AHS
AHS
35,000.00
3,515.00
1,277.00
1,899.90
190,080.00
1,404.00
3,240.00
16,800.00
13,000.00
1,500.00
1,600.00
269,315.90
269,316.00
35,000.00
3,515.00
75,480.00
1,277.00
1,899.90
190,080.00
1,404.00
13,680.00
16,800.00
13,000.00
1,500.00
1,600.00
355,235.90
355,236.00
28,000.00
2,812.00
158,750.00
1,277.00
1,899.90
1,404.00
12,600.00
13,000.00
1,500.00
1,600.00
222,842.90
222,843.00
22,446.00
468
14,501.90
4,200.00
6,500.00
750
400
49,265.90
49,266.00
35,000.00
475,200.00
19,890.00
29,480.00
49,210.00
35,010.00
25,540.00
31,665.00
23,250.00
3,953.75
71,800.00
6,992.00
14,175.00
8,400.00
84,000.00
130,000.00
65,000.00
22,500.00
4,000.00
1,135,065.75
1,135,066.00
47,600.00
554,400.00
7,020.00
14,763.00
7,662.00
10,555.00
94,350.00
42,000.00
130,000.00
15,000.00
4,000.00
927,350.00
927,350.00
35,000.00
491,040.00
7,020.00
25,308.00
7,662.00
10,555.00
94,350.00
42,000.00
130,000.00
15,000.00
4,000.00
861,935.00
861,935.00
4,200.00
4,000.00
8,200.00
8,200.00
30,825.00
17,640.00
2,334.00
42,000.00
4,000.00
96,799.00
96,799.00
280,014.00
26,640.00
306,654.00
306,654.00
280,014.00
2,640.00
282,654.00
282,654.00
196,411.20
138,600.00
18,899.60
30,820.60
63,270.00
15,750.00
8,125.00
900
1,520.00
474,296.40
474,296.00
6,466.60
124,183.80
775.92
2,400.00
3,515.00
1,277.00
1,899.90
15,750.00
8,125.00
900
1,520.00
166,813.22
166,813.00
74,344.20
2,812.00
158,750.00
1,277.00
1,899.90
15,750.00
8,125.00
900
1,520.00
265,378.10
265,378.00
25,000.00
5,850.00
10,500.00
1,105.00
150
1,040.00
43,645.00
43,645.00
31,250.00
21,000.00
2,000.00
54,250.00
54,250.00
Analisa Harga Satuan Pekerjaan Tanah
Berkut ini adalah contoh Analisa Harga Satuan (AHS) SNI tahun 2011 untuk pekerjaan tanah yang sering d
B. ANALISA HARGA SATUAN PEKERJAAN TANAH
1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk + balok poratl (180 kg besi + bekisting) 4dia.
Kayu papan terentang M3 0.32 ###
Paku Biasa 2" - 5" Kg 3.2 23,400
Besi Beton Kg 180 16,500
Kawat Beton Kg 2.25 27,700
Semen Portland Kg 323 1,200
Pasir Beton M3 0.52 225,000
Koral Beton 2/3 M3 0.78 200,000
Kayu Balok Terentang M3 0.14 ###
Dolken Ø-8-10/4m Btg 16 15,000
Pekerja Oh 5.96 55,000
Tukang Batu Oh 0.35 70,000
Tukang Kayu Oh 2.8 70,000
Tukang Besi Oh 1.4 70,000
Kepala Tukang Oh 0.455 80,000
Mandor Oh 0.208 85,000
Jumlah 6.412.865
Dibulatkan
D-29 1 M3 Tangga Beton Tulang (90 kg besi + bekisting)
Kayu papan terentang M3 0.25 ###
Paku Biasa 2" - 5" Kg 3 23,400
Minyak Bekisting Ltr 1.2 40,500
Besi Beton Kg 90 16,500
Kawat Beton Kg 3 27,700
Semen Portland Kg 323 1,200
Pasir Beton M3 0.52 225,000
Koral Beton 2/3 M3 0.78 200,000
Kayu Balok Terentang M3 0.105 ###
Dolken Ø-8-10/4m Btg 14 15,000
Pekerja Oh 5.6 55,000
Tukang Batu Oh 0.35 70,000
Tukang Kayu Oh 2.3 70,000
Tukang Besi Oh 1.4 70,000
Kepala Tukang Oh 0.405 80,000
Mandor Oh 0.202 85,000
Jumlah
Dibulatkan
3 1 M3 Membuat Plat Lantai Tb. 10 Cm Beton Bertulang ( 90 Kg Besi + Bekisting )
Kayu Terentang M3 0.4 ###
Paku Biasa 2" - 5" Kg 4 23,400
Minyak Bekisting Ltr 2 40,500
Besi Beton Polos Kg 90 16,500
Kawat Beton Kg 3 27,700
Kayu Balok Terentang M3 0.105 151,100
Plywood Tebal 9 mm Lbr 3.5 151,100
Dolken kayu Galam o - 8-10/4 m Btg 60 15,000
Semen Portland Kg 323 1,200
Pasir Beton M3 0.52 225,000
Koral Beton 2/3 M3 0.78 200,000
Pekerja Oh 5.2 55,000
Tukang Batu Oh 0.35 70,000
Tukang Kayu Oh 3.3 70,000
Kepala Tukang Oh 0.365 80,000
Mandor Oh 1.06 85,000
Jumlah
Dibulatkan
JUMLAH
769,500
46,800
###
83,100
387,600
117,000
156,000
266,750
24,500
109,200
98,000
26,480
14,450
###
###
###
93,600
-
###
49,860
387,600
117,000
156,000
396,000
300,000
401,500
24,500
231,000
147,000
45,600
21,250
6.480.910
6.481.000
712,500
70,200
48,600
###
83,100
387,600
117,000
156,000
277,200
210,000
308,000
24,500
161,000
98,000
32,400
17,170
###
###
si + Bekisting )
###
93,600 243
81,000 117
### 80.75
83,100 440.75
15,866 88.15
528,850
900,000
387,600
117,000
156,000
286,000
24,500
231,000
29,200
90,100
###
Analisa Harga Satuan Pekerjaan Dinding (AHS-SNI 2011)
Berikut adalah penggalan analisa harga satuan (AHS-SNI 2011) untuk pekerjaan dinding yang biasa digun
E. ANALISA HARGA SATUAN PEKERJAAN DINDING
No. URAIAN SATUAN VOLUME SATUAN
(Rp)
HARGA
(Rp)
###
###
###
###
###
1,500.00
2,400.00
###
###
###
###
###
###
###
1,500.00
2,400.00
###
###
###
###
###
###
###
1,500.00
2,400.00
###
###
###
###
9,336.00
###
6,500.00
750
1,200.00
###
###
###
###
###
###
6,500.00
750
1,200.00
###
###
###
###
###
###
6,500.00
750
1,200.00
###
###
al. Keseluruhan analisa pekerjaan dinding untuk berbagai ukuran ketebalan dinding dan komposisi adukan pada AHS-SNI ada s
i adukan pada AHS-SNI ada sekitar 40 analisa.
Analisa Harga Satuan Pekerjaan Plesteran (AHS SNI 2011)
Inilah penggalan analisa pekerjaan plesteran yang paling banyak digunakan untuk menghitung biaya bang
F. ANALISA HARGA SATUAN PEKERJAAN PLESTERAN
No. URAIAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)
F-01 1 M2 Plesteran adk. 1pc : 2ps Tebal 15 mm
- Semen Portland Kg 8.52 1,406.00 ###
- Pasir Pasang M3 0.017 ### 3,967.80
- Pekerja Oh 0.2 ### 8,400.00
- Tukang Batu Oh 0.15 ### 9,750.00
- Kepala Tukang Oh 0.015 ### 1,125.00
- Mandor Oh 0.01 ### 800
Jumlah ###
Dibulatkan ###
F-02 1 M2 Plesteran adk. 1pc : 3ps Tebal 15 mm
- Semen Portland Kg 6.48 1,406.00 9,110.88
- Pasir Pasang M3 0.019 ### 4,434.60
- Pekerja Oh 0.2 ### 8,400.00
- Tukang Batu Oh 0.15 ### 9,750.00
- Kepala Tukang Oh 0.015 ### 1,125.00
- Mandor Oh 0.01 ### 800
Jumlah ###
Dibulatkan ###
F-03 1 M2 Plesteran adk. 1pc : 4ps Tebal 15 mm
- Semen Portland Kg 5.2 1,406.00 7,311.20
- Pasir Pasang M3 0.02 ### 4,668.00
- Pekerja Oh 0.2 ### 8,400.00
- Tukang Batu Oh 0.15 ### 9,750.00
- Kepala Tukang Oh 0.015 ### 1,125.00
- Mandor Oh 0.01 ### 800
Jumlah ###
Dibulatkan ###
F-04 1 M2 Plesteran adk. 1pc : 3ps Tebal 20 mm
- Semen Portland Kg 10.8 1,406.00 ###
- Pasir Pasang M3 0.026 ### 6,068.40
- Pekerja Oh 0.25 ### ###
- Tukang Batu Oh 0.2 ### ###
- Kepala Tukang Oh 0.02 ### 1,500.00
- Mandor Oh 0.0125 ### 1,000.00
Jumlah ###
Dibulatkan ###
F-05 1 M2 Plesteran adk. 1pc : 4ps Tebal 20 mm
- Semen Portland Kg 8.68 1,406.00 ###
- Pasir Pasang M3 0.028 ### 6,535.20
- Pekerja Oh 0.25 ### ###
- Tukang Batu Oh 0.2 ### ###
- Kepala Tukang Oh 0.02 ### 1,500.00
- Mandor Oh 0.0125 ### 1,000.00
Jumlah ###
Dibulatkan ###
F-06 1 M2 Plesteran adk. 1pc:5ps tebal 20 mm
- Semen Portland Kg 7.29 1,406.00 ###
- Pasir Pasang M3 0.026 ### 6,068.40
- Pekerja Oh 0.25 ### ###
- Tukang Batu Oh 0.2 ### ###
- Kepala Tukang Oh 0.02 ### 1,500.00
- Mandor Oh 0.0125 ### 1,000.00
Jumlah ###
Dibulatkan ###
F-11 1 M2 Acian Plesteran
- Semen Portland Kg 4 1,406.00 5,624.00
- Pekerja Oh 0.143 ### 6,006.00
- Tukang batu Oh 0.107 ### 6,955.00
- Kepala Tukang Oh 0.0105 ### 787.5
- Mandor Oh 0.0105 ### 840
Jumlah ###
Dibulatkan ###
(AHS SNI 2011)
untuk menghitung biaya bangunan rumah tinggal.
Analisa Harga Satuan Penutup Atap (AHS SNI 2011)
Untuk menghitung pekerjaan penutup atap seperti genting plentong, genting morando, genting keramik, g
G. ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAP
No. URAIAN SATUAN VOLUME
SATUAN HARGA
(Rp) (Rp)
1,900.00 ###
### 6,300.00
### 4,875.00
### 600
### 640
###
###
6,000.00 ###
1,406.00 ###
### 7,468.80
### ###
### ###
### 1,500.00
### 160
###
###
### ###
### 1,190.00
### 5,880.00
### 4,355.00
### 525
### 560
###
###
### ###
### 2,856.00
### 5,880.00
### 4,550.00
### 525
### 560
###
###
### ###
### 2,856.00
### 5,880.00
### 4,550.00
### 525
### 560
###
###
### ###
### 2,856.00
### 5,880.00
### 4,355.00
### 525
### 560
###
###
### ###
### 2,856.00
### 5,880.00
### 4,355.00
### 525
### 560
###
###
### ###
### 2,856.00
### 5,880.00
### 4,355.00
### 525
### 560
###
###
### ###
800 4,800.00
### 3,528.00
### 8,125.00
### 975
### 320
###
###
8,500.00 ###
### 702
### 8,400.00
### 6,500.00
### 750
### 800
###
###
2,700.00 ###
### 6,300.00
### 4,875.00
### 600
### 640
###
###
4,000.00 ###
### 6,300.00
### 4,875.00
### 600
### 640
###
###
kut adalah penggalan AHS SNI 2011 penutup atap yang biasa digunakan untuk menghitung RAB Rumah tinggal.
Rumah tinggal.
Analisa Harga Satuan Pekerjaan Penutup Langit-langit (AHS
Berikut ini adalah penggalan Analisa Harga Satuan Pekerjaan untuk menghitung biaya pekerjaan langit-lan
H-01 1 M2 Langit-langit
- Pelat asb m2 1.1 ### ###
- Paku seng Kg 0.01 ### 238
- Pekerja Oh 0.03 ### 1,260.00
- Tukang k Oh 0.07 ### 4,550.00
- Kepala tu Oh 0.007 ### 525
- Mandor Oh 0.0015 ### 120
Jumlah ###
Dibulatkan ###
H-02 1 M2 Langit-langit
- Pelat asb Lbr 1.1 ### ###
- Paku seng Kg 0.01 ### 238
- Pekerja Oh 0.03 ### 1,260.00
- Tukang k Oh 0.07 ### 4,550.00
- Kepala tu Oh 0.007 ### 525
- Mandor Oh 0.0015 ### 120
Jumlah ###
Dibulatkan ###
345,000.00 362,250.00
1,406.00 13,778.80
233,400.00 5,018.10
15,700.00 20,410.00
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
421,656.90
421,657.00
322,800.00 338,940.00
1,406.00 14,060.00
233,400.00 5,018.10
15,700.00 23,550.00
42,000.00 10,920.00
65,000.00 8,125.00
75,000.00 937.5
80,000.00 1,040.00
402,590.60
402,591.00
27,600.00 73,140.00
1,406.00 1,687.20
233,400.00 700.2
15,700.00 1,570.00
42,000.00 2,520.00
65,000.00 1,950.00
75,000.00 225
80,000.00 240
82,032.40
82,032.00
25,900.00 86,247.00
1,406.00 2,319.90
233,400.00 746.88
15,700.00 1,570.00
42,000.00 3,780.00
65,000.00 5,850.00
75,000.00 675
80,000.00 360
101,548.78
101,549.00
56,000.00 56,000.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
92,670.20
92,670.00
62,500.00 62,500.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
99,170.20
99,170.00
53,000.00 53,000.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
89,670.20
89,670.00
58,000.00 58,000.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
94,670.20
94,670.00
56,800.00 56,800.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
93,470.20
93,470.00
65,500.00 65,500.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
102,170.20
102,170.00
72,200.00 72,200.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
108,870.20
108,870.00
75,200.00 75,200.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
111,870.20
111,870.00
68,900.00 68,900.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
105,570.20
105,570.00
76,600.00 76,600.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
113,270.20
113,270.00
72,500.00 72,500.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
109,170.20
109,170.00
77,000.00 77,000.00
1,406.00 11,248.00
233,400.00 5,018.10
15,700.00 204.1
42,000.00 10,500.00
65,000.00 7,800.00
75,000.00 900
80,000.00 1,000.00
113,670.20
113,670.00
550,000.00 583,000.00
1,406.00 11,515.14
233,400.00 10,503.00
15,700.00 10,205.00
42,000.00 29,400.00
65,000.00 22,750.00
75,000.00 2,625.00
80,000.00 2,800.00
672,798.14
672,798.00
375,400.00 394,170.00
44,000.00 26,400.00
42,000.00 27,300.00
65,000.00 22,750.00
75,000.00 2,625.00
80,000.00 2,600.00
475,845.00
475,845.00
Analisa Harga Satuan Pekerjaan Kayu - AHS SNI 2011
Berikut adalah penggalan analisa harga satuan pekerjaan kayu, untuk menghitung harga satuan pekerjaan
J. ANALISA HARGA SATUAN PEKERJAAN KAYU
No. URAIAN SATUAN VOLUME
8,633,700.00 10,360,440.00
42,000.00 252,000.00
65,000.00 1,170,000.00
75,000.00 150,000.00
80,000.00 24,000.00
11,956,440.00
11,956,440.00
5,692,600.00 6,831,120.00
42,000.00 252,000.00
65,000.00 1,170,000.00
75,000.00 150,000.00
80,000.00 24,000.00
8,427,120.00
8,427,120.00
5,280,000.00 6,336,000.00
42,000.00 252,000.00
65,000.00 1,170,000.00
75,000.00 150,000.00
80,000.00 24,000.00
7,932,000.00
7,932,000.00
8,633,700.00 345,348.00
23,400.00 1,170.00
42,000.00 42,000.00
65,000.00 162,500.00
75,000.00 18,750.00
80,000.00 4,000.00
573,768.00
573,768.00
5,692,600.00 227,704.00
23,400.00 1,170.00
42,000.00 42,000.00
65,000.00 162,500.00
75,000.00 18,750.00
80,000.00 4,000.00
456,124.00
456,124.00
5,692,600.00 199,241.00
42,000.00 33,600.00
65,000.00 130,000.00
75,000.00 15,000.00
80,000.00 3,200.00
381,041.00
381,041.00
5,595,800.00 195,853.00
42,000.00 33,600.00
65,000.00 130,000.00
75,000.00 15,000.00
80,000.00 3,200.00
377,653.00
377,653.00
5,692,600.00 364,326.40
42,000.00 42,000.00
65,000.00 195,000.00
75,000.00 22,500.00
80,000.00 40,000.00
663,826.40
663,826.00
5,692,600.00 111,574.96
23,800.00 714
23,900.00 7,170.00
64,400.00 64,400.00
42,000.00 25,200.00
65,000.00 130,000.00
75,000.00 15,000.00
80,000.00 2,400.00
356,458.96
356,459.00
5,692,600.00 341,556.00
23,800.00 3,570.00
42,000.00 21,000.00
65,000.00 130,000.00
75,000.00 15,000.00
80,000.00 2,000.00
513,126.00
513,126.00
5,595,800.00 109,677.68
23,800.00 714
23,900.00 7,170.00
64,400.00 64,400.00
42,000.00 25,200.00
65,000.00 130,000.00
75,000.00 15,000.00
80,000.00 2,400.00
354,561.68
354,562.00
5,692,600.00 111,574.96
23,800.00 7,140.00
23,900.00 7,170.00
131,700.00 131,700.00
42,000.00 25,200.00
65,000.00 130,000.00
75,000.00 15,000.00
80,000.00 2,400.00
430,184.96
430,185.00
5,692,600.00 111,574.96
23,800.00 7,140.00
23,900.00 19,120.00
64,400.00 64,400.00
132,900.00 66,450.00
42,000.00 33,600.00
65,000.00 162,500.00
75,000.00 18,750.00
80,000.00 3,200.00
486,734.96
486,735.00
5,692,600.00 111,574.96
23,800.00 7,140.00
23,900.00 19,120.00
131,700.00 131,700.00
238,100.00 119,050.00
42,000.00 33,600.00
65,000.00 162,500.00
75,000.00 18,750.00
80,000.00 3,200.00
606,634.96
606,635.00
5,692,600.00 6,261,860.00
26,800.00 402,000.00
23,800.00 19,040.00
42,000.00 168,000.00
65,000.00 780,000.00
75,000.00 90,000.00
80,000.00 16,000.00
7,736,900.00
7,736,900.00
5,280,000.00 5,808,000.00
26,800.00 402,000.00
23,800.00 19,040.00
42,000.00 168,000.00
65,000.00 780,000.00
75,000.00 90,000.00
80,000.00 16,000.00
7,283,040.00
7,283,040.00
5,280,000.00 63,360.00
23,800.00 3,570.00
42,000.00 4,200.00
65,000.00 6,500.00
75,000.00 750
80,000.00 400
78,780.00
78,780.00
5,280,000.00 73,920.00
23,800.00 3,570.00
42,000.00 4,200.00
65,000.00 6,500.00
75,000.00 750
80,000.00 400
89,340.00
89,340.00
5,823,400.00 41,928.48
23,800.00 1,190.00
42,000.00 4,200.00
65,000.00 13,000.00
75,000.00 1,500.00
80,000.00 400
62,218.48
62,218.00
5,692,600.00 62,618.60
23,800.00 1,190.00
42,000.00 4,620.00
65,000.00 14,300.00
75,000.00 1,650.00
80,000.00 400
84,778.60
84,779.00
29,400.00 30,870.00
42,000.00 882
65,000.00 1,365.00
75,000.00 150
80,000.00 80
33,347.00
33,347.00
pekerjaan atap.
Analisa Harga Satuan Pekerjaan Rangka Atap Baja Ringan
Diposkan : 21 Junii 2014
Oleh : Endang Kusman
Untuk analisa harga satuan pekerjaan rangka atap baja ringan saya belum menemukannya di AH
elum menemukannya di AHS-SNI, tapi ini saya menemukan di salah satu blog yang sepertinya memiliki hubungan d
10 tahun)
1 9,000.00 9,000.00
2.8 14,870.00 41,636.00
5.1 8,500.00 43,350.00
25 375 9,375.00
35 350 12,250.00
1 1,500.00 1,500.00
0.247 45,000.00 11,115.00
0.176 50,000.00 8,800.00
0.117 52,500.00 6,142.50
1 4,500.00 4,500.00
1 2,340.00 2,340.00
150,008.50
15,000.85
165,009.35
165,000.00
inya memiliki hubungan dengan salah satu produsen baja ringan, inilah analisanya:
Analisa Harga Satuan Pekerjaan Penutup Besi dan Aluminium
Analisa Harga Satuan Pekerjaan Penutup Besi dan Aluminium
Diposkan : 01 Juni 2014
Oleh : Endang Kusman
K-19 1 m2 Pintu pelat baja tebal 2mm rangkap, rangka baja siku
- Besi siku L 30.30.3 Kg 15 24,000.00
- Baja pelat Kg 32.8 24,000.00
- kawat las Kg 0.05 23,600.00
- Pekerja Oh 0.2 42,000.00
- Tukang kayu Oh 0.2 65,000.00
- Kepala tukang Oh 0.02 75,000.00
- Mandor Oh 0.001 80,000.00
Jumlah
Dibulatkan
HARGA
(Rp)
26,400.00
2,432.00
2,520.00
390
450
24
32,216.00
32,216.00
71.5
55
800
42
0.65
0.75
4
973.9
974
944
214.5
220
1,700.00
168
130
15
16
2,463.50
2,464.00
306,600.00
44,100.00
97,500.00
7,875.00
416
456,491.00
456,491.00
211,800.00
44,100.00
68,250.00
7,875.00
416
332,441.00
332,441.00
63,250.00
50,400.00
78,000.00
900
48
192,598.00
192,598.00
39,490.00
476
10,246.68
4,200.00
6,500.00
750
400
62,062.68
62,063.00
21,841.05
357
53,719.68
7,600.00
6,300.00
26,000.00
1,875.00
104
117,796.73
117,797.00
21,841.05
357
106,320.20
9,120.00
8,400.00
26,000.00
1,875.00
100
174,013.25
174,013.00
21,841.05
2,380.00
106,320.20
13,400.00
6,300.00
19,500.00
2,250.00
640
172,631.25
172,631.00
166,210.00
500
7,500.00
1,806.00
2,795.00
322.5
168
179,301.50
179,302.00
179,300.00
500
7,500.00
1,806.00
2,795.00
322.5
168
192,391.50
192,392.00
89,100.00
500
7,500.00
1,806.00
2,795.00
322.5
168
102,191.50
102,192.00
112,200.00
500
7,500.00
1,806.00
2,795.00
322.5
168
125,291.50
125,292.00
664,840.00
180,390.00
3,570.00
5,525.00
637.5
336
855,298.50
855,299.00
664,840.00
54,900.00
2,025.00
3,570.00
5,525.00
637.5
400
731,897.50
731,898.00
717,200.00
54,900.00
2,025.00
3,570.00
5,525.00
637.5
400
784,257.50
784,258.00
330,000.00
2,500.00
38,500.00
8,400.00
13,000.00
1,500.00
80
393,980.00
393,980.00
360,000.00
787,200.00
1,180.00
8,400.00
13,000.00
1,500.00
80
1,171,360.00
1,171,360.00
34,748.00
108,528.00
49,280.00
27,300.00
42,250.00
4,875.00
2,560.00
269,541.00
269,541.00
501,700.00
44,100.00
68,250.00
7,875.00
416
622,341.00
622,341.00
537,300.00
14,700.00
22,750.00
2,625.00
144
577,519.00
577,519.00
Analisa Harga Satuan Pekerjaan Pengecatan
Diposkan : 05 Juni 2014
Oleh : Endang Kusman
N-14 1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um
- Cat besi setara ICI Kg 0.3 67,700.00 20,310.00
- Pekerja Oh 0.006 42,000.00 252
- Tukang cat Oh 0.06 65,000.00 3,900.00
- Kepala tukang Oh 0.012 75,000.00 900
- Mandor Oh 0.006 80,000.00 480
Jumlah 25,842.00
Dibulatkan 25,842.00
N-15 1 M2 Pengecatan Tembok Baru Setara Vinilex (2 x laburan)
- Plamir tembok Kg 0.1 25,000.00 2,500.00
- Cat dasar Kg 0.1 30,000.00 3,000.00
- Cat penutup 2x setara vini Kg 0.26 25,000.00 6,500.00
- Pekerja Oh 0.02 42,000.00 840
- Tukang cat Oh 0.063 65,000.00 4,095.00
- Kepala tukang Oh 0.0063 75,000.00 472.5
- Mandor Oh 0.0025 80,000.00 200
Jumlah 17,607.50
Dibulatkan 17,608.00
N-15r' 1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan)
- Plamir tembok Kg 0.1 25,000.00 2,500.00
- Cat dasar Kg 0.1 30,000.00 3,000.00
- Cat penutup 3x setara vini Kg 0.39 25,000.00 9,750.00
- Pekerja Oh 0.03 42,000.00 1,260.00
- Tukang cat Oh 0.0945 65,000.00 6,142.50
- Kepala tukang Oh 0.0095 75,000.00 712.5
- Mandor Oh 0.0038 80,000.00 304
Jumlah 23,669.00
Dibulatkan 23,669.00
N-16 1 M2 Pengecatan Tembok Lama Setara Vinilex
- Cat dasar Kg 0.12 30,000.00 3,600.00
- Cat penutup 2 x Kg 0.18 25,000.00 4,500.00
- Pekerja Oh 0.028 42,000.00 1,176.00
- Tukang cat Oh 0.042 65,000.00 2,730.00
- Kepala tukang Oh 0.0042 75,000.00 315
- Mandor Oh 0.0025 80,000.00 200
Jumlah 12,521.00
Dibulatkan 12,521.00
Analisa Harga Satuan Pekerjaan Sanitasi
Diposkan : 04 Juni 2014
Oleh : Endang Kusman
###
8,436.00
2,334.00
42,000.00
97,500.00
###
12,800.00
###
###
###
8,436.00
2,334.00
42,000.00
65,000.00
7,500.00
80
###
###
###
###
8,436.00
2,334.00
50,400.00
94,250.00
11,250.00
8,000.00
###
###
###
###
75,600.00
###
40,500.00
8,800.00
45,954.00
###
###
67,870.00
19,375.00
14,481.80
14,237.40
12,095.70
15,960.00
12,350.00
1,425.00
1,520.00
###
###
###
###
42,945.60
6,966.30
80,025.00
30,648.00
90,720.00
46,800.00
5,400.00
8,640.00
4,200.00
###
###
41,075.00
61,864.00
16,338.00
14,777.00
26,400.00
15,324.00
###
65,975.00
112.5
1,280.00
###
###
12,030.00
1,512.00
3,900.00
450
144
4,210.50
22,246.50
22,247.00
18,960.00
1,512.00
3,900.00
450
144
6,636.00
31,602.00
31,602.00
31,770.00
1,512.00
3,900.00
450
144
11,119.50
48,895.50
48,896.00
33,210.00
1,512.00
3,900.00
450
144
11,119.50
50,335.50
50,336.00
###
3,402.00
8,775.00
1,012.50
328
36,529.50
###
###
15,660.00
3,402.00
8,775.00
1,012.50
328
5,481.00
34,658.50
34,659.00
###
1,260.00
19,500.00
2,250.00
120
###
###
40,900.00
105
420
6,500.00
750
400
49,075.00
49,075.00
66,600.00
420
6,500.00
750
400
74,670.00
74,670.00
48,730.00
9,300.00
144.82
7,118.70
6,047.85
420
6,500.00
750
400
79,411.37
79,411.00
63,000.00
22,050.00
6,300.00
26,000.00
1,875.00
100
###
###
###
19,375.00
289.64
14,237.40
12,095.70
15,960.00
12,350.00
1,425.00
1,520.00
###
###
10,400.50
351
27,360.00
7,600.00
6,300.00
26,000.00
1,875.00
100
79,986.50
79,987.00
###
###
71,500.00
75
12,800.00
###
###
###
###
###
71,500.00
75
12,800.00
78,984.00
###
###
###
37,514.20
###
###
###
###
###
###
67,500.00
###
###
###
38,907.00
###
###
45,000.00
18,757.10
###
###
###
###
###
###
33,760.00
63,180.00
###
###
19,470.79
###
###
Analisa Harga Satuan Pekerjaan Penanaman Pohon
Diposkan : o6 Juni2014
Oleh : Endang Kusman
I BAHAN KACA
1 Kaca Polos 2 mm ( ASAHI ) m2 69,000.00
2 Kaca Polos 3 mm ( ASAHI ) m2 87,400.00
3 Kaca Polos 5 mm ( ASAHI ) m2 111,000.00
4 Kaca Polos 8 mm ( ASAHI ) m2 183,100.00
5 Kaca Rayband 5 mm ( ASAHI ) m2 148,700.00
6 Kaca Rayband 8 mm ( ASAHI ) m2 323,400.00
7 Kaca Rayband 12 mm ( ASAHI ) m2 627,000.00
8 Kaca cermin 5 mm m2 150,500.00
9 Kaca cermin 6 mm m2 186,400.00
10 Kaca cermin 8 mm m2 234,300.00
11 Kaca Patri Lokal Terpasang ( ASAHI ) m2 1,621,100.00
12 Kaca Patri Ex Luar Negeri Terpasang m2 3,425,700.00
13 Kaca 6 mm Gravver m2 1,263,900.00
14 Glass Block DN 20 x 20 ( Kedawung ) bh 22,000.00
15 Glass Block DN 20 x 20 Ex LN bh 125,700.00
16 Sealant kg 211,800.00
17 Jendela Nako bh 109,200.00
K BAHAN PERPIPAAN
1 Besi Pipa Untuk Hydrant BSP 1" bt 166,700.00
2 Besi Pipa Untuk Hydrant BSP 1.25" bt 210,200.00
3 Besi Pipa Untuk Hydrant BSP 1.5" bt 298,000.00
4 Besi Pipa Untuk Hydrant BSP 2" bt 351,800.00
5 Besi Pipa Untuk Hydrant BSP 2.5" bt 439,300.00
6 Besi Pipa Untuk Hydrant BSP 3" bt 595,000.00
7 Besi Pipa Untuk Hydrant BSP 4" bt 869,600.00
8 Besi Pipa Untuk Hydrant BSP 6" bt 1,423,400.00
9 Besi Pipa Hitam 1" t = 2 mm bt 172,300.00
10 Besi Pipa Hitam 2" t = 2 mm bt 227,900.00
11 Besi Pipa Hitam 3" t = 2mm bt 365,800.00
12 Besi Pipa Hitam 4" t = 2 mm bt 573,100.00
13 Besi Pipa Hitam 6" t = 2 mm bt 772,400.00
14 Pipa GIP Medium A 1/2" ( 6 m1 ) bt 109,100.00
15 Pipa GIP Medium A 3/4" ( 6 m1 ) bt 159,400.00
16 Pipa GIP Medium A 1" ( 6 m1 ) bt 181,500.00
17 Pipa GIP Medium A 1 1/4" ( 6 m1 ) bt 259,300.00
18 Pipa GIP Medium A 1 1/2" ( 6 m1 ) bt 280,500.00
19 Pipa GIP Medium A 1 3/4" ( 6 m1 ) bt 326,400.00
20 Pipa GIP Medium A 2" ( 6 m1 ) bt 467,400.00
21 Pipa GIP Medium A 2 1/2" ( 6 m1 ) bt 672,100.00
22 Pipa GIP Medium A 3" ( 6 m1 ) bt 849,900.00
23 Pipa GIP Medium A 4" ( 6 m1 ) bt 920,300.00
24 Macam2 Sambungan GIP 1/2" bh 6,300.00
25 Macam2 Sambungan GIP 3/4" bh 8,600.00
26 Macam2 Sambungan GIP 1" bh 16,700.00
27 Macam2 Sambungan GIP 1 1/4" bh 19,800.00
28 Macam2 Sambungan GIP 1 1/2" bh 20,700.00
29 Macam2 Sambungan GIP 1 3/4" bh 22,700.00
30 Macam2 Sambungan GIP 2" bh 51,200.00
31 Macam2 Sambungan GIP 2 1/2" bh 60,400.00
32 Macam2 Sambungan GIP 3" bh 75,900.00
33 Macam2 Sambungan GIP 4" bh 118,600.00
34 Pipa PVC RUCIKA type AW 1/2" bt 40,100.00
35 Pipa PVC RUCIKA type AW 3/4" bt 52,200.00
36 Pipa PVC RUCIKA type AW 1" bt 63,200.00
37 Pipa PVC RUCIKA type AW 1 1/4" bt 79,900.00
38 Pipa PVC RUCIKA type AW 1 1/2" bt 105,900.00
39 Pipa PVC RUCIKA type AW 2" bt 110,700.00
40 Pipa PVC RUCIKA type AW 2 1/2" bt 167,100.00
41 Pipa PVC RUCIKA type AW 3" bt 205,100.00
42 Pipa PVC RUCIKA type AW 4" bt 347,900.00
43 Pipa PVC RUCIKA type AW 6" bt 640,000.00
44 Pipa PVC RUCIKA type AW 8" bt 818,300.00
45 Pipa PVC MASPION ABU ( AW ) 1/2" bt 22,500.00
46 Pipa PVC MASPION ABU ( AW ) 3/4" bt 27,800.00
47 Pipa PVC MASPION ABU ( AW ) 1" bt 40,500.00
48 Pipa PVC MASPION ABU ( AW ) 1 1/4" bt 58,500.00
49 Pipa PVC MASPION ABU ( AW ) 1 1/2" bt 60,200.00
50 Pipa PVC MASPION ABU ( AW ) 2" bt 75,800.00
51 Pipa PVC MASPION ABU ( AW ) 2 1/2" bt 126,300.00
52 Pipa PVC MASPION ABU ( AW ) 3" bt 145,700.00
53 Pipa PVC MASPION ABU ( AW ) 4" bt 256,800.00
54 Macam2 Sambungan Paralon 1/2" bh 4,400.00
55 Macam2 Sambungan Paralon 3/4" bh 4,700.00
56 Macam2 Sambungan Paralon 1" bh 4,900.00
57 Macam2 Sambungan Paralon 1 1/4" bh 7,200.00
58 Macam2 Sambungan Paralon 1 1/2" bh 9,500.00
59 Macam2 Sambungan Paralon 1 3/4" bh 13,500.00
60 Macam2 Sambungan Paralon 2" bh 15,800.00
61 Macam2 Sambungan Paralon 2 1/2" bh 26,400.00
62 Macam2 Sambungan Paralon 3" bh 29,700.00
63 Macam2 Sambungan Paralon 4" bh 34,000.00
64 Sambungan Pipa PVC Jenis AW 4" TY bh 89,900.00
65 Lem Paralon tb 10,100.00
66 Solatip Ledeng gl 4,200.00
67 Pipa PVC 4" Berlobang Jenis AW m1 36,700.00
68 PVC Waterstop lebar 150 m1 53,500.00
69 PVC Waterstop lebar 200 m1 57,900.00
70 PVC Waterstop lebar 230 m1 65,700.00
71 PVC Waterstop lebar 250 m1 74,700.00
72 PVC Waterstop lebar 300 m1 83,600.00
73 PVC Waterstop lebar 320 m1 92,500.00
L BAHAN SANITAIR
1 Stop Kran 3/4" KIT bh 103,900.00
2 Stop Kran 1" KIT bh 124,200.00
3 Stop Kran 1 1/2" KIT bh 208,000.00
4 Stop Kran 2" KIT bh 267,900.00
5 Stop Kran 2 1/2" KIT bh 713,200.00
6 Stop Kran 3" KIT bh 830,300.00
7 Check Valve 1/2" bh 86,400.00
8 Double Neple 1/2" bh 32,400.00
9 Water Mur 1/2" bh 40,200.00
10 Gate walve 1/2" bh 55,500.00
11 Saringan Air Lt. KM Stainless Steel bh 66,600.00
12 Apooer Bath Tube bh 267,800.00
13 Kran Stainless Lokal Kait bh 46,100.00
14 Shower Dengan Tiang bh 221,000.00
15 Shower Tanpa Tiang bh 134,800.00
16 Kran Tembok Sun Eui dia. 1/2" bh 86,900.00
17 Kran Tembok ITAP dia. 1/2" bh 40,900.00
18 Kran Bebek Sun Eui 1/2" bh 144,600.00
19 Kran Bebek ITAP 1/2" bh 51,500.00
20 Kran Panas Dingin San Eui Standard bh 228,400.00
21 Bath Cape Washteren unit 2,098,700.00
22 Tempat Sabun Poslin bh 46,300.00
23 Wastafel Lengkap TOTO LW 230 unit 1,012,700.00
24 Wastafel Lengkap INA unit 699,900.00
25 Closet Jongkok Poslin Warna TOTO unit 205,600.00
26 Closet Jongkok Standard Putih Poslin unit 188,200.00
27 Closet Jongkok Lengkap Sistem Jet T unit 2,032,900.00
28 Closet Duduk Warna Standard TOTO C unit 1,724,700.00
29 Wastafel Bulat Warna Standard Lengka unit 910,800.00
30 Closet Duduk Warna Standard INA Len bh 1,272,100.00
31 Urinoir Lengkap TOTO Warna Standard unit 1,773,400.00
32 Penyekat Poslin Urinoar TOTO lbr 495,900.00
33 Kitchen Zink Stainless Standard Lokal ( bh 397,800.00
34 Kitchen Zink Stainless Non Standard Fr bh 1,272,300.00
35 Kitchen Zink Stainless Non Standard Fr bh 1,650,200.00
36 Talang PVC U - 15 cm btng 60,000.00
N BAHAN MEKANIKAL
1 Jockey Pump kap. 80 gln/menit 100 m1 unit 71,396,400.00
2 Electrical Pump kap. 750 gln/menit 120 unit 216,358,900.00
3 Diesel Pump kap. 750 gln/menit 120 m1 unit 591,647,100.00
4 Presure Tank kap. 500 liter lengkap unit 36,997,300.00
5 Hydran Box dlm Gedung ( Lengkap ) unit 6,854,400.00
6 Fire House 1.5 x 30 m + nose unit 4,866,100.00
7 Exhose Fan H 360 W 60 x 60 cm unit 6,862,900.00
8 Exhose Fan H 380 W CFM 55 x 55 cm unit 5,491,100.00
9 Exhose Fan H 100 W 40 x 40 cm unit 1,092,600.00
10 AC Split 3 PK Setara TOSHIBA unit 30,791,800.00
11 AC Split 2 PK Setara TOSHIBA unit 21,926,500.00
12 AC Split 1 PK Setara TOSHIBA unit 5,174,100.00
13 Mesin AC Split DAIKIN ( Indoor / Outdoo 1 BTU 4,200,000.00
O BAHAN ELEKTRIKAL
1 Kabel NYA 1 x 1.5 Prima ( 1 rol = 50 m' ROLL 102,700.00
2 Kabel NYA 1 x 2.5 Prima ( 1 rol = 50 m' ROLL 151,700.00
3 Kabel NYM 2 x 1.5 Prima ( 1 rol = 50 m' m' 6,600.00
4 Kabel NYM 3 x 1.5 Prima ( 1 rol = 50 m' m' 7,600.00
5 Kabel NYM 2 x 2.5 Prima ( 1 rol = 50 m' m' 4,900.00
6 Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' m' 10,900.00
7 Kabel NYM 4 x 2.5 Prima ( 1 rol = 50 m' m' 7,600.00
8 Kabel NYM 2 x 4 Prima ( 1 rol = 50 m' ) m' 6,300.00
9 Kabel NYM 3 x 4 Prima ( 1 rol = 50 m' ) m' 15,400.00
10 Kabel NYM 4 x 4 Prima ( 1 rol = 50 m' ) m' 20,700.00
11 Kabel NYM 2 x 6 Supreme ( 1 rol = 50 m m' 11,800.00
12 Kabel NYM 3 x 6 Supreme ( 1 rol = 50 m m' 13,700.00
13 Kabel NYM 4 x 6 Supreme ( 1 rol = 50 m m' 18,600.00
14 Kabel NYM 2 x 10 Supreme ( 1 rol = 50 m' 17,600.00
15 Kabel NYM 3 x 10 Supreme ( 1 rol = 50 m' 119,700.00
16 Kabel NYM 4 x 10 Supreme ( 1 rol = 50 m' 26,500.00
17 Kabel NYM 4 x 16 Supreme ( 1 rol = 50 m' 29,700.00
18 Kabel NYY 2 x 4 Supreme ( 1 rol = 50 m' m' 12,000.00
19 Kabel NYY 3 x 4 Supreme ( 1 rol = 50 m' m' 19,300.00
20 Kabel NYY 4 x 4 Supreme ( 1 rol = 50 m' m' 23,800.00
21 Kabel NYY 2 x 6 Supreme ( 1 rol = 50 m' m' 14,500.00
22 Kabel NYY 3 x 6 Supreme ( 1 rol = 50 m' m' 19,200.00
23 Kabel NYY 4 x 6 Supreme ( 1 rol = 50 m' m' 18,500.00
24 Kabel NYY 2 x 10 Supreme ( 1 rol = 50 m' 20,400.00
25 Kabel NYY 3 x 10 Supreme ( 1 rol = 50 m' 25,800.00
26 Kabel NYY 4 x 10 Supreme ( 1 rol = 50 m' 35,500.00
27 Kabel NYY 4 x 16 Supreme ( 1 rol = 50 m' 41,900.00
28 NSFB FUJI EA - 100 A bh 841,900.00
29 NSFB FUJI EA - 150 A bh 2,182,600.00
30 Rumah Panel 30 x 60 cm ( Kosong ) unt 153,500.00
31 Skring Kas 2 grop Biasa unt 204,800.00
32 Skring Kas 3 grop Biasa unt 222,600.00
33 Skring Kas 5 grop Biasa unt 468,800.00
34 MCB 1 PAS bh 55,100.00
35 MCB 3 PAS bh 106,000.00
36 Tahanan 50 A Merk Fuji bh 521,100.00
37 Saklar Broko Tunggal Standard ( 1 Phas bh 23,800.00
38 Saklar Broko Seri Standard ( 1 Phase ) bh 26,300.00
39 Stop Kontak Broko Standard ( 1 Phase bh 23,800.00
40 Stop Kontak Broko 3 Phase (Out Bow) bh 87,700.00
41 Stop Kontak Broko 3 Phase ( In Bow) bh 144,900.00
42 Stop Kontak Handle 3 Phase bh 87,800.00
43 Instalas Titik Lampu / Stop Kontak (Upa ttk 179,600.00
44 Lampu pijar 25 Watt s/d 100 Watt bh 61,200.00
45 Lampu Neon Phillips 20 Watt bh 29,700.00
46 Lampu Neon Phillips 40 Watt bh 35,200.00
47 Trapo TL 20 W (Phillips) bh 41,800.00
48 Trapo TL 40 W (Phillips) bh 37,900.00
49 Trapo TL 20 W (Sinar) bh 40,600.00
50 Trapo TL 40 W (sinar) bh 41,300.00
51 Stater Neon Phillips bh 8,300.00
52 Stater Neon Biasa bh 6,500.00
53 Rumah TL In Bow / Out Bow 2 x 20 W ( bh 144,000.00
54 Down Light + SL 25 W bh 306,900.00
55 Lampu SL Philip 25 W bh 306,900.00
56 Lampu Sirkel TL 20 W Lengkap bh 67,900.00
57 Lampu Mercuri 80 W bh 147,400.00
58 Lampu Taman + Tiang + Lampu 1 Buah bh 307,600.00
59 Lampu Baret 30 cm + Neon bh 221,700.00
60 Lampu Neon Arcrilik 2 x 40 W Lengkap bh 738,000.00
61 Jarum Penangkal Petir 16 bh 101,500.00
62 Kawat BC ( Tembaga ) kg 65,100.00
63 Pentanahan Penangkal Petir ttk 423,700.00
64 Pentanahan Panel ttk 296,100.00
V BAHAN PAGAR
1 Panel Beton Pracetak lbr 199,200.00
2 Kolom Beton Pracetak btg 264,000.00
B. BIDANG PERTAMANAN
1 Aglonema batang 50,000.00
2 Bambu krisik/jepang batang 50,000.00
3 Furadan kg 24,000.00
4 Kompos/pupuk kandang karung 25,000.00
5 M atoa (2 m) batang 40,000.00
6 Palm (botol, ekor tupai, putri, dll) ti batang 100,000.00
7 Philo batang 75,000.00
8 Pohon pelindung (angsana, mahoni, batang 25,000.00
9 Pohon perdu (kaca piring, puring, maw batang 10,000.00
10 Rumput gajah mini m2 15,000.00