INFORME DE AVANCE DEL PROYECTO

Pedido No. : 4500492163 NOMBRE DEL PROYECTO Fecha de Corte del Informe : Friday, July 02, 2010
Referencia Interna : 1008/03/331 "ADQUISICIÓN DE PATÍN DE MEDICIÓN DE GAS COMBUSTIBLE PARA EL AREA DE COMPRESIÓN DEL CAMPO ZAPATO MATA R. Fecha Finalización Inicial : Friday, December 18, 2009
Monto Contrato (BsF) : 839,145.00 PROYECTO GAS ANACO" Fecha Finalización Proyectada : Friday, August 27, 2010

MATRIZ DE PESOS PONDERADOS DEL PROYECTO CURVAS DE AVANCE DEL PROYECTO

% Avance de (Hrs) Unid. Horas Ganadas


DESCRIPCION Fases Equivalentes % Peso Físico Actual Progreso Global Curva de Avance de Fabricación

% PROGRESO
Ingeniería 100.00%

Modelos 3D & Dimensionales 160 5.61% 100.00% 160.00 90.00%

I Aprobación de Planos Ingeniería 152 5.33% 100.00% 152.00 80.00%

Planos Finales 168 5.89% 100.00% 168.00 70.00%

Sub-Total Ingenieria : 100.00% 480 16.84% 480.00 60.00%

Procura 50.00%
Estructura 147.2 5.16% 100.00% 147.20 40.00%
Materiales Mecánicos 187.2 6.57% 100.00% 187.20 30.00%
P
Materiales Eléctricos 48 1.68% 100.00% 48.00 20.00%
Materiales Instrumentación 152 5.33% 100.00% 152.00 10.00%
Sub-Total Procura : 100.00% 534.4 18.75% 534.40 0.00%
Construcción 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55

Obras Mecánicas 1492 52.34% 80.00% 1,193.60 SEMANAS


Obras de Instrumentación 96 3.37% 0.00 AVANCE RE-PLANIFICADO AVANCE PLANIFICADO Re-planificado-3
C
Obras Eléctricas 168 5.89% 0.00
Pruebas F.A.T. 80 2.81% 0.00 Curva de Avance Financiero
900.00
Sub-Total Fabricación : 65.01% 1836 64.41% 1,193.60
Instalación 800.00

Despacho 0.00% 0.00 700.00

Instalción en Sitio 0.00% 0.00

MBsF
600.00

Arranque & Puesta en Marcha 0.00% 0.00 500.00


Sub-Total Instalación : 0 0.00 400.00
TOTAL : 2850.4 Total Horas Ganadas : 2,208.00
300.00
% Global de Completación : 77.46%
200.00

100.00
Progreso de Fabricación Progreso de Facturación
Actividad Plan Real Variación Factura No. Monto (BsF) Total Facturado 0.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 1516 17 1819 20 2122 23 24 25 26 27 28 29 30 31 32 33 34 35 36 3738 39 4041 42 43 44 45 46 47 48 49 5051 52 5354 55 56 57 58 59 60
C-2206 & C-2203 83,914.50 335,657.45 SEMANAS
Construcción 65.46% 65.01% -0.45% AVANCE PLANIFICADO AVANCE REAL
Acumulado Anterior (BsF) : 251,742.95
Balance (BsF) : 503,487.55

ACTIVIDADES COMPLETADAS Y EN EJECUCIÓN PROBLEMAS Y ACCIONES CORRECTIVAS

En vista de los retrasos presentados para la contratación del soldador, se presenta re-planificación de actividades restantes y de su cumplimiento
se estima culminar el proyecto para el mes de Agosto-2010:

1) Iniciar la reparación de las juntas el 12-Julio-10.

2) Hacer GAMMAGRAFÍA inmediatamente luego de reparadas las juntas seguida de la realización de Sand-Blasting de tuberías (Semana 29-
Julio-10)

3) Realización de Prueba Hidrostática la semana del 06-Agosto-10

Estas son las actividades claves de realizar según lo planteado para poder entregar el Skid en el mes de Agosto-10. Las sub-siguientes
No se reporta Avance ésta semana actividades deben mantenerse dentro de los plazos del project.

AVANCE FISICO GLOBAL


SEMANA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
FECHA 14/8/09 21/8/09 28/8/09 4/9/09 11/9/09 18/9/09 25/9/09 2/10/09 9/10/09 16/10/09 23/10/09 30/10/09 6/11/09 13/11/09 20/11/09 27/11/09 4/12/09 11/12/09 18/12/09 25/12/09 1/1/10 8/1/10 15/1/10 22/1/10 29/1/10 5/2/10 12/2/10 19/2/10 26/2/10 5/3/10 12/3/10 19/3/10 26/3/10 2/4/10 9/4/10
AVANCE PLANIFICADO 0.00% 2.18% 11.98% 16.34% 20.70% 29.41% 36.17% 40.52% 44.88% 53.16% 61.87% 64.49% 69.93% 72.77% 78.65% 86.49% 91.72% 96.95% 100.00%
AVANCE REAL 0.00% 1.63% 10.56% 15.44% 17.07% 21.13% 25.19% 25.19% 25.19% 29.25% 34.80% 40.20% 40.20% 50.00% 53.88% 53.88% 53.88% 53.88% 53.88% 53.88% 53.88% 53.88% 53.88% 53.88% 53.88% 53.88% 53.88% 53.88% 53.88% 53.88% 53.88% 53.88% 53.88% 53.88% 53.88%
AVANCE RE-PLANIFICADO 0.00% 1.75% 10.96% 17.11% 18.20% 18.99% 21.45% 21.45% 21.45% 23.20% 43.42% 49.34% 49.34% 57.02% 61.40% 61.84% 61.84% 61.84% 61.84% 61.84% 61.84% 61.84% 61.84% 66.01% 72.15% 74.78% 80.26% 85.75% 91.01% 96.27% 100.00% 100.00% 100.00%
AVANCE FINANCIERO
SEMANA 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
FECHA 3/7/09 10/7/09 17/7/09 24/7/09 31/7/09 7/8/09 14/8/09 21/8/09 28/8/09 4/9/09 11/9/09 18/9/09 25/9/09 2/10/09 9/10/09 16/10/09 23/10/09 30/10/09 6/11/09 13/11/09 20/11/09 27/11/09 4/12/09 11/12/09 18/12/09 25/12/09 1/1/10 8/1/10 15/1/10 22/1/10 29/1/10 5/2/10 12/2/10 19/2/10 26/2/10
HITOS HITO 1 HITO 2 HITO 3 HITO 4 HITO 5
FACTURA 84 168 84 168 336
AVANCE PLANIFICADO 0.00 83.92 83.92 83.92 251.74 251.74 251.74 251.74 251.74 251.74 251.74 251.74 251.74 251.74 335.66 335.66 335.66 335.66 335.66 335.66 335.66 335.66 335.66 503.49 839.15
AVANCE REAL 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 83.91 83.91 83.91 83.91 251.74 251.74 251.74 251.74 251.74 251.74 251.74 251.74 251.74 251.74 251.74 251.74 251.74 335.66 335.66 335.66 335.66 335.66
FACTURACIÓN 83.91 167.83 83.92
Nombre del Proyecto: Elaborado por : Ing. Emyra Andarcia
"ADQUISICIÓN DE PATÍN DE MEDICIÓN DE GAS COMBUSTIBLE PARA EL ÁREA DE COMPRESIÓN DEL CAMPO
ZAPATO MATA R. PROYECTO GAS-ANACO" Fecha : 28 de mayo de 2010
No. Orden de Compra: 4500492163
No. Referencia Interna: 1008/03/331 Tasa Cambiaria: 2.15 BsF./$

% % Fracción Fracción Total Monto Balance


N° HITOS DE PAGO (BsF.) ($) (BsF.) ($) (BsF.) Factura No. (BsF.) (BsF.) MODO DE APROBACIÓN & PAGO
APROBADO CON LA ENTREGA, REVISIÓN Y APROBACIÓN POR PARTE DE
1 APROBACIÓN DE PLANOS 10 58,620.18 11,764.80 83,914.50 C-2168/C-2169 83914.5 0.00
INGENIERÍA P.G.A. DE LOS PLANOS.
APROBADO CON LA VERIFICACIÓN POR PARTE DE PDVSA DE LA EXISTENCIA DE
2 COMPRA DE MATERIALES & EQUIPOS 20 117,240.16 23,529.60 167,828.80 C-2172 167828.8 0.00
LA MATERIA PRIMA PARA LA FABRICACIÓN DEL EQUIPO.
APROBADO CON EL 50% DE AVANCE EN FABRICACIÓN DE CADA EQUIPO -
3 AVANCE DE FABRICACIÓN 10 58,620.18 11,764.80 83,914.50 C-2206/C-2203 83914.5 0.00
PRESENTAR INFORME.
APROBADO CON EL ATESTIGUAMIENTO POR PARTE DE PDVSA DE LAS PRUEBAS
4 PRUEBAS DE FÁBRICA 20 117,240.16 23,529.60 167,828.80 167,828.80 DE FUNCIONAMIENTO DE LOS EQUIPOS (FUNCIONAMIENTO ÓPTIMO DE LOS
EQUIPOS)
APROBADO CON LA ENTREGA DE LOS EQUIPOS Y EL DATA BOOK EN ALMACÉN
5 ENTREGA DE EQUIPOS & DATA BOOK 40 234,480.72 47,059.20 335,658.00 335,658.00
DE ANACO.

0.00

0.00

0.00

0.00

0.00

MONTO TOTAL OTORGADO: 100 0 586,201.40 117,648.00 839,144.60 335,657.80 503,486.80

N° HITOS DE PAGO MBsF. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35


1 APROBACIÓN DE PLANOS 84.00 84
2 COMPRA DE MATERIALES & EQUIPOS 168.00 168
3 AVANCE DE FABRICACIÓN 84.00 84
4 PRUEBAS DE FÁBRICA 168.00 168
5 ENTREGA DE EQUIPOS & DATA BOOK 335.14 335
0 0
0 0
0 0
0 0
0 0
839.14
PROYECCIÓN DE HITOS : 0 0 0 0 84 0 168 0 0 0 0 84 0 0 0 0 0 0 0 0 0 168 335 0 0 0 0 0 0 0 0 0 0 0 0

PROYECCIÓN DE HITOS DE PAGO


400

350
MBsF

300

250

200

150

100

50

0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
SEMANAS
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
SEMANAS