Anda di halaman 1dari 6

Qbanjir = 68.

8 m3/s
Lebar bendung = 32 m
P1 = 3 m
Z = 1.8 m
DZ = P1+Z = 4.8 m

1. Menghitung yc
q2 debit
yc  3 dengan q 
g lebar bendung

q =
68.8 = 2.15
32
2 0.33
yc =( 2.15 ) = 0.778 m
9.81
2. Menghitung H1
H1 = 1.5 yc
= 1.5 x 0.778
= 1.168 m

3. Menghitung vu
vu  2 g 0,5H 1  ΔZ 

1/2
vu =( 2x 9.81 x( 0.5 x 1.168 + 4.8 )
vu = 10.28 m/s

4. Menghitung yu
yu = q = 2.15 = 0.209 m
vu 10.28
5. Menghitung Fru
vu
Fru 
gy u

Fru = 10.28 = 7.174


1/2
( 9.81 x 0.209 )
6. Menghitung yd
yd
yu

1
2
 1  8F
r
2
1
2 1/2
yd = 0.209 x0.5x(( 1+ 8x 7.174 ) -1)
yd = 2.02 m

7. Menghitung Lj
L j  5n  y d 

misal n = 0.25 m
Lj = 5 x( 0.25 + 2.02 )
Lj = 11.35 m

8. Menghitung LB
Menggunakan tabel yang sama dengan tabel yang digunakan pada bangunan terjun.

Fru = 7.174 maka Lp/DZ = 0.9


Lp = 0.9 x 4.8
Lp = 4.32 m
Sehingga total panjang kolam olak (LB) = Lp + Lj
= 4.32 + 11.35
= 15.67 m ≈ 16 m
Debit pengambilan air irigasi = Qp
3
Qp = 10.9 m /s
Qn = 1.2 x 10.9 m3/s =
3
13.08 m /s

Volume lumpur (Vlumpur)


Kandungan lumpur (Cn) = 0.0005
Selang waktu pembilasanan saluran = 1 minggu
Vlumpur = nC x Q n x T
Vlumpur = 5E-04 x 13.08 x 604800
Vlumpur = 3955 m3
LB = Qn
w
w = 0.004 m/s
2
LB = 13.08 3270 m
=
0.004
L/B > 8 sehingga L = 8B
2
8B = 3270
Syarat dimensi kantong lumpur
B < 20.22 m
L > 161.7 m

Penentuan In

Vn = 0.4 m/s
3
Qn = 13.08 m /s
Menentukan dimensi saluran saat kantong sedimen penuh
Dari tabel penentuan saluran didapatkan parameter berikut ini
n = 4.3 sehingga b = 4.3 yn
m = 2
Bentuk saluran di atas saluran kantung lumpur adalah trapesium
2
An = by+myn
2 2
An = 4.3 yn + 2 yn
2
An = 6.3 yn
2
An = Qn 13.08 32.7 m
= =
Vn 0.4
Qn = A x Vn
13.08 = 6.3 yn2 x 0.4
13.08 = 2.52 yn2
yn2 = 5.19
yn = 2.278
b = 9.797 ≈ 10 m < syarat dimensi kantong lumpur (B)
fb = 0.85
yn+fb = 3.128 m ≈ 3.15 m
Menentukan nilai In
Vn = ks x R2/3 x I1/2
ks = 45
2 1/2
P = b+2y(1+m )
2 1/2
P = 10 + 2x 2.278262 x( 1+ 2 )
P = 20.19
R = 1.62
In = 4.14E-05

Penentuan Is
Vs = 1.5 m/s
3
Qs = Qn = 13.08 m /s
2
AS = Qs 13.08 8.72 m
= =
Vs 1.5
b = 10 m
AS = bxhs
8.72 = 10 x hs
hs = 0.872 m ≈ 0.9 m

Menentukan nilai Is
Ps = 10 + 2x 0.9
Ps = 11.8 m
Rs = 8.72 = 0.739 m
11.8
Vs = ks x Rs2/3 x I1/2
ks = 45
2/3 1/2
1.5 = 45 x 0.739 x I
1/2
0.04082 = I
I = 1.67E-03
Nilai Fr harus kurang dari 1
Fr v 1.5 0.505 < 1
= = =
(ghs)1/2 2.97136

Panjang kantong lumpur


3
V lumpur = 3955 m
2
V lumpur = 0.5bL+0.5(Is-In)L b
2
3955.39 = 5L + 8.13E-03 L
L = 455 m
V lumpur = 3955.00
L/B = 45.4830097 > 8 sesuai dengan persyaratan rasio panjang/lebar
Bangunan pengambilan
Aliran dianggap normal (bebas)
3
Qp = 10.9 m /s
3 3
Qrencana = 1.2 x 10.9 m /s = 13.08 m /s
Vpengambilan = 1.5 m/s

Q = abμ(2gz)1/2
a = tinggi bukaan pintu (dianggap nilainya sama dengan yn= 2.278 m)
b = lebar yang dibutuhkan
μ = koefisien pintu (digunakan nilai 0.8 )
z = jarak antara dasar pintu dengan muka air (dianggap 0.1 m)

1/2
13.08 = 2.278 x b x 0.8 ( 2x9.81 x 0.1 )
b = 5.123 m
Bila digunakan pintu sorong yang lebarnya 1.5 m
Digunakan pintu sorong sejumlah 3.416 buah ≈ 4 buah = 6m
Dibutuhkan pilar @ 1m sejumlah 3 buah = 3m
Total lebar bangunan pengambilan (w) = 9m

Bangunan penguras (pembilas) di bendung


Lebar bangunan penguras (pembilas) di bendung = 0.6 w
= 0.6 x 9m
= 5.4 m

Bila digunakan pintu sorong dengan lebar @ 1.5 m


Digunakan pintu sejumlah 3 buah = 4.5 m
Digunakan pilar @ 1m sejumlah = 2 buah = 2m
Total lebar bangunan pembilas (penguras) di bendung = 6.5 m