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 Memasang LANTAI KERAMIK ukuran 20 x 20 cm (WARNA)

Bahan ubin keramik Bh 26.5000 Rp. 2,760.00 Rp.


semen portland (PC) Kg 10.4000 Rp. 1,320.00 Rp.
pasir pasang (PP) m3 0.0450 Rp. 66,000.00 Rp.
semen warna Kg 1.6200 Rp. 16,500.00 Rp.

Upah pekerja Oh 0.7000 Rp. 80,000.00 Rp.


tukang batu Oh 0.3500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0350 Rp. 135,000.00 Rp.
mandor Oh 0.0350 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 Memasang DINDING KERAMIK 20 x 25 Cm (Polos)

Bahan keramik 20 x 25 Cm bh 20.0000 Rp. 2,600.00 Rp.


semen portland (PC) kg 9.3000 Rp. 1,320.00 Rp.
pasir pasang (PP) m3 0.0180 Rp. 66,000.00 Rp.
semen warna kg 2.7500 Rp. 16,500.00 Rp.

Upah pekerja Oh 0.9000 Rp. 80,000.00 Rp.


tukang batu Oh 0.4500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0450 Rp. 135,000.00 Rp.
mandor Oh 0.0450 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 201 of 262


URAIAN INDEKS HARGA

1M2 Memasang DINDING KERAMIK 20 x 25 Cm (Warna)

Bahan keramik 20 x 25 Cm bh 20.0000 Rp. 3,300.00 Rp.


semen portland (PC) kg 9.3000 Rp. 1,320.00 Rp.
pasir pasang (PP) m3 0.0180 Rp. 66,000.00 Rp.
semen warna kg 2.7500 Rp. 16,500.00 Rp.

Upah pekerja Oh 0.9000 Rp. 80,000.00 Rp.


tukang batu Oh 0.4500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0450 Rp. 135,000.00 Rp.
mandor Oh 0.0450 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 Memasang Batu Alam

Bahan Batu Andesit M2 1.1000 Rp. 115,000.00 Rp.


Semen Pc (50 Kg) Kg 11.7500 Rp. 1,564.00 Rp.
pasir pasang (PP) M3 0.0350 Rp. 96,600.00 Rp.
Coating Batu Alam M2 1.0000 Rp. 17,500.00 Rp.
Kuas Bh 2.0000 Rp. 17,250.00 Rp.

Upah pekerja Oh 0.6000 Rp. 80,000.00 Rp.


tukang batu Oh 0.4500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0450 Rp. 135,000.00 Rp.
mandor Oh 0.0300 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 202 of 262


URAIAN INDEKS HARGA

Harga Satuan PEKERJAAN LANGIT - LANGIT (Plafond)

1M2 Memasang Langit - langit Gypsum Board uk. (1200x 2400x 9 mm)

Bahan Gypsum Board Lbr 0.3640 Rp. 82,500.00 Rp.


Paku Skrup kg 0.1100 Rp. 15,000.00 Rp.

Upah pekerja Oh 0.1000 Rp. 80,000.00 Rp.


tukang kayu Oh 0.0500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0050 Rp. 135,000.00 Rp.
mandor Oh 0.0050 Rp. 120,000.00 Rp.

Total >>> Rp.

1M' Memasang List Langit - langit Gypsum

Bahan Gypsum m 1.0500 Rp. 27,500.00 Rp.


paku kg 0.0100 Rp. 22,000.00 Rp.

Upah pekerja Oh 0.0500 Rp. 80,000.00 Rp.


tukang kayu Oh 0.0500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0050 Rp. 135,000.00 Rp.
mandor Oh 0.0030 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 Memasang Langit - langit GRC tebal 4 mm

Bahan GRC 4 mm lbr 0.3750 Rp. 79,200.00 Rp.


Paku GRC kg 0.0300 Rp. 22,000.00 Rp.

Upah pekerja Oh 0.1000 Rp. 80,000.00 Rp.


tukang kayu Oh 0.1000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0100 Rp. 135,000.00 Rp.
mandor Oh 0.0050 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 Memasang Langit - langit PVC Motif

Bahan Papan Kayu m3 0.0240 Rp. 3,135,000.00 Rp.

paku 1 cm - 2,5 cm kg 0.0150 Rp. 15,400.00 Rp.


cat dasar kg 0.1700 Rp. 43,700.00 Rp.
cat penutup kg 0.1700 Rp. 69,000.00 Rp.

Page 203 of 262


URAIAN INDEKS HARGA
Upah pekerja Oh 0.1000 Rp. 80,000.00 Rp.
tukang kayu Oh 0.1000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0100 Rp. 135,000.00 Rp.
mandor Oh 0.0050 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 Memasang Rangka ACP

Bahan Kawat Las Listrik kg 0.4000 Rp. 28,700.00 Rp.


Solar Ltr 0.3000 Rp. 22,000.00 Rp.
Pipa Galvanis M 1.0000 Rp. 50,000.00 Rp.

Upah pekerja Oh 2.0000 Rp. 80,000.00 Rp.


tukang Besi Oh 0.6060 Rp. 110,000.00 Rp.
kepala tukang Oh 0.1200 Rp. 135,000.00 Rp.
mandor Oh 0.0450 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 204 of 262


URAIAN INDEKS HARGA

Harga Satuan PEKERJAAN BESI dan ALUMINIUM

1M' Memasang Talang Datar/ Jurai Seng Bjls 28 lebar 90 cm

Bahan seng plat m' 1.0500 Rp. 71,500.00 Rp.


paku 1 cm - 2,5 cm kg 0.0150 Rp. 15,400.00 Rp.
Papan Kayu kelas II / Kelas III m3 0.0190 Rp. 2,860,000.00 Rp.

Upah pekerja Oh 0.2000 Rp. 80,000.00 Rp.


tukang kayu Oh 0.4000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0250 Rp. 135,000.00 Rp.
mandor Oh 0.0100 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 Memasang Rangka Besi Hollow 1x40.40.2mm, Modul 60x120Cm, Dinding Partisi

Bahan Rangka Metal Hollow 40.40.2mm M' 3.5000 Rp. 8,630.00 Rp.
Aksesoris (perkuatan,Las, dll) Ls 3.5000 Rp. 8,630.00 Rp.

Upah pekerja Oh 0.2500 Rp. 80,000.00 Rp.


tukang Besi Oh 0.2500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0250 Rp. 135,000.00 Rp.
mandor Oh 0.01300 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 Memasang Rangka Besi Hollow 1x40.40.2mm, Modul 60 x 60Cm, Plafond

Bahan Rangka Metal Hollow 40.40.2mm M' 4.0000 Rp. 8,630.00 Rp.
Aksesoris (perkuatan,Las, dll) Ls 4.0000 Rp. 8,630.00 Rp.

Upah pekerja Oh 0.3500 Rp. 80,000.00 Rp.


tukang Besi Oh 0.3500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0350 Rp. 135,000.00 Rp.
mandor Oh 0.01800 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 205 of 262


URAIAN INDEKS HARGA

HARGA SATUAN PEKERJAAN PENUTUP ATAP

1M2 PASANG ATAP GENTENG METAL

Bahan genteng metal Lbr 1.0200 Rp. 44,000.00 Rp.


Paku 5 cm - 12 cm kg 0.2000 Rp. 15,400.00 Rp.

Upah pekerja Oh 0.2000 Rp. 80,000.00 Rp.


tukang kayu Oh 0.1000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0100 Rp. 135,000.00 Rp.
mandor Oh 0.0010 Rp. 120,000.00 Rp.

Total >>> Rp.

1M' PASANG NOK GENTENG METAL

Bahan Nok Genteng Metal m' 1.1000 Rp. 24,200.00 Rp.


paku biasa 1/2" - 1" kg 0.0500 Rp. 15,400.00 Rp.

Upah pekerja Oh 0.2500 Rp. 80,000.00 Rp.


tukang kayu Oh 0.1500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0150 Rp. 135,000.00 Rp.
mandor Oh 0.0130 Rp. 120,000.00 Rp.

Total >>> Rp.

1M' PASANG NOK GENTENG METAL

Bahan Nok Genteng Metal m' 1.1000 Rp. 24,200.00 Rp.


Paku genteng kg 0.1000 Rp. 22,000.00 Rp.

Upah pekerja Oh 0.2500 Rp. 80,000.00 Rp.


tukang kayu Oh 0.1500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0150 Rp. 135,000.00 Rp.
mandor Oh 0.0130 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 206 of 262


URAIAN INDEKS HARGA
HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

1 Bh MEMASANG KLOSET JONGKOK KERAMIK STANDAR

Bahan Kloset duduk Bh 1.0000 Rp. 242,000.00 Rp.


Batu Bata Bh 7.0000 Rp. 500.00 Rp.
Semen portland Kg 6.0000 Rp. 1,320.00 Rp.
Pasir pasang M3 0.0100 Rp. 66,000.00 Rp.

Upah pekerja Oh 1.0000 Rp. 80,000.00 Rp.


tukang batu Oh 1.5000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.3000 Rp. 135,000.00 Rp.
mandor Oh 0.1100 Rp. 120,000.00 Rp.

Total >>> Rp.

1 Bh MEMASANG WASTAFEL

Bahan wastafel bh 1.0000 Rp. 280,500.00 Rp.


perlenngkapan Ls 0.1200 Rp. 33,660.00 Rp.
semen portland kg 6.0000 Rp. 1,320.00 Rp.
pasir pasang m3 0.0100 Rp. 66,000.00 Rp.

Upah pekerja Oh 1.2000 Rp. 80,000.00 Rp.


tukang batu Oh 1.4500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.1500 Rp. 135,000.00 Rp.
mandor Oh 0.1000 Rp. 120,000.00 Rp.

Total >>> Rp.

1 Bh MEMASANG BAK FIBREGLASS VOLUME 1M3 AIR

Bahan bak fibregass bh 1.0000 Rp. 275,000.00 Rp.


perlengkapan Ls 0.1200 Rp. 33,000.00 Rp.

Upah pekerja Oh 0.3000 Rp. 80,000.00 Rp.


tukang batu Oh 0.4500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0450 Rp. 135,000.00 Rp.
mandor Oh 0.0150 Rp. 120,000.00 Rp.

Total >>> Rp.

1 Bh MEMASANG KRAN DIAMETER 3/4 ATAU 1/2

Bahan kran air bh 1.0000 Rp. 30,000.00 Rp.


seal tape bh 0.0250 Rp. 4,400.00 Rp.

Upah pekerja Oh 0.0100 Rp. 80,000.00 Rp.

Page 207 of 262


URAIAN INDEKS HARGA
tukang batu Oh 0.4000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0400 Rp. 135,000.00 Rp.
mandor Oh 0.0050 Rp. 120,000.00 Rp.

Total >>> Rp.

M1 MEMASANG PIPA PVC tipe AW Dia 1/2"

Bahan Pipa PVC 4" bh 1.2000 Rp. 3,400.00 Rp.

Upah pekerja Oh 0.0810 Rp. 80,000.00 Rp.


tukang batu Oh 0.1350 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0135 Rp. 135,000.00 Rp.
mandor Oh 0.0040 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 208 of 262


URAIAN INDEKS HARGA

M1 MEMASANG PIPA PVC tipe AW Dia 2"

Bahan Pipa PVC 2,5" bh 1.2000 Rp. 14,875.00 Rp.

Upah pekerja Oh 0.0810 Rp. 80,000.00 Rp.


tukang batu Oh 0.1350 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0135 Rp. 135,000.00 Rp.
mandor Oh 0.0040 Rp. 120,000.00 Rp.

Total >>> Rp.

1 Bh MEMASANG KRAN DIAMETER 1/2''

Bahan kran air bh 1.0000 Rp. 30,000.00 Rp.


seal tape bh 0.0250 Rp. 4,400.00 Rp.

Upah pekerja Oh 0.0100 Rp. 80,000.00 Rp.


tukang batu Oh 0.1000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0100 Rp. 135,000.00 Rp.
mandor Oh 0.0050 Rp. 120,000.00 Rp.

Total >>> Rp.

1 Bh MEMASANG FLOOR DRAIN (BESI)

Bahan floor drain bh 1.0000 Rp. 38,500.00 Rp.

Upah pekerja Oh 0.0100 Rp. 80,000.00 Rp.


tukang batu Oh 0.1000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0100 Rp. 135,000.00 Rp.
mandor Oh 0.0050 Rp. 120,000.00 Rp.

Total >>> Rp.

1 Bh MEMASANG FLOOR DRAIN (PLASTIK)

Bahan floor drain bh 1.0000 Rp. 6,050.00 Rp.

Upah pekerja Oh 0.0100 Rp. 80,000.00 Rp.


tukang batu Oh 0.1000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0100 Rp. 135,000.00 Rp.
mandor Oh 0.0050 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 209 of 262


URAIAN INDEKS HARGA

HARGA SATUAN PEKERJAAN INSTALASI LISTRIK

1 Bh MEMASANG SAKLAR TUNGGAL

Bahan Saklar Tunggal bh 1.0000 Rp. 38,500.00 Rp.

Upah pekerja Oh 0.0250 Rp. 80,000.00 Rp.


tukang batu Oh 0.2500 Rp. 110,000.00 Rp.
mandor Oh 0.0050 Rp. 120,000.00 Rp.

Total >>> Rp.

1 Bh MEMASANG STOP KONTAK

Bahan Stop Kontak bh 1.0000 Rp. 22,000.00 Rp.

Upah pekerja Oh 0.0250 Rp. 80,000.00 Rp.


tukang batu Oh 0.2500 Rp. 110,000.00 Rp.
mandor Oh 0.0050 Rp. 120,000.00 Rp.

Total >>> Rp.

1 Bh MEMASANG SAKLAR GANDA

Bahan Saklar Ganda bh 1.0000 Rp. 46,750.00 Rp.

Upah pekerja Oh 0.0250 Rp. 80,000.00 Rp.


tukang batu Oh 0.2500 Rp. 110,000.00 Rp.
mandor Oh 0.0050 Rp. 120,000.00 Rp.

Total >>> Rp.

1 Bh MEMASANG BOX MCB

Bahan Box MCB bh 1.0000 Rp. 150,000.00 Rp.

Upah pekerja Oh 0.0250 Rp. 80,000.00 Rp.


tukang batu Oh 0.2500 Rp. 110,000.00 Rp.
mandor Oh 0.0050 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 210 of 262


URAIAN INDEKS HARGA

1 Bh MEMASANG LAMPU 18 Wat

Bahan Lampu Petak LED 18 Wat bh 1.0000 Rp. 140,000.00 Rp.

Upah pekerja Oh 0.0125 Rp. 80,000.00 Rp.


tukang batu Oh 0.1250 Rp. 110,000.00 Rp.
mandor Oh 0.0025 Rp. 120,000.00 Rp.

Total >>> Rp.

1 Bh MEMASANG LAMPU 6 Wat

Bahan Lampu Petak LED 6 Wat bh 1.0000 Rp. 72,000.00 Rp.

Upah pekerja Oh 0.0125 Rp. 80,000.00 Rp.


tukang batu Oh 0.1250 Rp. 110,000.00 Rp.
mandor Oh 0.0025 Rp. 120,000.00 Rp.

Total >>> Rp.

1 Bh MEMASANG LAMPU Selang

Bahan Lampu Petak LED 6 Wat bh 1.0000 Rp. 45,000.00 Rp.

Upah pekerja Oh 0.0125 Rp. 80,000.00 Rp.


tukang batu Oh 0.1250 Rp. 110,000.00 Rp.
mandor Oh 0.0025 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 211 of 262


URAIAN INDEKS HARGA

HARGA SATUAN PEKERJAAN KUNCI DAN KACA

1 Bh PASANG KUNCI TANAM ANTIK

Bahan kunci tanam antik bh 1.0000 Rp. 316,250.00 Rp.

Upah pekerja Oh 0.0600 Rp. 80,000.00 Rp.


tukang kayu Oh 0.6000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0600 Rp. 135,000.00 Rp.
mandor Oh 0.0030 Rp. 120,000.00 Rp.

Total >>> Rp.

1 Bh PASANG KUNCI TANAM BIASA

Bahan kunci tanam biasa bh 1.0000 Rp. 148,000.00 Rp.

Upah pekerja Oh 0.0100 Rp. 80,000.00 Rp.


tukang kayu Oh 0.5000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0500 Rp. 135,000.00 Rp.
mandor Oh 0.0050 Rp. 120,000.00 Rp.

Total >>> Rp.

1 Bh PASANG KUNCI TANAM KAMAR MANDI

Bahan kunci tanam kamar mandi bh 1.0000 Rp. 75,000.00 Rp.

Upah pekerja Oh 0.0050 Rp. 80,000.00 Rp.


tukang kayu Oh 0.5000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0500 Rp. 135,000.00 Rp.
mandor Oh 0.0030 Rp. 120,000.00 Rp.

Total >>> Rp.

1 Bh PASANG ENGSEL PINTU

Bahan engsel pintu bh 1.0000 Rp. 33,000.00 Rp.

Upah pekerja Oh 0.0150 Rp. 80,000.00 Rp.


tukang kayu Oh 0.1500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0150 Rp. 135,000.00 Rp.
mandor Oh 0.000800 Rp. 120,000.00 Rp.

Page 212 of 262


URAIAN INDEKS HARGA
Total >>> Rp.

Page 213 of 262


URAIAN INDEKS HARGA
1 Bh PASANG ENGSEL JENDELA

Bahan engsel jendela bh 1.0000 Rp. 22,000.00 Rp.

Upah pekerja Oh 0.0100 Rp. 80,000.00 Rp.


tukang kayu Oh 0.1000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0100 Rp. 135,000.00 Rp.
mandor Oh 0.0005 Rp. 120,000.00 Rp.

Total >>> Rp.

1 Bh PASANG TARIKAN JENDELA

Bahan Tarikan jendela bh 1.0000 Rp. 16,500.00 Rp.

Upah pekerja Oh 0.0100 Rp. 80,000.00 Rp.


tukang kayu Oh 0.1000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0100 Rp. 135,000.00 Rp.
mandor Oh 0.0005 Rp. 120,000.00 Rp.

Total >>> Rp.

1 Bh PASANG KAIT ANGIN

Bahan kait angin/ Hak Angin bh 1.0000 Rp. 11,000.00 Rp.

Upah pekerja Oh 0.0150 Rp. 80,000.00 Rp.


tukang kayu Oh 0.1500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0150 Rp. 135,000.00 Rp.
mandor Oh 0.0008 Rp. 120,000.00 Rp.

Total >>> Rp.

1 Bh PASANG GRENDEL PINTU

Bahan Gerendel pintu bh 1.0000 Rp. 22,000.00 Rp.

Upah pekerja Oh 0.0100 Rp. 80,000.00 Rp.


tukang kayu Oh 0.1000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0100 Rp. 135,000.00 Rp.
mandor Oh 0.0005 Rp. 120,000.00 Rp.

Total >>> Rp.

1 Bh PASANG GRENDEL JENDELA

Bahan Gerendel jendela bh 1.0000 Rp. 8,800.00 Rp.

Page 214 of 262


URAIAN INDEKS HARGA

Upah pekerja Oh 0.0100 Rp. 80,000.00 Rp.


tukang kayu Oh 0.1000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0100 Rp. 135,000.00 Rp.
mandor Oh 0.0005 Rp. 120,000.00 Rp.

Total >>> Rp.

Page 215 of 262


URAIAN INDEKS HARGA

1 Bh PASANG PEGANGAN PINTU/ DOOR HOLDER

Bahan door holder bh 1.0000 Rp. 28,750.00 Rp.

Upah pekerja Oh 0.0500 Rp. 80,000.00 Rp.


tukang kayu Oh 0.5000 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0500 Rp. 135,000.00 Rp.
mandor Oh 0.0030 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 PASANG KACA, TEBAL 3 MM

Bahan kaca tebal 3mm m2 1.1000 Rp. 80,500.00 Rp.


Sealant Kg 0.0500 Rp. 38,500.00 Rp.

Upah pekerja Oh 0.0150 Rp. 80,000.00 Rp.


tukang kayu Oh 0.1500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0150 Rp. 135,000.00 Rp.
mandor Oh 0.00075 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 PASANG KACA, TEBAL 5 MM

Bahan kaca tebal 5mm m2 1.1000 Rp. 150,000.00 Rp.


Sealant Kg 0.0500 Rp. 38,500.00 Rp.

Upah pekerja Oh 0.0150 Rp. 80,000.00 Rp.


tukang kayu Oh 0.1500 Rp. 110,000.00 Rp.
kepala tukang Oh 0.0150 Rp. 135,000.00 Rp.
mandor Oh 0.00080 Rp. 120,000.00 Rp.

Total >>> Rp.

HARGA SATUAN PEKERJAAN PENGECATAN

1M2 MENGIKIS / MENGEROK PERMUKAAN CAT TEMBOK LAMA

Bahan soda api kg 0.0500 Rp. 45,500.00 Rp.

Upah pekerja Oh 0.1500 Rp. 80,000.00 Rp.


mandor Oh 0.0030 Rp. 120,000.00 Rp.

Total >>> Rp.

1M2 PENGECATAN BIDANG KAYU LAMA


Page 216 of 262
Bahan plamir kg 0.1500 Rp. 8,800.00 Rp.
FTAR ANALISA BAHAN DAN UPAH

JUMLAH

ARGA SATUAN PEKERJAAN PERSIAPAN

34,320.00
308.00
14,245.00
48,873.00

8,000.00
11,000.00
1,350.00
600.00
20,950.00

69,823.00

Harga Satuan PEKERJAAN TANAH

60,000.00
3,000.00
63,000.00

63,000.00

72,000.00
5,400.00
77,400.00

77,400.00

21,000.00
21,000.00

21,000.00

25,800.00
25,800.00

25,800.00

Page 217 of 262


JUMLAH

40,000.00
6,000.00
46,000.00

46,000.00

Page 218 of 262


JUMLAH

51,562.50
40,000.00
6,000.00
97,562.50

97,562.50

93,600.00
81,480.00
175,080.00

175,080.00

105,600.00
105,600.00
24,000.00
1,200.00
25,200.00

130,800.00

51,562.50
51,562.50

20,000.00
1,200.00
21,200.00

72,762.50

Page 219 of 262


JUMLAH

NALISA BIAYA KONSTRUKSI SNI 2002


PEKERJAAN BETON

287,760.00
45,760.00
395,850.00
729,370.00

132,000.00
27,500.00
3,375.00
9,600.00
172,475.00

901,845.00

13,200.00
2,288.00
20,020.00
35,508.00

92,000.00
2,200.00
270.00
720.00
95,190.00

130,698.00

Page 220 of 262


JUMLAH

Harga Satuan PEKERJAAN BETON

407,000.00
23,100.00
4,680.00
1,338,750.00
38,981.25
443,520.00
47,520.00
368,550.00
2,672,101.25

424,000.00
30,250.00
143,000.00
115,500.00
35,370.00
31,800.00
779,920.00
3,452,021.25

549,450.00
30,800.00
7,020.00
1,610,716.00
46,900.26
443,520.00
47,520.00
368,550.00
3,104,476.26
452,000.00
30,250.00
171,600.00
154,000.00
43,605.00
33,960.00
885,415.00
3,989,891.26

814,000.00
61,600.00
23,400.00
1,093,175.56
31,830.70
443,520.00
47,520.00
368,550.00
429,000.00
654,500.00
132,000.00
4,099,096.26

Page 221 of 262


JUMLAH
564,000.00
30,250.00
181,500.00
231,000.00
54,405.00
42,360.00
1,103,515.00

5,202,611.26

Page 222 of 262


JUMLAH

814,000.00
61,600.00
23,400.00
1,138,932.00
33,163.02
443,520.00
47,520.00
368,550.00
429,000.00
654,500.00
132,000.00
4,146,185.02
564,000.00
30,250.00
181,500.00
231,000.00
54,405.00
42,360.00
1,103,515.00

5,249,700.02

651,200.00
49,280.00
18,720.00
1,113,709.67
46,900.26
426,360.00
47,520.00
368,550.00
400,400.00
523,600.00
105,600.00
3,751,839.93

508,000.00
30,250.00
181,500.00
154,000.00
44,955.00
38,160.00
956,865.00

4,708,704.93

Page 223 of 262


JUMLAH

651,200.00
49,280.00
18,720.00
933,390.67
27,178.14
426,360.00
47,520.00
368,550.00
400,400.00
523,600.00
105,600.00
3,551,798.81

508,000.00
30,250.00
181,500.00
154,000.00
44,955.00
38,160.00
956,865.00

4,508,663.81

651,200.00
49,280.00
18,720.00
1,472,877.17
42,886.72
426,360.00
47,520.00
368,550.00
400,400.00
523,600.00
105,600.00
4,106,993.88
508,000.00
30,250.00
181,500.00
154,000.00
44,955.00
38,160.00
956,865.00

5,063,858.88

4,070.00
154.00
25,500.00
7,425.00
5,280.00

Page 224 of 262


JUMLAH
528.00
4,095.00
47,052.00
14,400.00
2,200.00
2,200.00
2,200.00
810.00
1,080.00
22,890.00
69,942.00

Page 225 of 262


JUMLAH

6,105.00
308.00
30,600.00
825.00
7,260.00
792.00
6,825.00
52,715.00

23,760.00
3,630.00
3,630.00
3,630.00
1,350.00
1,800.00
37,800.00

90,515.00

6,105.00
308.00
1,166,840.77
33,975.66
7,260.00
792.00
6,825.00
1,222,106.43

23,760.00
3,630.00
3,630.00
3,630.00
1,350.00
1,800.00
37,800.00

1,259,906.43

651,200.00
49,280.00
18,720.00
1,338,750.00
37,125.00
443,520.00
47,520.00
368,550.00
343,200.00
523,600.00
211,200.00
4,032,665.00

Page 226 of 262


JUMLAH

424,000.00
30,250.00
143,000.00
115,500.00
35,775.00
31,800.00
780,325.00

4,812,990.00

Page 227 of 262


JUMLAH

Satuan PEKERJAAN PASANGAN DINDING

70,000.00
43,494.00
6,006.00
119,500.00
48,000.00
22,000.00
2,700.00
3,600.00
76,300.00
195,800.00

35,000.00
15,180.00
2,838.00
53,018.00

24,000.00
11,000.00
1,350.00
1,800.00
38,150.00

91,168.00

Harga Satuan PEKERJAAN PLESTERAN

8,236.80
1,584.00
9,820.80

24,000.00
16,500.00
2,025.00
1,800.00
44,325.00

54,145.80

4,290.00
4,290.00

16,000.00

Page 228 of 262


JUMLAH
11,000.00
1,350.00
1,200.00
29,550.00

33,840.00

Page 229 of 262


JUMLAH

Harga Satuan PEKERJAAN KAYU

3,448,500.00
19,250.00
16,500.00
3,484,250.00

560,000.00
2,310,000.00
283,500.00
42,000.00
3,195,500.00

6,679,750.00

125,400.00
8,250.00
133,650.00

80,000.00
330,000.00
40,500.00
6,000.00
456,500.00

590,150.00

484,000.00
8,250.00
492,250.00

80,000.00
330,000.00
40,500.00
6,000.00
456,500.00

948,750.00

75,240.00
4,950.00
165,000.00
245,190.00

64,000.00
264,000.00

Page 230 of 262


JUMLAH
32,400.00
4,800.00
365,200.00

610,390.00

Page 231 of 262


JUMLAH

30,000.00
2,200.00
32,200.00

8,000.00
22,000.00
2,700.00
600.00
33,300.00

65,500.00

23,750.00
924.00
24,674.00

8,000.00
11,000.00
1,350.00
6,000.00
26,350.00

51,024.00

Page 232 of 262


JUMLAH
TUAN PEKERJAAN PENUTUP LANTAI DAN DINDING

205,530.00
12,672.00
2,970.00
24,750.00
245,922.00

19,200.00
13,200.00
1,620.00
1,440.00
35,460.00

281,382.00

95,153.76
12,936.00
2,970.00
21,450.00
132,509.76

20,000.00
13,750.00
1,755.00
1,560.00
37,065.00

169,574.76

56,593.68
12,936.00
2,970.00
21,450.00
93,949.68

20,000.00
13,750.00
1,755.00
1,560.00
37,065.00

131,014.68

Page 233 of 262


JUMLAH
69,439.50
13,200.00
2,970.00
24,750.00
110,359.50

56,000.00
38,500.00
4,725.00
4,200.00
103,425.00

213,784.50

Page 234 of 262


JUMLAH

53,000.00
13,728.00
2,970.00
26,730.00
96,428.00

56,000.00
38,500.00
4,725.00
4,200.00
103,425.00

199,853.00

73,140.00
13,728.00
2,970.00
26,730.00
116,568.00

56,000.00
38,500.00
4,725.00
4,200.00
103,425.00

219,993.00

52,000.00
12,276.00
1,188.00
45,375.00
110,839.00

72,000.00
49,500.00
6,075.00
5,400.00
132,975.00
243,814.00

Page 235 of 262


JUMLAH

66,000.00
12,276.00
1,188.00
45,375.00
124,839.00

72,000.00
49,500.00
6,075.00
5,400.00
132,975.00
257,814.00

126,500.00
18,377.00
3,381.00
17,500.00
34,500.00
200,258.00

48,000.00
49,500.00
6,075.00
3,600.00
107,175.00
307,433.00

Page 236 of 262


JUMLAH

tuan PEKERJAAN LANGIT - LANGIT (Plafond)

30,030.00
1,650.00
31,680.00

8,000.00
5,500.00
675.00
600.00
14,775.00

46,455.00

28,875.00
220.00
29,095.00

4,000.00
5,500.00
675.00
360.00
10,535.00

39,630.00

29,700.00
660.00
30,360.00

8,000.00
11,000.00
1,350.00
600.00
20,950.00

51,310.00

75,240.00

231.00
7,429.00
11,730.00
94,630.00

Page 237 of 262


JUMLAH
8,000.00
11,000.00
1,350.00
600.00
20,950.00

115,580.00

11,480.00
6,600.00
50,000.00
68,080.00

160,000.00
66,660.00
16,200.00
5,400.00
248,260.00

316,340.00

Page 238 of 262


JUMLAH

Satuan PEKERJAAN BESI dan ALUMINIUM

75,075.00
231.00
54,340.00
129,646.00

16,000.00
44,000.00
3,375.00
1,200.00
64,575.00

194,221.00

30,205.00
30,205.00
60,410.00

20,000.00
27,500.00
3,375.00
1,560.00
52,435.00

112,845.00

34,520.00
34,520.00
69,040.00

28,000.00
38,500.00
4,725.00
2,160.00
73,385.00

142,425.00

Page 239 of 262


JUMLAH

GA SATUAN PEKERJAAN PENUTUP ATAP

44,880.00
3,080.00
47,960.00

16,000.00
11,000.00
1,350.00
120.00
28,470.00

76,430.00

26,620.00
770.00
27,390.00

20,000.00
16,500.00
2,025.00
1,560.00
40,085.00

67,475.00

26,620.00
2,200.00
28,820.00

20,000.00
16,500.00
2,025.00
1,560.00
40,085.00

68,905.00

Page 240 of 262


JUMLAH
ATUAN PEKERJAAN SANITASI DALAM GEDUNG

1,350,750.00
3,500.00
7,920.00
660.00
1,362,830.00

80,000.00
165,000.00
40,500.00
13,200.00
298,700.00
1,661,530.00

280,500.00
4,039.20
7,920.00
660.00
293,119.20

96,000.00
159,500.00
20,250.00
12,000.00
287,750.00

580,869.20

275,000.00
3,960.00
278,960.00

24,000.00
49,500.00
6,075.00
1,800.00
81,375.00
360,335.00

30,000.00
110.00
30,110.00

800.00

Page 241 of 262


JUMLAH
44,000.00
5,400.00
600.00
50,800.00

80,910.00

4,080.00
4,080.00

6,480.00
14,850.00
1,822.50
480.00
23,632.50

27,712.50

Page 242 of 262


JUMLAH

17,850.00
17,850.00

6,480.00
14,850.00
1,822.50
480.00
23,632.50

41,482.50

30,000.00
110.00
30,110.00
800.00
11,000.00
1,350.00
600.00
13,750.00

43,860.00

38,500.00
38,500.00

800.00
11,000.00
1,350.00
600.00
13,750.00

52,250.00

6,050.00
6,050.00

800.00
11,000.00
1,350.00
600.00
13,750.00

19,800.00

Page 243 of 262


JUMLAH

A SATUAN PEKERJAAN INSTALASI LISTRIK

38,500.00
38,500.00

2,000.00
27,500.00
600.00
30,100.00

68,600.00

22,000.00
22,000.00

2,000.00
27,500.00
600.00
30,100.00

52,100.00

46,750.00
46,750.00

2,000.00
27,500.00
600.00
30,100.00

76,850.00

150,000.00
150,000.00

2,000.00
27,500.00
600.00
30,100.00

180,100.00

Page 244 of 262


JUMLAH

140,000.00
140,000.00

1,000.00
13,750.00
300.00
15,050.00

155,050.00

72,000.00
72,000.00

1,000.00
13,750.00
300.00
15,050.00

87,050.00

45,000.00
45,000.00

1,000.00
13,750.00
300.00
15,050.00

60,050.00

Page 245 of 262


JUMLAH

GA SATUAN PEKERJAAN KUNCI DAN KACA

316,250.00
316,250.00

4,800.00
66,000.00
8,100.00
360.00
79,260.00

395,510.00

148,000.00
148,000.00

800.00
55,000.00
6,750.00
600.00
63,150.00

211,150.00

75,000.00
75,000.00

400.00
55,000.00
6,750.00
360.00
62,510.00

137,510.00

33,000.00
33,000.00

1,200.00
16,500.00
2,025.00
96.00
19,821.00

Page 246 of 262


JUMLAH
52,821.00

Page 247 of 262


JUMLAH

22,000.00
22,000.00

800.00
11,000.00
1,350.00
60.00
13,210.00

35,210.00

16,500.00
16,500.00

800.00
11,000.00
1,350.00
60.00
13,210.00

29,710.00

11,000.00
11,000.00

1,200.00
16,500.00
2,025.00
96.00
19,821.00

30,821.00

22,000.00
22,000.00

800.00
11,000.00
1,350.00
60.00
13,210.00

35,210.00

8,800.00

Page 248 of 262


JUMLAH
8,800.00

800.00
11,000.00
1,350.00
60.00
13,210.00

22,010.00

Page 249 of 262


JUMLAH

28,750.00
28,750.00

4,000.00
55,000.00
6,750.00
360.00
66,110.00

94,860.00

88,550.00
1,925.00
90,475.00

1,200.00
16,500.00
2,025.00
90.00
19,815.00

110,290.00

165,000.00
1,925.00
166,925.00

1,200.00
16,500.00
2,025.00
96.00
19,821.00

186,746.00

RGA SATUAN PEKERJAAN PENGECATAN

2,275.00
2,275.00

12,000.00
360.00
12,360.00
14,635.00

Page 250 of 262


1,320.00
DAFTAR BAHAN DAN UPAH

I. HARGA UPAH

1 Kepala Tukang Rp. 135,000.00 / Hari


2 Tukang Rp. 110,000.00 / Hari
3 Pekerja Rp. 80,000.00 / Hari
4 Mandor Rp. 120,000.00 / Hari
5 Upah Operator / Sopir Rp. 110,000.00 / Hari
6 Upah Pembantu Operator / Pmb.Sopir Rp. 80,000.00 / Hari
7 Sopir Rp. 95,000.00 / Hari
8 Mekanik Rp. 150,000.00 / Hari
9 Teknisi Rp. 110,000.00 / Hari

II. HARGA BAHAN


A. BAHAN PONDASI DAN PASANGAN

1 Pasir Beton Rp. 88,000.00 / M³


2 Pasir Beton (dalam Kg) Rp. 100.00 / Kg
2 Pasir Pasangan Rp. 66,000.00 / M³
3 Pasir Urug Rp. 88,000.00 / M³
3 Semen PC @ 50/ Kg Rp. 1,320.00 / Kg
4 Semen PC @ 50 Rp. 66,000.00 / Zak
4 Semen PC @ 40 Rp. 55,000.00 / Zak
5 Semen PC @ 40/ Kg Rp. 1,375.00 / Kg
5 Semen Putih @ 40 Kg Rp. 121,000.00 / Zak
6 Semen Putih @ 40 Kg Rp. 3,025.00 / Kg
6 Semen Warna Rp. 16,500.00 / Kg
7 Semen Perekat Glass Block Rp. 7,800.00 / Kg
7 Batu Kerikil Rp. 440,000.00 / M³
8 Batu Kerikil/ Kg Rp. 400.00 / Kg
8 Koral Beton (Split) Rp. 455,000.00 / M³
9 Koral Beton (Split)/ Kg Rp. 400.00 / Kg
9 Batu Koral Beton (KERACAL) Rp. 325,000.00 / M³
10 Batu Bata Rp. 500.00 / Bh
12 Tanah Biasa Rp. 41,250.00 / M³
13 Paving Block Rp. 3,000.00 / Bh
14 Andesit 30 x 40 Rp. 156,000.00 / M²
15 Andesit 20 x 40 Rp. 145,000.00 / M²
16 Andesit x 30 Rp. 115,000.00 M²

B. BAHAN LANTAI
1 Keramik 40 x 40 cm (Warna) Rp. 89,700.00 / M²
2 Keramik 40 x 40 cm (Warna) Rp. 14,352.00 / Bh
2 Keramik Putih 40 x 40 cm Rp. 53,350.00 / M²
3 Keramik Putih 40 x 40 cm Rp. 8,536.00 / Bh
3 Keramik 30 x 30 cm (Warna) Rp. 65,000.00 / M²
4 Keramik 30 x 30 cm (Warna) Rp. 5,850.00 / Bh
4 Keramik Putih 30 x 30 cm Rp. 62,500.00 / M²
5 Keramik Putih 30 x 30 cm Rp. 5,625.00 / Bh
3 Keramik Mulia 20 x 20 cm (Warna) Rp. 69,000.00 / M²

Page 251 of 262


4 Keramik Mulia 20 x 20 cm (Warna) Rp. 2,760.00 / Bh
5 Keramik 20 x 25 cm (Warna) Rp. 66,000.00 / M²
6 Keramik 20 x 25 cm (Warna) Rp. 3,300.00 / Bh
7 Granit 60 x 60 cm Rp. 184,000.00 / M²
8 Granit 60 x 60 cm Rp. 66,300.00 / Bh
9 Keramik 60 x 60 cm Rp. 140,000.00 / M²
10 Keramik 60 x 60 cm Rp. 50,400.00 / Bh

Page 252 of 262


C. BAHAN PENUTUP LANGIT - LANGIT
1 Gypsum 9 mm Rp. 82,500.00 / Lbr
2 GRC Board 4 mm Rp. 79,200.00 / Lbr
3 GRC Board 5 mm Rp. 115,000.00 / Lbr
4 GRC Board 6 mm Rp. 172,000.00 / Lbr
5 PVC Motif Rp. 300,000.00 / Lbr
6 ACP ( Alumunium Composite Panel ) Rp. 700,000.00 / Lbr

D. BAHAN PENUTUP ATAP

1 Plat Talang (100 x 52 cm) Rp. 20,100.00 / Lbr


2 Atap metal polos surya roof ( 0.30 mm ) Rp. 77,000.00 / M²
3 Nok metal polos surya roof ( 0.30 mm ) Rp. 27,500.00 / M¹
4 Genteng Metal Rp. 44,000.00 / M¹
5 Genteng Sakura Roof Rp. 44,000.00 / M¹
6 Genteng Multi roof Rp. 110,000.00 / M¹
7 Bubungan Genteng Metal Rp. 24,200.00 / M¹
8 Baja Smustruss C.75.100 Rp. 20,500.00 / M¹
9 Baja Smustruss C.75.75 Rp. 14,300.00 / M¹
10 Reng/Topspan Rp. 15,000.00 / M¹
11 Baut/Screw Rp. 500.00 / Bh

E. BAHAN KAYU

1 Kayu Balok Kelas I Rp. 3,135,000.00 / M³


2 Kayu Balok Kelas II Rp. 2,860,000.00 / M³
3 Kayu Balok Kelas III Rp. 2,750,000.00 / M³
4 Kayu Balok Kulim Rp. 4,400,000.00 / M³
5 Kayu Bulian Rp. 19,800,000.00 / M³
6 Kayu Papan Tembesu Rp. 12,100,000.00 / M³
7 Kayu Papan Kelas I Rp. 3,135,000.00 / M³
8 Kayu Papan Kelas I Parquite Tangga Rp. 3,135,000.00 / M²
9 Kayu Papan Kelas II Rp. 2,860,000.00 / M³
10 Kayu Papan Kelas III Rp. 2,035,000.00 / M³
11 Kayu Papan Bekisting Rp. 2,750,000.00 / M³
12 Kayu Bulat (Dolken) Rp. 6,600.00 / Btg
13 Papan Lisplank GRC L= 20 Cm Rp. 25,000.00 / M¹
14 Papan Lisplank GRC L= 30 Cm Rp. 36,000.00 / M¹
15 List Plapond 11 x 13 cm P = 4 m Rp. 27,500.00 / Lbr
16 List Profil Kayu P = 4 m Rp. 27,500.00 / Lbr

F. BAHAN BESI

1 Besi Beton Rp. 8,500.00 / Kg


2 Besi dia. 8 mm Rp. 38,500.00 / Btg
3 Besi dia. 10 mm Rp. 58,300.00 / Btg
4 Besi dia. 12 mm Rp. 82,500.00 / Btg
5 Besi dia. 14 mm Rp. 121,000.00 / Btg
6 Besi dia. 16 mm Rp. 148,500.00 / Btg
7 Besi Ulir dia. 8 mm Rp. 165,000.00 / Btg
8 Besi Ulir dia. 10 mm Rp. 165,000.00 / Btg

Page 253 of 262


9 Besi Ulir dia. 12 mm Rp. 88,000.00 / Btg
10 Besi Ulir dia. 13 mm Rp. 121,000.00 / Btg
11 Besi Ulir dia. 14 mm Rp. 132,000.00 / Btg
12 Besi Ulir dia. 16 mm Rp. 165,000.00 / Btg
13 Hollow 4 x 4 Zincromat Rp. 7,500.00 / M¹
14 Hollow 2 x 4 Zincromat Rp. 6,000.00 / M¹
15 Kawat Beton Rp. 16,500.00 / Kg
16 Paku Halus Rp. 22,000.00 / Kg
17 Paku Biasa Rp. 15,400.00 / Kg
18 Paku Seng Rp. 22,000.00 / Kg
19 Paku GRC Rp. 22,000.00 / Kg
20 Paku Sirap Rp. 16,500.00 / Kg
21 Paku Sekrup Rp. 15,000.00 / Kg
22 Mour Baut/Begel/Besi Rp. 6,500.00 / Kg
22 Plat Strip 4 x 40 Rp. 27,400.00 / Kg
23 Baja Profil/ Baja Prestres/ Baja Seling Rp. 20,800.00 / Kg
24 Kawat Las Rp. 33,000.00 / Kg
25 Sewa Alat Rp. 109,200.00 / Jam
26 Pintu Lipat (Folding Gate) Besi Rp. 766,700.00 / M²
27 Rolling Door Alumunium Rp. 600,000.00 / M²
28 Profil Aluminium Rp. 130,000.00 / M¹
29 Skrup / Fixer Rp. 24,200.00 / Bh
30 Sealent Rp. 38,500.00 / Tube
31 Aluminium Strip Rp. 119,600.00 / M¹
32 Besi Strip (3/4 x 4) mm Rp. 34,500.00 / Bh
33 Besi Plat (120 x 240) cm tebal 10 mm Rp. 3,055,000.00 / Lbr
34 Besi Plat (120 x 240) cm tebal 5 mm Rp. 1,495,000.00 / Lbr

G. BAHAN INSTALASI LISTRIK

1 Instalasi Titik Lampu dan Stop Kontak Rp. 162,500.00 / Ttk


2 Stop kontak Merk Broco Rp. 22,000.00 / Bh
3 Saklar tunggal Merk Broco Rp. 38,500.00 / Unit
4 Saklar ganda Merk Broco Rp. 46,750.00 / Unit
5 Lampu XL 25 watt Rp. 74,300.00 / Unit
6 Lampu XL 20 watt Rp. 63,300.00 / Unit
7 Lampu XC 15 watt Rp. 46,000.00 / Unit
8 Lampu LED 18 Watt Rp. 140,000.00 / Unit
9 Lampu LED 6 Watt Rp. 72,000.00 / Unit
10 Lampu Selang Rp. 45,000.00 / M
11 MCB 1 Phase + BOX Rp. 150,000.00 / Bh
12 Pek. Pasang Meteran Baru 1300 watt + Gorunding Meteran Rp. 3,500,000.00 / Bh

H. BAHAN SANITAIR

1 Instalasi Titik Air Bersih Rp. 55,000.00 / Titik


2 Instalasi Titik Air Kotor Rp. 55,000.00 / Titik
3 Pek. Penyambungan Baru PDAM Rp. 2,500,000.00 / Unit
4 Daun Pintu Fiber WC/ KM Terpasang Rp. 385,000.00 / M¹
5 Closed Jongkok Standart Rp. 242,000.00 / Bh
6 Bak Mandi Fiver Glass 0.3 M3 Rp. 275,000.00 / Unit
7 Bak Mandi Teraso 0.3 M3 Rp. 165,000.00 / Unit
8 Bak Cuci Piring Stainles Stell Rp. 220,000.00 / Unit
9 Kran Air 1/2 Rp. 30,000.00 / Bh
10 Kran Air San Standart Rp. 40,150.00 / Bh
Page 254 of 262
11 Floor Drain Besi Rp. 38,500.00 / Bh
12 Floor Drain Plastik Rp. 6,050.00 / Bh
13 Pintu Fiber Rp. 220,000.00 / Set
14 Pipa PVC Tipe AW Ø 1/2" Rp. 3,400.00 / M1
15 Pipa PVC Tipe AW Ø 3/4" Rp. 4,550.00 / M1
16 Pipa PVC Tipe AW Ø 1" Rp. 6,062.50 / M1
17 Pipa PVC Tipe AW Ø 1 1/2" Rp. 8,750.00 / M1
18 Pipa PVC Tipe AW Ø 2" Rp. 14,875.00 / M1
19 Pipa PVC Tipe AW Ø 2 1/2" Rp. 22,500.00 / M1
20 Pipa PVC Tipe AW Ø 3" Rp. 25,156.25 / M1
21 Pipa PVC Tipe AW Ø 4" Rp. 51,500.00 / M1
22 kloset duduk Rp. 1,350,750.00 / unit

I. BAHAN FINISHING

1 Cat Kilat/Cat Kayu Rp. 66,000.00 / Kg


2 Cat Tembok Rp. 26,400.00 / Kg
3 Cat Dasar Rp. 44,000.00 / Kg
4 Dempul Rp. 82,500.00 / Kg
5 Plamour Rp. 8,800.00 / Kg
6 Minyak Cat Rp. 11,000.00 / Kg
7 Minyak bekisting Rp. 11,700.00 / Liter
8 Amplas Rp. 7,700.00 / Lbr
9 Lem Kayu Rp. 16,500.00 / Kg
10 Lem Aibon Rp. 44,000.00 / Kg
11 Lem Fox Rp. 17,600.00 / Kg
12 Sirlak Rp. 107,700.00 / Kg
13 Speritus Rp. 9,350.00 / Liter
14 Cat Meni Rp. 28,750.00 / Kg
15 Cat Antara Rp. 28,750.00 / Kg
16 Politur Rp. 69,000.00 / Liter
17 Kuas Rp. 17,250.00 / Bh
18 Kapur Rp. 8,250.00 / Bks
19 Thiner (Minyak Cat) Rp. 11,000.00 / Btl
20 Minyak Pelumas Rp. 70,000.00 / Liter
21 Soda Api Rp. 45,500.00 / Kg

J. BAHAN KUNCI DAN PENGGANTUNG

1 Kunci tanam Antik Rp. 316,250.00 / Bh


2 Kunci tanam Biasa Rp. 148,000.00 / Bh
3 Kunci Tanam Kamar mandi Rp. 75,000.00 / Bh
4 Engsel Pintu Rp. 33,000.00 / Bh
5 Engsel Jendela Rp. 22,000.00 / Bh
6 Tarikan Jendela Rp. 11,000.00 / Bh
7 Tarikan Jendela 4" Rp. 16,500.00 / Bh
8 Hak angin Rp. 11,000.00 / Bh
9 Grendel Pintu Rp. 22,000.00 / Bh
10 Grendel Jendela Rp. 8,800.00 / Bh
11 Door Holder Rp. 28,750.00 / Bh
12 Tarikan Pintu Rp. 86,250.00 / Bh
13 Kunci Pintu Standart Rp. 165,000.00 / Bh
Page 255 of 262
K. BAHAN - BAHAN LAIN
1 Kaca Polos 3 mm Rp. 80,500.00 / M²
2 Kaca Polos 5 mm Rp. 150,000.00 / M²
3 Kaca Polos 8 mm Rp. 207,000.00 / M²
4 Kaca Tempered 12 mm Rp. 850,000.00 / M²

Page 256 of 262


PENGADAAN DAN PEMASANGAN POMPA BESERTA JARING
KEGIATAN
PEKERJAAN
TAHUN ANGGARAN
KONTRAKTOR PELAKSANA

NO URAIAN PEKERJAAN

1 PEK. Pendahuluan
jumlah
2 PEK. Sumur Bor
a Pek: Mencari Sumber Air
b Pek: Pengeboran
c Pek: pemasangan pipa 3 "
Pek: Pemasangan Pipa 1 "
d Pek: Pembuatan Dudukan Mesin Pompa Jet
e Pek: Pemasangan mesin Pompa Jet

jumlah
3 PEK. Tower Tedmon
a Pek: Pemasangan Pondasi Cor Beton
b Pek: Pemasangan Rangka Besi Siku
c Pek: Pengecatan Tower
d pek: Pemasangan Tedmon

jumlah
4 PEK. Pemasangan Instalasi Pemipaan
a Pek: Pemasangan Pipa Air bersi
b Pek: Pembongkaran dan perapian Kembali Beton saluran Pipa
c Pek: pemasangan Sok Dran
d Pek: Pemasangan Kran

jumlah
JUMLAH
PPN 10 %
TOTAL
PENGADAAN DAN PEMASANGAN POMPA BESERTA JARING
KEGIATAN
PEKERJAAN
TAHUN ANGGARAN
KONTRAKTOR PELAKSANA

NO URAIAN PEKERJAAN
A B
1 PEK. Pendahuluan
2 PEK. Sumur Bor
3 PEK. Tower Tedmon
4 PEK. Pemasangan Instalasi Pemipaan

JUM
PPN
JUMLAH +
DIBULAT
MPA BESERTA JARINGAN INSTALASI AIR MESS PU KERINCI
: BELANJA MODAL PEMELIHARAAN GEDUNG KANTOR
: PENGADAAN DAN PEMASANGAN POMPA BESERTA JARINGAN INSTALASI AIR
: 2019
:

HARGA SATUAN JUMLAH HARGA


VOLUME SATUAN
(Rp) (Rp)
1 ls Rp 2,500,000.00 Rp 2,500,000.00
Rp 2,500,000.00

1 ls Rp 1,000,000.00 Rp 1,000,000.00
1 ls Rp 4,500,000.00 Rp 4,500,000.00
34 m1 Rp 41,482.50 Rp 1,410,405.00
34 m1 Rp 27,712.50 Rp 942,225.00
1 ls Rp 450,000.00 Rp 450,000.00
1 unit Rp 2,350,000.00 Rp 2,350,000.00

Rp 10,652,630.00

0.2 m3 Rp 3,452,021.25 Rp 690,404.25


23 m2 Rp 316,340.00 Rp 7,275,820.00
23 m2 Rp 29,962.50 Rp 689,137.50
1 bh Rp 1,950,000.00 Rp 1,950,000.00

Rp 10,605,361.75

48 m1 Rp 41,482.50 Rp 1,991,160.00
1 ls Rp 1,000,000.00 Rp 1,000,000.00
3 bh Rp 36,500.00 Rp 109,500.00
3 bh Rp 80,910.00 Rp 242,730.00

Rp 3,343,390.00
Rp 27,101,381.75
Rp 2,710,138.18
Rp 29,811,519.93
MPA BESERTA JARINGAN INSTALASI AIR MESS PU KERINCI
: BELANJA MODAL PEMELIHARAAN GEDUNG KANTOR
: PENGADAAN DAN PEMASANGAN POMPA BESERTA JARINGAN INSTALASI AIR
: 2019
:

JUMLAH HARGA
C
Rp 2,500,000.00
Rp 10,652,630.00
Rp 10,605,361.75
Rp 3,343,390.00

JUMLAH Rp 27,101,381.75
PPN 10 % Rp 2,710,138.18
JUMLAH + PPN Rp 29,811,519.93
DIBULATKAN Rp 29,811,000.00