UPAH KEGIATAN PENGECORAN KOLAM

Lembur
No Nama Upah/hari Hari Jumlah Tanda tangan
jam

1 300,000 1 240,000 540,000


2 300,000 1 240,000 540,000
3 300,000 1 240,000 540,000
4 300,000 1 240,000 540,000
5 Arul 300,000 1 240,000 540,000
6 Agus 300,000 1 240,000 540,000
7 Hendra 300,000 1 240,000 540,000
8 Isur 300,000 1 240,000 540,000
9 Karna 300,000 1 240,000 540,000
10 Ari 300,000 1 240,000 540,000

Total 5,400,000

dibuat Keterangan:
300.000/5 = 60.000

Rata2 semua 4 jam


Hendrik 4 x 60000 = 240000
DANA TERPAKAI KEGIATAN PENGECORAN KOLAM

Uraian Volume Satuan Jumlah Keterangan


KASBON TUKANG 1 3,000,000 3,000,000
Konsumsi pengecoran 1 ls 1,160,000 1,160,000
Pasir 3 ret 700,000 2,100,000
batu Split 4 ret 1,800,000 7,200,000
Semen Gresik 50 Zak 51,000 2,550,000
Perbaikan Mesin Alcon 1 bh 100,000 100,000
Sewa mesin Alcon 1 bh 200,000 200,000
Sewa Molen 2 hari 350,000 700,000
Sewa Angkut molen 2 pp 150,000 300,000
Artco 1 bh 425,000 425,000
keranjang 6 bh 15,000 90,000
Baut 2 bh 2,000 4,000
Lampu 3 bh 75,000 225,000
stop kontak 2 bh 13,000 26,000
jek 3 bh 7,000 21,000
fiting gantung 3 bh 7,000 21,000
Multidex (obat cor) 2 bh 110,000 220,000 5 lter
Kasutan 2 bh 25,000 50,000
Baut 4 bh 2,000 8,000
sarung tangan 10 pasang 5,000 50,000
solar 10 lter 10,000 100,000
UPAH TUKANG 1 5,400,000 5,400,000
-
Total 23,950,000

Pagi 2,540,000
Makanan 1 kali 156000 1,160,000
Air es extrajoss 1 pagi 50000 3,700,000
Rokok 1 100000
Bensin + Pulsa+ Rokok 1 162000 1,300,000

Siang
Makanan 1 kali 156000
Air es extrajoss 1 siang 50000
Rokok 1 100000
Gorengan 80 bh 80000

Malam
Makanan 1 kali 156000
Air es extrajoss 1 malam 50000
Rokok 1 100000
Total 1160000
17,000,000
18,250,000

13700000

900000
200000
200000
100000
1400000