Anda di halaman 1dari 83

ULHASNAGAR MUNICIPAL CORPORATION

Rates
Sr. DESCRIPTION OF ITEMS RATE
1 Dismantling RCC work including breaking concrete by 396.63
chieseling, wedging etc. includg cutting the reinforcmt Rates converted to 0607
stacking the serviceable materials and the debris
seperatly up to a distance of 50 mtrs or spreading the
debris as directed complete. (Spec.Bd.W-8 As Directed
by Engineer P-587 Mod) (DSR .Item-51 Page-111)

2 Dismantling carefully the existing plain concrete, 307.55


including stacking the materials neatly within 50mtrs
lead as directed. (Spec.Bd.W-8 As Directed by
Engineer )(DSR Item-50 Page-111)

3 Dismantling carefully the existing structure of brick 91.2


masonary in cement mortar or lime morter, including
sorting out serviceable material and stacking
dismantled material within 50mtrs lead as directed.
(Spec.Bd.W-8, As Directed by Engineer) (DSR Item-49
Page-111)

4 Dismantling carefully the existing structure of stone 91.2


masonary in cement mortar or lime morter, including
sorting out serviceable material and stacking
dismantled material within 50mtrs lead as directed.
(Spec.Bd.W-8/11 As Directed by Engineer) (DSR Item-
48 Page-111)

5 Cutting down trees including trunks and branches and


stacking the material neatly within a lead of 50m.as
directed.(Spec.Rd.A,B P-179) (DSR Item-1b,1d Page-
148)
th of 60 to 90 cm. 592.82
of 180 to 270 cm. 828.25

6 Dewatering on BHP basis by using water pump 3 HP 53.03


including diversion of stream, plroviding earthen bunds
coffer dam etc. as may be neccessary for foundation
and other parts of the work and bailing out and
pumping out water, during and after excavation as
required (The item include dewatering for excavation
up to foundation level, filling foundation and sub
structre masonary above water level)(Spec. Br As
directed by engineer in charge) (DSR, Item-3(B)(i)
Page-116)

7 Engaging J.C.B. for removing debris wastes on road 1210


including all materials labours, operators, etc complete.
(Spec. Special) (Rate Analysis)
Engaging J.C.B. for removing debris wastes on road
including all materials labours, operators, etc complete.
(Spec. Special) (Rate Analysis)

1 Excavation for foundation in earth soils of all types, 110.29


sand gravel and soft murum including removing the
excavated materials upto a distance of 50 meters
beyond the building area and lift upto 1.5 meters
stacking and spreading as directed including
dewatering unless provided elsewhere, preparing the
bed for the foundation and necessary back filling,
ramming, watering complete excluding shoring and
strutting.(Spec Bd. A-1 Page-259) (DSR Item-1a Page-
5)

2 Excavation for foundation in hard murum and boulder 127.26


upto including removing the excavated material upto a
distance of 50 meters beyond the building area and lift
upto 1.5meters, stacking and spreading as directed
including dewatering manually, preparing the bed for
the foundation and necessary back filling ramming,
watering complete excluding shoring and strtutting.
(Spec.Bd.A-3 P-259) (DSR Item-1c Page-5)

3 Excavation for foundation in in soft rock,old cement 295.88


lime masonary, B.T. surface incldg removing the
excavated materials upto a dist of 50 meters beyond
the building area and lift upto 1.5 meters stacking and
spreading as directed incldg dewatering unless
provided elsewhere, preparing the bed for the
foundation and necessary back filling with available
earth/ murum,, ramming, watering complete excluding
shoring and strutting. (Spec.Bd.A-4 P-259) (DSR Item-
2a Page-5)

4 Excavation for foundation in hard rock by chiselling 705.23


wedging, line drilling etc.including trimmng and levelling
the bed, removing the excavated material upto a
distance of 50 meters, stacking as directed includg
dewatering manually, backfilling with available earth,
murum, ramming and waterng complete. (Spec.Bd.A-6
P-260) (DSR Item-2c Page-5)

5 Excavation for foundation in slush including disposing 321.3


off the excavated stuff within 50 meters beyond the
building area asdirected etc. complete.(Spec As
directed).(Rate Analysis)

6 Providing dry trap/rubble stone soling 15 cm.to 683.42


20cm.thick including hand packing and compacting
etc.complete. (Spec. Bd. A-12 P-264) (DSR P Item-6
Page-6)
Providing dry trap/rubble stone soling 15 cm.to
20cm.thick including hand packing and compacting
etc.complete. (Spec. Bd. A-12 P-264) (DSR P Item-6
Page-6)
7 Providing and laying precaste RCC half round pipe 341
300mm. Dia. for drain bottom including laying to proper
level, grade, slope,jointing etc complete.(Spec.Special)
(Rate Analysis)

8 Providing and laying precaste RCC half round pipe 563


450mm.dia. for drain bottom including laying to proper
level, grade, slope,jointing etc complete.(Spec.Special)
(Rate Analysis)

9 Providing and laying precaste RCC half round pipe 820


600mm.dia. for drain bottom including laying to proper
level, grade, slope,jointing etc complete.(Spec.Special)
(Rate Analysis)

10 Providing 1532
and laying
precaste
RCC half
round
pipe
11 Providing 4481.52
900mm.di
and
a. forlaying
in situ
drain
cement
bottom
concrete
including
for mixto
laying
1:3:6
12 proper
Providing
(M10) 5277.26
level, of
and
trap laying
metal
grade,
in
for situ
gutter
slope,joint
cement
foundatio
ing etc
concrete
n and
complete.
for mix
bedding,
(Spec.Sp
1:2:4(M15
including
13 ecial)
Providing
)bailing
of trapout 128.22 70.02 19.95
(Rate
internal
metal
water for
Analysis)
cement
gutter
manually,
plaster
foundatio
formwork,
6mm.
n and
compactin
Thickin
g and a
bedding,
single
including
curing.
coat,
bailinginout
14 (Spec.Bd.
Providing
cement 7562.64
water
E-1 Page
and
287)laying
morter
manually,1:4
in situ
with
formwork,
( DSR M-
20
cement
compactin
Item-1c
cement
finish
g and to
Page-14)
concrete
curing.
of trap
surfaces
(Spec.Cd-
metal
in all in
-3 P-160)
solid
( DSRslab
positions
over
including
Item-2d
gutter
racking
Page-
including
out
174)joints,
plywood/s
scafolding
teel
and
formwork,
curing
steel
complete.
centering,
(Spec.Bd.
compactio
L-1 P-
n by
367)&(Sp
15 Providing 44022.62
and fixing
in position
M.S./HYS
D/T.M.T.
steel
reinforce
ment of
varous
diameters
for R.C.C.
4 pile
Providing caps, 406.17
footings,f
and laying
oundation
R.C.C.pip
s,
esslabs,of
beams,
I.S.NP.2
columns,
class of
canaopies
150mm.
,diameter
5 staircases
Providing
in proper 397
,andnewels,
line, laying
level
chajjas,
PVC
and slope pipe
lintels,
line 75mm
including
pardies,
for
necessary
copping,
passing
collars,tes
fins,
street
ting,
7 Providing
arches,
light
excavatio cable 511
etc.
n as
precast
through
per
kerbs
footpath
laying,fixi of
detailed
cc
ng M
including
with 20
designs
(1:11/2:3)
necessary
collars in
and
with
excavatio
cement
shedules,
chamfere
n, laying,
mortar 1:1
including
d faces as
jointing,
and
cutting,
per
bends
reffilling
bending,
detailed
tees,
the trench
hooking
8 drawing
junctions,
etc.
Providing 304
the barss,
including
inserting
complete.
and fixing
binding
necessary
copper
(Spec.Bd.
precast
with
excavatio
wire
V-41
concrete wires
to
P-
or
n
pull
573) tack
and
blocks
welding
reinfaorce
electric
(DSR
450mmX2
and
ment
cable
Item-45a
30mmX20 etc
supportin
(necessar
complete.
Page-with
0mm
g
y) asholes
(Spec.
106)
two As
9 ofdirected
including
Directed)
150mm 328.4
Providing
complete.
painting
(Rate
dia infixing
the
and
(Spec.
the
Analysis)
walls of
water
Bd.
exposed
drains F-17
table oforM
Page-
surfaces
in kerbing
15 grade
306,
of
of kerb
cement
(DSR
with
footpath one
concrete
Item-11,
coat
to serve of
30cm
Page-19)
road
as inlet to
wide and
marking
drain
10cmthick to
paint
pass
on a M10
removing
storm
cement
the
water in
concrete
excavated
to the
bed 10cm
stuff
thick etc.
drain
complete.
including
includingfi
Compacti
making
lling in
on
good
jointsby thewith
vibratory
10 Providing 2925
casting in
situ cc
M20 for
R.C.C.cen
tre line
single
divider
wall
longitudin
ally in the
road to
the
required
cross
section of
30cm
wide at up
to height
of 30cm
11 from pcc
Providing 66875.69
bed then
and
45cm
fabricatin
height
g
tappered
structural
curved
steel work
shape wit
in rolled
20cm
sections
width at
like joist,
top
channnels
including
, angles,
necessary
tees, etc.
steel plate
12 as per
Providing
forms(Mo 2102.7
detailed
and
ulds)fixing
duly
designs
precast
secured
or as
RCC
with nut
directed
grating/co
and bolts
including
ver
for of
cutting,
strength
assemblin
fabricatin
M20
g for over
g,
drain/foot
casting to
13 hoisting,e
path
form of
Providing 1002
recting,
size
finsh,fixing
and
fixing in
90cmx60c
including
precast
position
mx60mm
necessary
heavy
making
including
P.C.C.fou
duty inter
reveted/b
necessary
ndation
locked
olted/weld
reinforce
bedding
concrete
ed
ments
formwork,
paving as
connectio
per
placing
block of
ns with
drawing
concrete
60 mm
connectin
or as
compactin
thickness
g plates,
directed,
g,vibratin
having
braces a
conveying
g, curing,
strength
etc. and
stacking
watering
of 300
including
etc.
etc.,with
kg/sq.mt..
one coat
complete.
reinforce
of
of
(Spec.Sp
ment of
approved
anticorrsiv
ecial)
12mm
quality
e paint
(straight
Rate
and
and over
Analysis)
torque on
shape
it two
(Spec.Sp
steel
a bedbars
of
coats of
ecial)
12 no.and
grit / sand
1 Excavatio 110.29
n for
roadways
in soft
strata
such as
earth soil
of all sorts
sand,
gravel or
2 soft
Excavatio 127.26
murum
n for
including
roadways
dressing
in soft
section
strata to
the
such as
required
hard
grade,
murum
camber
and
3 and
bouldersside
Excavatio 144.23
slopes
including
n for
and
dressing
roadways
conveying
section
in hard to
the
the
strata
excavated
required
such as
materials
grade,
soft rock
with
camber all
including
lifts
and side a
upto
dressing
4 lead
slopes
section
Watering of 50 to 39.24
m
and
the
and and
spreading
conveying
required
compactin
for
the
grade,
g of
embankm
excavated
camber
embankm
ent
andor
materials
ent side
stacking,
with
slopes
formed all of
disposing
lifts upto a
and
materials
5 as
lead of 50
conveying
Providing
obtained 212.44
directed.
m
theand
earth
from the
Spec.
spreading
excavated
work
road in
No.:Rd.
for
materials
embankm
cutting,
2.3,4.
embankm
with
enk
within alla
with
Page
ent or
lifts ofNo.a
upto
approved
lead
180,183,1
stacking,
lead of
materials
50m to 50
84
m and (DSR
disposing
obtained
95% of
Item-2a
as
spreading
from
standard
7 Page-
directed.
for
private
proctor 1285.3
Providing
148)
Spec.
embankm
land
density
and
No.:Rd.
ent or
including
after
constructi
2.3,4.
stacking,
all lift
laying
ng and
W.B.M.
Page
disposing
laying
them with
road No.
inin
180,183,1
as
layers
80mm in of
84 to (DSR
directed.
20cm.to
20
oversize/ 30
Item-2c
Spec.
30cm.
cm
Grade withI
Page-
No.:Rd.
Thickness
static
metal in
148)
5,6,7,.8
breaking
roller etc.
layers of
Page
75/100No.
clods
complete.
184,185,1
dressing
Spec.
mm
86.the
to
No.: (DSR
compacte Rd. 1
Item-3a
required
0
d Page
Page-
lines,
No. 187
thickness,
148)
curves,
(DSR
preparatio
grades,
Item-7a
n of &
section,
Page-
subgrade,
8 Providing 1328.6
and
constructi
ng W.B.M.
road with
50mm
over
size/Grad
e II metal
in layers
of 75 mm
compacte
1 d 4698.60
Providing
thickness,
and laying
preparatio
in situ Dry
n of
lean
subgrade,
cement
screening
concrete
metal
sub-base
13.2mm
of trap
2 size 4561.84
Providing
metal of
Binding
and laying
specified
with
heavy
gradation
murum
duty
using
necessary
precaste
minimum
testing
paver
cement
including
block
content in of
4 supplying
Providing 6.90
situ
150 C.C.
and laying
and
M15
Kg/cum., of
conyeying
water
trap
mixing metalas
all
proof
for
per
materials
paper of
bedding
approved
with
40 GSMall
5 below
design 5785.74
Providing
lead and
over
R.C.C.
mix,
and
lift,
bedding,
Runner
compactin
casting
spreading
below in
beams
g with
situ
,concrete
including
vibratory
cement
sectioning
pavement
bailing
roller ofout
concret
, artificialM
(overlap
water
minimum
35 of
watering
not lesstrap
mannuly,f
80-100KN
metal
and
than 10for
orm
static work,
pavement
compactin
cm.) etc.
compactin
weight to
as
g inper
layers
complete
g and
give
approved
with
as
curing
desired
mix
vibratory
directed.
finishing
compacte
6 design
roller
(Sp. as 1245.00
Providing
as
d density,
including
directed
Spec) (R.
and laying
directed
providing
necessary
by
A.)
heavy
etc
constructi
form of
Engineer
duty
complete.
on joints,
mild
in steel
charge
precaste
(Spec.Bd.
and
channels
including
concrete
E-1
curing Page-
duly fixed
maintaina
paver
287)
with liquid
by nails.
nce of
blocks
(DSR
curing of
Dimbras,
diversion
80mm
Item-1e,
compoun
in line and
road
thickness
Page-14)
d andand
level
during
of
sprinkling
to
constructi
appprove
water,
required
on etc.
d
andquality
grade
complete. and
and brand
covering
side
(Spec.
including
with moist
slope.incl
MOST-
all
hessain
uding
400) all
transporta
or
supports,
(Rate
tions
ponding from
fastening,
Analysis)
7 Providing 5717.87
and
casting in
situ
cement
concret M
35 of trap
metal for
runner
beams as
per
9 approved
Providing 44022.62
mix
and ficing
design
Mild Steel
including
dowel
necessary
bars of 25
form
mm dia. of
mild
55 cm. steel
channels
Long 30
10 duly
Providing
cm c/c fixed 19.60
by
and
which nails.
fixing
Dimbras,
40
ever mm
in
dia. line
necessary Highand
level
density
as and
to
lpolythene
directed
required
pipe
including of
grade
approved
applying and
11 side
Cutting
quality
bitumen, to
slope.incl
the
fit the
greasing
uding
constructi
dowel
to dowel all
supports,
on
bars
bars, joints
of 25
fastening,
of
mm cement
suitable dia.
Transvers
compactin
concrete
Left at the
dummy
g
pavement
end
capsofand
a) joints 70 37.00
concrete
Longitudi
by
mmmeans
expansion
galass deep
by
nal mean
& 6 joint
of
joint
wool mmdully
etc.
b) of
70
mechanic
greased mm
complete. 49.90
wide
machanic
deep
al
in side& 6
cutting
(Special
12 al
mm
machine
pipe
Specificatiwide
and
Dressing
vibrations
including
arround
ons)
the joints
with
necessary
the the
(Rate
in
help Mbars 35
of
materials,
dully
Analysis)
cement
needle
fuels,
corced
(Spec. oils,
concrete
vibrators.
loperator,
and
Bd. the
pavement
levelling
Transvers
labours
endas
17,Page-
with
the
dummy top
etc.
directed
306)
bitumen
a) surface
joints
complete.
(HDPE)
(Item-11, 80 8.75
10/12
Longitudi
broom
mm deep
(Special
shall
Page-19)
(Pavemen be
nal
finshing,
& 6cm joint
mmin
b) Specificati
t30grade 6.90
60
curing
wide mm
Expansio
on)
length.
bitumen) ( Rate
deep
etc.
n joints & 25
6
Analysis)
(Special
&
c) mm
complete.
mm wide
deep 5.70
Specificati
providing
(Special
&
on) 12(Rate mm
a layer
Specificati
thick) of
13 Analysis)
Providing 2009.90
stone
ons)
and
dust fixing
over
(Rate
in position
hot
Analysis)
premould
bitumen
asphalt
including
filler
cleaning of 18
mm
the jointsthick
confirming
and
to IS
ramming
1838-
over
14 Providing 50.00
and
casting
vattas in
cement
mortar
1:10 (0.60
x0.60) m
1 Providing
c/c and 40.02
laying
measurin
bituminou
g 3 cm at
sbottom
tack
coat
and 1bycm
using
at top bulk and
bitumen
of depth
of 60/70
8 cm ,
grade
maintainin @
100
g the
2 kg./100
same
Providing 4839.07
sqm
throuout
and laying
mannual/
14 days
hot mix
mechanic
curing
hot laid
al
periodsprayer
bituminou
including
and
s
supplying
removing
macadam
all
the same
50/75 mm
materials
after
average
preparing
curing
thickness
the
period
with 3.3% is
existing
over.
bitumen
surface,
(Special
by weight
heating
Specificati
of total
bitumen
on)
mix (Ratefor
3 Providing
and
Analysis) 22.14
levelling
applying
laying
course to
tack coat
bituminou
remove
evenly
tack on
sirregulariti
the
coat
es by
surface
using
including bulk
etc.compl
bitumen
diversion
ete..
of
of 60/70
Over
traffic
WBM.
grade
supply @ of
surface.
50
all
As
4 kg./100 per
materials,
Providing 4839.07
standard
sqm
heating
and laying
specificati
mannual/
bitumen
hot mix
on.
mechanic
andlaid
hot chips
(Spec.Rd.
al
in sprayer
drum
bituminou
-47.3.3
including
smix plant,
Page-224
supplying
cleaning
macadam
& Rd-47.7
all
the
50/75 roadmm
Page224)
materials
surface,la
average
(DSR
preparing
ying
thickness
Item-59b
the
bitumen
with 3.5%
Page-
existing
macadam
bitumen
162)
surface,
by paver
weight
heating
finisher
of total
bitumen
inclding
mix for
and
compactin
levelling
applying
g with to
course
5 Providing 8292
and laying
hot mix
hot laid
asphaltic
concrete
with
bitumen
of 60/70
grade5.75
% by
8 weight
Providing of 4481.52
total mix
and laying
including
in situ
supplying
cement
all
concrete
materials
for mix
heating
1:3:6
9 bitumen
Providing
(M10) of 4490.32
and
& chips,
laying
trap metal
in
in hot
forsitu mix
gutter
plant,
cement
foundatio
laying
concrete
n and
asphaltic
of
bedding,
concret
trap/granit
including
with paver
e/quartzit
bailing out
finisher
e/ gneiss
water
including
metal
manually,
compactin
PCCM-
formwork,
g with
15,Span
compactin
power
length
g and
roller
less
curing.than
etc.compl
30mtr.in
(Spec..Cd
ete.
severe
. 3 Page.
(excluding
condition
160)
tack
for
( DSR coat)
cast in
With
10 citu filler
piers,
Item-2c
Providing 118.78
lime/ceme
abutment,
Page-
and laying
nt
returns,
174)
weep
25mmthic
wings of
holes etc.
k/40mm
including
100 mm
thick.
provision
diameter
12 Providing
(Spec.
of "V" 5191.67
AC/PVC
MOST
and
shaped
pipes laying
as
Cluase
in situ
false
per
No.512
controlled
joints
drawing to
Page
for 189
M-20
form
to 192)
cement
suitable
abutment
(Rate
concrete
panels on
returns,
Analysis)
of
the faces
return
trap/granit
to
walls etc.
e/quartzit
approve
complete.
e/gneiss/
design
(Spec.- As
metal
with for
directed
R.C.C.
compactin
by
caps
g by over
Engineer-
piers
in- and
vibrating
abutment
and
charge.)
s(DSR
curing
13 Providing 6328.01
and laying
in situ M-
20
cement
concrete
of trap
metal in
solid/deck
slab/T-
Beams
&slab/Box
girder and
balanced
cantilever,
14 Providing
including 418.91
and
plywood/slaying
in
teel M-
situ
25
formwork,
cement
steel
concrete
centering,
of
compactio
trap/granit
n by
15 Providing
e/quartzit 44022.62
vibrating,
and
e/gniess
roughning
cutting,
metal
the for
bending,
wearing
surface if
hooking,
course
special 8
laying isinto
17 cm
finish thick
Providing 7766.64
position
including
be
Precast
Mild/
compactin
provided,
M25
H.Y.S.D./
g,
curing
R.C.C.
TMT
finishing,bars
Using
slab over
for
curing
Concrete
the span
reinforce
and filling
Mixer
of cross
18 ment
joints
Span
Dewaterin
drainage
as
with 364.81
per
bitumen
length
g
work as
detailed
complete.
less than
abutment
per
drawing
(Excludin
30mtr.in
in
drawings
for
g work.
moderate
perinnial
including
(Spec.
reinforce
condition
river
HYSD orbar
BR.-35
ment
etc ) P-
stream
reinforce
134,
(Spec.
complete. Br- Br-
including
ment,
49
47 Page-
P-
(conyeyan
excludin
diversion
143)
140,
g cost of
of
ce, stream,
fixing
(DSR
MoRT&H-
reinforce
providing
in C.M. !:3
Item-30
Sect,
ment
earthen
and
Page-
2700)
newly laid
bunds
curing,
128)
(DSR
concrete
cofferdam
finishing
Item-54(c)
shall be
bunds
etc
Page-
covered
etc. as
complete.
19 140)
by
may gunny
Providingbe 650.54
(Spec.
bags,
trap/granit
necessary
CD.-12 P-
plastic,
e/quartzit
for
166)
tarpaulin
e/gneiss
foundatio
(DSR
etc
rubble
n and
Item-10
complete.
filling
other
Page-
)parts
Wooden
behind
176) of
centering/
the work
formwork
abutment
and
will
s, not out
returns
bailing be
allowed.
or wings.
and/or
(Spec.Br-
(including
pumping
38 Page-
initial
out lead
water
foundatio
ns and
footing of
R.C.C.
Columns
and steel
stanchion
5 s, 5139.4
including
bailing out
water
manually,
centering,
formwork,
compactin
g,
6 finishing
Providing 7051.48
and
and
curing. in
casting
(Excludin
situ
g steel
cement
reinforce
concrete
ment)
M-20 of
(Spec.Bd
trap metal
7 Providing
F-3R.C.C.
for Page- 5383.31
198)(DSR
and
pardi
Item-2a
casting
75mm in
Page-16)
situ
thick,
cement
includin
concrete
centering
M-20
formwork,of
trap metal
compactin
for
g, R.C.C.
coping
roughenin
plinth
g the
9 Parept
surface
Providing if 386.33
moulded
special
sand face
or
finish is to
plaster
champher
be
externally
ed as per
provided
in two
detailed
and
coats
designs
curing
using
and
(Excludin
approved
drawings
g steel
screened
or as in all
reinforce
sand
directed,
ment)
positions,
including
(Spec.
including Bd
centering,
F-11
providing
formwork,
Page-
base coat
compactin
304)
of 15 mm
10 Providinf
g,
(DSR
thick in 4570.00
roughenin
Item-9a
and
cementfixing
g the 1:4
Page-18)
in
mortar
surface
mixing if
required
special
position
approved
finish
water is to
for
be
dadoing
12 proofing
Providing
provided
of granite 1136.69
compoun
and
stone laying
d at the to
ceramic
curing.
required
rate of 1
tiles of /
(Excludin
position
kilogram
approved
g
on steel
bed
50 Kg. of of
quality
reinforce
C.M.
cement 1:6
30cm
and x
ment)Spe
including
30cm
c. Bd E for
scafolding
curing the
dado
Page-
etc.
same for and
skirting
not less in
288)
complete.
required
(DSR
(Special
than two
position
Item- 3b
Specificati
days and
with
ons) ready
Page-14)
keeping,
made
(Rate
13 Providing 324.33
and laying
cement
concrete
flooring
50 mm
thick with
cement
concrete
in
proportion
14 1:2:3
Providing 1391.21
(M25)
and fixing laid
to proper
ceramic
line,
tiles of level
and
approved slope
in
quality
alternate
60cm x
days
60cm for
1 including
Rising orin
flooring 736.20
compactio
lowering
required
n, filling
circular/re
position
joints
ctangular
laid on
marking
manholes
bed of
Lines
to
C.M. the1:4 to
give
required
including
appearan
levels
cement
ce
upto
float,of 50tiles
30cm
2 Providing
cm x
filling joint 6644.00
30cm
including
with fixing
and or
other
all
white/colo
new C.I.
approved
materials
ur cement
Circular
design,
3 formworks
slurry,
Manhole
Providing
finishing
etc. with
cleaning,
cover 21
and
smooth
18 cm
curing, fixing a)
inches
C.I.
(with
600mmX9
thick
complete. extrab)
dia.&
Rectangul
cement)
cement
(Spec.
600mmX6 00mm Bd 7040.00
Weight of
ar
in
size(160K
concrete
M-12 00mm 5808.00
151 Kg.
Manhole
approved
M
Page-15 g.)
size(132K
Heavy
chamber
colour
cement
385) as
4 duty
Providing with g.) 4727.53
cover
directed
concrete
(DSR
frame
second etc.
heavy
and
copping
Item-14a,
complete.
class
duty
curing
under
Page-38) with
(Spec.
Burnt
frame.
complete.
frame and
Special,
Brick
(Spec.
cover of
As
masonary
Special,
Bd.
manholesM-6
directed)
with
As
Page-
including
5 Providing 300.71
(Rate
conventio
directed)
381)
curing
Analysis)
cement
nal/I.S.
(Rate
(DSR
etc.compl
plaster
type
Analysis)
Item-9b
ete
25mm as
bricks
Page-37) in
specified
thick
C.M. in 1:6
and
two as
in coats
directed.
in cement
superstru
(Spec.
martar
cture 1:4
Special,
without
including
As
neeru
stricking
directed)
finish
joints,to
(Rate
concrete
racking /
Analysis)
brick/ston
out joints
e
and
6 Providing
and laying
in
trenches
approved
Medium
type(Item
a to d)
Heavy
type (Item
e to g)
a) 15mm
Galvanize
dia
d iron b) 20mm
out/dia
a pipe -1(A)
DSR dia
c) 25mm 209.98
21.32mm
having
(a),P-83
DSR -1(A) out/dia
dia
b d)
& 40mm 233.31
embosed
(b),P-83 26.9mm
c DSR
at every
-1(A) 50mm&
out/dia
dia
wt.1.27kg/
e) 329.82
(c),P-83
DSR -1(A) wt.1.64kg/
33.7mm
out/dia
m
dia &
d meter the m
f) 80mm 398.75
(e),P-83
DSR -1(B) wt.2.52kg/
g) 100mm
48.3mm
out/dia &
e ISI mark dia
m 428.44
(f),P84
DSRname -1(B) wt.3.73kg/
60.3mm &
f and out/dia 751.89
(g),P-84
DSR -1(B) m
wt.5.23kg/
g of 88.9mm
114.3mm &
(h),P-84 m 854.76
manufact wt.8.7kg/8
&
urer, with wt.12.77k
7 Shifting 305.00
screwedof g/m
existing
sockets,
G.I.
joints, and
Connectio
necessary
8 ns to
galvanize
Providing
required
d iron
& Laying
location
fittings
concrete
as
such
pipesas of
directed
backnuts,
I.S. NP.2
by
elbows,
class of
Engineer
bends,
required
a)150mm
a in
tees, 406,17
diameter
diameter
b)225mm
b Charge.
reducers,
indiameter
proper 461.32
c (Spec.
c)300mm
enlargers,
line, level 516.46
Special,
diameter
pliugs,etc.
and slope
As
including ,
9 including
Providing
directed)
providing
necessary
and laying
(Rate
and
collars,
cement
Analysis)
applying
testing,
concrete
two coats
excavatio
pipeoil of ,
oflaying
n
450mm
paints
fixing with
diametere
with one
collars
IS 458- in
coat
Rate
cement of
1988 NP a) 450mm
primer
Analysis
mortar 1:1
a 3 Class in dia pipe 1692.00
and
and
proper
necessary
refilling
Rate
line level
excavatio
the trench b) 600mm
Analysis
& slope
b n
etcand dia pipe 2566.00
including
backfilling
complete.
fixing c) 900mm
Rate
complete
(Spec.Bd
collars in dia pipe
Analysis
including
c V-41
cement P- 4795.00
removing
573)
mortar
existing 1:2
(DSR
etc.
pipe
Item- if
complete.
necessary
45(a),(b),
(Spec.CD.
&
(c) Page-(
7 P-162)
conveying
99)
Rate
&
Analysid
stacking
based
in PWDon
10 Providing 260.88
and laying
salt
glazed
stone
ware pipe
150mm
diametere
including
fitting
such as
bends,
tees,
single
junctions,
double
junctions,
laying,
jointing
including
excavatio
n and
refilling
trenches
complete.
(Spec.
Bd.V39
Page-
102)
(DSR
Item-34(b)
Page-95)
11 Providing 4445.73
and
constructi
ng Brick
masonary
Inspection
chember
90cm x
45 cm
12 including
Transport 199.32
1:4:8
ation of
cement
excess
concrete
excavated
/foundatio
n, 1:2:4
dismantle
cement
d/ scrap/
concrete
debries
channels,
etc. upto
plastering
lead of
from
2kms
inside
includingto
the Brick
loading
Masonary,
unloading
and
conveying
airtight
stacking
R.C.C
etc lid
with frame
complete.
fixed in
(Lead
cement
Chart
concrete,
Page
curing,
-208)
testing
etc.
complete.
(Spec.
Bd. V-43
Page-
574)
(DSR
Item-46(b)
Page-
100)
nverted to 0607
ULHASNAGAR MUNICIPAL CORPORATION
FACE SHEET
(NOTE: Please fill data in the yellow cells only; Do not chang values in cells containing FORMULAS.)
Name of Construction of Cement Concrete Pavement Road from Radhaswami Satsang to
Work:- OT Ulhasnagar - 3.

Estimared cost
Rs. :-
Technical Clearance Date:- Financial Year::-
No.:-
Administrative Approval Budget control Reg.Page
& Finanancial Sanction
Date:- Total Budget ProvisionNo.:-
Rs. :-
No.:-of Funds
Source Balance Before This Work
:- Head
Budget Cost Of This Work Rs.:- Rs.:-
:- Balance After this work Rs.:-
0
Demand From :-
Necesity:-

Condition at
Present/Scope:-

Jr. Engineer Dy.Engineer Executive Engineer City Engineer


U.M.C. U.M.C. U.M.C. U.M.C.
ULHASNAGAR MUNICIPAL CORPORATION
DATA SHEET
Note: Fill Dimensions in Yellow cells in this page & at end for misc. items
(NOTE: Please fill data in the yellow cells only; Do not chang values in cells containing FORMULAS.)
Name Of Work Construction of Cement Concrete Pavement Road from Radhaswami Satsang to
:- OT Ulhasnagar - 3.

Proposed Length of the road 424.00 Mtr.


Proposed Width of the road :-
12.20 Mtr.
:-
Existing Average Width of Road 12.20 Mtr.
:- Average Carriage Width of Road With Crust
Existing 8.00
:-
Data For Drain Work(All Dimensions shall be in mtrs. Except Half Round Diameter)
Chinag Length of Propos
Proposed
e To Side ed Minimum Wall
Waterway Wall Slab
(For drain( Incld. Diamet Waterway Wall Thickne
At Side at H.R. top Thickness Width/Dr
One Fanning er RCC at H.R. Height ss@
including @ Top Width
Side Length At H.R. in top bottom
H.R. dia.
Only) Junct.) mm.
Left A 424.00 424.00 450.00 0.45 0.45 0.45 0.28 0.20 1.01
Left B 0.00 0.00 0.00 0.00 0.00
Right A 424.00 424.00 450.00 0.45 0.45 0.45 0.28 0.20 1.01
Right B 0.00 0.00 0.00 0.00 0.00
Left Length :- 424.00 Total Length OK
Right Length :- 424.00 Total Length OK

FOOTPATH & DIVIDER(All Dimensions in mtrs.)


Proposed Width of the road 12.20 Mtr. Foot Path Width Divider Type
:-
Proposed Length of the Dividers (Considerd
0.00 Mtr. With
:- Maximum)
Proposed Length of the Left A 424.00 Mtr. 1.01 0.90 Footpat Single Kerb
New Jersy
Footpath Left B 0.00 Mtr. 0 0.00 h
Type
Proposed Length of the Right A 424.00 Mtr. 1.01 0.90 (Width)
Footpath Right B 0.00 Mtr. 0 0.00 0.00 0.00
Le
ngt Deep Trial Pit Reasults In CarriageWay
Propos
h Propos Strata In The Existing Road In The Widng & App. Rd.
ed Existing
In ed If Loose If Loose
Length Width Width Of Strata Existing
the Wideni Existing State State
Of The The Road Below Crust Strata
por ng Crust Thk. Thickne Thicknes
Road Crust Thk.
tion ss s
t ofA 424.00 6.10 6.10 0.00 0.45 l 0.45 0.45 l 0.45
t B 0.00 6.10 6.10
ht A 424.00 6.10 6.10 0.00 0.45 l 0.45 0.45 l 0.45
t B 0.00 6.10 6.10
Le
848.00
ngt
Propos In Existing
h
ed Soling Road Portion In The Widening Portion & Approach Roads.
In Soling
Length Crust Additional Thickn Soling No. of Addition Soling No. of
the Thickne
Thickne WBM ess If Thickness W.B.M. al WBM Thickness If W.B.M.
por ss If
ss Layers Strata If Strata L Layers Layers Strata L Layers
tion Strata H
t A 424.00 0.45 0 H
0.00 0.30 2 0 0.00 0.30 2
of 0.00 0 0.00 0.00 0
t B 0 0.00 0.00 0
ht A 424.00 0.45 0 0.00 0.30 2 0 0.00 0.30 2
t B 0.00 0 0.00 0.00 0 0 0.00 0.00 0
CEMENT CONCRETE PAVEMENT
No of Propos
Available
Pavem Width of ed
Portion Of Carriage
ent Each Side Patti Paveme
Road Carriage Length Way After Remark
Lanes Lane of Remaining nt
Wise Footpath &
Propos Pavement Thickne
Divider
ed ss
Left A 424.00 5.09 1 3.50 1.29 0.30 Ok
Left B 0.00 0.00 0.00 0
Right A 424.00 5.09 1 3.50 1.29 0.30 Ok
Right B 0.00 0.00 0.00 0
Additional Pavement At Junctions Of Approach Roads
At Left Hand Side Of Proposed Road (Left A)
Availabl
Addition
e No. Of
Side Patti al Rd.
Width of carriage C.C.Pa Width Of Tiangul Additional
Jun Length Remainng Area
Approach Width of vmn. Each ar Drain
ctio Considered After Drain Due To Remark
Road At Approa Lanes Lane Of Fanning Length At
ns For Pavem. & Add.
LHS ch Propos Pavement Area Fanning
Pavement Blocks
Road of ed
@Junc.
LHS
Junction1
0.00 0.00 0.00 0.00 0.00 0
Junction 2
0.00 0.00 0.00 0.00 0.00 0
Junction 3
0.00 0.00 0.00 0.00 0.00 0
Junction 4
0.00 0.00 0.00 0.00 0.00 0
Junction 5
0.00 0.00 0.00 0.00 0.00 0
Less Dr.L. 0.00 Tot. L-Pav 0.00 0.00 0.00 0.00 0.00
At Left Hand Side Of Proposed Road (Left B)
Availabl
Addition
e No. Of
Side Patti al Rd.
Width of carriage C.C.Pa Width Of Tiangul Additional
Jun Length Remainng Area
Approach Width of vmn. Each ar Drain
ctio Considered After Drain Due To Remark
Road At Approa Lanes Lane Of Fanning Length At
ns For Pavem. & Add.
LHS ch Propos Pavement Area Fanning
Pavement Blocks
Road of ed
@Junc.
LHS
Junction6
0.00 0.00 0.00 0.00 0.00 0.00
Junction 7
0.00 0.00 0.00 0.00 0.00 0.00
Junction 8
0.00 0.00 0.00 0.00 0.00 0.00
Junction 49
0.00 0.00 0.00 0.00 0.00 0.00
Junction 10
0.00 0.00 0.00 0.00 0.00 0.00
Less Dr.L. 0.00 Tot. L-Pav 0.00 0.00 0.00 0.00 0.00
At Right Hand Side Of Proposed Road (Rightt A)
Availabl
Addition
e No. Of
al Rd.
Width of carriage C.C.Pa Width Of Side Patti Tiangul Additional
Jun Length Area
Approach Width of vmn. Each Remainng ar Drain
ctio Considered Due To Remark
Road At Approa Lanes Lane Of After Drn & Fanning Length At
ns For Pavem. Add.
RHS ch Propos Pavement Pavemnt Area Fanning
Blocks
Road of ed
@Junc.
RHS
Junction1
0.00 0.00 0.00 0.00 0.00 0.00
Junction 2
0.00 0.00 0.00 0.00 0.00 0.00
Junction 3
0.00 0.00 0.00 0.00 0.00 0.00
Junction 4
0.00 0.00 0.00 0.00 0.00 0.00
Junction 5
0.00 0.00 0.00 0.00 0.00 0.00
Less 0Tot. L-Pav 0.00 0.00 0.00 0.00 0.00
At Right Hand Side Of Proposed Road (Rightt B)
Availabl
Addition
e No. Of
al Rd.
Width of carriage C.C.Pa Width Of Side Patti Tiangul Additional
Jun Length Area
Approach Width of vmn. Each Remainng ar Drain
ctio Considered Due To Remark
Road At Approa Lanes Lane Of After Drain Fanning Length At
ns For Pavem. Add.
RHS ch Propos Pavement Pavement Area Fanning
Blocks
Road of ed
@Junc.
RHS
Junction6
0.00 0.00 0.00 0.00 0.00 0.00
Junction 7
0.00 0.00 0.00 0.00 0.00 0.00
Junction 8
0.00 0.00 0.00 0.00 0.00 0.00
Junction 49
0.00 0.00 0.00 0.00 0.00 0.00
Junction 10
0.00 0.00 0.00 0.00 0.00 0.00
Less 0Tot. L-Pav 0.00 0.00 0.00 0.00 0.00
Junction Development (Civil Works Only)
Jun Rotaries Proposed Oval Shaped Middle Channelizers In ProposedLarge
Road
ctn Available Width Of Apprch Rds. Typical Diameter Typical
MaxLen
Small Typical Dia
No. Carigway At LHS At RHS Diamet Considere gth
Length dia. Large Dia Propose
er d Prop.
Junction1
0.00 0.00 0.00 0.00 d
Junction 2
0.00 0.00 0.00 0.00
Junction 3
0.00 0.00 0.00 0.00
Junction 4
0.00 0.00 0.00 0.00
Junction 5
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

Jun Oval Shaped Middle Channelizers In Left Road


MaxLen Oval Shaped Middle Channelizers In Left Road
Large
ctn Typical MaxLen
Typical gth Large Dia Typical Small Typical Dia
No. Small dia. Diamet gth
Length Propos Proposed Length dia. Large Dia Propose
er Prop.
Junction1
0.00 ed 0.00 0.00 0.00 0.00 0.00 d
Junction 2
0.00 0.00 0.00 0.00 0.00 0.00
Junction 3
0.00 0.00 0.00 0.00 0.00 0.00
Junction 4
0.00 0.00 0.00 0.00 0.00 0.00
Junction 5
0.00 0.00 0.00 0.00 0.00 0.00

Widening work of existing C.D. Const. Of new C.D.


No.of CD.Lengh Waterway Wall Ht. No. of C.D. Lengh Waterway Wall Ht.
### 12.20 1.00 1.00 3.00 12.20 2.50 2.00

Th
k Slab Wall Thk Slab
at Depth at Bottom Depth
Bot
### 0.30 0.9 0.30
### 0
ULHASNAGAR MUNICIPAL CORPORATION

Name Of Work
:- Construction of Cement Concrete Pavement Road from Radhaswami Satsang to
OT Ulhasnagar - 3.

MEASUREMENT SHEET
1
PART I (SitePreparation) Page 1/1
Sr. Item of Work For The Work No Length Width Depth Quntity Tot. Qty.
Dismantlg RCC
1 Affecting Structures LUM SUM QUANTITY 10.00 10.00
Work
Dismantlg PCC
2 Affecting Structures LUM SUM QUANTITY 20 20.00
Work
Dismantlg BB M
3 Affecting Structures LUM SUM QUANTITY 20 20.00
Work
Dismantlg UCR
4 Affecting Structures LUM SUM QUANTITY 0.00
Work
5 Tree cutting with girth of 30to60 cm. LUM SUM QUANTITY 0 0.00
Tree cutting with girth of 60to90 cm. LUM SUM QUANTITY 0 0.00

6 Dewatering LUM SUM QUANTITY 100 100.00

7 J.C.B. LUM SUM QUANTITY 100 100.00

2
PART II (side Drain) Page 1/2
Sr. Item of Work For The Work No Length Width Depth Quntity Tot. Qty.
1 Excavation Left A 1 424.00 1.21 0.67 342.97
Foundation in in 0 0 0.00 0.00 0.00 0.00
Earth soil & Soft Right A 1 424.00 1.21 0.67 342.97
Murum 0 0 0.00 0.00 0.00 0.00
685.94
2 Excavation for Left A 1 424.00 1.21 0.10 49.00
Foundation hard 0 0 0.00 0.00 0.00 0.00
murum and Right A 1 424.00 1.21 0.10 49.00
Boulders 0 0 0.00 0.00 0.00 0.00
98.00
3 Excav. Foundation Left A 1 424.00 1.21 0.05 24.50
in Soft 0 0 0.00 0.00 0.00 0.00
Rock/Bitumen Right A 1 424.00 1.21 0.05 24.50
surface of road 0 0 0.00 0.00 0.00 0.00
49.00

4 Excavation for Left A 1 424.00 1.21 0.05 24.50


foundation hard 0 0 0.00 0.00 0.00 0.00
rock by Chieseling Right A 1 424.00 1.21 0.05 24.50
0 0 0.00 0.00 0.00 0.00
49.00
5 Excavation for Left A 1 424.00 1.21 0.53 270.89
Foundation in 0 0 0.00 0.00 0.00 0.00
Slush Right A 1 424.00 1.21 0.53 270.89
0 0 0.00 0.00 0.00 0.00 541.78

6 Providing and Left A 1 424.00 1.21 0.15 76.96


laying trap Rubble 0 0 0.00 0.00 0.00 0.00
Soling 6" Right A 1 424.00 1.21 0.15 76.96
0 0 0.00 0.00 0.00 0.00
153.92
7 Providing laying 0 0 0.00 - - 0.00
RCC half round 0 0 0.00 - - 0.00
pipe 300mm 0 0 0.00 - - 0.00
diameter 0 0 0.00 - - 0.00 0.00

8 Providing laying Left A 1 424.00 - - 424.00


RCC half round 0 0 0.00 0.00
pipe 450mm Right A 1 424.00 424.00
diameter 0 0 0.00 - - 0.00 848.00

9 Providing laying 0 0 0.00 0.00


RCC half round 0 0 0.00 0.00
pipe 600mm 0 0 0.00 0.00
diameter 0 0 0.00 0.00 0.00

10 Providing laying 0 0 0.00 0.00


RCC half round 0 0 0.00 0.00
pipe 900mm 0 0 0.00 0.00
diameter 0 0 0.00 0.00 0.00

3
PART II (side Drain) Page 2/2
Sr. Item of Work For The Work No Length Width Depth Quntity Tot. Qty.
Beddin
11 Providing and 1 424.00 1.21 0.10 51.30
g.
laying PCC M10 for At HR 1 424.00 1.01 0.26 109.20
foundation and Left-A
Less
bedding -0.39 424.00 0.48 0.48 -38.34
HR
0 0 0.00 0.00 0.00 0.00
0 0 0 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00
Beddin
1 424.00 1.21 0.10 51.30
g
At HR 1 424.00 1.01 0.26 109.20
Left-A
Less
-0.39 424.00 0.48 0.48 -38.34
HR
0 0 0.00 0.00 0.00 0.00
0 0 0 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00 0.00 244.32

12 Providing laying Left A 2 424.00 0.24 0.45 91.58


PCC M10 Gutter 0 0 0.00 0.00 0.00 0.00
walls Right A 2 424.00 0.24 0.45 91.58
0 0 0.00 0.00 0.00 0.00 183.16

13 Providing 6mm Left A 2 424.00 - 0.45 381.60


thick cement 0 0 0.00 - 0.00 0.00
plaster 1:3 with Right A 2 424.00 - 0.45 381.60
cement finish 0 0 0.00 - 0.00 0.00 763.20

14 Providing laying Left A 1 424.00 1.01 0.12 51.39


insitu CC M20 for 0 0 0.00 0.00 0.00 0.00
RCC Slab over Right A 1 424.00 1.01 0.12 51.39
gutter 0 0 0.00 0.00 0.00 0.00 102.78
In slab @100
15 P/F High yield 100 102.78 0.001 - 10.28
Kg./Cum
strength steel Rein. 10.28
4
PART III (Foot Path & Dividers) Page 1/2
Sr. Item of Work For The Work No Length Width Depth Quntity Tot. Qty.
1 Excavation for 0 0 0.00 0.00 0.00 0.00
Foundation in Soft Left A 1 424.00 0.30 0.15 19.08
Rock/Bitumen road 0 0 0.00 0.00 0.00 0.00
surface Right A 1 424.00 0.30 0.15 19.08
0 0 0.00 0.00 0.00 0.00 38.16

2 Excavation for 0 0 0.00 0.00 0.00 0.00


foundation in hard Left A 1 424.00 0.30 0.15 19.08
murum and 0 0 0.00 0.00 0.00 0.00
boulder/W.B.M. Right A 1 424.00 0.30 0.15 19.08
road surface 0 0 0.00 0.00 0.00 0.00 38.16

3 Providing laying 6" 0 0 0.00 0.00 0.00 0.00


thickk rubble soling 0 0 0.00 0.00 0.00 0.00
in footpath 0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00 0.00

4 Providing laying Left A 141 0.30 - - 42.40


RCC NP2 class 0 0 0.00 - - 0.00
150mm dia pipes Right A 141 0.30 - - 42.40
0 0 0.00 - - 0.00 84.80

5 Providing laying 0 0 0.00 - - 0.00


PVC pipe 3"dia In Left A 1 424.00 - - 424.00
Footpath for laying 0 0 0.00 - - 0.00
street light cables Right A 1 424.00 - - 424.00
etc. 0 0 0.00 - - 0.00 848.00

6 Providing laying 0 0 0.00 0.00 0.00 0.00


insitu cc M10 for 0 0 0.00 0.00 0.00 0.00
foundation and Left A 0 0 0.00 0.00 0.00 0.00
bedding. Footpath For kerb 1 424.00 0.30 0.11 13.99
0 0 0.00 0.00 0.00 0.00
0
0 0 0.00 0.00 0.00 0.00
Right A 0 0 0.00 0.00 0.00 0.00
Footpath For kerb 1 424.00 0.30 0.11 13.99
0 0 0.00 0.00 0.00 0.00
0
0 0 0.00 0.00 0.00 0.00 27.98

7 Providing and 0 0 0.00 - - 0.00


fixing RCC Kerb Footpath At Left A 1 424.00 - - 424.00
Stones for footpath 0 0 0.00 - - 0.00
edge Footpath At Right
1 424.00 - - 424.00
A
0 0 0.00 - - 0.00 848.00

5
PART III (Foot Path & Dividers) Page 2/2
Sr. Item of Work For The Work No Length Width Depth Quntity Tot. Qty.
8 Providing and Footpath At Left A 71 - - - 71.00
fixing precast cc 0 0 - - - 0.00
inlet blocks in Footpath At Right
71 - - - 71.00
gutter wall A
0 0 - - - 0.00 142.00

9 Providing and Footpath At Left A 1 424.00 - - 424.00


fixing cc water 0 0 0.00 - - 0.00
tables at edge of Footpath At Right
1 424.00 - - 424.00
footpath A
0 0 0.00 - - 0.00 848.00

10 P/L RCC M20 0 0 0.00 - - 0.00 0.00


Road Divider by
wall
11 P/F M.S. Man Hole At Left A 8 40.00 0.001 - 0.34
cover fabricated 0 0 0.00 0.000 - 0.00
with M.S. angles, At Right A 8 40.00 0.001 - 0.34
flats plates hinges 0 0 0.00 0.000 - 0.00 0.68
handles etc in
gutter slab at
12 Providing fixing
junctions of drains Footpath At Left A 71 0.90 0.60 - 38.16
RCC precast 0 0 0.00 0.00 - 0.00
M.H.covers in Footpath At Right
71 0.90 0.60 - 38.16
gutter slab with A
0 0 0.00 0.00 - 0.00 76.32
RCC frame
13 Providing and 0 0 0.00 0.00 - 0.00
fixing precast Footpath At Left A 1 424.00 1.01 - 428.24
heavy duty inter 0 0 0.00 0.00 - 0.00
locked concrete Footpath At Right
1 424.00 1.01 - 428.24
paving block of 60 A
0 0 0.00 0.00 - 0.00 856.48
mm thickness
having a strength 6
PARTofIV 300Road Work(W.B.M.)
kg/sqmt. Of Page 1/2
Sr. approved
Item ofquality
Work For The Work No Length Width Depth Quntity Tot. Qty.
1 Excavation
and shape on foraroad 0 0 0.00 0.00 0.00 0.00
bed ofingrit/
ways sand
earth of
soils 0 0 0.00 0.00 0.00 0.00
65all
of mm thicksoft
sorts, with 0
0 0 0.00 0.00 0.00 0.00
C.M>
Murum... 1:4 stricking 0 0 0.00 0.00 0.00 0.00
joints, including
Existing Left A 1 424.00 6.10 0.45 1163.88
neat cemnt float
filling joints wit Road Due 0 0 0.00 0.00 0.00 0.00
colured cemnt To Loose ght A 1 424.00 6.10 0.45 1163.88
slurry all labour Soil Strata 0 0 0.00 0.00 0.00 0.00
material and 0 0 0.00 0.00 0.00
cleaning etc. 0 0 0.00 0.00 0.00
complete. Spec. As 0
0 0 0.00 0.00 0.00
directed by
0 0 0.00 0.00 0.00 2327.76
Engineer -in-
charge.(DSR Item-
2 Excavation
36, Page-47) for 0 0 0.00 0.00 0.00 0.00
roadways in Hard 0 0 0.00 0.00 0.00 0.00
Murum and 0
0 0 0.00 0.00 0.00 0.00
Boulder 0 0 0.00 0.00 0.00 0.00
Existing Left A 1 424.00 6.10 0.23 581.94
Road Due 0 0 0.00 0.00 0.00 0.00
To Loose ght A 1 424.00 6.10 0.23 581.94
Soil Strata 0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00 1163.88
3 Excavation for 0 0 0.00 0.00 0.00 0.00
roadways in Soft 0 0 0.00 0.00 0.00 0.00
Rock 0
0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00 0.00
Existing Left A 1 424.00 6.10 0.23 581.94
Road Due 0 0 0.00 0.00 0.00 0.00
To Loose ght A 1 424.00 6.10 0.23 581.94
Soil Strata 0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00 1163.88

4 Watering and For 0 0 0.00 0.00 - 0.00


compacting by Excavated 0 0 0.00 0.00 - 0.00
power roller Widening 0 0 0.00 0.00 - 0.00
Portion 0 0 0.00 0.00 - 0.00
Existing ft A 1 424.00 6.10 - 2586.40
Excavated 0 0 0.00 0.00 - 0.00
Road ht A 1 424.00 6.10 - 2586.40
Formation 0 0 0.00 0.00 - 0.00
0 0 0.00 - 0.00
0 0 0.00 - 0.00
0
0 0 0.00 - 0.00
0 0 0.00 - 0.00 5172.80
7
PART IV Road Work(W.B.M.) Page 2/2
Sr. Item of Work For The Work No Length Width Depth Quntity Tot. Qty.
5 Providing Earth To Fill In 0 0 0.00 0.00 0.44 0.00
work embankment Excavated 0 0 0.00 0.00 0.00 0.00
with hard murum Widening 0 0 0.00 0.00 0.44 0.00
including Portion 0 0 0.00 0.00 0.00 0.00
sectioning,
compacting etc To Fill In ft A 1 424.00 6.10 0.22 569.01
Existing 0 0 0.00 0.00 0.00 0.00
Excavated ht A 1 424.00 6.10 0.22 569.01
Portion 0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00 1138.02

6 Providing trap To Built ft A 1 424.00 3.88 0.30 493.54


rubble soling 8" to Crust 0 0 0.00 0.00 0.00 0.00
9" thick Below ht A 1 424.00 3.88 0.30 493.54
Pavement 0 0 0.00 0.00 0.00 0.00
ft A Total Additional.Area 546.96 0.23 125.80
For Side 0 0 0.00 0.00 0.00
patti At CC
Pavement ht A Total Additional.Area 546.96 0.23 125.80
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00 1238.68
7 Providing laying To Built ft A 1 424.00 3.88 0.10 164.51
W.B.M.layer Grade Crust 0 0 0.00 0.00 0.00 0.00
I trap metal Below ht A 1 424.00 3.88 0.10 164.51
Pavement 0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00 329.02

8 Providing and To Built Left A 1 424.00 3.88 0.08 123.38


laying W.B.M.layer Crust 0 0 0.00 0.00 0.00 0.00
with Grade II trap Below ht A 1 424.00 3.88 0.08 123.38
metal Pavement 0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00 246.76
8
Part V- Cement Concrete Pavement Page 1/2
Sr. Item of Work For The Work No Length Width Depth Quntity Tot. Qty.
1 Providing and ft A 1 424.00 3.43 0.10 145.22
laying CC M10 dry 0 0 0.00 0.00 0.00 0.00
rolled bedding 0
ght A 1 424.00 3.43 0.10 145.22
below pavement 0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00
0
0 0 0.00 0.00 0.00
0 0 0.00 0.00 0.00 290.44

2 Providing and ft A 1 424.00 0.45 0.15 28.62


laying CC M15 0 0 0.00 0.00 0.00 0.00
bedding below 0
ght A 1 424.00 0.45 0.15 28.62
Beam 0 0 0.00 0.00 0.00 0.00 57.24

3 Providing and ft A Total Additional.Area 546.96 0.08 43.76


laying CC M10 For Side 0 0 0.00 0.00 0.00
bedding below patti At CC
Side Patti Pavement ht A Total Additional.Area 546.96 0.08 43.76
0 0 0.00 0.00 0.00 87.52

4 Providing 0 0.00
Bituminous twin 0 0.00
craft paper below 0
0 0.00
pavement 0 0 0.00 0.00 0.00
0 0 0.00 0.00
0 0 0.00 0.00
0
0 0 0.00 0.00
0 0 0.00 0.00 0.00
5 Providing laying ft A 1 424.00 3.50 0.30 445.20
M40 controllled 0 0 0.00 0.00 0.00 0.00
concrete for 0
ght A 1 424.00 3.50 0.30 445.20
pavement 0 0 0.00 0.00 0.00 0.00
0 0 0.00 0.30 0.00
0 0 0.00 0.00 0.00
0
0 0 0.00 0.30 0.00
0 0 0.00 0.00 0.00 890.40

6 Providing and ft A Total Additional.Area 546.96 1.00 546.96


laying paver block For Side 0 0 0.00 0.00 0.00
of M35 strength for patti At CC ht A Total Additional.Area 546.96 1.00 546.96
pavement (for side Pavement 0 0 0.00 0.00 0.00 1093.92
patti)
7 Providing laying ft A 1 424.00 0.30 0.30 38.16
M35 controllled Side 0 0 0.00 0.00 0.00 0.00
concrete for beam Beams ght A 1 424.00 0.30 0.30 38.16
0 0 0.00 0.00 0.00 0.00 76.32

8 Providing fixing ft A 4 424.00 0.00062 1.05


Torque steel Side 0 0 0.00 0.00000 0.00
reinforcement Beams ght A 4 424.00 0.00062 1.05
0 0 0.00 0.00000 0.00
Side ft A 1413 2.15 0.00089 2.70
Beams 0 0 0.00 0.00000 0.00
Rings & ght A 1413 2.15 0.00089 2.70
Anchor 0 0 0.00 0.00000 0.00 7.50

14 Providing and 0.00


casting vattas in 0.00
cement mortar 1:10 0
0.00
(0.60 x0.60) m c/c 0 0 0.00 0.00 0.00
and measuring 3 0 0 0.00 0.00
cm at bottom and 1
cm at top and of 0 0 0.00 0.00
0
depth of 8 cm , 0 0 0.00 0.00
maintaining the 0 0 0.00 0.00 0.00
11
Part VII Wideneing of existing C.D. Page 1/1
Sr. Item of Work For The Work No Length Width Depth Quntity Tot. Qty.
1 Excav. Foundation 1 12.20 2.50 1.25 37.97
in Soft Murum 0 0.00 0.00 0.00 0.00 37.97

2 Excav. Foundation 1 12.20 2.50 0.31 9.49


H.M. Boldr 0 0.00 0.00 0.00 0.00 9.49

3 Excav. Foundation 1 12.20 2.50 0.21 6.33


S.R./Bitumen 0 0.00 0.00 0.00 0.00 6.33

4 Excav. Foundation 1 12.20 2.50 0.10 3.16


H.R. by Chieseling 0 0.00 0.00 0.00 0.00 3.16

5 Excav. 1 12.20 2.50 0.21 6.33


Foundatiuon Slush 0 0.00 0.00 0.00 0.00 6.33

6 Providing and 1 12.20 2.50 0.23 7.02


laying Rubble 0 0.00 0.00 0.00 0.00 7.02
Soling 6"
7 P/L. RCC half 1 12.20 12.20
round pipe 450 dia 0 0.00 0.00 12.20
8 Providing laying 1 12.20 2.50 0.08 2.44
PCC M10 1 12.20 2.20 0.23 6.04
foundation and Less -0.393 12.20 0.45 0.45 -0.97
bedding 0 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00
0 0.000 0.00 0.00 0.00 0.00 7.51

9 P/L PCC M10 2 12.20 0.53 1.00 12.81


Abutments/piers 0 0.00 0.00 0.00 0.00 12.81

10 Providing and 27 0.53 14.18


laying weep holes 0 0.00 0.00 14.18
of 100 mm
11 diameter
ProvidingAC/PVC
cemnet 2 12.20 1.20 29.28
pipes
plasteras6mm
per 0 0.00 0.00 0.00
drawing for
thick1:3 with
abutment returns, For parapet 4 2.35 1.08 10.11
cement finish 0 0 0.00 0.00 0.00 39.39
return walls etc.
complete.
12 Providing and 2 12.20 0.45 0.20 2.20
casting insitu cc 0 0.00 0.00 0.00 0.00
M20 for Pier cap P/c Rcc Parapet 2 2.20 0.15 1.00 0.66
0 0 0.00 0.00 0.00 0.00 2.86

13 P/C cc M20 1 12.20 2.20 0.30 8.05


Deck/solid slab 0 0.00 0.00 0.00 0.00 8.05

14 Providing/ laying cc 1 12.20 2.20 0.08 2.15


m20 Wearing 0 0.00 0.00 0.00 0.00 2.15
Course
15 Providing/fixing 100.00 8.05 0.00 0.81
Cap/ Parapet
Torquesteel reinf. 50.00 2.86 0.00 0.14
50Kg/cmt
Wearing Cou.
Slab @100 20.00 2.15 0.00 0.04 0.99
kg/cum. 20Kg/cmt
16 P/F M.S chemb 2 4.30 5.80 0.00 0.05
frame 925X625mm 0 0.00 0.00 0.00 0.00 0.05

17 P/F RCC Chmber 2 2.00


cover 925X625 0 0.00 2.00

18 Dewatering 5 to 9 Job Work 63 1.00 63.28


HP pumps 0 63.28

19 Rubble filling back 1 12.20 0.45 1.00 5.49


side Abutment 0 0.00 0.00 0.00 0.00 5.49
12
Part VIII Const of new C.D. Page 1/1
Sr. Item of Work For The Work No Length Width Depth Quntity Tot. Qty.
1 Excav. Foundation 3 12.20 4.60 1.85 310.62
in Soft Murum 0 0.00 0.00 0.00 0.00 310.62

2 Excav. Foundation 3 12.20 4.60 0.46 77.66


H.M. Boldr 0 0.00 0.00 0.00 0.00 77.66

3 Excav. Foundation 3 12.20 4.60 0.31 51.77


S.R./Bitumen 0 0.00 0.00 0.00 0.00 51.77

4 Excav. Foundation 3 12.20 4.60 0.15 25.89


H.R. by Chieseling 0 0.00 0.00 0.00 0.00 25.89

5 Excav. 3 12.20 4.60 0.31 51.77


Foundatiuon Slush
Excav.
Foundatiuon Slush 0 0.00 0.00 0.00 0.00 51.77
6 Providing and 3 12.20 4.60 0.23 38.72
laying Rubble 0 0.00 0.00 0.00 0.00 38.72
Soling 6"
7 P/L. RCC half 3 12.20 36.60
round pipe 450 dia 0 0.00 0.00 36.60

8 Providing laying 3 12.20 4.60 0.08 13.47


PCC M10 3 12.20 4.30 0.23 35.41
foundation and Less -1.178 12.20 0.45 0.45 -2.91
bedding 0 0.00 0.00 0.00 0.00
0 0.00 0.00 0.00 0.00
0 0.000 0.00 0.00 0.00 0.00 45.97

9 Providing and
P/L PCC M10 6 12.20 0.68 2.00 98.82
laying weep holes
Abutments/piers 0 0.00 0.00 0.00 0.00 98.82
of 100 mm
10 diameter AC/PVC 163 0.68 110.03
pipes as per
drawing for 0 0.00 0.00 110.03
abutment returns,
11 Providing cemnet
return walls etc. 6 12.20 2.20 161.04
plaster 6mm
complete. 0 0.00 0.00 0.00
thick1:3 with For parapet 12 4.45 1.08 57.41
cement finish 0 0 0.00 0.00 0.00 218.45

12 Providing and 6 12.20 0.45 0.20 6.59


casting insitu cc 0 0.00 0.00 0.00 0.00
M20 for Pier cap P/c Rcc Parapet 6 4.30 0.15 1.00 3.87
0 0 0.00 0.00 0.00 0.00 10.46

13 P/C cc M20 3 12.20 2.60 0.30 28.55


Deck/solid slab 0 0.00 0.00 0.00 0.00 28.55

14 Providing/ laying cc 3 12.20 4.30 0.08 12.59


m20 Wearing 0 0.00 0.00 0.00 0.00 12.59
Course
15 Providing/fixing Slab @100 kg/cum. 100.00 28.55 0.00 2.86
Cap/Parapet
Torquesteel reinf. 50.00 10.46 0.00 0.52
50Kg/cmt
Wearing Cou.
Slab @100 20.00 12.59 0.00 0.25 3.63
kg/cum. 20Kg/cmt
16 P/F M.S chemb 6 4.30 5.80 0.00 0.15
frame 925X625mm 0 0.00 0.00 0.00 0.00 0.15

17 P/F RCC Chmber 6 6.00


cover 925X625 0 0.00 6.00

18 Dewatering 5 to 9 Job Work 518 1.00 517.71


HP pumps 517.71

19 Rubble filling back 3 12.20 0.45 2.00 32.94


side Abutment 0 0.00 0.00 0.00 0.00 32.94
13
Part X Miscelinious Items Page 1/1
Sr. Item of Work For The Work No Length Width Depth Quntity Tot. Qty.
1 Rising or lowering 5.00 5.00 5.00
M.H.

2 P/F C.I. Circular 1.00 1.00


M.H.cover21"dia 1.00 1.00 2.00
3 P/F C.I. a)size 60cmX90cm 1.00 1.00 1.00
Rectangular M.H. b)size 60cmX60cm 1.00 1.00 1.00
cover
4 P BB masonary 1.00 2.00 0.23 0.50 0.23
CM1:6 1.00 2.00 0.23 0.50 0.23 0.46

5 P 25mm thick 1.00 2.00 3.00 6.00


plaster 1.00 2.00 3.00 6.00 12.00

6 P/L G.I. Pipe line a)15mm dia. 50.00 50.00 50.00


memium class b)20mm.dia 50.00 50.00 50.00
c)25mm dia 0.00 0.00
d)40mm dia 0.00 0.00
e)50mm dia 0.00 0.00
f)75mm dia 0.00 0.00
g)100 mm dia 0.00 0.00

7 Shifting existing 100.00 100.00


G.I. Connectios 149.00 149.00 249.00

8 Providinfg and a) 150mm dia 5.00 5.00 5.00


laying R.C.C. NP2 b)225mm dia 5.00 5.00 5.00
Class pipe c)300mm dia 5.00 5.00 5.00

9 P/L NP3 Class 0.00


RCC pipe a) 450mm dia 2.00 2.00 2.00
b) 600mm dia 2.00 2.00 2.00
c) 900 mm dia. 2.00 2.00 2.00

11 P/L SW pipe line 5.00 5.00


150mm dia 5.00 5.00 10.00

12 P/C BB mas. Insp. 4.00 4.00


Chember 90X45 0.00 4.00

13 Transporting excav. Total Quantity of Items Quantity Add Loose Total Qty
Material Part I Item No. 1,2,3,4 50.00 30.00% 65.00
Part II Item No. 1,2,3,4,5 639.78 30.00% 831.71
Part III Item No. 1,2 76.32 30.00% 99.22
Part IV Item No. 1,2,3 4655.52 30.00% 6052.18
Part VII Item No. 1,2,3,4,5 63.28 30.00% 82.26
Part VIII Item No. 1,2,3,4,5 517.71 30.00% 673.02 7803.39
ULHASNAGAR MUNICIPAL CORPORATION

Name of Work :- Construction of Cement Concrete Pavement Road from Radhaswami


Satsang to OT Ulhasnagar - 3.

ABSTRACT SHEET
1
PART I (SitePreparation) Page 1/1
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
1 10.00 Dismantling RCC work including breaking concrete by 396.63 Cum. 3966.30
chieseling, wedging etc. includg cutting the reinforcmt
stacking the serviceable materials and the debris
seperatly up to a distance of 50 mtrs or spreading the
debris as directed complete. (Spec.Bd.W-8 As Directed
by Engineer P-587 Mod) (DSR .Item-51 Page-111)

2 20.00 Dismantling carefully the existing plain concrete, 307.55 Cum. 6151.00
including stacking the materials neatly within 50mtrs
lead as directed. (Spec.Bd.W-8 As Directed by
Engineer )(DSR Item-50 Page-111)

3 20.00 Dismantling carefully the existing structure of brick 91.2 Cum. 1824.00
masonary in cement mortar or lime morter, including
sorting out serviceable material and stacking
dismantled material within 50mtrs lead as directed.
(Spec.Bd.W-8, As Directed by Engineer) (DSR Item-49
Page-111)

4 0.00 Dismantling carefully the existing structure of stone 91.2 Cum. 0.00
masonary in cement mortar or lime morter, including
sorting out serviceable material and stacking
dismantled material within 50mtrs lead as directed.
(Spec.Bd.W-8/11 As Directed by Engineer) (DSR Item-
48 Page-111)

5 Cutting down trees including trunks and branches and


stacking the material neatly within a lead of 50m.as
directed.(Spec.Rd.A,B P-179) (DSR Item-1b,1d Page-
148)
0.00 I) with girth of 60 to 90 cm. 592.82 0.00
0.00 II) with girth of 180 to 270 cm. 828.25 0.00

6 100.00 Dewatering on BHP basis by using water pump 3 HP 53.03 Hr 5303.00


including diversion of stream, plroviding earthen bunds
coffer dam etc. as may be neccessary for foundation
and other parts of the work and bailing out and
pumping out water, during and after excavation as
required (The item include dewatering for excavation
up to foundation level, filling foundation and sub
structre masonary above water level)(Spec. Br As
directed by engineer in charge) (DSR, Item-3(B)(i)
Page-116)

7 100.00 Engaging J.C.B. for removing debris wastes on road 1210 Hr 121000.00
including all materials labours, operators, etc complete.
(Spec. Special) (Rate Analysis)
Total Of Part I (Site Prepaeation Work) 138244.30
2
PART II (side Drain) Page 1/2
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
1 0.00 Excavation for foundation in earth soils of all types, 110.29 Cum. 0.00
sand gravel and soft murum including removing the
excavated materials upto a distance of 50 meters
beyond the building area and lift upto 1.5 meters
stacking and spreading as directed including
dewatering unless provided elsewhere, preparing the
bed for the foundation and necessary back filling,
ramming, watering complete excluding shoring and
strutting.(Spec Bd. A-1 Page-259) (DSR Item-1a Page-
5)

2 0.00 Excavation for foundation in hard murum and boulder 127.26 Cum. 0.00
upto including removing the excavated material upto a
distance of 50 meters beyond the building area and lift
upto 1.5meters, stacking and spreading as directed
including dewatering manually, preparing the bed for
the foundation and necessary back filling ramming,
watering complete excluding shoring and strtutting.
(Spec.Bd.A-3 P-259) (DSR Item-1c Page-5)

3 0.00 Excavation for foundation in in soft rock,old cement 295.88 Cum. 0.00
lime masonary, B.T. surface incldg removing the
excavated materials upto a dist of 50 meters beyond
the building area and lift upto 1.5 meters stacking and
spreading as directed incldg dewatering unless
provided elsewhere, preparing the bed for the
foundation and necessary back filling with available
earth/ murum,, ramming, watering complete excluding
shoring and strutting. (Spec.Bd.A-4 P-259) (DSR Item-
2a Page-5)

4 0.00 Excavation for foundation in hard rock by chiselling 705.23 Cum. 0.00
wedging, line drilling etc.including trimmng and levelling
the bed, removing the excavated material upto a
distance of 50 meters, stacking as directed includg
dewatering manually, backfilling with available earth,
murum, ramming and waterng complete. (Spec.Bd.A-6
P-260) (DSR Item-2c Page-5)

5 541.78 Excavation for foundation in slush including disposing 215.2 Cum. 116591.06
off the excavated stuff within 50 meters beyond the
building area asdirected etc. complete.(Spec As
directed).(Rate Analysis)

6 0.00 Providing dry trap/rubble stone soling 15 cm.to 695.92 Cum. 0.00
20cm.thick including hand packing and compacting
etc.complete. (Spec. Bd. A-12 P-264) (DSR P Item-6
Page-6)

7 0.00 Providing and laying precaste RCC half round pipe 349 Rmt 0.00
300mm. Dia. for drain bottom including laying to proper
level, grade, slope,jointing etc complete.(Spec.Special)
(Rate Analysis)
3
PART II (side Drain) Page 2/2
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
8 848.00 Providing and laying precaste RCC half round pipe 561 Rmt 475728.00
450mm.dia. for drain bottom including laying to proper
level, grade, slope,jointing etc complete.(Spec.Special)
(Rate Analysis)

9 0.00 Providing and laying precaste RCC half round pipe 820 Rmt 0.00
600mm.dia. for drain bottom including laying to proper
level, grade, slope,jointing etc complete.(Spec.Special)
(Rate Analysis)

10 0.00 Providing and laying precaste RCC half round pipe 1532 Rmt 0.00
900mm.dia. for drain bottom including laying to proper
level, grade, slope,jointing etc complete.(Spec.Special)
(Rate Analysis)

11 244.32 Providing and laying in situ cement concrete for mix 4716.03 Cum. 1152220.45
1:3:6 (M10) of trap metal for gutter foundation and
bedding, including bailing out water manually,
formwork, compacting and curing.(Spec.Bd. E-1 Page
287) ( DSR Item-1c Page-14)

12 183.16 Providing and laying in situ cement concrete for mix 5335.63 Cum. 977273.99
1:2:4(M15) of trap metal for gutter foundation and
bedding, including bailing out water manually,
formwork, compacting and curing.(Spec.Cd--3 P-160) (
DSR Item-2d Page-174)

13 763.20 Providing internal cement plaster 6mm. Thickin a single 148.9 Sqm. 113640.48
coat, in cement morter 1:4 with cement finish to
concrete surfaces in all positions including racking out
joints, scafolding and curing complete.(Spec.Bd.L-1 P-
367)&(Spec. Bd.L-10, Page-370) ( DSR Item-1a Page-
31+Item-9 Page-33).

14 102.78 Providing and laying in situ M-20 cement concrete of 8042.42 Cum 826599.93
trap metal in solid slab over gutter including
plywood/steel formwork, steel centering, compaction by
vibraing, roughening the surface if special finish is to be
provided,curing etc. complete. (Excludingcost of
reinforcement newly laid concrete shall be covered by
gunny bags, plastic, tarpaulin or providing vattas etc
complete.(wooden centering/formwork will not be
allowed) (Spec.Bd. F-8, P- 302, Modified) ( DSR Item-
5a Page-17)

15 10.28 Providing and fixing in position M.S./HYSD/T.M.T. steel 53945.51 M.T. 554559.84
reinforcement of varous diameters for R.C.C. pile caps,
footings,foundations, slabs, beams, columns,
canaopies, staircases, newels, chajjas, lintels, pardies,
copping, fins, arches, etc. as per detailed designs and
shedules, including cutting, bending, hooking the barss,
binding with wires or tack welding and supporting as
directed complete. (Spec. Bd. F-17 Page-306, (DSR
Item-11, Page-19)
Total Of Part II (Side Drain Work) 4216613.75
4
PART III Foot Path & Dividers Page 1/2
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
1 38.16 Excavation for foundation in in soft rock,old cement 295.88 Cum. 11290.78
lime masonary, B.T. surface incldg removing the
excavated materials upto a dist of 50 meters beyond
the building area and lift upto 1.5 meters stacking and
spreading as directed incldg dewatering unless
provided elsewhere, preparing the bed for the
foundation and necessary back filling with available
earth/ murum,, ramming, watering complete excluding
shoring and strutting. (Spec.Bd.A-4 P-259) (DSR Item-
2a Page-5)

2 38.16 Excavation for foundation in hard murum and boulder 127.26 Cum. 4856.24
upto including removing the excavated material upto a
distance of 50 meters beyond the building area and lift
upto 1.5meters, stacking and spreading as directed
including dewatering manually, preparing the bed for
the foundation and necessary back filling ramming,
watering complete excluding shoring and strtutting.
(Spec.Bd.A-3 P-259) (DSR Item-1c Page-5)

3 0.00 Providing dry trap/rubble stone soling 15 cm.to 695.92 Cum. 0.00
20cm.thick including hand packing and compacting
etc.complete. (Spec. Bd. A-12 P-264) (DSR P Item-6
Page-6)

4 84.80 Providing and laying R.C.C.pipes of I.S.NP.2 class of 406.17 Rmt 34443.22
150mm. diameter in proper line, level and slope
including necessary collars,testing, excavation
laying,fixing with collars in cement mortar 1:1 and
reffilling the trench etc. complete.(Spec.Bd.V-41 P-573)
(DSR Item-45a Page-106)

5 848.00 Providing and laying PVC pipe line 75mm for passing 434 Rmt 368032.00
street light cable through footpath including necessary
excavation, laying, jointing, bends tees, junctions,
inserting copper wire to pull electric cable etc complete.
(Spec. As Directed) (Rate Analysis)

6 27.98 Providing and laying in situ cement concrete for mix 4716.03 Cum. 131954.52
1:3:6 (M10) of trap metal for gutter foundation and
bedding, including bailing out water manually,
formwork, compacting and curing.(Spec.Bd. E-1 Page
287) ( DSR Item-1c Page-14)

7 848.00 Providing precast kerbs of cc M 20 (1:11/2:3) with 621 526608.00


chamfered faces as per detailed drawing including
necessary excavation and reinfaorcement (necessary)
including painting the exposed surfaces of kerb with
one coat of road marking paint removing the excavated
stuff etc. complete. Compaction by vibratory Platform
and curing in tank immersion. (Spec. As directed) (Rate
Analysis)
5
PART III Foot Path & Dividers Page 2/2
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
8 142.00 Providing and fixing precast concrete blocks 386 54812.00
450mmX230mmX200mm with two holes of 150mm dia
in the walls of drains or in kerbing of footpath to serve
as inlet to drain to pass storm water in to the drain
including making good the surfaces to match the cross
section etc complete (Spec.Special) (Rate Analysis)

9 848.00 Providing and fixing water table of M 15 grade cement 330 279840.00
concrete 30cm wide and 10cmthick on a M10 cement
concrete bed 10cm thick includingfilling in joints with
cement mortar 1:2, cement pointing, curing etc
complete as specified and as directed.(Spec.Special)
(Rate Analysis)

10 0.00 Providing casting in situ cc M20 for R.C.C.centre line 3481 0.00
single divider wall longitudinally in the road to the
required cross section of 30cm wide at up to height of
30cm from pcc bed then 45cm height tappered curved
shape wit 20cm width at top including necessary steel
plate forms(Moulds) duly secured with nut and bolts for
assembling for casting to form finsh, including
necessary P.C.C.foundation bedding formwork, placing
concrete compacting,vibrating, curing, watering
etc.,with reinforcement of 12mm straight torque steel
bars 12 no.and 10mm dia torque steel bars for rings
@150mm c/c including cutting, hooking, bending,
binding with wire , supporting in all position, including
P/F P.V.C. pipe for street light cable with necessary
sockets.etc excavation in B.T., pcc M10 bedding, oil
11 0.68 Providing and fabricating structural steel work in rolled 70390.69 M.T. 47865.67
sections like joist, channnels, angles, tees, etc. as per
detailed designs or as directed including cutting,
fabricating, hoisting,erecting, fixing in position making
reveted/bolted/welded connections with connecting
plates, braces etc. and including one coat of
anticorrsive paint and over it two coats of oil painting of
aproved quality and shade complete.(For Frame of MH
cover over drain slab/footpath.(Spec.Bd.C-2 P-275)
(DSR Part I, Item-1 Page-12)

12 76.32 Providing and fixing precast RCC grating/cover of 2490 Sqm. 190036.80
strength M20 over drain/footpath of size
90cmx60cmx60mm including necessary reinforcements
as per drawing or as directed, conveying stacking etc.
complete. (Spec.Special) ( Rate Analysis)
(Spec.Special) ( Rate Analysis) (With RCC Frame)
Mode of Meas.- Cover size only

13 856.48 Providing and fixing precast heavy duty inter locked 1002 Sqm. 858192.96
concrete paving block of 60 mm thickness having a
strength of 300 kg/sq.mt.. of approved quality and
shape on a bed of grit / sand of 65mm thick with
C.M.1:4,striking joints, including neat cement float filling
joints with coloured cement slurry all labour material
and cleaning etc. complete. Spec As Directed by
Engr(DSR Item-36, Page-44)
Total Of Part III (Footpath Work) 2507932.19
6
PART IV Road Work(W.B.M.) Page 1/2
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
1 2327.76 Excavation for roadways in soft strata such as earth 109.23 Cum. 254261.22
soil of all sorts sand, gravel or soft murum including
dressing section to the required grade, camber and
side slopes and conveying the excavated materials with
all lifts upto a lead of 50 m and spreading for
embankment or stacking, disposing as directed. Spec.
No.:Rd. 2.3,4. Page No. 180,183,184 (DSR Item-2a
Page-148)

2 1163.88 Excavation for roadways in soft strata such as hard 126.2 Cum. 146881.66
murum and boulders including dressing section to the
required grade, camber and side slopes and conveying
the excavated materials with all lifts upto a lead of 50 m
and spreading for embankment or stacking, disposing
as directed. Spec. No.:Rd. 2.3,4. Page No.
180,183,184 (DSR Item-2c Page-148)

3 1163.88 Excavation for roadways in hard strata such as soft 299.06 Cum. 348069.95
rock including dressing section to the required grade,
camber and side slopes and conveying the excavated
materials with all lifts upto a lead of 50 m and spreading
for embankment or stacking, disposing as directed.
Spec. No.:Rd. 5,6,7,.8 Page No. 184,185,186. (DSR
Item-3a Page-148)

4 5172.80 Watering and compacting of embankment formed of 39.24 Cum. 202980.67


materials obtained from the road cutting, within a lead
of 50m to 95% of standard proctor density after laying
them in layers of 20 to 30 cm with static roller etc.
complete. Spec. No.: Rd. 1 0 Page No. 187 (DSR Item-
7a Page-150)

5 1138.02 Providing earth work in embankmenk with approved 221.8 Cum. 252412.84
materials obtained from private land including all lift and
laying in layers in 20cm.to 30cm. Thickness breaking
clods dressing to the required lines, curves, grades, &
section, normal watering compaction to 95% proctor
density with power roller etc. complete. (Spec.Rd. 13 P-
194) (DSR Item-12a i Page-151)

6 1238.68 Providing dry trap/rubble stone soling 15 cm.to 695.92 Cum. 862022.19
20cm.thick including hand packing and compacting
etc.complete. (Spec. Bd. A-12 P-264) (DSR P Item-6
Page-6)
7
PART IV Road Work(W.B.M.) Page 2/2
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
7 329.02 Providing and constructing W.B.M. road with 80mm 875 Cum. 287892.50
oversize/Grade I metal in layers of 75/100 mm
compacted thickness, preparation of subgrade,
screening metal 13.2mm size Binding with murum
necessary testing including supplying and conyeying all
materials with all lead and lift, spreading, sectioning,
artificial watering and compacting in layers with
vibratory roller as directed by Engineer in charge
including maintainance of diversion road during
construction etc. complete. (Spec. MOST-400) (Rate
Analysis)

8 246.76 Providing and constructing W.B.M. road with 50mm 919 Cum. 226772.44
over size/Grade II metal in layers of 75 mm compacted
thickness, preparation of subgrade, screening metal
13.2mm size Binding with murum necessary testing
including supplying and conyeying all materials with all
lead and lift, spreading, sectioning, artificial watering
and compacting in layers with vibratory roller as
directed by Engineer in charge including maintainance
of diversion road during construction etc. complete.
(Spec. MOST-400) (Rate Analysis)

Total Of Part IV (W.B.M. Work) 2581293.47


8
1 290.44 Providing and laying in situ Dry lean cement concrete 4934.50 Cum 1433176.18
sub-base of trap metal of specified gradation using
minimum cement content of 150 Kg/cum., mixing as
per approved design mix, compacting with vibratory
roller of minimum 80-100KN static weight to give
desired compacted density, providing construction
2 57.24 Providing and laying heavy duty precaste paver block 5335.63 Cum 305411.46
in situ C.C. M15 of trap metal for bedding below R.C.C.
Runner beams including bailing out water mannuly,form
work, compacting and curing finishing as directed etc
complete.(Spec.Bd. E-1 Page-287) (DSR Item-1e,
Page-14)
3 87.52 Providing and laying in situ cement concrete for mix 4716.03 Cum 412746.95
1:3:6 (M10) of trap metal for gutter foundation and
bedding, including bailing out water manually,
formwork, compacting and curing.(Spec.Bd. E-1 Page
287) ( DSR Item-1c Page-14)

4 0.00 Providing and laying water proof paper of 40 GSM over 6.90 Sqm 0.00
bedding, below concrete pavement (overlap not less
than 10 cm.) etc. complete as directed. (Sp. Spec) (R.
A.)
5 890.40 Providing and laying Pavement Ouality Concrete of M- 6958.25 Cum 6195625.80
40 MORT&H- grade (cast in situ) of trap metal including
providing 125 602 micron thick impermeable plastic
sheet membrane over the surface to be covered,
coarse and fine aggregates of specified gradation using
minimum cement content of 350 kg/cum., approved
admixtures, mixing as per the design mix to the
specified workability, providing necessary side forms,
rails and guide wires, transporting the mix with transit
mixers and laying and spreading within fixed form by
mechanical auger and compacting with plate vibrator
and minimum ten needle vibrators, curing with
6 1093.92 Providing and laying heavy duty precaste concrete 1245.00 Cum 1361930.40
paver blocks of 80mm thickness of appproved quality
and brand including all transportations from factory or
godown to site of work, laying fixing to proper line,
level, slope, grade, crosssection. diversion of traffic, all
form work etc. complete. (Special Specifications) (Rate
Analysis)

7 76.32 Providing and casting in situ cement concret M 35 of 6443.00 Cum 491729.76
trap metal for runner beams as per approved mix
design including necessary form of mild steel channels
duly fixed by nails. Dimbras, in line and level and to
required grade and side slope.including all supports,
fastening, compacting concrete by mean of machanical
vibrations with the help of needle vibrators. levelling the
top surface broom finshing, curing etc. complete.
(Special Specifications) (Rate Analysis)

8 7.50 Providing and fixing in position M.S./HYSD/T.M.T. steel 53945.51 M.T. 404591.33
reinforcement of varous diameters for R.C.C. pile caps,
footings,foundations, slabs, beams, columns,
canaopies, staircases, newels, chajjas, lintels, pardies,
copping, fins, arches, etc. as per detailed designs and
shedules, including cutting, bending, hooking the barss,
binding with wires or tack welding and supporting as
9 0.00 Providing and casting vattas in cement mortar 1:10 52.00 Sqm 0.00
(0.60 x0.60) m c/c and measuring 3 cm at bottom and
1 cm at top and of depth of 8 cm , maintaining the
same throuout 14 days curing period and removing the
same after curing period is over. (Special Specification)
(Rate Analysis)

Total Of Part V (C.C. Pavement Work) 10605211.88


11
Part VII Wideneing of existing C.D. work Page 1/3
1 37.97 Excavation for foundation in earth soils of all types, 110.29 Cum. 4187.71
sand gravel and soft murum including removing the
excavated materials upto a distance of 50 meters
beyond the building area and lift upto 1.5 meters
stacking and spreading as directed including
dewatering unless provided elsewhere, preparing the
bed for the foundation and necessary back filling,
ramming, watering complete excluding shoring and
strutting.(Spec Bd. A-1 Page-259) (DSR Item-1a Page-
5)
2 9.49 Excavation for foundation in hard murum and boulder 127.26 Cum. 1207.70
upto including removing the excavated material upto a
distance of 50 meters beyond the building area and lift
upto 1.5meters, stacking and spreading as directed
including dewatering manually, preparing the bed for
the foundation and necessary back filling ramming,
watering complete excluding shoring and strtutting.
(Spec.Bd.A-3 P-259) (DSR Item-1c Page-5)

3 6.33 Excavation for foundation in in soft rock,old cement 295.88 Cum. 1872.92
lime masonary, B.T. surface incldg removing the
excavated materials upto a dist of 50 meters beyond
the building area and lift upto 1.5 meters stacking and
spreading as directed incldg dewatering unless
provided elsewhere, preparing the bed for the
foundation and necessary back filling with available
earth/ murum,, ramming, watering complete excluding
shoring and strutting. (Spec.Bd.A-4 P-259) (DSR Item-
2a Page-5)

4 3.16 Excavation for foundation in hard rock by chiselling 705.23 Cum. 2228.53
wedging, line drilling etc.including trimmng and levelling
the bed, removing the excavated material upto a
distance of 50 meters, stacking as directed includg
dewatering manually, backfilling with available earth,
murum, ramming and waterng complete. (Spec.Bd.A-6
P-260) (DSR Item-2c Page-5)

5 6.33 Excavation for foundation in slush including disposing 215.2 Cum. 1362.22
off the excavated stuff within 50 meters beyond the
building area asdirected etc. complete.(Spec As
directed).(Rate Analysis)

6 7.02 Providing dry trap/rubble stone soling 15 cm.to 695.92 Cum. 4885.36
20cm.thick including hand packing and compacting
etc.complete. (Spec. Bd. A-12 P-264) (DSR P Item-6
Page-6)

7 12.20 Providing and laying precaste RCC half round pipe 561 Rmt 6844.20
450mm.dia. for drain bottom including laying to proper
level, grade, slope,jointing etc complete.(Spec.Special)
(Rate Analysis)
12
Part VII Wideneing of existing C.D. work Page 2/3
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
8 7.51 Providing and laying in situ cement concrete for mix 4716.03 Cum. 35417.39
1:3:6 (M10) of trap metal for gutter foundation and
bedding, including bailing out water manually,
formwork, compacting and curing.(Spec.Bd. E-1 Page
287) ( DSR Item-1c Page-14)

9 12.81 Providing & laying in situ cement concrete of 4990.41 Cum. 63927.15
trap/granite/quartzite/ gneiss metal PCCM-15,Span
length less than 30mtr.in severe . condition for cast in
citu piers, abutment, returns, wings etc. including
provision of "V" shaped false joints to form suitable
panels on the faces to approve design with compacting
by vibrating and curing complete, including form work
centering (excluding dewatering by means of pump)
and including bailing out water and curing etc.
complete. (upto 5.00 mt. height) Note : add 2% for over
5.00 mt.height increase upto 10.00 mt. and 6% height
above 10.00 mt.(height for that particular structure)
Spec. No. Br-27 Page No.127& MoRT&H-Sect. .
1500,1700 &2100) ( DSR Item-32(I)(b) Page-136)

10 14.18 Providing and laying weep holes of 100 mm diameter 118.78 Rmt 1684.30
AC/PVC pipes as per drawing for abutment returns,
return walls etc. complete.(Spec.- As directed by
Engineer-in-charge.) (DSR Item-44,Page-134)

11 39.39 Providing internal cement plaster 6mm. Thickin a single 148.9 Sqm. 5865.17
coat, in cement morter 1:4 with cement finish to
concrete surfaces in all positions including racking out
joints, scafolding and curing complete.(Spec.Bd.L-1 P-
367)&(Spec. Bd.L-10, Page-370) ( DSR Item-1a Page-
31+Item-9 Page-33).

12 2.86 Providing and laying in situ controlled M-20 cement 6074.17 Cum. 17372.13
concrete of trap/granite/quartzite/gneiss/ metal for
R.C.C. caps over piers and abutments including
necessary scafolding, formwork, compacting by
vibrating, finishing and curingUsing Concrete Mixer
Span length less than 30mtr.in moderate Cu.M.
condition etc complete (excluding reinforcement)
(Spec. Br.-29 P-129 MoRT&H-Sct. 1500,1700) (DSR
Item 36(I)(a) Page-132)

13 8.05 Providing and laying in situ M-20 cement concrete of 6880.15 Cum. 55385.21
trap metal in solid/deck slab/T-Beams &slab/Box girder
and balanced cantilever, including plywood/steel
formwork, steel centering, compaction by vibrating,
roughning the surface if special finish is to be provided,
curing Using Concrete Mixer Span length less than
30mtr.in moderate condition etc complete.( excluding
cost of reinforcement newly laid concrete shall be
covered by gunny bags, plastic, tarpaulin etc
complete.) Wooden centering/formwork will not be
allowed.(Spec.Br-38 Page- 135 MoRT&H Sect.
1500,1600,1700) ( DSR Item-46(I)(a) Page-135)
cost of reinforcement newly laid concrete shall be
covered by gunny bags, plastic, tarpaulin etc
complete.) Wooden centering/formwork will not be
allowed.(Spec.Br-38 Page- 135 MoRT&H Sect.
1500,1600,1700) ( DSR Item-46(I)(a) Page-135)
13
Part VII Wideneing of existing C.D. work Page 3/3
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
14 2.15 Providing and laying in situ M-25 cement concrete of 464.36 Sqm 998.37
trap/granite/quartzite/gniess metal for wearing course 8
cm thick including compacting, finishing, curing and
filling joints with bitumen complete.(Excluding
reinforcement ) (Spec. Br-47 P-140, MoRT&H-Sect,
2700) (DSR Item-54(c) Page-140)

15 0.99 Providing and cutting, bending, hooking, laying in 55939.25 M.T. 55379.86
position Mild/ H.Y.S.D./TMT bars for reinforcement as
per detailed drawing for work.(Spec. BR.-35 P-134, Br-
49 Page-143) (DSR Item-30 Page-128)

16 0.05 Providing and fabricating structural steel work in rolled 70390.69 M.T. 3519.53
sections like joist, channnels, angles, tees, etc. as per
detailed designs or as directed including cutting,
fabricating, hoisting,erecting, fixing in position making
reveted/bolted/welded connections with connecting
plates, braces etc. and including one coat of
anticorrsive paint and over it two coats of oil painting of
aproved quality and shade complete.(For Frame of MH
cover over drain slab/footpath.(Spec.Bd.C-2 P-275)
(DSR Part I, Item-1 Page-12)

17 2.00 Providing Precast M25 R.C.C. slab over the span of 9462.19 Cum. 18924.38
cross drainage work as per drawings including HYSD
bar reinforcement, conyeyance, fixing in C.M. !:3 and
curing, finishing etc complete.(Spec. CD.-12 P-166)
(DSR Item-10 Page-176)

18 63.28 Dewatering abutment in perinnial river or stream 364.81 Cum 23085.18


including diversion of stream, providing earthen bunds
cofferdam bunds etc. as may be necessary for
foundation and other parts of the work and bailing out
and/or pumping out water below the actual initial
natural water level during execution of all items of
construction as required (from start of that particular
component till completion of bridge) including all lead
and lift etc. complete. Note all items of construction i.e.
excavation, bedding, (soling & PCC) and concreting of
that structure up to natural water level..9Spec. BR-4 P-
104) (DSR Item 3(A)(iii)(a) Page-115)

19 5.49 Providing trap/granite/quartzite/gneiss rubble filling 650.54 Cum. 3571.46


behind the abutments, returns or wings. (including
initial lead for rubble 5 kms.) (Spec. BR.-57 Page-151)
(DSR, Item-45 Page-134)

Total Of Part VII (Widening Of Existing C.D. Work) 307718.77


14
Part VIII Const of new C.D. Page 1/3
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
1 310.62 Excavation for foundation in earth soils of all types, 110.29 Cum. 34258.28
sand gravel and soft murum including removing the
excavated materials upto a distance of 50 meters
beyond the building area and lift upto 1.5 meters
stacking and spreading as directed including
dewatering unless provided elsewhere, preparing the
bed for the foundation and necessary back filling,
ramming, watering complete excluding shoring and
strutting.(Spec Bd. A-1 Page-259) (DSR Item-1a Page-
5)

2 77.66 Excavation for foundation in hard murum and boulder 127.26 Cum. 9883.01
upto including removing the excavated material upto a
distance of 50 meters beyond the building area and lift
upto 1.5meters, stacking and spreading as directed
including dewatering manually, preparing the bed for
the foundation and necessary back filling ramming,
watering complete excluding shoring and strtutting.
(Spec.Bd.A-3 P-259) (DSR Item-1c Page-5)

3 51.77 Excavation for foundation in in soft rock,old cement 295.88 Cum. 15317.71
lime masonary, B.T. surface incldg removing the
excavated materials upto a dist of 50 meters beyond
the building area and lift upto 1.5 meters stacking and
spreading as directed incldg dewatering unless
provided elsewhere, preparing the bed for the
foundation and necessary back filling with available
earth/ murum,, ramming, watering complete excluding
shoring and strutting. (Spec.Bd.A-4 P-259) (DSR Item-
2a Page-5)

4 25.89 Excavation for foundation in hard rock by chiselling 705.23 Cum. 18258.40
wedging, line drilling etc.including trimmng and levelling
the bed, removing the excavated material upto a
distance of 50 meters, stacking as directed includg
dewatering manually, backfilling with available earth,
murum, ramming and waterng complete. (Spec.Bd.A-6
P-260) (DSR Item-2c Page-5)

5 51.77 Excavation for foundation in slush including disposing 215.2 Cum. 11140.90
off the excavated stuff within 50 meters beyond the
building area asdirected etc. complete.(Spec As
directed).(Rate Analysis)

6 38.72 Providing dry trap/rubble stone soling 15 cm.to 695.92 Cum. 26946.02
20cm.thick including hand packing and compacting
etc.complete. (Spec. Bd. A-12 P-264) (DSR P Item-6
Page-6)

7 36.60 Providing and laying precaste RCC half round pipe 561 Rmt 20532.60
450mm.dia. for drain bottom including laying to proper
level, grade, slope,jointing etc complete.(Spec.Special)
(Rate Analysis)
15
Part VIII Const of new C.D. Page 2/3
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
8 45.97 Providing and laying in situ cement concrete for mix 4716.03 Cum. 216795.90
1:3:6 (M10) of trap metal for gutter foundation and
bedding, including bailing out water manually,
formwork, compacting and curing.(Spec.Bd. E-1 Page
287) ( DSR Item-1c Page-14)

9 98.82 Providing & laying in situ cement concrete of 4990.41 Cum. 493152.32
trap/granite/quartzite/ gneiss metal PCCM-15,Span
length less than 30mtr.in severe . condition for cast in
citu piers, abutment, returns, wings etc. including
provision of "V" shaped false joints to form suitable
panels on the faces to approve design with compacting
by vibrating and curing complete, including form work
centering (excluding dewatering by means of pump)
and including bailing out water and curing etc.
complete. (upto 5.00 mt. height) Note : add 2% for over
5.00 mt.height increase upto 10.00 mt. and 6% height
above 10.00 mt.(height for that particular structure)
Spec. No. Br-27 Page No.127& MoRT&H-Sect. .
1500,1700 &2100) ( DSR Item-32(I)(b) Page-136)

10 110.03 Providing and laying weep holes of 100 mm diameter 118.78 Rmt 13069.36
AC/PVC pipes as per drawing for abutment returns,
return walls etc. complete.(Spec.- As directed by
Engineer-in-charge.) (DSR Item-44,Page-134)

11 218.45 Providing internal cement plaster 6mm. Thickin a single 148.9 Sqm. 32527.21
coat, in cement morter 1:4 with cement finish to
concrete surfaces in all positions including racking out
joints, scafolding and curing complete.(Spec.Bd.L-1 P-
367)&(Spec. Bd.L-10, Page-370) ( DSR Item-1a Page-
31+Item-9 Page-33).

12 10.46 Providing and laying in situ controlled M-20 cement 6074.17 Cum. 63535.82
concrete of trap/granite/quartzite/gneiss/ metal for
R.C.C. caps over piers and abutments including
necessary scafolding, formwork, compacting by
vibrating, finishing and curingUsing Concrete Mixer
Span length less than 30mtr.in moderate Cu.M.
condition etc complete (excluding reinforcement)
(Spec. Br.-29 P-129 MoRT&H-Sct. 1500,1700) (DSR
Item 36(I)(a) Page-132)

13 28.55 Providing and laying in situ M-20 cement concrete of 6880.15 Cum. 196428.28
trap metal in solid/deck slab/T-Beams &slab/Box girder
and balanced cantilever, including plywood/steel
formwork, steel centering, compaction by vibrating,
roughning the surface if special finish is to be provided,
curing Using Concrete Mixer Span length less than
30mtr.in moderate condition etc complete.( excluding
cost of reinforcement newly laid concrete shall be
covered by gunny bags, plastic, tarpaulin etc
complete.) Wooden centering/formwork will not be
allowed.(Spec.Br-38 Page- 135 MoRT&H Sect.
1500,1600,1700) ( DSR Item-46(I)(a) Page-135)
cost of reinforcement newly laid concrete shall be
covered by gunny bags, plastic, tarpaulin etc
complete.) Wooden centering/formwork will not be
allowed.(Spec.Br-38 Page- 135 MoRT&H Sect.
1500,1600,1700) ( DSR Item-46(I)(a) Page-135)
16
Part VIII Const of new C.D. Page 3/3
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
14 12.59 Providing and laying in situ M-25 cement concrete of 464.36 Sqm 5846.29
trap/granite/quartzite/gniess metal for wearing course 8
cm thick including compacting, finishing, curing and
filling joints with bitumen complete.(Excluding
reinforcement ) (Spec. Br-47 P-140, MoRT&H-Sect,
2700) (DSR Item-54(c) Page-140)

15 3.63 Providing and cutting, bending, hooking, laying in 55939.15 M.T. 203059.11
position Mild/ H.Y.S.D./TMT bars for reinforcement as
per detailed drawing for work.(Spec. BR.-35 P-134, Br-
49 Page-143) (DSR Item-30 Page-128)

16 0.15 Providing and fabricating structural steel work in rolled 9462.19 M.T. 1419.33
sections like joist, channnels, angles, tees, etc. as per
detailed designs or as directed including cutting,
fabricating, hoisting,erecting, fixing in position making
reveted/bolted/welded connections with connecting
plates, braces etc. and including one coat of
anticorrsive paint and over it two coats of oil painting of
aproved quality and shade complete.(For Frame of MH
cover over drain slab/footpath.(Spec.Bd.C-2 P-275)
(DSR Part I, Item-1 Page-12)

17 6.00 Providing Precast M25 R.C.C. slab over the span of 9462.19 Cum. 56773.14
cross drainage work as per drawings including HYSD
bar reinforcement, conyeyance, fixing in C.M. !:3 and
curing, finishing etc complete.(Spec. CD.-12 P-166)
(DSR Item-10 Page-176)

18 517.71 Dewatering abutment in perinnial river or stream 364.81 Cum 188865.79


including diversion of stream, providing earthen bunds
cofferdam bunds etc. as may be necessary for
foundation and other parts of the work and bailing out
and/or pumping out water below the actual initial
natural water level during execution of all items of
construction as required (from start of that particular
component till completion of bridge) including all lead
and lift etc. complete. Note all items of construction i.e.
excavation, bedding, (soling & PCC) and concreting of
that structure up to natural water level..9Spec. BR-4 P-
104) (DSR Item 3(A)(iii)(a) Page-115)

19 32.94 Providing trap/granite/quartzite/gneiss rubble filling 650.54 Cum. 21428.79


behind the abutments, returns or wings. (including
initial lead for rubble 5 kms.) (Spec. BR.-57 Page-151)
(DSR, Item-45 Page-134)

Total Of Part VIII (Construction Of New C.D. Work) 1629238.26


20
Part X Miscelinious Items Page 1/2
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
1 5.00 Rising or lowering circular/rectangular manholes to the 800.4 No. 4002.00
required levels upto 50 cm including all materials
formworks etc. with 18 cm thick cement concrete M 15
cement concrete copping under frame and cover of
manholes including curing etc.complete as specified
and as directed.(Spec. Special, As directed) (Rate
Analysis)

2 2.00 Providing and fixing new C.I. Circular Manhole cover 21 6644 No. 13288.00
inches dia.& Weight of 151 Kg. Heavy duty with frame
etc. complete.(Spec. Special, As directed) (Rate
Analysis)
3 Providing and fixing C.I. Rectangular Manhole chamber 0.00
cover heavy duty with frame. (Spec. Special, As
directed) (Rate Analysis)
1.00 a) 600mmX900mm size(160Kg.) 7040 No. 7040.00
1.00 b) 600mmX600mm size(132Kg.) 5808 No. 5808.00

4 0.46 Providing second class Burnt Brick masonary with 4799.28 Cum. 2207.67
conventional/I.S. type bricks in C.M. 1:6 in
superstructure including stricking joints, racking out
joints and watering complete.(Spec. Bd. G-5 P-315)
(DSR Item-2 Page-21)

5 12.00 Providing cement plaster 25mm thick in two coats in 348.53 Sqm. 4182.36
cement martar 1:4 without neeru finish to concrete
/brick/stone surfaces in all positions including racking
out joints, scafolding and curing complete.(Spec.Bd.L-5
P-368) (DSR Item-5 Page-32)

6 Providing and laying in trenches approved Medium


type(Item a to d) Heavy type (Item e to g) Galvanized
iron pipe having embosed at every meter the ISI mark
and name of manufacturer, with screwed sockets,
joints, and necessary galvanized iron fittings such as
backnuts, elbows, bends, tees, reducers, enlargers,
pliugs,etc. including providing and applying two coats of
oil paints with one coat of primer and necessary
excavation and backfilling complete including removing
existing pipe if necessary & conveying & stacking in
PWD chowky or as directed (Spec.Bd.V-5 P-551) (DSR
Item-1 Page-89, )

a 50.00 DSR -1(A)(a),P-83 a) 15mm dia out/dia 21.32mm & wt.1.27kg/m 209.98 Rmt 10499.00
b 50.00 DSR -1(A)(b),P-83 b) 20mm dia out/dia 26.9mm & wt.1.64kg/m 233.31 Rmt 11665.50
c 0.00 DSR -1(A)(c),P-83 c) 25mm dia out/dia 33.7mm & wt.2.52kg/m 329.82 Rmt 0.00
d 0.00 DSR -1(A)(e),P-83 d) 40mm dia out/dia 48.3mm & wt.3.73kg/m 398.75 Rmt 0.00
e 0.00 DSR -1(B)(f),P84 e) 50mm dia out/dia 60.3mm & wt.5.23kg/m 428.44 Rmt 0.00
f 0.00 DSR -1(B)(g),P-84 f) 80mm dia out/dia 88.9mm & wt.8.7kg/8 751.89 Rmt 0.00
g 0.00 DSR -1(B)(h),P-84 g) 100mm dia out/dia 114.3mm & wt.12.77kg/m 1083.83 Rmt 0.00
21
Part X Miscelinious Items Page 2/2
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
7 249.00 Shifting of existing G.I. Connections to required location 305 No. 75945.00
as directed by Engineer in Charge. (Spec. Special, As
directed) (Rate Analysis)

8 Providing & Laying concrete pipes of I.S. NP.2 class of


required diameter in proper line, level and slope
including , necessary collars, testing, excavation
laying , fixing with collars in cement mortar 1:1 and
refilling the trench etc complete. (Spec.Bd V-41 P-573)
(DSR Item-45(a),(b),(c) Page-99)
a 5.00 a)150mm diameter 406,17 Rmt 5.00
b 5.00 b)225mm diameter 461.32 Rmt 2306.60
c 5.00 c)300mm diameter 516.46 Rmt 2582.30

9 Providing and laying cement concrete pipe of 450mm


diametere IS 458-1988 NP 3 Class in proper line level
& slope including fixing collars in cement mortar 1:2
etc. complete. (Spec.CD.7 P-162) ( Rate Analysid
based on DSR Item-8 Page-156+MSSIDC Ltd Rate
contract(Annexure A) Page-228
a 2.00 Rate Analysis a) 450mm dia pipe 2108 4216.00
b 2.00 Rate Analysis b) 600mm dia pipe 3129 Rmt 6258.00
c 2.00 Rate Analysis c) 900mm dia pipe 5721 Rmt 11442.00

10 10.00 Providing and laying salt glazed stone ware pipe 261.94 Rmt 2619.40
150mm diametere including fitting such as bends, tees,
single junctions, double junctions, laying, jointing
including excavation and refilling trenches complete.
(Spec. Bd.V39 Page-102) (DSR Item-34(b) Page-95)

11 4.00 Providing and constructing Brick masonary Inspection 5555.18 No. 22220.72
chember 90cm x 45 cm including 1:4:8 cement
concrete foundation, 1:2:4 cement concrete
channels,plastering from inside to the Brick Masonary,
and airtight R.C.C lid with frame fixed in cement
concrete, curing, testing etc. complete.(Spec. Bd. V-43
Page-574) (DSR Item-46(b) Page-100)

12 7803.39 Transportation of excess excavated/ dismantled/ scrap/ 147.92 Cum. 1154277.89


debries etc. upto lead of 2kms including loading
unloading conveying stacking etc complete.(Lead Chart
Page -208)

Total Of Part X (Miscelniou Items Of Work) 1340565.44


ULHASNAGAR MUNICIPAL CORPORATION
RECAPITULATION SHEET
Name of Construction of Cement Concrete Pavement Road from Radhaswami Satsang to
Work:- OT Ulhasnagar - 3.

PART TYPE OF WORK PAGE ESTIMATED COST


Part-I :- Cost Of Site Prepaeation Work 1 Rs.138,244.30
Part-II :- Cost Of Side Drain Work 3 Rs.4,216,613.75
Part-III :- Cost Of Footpath Work 5 Rs.2,507,932.19
Part-IV :- Cost Of W.B.M. Work 7 Rs.2,581,293.47
Part-V :- Const. Of C.C. Pavement Work 9 Rs.10,605,211.88
Part-VII :- Cost Of Widening Of Existing C.D. Work 13 Rs.307,718.77
Part-VIII :- Cost Of Construction Of New C.D. Work 16 Rs.1,629,238.26
Part-X :- Miscelinious Items 21 Rs.1,340,565.44
TOTAL COST OF WORK Rs.23,326,818.06

Add 10% for testing Rs.2,332,681.81


Add 1%% for cess Rs.233,268.18
Add 1%% for Insurance Rs.233,268.18
Total Rs.26,126,036.23
Add 15% For Probable Expenditure on Utilities of Water supply &
Rs.3,918,905.43
Under Ground Drainage
TOTAL Rs.30,044,941.66

Add 2% For Work Charge Establishment Rs.600,898.83

TOTAL Rs.30,645,840.49

Add 1% For Quality Control Rs.306,458.40

TOTAL Rs.30,952,298.89

Add 5% For Prize Escalations Rs.1,547,614.94

TOTAL Rs.32,499,913.83

Gross Cost Of Civil Work is Rs.32,499,914

40' wide Existing IRDP BT Road By CC pave. Cost per Km Rs.7.67

Jr. Engineer Dy. Engineer Ex. Engineer


UMC UMC UMC

Technically scrutinised & found TECHNICALLY CLEARED


to be correct & recommanded for cost Rs.32,499,914
for TECHNICL CLEARANCE Vide No.:-
for cost of Rs.32,499,914
for Date :-
Jr. Engr. Dy. Engr. City Engineer
U.M.C. U.M.C. U.M.C.
ULHASNAGAR MUNICIPAL CORPORATION
0
Name of Work :- Construction of Cement Concrete Pavement Road from Radhaswami
Satsang to OT Ulhasnagar - 3.

Schedule B
1
PART I (SitePreparation) Page 1/1
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
1 10.00 Dismantling RCC work including breaking concrete by 396.63 Cum. 3966.30
0 0 chieseling, wedging etc. includg cutting the reinforcmt 0 0 0
0 0 stacking the serviceable materials and the debris 0 0 0
0 0 seperatly up to a distance of 50 mtrs or spreading the 0 0 0
0 0 debris as directed complete. (Spec.Bd.W-8 As Directed 0 0 0
by Engineer P-587 Mod) (DSR .Item-51 Page-111)
0 0 0 0 0
0 0 0.00 0 0.00
0 0 0 0 0 0
2 20.00 Dismantling carefully the existing plain concrete, 307.55 Cum. 6151.00
0 0 including stacking the materials neatly within 50mtrs 0 0 0
0 0 lead as directed. (Spec.Bd.W-8 As Directed by 0 0 0
0 0 Engineer )(DSR Item-50 Page-111) 0.00 0 0.00
0 0 0 0 0 0
3 20.00 Dismantling carefully the existing structure of brick 91.2 Cum. 1824.00
0 0 masonary in cement mortar or lime morter, including 0 0 0
0 0 sorting out serviceable material and stacking 0 0 0
0 0 dismantled material within 50mtrs lead as directed. 0 0 0
0 0 (Spec.Bd.W-8, As Directed by Engineer) (DSR Item-49 0 0 0
Page-111)
0 0 0.00 0 0
0 0 0 0 0 0
4 0.00 Dismantling carefully the existing structure of stone 91.2 Cum. 0.00
0 0 masonary in cement mortar or lime morter, including 0 0 0
0 0 sorting out serviceable material and stacking 0 0 0
0 0 dismantled material within 50mtrs lead as directed. 0 0 0
0 0 (Spec.Bd.W-8/11 As Directed by Engineer) (DSR Item- 0 0 0
48 Page-111)
0 0 0.00 0 0
0 0 0 0 0 0
5 0 Cutting down trees including trunks and branches and 0 0 0
0 0 stacking the material neatly within a lead of 50m.as 0 0 0
0 0 directed.(Spec.Rd.A,B P-179) (DSR Item-1b,1d Page- 0 0 0
0 0 148) 0 0 0
0 0.00 I) with girth of 60 to 90 cm. 592.82 0 0.00
0 0.00 II) with girth of 180 to 270 cm. 828.25 0 0.00
0 0 0 0 0 0
6 100.00 Dewatering on BHP basis by using water pump 3 HP 53.03 Hr 5303.00
0 0 including diversion of stream, plroviding earthen bunds 0 0 0
0 0 coffer dam etc. as may be neccessary for foundation 0 0 0
0 0 and other parts of the work and bailing out and 0 0 0
0 0 pumping out water, during and after excavation as 0 0 0
required (The item include dewatering for excavation
0 0 0 0 0
up to foundation level, filling foundation and sub
0 0 structre masonary above water level)(Spec. Br As 0 0 0
0 0 directed by engineer in charge) (DSR, Item-3(B)(i) 0 0 0
0 0 Page-116) 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
7 100.00 Engaging J.C.B. for removing debris wastes on road 1210 Hr 121000.00
0 0 including all materials labours, operators, etc complete. 0 0 0
0 0 (Spec. Special) (Rate Analysis) 0 0 0
Total Of Part I (Site Prepaeation Work) 138244.30
2
PART II (side Drain) Page 1/2
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
1 0.00 Excavation for foundation in earth soils of all types, 110.29 Cum. 0.00
0 0 sand gravel and soft murum including removing the 0 0 0
0 0 excavated materials upto a distance of 50 meters 0 0 0
0 0 beyond the building area and lift upto 1.5 meters 0 0 0
0 0 stacking and spreading as directed including 0 0 0
dewatering unless provided elsewhere, preparing the
0 0 0 0 0
bed for the foundation and necessary back filling,
0 0 ramming, watering complete excluding shoring and 0 0 0
0 0 strutting.(Spec Bd. A-1 Page-259) (DSR Item-1a Page- 0 0 0
0 0 5) 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
2 0.00 Excavation for foundation in hard murum and boulder 127.26 Cum. 0.00
0 0 upto including removing the excavated material upto a 0 0 0
0 0 distance of 50 meters beyond the building area and lift 0 0 0
0 0 upto 1.5meters, stacking and spreading as directed 0 0 0
0 0 including dewatering manually, preparing the bed for 0 0 0
the foundation and necessary back filling ramming,
0 0 0 0 0
watering complete excluding shoring and strtutting.
0 0 (Spec.Bd.A-3 P-259) (DSR Item-1c Page-5) 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
3 0.00 Excavation for foundation in in soft rock,old cement 295.88 Cum. 0.00
0 0 lime masonary, B.T. surface incldg removing the 0 0 0
0 0 excavated materials upto a dist of 50 meters beyond 0 0 0
0 0 the building area and lift upto 1.5 meters stacking and 0 0 0
0 0 spreading as directed incldg dewatering unless 0 0 0
provided elsewhere, preparing the bed for the
0 0 0 0 0
foundation and necessary back filling with available
0 0 earth/ murum,, ramming, watering complete excluding 0 0 0
0 0 shoring and strutting. (Spec.Bd.A-4 P-259) (DSR Item- 0 0 0
0 0 2a Page-5) 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
4 0.00 Excavation for foundation in hard rock by chiselling 705.23 Cum. 0.00
0 0 wedging, line drilling etc.including trimmng and levelling 0 0 0
0 0 the bed, removing the excavated material upto a 0 0 0
0 0 distance of 50 meters, stacking as directed includg 0 0 0
0 0 dewatering manually, backfilling with available earth, 0 0 0
murum, ramming and waterng complete. (Spec.Bd.A-6
0 0 0 0 0
P-260) (DSR Item-2c Page-5)
0 0 0.00 0 0
0 0 0 0 0 0
5 541.78 Excavation for foundation in slush including disposing 215.2 Cum. 116591.06
0 0 off the excavated stuff within 50 meters beyond the 0 0 0
0 0 building area asdirected etc. complete.(Spec As 0 0 0
0 0 directed).(Rate Analysis) 0.00 0 0
0 0 0 0 0 0
6 0.00 Providing dry trap/rubble stone soling 15 cm.to 695.92 Cum. 0.00
0 0 20cm.thick including hand packing and compacting 0 0 0
0 0 etc.complete. (Spec. Bd. A-12 P-264) (DSR P Item-6 0 0 0
0 0 Page-6) 0.00 0 0
0 0 0 0 0 0
7 0.00 Providing and laying precaste RCC half round pipe 349 Rmt 0.00
0 0 300mm. Dia. for drain bottom including laying to proper 0 0 0
0 0 level, grade, slope,jointing etc complete.(Spec.Special) 0 0 0
0 0 (Rate Analysis) 0 0 0
3
PART II (side Drain) Page 2/2
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
8 848.00 Providing and laying precaste RCC half round pipe 561 Rmt 475728.00
0 0 450mm.dia. for drain bottom including laying to proper 0 0 0
0 0 level, grade, slope,jointing etc complete.(Spec.Special) 0 0 0
0 0 (Rate Analysis) 0.00 0 0
0 0 0 0 0 0
9 0.00 Providing and laying precaste RCC half round pipe 820 Rmt 0.00
0 0 600mm.dia. for drain bottom including laying to proper 0 0 0
0 0 level, grade, slope,jointing etc complete.(Spec.Special) 0 0 0
0 0 (Rate Analysis) 0 0 0
0 0 0 0 0 0
10 0.00 Providing and laying precaste RCC half round pipe 1532 Rmt 0.00
0 0 900mm.dia. for drain bottom including laying to proper 0 0 0
0 0 level, grade, slope,jointing etc complete.(Spec.Special) 0 0 0
0 0 (Rate Analysis) 0 0 0
0 0 0 0 0 0
11 244.32 Providing and laying in situ cement concrete for mix 4716.03 Cum. 1152220.45
0 0 1:3:6 (M10) of trap metal for gutter foundation and 0 0 0
0 0 bedding, including bailing out water manually, 0 0 0
0 0 formwork, compacting and curing.(Spec.Bd. E-1 Page 0 0 0
0 0 287) ( DSR Item-1c Page-14) 0.00 0 0
0 0 0 0 0 0
12 183.16 Providing and laying in situ cement concrete for mix 5335.63 Cum. 977273.99
0 0 1:2:4(M15) of trap metal for gutter foundation and 0 0 0
0 0 bedding, including bailing out water manually, 0 0 0
0 0 formwork, compacting and curing.(Spec.Cd--3 P-160) ( 0 0 0
0 0 DSR Item-2d Page-174) 0.00 0 0
0 0 0 0.00 0 0
13 763.20 Providing internal cement plaster 6mm. Thickin a single 148.9 Sqm. 113640.48
0 0.00 coat, in cement morter 1:4 with cement finish to 0 0 0.00
0 0 concrete surfaces in all positions including racking out 0 0 0
0 0 joints, scafolding and curing complete.(Spec.Bd.L-1 P- 0 0 0
0 0 367)&(Spec. Bd.L-10, Page-370) ( DSR Item-1a Page- 0 0 0
31+Item-9 Page-33).
0 0 0.00 0 0
0 0 0 0 0 0
14 102.78 Providing and laying in situ M-20 cement concrete of 8042.42 Cum 826599.93
0 0 trap metal in solid slab over gutter including 0 0 0
0 0 plywood/steel formwork, steel centering, compaction by 0 0 0
0 0 vibraing, roughening the surface if special finish is to be 0 0 0
0 0 provided,curing etc. complete. (Excludingcost of 0 0 0
reinforcement newly laid concrete shall be covered by
0 0 0 0 0
gunny bags, plastic, tarpaulin or providing vattas etc
0 0 complete.(wooden centering/formwork will not be 0 0 0
0 0 allowed) (Spec.Bd. F-8, P- 302, Modified) ( DSR Item- 0 0 0
0 0 5a Page-17) 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
15 10.28 Providing and fixing in position M.S./HYSD/T.M.T. steel 53945.51 M.T. 554559.84
0 0.00 reinforcement of varous diameters for R.C.C. pile caps, 0 0 0.00
0 0.00 footings,foundations, slabs, beams, columns, 0 0 0.00
0 0.00 canaopies, staircases, newels, chajjas, lintels, pardies, 0 0 0.00
0 0.00 copping, fins, arches, etc. as per detailed designs and 0 0 0.00
shedules, including cutting, bending, hooking the barss,
0 0.00 0 0 0.00
binding with wires or tack welding and supporting as
0 0 directed complete. (Spec. Bd. F-17 Page-306, (DSR 0 0 0
0 0 Item-11, Page-19) 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
Total Of Part II (Side Drain Work) 4216613.75
4
PART III Foot Path & Dividers Page 1/2
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
1 38.16 Excavation for foundation in in soft rock,old cement 295.88 Cum. 11290.78
0 0 lime masonary, B.T. surface incldg removing the 0 0 0
0 0 excavated materials upto a dist of 50 meters beyond 0 0 0
0 0 the building area and lift upto 1.5 meters stacking and 0 0 0
0 0 spreading as directed incldg dewatering unless 0 0 0
provided elsewhere, preparing the bed for the
0 0 0 0 0
foundation and necessary back filling with available
0 0 earth/ murum,, ramming, watering complete excluding 0 0 0
0 0 shoring and strutting. (Spec.Bd.A-4 P-259) (DSR Item- 0 0 0
0 0 2a Page-5) 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
2 38.16 Excavation for foundation in hard murum and boulder 127.26 Cum. 4856.24
0 0 upto including removing the excavated material upto a 0 0 0
0 0 distance of 50 meters beyond the building area and lift 0 0 0
0 0 upto 1.5meters, stacking and spreading as directed 0 0 0
0 0 including dewatering manually, preparing the bed for 0 0 0
the foundation and necessary back filling ramming,
0 0 0 0 0
watering complete excluding shoring and strtutting.
0 0 (Spec.Bd.A-3 P-259) (DSR Item-1c Page-5) 0 0 0
0 0 0 0 0
0 0 0.00 0 0.00
0 0 0 0 0 0
3 0.00 Providing dry trap/rubble stone soling 15 cm.to 695.92 Cum. 0.00
0 0 20cm.thick including hand packing and compacting 0 0 0
0 0 etc.complete. (Spec. Bd. A-12 P-264) (DSR P Item-6 0 0 0
0 0 Page-6) 0.00 0 0
0 0 0 0 0 0
4 84.80 Providing and laying R.C.C.pipes of I.S.NP.2 class of 406.17 Rmt 34443.22
0 0 150mm. diameter in proper line, level and slope 0 0 0
0 0 including necessary collars,testing, excavation 0 0 0
0 0 laying,fixing with collars in cement mortar 1:1 and 0 0 0
0 0 reffilling the trench etc. complete.(Spec.Bd.V-41 P-573) 0 0 0
(DSR Item-45a Page-106)
0 0 0.00 0 0
0 0 0 0 0 0
5 848.00 Providing and laying PVC pipe line 75mm for passing 434 Rmt 368032.00
0 0 street light cable through footpath including necessary 0 0 0
0 0 excavation, laying, jointing, bends tees, junctions, 0 0 0
0 0 inserting copper wire to pull electric cable etc complete. 0 0 0
0 0 (Spec. As Directed) (Rate Analysis) 0 0 0
0 0 0 0 0 0
6 27.98 Providing and laying in situ cement concrete for mix 4716.03 Cum. 131954.52
0 0 1:3:6 (M10) of trap metal for gutter foundation and 0 0 0
0 0 bedding, including bailing out water manually, 0 0 0
0 0 formwork, compacting and curing.(Spec.Bd. E-1 Page 0 0 0
0 0 287) ( DSR Item-1c Page-14) 0.00 0 0
0 0 0 0 0 0
7 848.00 Providing precast kerbs of cc M 20 (1:11/2:3) with 621 0 526608.00
0 0 chamfered faces as per detailed drawing including 0 0 0
0 0 necessary excavation and reinfaorcement (necessary) 0 0 0
0 0 including painting the exposed surfaces of kerb with 0 0 0
0 0 one coat of road marking paint removing the excavated 0 0 0
stuff etc. complete. Compaction by vibratory Platform
0 0 0 0 0
and curing in tank immersion. (Spec. As directed) (Rate
0 0 Analysis) 0 0 0
0 0 0 0 0
5
PART III Foot Path & Dividers Page 2/2
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
8 142.00 Providing and fixing precast concrete blocks 386 0 54812.00
0 0 450mmX230mmX200mm with two holes of 150mm dia 0 0 0
0 0 in the walls of drains or in kerbing of footpath to serve 0 0 0
0 0 as inlet to drain to pass storm water in to the drain 0 0 0
0 0 including making good the surfaces to match the cross 0 0 0
section etc complete (Spec.Special) (Rate Analysis)
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0 0
9 848.00 Providing and fixing water table of M 15 grade cement 330 0 279840.00
0 0 concrete 30cm wide and 10cmthick on a M10 cement 0 0 0
0 0 concrete bed 10cm thick includingfilling in joints with 0 0 0
0 0 cement mortar 1:2, cement pointing, curing etc 0 0 0
0 0 complete as specified and as directed.(Spec.Special) 0 0 0
(Rate Analysis)
0 0 0 0 0
0 0 0 0 0 0
10 0.00 Providing casting in situ cc M20 for R.C.C.centre line 3481 0 0.00
0 0 single divider wall longitudinally in the road to the 0 0 0
0 0 required cross section of 30cm wide at up to height of 0 0 0
0 0 30cm from pcc bed then 45cm height tappered curved 0 0 0
0 0 shape wit 20cm width at top including necessary steel 0 0 0
plate forms(Moulds) duly secured with nut and bolts for
0 0 0 0 0
assembling for casting to form finsh, including
### #REF! necessary P.C.C.foundation bedding formwork, placing #REF! #REF! #REF!
### #REF! concrete compacting,vibrating, curing, watering #REF! #REF! #REF!
### #REF! etc.,with reinforcement of 12mm straight torque steel #REF! #REF! #REF!
### #REF! bars 12 no.and 10mm dia torque steel bars for rings #REF! #REF! #REF!
0 0 @150mm c/c including cutting, hooking, bending, 0 0 0
0 0 binding with wire , supporting in all position, including 0 0 0
0 0 P/F P.V.C. pipe for street light cable with necessary 0 0 0
sockets.etc excavation in B.T., pcc M10 bedding, oil
0 0.00 painting etc complete.(Spec.Special) (Rate Analysis). 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0 0
11 0.68 Providing and fabricating structural steel work in rolled 70390.69 M.T. 47865.67
0 0 sections like joist, channnels, angles, tees, etc. as per 0 0 0
0 0 detailed designs or as directed including cutting, 0 0 0
0 0 fabricating, hoisting,erecting, fixing in position making 0 0 0
0 0 reveted/bolted/welded connections with connecting 0 0 0
plates, braces etc. and including one coat of
0 0 0 0 0
anticorrsive paint and over it two coats of oil painting of
0 0 aproved quality and shade complete.(For Frame of MH 0 0 0
0 0 cover over drain slab/footpath.(Spec.Bd.C-2 P-275) 0 0 0
0 0 (DSR Part I, Item-1 Page-12) 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
12 76.32 Providing and fixing precast RCC grating/cover of 2490 Sqm. 190036.80
0 0 strength M20 over drain/footpath of size 0 0 0
0 0 90cmx60cmx60mm including necessary reinforcements 0 0 0
0 0 as per drawing or as directed, conveying stacking etc. 0 0 0
0 0 complete. (Spec.Special) ( Rate Analysis) 0 0 0
(Spec.Special) ( Rate Analysis) (With RCC Frame)
0 0 0 0 0
Mode of Meas.- Cover size only
0 0 0 0 0
0 0 0 0 0 0
13 856.48 Providing and fixing precast heavy duty inter locked 1002 Sqm. 858192.96
0 0 concrete paving block of 60 mm thickness having a 0 0 0
0 0 strength of 300 kg/sq.mt.. of approved quality and 0 0 0
0 0 shape on a bed of grit / sand of 65mm thick with 0 0 0
0 0 C.M.1:4,striking joints, including neat cement float filling 0 0 0
joints with coloured cement slurry all labour material
### #REF! #REF! #REF! #REF!
and cleaning etc. complete. Spec As Directed by
0 0 Engr(DSR Item-36, Page-44) 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
Total Of Part III (Footpath Work) 2507932.19
6
PART IV Road Work(W.B.M.) Page 1/2
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
1 2327.76 Excavation for roadways in soft strata such as earth 109.23 Cum. 254261.22
0 0 soil of all sorts sand, gravel or soft murum including 0 0 0
0 0 dressing section to the required grade, camber and 0 0 0
0 0 side slopes and conveying the excavated materials with 0 0 0
0 0 all lifts upto a lead of 50 m and spreading for 0 0 0
embankment or stacking, disposing as directed. Spec.
0 0 0 0 0
No.:Rd. 2.3,4. Page No. 180,183,184 (DSR Item-2a
0 0 Page-148) 0.00 0 0
0 0 0 0 0 0
2 1163.88 Excavation for roadways in soft strata such as hard 126.2 Cum. 146881.66
0 0 murum and boulders including dressing section to the 0 0 0
0 0 required grade, camber and side slopes and conveying 0 0 0
0 0 the excavated materials with all lifts upto a lead of 50 m 0 0 0
0 0 and spreading for embankment or stacking, disposing 0 0 0
as directed. Spec. No.:Rd. 2.3,4. Page No.
0 0 0 0 0
180,183,184 (DSR Item-2c Page-148)
0 0 0.00 0 0
0 0 0 0 0 0
3 1163.88 Excavation for roadways in hard strata such as soft 299.06 Cum. 348069.95
0 0 rock including dressing section to the required grade, 0 0 0
0 0 camber and side slopes and conveying the excavated 0 0 0
0 0 materials with all lifts upto a lead of 50 m and spreading 0 0 0
0 0 for embankment or stacking, disposing as directed. 0 0 0
Spec. No.:Rd. 5,6,7,.8 Page No. 184,185,186. (DSR
0 0 0 0 0
Item-3a Page-148)
0 0 0.00 0 0
0 0 0 0 0 0
4 5172.80 Watering and compacting of embankment formed of 39.24 Cum. 202980.67
0 0 materials obtained from the road cutting, within a lead 0 0 0
0 0 of 50m to 95% of standard proctor density after laying 0 0 0
0 0 them in layers of 20 to 30 cm with static roller etc. 0 0 0
0 0 complete. Spec. No.: Rd. 1 0 Page No. 187 (DSR Item- 0 0 0
7a Page-150)
0 0 0.00 0 0
0 0 0 0.00 0 0
5 1138.02 Providing earth work in embankmenk with approved 221.8 Cum. 252412.84
0 0 materials obtained from private land including all lift and 0 0 0
0 0 laying in layers in 20cm.to 30cm. Thickness breaking 0 0 0
0 0 clods dressing to the required lines, curves, grades, & 0 0 0
0 0 section, normal watering compaction to 95% proctor 0 0 0
density with power roller etc. complete. (Spec.Rd. 13 P-
0 0 0 0 0
194) (DSR Item-12a i Page-151)
0 0 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
6 1238.68 Providing dry trap/rubble stone soling 15 cm.to 695.92 Cum. 862022.19
0 0 20cm.thick including hand packing and compacting 0 0 0
0 0 etc.complete. (Spec. Bd. A-12 P-264) (DSR P Item-6 0 0 0
0 0 Page-6) 0.00 0 0
7
PART IV Road Work(W.B.M.) Page 2/2
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
7 329.02 Providing and constructing W.B.M. road with 80mm 875 Cum. 287892.50
0 0 oversize/Grade I metal in layers of 75/100 mm 0 0 0
0 0 compacted thickness, preparation of subgrade, 0 0 0
0 0 screening metal 13.2mm size Binding with murum 0 0 0
0 0 necessary testing including supplying and conyeying all 0 0 0
materials with all lead and lift, spreading, sectioning,
0 0 0 0 0
artificial watering and compacting in layers with
0 0 vibratory roller as directed by Engineer in charge 0 0 0
0 0 including maintainance of diversion road during 0 0 0
0 0 construction etc. complete. (Spec. MOST-400) (Rate 0 0 0
0 0 Analysis) 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
8 246.76 Providing and constructing W.B.M. road with 50mm 919 Cum. 226772.44
0 0 over size/Grade II metal in layers of 75 mm compacted 0 0 0
0 0 thickness, preparation of subgrade, screening metal 0 0 0
0 0 13.2mm size Binding with murum necessary testing 0 0 0
0 0 including supplying and conyeying all materials with all 0 0 0
lead and lift, spreading, sectioning, artificial watering
0 0 0 0 0
and compacting in layers with vibratory roller as
0 0 directed by Engineer in charge including maintainance 0 0 0
0 0 of diversion road during construction etc. complete. 0 0 0
0 0 (Spec. MOST-400) (Rate Analysis) 0 0 0
0 0 0.00 0 0
0 0 0 0.00 0 0
Total Of Part IV (W.B.M. Work) 2581293.47
8
#REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
1 290.44 Providing and laying in situ Dry lean cement concrete 4934.50 Cum 1433176.18
0 0 sub-base of trap metal of specified gradation using 0.00 0 0
0 0 minimum cement content of 150 Kg/cum., mixing as 0.00 0 0
0 0 per approved design mix, compacting with vibratory 0.00 0 0
0 0 roller of minimum 80-100KN static weight to give 0.00 0 0
desired compacted density, providing construction
0 0 0 0.00 0 0
2 57.24 Providing and laying heavy duty precaste paver block 5335.63 Cum 305411.46
0 0 in situ C.C. M15 of trap metal for bedding below R.C.C. 0.00 0 0
0 0 Runner beams including bailing out water mannuly,form 0.00 0 0
0 0 work, compacting and curing finishing as directed etc 0.00 0 0
0 0 complete.(Spec.Bd. E-1 Page-287) (DSR Item-1e, 0.00 0 0
Page-14)
0 0 0 0.00 0 0
3 87.52 Providing and laying in situ cement concrete for mix 4716.03 Cum 412746.95
0 0 1:3:6 (M10) of trap metal for gutter foundation and 0.00 0 0
0 0 bedding, including bailing out water manually, 0.00 0 0
0 0 formwork, compacting and curing.(Spec.Bd. E-1 Page 0.00 0 0
0 0 287) ( DSR Item-1c Page-14) 0.00 0 0
0 0 0 0.00 0 0
4 0.00 Providing and laying water proof paper of 40 GSM over 6.90 Sqm 0.00
0 0.00 bedding, below concrete pavement (overlap not less 0.00 0 0.00
0 0 than 10 cm.) etc. complete as directed. (Sp. Spec) (R. 0.00 0 0
0 0 A.) 0.00 0 0
0 0 0 0.00 0 0
5 890.40 Providing and laying Pavement Ouality Concrete of M- 6958.25 Cum 6195625.80
0 0 40 MORT&H- grade (cast in situ) of trap metal including 0.00 0 0
0 0 providing 125 602 micron thick impermeable plastic 0.00 0 0
0 0 sheet membrane over the surface to be covered, 0.00 0 0
0 0 coarse and fine aggregates of specified gradation using 0.00 0 0
minimum cement content of 350 kg/cum., approved
0 0 0.00 0 0
admixtures, mixing as per the design mix to the
0 0 specified workability, providing necessary side forms, 0.00 0 0
0 0 rails and guide wires, transporting the mix with transit 0.00 0 0
0 0 mixers and laying and spreading within fixed form by 0.00 0 0
0 0 mechanical auger and compacting with plate vibrator 0.00 0 0
0 0 and minimum ten needle vibrators,
0 curing with 0.00 0 0
6 1093.92 Providing and laying heavy duty precaste concrete 1245.00 Cum 1361930.40
0 0 paver blocks of 80mm thickness of appproved quality 0.00 0 0
0 0 and brand including all transportations from factory or 0.00 0 0
0 0 godown to site of work, laying fixing to proper line, 0.00 0 0
0 0 level, slope, grade, crosssection. diversion of traffic, all 0.00 0 0
form work etc. complete. (Special Specifications) (Rate
0 0 0.00 0 0
Analysis)
0 0 0.00 0 0
0 0 0 0.00 0 0
7 76.32 Providing and casting in situ cement concret M 35 of 6443.00 Cum 491729.76
0 0 trap metal for runner beams as per approved mix 0.00 0 0
0 0 design including necessary form of mild steel channels 0.00 0 0
0 0 duly fixed by nails. Dimbras, in line and level and to 0.00 0 0
0 0 required grade and side slope.including all supports, 0.00 0 0
fastening, compacting concrete by mean of machanical
0 0 0.00 0 0
vibrations with the help of needle vibrators. levelling the
0 0 top surface broom finshing, curing etc. complete. 0.00 0 0
0 0 (Special Specifications) (Rate Analysis) 0.00 0 0
0 0 0.00 0 0
0 0 0 0.00 0 0
8 7.50 Providing and fixing in position M.S./HYSD/T.M.T. steel 53945.51 M.T. 404591.33
0 0 reinforcement of varous diameters for R.C.C. pile caps, 0.00 0 0
0 0 footings,foundations, slabs, beams, columns, 0.00 0 0
0 0 canaopies, staircases, newels, chajjas, lintels, pardies, 0.00 0 0
0 0 copping, fins, arches, etc. as per detailed designs and 0.00 0 0
shedules, including cutting, bending, hooking the barss,
0 0 0.00 0 0
binding with wires or tack welding and supporting as
#REF!
#REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
9 0.00 Providing and casting vattas in cement mortar 1:10 52.00 Sqm 0.00
0 0 (0.60 x0.60) m c/c and measuring 3 cm at bottom and 0.00 0 0
0 0 1 cm at top and of depth of 8 cm , maintaining the 0.00 0 0
0 0 same throuout 14 days curing period and removing the 0.00 0 0
0 0 same after curing period is over. (Special Specification) 0.00 0 0
(Rate Analysis)
0 0 0.00 0 0
0 0 0 0.00 0 0
Total Of Part V (C.C. Pavement Work) 10605211.88
#REF!
#REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
11
Part VII Wideneing of existing C.D. work Page 1/3
### #REF! #REF! #REF! #REF! #REF!
1 37.97 Excavation for foundation in earth soils of all types, 110.29 Cum. 4187.71
0 0 sand gravel and soft murum including removing the 0 0 0
0 0 excavated materials upto a distance of 50 meters 0 0 0
0 0 beyond the building area and lift upto 1.5 meters 0 0 0
0 0 stacking and spreading as directed including 0 0 0
dewatering unless provided elsewhere, preparing the
0 0 0 0 0
bed for the foundation and necessary back filling,
0 0 ramming, watering complete excluding shoring and 0 0 0
0 0 strutting.(Spec Bd. A-1 Page-259) (DSR Item-1a Page- 0 0 0
0 0 5) 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
2 9.49 Excavation for foundation in hard murum and boulder 127.26 Cum. 1207.70
0 0 upto including removing the excavated material upto a 0 0 0
0 0 distance of 50 meters beyond the building area and lift 0 0 0
0 0 upto 1.5meters, stacking and spreading as directed 0 0 0
0 0 including dewatering manually, preparing the bed for 0 0 0
the foundation and necessary back filling ramming,
0 0 0 0 0
watering complete excluding shoring and strtutting.
0 0 (Spec.Bd.A-3 P-259) (DSR Item-1c Page-5) 0 0 0
0 0 0 0 0
0 0 0 0 0 0
3 6.33 Excavation for foundation in in soft rock,old cement 295.88 Cum. 1872.92
0 0 lime masonary, B.T. surface incldg removing the 0 0 0
0 0 excavated materials upto a dist of 50 meters beyond 0 0 0
0 0 the building area and lift upto 1.5 meters stacking and 0 0 0
0 0 spreading as directed incldg dewatering unless 0 0 0
provided elsewhere, preparing the bed for the
0 0 0 0 0
foundation and necessary back filling with available
0 0 earth/ murum,, ramming, watering complete excluding 0 0 0
0 0 shoring and strutting. (Spec.Bd.A-4 P-259) (DSR Item- 0 0 0
0 0 2a Page-5) 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
4 3.16 Excavation for foundation in hard rock by chiselling 705.23 Cum. 2228.53
0 0 wedging, line drilling etc.including trimmng and levelling 0 0 0
0 0 the bed, removing the excavated material upto a 0 0 0
0 0 distance of 50 meters, stacking as directed includg 0 0 0
0 0 dewatering manually, backfilling with available earth, 0 0 0
murum, ramming and waterng complete. (Spec.Bd.A-6
0 0 0 0 0
P-260) (DSR Item-2c Page-5)
0 0 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
5 6.33 Excavation for foundation in slush including disposing 215.2 Cum. 1362.22
0 0 off the excavated stuff within 50 meters beyond the 0 0 0
0 0 building area asdirected etc. complete.(Spec As 0 0 0
0 0 directed).(Rate Analysis) 0.00 0 0
0 0 0 0 0 0
6 7.02 Providing dry trap/rubble stone soling 15 cm.to 695.92 Cum. 4885.36
0 0 20cm.thick including hand packing and compacting 0 0 0
0 0 etc.complete. (Spec. Bd. A-12 P-264) (DSR P Item-6 0 0 0
0 0 Page-6) 0.00 0 0
0 0 0 0 0 0
7 12.20 Providing and laying precaste RCC half round pipe 561 Rmt 6844.20
0 0 450mm.dia. for drain bottom including laying to proper 0 0 0
0 0 level, grade, slope,jointing etc complete.(Spec.Special) 0 0 0
0 0 (Rate Analysis) 0 0 0
0 0 0 0 0 0
12
Part VII Wideneing of existing C.D. work Page 2/3
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
8 7.51 Providing and laying in situ cement concrete for mix 4716.03 Cum. 35417.39
0 0 1:3:6 (M10) of trap metal for gutter foundation and 0 0 0
0 0 bedding, including bailing out water manually, 0 0 0
0 0 formwork, compacting and curing.(Spec.Bd. E-1 Page 0 0 0
0 0 287) ( DSR Item-1c Page-14) 0.00 0 0
0 0 0 0 0 0
9 12.81 Providing & laying in situ cement concrete of 4990.41 Cum. 63927.15
0 0 trap/granite/quartzite/ gneiss metal PCCM-15,Span 0 0 0
0 0 length less than 30mtr.in severe . condition for cast in 0 0 0
0 0 citu piers, abutment, returns, wings etc. including 0 0 0
0 0 provision of "V" shaped false joints to form suitable 0 0 0
panels on the faces to approve design with compacting
0 0 0 0 0
by vibrating and curing complete, including form work
0 0 centering (excluding dewatering by means of pump) 0 0 0
0 0 and including bailing out water and curing etc. 0 0 0
0 0 complete. (upto 5.00 mt. height) Note : add 2% for over 0 0 0
0 0 5.00 mt.height increase upto 10.00 mt. and 6% height 0 0 0
0 0 above 10.00 mt.(height for that particular structure) 0 0 0
0 0 Spec. No. Br-27 Page No.127& MoRT&H-Sect. . 0 0 0
0 0 1500,1700 &2100) ( DSR Item-32(I)(b) Page-136) 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0.00 0 0
10 14.18 Providing and laying weep holes of 100 mm diameter 118.78 Rmt 1684.30
0 0 AC/PVC pipes as per drawing for abutment returns, 0.00 0 0
0 0 return walls etc. complete.(Spec.- As directed by 0.00 0 0
0 0 Engineer-in-charge.) (DSR Item-44,Page-134) 0.00 0 0
0 0 0 0.00 0 0
11 39.39 Providing internal cement plaster 6mm. Thickin a single 148.9 Sqm. 5865.17
0 0 coat, in cement morter 1:4 with cement finish to 0 0 0
0 0 concrete surfaces in all positions including racking out 0 0 0
0 0 joints, scafolding and curing complete.(Spec.Bd.L-1 P- 0 0 0
0 0 367)&(Spec. Bd.L-10, Page-370) ( DSR Item-1a Page- 0 0 0
31+Item-9 Page-33).
0 0 0.00 0 0
0 0 0 0 0 0
12 2.86 Providing and laying in situ controlled M-20 cement 6074.17 Cum. 17372.13
0 0 concrete of trap/granite/quartzite/gneiss/ metal for 0 0 0
0 0 R.C.C. caps over piers and abutments including 0 0 0
0 0 necessary scafolding, formwork, compacting by 0 0 0
0 0 vibrating, finishing and curingUsing Concrete Mixer 0 0 0
Span length less than 30mtr.in moderate Cu.M.
0 0 0 0 0
condition etc complete (excluding reinforcement)
0 0 (Spec. Br.-29 P-129 MoRT&H-Sct. 1500,1700) (DSR 0 0 0
0 0 Item 36(I)(a) Page-132) 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
13 8.05 Providing and laying in situ M-20 cement concrete of 6880.15 Cum. 55385.21
0 0 trap metal in solid/deck slab/T-Beams &slab/Box girder 0 0 0
0 0 and balanced cantilever, including plywood/steel 0 0 0
0 0 formwork, steel centering, compaction by vibrating, 0 0 0
0 0 roughning the surface if special finish is to be provided, 0 0 0
curing Using Concrete Mixer Span length less than
0 0 0 0 0
30mtr.in moderate condition etc complete.( excluding
0 0 cost of reinforcement newly laid concrete shall be 0 0 0
0 0 covered by gunny bags, plastic, tarpaulin etc 0 0 0
0 0 complete.) Wooden centering/formwork will not be 0 0 0
0 0 allowed.(Spec.Br-38 Page- 135 MoRT&H Sect. 0 0 0
0 0 1500,1600,1700) ( DSR Item-46(I)(a) Page-135) 0 0 0
0 0 0 0 0
13
Part VII Wideneing of existing C.D. work Page 3/3
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
14 2.15 Providing and laying in situ M-25 cement concrete of 464.36 Sqm 998.37
0 0 trap/granite/quartzite/gniess metal for wearing course 8 0 0 0
0 0 cm thick including compacting, finishing, curing and 0 0 0
0 0 filling joints with bitumen complete.(Excluding 0 0 0
0 0 reinforcement ) (Spec. Br-47 P-140, MoRT&H-Sect, 0 0 0
2700) (DSR Item-54(c) Page-140)
0 0 0.00 0 0
0 0 0 0 0 0
15 0.99 Providing and cutting, bending, hooking, laying in 55939.25 M.T. 55379.86
0 0 position Mild/ H.Y.S.D./TMT bars for reinforcement as 0 0 0
0 0 per detailed drawing for work.(Spec. BR.-35 P-134, Br- 0 0 0
0 0 49 Page-143) (DSR Item-30 Page-128) 0.00 0 0
0 0 0 0.00 0 0
16 0.05 Providing and fabricating structural steel work in rolled 70390.69 M.T. 3519.53
0 0 sections like joist, channnels, angles, tees, etc. as per 0 0 0
0 0 detailed designs or as directed including cutting, 0 0 0
0 0 fabricating, hoisting,erecting, fixing in position making 0 0 0
0 0 reveted/bolted/welded connections with connecting 0 0 0
plates, braces etc. and including one coat of
0 0 0 0 0
anticorrsive paint and over it two coats of oil painting of
0 0 aproved quality and shade complete.(For Frame of MH 0 0 0
0 0 cover over drain slab/footpath.(Spec.Bd.C-2 P-275) 0 0 0
0 0 (DSR Part I, Item-1 Page-12) 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
17 2.00 Providing Precast M25 R.C.C. slab over the span of 9462.19 Cum. 18924.38
0 0 cross drainage work as per drawings including HYSD 0 0 0
0 0 bar reinforcement, conyeyance, fixing in C.M. !:3 and 0 0 0
0 0 curing, finishing etc complete.(Spec. CD.-12 P-166) 0 0 0
0 0 (DSR Item-10 Page-176) 0.00 0 0
0 0 0 0 0 0
18 63.28 Dewatering abutment in perinnial river or stream 364.81 Cum 23085.18
0 0 including diversion of stream, providing earthen bunds 0 0 0
0 0 cofferdam bunds etc. as may be necessary for 0 0 0
0 0 foundation and other parts of the work and bailing out 0 0 0
0 0 and/or pumping out water below the actual initial 0 0 0
natural water level during execution of all items of
0 0 0 0 0
construction as required (from start of that particular
0 0 component till completion of bridge) including all lead 0 0 0
0 0 and lift etc. complete. Note all items of construction i.e. 0 0 0
0 0 excavation, bedding, (soling & PCC) and concreting of 0 0 0
0 0 that structure up to natural water level..9Spec. BR-4 P- 0 0 0
0 0 104) (DSR Item 3(A)(iii)(a) Page-115) 0 0 0
0 0 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
19 5.49 Providing trap/granite/quartzite/gneiss rubble filling 650.54 Cum. 3571.46
0 0 behind the abutments, returns or wings. (including 0 0 0
0 0 initial lead for rubble 5 kms.) (Spec. BR.-57 Page-151) 0 0 0
0 0 (DSR, Item-45 Page-134) 0.00 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
Total Of Part VII (Widening Of Existing C.D. Work) 307718.77
14
Part VIII Const of new C.D. Page 1/3
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
1 310.62 Excavation for foundation in earth soils of all types, 110.29 Cum. 34258.28
0 0 sand gravel and soft murum including removing the 0 0 0
0 0 excavated materials upto a distance of 50 meters 0 0 0
0 0 beyond the building area and lift upto 1.5 meters 0 0 0
0 0 stacking and spreading as directed including 0 0 0
dewatering unless provided elsewhere, preparing the
0 0 0 0 0
bed for the foundation and necessary back filling,
0 0 ramming, watering complete excluding shoring and 0 0 0
0 0 strutting.(Spec Bd. A-1 Page-259) (DSR Item-1a Page- 0 0 0
0 0 5) 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
2 77.66 Excavation for foundation in hard murum and boulder 127.26 Cum. 9883.01
0 0 upto including removing the excavated material upto a 0 0 0
0 0 distance of 50 meters beyond the building area and lift 0 0 0
0 0 upto 1.5meters, stacking and spreading as directed 0 0 0
0 0 including dewatering manually, preparing the bed for 0 0 0
the foundation and necessary back filling ramming,
0 0 0 0 0
watering complete excluding shoring and strtutting.
0 0 (Spec.Bd.A-3 P-259) (DSR Item-1c Page-5) 0 0 0
0 0 0 0 0
0 0 0 0 0 0
3 51.77 Excavation for foundation in in soft rock,old cement 295.88 Cum. 15317.71
0 0 lime masonary, B.T. surface incldg removing the 0 0 0
0 0 excavated materials upto a dist of 50 meters beyond 0 0 0
0 0 the building area and lift upto 1.5 meters stacking and 0 0 0
0 0 spreading as directed incldg dewatering unless 0 0 0
provided elsewhere, preparing the bed for the
0 0 0 0 0
foundation and necessary back filling with available
0 0 earth/ murum,, ramming, watering complete excluding 0 0 0
0 0 shoring and strutting. (Spec.Bd.A-4 P-259) (DSR Item- 0 0 0
0 0 2a Page-5) 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
4 25.89 Excavation for foundation in hard rock by chiselling 705.23 Cum. 18258.40
0 0 wedging, line drilling etc.including trimmng and levelling 0 0 0
0 0 the bed, removing the excavated material upto a 0 0 0
0 0 distance of 50 meters, stacking as directed includg 0 0 0
0 0 dewatering manually, backfilling with available earth, 0 0 0
murum, ramming and waterng complete. (Spec.Bd.A-6
0 0 0 0 0
P-260) (DSR Item-2c Page-5)
0 0 0 0 0
0 0 0 0 0 0
5 51.77 Excavation for foundation in slush including disposing 215.2 Cum. 11140.90
0 0 off the excavated stuff within 50 meters beyond the 0 0 0
0 0 building area asdirected etc. complete.(Spec As 0 0 0
0 0 directed).(Rate Analysis) 0.00 0 0
0 0 0 0 0 0
6 38.72 Providing dry trap/rubble stone soling 15 cm.to 695.92 Cum. 26946.02
0 0 20cm.thick including hand packing and compacting 0 0 0
0 0 etc.complete. (Spec. Bd. A-12 P-264) (DSR P Item-6 0 0 0
0 0 Page-6) 0.00 0 0
0 0 0 0 0 0
7 36.60 Providing and laying precaste RCC half round pipe 561 Rmt 20532.60
0 0 450mm.dia. for drain bottom including laying to proper 0 0 0
0 0 level, grade, slope,jointing etc complete.(Spec.Special) 0 0 0
0 0 (Rate Analysis) 0 0 0
0 0 0 0 0 0
15
Part VIII Const of new C.D. Page 2/3
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
8 45.97 Providing and laying in situ cement concrete for mix 4716.03 Cum. 216795.90
0 0 1:3:6 (M10) of trap metal for gutter foundation and 0 0 0
0 0 bedding, including bailing out water manually, 0 0 0
0 0 formwork, compacting and curing.(Spec.Bd. E-1 Page 0 0 0
0 0 287) ( DSR Item-1c Page-14) 0.00 0 0
0 0 0 0 0 0
9 98.82 Providing & laying in situ cement concrete of 4990.41 Cum. 493152.32
0 0 trap/granite/quartzite/ gneiss metal PCCM-15,Span 0 0 0
0 0 length less than 30mtr.in severe . condition for cast in 0 0 0
0 0 citu piers, abutment, returns, wings etc. including 0 0 0
0 0 provision of "V" shaped false joints to form suitable 0 0 0
panels on the faces to approve design with compacting
0 0 0 0 0
by vibrating and curing complete, including form work
0 0 centering (excluding dewatering by means of pump) 0 0 0
0 0 and including bailing out water and curing etc. 0 0 0
0 0 complete. (upto 5.00 mt. height) Note : add 2% for over 0 0 0
0 0 5.00 mt.height increase upto 10.00 mt. and 6% height 0 0 0
0 0 above 10.00 mt.(height for that particular structure) 0 0 0
0 0 Spec. No. Br-27 Page No.127& MoRT&H-Sect. . 0 0 0
0 0 1500,1700 &2100) ( DSR Item-32(I)(b) Page-136) 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0 0
10 110.03 Providing and laying weep holes of 100 mm diameter 118.78 Rmt 13069.36
0 0 AC/PVC pipes as per drawing for abutment returns, 0 0 0
0 0 return walls etc. complete.(Spec.- As directed by 0 0 0
0 0 Engineer-in-charge.) (DSR Item-44,Page-134) 0 0 0
0 0 0 0 0 0
11 218.45 Providing internal cement plaster 6mm. Thickin a single 148.9 Sqm. 32527.21
0 0 coat, in cement morter 1:4 with cement finish to 0 0 0
0 0 concrete surfaces in all positions including racking out 0 0 0
0 0 joints, scafolding and curing complete.(Spec.Bd.L-1 P- 0 0 0
0 0 367)&(Spec. Bd.L-10, Page-370) ( DSR Item-1a Page- 0 0 0
31+Item-9 Page-33).
0 0 0.00 0 0
0 0 0 0 0 0
12 10.46 Providing and laying in situ controlled M-20 cement 6074.17 Cum. 63535.82
0 0 concrete of trap/granite/quartzite/gneiss/ metal for 0 0 0
0 0 R.C.C. caps over piers and abutments including 0 0 0
0 0 necessary scafolding, formwork, compacting by 0 0 0
0 0 vibrating, finishing and curingUsing Concrete Mixer 0 0 0
Span length less than 30mtr.in moderate Cu.M.
0 0 0 0 0
condition etc complete (excluding reinforcement)
0 0 (Spec. Br.-29 P-129 MoRT&H-Sct. 1500,1700) (DSR 0 0 0
0 0 Item 36(I)(a) Page-132) 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
13 28.55 Providing and laying in situ M-20 cement concrete of 6880.15 Cum. 196428.28
0 0 trap metal in solid/deck slab/T-Beams &slab/Box girder 0 0 0
0 0 and balanced cantilever, including plywood/steel 0 0 0
0 0 formwork, steel centering, compaction by vibrating, 0 0 0
0 0 roughning the surface if special finish is to be provided, 0 0 0
curing Using Concrete Mixer Span length less than
0 0 0 0 0
30mtr.in moderate condition etc complete.( excluding
0 0 cost of reinforcement newly laid concrete shall be 0 0 0
0 0 covered by gunny bags, plastic, tarpaulin etc 0 0 0
0 0 complete.) Wooden centering/formwork will not be 0 0 0
0 0 allowed.(Spec.Br-38 Page- 135 MoRT&H Sect. 0 0 0
0 0 1500,1600,1700) ( DSR Item-46(I)(a) Page-135) 0 0 0
0 0 0 0 0
16
Part VIII Const of new C.D. Page 3/3
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
14 12.59 Providing and laying in situ M-25 cement concrete of 464.36 Sqm 5846.29
0 0 trap/granite/quartzite/gniess metal for wearing course 8 0 0 0
0 0 cm thick including compacting, finishing, curing and 0 0 0
0 0 filling joints with bitumen complete.(Excluding 0 0 0
0 0 reinforcement ) (Spec. Br-47 P-140, MoRT&H-Sect, 0 0 0
2700) (DSR Item-54(c) Page-140)
0 0 0.00 0 0.00
0 0 0 0 0 0
15 3.63 Providing and cutting, bending, hooking, laying in 55939.15 M.T. 203059.11
0 0 position Mild/ H.Y.S.D./TMT bars for reinforcement as 0 0 0
0 0 per detailed drawing for work.(Spec. BR.-35 P-134, Br- 0 0 0
0 0 49 Page-143) (DSR Item-30 Page-128) 0.00 0 0
0 0 0 0.00 0 0
16 0.15 Providing and fabricating structural steel work in rolled 9462.19 M.T. 1419.33
0 0 sections like joist, channnels, angles, tees, etc. as per 0 0 0
0 0 detailed designs or as directed including cutting, 0 0 0
0 0 fabricating, hoisting,erecting, fixing in position making 0 0 0
0 0 reveted/bolted/welded connections with connecting 0 0 0
plates, braces etc. and including one coat of
0 0 0 0 0
anticorrsive paint and over it two coats of oil painting of
0 0 aproved quality and shade complete.(For Frame of MH 0 0 0
0 0 cover over drain slab/footpath.(Spec.Bd.C-2 P-275) 0 0 0
0 0 (DSR Part I, Item-1 Page-12) 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
17 6.00 Providing Precast M25 R.C.C. slab over the span of 9462.19 Cum. 56773.14
0 0 cross drainage work as per drawings including HYSD 0 0 0
0 0 bar reinforcement, conyeyance, fixing in C.M. !:3 and 0 0 0
0 0 curing, finishing etc complete.(Spec. CD.-12 P-166) 0 0 0
0 0 (DSR Item-10 Page-176) 0.00 0 0
0 0 0 0 0 0
18 517.71 Dewatering abutment in perinnial river or stream 364.81 Cum 188865.79
0 0 including diversion of stream, providing earthen bunds 0 0 0
0 0 cofferdam bunds etc. as may be necessary for 0 0 0
0 0 foundation and other parts of the work and bailing out 0 0 0
0 0 and/or pumping out water below the actual initial 0 0 0
natural water level during execution of all items of
0 0 0 0 0
construction as required (from start of that particular
0 0 component till completion of bridge) including all lead 0 0 0
0 0 and lift etc. complete. Note all items of construction i.e. 0 0 0
0 0 excavation, bedding, (soling & PCC) and concreting of 0 0 0
0 0 that structure up to natural water level..9Spec. BR-4 P- 0 0 0
0 0 104) (DSR Item 3(A)(iii)(a) Page-115) 0 0 0
0 0 0 0 0
0 0 0.00 0 0
0 0 0 0 0 0
19 32.94 Providing trap/granite/quartzite/gneiss rubble filling 650.54 Cum. 21428.79
0 0 behind the abutments, returns or wings. (including 0 0 0
0 0 initial lead for rubble 5 kms.) (Spec. BR.-57 Page-151) 0 0 0
0 0 (DSR, Item-45 Page-134) 0.00 0 0
0 0 0 0 0 0
Total Of Part VIII (Construction Of New C.D. Work) 1629238.26
#REF!
#REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
#REF!
#REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
#REF!
#REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
#REF! #REF!
20
Part X Miscelinious Items Page 1/2
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
1 5.00 Rising or lowering circular/rectangular manholes to the 800.4 No. 4002.00
0 0 required levels upto 50 cm including all materials 0.00 0 0
0 0 formworks etc. with 18 cm thick cement concrete M 15 0.00 0 0
0 0 cement concrete copping under frame and cover of 0.00 0 0
0 0 manholes including curing etc.complete as specified 0.00 0 0
and as directed.(Spec. Special, As directed) (Rate
0 0 0.00 0 0
Analysis)
0 0 0.00 0 0
0 0 0 0.00 0 0
2 2.00 Providing and fixing new C.I. Circular Manhole cover 21 6644 No. 13288.00
0 0 inches dia.& Weight of 151 Kg. Heavy duty with frame 0.00 0 0
0 0 etc. complete.(Spec. Special, As directed) (Rate 0.00 0 0
0 0 Analysis) 0 0.00 0 0
3 0 Providing and fixing C.I. Rectangular Manhole chamber 0.00 0 0.00
0 0 cover heavy duty with frame. (Spec. Special, As 0.00 0 0
0 0 directed) (Rate Analysis) 0.00 0 0
0 1.00 a) 600mmX900mm size(160Kg.) 7040 No. 7040.00
0 1.00 b) 600mmX600mm size(132Kg.) 5808 No. 5808.00
0 0 0 0 0 0
4 0.46 Providing second class Burnt Brick masonary with 4799.28 Cum. 2207.67
0 0 conventional/I.S. type bricks in C.M. 1:6 in 0 0 0
0 0 superstructure including stricking joints, racking out 0 0 0
0 0 joints and watering complete.(Spec. Bd. G-5 P-315) 0 0 0
0 0 (DSR Item-2 Page-21) 0 0 0
0 0 0 0 0 0
5 12.00 Providing cement plaster 25mm thick in two coats in 348.53 Sqm. 4182.36
0 0 cement martar 1:4 without neeru finish to concrete 0 0 0
0 0 /brick/stone surfaces in all positions including racking 0 0 0
0 0 out joints, scafolding and curing complete.(Spec.Bd.L-5 0 0 0
0 0 P-368) (DSR Item-5 Page-32) 0 0 0
0 0 0 0 0 0
6 0 Providing and laying in trenches approved Medium 0 0 0
0 0 type(Item a to d) Heavy type (Item e to g) Galvanized 0 0 0
0 0 iron pipe having embosed at every meter the ISI mark 0 0 0
0 0 and name of manufacturer, with screwed sockets, 0 0 0
0 0 joints, and necessary galvanized iron fittings such as 0 0 0
backnuts, elbows, bends, tees, reducers, enlargers,
0 0 0 0 0
pliugs,etc. including providing and applying two coats of
0 0 oil paints with one coat of primer and necessary 0 0 0
0 0 excavation and backfilling complete including removing 0 0 0
0 0 existing pipe if necessary & conveying & stacking in 0 0 0
0 0 PWD chowky or as directed (Spec.Bd.V-5 P-551) (DSR 0 0 0
0 0 Item-1 Page-89, ) 0 0 0
0 0 0 0 0
a 50.00 DSR -1(A)(a),P-83 a) 15mm dia out/dia 21.32mm & wt.1.27kg/m 209.98 Rmt 10499.00
b 50.00 DSR -1(A)(b),P-83 b) 20mm dia out/dia 26.9mm & wt.1.64kg/m 233.31 Rmt 11665.50
c 0.00 DSR -1(A)(c),P-83 c) 25mm dia out/dia 33.7mm & wt.2.52kg/m 329.82 Rmt 0.00
d 0.00 DSR -1(A)(e),P-83 d) 40mm dia out/dia 48.3mm & wt.3.73kg/m 398.75 Rmt 0.00
e 0.00 DSR -1(B)(f),P84 e) 50mm dia out/dia 60.3mm & wt.5.23kg/m 428.44 Rmt 0.00
f 0.00 DSR -1(B)(g),P-84 f) 80mm dia out/dia 88.9mm & wt.8.7kg/8 751.89 Rmt 0.00
g 0.00 DSR -1(B)(h),P-84 g) 100mm dia out/dia 114.3mm & wt.12.77kg/m 1083.83 Rmt 0.00
21
Part X Miscelinious Items Page 2/2
Sr. QTY. DESCRIPTION OF ITEMS RATE UNIT AMOUNT
7 249.00 Shifting of existing G.I. Connections to required location 305 No. 75945.00
0 0 as directed by Engineer in Charge. (Spec. Special, As 0 0 0
0 0 directed) (Rate Analysis) 0 0 0
0 0 0 0 0 0
8 0 Providing & Laying concrete pipes of I.S. NP.2 class of 0 0 0
0 0 required diameter in proper line, level and slope 0 0 0
0 0 including , necessary collars, testing, excavation 0 0 0
0 0 laying , fixing with collars in cement mortar 1:1 and 0 0 0
0 0 refilling the trench etc complete. (Spec.Bd V-41 P-573) 0 0 0
(DSR Item-45(a),(b),(c) Page-99)
0 0 0 0 0
a 5.00 a)150mm diameter 406,17 Rmt 5.00
b 5.00 b)225mm diameter 461.32 Rmt 2306.60
c 5.00 c)300mm diameter 516.46 Rmt 2582.30
0 0 0 0 0 0
9 0 Providing and laying cement concrete pipe of 450mm 0 0 0
0 0 diametere IS 458-1988 NP 3 Class in proper line level 0 0 0
0 0 & slope including fixing collars in cement mortar 1:2 0 0 0
0 0 etc. complete. (Spec.CD.7 P-162) ( Rate Analysid 0 0 0
0 0 based on DSR Item-8 Page-156+MSSIDC Ltd Rate 0 0 0
contract(Annexure A) Page-228
0 0 0 0 0
a 2.00 Rate Analysis a) 450mm dia pipe 2108 0 4216.00
b 2.00 Rate Analysis b) 600mm dia pipe 3129 Rmt 6258.00
c 2.00 Rate Analysis c) 900mm dia pipe 5721 Rmt 11442.00
0 0 0 0 0 0
10 10.00 Providing and laying salt glazed stone ware pipe 261.94 Rmt 2619.40
0 0 150mm diametere including fitting such as bends, tees, 0 0 0
0 0 single junctions, double junctions, laying, jointing 0 0 0
0 0 including excavation and refilling trenches complete. 0 0 0
0 0 (Spec. Bd.V39 Page-102) (DSR Item-34(b) Page-95) 0 0 0
0 0 0 0 0
0 0 0 0 0 0
11 4.00 Providing and constructing Brick masonary Inspection 5555.18 No. 22220.72
0 0 chember 90cm x 45 cm including 1:4:8 cement 0 0 0
0 0 concrete foundation, 1:2:4 cement concrete 0 0 0
0 0 channels,plastering from inside to the Brick Masonary, 0 0 0
0 0 and airtight R.C.C lid with frame fixed in cement 0 0 0
concrete, curing, testing etc. complete.(Spec. Bd. V-43
0 0 0 0 0
Page-574) (DSR Item-46(b) Page-100)
0 0 0 0 0
0 0 0 0 0 0
12 7803.39 Transportation of excess excavated/ dismantled/ scrap/ 147.92 Cum. 1154277.89
0 0.00 debries etc. upto lead of 2kms including loading 0 0 0.00
0 0 unloading conveying stacking etc complete.(Lead Chart 0 0 0
0 0 Page -208) 0 0 0
0 0 0 0 0 0
Total Of Part X (Miscelniou Items Of Work) 1340565.44
0
ULHASNAGAR MUNICIPAL CORPORATION
RECAPITULATION SHEET
Name of Work:- Construction of Cement Concrete Pavement Road from Radhaswami Satsang
to OT Ulhasnagar - 3.

0 0 0 0 0 0
0 PART TYPE OF WORK PAGE 0 ESTIMATED COST
0 Part-I :- Cost Of Site Prepaeation Work 1 Rs.138,244.30
0 Part-II :- Cost Of Side Drain Work 3 Rs.4,216,613.75
0 Part-III :- Cost Of Footpath Work 5 Rs.2,507,932.19
0 Part-IV :- Cost Of W.B.M. Work 7 Rs.2,581,293.47
0 Part-V :- Const. Of C.C. Pavement Work 9 Rs.10,605,211.88
### #REF! #REF! #REF! #REF!
0 Part-VII :-
Cost Of Widening Of Existing C.D. Work 13 Rs.307,718.77
0 Part-VIII :-
Cost Of Construction Of New C.D. Work 16 Rs.1,629,238.26
### #REF! #REF! #REF! #REF!
0 Part-X :-
Miscelinious Items 21 Rs.1,340,565.44
0 TOTAL COST OF WORK Rs.23,326,818.06
0 Add 15% For Probable Expenditure on Utilities of Water supply &
Rs.3,918,905.43
Under Ground Drainage
0 TOTAL Rs.30,044,941.66

Sign of Contractor Sign of City Engineer


ULHASNAGAR MUNICIPAL CORPORATION
PUBLIC WORKS DEPARTMENT
Table Showing Computation of Interest & Amount of Work Done As Per Monthly Progress of Work
Name of Construction of Cement Concrete Pavement Road from Radhaswami Satsang to OT
Work Ulhasnagar - 3.
A)Estimated cost Rs.
B)Less 10% Overheads Rs. 0
Assume Interest Per Annum @ 9%
C)Probable capital (Loan Amount) (A-B)Rs. 0
D)Total Interest Payable on LoanRs. 0
E)Total Cost Of Work(A+D) Rs. 0

Work Interest Per


Cost of Work done
Done At Month @ Total Cost of
Sr. No Remarks
End of Percenta Work Done Rs.
Month Amount Rs 0.75%
ge
Work
Oct-05
Started
1 Nov-05 5% 0 0 0
2 Dec-05 10% 0 0 0
3 Jan-06 20% 0 0 0
4 Feb-06 30% 0 0 0
5 Mar-06 40% 0 0 0
6 Apr-06 50% 0 0 0
7 May-06 60% 0 0 0
8 Jun-06 70% 0 0 0
9 Jul-06 80% 0 0 0
10 Aug-06 90% 0 0 0
11 Sep-06 100% 0 0 0
0 0.00 0
0 0.00 0
0 0.00 0
0 0.00 0
0 0.00 0
0 0.00 0
0 0.00 0
0 0.00 0
0 0.00 0
0 0.00 0
0 0.00 0
0 0.00 0
0 0.00 0
0 0.00 0
0 0.00 0
0 0.00 0
0 0.00 0
0 0.00 0
0 0.00 0
0 0.00 0
0 0 0
ULHASNAGAR MUNICIPAL CORPORATION
PUBLIC WORKS DEPARTMENT
Statement Showing Total Cost of Project After Repayment of Loan
Name of Construction of Cement Concrete Pavement Road from Radhaswami Satsang to OT
Work Ulhasnagar - 3.
A)Estimated cost Rs.
B)Total Cost of Work Rs.
C)Loan Period in Months 36
D)Rate of Interest per Annum 9%
E)Re Payment InstallementRs. 0
F)Total Project Cost Rs. 0
G)% Increase #DIV/0!
Installem Loan Amount
Month Installement Interest per month Total payment Balance
ent Rs.
1 Oct-06 0 0 0 0 0
2 Nov-06 0 0 0 0 0
3 Dec-06 0 0 0 0 0
4 Jan-07 0 0 0 0 0
5 Feb-07 0 0 0 0 0
6 Mar-07 0 0 0 0 0
7 Apr-07 0 0 0 0 0
8 May-07 0 0 0 0 0
9 Jun-07 0 0 0 0 0
10 Jul-07 0 0 0 0 0
11 Aug-07 0 0 0 0 0
12 Sep-07 0 0 0 0 0
13 Oct-07 0 0 0 0 0
14 Nov-07 0 0 0 0 0
15 Dec-07 0 0 0 0 0
16 Jan-08 0 0 0 0 0
17 Feb-08 0 0 0 0 0
18 Mar-08 0 0 0 0 0
19 Apr-08 0 0 0 0 0
20 May-08 0 0 0 0 0
21 Jun-08 0 0 0 0 0
22 Jul-08 0 0 0 0 0
23 Aug-08 0 0 0 0 0
24 Sep-08 0 0 0 0 0
25 Oct-08 0 0 0 0 0
26 Nov-08 0 0 0 0 0
27 Dec-08 0 0 0 0 0
28 Jan-09 0 0 0 0 0
29 Feb-09 0 0 0 0 0
30 Mar-09 0 0 0 0 0
31 Apr-09 0 0 0 0 0
32 May-09 0 0 0 0 0
33 Jun-09 0 0 0 0 0
34 Jul-09 0 0 0 0 0
35 Aug-09 0 0 0 0 0
36 Sep-09 0 0 0 0 0
Total Rs. 0 0 0