Anda di halaman 1dari 15

PERHITUNGAN DEBIT

DATA :
c= 1 koefisien pengurangan karena sistem golongan
NFR = 1.4 l/dt/ha (diasumsikan dari perbaikan uts Pa Asmawar)
et = 0.8
es = 0.885 diasumsik
ep = 0.9 an

saluran sekunder SB4


A= 733 ha
Q= 1449.435 l/dt (diasumsikan dari perbaikan uts Pa Asmawar)
1.449 m3/dt

saluran tersier SB3ki


A= 87 ha
Q= 152.250 l/dt
0.152 m3/dt

saluran tersier SB3ka


A= 95 ha
Q= 166.250 l/dt
0.166 m3/dt

saluran sekunder SB3


A= 915 ha
Q= 1809.322 l/dt
1.809 m3/dt

Resume Tabel Debit Rencana

Debit debit
No. Nama Jaringan Luas (ha) Rencana rencana
(l/dt) (m3/dt)
1 SB4 Sekunder 733 1449.435 1.449
2 SB3ki Tersier 87 152.250 0.152
3 SB3ka Tersier 95 166.250 0.166
4 SB3 Sekunder 915 1809.322 1.809
PERHITUNGAN DIMENSI SALURAN

1 dimensi saluran tersier SB3ki

DATA: w1
A= 87 ha f
Q= 152.250 l/dt 0.152 m3/dt
m= 1 1
n= 1 b =h m
k= 35 b= 1h
Jenis bahan lanau berpasir h= 1
Vmaks = 0.53 m/dt b

1.a Profil melintang


Dicoba
Q=AxV
Abutuh = Q/V = 0.287 m2

A=(b+mh)h
0.287 = 2 h^2
h = 0.379 m
b = 0.379 m m
b
Ditetapkan
b = 0.5 m
h = 0.5 m

Kontrol
As = 0.5 m2
Vs = 0.305 m/dt < 0.53 m/dt ok

1.b Profil memanjang


V = k x (R^(2/3)) x (I^(1/2))
R = A/P
P = b+2h(m2+1)^(0.5)
As = 0.5 m2
P = 1.914 m
R = 0.261 m
I = 0.000453 m
100I = 0.045331 m 4.533139 cm
1000I = 0.453314 m 45.33139 cm

2 dimensi saluran tersier SB3ka

DATA:
A= 95 ha
Q= 166.250 = 0.166 m3/dt
m= 1
n= 1 b =h
k= 35 b= 1h
Jenis bahan lanau berpasir h= 1
Vmaks = 0.53 m/dt

2.a Profil melintang


Dicoba
Q=AxV
Abutuh = Q/V = 0.314 m2

A=(b+mh)h
0.314 = 2 h^2
h = 0.396 m
b = 0.396 m m
b
Ditetapkan
b = 0.5 m
h = 0.5 m

Kontrol
As = 0.5 m2
Vmaks = 0.333 m/dt < 0.53 m/dt ok

2.b Profil memanjang


V = k x (R^(2/3)) x (I^(1/2))
R = A/P
P = b+2h(m2+1)^(0.5)
A = 0.5 m2
P = 1.91 m
R = 0.26 m
I = 0.000541 m
100I = 0.054051 m 5.40515 cm
1000I = 0.540515 m

3 dimensi saluran sekunder SB4

DATA:
A= 733 ha
Q= 1449.435 = 1.449 m3/dt
m= 1
n= 1.5 - 1.8 n= 1.75
k= 40 b= 1.75 h
Jenis bahan lanau aluvial h= 1
Vmaks = 0.61 m/dt

3.a Profil melintang


Dicoba
Q=AxV
Abutuh = Q/V = 2.376 m2

A=(b+mh)h
2.376123 = 2.750 h^2
h = 0.930 m
b = 1.627 m m
b
Ditetapkan
b = 2 m
h = 1 m

Kontrol
As = 3.000 m2
Vmaks = 0.483 m/dt < 0.61 m/dt ok

3.b Profil memanjang


V = k x (R^(2/3)) x (I^(1/2))
R = A/P
P = b+2h(m2+1)^(0.5)
As = 3 m2
P = 4.828 m
R = 0.621 m
I = 0.000275 m
100I = 0.027518 m 2.751783 cm
1000I = 0.275178 m

4 dimensi saluran sekunder SB3

DATA:
A= 915 ha
Q= 1809.322 = 1.809 m3/dt
m= 1.5
n= 1.8 - 2.3 n= 2.2
k= 40 b= 2.2 h
Jenis bahan lanau aluvial h= 1
Vmaks = 0.61 m/dt

4.a Profil melintang


Dicoba
Q=AxV
Abutuh = Q/V = 2.966 m2

A=(b+mh)h
2.966102 = 3.700 h^2
h = 0.895 m
b = 1.970 m m
b
Ditetapkan
b = 2 m
h = 1 m

Kontrol
As = 3.500 m2
Vmaks = 0.517 m/dt < 0.61 m/dt ok

4.b Profil memanjang


V = k x (R^(2/3)) x (I^(1/2))
R = A/P
P = b+2h(m2+1)^(0.5)
As = 3.5 m2
P = 5.606 m
R = 0.624 m
I = 0.000313 m
100I = 0.031297 m 3.129748 cm
1000I = 0.312975 m

Resume Tabel Dimensi Saluran

Debit
No. Nama Rencana b (m) h (m) I f (m) w1 w2
(m3/dt)
1 SB4 1.449 2 1 0.000275 0.5 5 1.5
2 sb3ki 0.152 0.5 0.5 0.000453 0.4 1 1
3 SB3ka 0.166 0.5 0.5 0.000541 0.4 1 1
4 SB3 1.809 2 1 0.000313 0.6 5 1.5
w2

0.5

0.5
h

0.5

0.5
h

h
1

2
PERHITUNGAN ALAT UKUR ROMIJIN

1 Perencanaan Hidrolis Saluran Tersier SB3ki


Q= 0.152 m3/dt
kecepatan = 0.53 m/dt
Lebar meja bc = 0.5 m standar

Q= 1.756 * bc * (h1^1.5)
h1= 0.311 m 310.9629
H1max= 0.33 m dari tabel 4.13
L= H1max = 0.33 m
R = 0.2 L = 0.066 m 66

2 Perencanaan Hidrolis Saluran Tersier SB3ka


Q= 0.166 m3/dt
kecepatan = 0.53 m/dt
Lebar meja bc = 0.5 m standar

Q= 1.756 * bc * (h1^1.5)
h1= 0.330 m
H1max= 0.5 m dari tabel 4.13
L= H1max = 0.5 m
R = 0.2 L = 0.1 m

o
DIMENSI PINTU SKOT BALOK

saluran sekunder SB4


Q= 1.449 m3/det
Q= (2/3) * Cd * Cv * (2*g/3)^0.5 * b * h1^1.5
Cd = 1
Cv = 1
b= 2m standar
h1 = Err:509 m Err:509
Hmax = Err:509 m

diambil balok
PERENCANAAN DIMENSI GORONG-GORONG

DATA: Q= 0.166 m3/dt SB3ka


L= 5m
V= 0.333 m/dt

Diambil : Va = 1.5 m/dt


A= 0.111 m2

Pipa bulat R = 0.1878756 m


D= 0.3757512 m
diambil D= 0.5 m

kontrol A= 0.19625 m2
Va = 0.8471338 m/dt < 1.5 m/dt ok

type B em= 0.55


em= 1.1

a. kehilangan energi akibar pemasukan


D H= 0.007424381 m
b. kehilangan energi akibat kehilangan
D H= 0.014848761 m
c. kehilangan energi akibat gesekan
k= 70
c= 52.97566726
D H= 0.006805354
d. kehilangan energi total
D H= 0.03 m

Anda mungkin juga menyukai