: PDH/WG/TRS/ARS/APT/34/I/2018 FORCON
DHARMAHUSADA SURABAYA SHOP DRAWING
TANGGAL : 02 Januari 2018 SAMPLE MATERIAL/PROCURES
TECHNICAL PROBLEM
SCHEDULE / PROGRESS REPORT
Puncak Dharmahusada
Apartments TRANSMITAL ARS NOMINATED SUB CONTRACTOR
OTHER √
PENGAJUAN REVISI
FROM : KONSULTAN MK ARCH. ENGINEER STR/CIVIL ENGINEER MECH. ENGINEER ELECT. ENGINEER
NOTES :
A. DISETUJUI SESUAI YANG DIAJUKAN D. DIREKOMENDASIKAN UNTUK DISETUJUI OLEH MK
B. DISETUJUI, KECUALI GAMBAR2 YANG DIBERI CATATAN DIPERLUKAN
DIAJUKAN KEMBALI : TIDAK DIPERLUKAN
DIPERLUKAN E. TIDAK DISETUJUI (LIHAT LAMPIRAN)
TIDAK DIPERLUKAN F. F. LAIN-LAIN (LIHAT LAMPIRAN)
C. DIREKOMENDASIKAN UNTUK DISETUJUI OLEH PERENCANA