Anda di halaman 1dari 8

no Description Calc

A CORIDOR

1 excavate 0.3 m x 0.25


0.25 m x 0.2

concrete yang tertaanam 0.25 m x 0.2


0.25 m x 0.15

2 Lean Concrete 0.05 m x 0.2


0.05 m x 0.15

3 Conceret sloof 0.35 m x 0.2


0.2 m x 0.15

4 concrete kolom 0.25 x 3.14

5 concrete kolom 0.45 m x 0.45


0.25 x 0.2826

6 Floor 2.2 m x 0.15

7 batu alam palimanan 0.45 m x 4


batu alam andesit 2.2 m x 6.25

8 Plester aci 0.25 x 0.3

9 kayu gording 5/12 penahan tekuk 6.25 m x 2


kayu klos 5/12 penahan tekuk 0.5 m x 3

10 kayu gording 4/10 21 pcs x 3.6

11 Coating wood
kayu gording 5/12 6.25 m x 2
kayu klos 5/12 0.5 m x 3
Kayu gording 4/10 21 pcs x 3.6

12 Policarbonat 6.25 m x 4

13 Angle 50.50.5 21 baris x 8


4 kolom x 8

14 Pengecatan dinding 3.14 x 0.3

B INSTALLATION INSULATION ( ALLUMINIUM FOIL )

1 Aluminium foil /Insulation 5.7 m x 5.2


9m x 5.11

2 Drop celling 0.25 x 3.14


3 List plafond
ruang mihrab 6m + 4
storage 6m + 4
mimbar 4m + 4
Ruang sholat 16 m + 18
Female 4.4 m + 2.75
Male 3.8 m + 4.4
urinoir 4.4 m + 2.75
Teras 12.2 m x 2
11 m x 1
11 m x 2
8m x 1

C PENANGKAL PETIR

Flasshing atap m
1 Air Terminal (Sistem Elektrostatis)
Pipe galv 2" 5.44 kg/m x 2
Down Conductor, NYY 70 mm2 40 m + 10
Grounding Rod diameter 5/8"
Box rounding 300 x 300 0.6 m2
Material Bantu & Accessories
m x 6.25 m x 2 sisi
m x 2.2 m x 2 pcs

m x 6.25 m x 2 sisi
m x 2.2 m x 2 pcs

m x 6.25 m x 2 sisi
m x 2.2 m x 2 pcs

m x 6.25 m x 2 sisi
m x 2.2 m x 2 pcs

x 0.09 m2 x 4 pcs x 2.65 m

m x 0.8 m x 4 pcs
x 0.8 m x -4 pcs

m x 6.25 m

sisi x 0.8 m x 4 pcs


m

m x 2.65 m x 4 pcs

double x 2 sisi x 0.05 m x 0.12


pcs x 2 sisi x 0.05 m x 0.12

m x x 0.04 m x 0.1

double x 2 sisi + 0.1 m + 0.24 m


pcs x 2 sisi x 0.1 m + 0.24 m
m x 0.08 m + 0.2 m

titik x 0.07 m x 3.78


titik x 0.07 m x

m x 2.65 m x 4 pcs

m 1x 2 sisi
m x 0.5 x 2 sisi

x 9

m
m
m
m
m
m
m
pcs
pcs
pcs
pcs

m
m + 2m
vol sat

= 0.9375 m3
= 0.22 m3
1.1575 m3

= 0.625 m3
= 0.165 m3
0.79 m3

= 0.125 m3
= 0.033 m3
0.158 m3

= 0.875 m3
= 0.132 m3

= 0.74889 m3
1.75589 m3

= 0.648 m3
= -0.22608 m3

= 2.0625 m3

2.48442 m3

= 5.76 m2
= 13.75 m2
19.51 m2

= 0.795 m2

= 0.15 m3
= 0.018 m3

= 0.3024 m3

0.4704 m3

= 8.5 m2
= 1.02 m2
= 21.168 m2
30.688 m2
= 25 m2

= 9.9852 m2

= 59.28 m2
= 45.99 m2
=

105.27 m2

= 7.065 m2

= 10 m
= 10 m
= 8m
= 34 m
= 7.15 m
= 8.2 m
= 7.15 m
= 24.4 m
= 11 m
= 22 m
= 8m
149.9 m

= 2m

= 10.88 kg
= 52 m
= 6 titik
=
Project Coridor
Location MCTN

Brief Specification/Requirement/Scope
No. Description
(Detail will be provided in Exhibit A2)

A CORIDOR
Cut/excavate/trenching on rock, boulder - machine -
1 manual
2 Backfill (including compaction)
3 Soil/ asphalt disposal handling & spreading
4 Supply material and install lean concrete K-100
5 Supply material, fabricate re-bar & formwork, pour & Steel reinforcing max 125 Kg/m3
cure concrete concrete (exceed the value may add
supply & fabricate steel - unit rates),
include admixture if required

6 Supply and install stone masonry


7 Supply and install brick wall
8 Frame of Roof Meranti wood
9 Coating of Frame
10 Acrylic emulsion paint (for exterior) / Cat luar
11 Roof (Policarbonat ) 5 mm
B MUSHOLA
1 Installation insulation of roof
2 Drop celling ukuran diameter 3 m
3 Profil gypsum

C LIGHTINING ARRESTER
1 Flashing atap Kirana
2 Air Terminal (Sistem Elektrostatis)
3 Supply, fabricate, and install structural steel painting included, include all type anchor bolts
4 Hot dip Galv Pipe
5 Down Conductor, NYY 70 mm2
6 Grounding Rod diameter 5/8" Panjang 2 m
7 Box grounding 200 x 200
8 Material Bantu & Accessories
9 instalation dan testing

note:
Size/Range/C Unit of
Unit Rate (IDR) Estimate Quantity Price (IDR)
lass Measure

m3 300,000 1.158 347,250


m3 200,000 0.368 73,500
m3 291,484 0.790 230,272
m3 1,100,000 0.158 173,800
m3 7,100,000 4.240 30,106,201

m2 699,320 19.510 13,643,733


m2 280,000 0.398 111,300
m3 5,850,000 0.470 2,751,840
m2 40,000 30.688 1,227,520
m2 50,000 9.985 499,260
m2 368,000 25.000 9,200,000

m2 120,000 105.270 12,632,400


m2 495,000 7.065 3,497,175
m 21,000 149.900 3,147,900

m 103,000 2.000 206,000


unit 18,000,000 1.000 18,000,000
ype anchor bolts kg 45,000 10.880 489,600
kg 22,500 10.880 244,800
m 90,000 52.000 4,680,000
btg 2,500,000 6.000 15,000,000
unit 840,000 1.000 840,000
lot 567,000 1.000 567,000
lot 6,000,000 1.000 6,000,000

TOTAL 123,669,552

Anda mungkin juga menyukai