JOB SAFETY ANALYSIS

Facility / Site: TATAOUINE Location within Site: TATAOUINE Permit No: Permit Type: Date:

Task Description: maintenance et entretien du camp facility


REQUIRED REFERENCES JSA REVIEW
Have the relevant Procedures, Standards,
Guidelines, or Safe Work Practices been Yes N/A Pending confirmation by the Task Leader of site conditions, I agree that the attached JSA identifies the
reviewed? significant Task Steps, Hazards, and Controls.

JSA REVIEWER (Supervisor or Designate):


RISK ASSESSMENT
Must existing Procedures or Work Practices be
Yes No Name / Signature: RAOUANE AMINE Company: SOCOBAT
modified to perform this work?
After mitigation, are there any hazards that WORK SITE VERIFICATION
continue to present a potentially significant risk? Yes No
(Scenario-Based Risk Assessment required)
The Work Team has assessed the worksite conditions and confirms:
The JSA addresses the applicable hazards and necessary controls.
PPE REQUIRED DURING THIS TASK The Team has the appropriate resources (people and equipment) to do the job safely.
Others that could be affected by the work have been informed.
HARD HAT SAFETY GLASSES
TASK LEADER:
SAFETY SHOES / FACE SHIELD
BOOTS GOGGLES
Name / Signature: Company:
FALL PROTECTION
FALL RESTRAINT COMPLETE THE SECTION BELOW IF THIS JSA IS NOT PART OF A PERMIT PACK
GLOVES:
COTTON Work Team Declaration:
LEATHER I acknowledge that I have reviewed the attached JSA, I understand my roles
IMPACT PROTECTION and responsibilities, and I will comply with the instructions for this task.
OTHER (specify): Name (print): Name (print):
Dust mask
Work clothes

OTHER PPE (specify): High Vis Jacket


[Tapez ici]

TASK STEPS POTENTIAL HAZARDS HAZARDS CONTROLS HAZARD PORT


MITIGATION STATES
(Number) (What could go wrong?) (How can harm be prevented?)

Slips trips and fall Check The Work Area to avoid Slips Eni ERP
1. Electrical work: Trips Fall.
Approach the equipment Torsion /back injury /hernia First aider in the site
(electric, hand tool, cable Two person at least to carry the heavy
Air conditioning unit) to work Hand injury loads First aid kit available
spot (manual handling)
PPE

- Ensure work area is clear of Eni ERP


other workers.
- User shall wear a hard hat, eye First aider in the site
protection, and ear plugs.
- Use dust-free power tools in First aid kit available
good condition, and
- have dust masks available for
workers who might
- Falling/Flying Debris
- want to use one in addition to
- Harmful Dust (Silica)
the other hazard
- Tool Malfunction
- Controls.
- Electric Shock
2. Work of Piercing - Plug into a protected outlet.
- Loss of Control Over Tool
- Make sure that cords are not
- Vibratory Fatigue
lying in water.
- Excessive Noise
- The drill operator should use
- Looseness Perforator bit
any auxiliary Handles that are
on the drill to maintain control.
- The drill operator should make
sure that he sets his feet
properly before beginning to
drill or chip.
[Tapez ici]

1. Connected the electrical Electric failure, electric shocks Use all PPE Eni ERP
cable with Air conditioning
unit Injuries wounds Good supervision First aider in the site

Fire and burns First aid kit First aid kit available

Only qualified personal to be onsite

Warning tapes to be installed to avoid


unauthorized personals entry

Ensure earthing is grounded and fire


extinguishers on place

2. Commissioning/ Energizing Equipment/ Asset damage Work shall be carried as per PTW Eni ERP
the installed Air conditioning procedure
unit Electric shock/ Electrocution/ Fire First aider in the site
Strictly follow electrical procedure
Hazardous area First aid kit available
Follow Manufacturer instruction.
Incompetent person.
Deploy qualified and competent
electrical person.

Slips, Trips Eni ERP


Good Housekeeping and keep all area First aider in the site
3. End Job and Housekeeping Back injury
free from hazard
First aid kit available

Position Date Signed

Prepared By Site supervisor

Checked By RAOUANE AMINE Area HSSE Supervisor

Approved By