SEGREGATION DCS GROUP III HCC / 701, 702, 410, 840, & 920
PT. PERTAMINA RU II DUMAI
Scope of Work and Scope of Responsibility
SUBCONTRACTOR : PT. xxxx
Date:
Description
SUBCONTRACTOR to provide all documents and drawings for review / approval by PERTAMINA until the
"Issue For Construction" document during the project implementation
SUBCONTRACTOR must provide all temporary storage needs, construction facilities, buildings, health or care
facilities, camps and lodging facilities and other construction infrastructure
SUBCONTRACTOR must provide all construction equipment and tools needed / required in order to carry out
all construction work so that it can be achieved
SUBCONTRACTOR must carry out construction in the refinery area in accordance with the approved drawings
and specifications and meet the safety aspects and applicable local regulations
SUBCONTRACTOR (together with SCHNEIDER ELECTRIC) must carry out all testing and certification activities
together with PERTAMINA up to the date of the Commercial Completion Certificate, and must perform all
obligations under this contract to fulfill the warranty
SUBCONTRACTOR must provide office space, furniture, equipment and all office equipment, including
telephone, telex, facsimile, communication, on site and local areas to facilitate coordination and any site
meetings
MAIN SCOPE:
1. Modification internal wiring existing BO5 w/q 11 Pcs.
2. Provide materials and accessories needed for modification existing BO5, included and not limited to cable,
cable duct, ferrule, etc
3. Provide new mounting plate, DIN Rails and accessories for existing BO5
4. Dismantling existing BO5's mounting plate
5. Dismantling existing IO Module and existing Baseplate
6. Install new mounting plate with accessories
7. Install new baseplate and IO modules (include wiring) on exisitng BO5
8. Provide 1 (one) new BO5 cabinet (refer to Foxboro Global Enclosure G06, Stainless steel) wiring and
accessories, include cabinet support included but not limited to canopy, accessories, etc.
9. Install new BO5 and accessories on site
10. Install, laying, Pulling, splicing, OTDR test for FO Cable for FCP and FCM
11. Dismantling Existing ATS, install new ATS w/q 13 Pcs included but not limited to cable and accessories.
12. Laying and pulling Power Cable from cabinet rack room to console desk.
HSE Procedure
SUBCONTRACTOR must prepare HSE Plan and Job Safety Analysis (JSA) documents, HSE procedures for all
potential hazards that may arise, how to prevent and deal with this project work, all HSE document must get
SCHNEIDER ELECTRIC and PERTAMINA approval
Safety and Fire Protection Facilities
a. Safety equipment standards must refer to the regulations in force
PERTAMINA
b. Provide Personal Protective Equipment (PPE) equipment for workers in accordance with their respective
work areas.
c. SUBCONTRACTOR make signs for evacuation routes and coordinate with PERTAMINA
d. Hold safety signs (safety signs) in the form of written suggestions, hazards and warnings, safety lines, traffic
cones in sufficient quantities.
e. Providing Light Fire Extinguisher (APAR) in the work area that has the potential to cause a fire hazard in
sufficient quantities at each work location (Refinery Unit)
f. Provides Fire protection and fire blanketing equipment for hot work types.
g. For work at SUBCONTRACTOR heights, workers must complete their work with a full body double hook
harness
Safety Superintendent
a. Manage licensing before the work takes place.
b. SUBCONTRACTOR are required to provide a Safety Officer and Safety Man in accordance with the
competencies and qualifications in accordance with the requirements of PERTAMINA
c. Safety Supervisors must supervise and be responsible for work safety and equipment during the
construction period.
d. Safety Supervisors must always coordinate with HSE PERTAMINA
e. SUBCONTRACTOR (together with SCHNEIDER ELECTRIC) must carry out a Safety Talk Meeting for all
workers at the start of the project.
f. SUBCONTRACTORS must carry out the Tool Box Meeting every morning, before starting work.
g. Subcontractors must take care of the safety tags to PERTAMINA HSE on all equipment used in this project
in accordance with applicable regulations, before the tool is used.
h. Make a report HSE activity per week during the implementation of construction work.
Administration, Licensing and Mobilization / Demobilization Work
a. SUBCONTRACTOR prepare all administrative work and take care of all necessary permits to PERTAMINA
REFINERY
b. Together with the SCHNEIDER ELECTRIC team, they prepare a work plan and supply of manpower and
equipment in accordance with a work schedule in sufficient quantities.
c. SUBCONTRACTOR must carry out mobilization and demobilization of labor, materials and all equipment at
the cost of SUBCONTRACTOR.
d. SUBCONTRACTOR must insure (BPJS) for all workers involved in the work of this project to the insurance
company include Contruction & Service insurance (JAKON)
e. SUBCONTRACTOR must insure the entire scope of work with Construction All Risk, including Third Party
Liability, to insurance companies approved by PERTAMINA with a coverage limit value of the contract value.
f. Provide work equipment and material transportation equipment as well as SUBCONTRACTOR workers from
and to SPM regardless of the RUs in accordance with sufficient quantities.
Acknowledgement
SUBCONTRACTOR
PT. SESI
Subcontractor Confirmation
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY
COMPLY