DAFTAR HARGA SATUAN BAHAN
Provinsi DKI JAKARTA
PERIODE JANUARI 2014
BIAYA SEWA
No. U R A I A N SATUAN
( Rp.)
1 2 3 4
1. MESIN GILING HARI 400,000.00
2. PONTON PANCANG HARI 1,750,000.00
3. PERALATAN PANCANG HARI 475,000.00
4. C RAN E HARI 1,600,000.00
5. JACK SNIPER HARI 225,000.00
6. M E S I N LAS HARI 350,000.00
7. BOR BETON HARI 150,000.00
8. BOR BETON MATA INTAN HARI 275,000.00
9. VIBRO COMPACTOR HARI 1,100,000.00
10. EXAVATOR HARI 1,500,000.00
11. BULDOZER HARI 1,400,000.00
12. S TAM PE R HARI 150,000.00
13. THEODOLITH HARI 75,000.00
14. WATERPASS HARI 45,000.00
15. COMPRESSOR HARI 550,000.00
16. PERANCAH KERJA HARI 275,000.00
17. GRADER HARI 1,400,000.00
DAFTAR ANALISIS HARGA SATUAN PEKERJAAN ( AHSP)
SNI .2014 DPU BIDANG CIPTA KARYA
A. PEKERJAAN PERSIAPAN
A.2.2.1.4
1 Pengukuran & Pemasangan Bouwplank
1 m' Pekerja L01 Oh 0.100 Rp 102,920 Rp 10,292.00
Tukang Kayu L02 Oh 0.100 Rp 121,230 Rp 12,123.00
Kepala Tukang L03 Oh 0.010 Rp 139,574 Rp 1,395.74
Mandor L04 Oh 0.005 Rp 157,901 Rp 789.51
kayu 5/7 kls III btg 0.012 Rp 30,000 Rp 360.00
Paku biasa 5-7 cm kg 0.020 Rp 16,500 Rp 330.00
Papan kayu 3/20`klas III m3 0.007 Rp 5,000,000 Rp 35,000.00
Jumlah harga Rp 60,290.25
Profit +overhead 10% Rp 6,029.02
Total HSP Rp 66,319.27
Pembulatan Rp 66,320.00
B PEKERJAAN GALIAN DAN URUGAN
1 A.2.3.1.2
Mengali 1 m3 tanah biasa sedalam 2 meter
m3 Pekerja L01 Oh 0.900 Rp 102,920 Rp 92,628.00
Mandor L04 Oh 0.045 Rp 157,901 Rp 7,105.55
2 A.4.1.1.1.
Membuat lantai kerja 1 m3 beton mutu f'c = 7.4 Mpa (K-100),
M3 Pekerja L.01 Oh 1.650 102,920 Rp 169,818.00
Tukang batu L.02 Oh 0.275 121,230 Rp 33,338.25
Kepala Tukang L.03 Oh 0.028 139,574 Rp 3,908.07
Mandor L.04 Oh 0.083 157,901 Rp 13,105.78
Portland Semen kg 247 1,304 Rp 322,013.90
Pasir Beton M3 0.869 277,385 Rp 241,047.57
Kerikil Beton (mak 30mm) M3 0.999 264,120 Rp 263,855.88
Air Liter 215 100 Rp 21,500.00
Jumlah harga Rp 1,068,587.45
Profit +overhead 10% Rp 106,858.75
Total HSP Rp 1,175,446.20
Pembulatan Rp 1,175,450.00
3 A.4.1.1.35.
Membuat 1 m' kolom praktis beton bertulang (11x11) cm
1m ' Pekerja L.01 Oh 0.180 102,920 Rp 18,525.60
Tukang batu L.02 Oh 0.020 121,230 Rp 2,424.60
Tukang kayu L.02 Oh 0.020 139,574 Rp 2,791.48
Tukang besi L.02 Oh 0.020 157,901 Rp 3,158.02
Kepala Tukang L.03 Oh 0.006 5,500,000 Rp 33,000.00
Mandor L.04 Oh 0.009 17,300 Rp 155.70
kayu kelas III m3 0.002 1,304 Rp 2.61
Paku 5cm-12cm kg 0.010 17,300 Rp 173.00
minyak bekisting liter 1.200 24,000 Rp 28,800.00
besi beton polos kg 3.000 12,027 Rp 36,080.01
kawat beton kg 0.450 20,000 Rp 9,000.00
Semen portland kg 4.000 1,304 Rp 5,214.80
Pasir Beton m3 0.006 277,385 Rp 1,664.31
Kerikil m3 0.009 264,120 Rp 2,377.08
Jumlah harga Rp 143,367.21
Profit +overhead 10% Rp 14,336.72
Total HSP Rp 157,703.93
Pembulatan Rp 157,700.00
E PEKERJAAN ARSITEKTUR
1 PEKERJAAN DINDING PLESTER / ACI
a A.4.4.1.10
Pemasang 1 m2 dinding bata merah tebal 1/2 bata campuran 1 sp: 5 pp
1 m2 Pekerja L.01 Oh 0.300 102,920 Rp 30,876.00
Tukang batu L.02 Oh 0.100 121,230 Rp 12,123.00
Kepala Tukang L.03 Oh 0.010 139,574 Rp 1,395.74
Mandor L.04 Oh 0.015 157,901 Rp 2,368.52
Bata merah m 3
70.000 611 Rp 42,793.10
Semen portland kg 9.680 1,304 Rp 12,619.82
Pasir pasang m 3
0.045 282,536 Rp 12,714.12
Jumlah harga Rp 114,890.29
Profit +overhead 10% Rp 11,489.03
Total HSP Rp 126,379.32
Pembulatan Rp 126,380.00
b A.4.4.2.5
Pemasangan 1 m2 plesteran 1 SP: 5PP, tebal 15 mm
1 m2 Pekerja L.01 Oh 0.300 102,920 Rp 30,876.00
Tukang batu L.02 Oh 0.150 121,230 Rp 18,184.50
Kepala Tukang L.03 Oh 0.015 139,574 Rp 2,093.61
Mandor L.04 Oh 0.015 157,901 Rp 2,368.52
Semen portland (SP) kg 5.184 1,304 Rp 6,758.38
Pasir pasang (PP) m 3
0.026 282,536 Rp 7,345.94
Jumlah harga Rp 67,626.94
Profit +overhead 10% Rp 6,762.69
Total HSP Rp 74,389.64
Pembulatan Rp 74,390.00
c A.4.4.2.27.
Pemasangan 1 m2 acian
1 m2 Pekerja L.01 Oh 0.200 102,920 Rp 20,584.00
Tukang batu L.02 Oh 0.100 121,230 Rp 12,123.00
Kepala Tukang L.03 Oh 0.010 139,574 Rp 1,395.74
Mandor L.04 Oh 0.010 157,901 Rp 1,579.01
Semen portland kg 3.250 1,304 Rp 4,237.03
Jumlah harga Rp 39,918.78
Profit +overhead 10% Rp 3,991.88
Total HSP Rp 43,910.65
Pembulatan Rp 43,910.00
d A.4.4.1.23
Asumsi Pemasangan 1 m2 glass block ukuran 20x20 cm
1 m2 Pekerja L.01 Oh 0.300 102,920 Rp 30,876.00
Tukang batu L.02 Oh 0.100 121,230 Rp 12,123.00
Kepala Tukang L.03 Oh 0.010 139,574 Rp 1,395.74
Mandor L.04 Oh 0.015 157,901 Rp 2,368.52
glass block bh 25.000 20,000 Rp 500,000.00
Semen portland (SP) kg 11.000 1,304
Jumlah harga Rp 546,763.26
Profit +overhead 10% Rp 54,676.33
Total HSP Rp 601,439.58
Pembulatan Rp 601,440.00
2 PEKERJAAN DINDING
a A.4.4.3.54.
Pemasangan 1 m2 dinding keramik ukuran (30x60) cm
1 m2 Pekerja L.01 Oh 0.900 102,920 Rp 92,628.00
Tukang batu L.02 Oh 0.450 121,230 Rp 54,553.50
Kepala Tukang L.03 Oh 0.045 139,574 Rp 6,280.83
Mandor L.04 Oh 0.045 157,901 Rp 7,105.55
keramik dinding Bh 11.550 28,333 Rp 327,250.00
Portland cement kg 9.300 1,304 Rp 12,124.41
Pasir pasang m3 0.018 282,536 Rp 5,085.65
Semen warna kg 1.940 16,000 Rp 31,040.00
Jumlah harga Rp 536,067.93
Profit +overhead 10% Rp 53,606.79
Total HSP Rp 589,674.73
Pembulatan Rp 589,670.00
b A.4.4.3.57.
Pemasangan 1 m2 dinding Batu alam paras
1 m2 Pekerja L.01 Oh 0.700 102,920 Rp 72,044.00
Tukang batu L.02 Oh 0.350 121,230 Rp 42,430.50
Kepala Tukang L.03 Oh 0.035 139,574 Rp 4,885.09
Mandor L.04 Oh 0.035 157,901 Rp 5,526.54
Batu alam paras Bh 1.100 7,813 Rp 8,593.75
Portland cement kg 11.750 1,304 Rp 15,318.48
Pasir pasang m3 0.035 282,536 Rp 9,888.76
Jumlah harga Rp 158,687.11
Profit +overhead 10% Rp 15,868.71
Total HSP Rp 174,555.82
Pembulatan Rp 174,560.00
c A.4.4.2.20 Asumsi.
Pemasangan 1 m' Profil dinding bergaris 3cm + tebal acian ban banan t=2,5cm
1 m' Pekerja L.01 Oh 0.080 102,920 Rp 8,233.60
Tukang batu L.02 Oh 0.400 121,230 Rp 48,492.00
Kepala Tukang L.03 Oh 0.040 139,574 Rp 5,582.96
Mandor L.04 Oh 0.004 157,901 Rp 631.60
Portland cement kg 3.250 1,304 Rp 4,237.03
Pasir pasang m3 0.013 282,536 Rp 3,672.97
Jumlah harga Rp 70,850.16
Profit +overhead 10% Rp 7,085.02
Total HSP Rp 77,935.17
Pembulatan Rp 77,940.00
c A.4.2.1.11.
Pemasangan 1 m' kusen alluminium
1 m' Pekerja L.01 Oh 0.043 102,920 Rp 4,425.56
Tukang allumunium L.03 Oh 0.043 121,230 Rp 5,212.89
Kepala Tukang L.03 Oh 0.004 139,574 Rp 600.17
Mandor L.04 Oh 0.002 157,901 Rp 331.59
profil allumunium m' 1.100 97,000 Rp 106,700.00
skrup fixer bh 2.000 2,500 Rp 5,000.00
sealant tube 0.060 40,000 Rp 2,400.00
Jumlah harga Rp 124,670.21
Profit +overhead 10% Rp 12,467.02
Total HSP Rp 137,137.23
Pembulatan Rp 137,140.00
d A.4.6.2.17.
Pemasangan 1 m2 kaca tebal 5mm
1 m2 Pekerja L.01 Oh 0.015 102,920 Rp 1,543.80
Tukang khusus allu L.03 Oh 0.170 121,230 Rp 20,609.10
Kepala Tukang L.03 Oh 0.015 139,574 Rp 2,093.61
Mandor L.04 Oh 0.0008 157,901 Rp 126.32
Kaca tebal 5mm m2 1.100 155,000 Rp 170,500.00
sealant kg 0.050 19,608 Rp 980.42
Jumlah harga Rp 195,853.25
Profit +overhead 10% Rp 19,585.32
Total HSP Rp 215,438.57
Pembulatan Rp 215,440.00
e A.4.6.2.18.
Pemasangan 1 m2 kaca tebal 8mm
1m 2 Pekerja L.01 Oh 0.017 102,920 Rp 1,749.64
Tukang khusus allu L.03 Oh 0.170 121,230 Rp 20,609.10
Kepala Tukang L.03 Oh 0.017 139,574 Rp 2,372.76
Mandor L.04 Oh 0.0009 157,901 Rp 142.11
Kaca tebal 8mm m2 1.100 155,000 Rp 170,500.00
sealant kg 0.070 19,608 Rp 1,372.58
Jumlah harga Rp 196,746.19
Profit +overhead 10% Rp 19,674.62
Total HSP Rp 216,420.81
Pembulatan Rp 216,420.00
3 PEKERJAAN LANTAI
a A.4.4.3.5.
Pemasangan 1 m2 lantai keramik ukuran (30x30) cm
1 m2 Pekerja L.01 Oh 0.260 102,920 Rp 26,759.20
Tukang batu L.02 Oh 0.130 121,230 Rp 15,759.90
Kepala Tukang L.03 Oh 0.013 139,574 Rp 1,814.46
Mandor L.04 Oh 0.013 157,901 Rp 2,052.71
Lantai keramik Bh 11.870 8,750 Rp 103,862.50
Portland cement kg 10.000 1,304 Rp 13,037.00
Pasir pasang m 3
0.045 282,536 Rp 12,714.12
Semen warna kg 1.500 16,000 Rp 24,000.00
Jumlah harga Rp 199,999.90
Profit +overhead 10% Rp 19,999.99
Total HSP Rp 219,999.88
Pembulatan Rp 220,000.00
a A.4.4.3.13.
Pemasangan 1 m2 lantai granite ukuran (60x60) cm
1 m2 Pekerja L.01 Oh 0.240 102,920 Rp 24,700.80
Tukang batu L.02 Oh 0.120 121,230 Rp 14,547.60
Kepala Tukang L.03 Oh 0.012 139,574 Rp 1,674.89
Mandor L.04 Oh 0.012 157,901 Rp 1,894.81
Lantai granite Bh 6.500 61,250 Rp 398,125.00
Portland cement kg 8.190 1,304 Rp 10,677.30
Pasir pasang m 3
0.045 282,536 Rp 12,714.12
Semen warna kg 1.620 16,000 Rp 25,920.00
Jumlah harga Rp 490,254.52
Profit +overhead 10% Rp 49,025.45
Total HSP Rp 539,279.98
Pembulatan Rp 539,280.00
b A.4.4.3.24.
Pemasang 1 m¹ plint ubin granit ukuran(10x60 cm)
1 m' Pekerja L.01 Oh 0.240 102,920 Rp 24,700.80
Tukang batu L.02 Oh 0.120 121,230 Rp 14,547.60
Kepala Tukang L.03 Oh 0.012 139,574 Rp 1,674.89
Mandor L.04 Oh 0.012 157,901 Rp 1,894.81
Lantai granit Bh 6.500 61,250 Rp 398,125.00
Portland cement kg 8.190 1,304 Rp 10,677.30
Pasir pasang m3 0.045 282,536 Rp 12,714.12
Semen warna kg 1.620 16,000 Rp 25,920.00
Jumlah harga Rp 490,254.52
Profit +overhead 10% Rp 49,025.45
Total HSP Rp 539,279.98
Pembulatan Rp 539,280.00
c A.4.4.3.24.
Pemasang 1 m¹ plint ubin granit ukuran(10x60 cm)
1 m' Pekerja L.01 Oh 0.090 102,920 Rp 9,262.80
Tukang batu L.02 Oh 0.090 121,230 Rp 10,910.70
Kepala Tukang L.03 Oh 0.009 139,574 Rp 1,256.17
Mandor L.04 Oh 0.005 157,901 Rp 789.51
plint ubin granit Bh 1.700 23,000 Rp 39,100.00
Semen Portland kg 1.140 1,304 Rp 1,486.22
Pasir pasang m 3
0.003 282,536 Rp 847.61
Semen warna kg 0.100 16,000 Rp 1,600.00
Jumlah harga Rp 65,253.00
Profit +overhead 10% Rp 6,525.30
Total HSP Rp 71,778.30
Pembulatan Rp 71,780.00
d A.4.4.3.25.
Pemasang 1 m¹ plint ubin granit ukuran(10x30 cm)
1 m' Pekerja L.01 Oh 0.090 102,920 Rp 9,262.80
Tukang batu L.02 Oh 0.090 121,230 Rp 10,910.70
Kepala Tukang L.03 Oh 0.009 139,574 Rp 1,256.17
Mandor L.04 Oh 0.005 157,901 Rp 789.51
plint keramik Bh 3.540 17,000 Rp 60,180.00
Semen Portland kg 1.140 1,304 Rp 1,486.22
Pasir pasang m3
0.003 282,536 Rp 847.61
Semen warna kg 0.100 16,000 Rp 1,600.00
Jumlah harga Rp 86,333.00
Profit +overhead 10% Rp 8,633.30
Total HSP Rp 94,966.30
Pembulatan Rp 94,970.00
e ASUMSI
Pelapisan water proofing 1 m2
1 m2 Pekerja L.01 Oh 0.0500 102,920 Rp 5,146.00
Tukang L.03 Oh 0.0750 121,230 Rp 9,092.25
Kepala Tukang L.03 Oh 0.0075 139,574 Rp 1,046.81
Mandor L.04 Oh 0.0025 157,901 Rp 394.75
water proofing coating m2 1.0000 90,000 Rp 90,000.00
( ex.fosroc / sika/ setara) Rp -
Jumlah harga Rp 105,679.81
Profit +overhead 10% Rp 10,567.98
Total HSP Rp 116,247.79
Pembulatan Rp 116,250.00
4 PEKERJAAN PLAFON
a A.4.2.1.21.
Pemasangan 1 m2 Plafond rangka besi hollow
1 m2 Pekerja L.01 Oh 0.100 102,920 Rp 10,292.00
Tukang Kayu L.02 Oh 0.050 121,230 Rp 6,061.50
Kepala Tukang L.03 Oh 0.005 139,574 Rp 697.87
Mandor L.04 Oh 0.005 157,901 Rp 789.51
Gypsum board lbr 0.364 68,000 Rp 24,752.00
Hollow 40x40 btg 1.000 24,000 Rp 24,000.00
Hollow 20x40 btg 1.000 20,000 Rp 20,000.00
Paku skrup kg 0.110 25,000 Rp 2,750.00
Jumlah harga Rp 89,342.88
Profit +overhead 10% Rp 8,934.29
Total HSP Rp 98,277.16
Pembulatan Rp 98,280.00
b A.4.5.1.9.
Pemasangan 1 m' list shadowline 10x10mm
1 m' Pekerja L.01 Oh 0.050 102,920 Rp 5,146.00
Tukang Kayu L.02 Oh 0.050 121,230 Rp 6,061.50
Kepala Tukang L.03 Oh 0.005 139,574 Rp 697.87
Mandor L.04 Oh 0.003 157,901 Rp 473.70
list shadow line 10x10mm m 1.050 10,000 Rp 10,500.00
skrup kg 0.010 25,000 Rp 250.00
Jumlah harga Rp 23,129.07
Profit +overhead 10% Rp 2,312.91
Total HSP Rp 25,441.98
Pembulatan Rp 25,440.00
c A.4.6.1.22.
Pemasangan 1 m' list plank kalsiboard
1 m' Pekerja L.01 Oh 0.100 102,920 Rp 10,292.00
Tukang Kayu L.02 Oh 0.200 121,230 Rp 24,246.00
Kepala Tukang L.03 Oh 0.020 139,574 Rp 2,791.48
Mandor L.04 Oh 0.005 157,901 Rp 789.51
papan kalsiboard/GRC m 1.050 20,000 Rp 21,000.00
skrup kg 0.050 25,000 Rp 1,250.00
Jumlah harga Rp 60,368.99
Profit +overhead 10% Rp 6,036.90
Total HSP Rp 66,405.88
Pembulatan Rp 66,410.00
5 PEKERJAAN PENGECATAN
a A.4.7.1.10.
Pengecatan 1 m2 tembok baru
1 m2 Pekerja L.01 Oh 0.020 102,920 Rp 2,058.40
Tukang khusus allu L.03 Oh 0.063 121,230 Rp 7,637.49
Kepala Tukang L.03 Oh 0.0063 139,574 Rp 879.32
Mandor L.04 Oh 0.0030 157,901 Rp 473.70
plamuur kg 0.100 10,600 Rp 1,060.00
cat dasar kg 0.100 20,568 Rp 2,056.80
cat penutup kg 0.260 39,668 Rp 10,313.70
Jumlah harga Rp 24,479.41
Profit +overhead 10% Rp 2,447.94
Total HSP Rp 26,927.36
Pembulatan Rp 26,930.00
b A.4.7.1.10.
Pengecatan 1 m2 dinding luar
1 m2 Pekerja L.01 Oh 0.020 102,920 Rp 2,058.40
Tukang khusus allu L.03 Oh 0.063 121,230 Rp 7,637.49
Kepala Tukang L.03 Oh
0.0063 139,574 Rp 879.32
Mandor L.04 Oh
0.0030 157,901 Rp 473.70
plamuur kg 0.100 10,600 Rp 1,060.00
cat dasar kg 0.100 20,568 Rp 2,056.80
cat penutup kg 0.260 39,668 Rp 10,313.70
Jumlah harga Rp 24,479.41
Profit +overhead 10% Rp 2,447.94
Total HSP Rp 26,927.36
Pembulatan Rp 26,930.00
6 PEKERJAAN KUSEN, PINTU & JENDELA
a A.4.2.1.11.
Pemasangan 1 m' kusen alluminium
1 m' Pekerja L.01 Oh 0.043 102,920 Rp 4,425.56
Tukang allumunium L.03 Oh 0.043 121,230 Rp 5,212.89
Kepala Tukang L.03 Oh 0.004 139,574 Rp 600.17
Mandor L.04 Oh 0.002 157,901 Rp 331.59
profil allumunium m' 1.100 97,000 Rp 106,700.00
skrup fixer bh 2.000 2,500 Rp 5,000.00
sealant tube 0.060 40,000 Rp 2,400.00
Jumlah harga Rp 124,670.21
Profit +overhead 10% Rp 12,467.02
Total HSP Rp 137,137.23
Pembulatan Rp 137,140.00
b A.4.6.1.5.
Pembuatan & pemasangan 1 m2 daun pintu panel, kayu kelas I & II
1 m2 Pekerja L.01 Oh 1.000 102,920 Rp 102,920.00
Tukang kayu L.03 Oh 3.000 121,230 Rp 363,690.00
Kepala Tukang L.03 Oh 0.300 139,574 Rp 41,872.20
Mandor L.04 Oh 0.050 157,901 Rp 7,895.05
Papan kayu m3 0.040 5,000,000 Rp 200,000.00
lem kayu kg 0.500 30,285 Rp 15,142.50
Jumlah harga Rp 731,519.75
Profit +overhead 10% Rp 73,151.98
Total HSP Rp 804,671.73
Pembulatan Rp 804,670.00
c A.4.7.1.7.
Pelaburan 1 m2 bidang kayu dengan politur
1 m2 Pekerja L.01 Oh 0.040 102,920 Rp 4,116.80
Tukang kayu L.03 Oh 0.060 121,230 Rp 7,273.80
Kepala Tukang L.03 Oh 0.016 139,574 Rp 2,233.18
Mandor L.04 Oh 0.003 157,901 Rp 473.70
Politur / melamine Liter 0.150 54,000 Rp 8,100.00
Politur / melamine jadi liter 0.372 75,000 Rp 27,900.00
amplas lbr 2.000 30,285 Rp 60,570.00
Jumlah harga Rp 110,667.49
Profit +overhead 10% Rp 11,066.75
Total HSP Rp 121,734.24
Pembulatan Rp 121,730.00
d Asumsi
pemasangan 1 bh daun pintu PVC
1 bh Pekerja L.01 Oh 0.043 102,920 Rp 4,425.56
Tukang khusus allu L.03 Oh 0.043 121,230 Rp 5,212.89
Kepala Tukang L.03 Oh 0.004 139,574 Rp 600.17
Mandor L.04 Oh 0.002 157,901 Rp 331.59
pintu pvc unit 1.000 1,250,000 Rp 1,250,000.00
Sekrup fisher bh 5.000 2,500 Rp 12,500.00
Jumlah harga Rp 1,273,070.21
Profit +overhead 10% Rp 127,307.02
Total HSP Rp 1,400,377.23
Pembulatan Rp 1,400,380.00
e Asumsi
pemasangan 1 bh daun pintu PVC
1 bh Pekerja L.01 Oh 0.043 102,920 Rp 4,425.56
Tukang khusus allu L.03 Oh 0.043 121,230 Rp 5,212.89
Kepala Tukang L.03 Oh 0.004 139,574 Rp 600.17
Mandor L.04 Oh 0.002 157,901 Rp 331.59
pintu pvc unit 1.000 1,250,000 Rp 1,250,000.00
Sekrup fisher bh 5.000 2,500 Rp 12,500.00
Jumlah harga Rp 1,273,070.21
Profit +overhead 10% Rp 127,307.02
Total HSP Rp 1,400,377.23
Pembulatan Rp 1,400,380.00
f A.4.6.2.5.
Pemasangan 1 buah engsel pintu
1bh Pekerja L.01 Oh 0.015 102,920 Rp 1,543.80
Tukang L.03 Oh 0.150 121,230 Rp 18,184.50
Kepala Tukang L.03 Oh 0.015 139,574 Rp 2,093.61
Mandor L.04 Oh 0.0008 157,901 Rp 126.32
Engsel pintu bh 1.000 18,000 Rp 18,000.00
Rp -
Jumlah harga Rp 39,948.23
Profit +overhead 10% Rp 3,994.82
Total HSP Rp 43,943.05
Pembulatan Rp 43,940.00
g A.4.6.2.6.
Pemasangan 1 buah engsel jendela
1 bh Pekerja L.01 Oh 0.010 102,920 Rp 1,029.20
Tukang L.03 Oh 0.100 121,230 Rp 12,123.00
Kepala Tukang L.03 Oh 0.010 139,574 Rp 1,395.74
Mandor L.04 Oh 0.0005 157,901 Rp 78.95
Engsel jendela bh 1.000 32,500 Rp 32,500.00
Rp -
Jumlah harga Rp 47,126.89
Profit +overhead 10% Rp 4,712.69
Total HSP Rp 51,839.58
Pembulatan Rp 51,840.00
h A.4.6.2.9.
Pemasangan 1 buah kait angin
1 bh Pekerja L.01 Oh 0.015 102,920 Rp 1,543.80
Tukang L.03 Oh 0.150 121,230 Rp 18,184.50
Kepala Tukang L.03 Oh 0.015 139,574 Rp 2,093.61
Mandor L.04 Oh 0.0008 157,901 Rp 126.32
kait angin bh 1.000 12,500 Rp 12,500.00
Rp -
Jumlah harga Rp 34,448.23
Profit +overhead 10% Rp 3,444.82
Total HSP Rp 37,893.05
Pembulatan Rp 37,890.00
i A.4.6.2.4.
Pemasangan 1 buah kunci silinder
1 bh Pekerja L.01 Oh 0.005 102,920 Rp 514.60
Tukang L.03 Oh 0.500 121,230 Rp 60,615.00
Kepala Tukang L.03 Oh 0.050 139,574 Rp 6,978.70
Mandor L.04 Oh 0.0030 157,901 Rp 473.70
kunci silinder bh 1.000 130,000 Rp 130,000.00
Rp -
Jumlah harga Rp 198,582.00
Profit +overhead 10% Rp 19,858.20
Total HSP Rp 218,440.20
Pembulatan Rp 218,440.00
j A.4.6.2.11.
Pemasangan 1 buah kunci slot
1 bh Pekerja L.01 Oh 0.020 102,920 Rp 2,058.40
Tukang L.03 Oh 0.200 121,230 Rp 24,246.00
Kepala Tukang L.03 Oh 0.020 139,574 Rp 2,791.48
Mandor L.04 Oh 0.0010 157,901 Rp 157.90
kunci slot double bh 1.000 125,000 Rp 125,000.00
H PEKERJAAN ATAP
1 ASUMSI.
Pemasangan 1 M2 rangka atap baja ringan
1 m2 Pekerja L.01 Oh 0.247 102,920 Rp 25,421.24
Tukang kayu L.02 Oh 0.176 121,230 Rp 21,336.48
Kepala Tukang L.03 Oh 0.017 139,574 Rp 2,372.76
Mandor L.04 Oh 0.006 157,901 Rp 947.41
Main truss C-750 t=0,75 m' 2.800 18,150 Rp 50,820.00
Roof buttom/reng R33-0,45 m' 5.100 8,400 Rp 42,840.00
Self driiving screw ∅ 6x20mm bh 25.000 650 Rp 16,250.00
(trusss screw)
Self driiving screw ∅ 4x16mm bh 35.000 525 Rp 18,375.00
(bottum trusss screw)
Angle clip 50x50cm bh 1.000 1,750 Rp 1,750.00
Dinabolt ∅ 12x120mm bh 1.000 1,800 Rp 1,800.00
Jumlah harga Rp 181,912.88
Profit +overhead 10% Rp 18,191.29
Total HSP Rp 200,104.17
Pembulatan Rp 200,100.00
2 A.4.5.2.42.
Pemasangan 1 m2 alumunium foil
1 m2 Pekerja L.01 Oh 0.150 102,920 Rp 15,438.00
Tukang batu L.02 Oh 0.050 121,230 Rp 6,061.50
Kepala Tukang L.03 Oh 0.005 139,574 Rp 697.87
Mandor L.04 Oh 0.008 157,901 Rp 1,263.21
Alumunium foil m2 1.050 4,967 Rp 5,215.00
Jumlah harga Rp 28,675.58
Profit +overhead 10% Rp 2,867.56
Total HSP Rp 31,543.14
Pembulatan Rp 31,540.00
3 A.4.5.2.3.
Pemasangan 1 m2 genteng keramik / pelentong besar super
1 m2 Pekerja L.01 Oh 0.150 102,920 Rp 15,438.00
Tukang batu L.02 Oh 0.075 121,230 Rp 9,092.25
Kepala Tukang L.03 Oh 0.008 139,574 Rp 1,116.59
Mandor L.04 Oh 0.008 157,901 Rp 1,263.21
genteng beton bh 12.000 10,700 Rp 128,400.00
Jumlah harga Rp 155,310.05
Profit +overhead 10% Rp 15,531.01
Total HSP Rp 170,841.06
Pembulatan Rp 170,840.00
4 A.4.5.2.4.
Pemasangan 1 m' bubungan genteng pelentong
1 m' Pekerja L.01 Oh 0.400 102,920 Rp 41,168.00
Tukang batu L.02 Oh 0.200 121,230 Rp 24,246.00
Kepala Tukang L.03 Oh 0.020 139,574 Rp 2,791.48
Mandor L.04 Oh 0.002 157,901 Rp 315.80
genteng bubung bh 5.000 19,400 Rp 97,000.00
Portland cement kg 8.000 1,304 Rp 10,429.60
Pasir pasang m3 0.032 282,536 Rp 9,041.15
Jumlah harga Rp 184,992.03
Profit +overhead 10% Rp 18,499.20
Total HSP Rp 203,491.24
Pembulatan Rp 203,490.00
5 ASUMSI.
Pemasangan 1 buah toren air
1 bh Pekerja L.01 Oh 0.400 102,920 Rp 41,168.00
Tukang batu L.02 Oh 0.200 121,230 Rp 24,246.00
Kepala Tukang L.03 Oh 0.020 139,574 Rp 2,791.48
Mandor L.04 Oh 0.002 157,901 Rp 315.80
toren ex penguin unit 1.000 950,000 Rp 950,000.00
Jumlah harga Rp 1,018,521.28
Profit +overhead 10% Rp 101,852.13
Total HSP Rp 1,120,373.41
Pembulatan Rp 1,120,370.00
REKAPITULASI RENCANA ANGGARAN BIAYA
BERDASARKAN SNI / DPU BIDANG CIPTA KARYA
PERUMAHAN GADING RESIDENCE
TYPE 85 KAV. 9X10 M
JL.Hankam, Puspitek, Serpong, Tangerang Selatan
Harga Satuan
No Uraian Pekerjaan Sat Volume
Rp.
A. PEKERJAAN PERSIAPAN
1 Bouwplank & pengukuran m1 45.00 66,320.00
Jumlah I
B. PEKERJAAN GALIAN DAN URUGAN
1 Galian Pondasi Foot plat M3 3.69 109,710.00
2 Galian Sloof M3 2.10 109,710.00
3 Urugan Tanah Kembali M3 1.40 62,270.00
4 Pemadatan Tanah + Urugan Pasir t = 10 cm M3 8.63 465,940.00
Jumlah II
C. PEKERJAAN PONDASI
1 Pondasi Beton setempat / foot plat M3 2.29 5,367,770.00
2 Sloof M3 2.10 5,367,770.00
3 Pondasi Bata kali 1 SP: 5 PP m' 7.90 902,680.00
Jumlah III
D. PEKERJAAN KONSTRUKSI BETON
LANTAI 1
1 Lantai kerja 1:3: 5 tebal 5 cm ( Pondasi Plat Setempat ) M3 0.30 1,175,450.00
2 Konstruksi Kolom M3 2.28 5,367,770.00
3 Konstruksi balok M3 2.35 5,367,770.00
4 Konstruksi Plat M3 4.24 5,367,770.00
5 Konstruksi Tangga M3 1.84 5,367,770.00
6 Konstruksi Canopy M3 0.49 5,367,770.00
7 Kolom/balok Praktis M3 0.91 143,000.00
LANTAI 2
1 Konstruksi Kolom M3 0.82 5,367,770.00
2 Konstruksi Ring Balk M3 1.09 5,367,770.00
3 Konstruksi Plat ( Dudukan Toren ) M3 0.24 5,367,770.00
4 Konstruksi Canopy M3 0.04 5,367,770.00
5 Kolom/balok Praktis M3 0.62 143,000.00
Jumlah IV
E PEKERJAAN ARSITEKTUR
E.1 PEKERJAAN DINDING PLESTER/ACI
LANTAI I
1 Pas. Dinding bata tebal 1/2 bata M2 159.00 126,380
2 Plester Dinding M2 320.50 74,390
3 Acian Dinding M2 320.50 43,910
LANTAI II
1 Pas. Dinding bata tebal 1/2 bata M2 154.00 126,380
2 Plester Dinding M2 273.50 74,390
3 Acian Dinding M2 273.50 43,910
4 Pek.GlassBlock M2 1.31 601,440
Jumlah V
E.2 PEKERJAAN DINDING
LANTAI I
Pasangan Dinding Keramik 30x60 ex.Roman + 10x30
1 M2 19.56 589,670
ex.Roman
2 Pasangan + Finish Batu Alam M2 7.20 174,560
Pek. Profil dinding bergaris 3cm + tebal acian ban
3 M2 5.25 77,940
banan t=2,5cm
LANTAI II
Pasangan Dinding Keramik 30x60 ex.Roman + 10x30
1 M2 20.64 589,670
ex.Roman
2 Pek. Penebalan Plesteran/ Ban-banan t=2,5cm M2 9.10 77,940
3 Pek.Kaca Mati + Alumunium + Sealant M2 18.00 325,500
Jumlah VI
E.3 PEKERJAAN FINISH LANTAI
LANTAI I
Pasangan granite lantai utama + Keramik Tangga 60 x
1 M2 39.40 539,410
60 ex Roman
2 Pasangan keramik KM 30x30 ex.Roman M2 3.00 220,000
Pasangan keramik Teras Depan dan Belakang 30x30
3 M2 6.93 220,000
ex.Roman
4 Carport beton rabat M2 12.60 110,000
5 Lapisan Water Proofing Canopy Beton (Atap Lantai 1) M2 5.30 116,250
6 Plint Keramik uk. 10x60 cm m1 53.50 71,780
LANTAI II
Pasangan keramik lantai utama 60 x 60 ex Granit
1 M2 35.00 539,410
Roman
2 Pasangan keramik KM 30 x 30 ex Roman M2 4.00 220,000
3 Lapisan Water Proofing Plat Dak Toren M2 2.00 116,250.00
4 Plint Keramik uk. 10x60 cm m1 40.00 71,780
Jumlah VII
E.4 PEKERJAAN PLAFOND
LANTAI I
1 Pekerjaan Plafond ex.Jayaboard M2 34.00 98,280.00
2 Tali air shadowline 10x10mm m1 44.50 25,440.00
LANTAI II
1 Pekerjaan Plafond ex.Elephant M2 67.20 98,280.00
2 Tali air shadowline 10x10mm m1 101.00 25,440.00
3 Pekerjaan List Plank ex.kalsiboard 6/30 cm m1 18.00 66,410.00
Jumlah VIII
Jumlah X
F PEKERJAAN SANITAIR
LANTAI I
1 Kloset Duduk Ex.Toto Bh 1.00 3,173,110.00
2 Kran Air KM,Taman depan dan belakang ,ex.Toto Bh 3.00 254,050.00
3 Shower + Headset dinding ex.Toto Bh 1.00 1,093,680.00
4 Floor Drain Stainless Bh 1.00 165,370.00
5 Kran Kitchen Zink Bh 1.00 232,050.00
6 Washtafel Lengkap + Acc. Ex.Toto Set 1.00 3,208,820.00
7 Kitchen Zink 1 lobang Meiwa Unit 1.00 1,046,110.00
LANTAI II
1 Kloset Duduk ex.Toto Bh 1.00 3,173,110.00
2 Kran KM ex Toto Bh 1.00 254,050.00
3 Shower + Headset dinding ex.Toto Bh 1.00 1,093,680.00
4 Washtafel Lengkap + Acc. Ex.Toto Bh 1.00 3,208,820.00
5 Floor Drain Stainless Bh 1.00 165,370.00
6 Roof Drain Stainless BH 1.00 67,420.00
Jumlah XI
G INSTALASI LISTRIK & AIR
LANTAI I
1 Instalasi Air Bersih 1" Wavin AW M1 11.00 23,700.00
2 Instalasi Air Bekas 3" Wavin AW M1 8.00 84,700.00
3 Instalasi Air Kotor 4" Wavin AW M1 9.00 120,710.00
4 Bak kontrol Unit 1.00 785,670.00
5 Septicktank & Rembesan ( 1m x 1m x 1,5m ) Unit 1.00 2,755,000.00
7 Instalasi Titik Lampu Ttk 7.00 210,500.00
8 Instalasi Titik Taman Ttk 1.00 210,500.00
9 Saklar Single ex clipsal Bh 1.00 40,000.00
10 Saklar Double ex clipsal Bh 3.00 40,000.00
11 Stop Kontak ex clipsal Ttk 3.00 210,500.00
12 Box Panel Unit 1.00 550,000.00
13 MCB 10A Bh 1.00 115,000.00
14 Pemasangan Lampu Down Lite-PLC D4'' dan KM D3'' Ttk 7.00 180,000.00
15 Kabel Toevoer/ 3x4 mm M1 3.00 125,000.00
16 Arde Pertanahan Unit 1.00 100,000.00
LANTAI II
1 Instalasi Air Bersih 1" Wavin AW M1 10.00 23,700.00
2 Instalasi Air Bekas 3" Wavin AW M1 10.00 84,700.00
3 Instalasi Air Kotor 4" Wavin AW M1 10.00 120,710.00
4 Instalasi Titik Lampu Ttk 6.00 220,500.00
5 Saklar Single ex clipsal Bh 2.00 43,000.00
6 Saklar Double ex clipsal Bh 2.00 43,000.00
7 Stop Kontak ex clipsal Ttk 3.00 220,500.00
8 Box Panel Unit 1.00 575,000.00
9 MCB 10A Ttk 1.00 65,000.00
10 Pemasangan Lampu Down Lite-PLC D4'' dan KM D3'' Ttk 6.00 180,000.00
Jumlah XII
H PEKERJAAN ATAP
1 Pek. Rangka atap baja ringan ex.Taso/Tangguh m2 82.00 200,100.00
2 Alumunium Foil m2 82.00 31,540.00
Pek. Penutup atap genteng keramik SNI + Nok
3 m2 82.00 170,840.00
Genteng keramik
Jumlah XIII
I PEKERJAAN LAIN-LAIN
1 Pemasangan Toren 650 Liter TB 70 + Acc ex.Pinguin bh 1.00 1,120,370.00
Pekerjaan Sumur Pantek,pompa + Acc ex Jetpump
2 unit 1.00 4,150,000.00
Standart
Jumlah XIV
GRAND TOTAL
Jumlah
Rp.
2,984,400.00
2,984,400.00
404,336.21
230,391.00
87,146.87
4,021,062.20
4,742,936.27
12,270,722.22
11,272,317.00
7,131,172.00
30,674,211.22
357,042.94
12,238,515.60
12,604,275.45
22,737,873.72
9,876,696.80
2,632,354.41
129,729.60
4,400,068.42
5,862,893.10
1,288,264.80
214,710.80
88,133.76
72,430,559.40
20,094,420.00
23,841,995.00
14,073,155.00
19,462,520.00
20,345,665.00
12,009,385.00
787,886.40
110,615,026.40
11,533,945.20
1,256,832.00
409,185.00
12,170,788.80
709,254.00
5,859,000.00
31,939,005.00
21,252,754.00
660,000.00
1,523,500.00
1,386,000.00
616,125.00
3,840,230.00
18,879,350.00
880,000.00
232,500.00
2,871,200.00
52,141,659.00
3,341,520.00
1,132,080.00
6,604,416.00
2,569,440.00
1,195,380.00
14,842,836.00
4,648,118.00
2,784,562.00
915,620.00
3,581,690.00
2,558,350.00
1,809,696.00
145,422.00
16,443,458.00
2,655,000.00
2,704,000.00
1,400,380.00
3,100,000.00
4,600,000.00
3,450,000.00
425,500.00
218,890.00
509,580.00
396,720.00
415,440.00
304,240.00
2,704,000.00
1,400,380.00
3,450,000.00
425,500.00
339,360.00
263,640.00
311,580.00
228,180.00
29,302,390.00
3,173,110.00
762,150.00
1,093,680.00
165,370.00
232,050.00
3,208,820.00
1,046,110.00
3,173,110.00
254,050.00
1,093,680.00
3,208,820.00
165,370.00
67,420.00
17,643,740.00
260,700.00
677,600.00
1,086,390.00
785,670.00
2,755,000.00
1,473,500.00
210,500.00
40,000.00
120,000.00
631,500.00
550,000.00
115,000.00
1,260,000.00
375,000.00
100,000.00
237,000.00
847,000.00
1,207,100.00
1,323,000.00
86,000.00
86,000.00
661,500.00
575,000.00
65,000.00
1,080,000.00
16,608,460.00
16,408,200.00
2,586,280.00
14,008,880.00
33,003,360.00
1,120,370.00
4,150,000.00
5,270,370.00
438,642,411.29
Asumsi
Membuat 1 m3 kolom praktis beton bertulang
1m ' Pekerja L.01 Oh 0.180 102,920 Rp 18,525.60
Tukang batu L.02 Oh 0.020 121,230 Rp 2,424.60
Tukang kayu L.02 Oh 0.020 139,574 Rp 2,791.48
Tukang besi L.02 Oh 0.020 157,901 Rp 3,158.02
Kepala Tukang L.03 Oh 0.005 5,500,000 Rp 27,500.00
Mandor L.04 Oh 0.065 17,300 Rp 1,124.50
kayu kelas III m3 0.002 1,304 Rp 2.61
Paku 5cm-12cm kg 0.010 17,300 Rp 173.00
minyak bekisting liter 1.200 24,000 Rp 28,800.00
besi beton polos kg 3.000 12,027 Rp 36,080.01
kawat beton kg 0.200 20,000 Rp 4,000.00
Semen portland kg 2.000 1,304 Rp 2,607.40
Pasir Beton m3 0.002 277,385 Rp 554.77
Kerikil m3 0.006 264,120 Rp 1,584.72
Jumlah harga Rp 129,326.71
Profit +overhead 10% Rp 12,932.67
Total HSP Rp 142,259.38
Pembulatan Rp 143,000.00
Asumsi
Membuat 1 m2 COR Rabat beton
1m ' Pekerja L.01 Oh 0.200 102,920 Rp 20,584.00
Tukang batu L.02 Oh 0.020 121,230 Rp 2,424.60
Tukang kayu L.02 Oh 0.020 139,574 Rp 2,791.48
Tukang besi L.02 Oh 0.020 157,901 Rp 3,158.02
Kepala Tukang L.03 Oh 0.005 5,500,000 Rp 27,500.00
Mandor L.04 Oh 0.065 17,300 Rp 1,124.50
kayu kelas III m3 0.001 1,304 Rp 1.30
Paku 5cm-12cm kg 0.010 17,300 Rp 173.00
besi beton polos kg 2.000 12,027 Rp 24,053.34
kawat beton kg 0.250 20,000 Rp 5,000.00
Semen portland kg 2.000 1,304 Rp 2,607.40
Pasir Beton m3 0.003 277,385 Rp 832.16
Kerikil m3 0.007 264,120 Rp 1,848.84
Jumlah harga Rp 92,098.64
Profit +overhead 10% Rp 9,209.86
Total HSP Rp 101,308.50
Pembulatan Rp 110,000.00
0.0005
ANALISA PEKERJAAN KUSEN ,PINTU,JENDELA
900
1 Kusen 3" 4.9 m' Rp 97,000
lem silicone 4.9 m' Rp 19,608
2000
jumlah
900
Kusen 3" 4.9 m' Rp 97,000
P2 lem silicone 4.9 m' Rp 19,608
2000
jumlah
1.45
P1A Kusen 3" 5.65 m' Rp 97,000
lem silicone 4.9 m' Rp 19,608
Kaca 5mm 3.045 m2 Rp 145,800
2.1
acsesories 1 Rp 700,000
upah tenaga 1 ls Rp 1,250,000
jumlah
700
j1 Kusen 3" 5.6 m' Rp 97,000
lem silicone 5.6 m' Rp 19,608
Jendela kaca 1 bh 1 unit Rp 495,000
Lem Silicone
2.1
700
J3 Kusen 3" 2.2 m' Rp 97,000
lem silicone 5.6 m' Rp 19,608
400
Rp 475,300
Rp 96,081
Rp 1,850,000
Rp 219,114
Rp 2,640,495 1 Rp 2,640,495
Rp 2,655,000
Rp 475,300
Rp 96,081
Rp 780,000
Rp 1,351,381 1 Rp 1,351,381
Rp 1,352,000
Rp 548,050
Rp 96,081
Rp 443,961
Rp 700,000
Rp 1,250,000
Rp 3,038,092 1 Rp 3,038,092
Rp 3,100,000
Rp 543,200
Rp 109,807
Rp 495,000
Rp 1,148,007 1 Rp 1,148,007
Rp 1,150,000
Rp 213,400
Rp 109,807
Rp 102,000
Rp 425,207 1 Rp 425,207
Rp 425,500
ANALISA RESAPAN
Sumur Resepan unit Galian tanah 3.375 m3
Ijuk 3.900 kg
Urugan pasir t=20 cm 0.600 m3
Batu koral t=20 cm 4.500 m3
urugan tanah kembali 1.500 m3
plesteran 3.000 m2
Pas. Bata 3.000 m2
210,500.00
210,500.00
40,000.00
40,000.00
210,500.00
550,000.00
115,000.00
180,000.00
125,000.00
100,000.00
220,500.00
43,000.00
43,000.00
220,500.00
575,000.00
65,000.00
180,000.00
REKAPITULASI RENCANA ANGGARAN BIAYA
BERDASARKAN SNI / DPU BIDANG CIPTA KARYA
PERUMAHAN GADING RESIDENCE
TYPE 85 KAV. 9X10 M
JL.Hankam, Puspitek, Serpong, Tangerang Selatan
A. PEKERJAAN PERSIAPAN
1 Bouwplank & pengukuran m1 45.00
C. PEKERJAAN PONDASI
1 Pondasi Beton setempat / foot plat M3 2.29
2 Sloof M3 2.10
3 Pondasi Bata kali 1 SP: 5 PP m' 7.90
Jumlah III
D. PEKERJAAN KONSTRUKSI BETON
LANTAI 1
1 Lantai kerja 1:3: 5 tebal 5 cm ( Pondasi Plat Setempat ) M3 0.30
2 Konstruksi Kolom M3 2.28
3 Konstruksi balok M3 2.35
4 Konstruksi Plat M3 4.24
5 Konstruksi Tangga M3 1.84
6 Konstruksi Canopy M3 0.49
7 Kolom/balok Praktis M3 0.91
LANTAI 2
1 Konstruksi Kolom M3 0.82
2 Konstruksi Ring Balk M3 1.09
3 Konstruksi Plat ( Dudukan Toren ) M3 0.24
4 Konstruksi Canopy M3 0.04
5 Kolom/balok Praktis M3 0.62
Jumlah IV
E PEKERJAAN ARSITEKTUR
E.1 PEKERJAAN DINDING PLESTER/ACI
LANTAI I
1 Pas. Dinding bata tebal 1/2 bata M2 159.00
2 Plester Dinding M2 320.50
3 Acian Dinding M2 320.50
LANTAI II
1 Pas. Dinding bata tebal 1/2 bata M2 154.00
2 Plester Dinding M2 273.50
3 Acian Dinding M2 273.50
4 Pek.GlassBlock M2 1.31
Jumlah V
E.2 PEKERJAAN DINDING
LANTAI I
Pasangan Dinding Keramik 30x60 ex.Roman + 10x30
1 M2 19.56
ex.Roman
2 Pasangan + Finish Batu Alam M2 7.20
Pek. Profil dinding bergaris 3cm + tebal acian ban
3 M2 5.25
banan t=2,5cm
LANTAI II
Pasangan Dinding Keramik 30x60 ex.Roman + 10x30
1 M2 20.64
ex.Roman
2 Pek. Penebalan Plesteran/ Ban-banan t=2,5cm M2 9.10
3 Pek.Kaca Mati + Alumunium + Sealant M2 18.00
Jumlah VI
E.3 PEKERJAAN FINISH LANTAI
LANTAI I
Pasangan granite lantai utama + Keramik Tangga 60 x
1 M2 39.40
60 ex Roman
2 Pasangan keramik KM 30x30 ex.Roman M2 3.00
Pasangan keramik Teras Depan dan Belakang 30x30
3 M2 6.93
ex.Roman
4 Carport beton rabat M2 12.60
5 Lapisan Water Proofing Canopy Beton (Atap Lantai 1) M2 5.30
6 Plint Keramik uk. 10x60 cm m1 53.50
LANTAI II
Pasangan keramik lantai utama 60 x 60 ex Granit
1 M2 35.00
Roman
2 Pasangan keramik KM 30 x 30 ex Roman M2 4.00
3 Lapisan Water Proofing Plat Dak Toren M2 2.00
4 Plint Keramik uk. 10x60 cm m1 40.00
Jumlah VII
E.4 PEKERJAAN PLAFOND
LANTAI I
1 Pekerjaan Plafond ex.Jayaboard M2 34.00
2 Tali air shadowline 10x10mm m1 44.50
LANTAI II
1 Pekerjaan Plafond ex.Elephant M2 67.20
2 Tali air shadowline 10x10mm m1 101.00
3 Pekerjaan List Plank ex.kalsiboard 6/30 cm m1 18.00
Jumlah VIII
Jumlah X
F PEKERJAAN SANITAIR
LANTAI I
1 Kloset Duduk Ex.Toto Bh 1.00
2 Kran Air KM,Taman depan dan belakang ,ex.Toto Bh 3.00
3 Shower + Headset dinding ex.Toto Bh 1.00
4 Floor Drain Stainless Bh 1.00
5 Kran Kitchen Zink Bh 1.00
6 Washtafel Lengkap + Acc. Ex.Toto Set 1.00
7 Kitchen Zink 1 lobang Meiwa Unit 1.00
LANTAI II
1 Kloset Duduk ex.Toto Bh 1.00
2 Kran KM ex Toto Bh 1.00
3 Shower + Headset dinding ex.Toto Bh 1.00
4 Washtafel Lengkap + Acc. Ex.Toto Bh 1.00
5 Floor Drain Stainless Bh 1.00
6 Roof Drain Stainless BH 1.00
Jumlah XI
G INSTALASI LISTRIK & AIR
LANTAI I
1 Instalasi Air Bersih 1" Wavin AW M1 11.00
2 Instalasi Air Bekas 3" Wavin AW M1 8.00
3 Instalasi Air Kotor 4" Wavin AW M1 9.00
4 Bak kontrol Unit 1.00
5 Septicktank & Rembesan ( 1m x 1m x 1,5m ) Unit 1.00
7 Instalasi Titik Lampu Ttk 7.00
8 Instalasi Titik Taman Ttk 1.00
9 Saklar Single ex clipsal Bh 1.00
10 Saklar Double ex clipsal Bh 3.00
11 Stop Kontak ex clipsal Ttk 3.00
12 Box Panel Unit 1.00
13 MCB 10A Bh 1.00
14 Pemasangan Lampu Down Lite-PLC D4'' dan KM D3'' Ttk 7.00
15 Kabel Toevoer/ 3x4 mm M1 3.00
16 Arde Pertanahan Unit 1.00
LANTAI II
1 Instalasi Air Bersih 1" Wavin AW M1 10.00
2 Instalasi Air Bekas 3" Wavin AW M1 10.00
3 Instalasi Air Kotor 4" Wavin AW M1 10.00
4 Instalasi Titik Lampu Ttk 6.00
5 Saklar Single ex clipsal Bh 2.00
6 Saklar Double ex clipsal Bh 2.00
7 Stop Kontak ex clipsal Ttk 3.00
8 Box Panel Unit 1.00
9 MCB 10A Ttk 1.00
10 Pemasangan Lampu Down Lite-PLC D4'' dan KM D3'' Ttk 6.00
Jumlah XII
H PEKERJAAN ATAP
1 Pek. Rangka atap baja ringan ex.Taso/Tangguh m2 82.00
2 Alumunium Foil m2 82.00
Pek. Penutup atap genteng keramik SNI + Nok
3 m2 82.00
Genteng keramik
Jumlah XIII
I PEKERJAAN LAIN-LAIN
1 Pemasangan Toren 650 Liter TB 70 + Acc ex.Pinguin bh 1.00
Pekerjaan Sumur Pantek,pompa + Acc ex Jetpump
2 unit 1.00
Standart
Jumlah XIV
GRAND TOTAL
-