JUMLAH HARGA
NO. URAIAN PEKERJAAN
Rp.
Terbilang :
BOQ )
PERPUSTAKAAN SMK
b. Majalengka
ngka - Jawa Barat 45464
RPUSTAKAAN SMK
JAWA BARAT
JUMLAH HARGA
Rp.
4,767,600.00
5,508,967.45
4,298,611.90
77,784,390.66
37,099,149.98
18,251,600.00
-
41,744,787.37
51,356,400.00
889,000.00
3,394,600.00
7,734,114.88
2,000,000.00
254,829,222.24
25,482,922.22
280,312,144.46
GITO MANDELA
Direktur
BILL OF QUANTITY ( BOQ )
1 2 3
I PEKERJAAN PERSIAPAN
1 Pek. Biaya Administrasi & Dokumentasi 1.00
2 Pek. Pengukuran dan Pemasangan Bouwplank 44.00
3 Mobilisasi dan demobilisasi 1.00
II PEKERJAAN TANAH
1 Pek. Galian tanah Pondasi batu belah 33.32
2 Pek. Galian tanah Pondasi setempat batu belah 2.24
3 Pek. Urugan tanah kembali ex. galian 15.36
4 Pek. Urugan tanah peninggian lantai, + 50 cm 59.50
5 Pek. Urugan pasir dibawah lantai keramik, t = 5 cm 6.36
6 Pek. Urugan pasir dibawah pondasi batu belah , t = 5 cm 2.51
IV PEKERJAAN BETON
1 Pek. Sloof beton S1 20/15 cm ,K - 225 2.45
2 Pek. Kolom beton K1 20 X 15 CM K - 225 1.84
3 Pek. Ring balok beton K1 20 X 15 CM K - 225 2.51
4 Pek. Kolom praktis beton KP 15/15 cm, K - 175 0.51
5 Pek. Balok Latei Beton BL 12 x 12 cm K - 175 0.51
6 Pek. Rabat beton, K - 175 untuk lantai selasar luar 4.80
V PEKERJAAN DINDING
1 Pek. Dinding bata ad. 1PC : 5PS 118.41
2 Pek. Plesteran dinding adukan 1PC : 5PS 233.87
3 Pek. Plesteran Acian 233.87
4 Pek. Keramik Dinding KM/WC 20 X 25 CM Sek. Mulia 11.20
5 Pek. Keramik Dinding Border KM/WC 8 X 20 CM Sek. Mulia 6.00
6 Pek. Plesteran Acian ban banan 42.00
Vl PEKERJAAN LANTAI
1 Pek. Keramik Lantai KM/WC 20 X 20 CM Sek. Mulia Un Polish 3.00
2 Pek. Keramik Lantai 40 x 40 cm Sek. Mulia Polish 128.00
IX PEKERJAAN PLAFOND
1 Pek. Rangka plafond 168.00
2 Pek. Penutup plafond gypsum Perpustakaan 120.00
3 Pek. Penutup plafond GRC Perpustakaan 44.00
4 Pek. List plafond Gypsum 88.00
X PEKERJAAN LISTRIK
1 Pek. Pemas. Instalasi titik lampu 7.00
2 Pek. Pemas. Instalasi stop kontak 2.00
3 Pek. Pemas. Saklar tunggal 1.00
4 Pek. Pemas. Saklar ganda 2.00
5 Pek. Pemas. Stop kontak 2.00
6 Pek. Pemas. Lamu Down Light 4.00
7 Pek. Pemas. Box Inbow + TL 2 X 20 watt 3.00
8 Pek. Panel Distribusi Daya listrik 1.00
9 Pek. Penyambungan kabel feeder 4 x 4 mm ke panel induk 10.00
XI PEKERJAAN SANITASI
1 Pek. Pemasangan. Kran Dinding 1.00
2 Pek. Pemasangan. Kloset Jongkok Standar 1.00
3 Pek. Pemasangan. Pipa PVC (AW) 4" sek. Rucika 10.00
4 Pek. Pemasangan. Pipa PVC (AW) 3" sek. Rucika 10.00
5 Pek. Pemasangan. Pipa PVC (AW) 3/4" sek. Rucika 15.00
6 Pek. Pemasangan. Floor Drain 1.00
7 Pek. Septictank + Resapan p =1.8 m, l = 1.5 m dan t = 2 m 1.00
JUMLAH TOTAL
BOQ )
ERPUSTAKAAN SMK
Majalengka
gka - Jawa Barat 45464
PUSTAKAAN SMK
AWA BARAT
HARGA JUMLAH
SAT. SATUAN HARGA
Rp. (Rp.)
4 5 6=(3x5)
LS 750,000.00 750,000.00
M1 75,400.00 3,317,600.00
LS 700,000.00 700,000.00
JUMLAH I 4,767,600.00
M3 37,800.00 1,259,496.00
M3 37,300.00 83,552.00
M3 19,400.00 298,008.25
M3 37,300.00 2,219,350.00
M3 185,900.00 1,182,324.00
M3 185,900.00 466,237.20
JUMLAH II 5,508,967.45
M3 320,800.00 1,609,132.80
M3 124,300.00 2,588,547.50
M3 124,300.00 100,931.60
JUMLAH III 4,298,611.90
M3 6,449,200.00 15,768,294.00
KG 11,405,500.00 20,940,498.00
M3 10,509,900.00 26,327,299.50
M3 7,983,300.00 4,071,483.00
M3 10,531,800.00 5,383,856.16
M3 1,102,700.00 5,292,960.00
JUMLAH IV 77,784,390.66
M2 124,300.00 14,718,338.14
M2 60,900.00 14,242,658.64
M2 29,500.00 6,899,153.20
M2 - 0.00
M1 - 0.00
M1 29,500.00 1,239,000.00
JUMLAH V 37,099,149.98
M2 127,600.00 382,800.00
M2 139,600.00 17,868,800.00
JUMLAH VI 18,251,600.00
unit - 0.00
unit - 0.00
unit - 0.00
unit - 0.00
unit - 0.00
JUMLAH VII -
M2 181,500.00 38,163,061.20
M2 2,300.00 439,101.17
M1 5,500.00 209,825.00
M1 61,100.00 2,932,800.00
JUMLAH VIII 41,744,787.37
M2 212,600.00 35,716,800.00
M2 61,800.00 7,416,000.00
M2 61,100.00 2,688,400.00
M1 62,900.00 5,535,200.00
JUMLAH IX 51,356,400.00
bh - 0.00
bh - 0.00
m1 - 0.00
m1 - 0.00
m1 - 0.00
bh 394,600.00 394,600.00
unit 3,000,000.00 3,000,000.00
JUMLAH XI 3,394,600.00
M2 18,300.00 4,279,813.68
M2 18,300.00 3,074,400.00
M2 19,300.00 162,120.00
M2 19,300.00 217,781.20
JUMLAH XII 7,734,114.88
Ls 2,000,000.00 2,000,000.00
JUMLAH XIII 2,000,000.00
254,829,222.24
HARGA SATUAN PEKERJAAN
1 2 4
I PEKERJAAN PERSIAPAN
1 Pek. Biaya Administrasi & Dokumentasi LS
2 Pek. Pengukuran dan Pemasangan Bouwplank M1
3 Mobilisasi dan demobilisasi LS
II PEKERJAAN TANAH
1 Pek. Galian tanah Pondasi batu belah M3
2 Pek. Galian tanah Pondasi setempat batu belah M3
3 Pek. Urugan tanah kembali ex. galian M3
4 Pek. Urugan tanah peninggian lantai, + 60 cm M3
5 Pek. Urugan pasir dibawah lantai keramik, t = 5 cm M3
6 Pek. Urugan pasir dibawah pondasi batu belah , t = 5 cm M3
IV PEKERJAAN BETON
1 Pek. Sloof beton S1 20/15 cm ,K - 225 M3
2 Pek. Kolom beton K1 20 X 15 CM K - 225 KG
3 Pek. Ring balok beton K1 20 X 15 CM K - 225 M3
4 Pek. Kolom praktis beton KP 15/15 cm, K - 175 M3
5 Pek. Balok Latei Beton BL 12 x 12 cm K - 175 M3
6 Pek. Rabat beton, K - 175 untuk lantai selasar luar M3
V PEKERJAAN DINDING
1 Pek. Dinding bata ad. 1PC : 5PS M2
2 Pek. Plesteran dinding adukan 1PC : 5PS M2
3 Pek. Plesteran Acian M2
4 Pek. Keramik Dinding KM/WC 20 X 25 CM Sek. Mulia M2
5 Pek. Keramik Dinding Border KM/WC 8 X 20 CM Sek. Mulia M1
6 Pek. Plesteran Acian ban banan M1
Vl PEKERJAAN LANTAI
1 Pek. Keramik Lantai KM/WC 20 X 20 CM Sek. Mulia Un Polish M2
2 Pek. Keramik Lantai 40 x 40 cm Sek. Mulia Polish M2
IX PEKERJAAN PLAFOND
1 Pek. Rangka plafond M2
2 Pek. Penutup plafond gypsum Perpustakaan M2
3 Pek. Penutup plafond GRC Perpustakaan M2
4 Pek. List plafond Gypsum M1
X PEKERJAAN LISTRIK
1 Pek. Pemas. Instalasi titik lampu TTK
2 Pek. Pemas. Instalasi stop kontak TTK
3 Pek. Pemas. Saklar tunggal BH
4 Pek. Pemas. Saklar ganda BH
5 Pek. Pemas. Stop kontak BH
6 Pek. Pemas. Lamu Down Light BH
7 Pek. Pemas. Box Inbow + TL 2 X 20 watt BH
8 Pek. Panel Distribusi Daya listrik UNIT
9 Pek. Penyambungan kabel feeder 4 x 4 mm ke panel induk M1
XI PEKERJAAN SANITASI
1 Pek. Pemasangan. Kran Dinding bh
2 Pek. Pemasangan. Kloset Jongkok Standar bh
3 Pek. Pemasangan. Pipa PVC (AW) 4" sek. Rucika m1
4 Pek. Pemasangan. Pipa PVC (AW) 3" sek. Rucika m1
5 Pek. Pemasangan. Pipa PVC (AW) 3/4" sek. Rucika m1
6 Pek. Pemasangan. Floor Drain bh
7 Pek. Septictank + Resapan p =1.8 m, l = 1.5 m dan t = 2 m unit
Barat 45464
N SMK
T
HARGA
SATUAN
Rp.
5
750,000.00
75,400.00
300,000.00
37,800.00
37,300.00
19,400.00
37,300.00
185,900.00
185,900.00
320,800.00
124,300.00
124,300.00
6,449,200.00
11,405,500.00
10,509,900.00
7,983,300.00
10,531,800.00
1,102,700.00
124,300.00
60,900.00
29,500.00
124,200.00
60,900.00
127,600.00
139,600.00
181,500.00
2,300.00
5,500.00
61,100.00
212,600.00
61,800.00
61,100.00
62,900.00
90,000.00
90,000.00
15,000.00
18,000.00
14,000.00
394,600.00
3,000,000.00
18,300.00
18,300.00
19,300.00
19,300.00
2,000,000.00
ANALISA HARGA SATUAN PEKERJAAN
HARGA SAT.
NO. URAIAN PEKERJAAN INDEX SAT.
(Rp.)
1 2 3 4 6
1 1M Pek. Pengukuran dan Pemasangan Bowplank
Bahan
Kayu 5/7 lokal kelas II 0.01 m3 2,750,000.00
Paku Biasa 2"-5" 0.02 kg 15,600.00
Kayu Papan 3/20 cm lokal kelas II 0.01 m3 2,950,000.00
Tenaga
Pekerja 0.10 Oh 65,000.00
Tukang kayu 0.10 Oh 70,000.00
Kepala tukang 0.01 Oh 75,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
2 1 M3 Galian Tanah biasa sedalam 1M
Tenaga
Pekerja 0.50 Oh 65,000.00
Mandor 0.03 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
3 1 M3 Urugan Tanah kembali
Tenaga
Pekerja 0.26 Oh 65,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
4 1 M3 Urugan tanah peninggian lantai (tanah setempat)
Tenaga
Pekerja 0.50 Oh 65,000.00
Mandor 0.02 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
5 1 M3 Urugan pasir urug
Bahan
Sirtu 1.00 m3 165,000.00
Tenaga
Pekerja 0.05 Oh 65,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
6 10 kg Pembesian dengan besi polos U32
Bahan
Besi Beton 10.05 kg 13,000.00
Kawat Beton 0.15 kg 13,000.00
Tenaga
Pekerja 0.07 Oh 65,000.00
Tukang besi 0.07 Oh 70,000.00
Kepala tukang besi beton 0.01 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
1 Kg Pembesian dengan besi Polos U32
7 1 M2 Pasang Bekisting untuk sloof
Bahan
Kayu Papan Kelas II 0.05 m3 2,950,000.00
Paku Biasa 2"-5" 0.30 kg 16,000.00
Minyak Bekisting 0.10 lt 5,000.00
Tenaga
Pekerja 0.52 Oh 65,000.00
Tukang Kayu 0.26 Oh 70,000.00
Kepala Tukang Kayu 0.03 Oh 75,000.00
Mandor 0.03 Oh 75,000.00
jumlah
Overhead & Profit 0.10
Dibulatkan
8 1 M2 Pasang Bekisting untuk kolom
Bahan
Kayu Papan Kelas II 0.04 m3 2,950,000.00
Paku Biasa 2"-5" 0.40 kg 16,000.00
Minyak Bekisting 0.20 lt 5,000.00
Balok Kayu Kelas II 0.03 m3 2,750,000.00
Playwood tebal 9 mm 0.04 lbr 110,000.00
Dolken Kayu ᴓ 8 - 10 cm I = 4cm 2.00 bh 17,500.00
Tenaga
Pekerja 0.66 Oh 65,000.00
Tukang Kayu 0.33 Oh 70,000.00
Kepala Tukang Kayu 0.03 Oh 75,000.00
Mandor 0.03 Oh 75,000.00
jumlah
Overhead & Profit 0.10
Dibulatkan
9 1 M2 Pasang Bekisting untuk balok
Bahan
Kayu Papan Kelas II 0.04 m3 2,950,000.00
Paku Biasa 2"-5" 0.40 kg 16,000.00
Minyak Bekisting 0.20 lt 5,000.00
Balok Kayu Kelas II 0.02 m3 2,750,000.00
Playwood tebal 9 mm 0.35 lbr 110,000.00
Dolken Kayu ᴓ 8 - 10 cm I = 4cm 2.00 bh 17,500.00
Tenaga
Pekerja 0.66 Oh 65,000.00
Tukang Kayu 0.33 Oh 70,000.00
Kepala Tukang Kayu 0.03 Oh 75,000.00
Mandor 0.03 Oh 75,000.00
jumlah
Overhead & Profit 0.10
Dibulatkan
10 1 M2 Pasang Bekisting untuk lantai
Bahan
Kayu Papan Kelas II 0.04 m3 2,950,000.00
Paku Biasa 2"-5" 0.40 kg 16,000.00
Minyak Bekisting 0.20 lt 5,000.00
Balok Kayu Kelas II 0.02 m3 2,750,000.00
Playwood tebal 9 mm 0.35 lbr 110,000.00
Dolken Kayu ᴓ 8 - 10 cm I = 4cm 6.00 bh 17,500.00
Tenaga
Pekerja 0.66 Oh 65,000.00
Tukang Kayu 0.33 Oh 70,000.00
Kepala Tukang Kayu 0.03 Oh 75,000.00
Mandor 0.03 Oh 75,000.00
jumlah
Overhead & Profit 0.10
Dibulatkan
11 1 M3 Lantai Kerja 1PC : 3PS : 5KR
Bahan
Semen Portland 197.80 kg 1,300.00
Pasir Beton 0.55 m3 165,000.00
Split 0.76 m3 185,000.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Batu 0.20 Oh 70,000.00
Kepala Tukang Batu 0.05 Oh 75,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
12 1 M3 Membuat beton mutu K-175
Bahan
Semen Portland 326.00 kg 1,300.00
Pasir Beton 0.54 m3 165,000.00
Split 0.76 m3 185,000.00
Air 215.00 Liter 1,000.00
Tenaga
Pekerja 1.65 Oh 65,000.00
Tukang Batu 0.28 Oh 70,000.00
Kepala Tukang Batu 0.03 Oh 75,000.00
Mandor 0.06 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
13 1 M3 Membuat beton mutu K-225
Bahan
Semen Portland 371.00 kg 1,300.00
Pasir Beton 0.50 m3 165,000.00
Kerikil (max 30mm) 0.78 m3 185,000.00
Air 215.00 Liter 1,000.00
Tenaga
Pekerja 1.65 Oh 65,000.00
Tukang Batu 0.28 Oh 70,000.00
Kepala Tukang Batu 0.03 Oh 75,000.00
Mandor 0.08 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
14 1 M3 Sloof beton 20 x 15, K-225
Beton K - 225 1.00 m3 1,163,800.00
Tulangan Beton 155.41 kg 15,710.00
Bekisting Papan 13.33 m2 213,300.00
Jumlah
Dibulatkan
15 1 M3 Kolom K1, 15/20, K-225
Beton K - 225 1.00 m3 1,163,800.00
Tulangan Beton 155.41 kg 15,710.00
Bekisting Papan 23.33 m2 334,300.00
Jumlah
Dibulatkan
16 1 M3 Kolom KP, 15/15, K-225
Beton K - 225 1.00 m3 1,163,800.00
Tulangan Beton 150.36 kg 15,710.00
Bekisting Papan 13.33 m2 334,300.00
Jumlah
Dibulatkan
17 1 M3 Balok Beton B2, 15/20, K - 225
Beton K - 225 1.00 m3 1,163,800.00
Tulangan Beton 185.07 kg 15,710.00
Bekisting Papan 18.33 m2 351,200.00
Jumlah
Dibulatkan
18 1 M3 Balok Lintel Beton
Beton K - 225 1.00 m3 1,163,800.00
Tulangan Beton 223.73 kg 15,710.00
Bekisting Papan 16.67 m2 351,200.00
Jumlah
Dibulatkan
19 1 M3 Pasangan pondasi batu kali 1 PC : 5 PP
Bahan
Batu Belah 15/20 cm 1.20 m3 110,000.00
Semen Portland 136.00 kg 1,300.00
Pasir Pasang 0.54 m2 150,000.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Batu 0.60 Oh 70,000.00
Kepala Tukang Batu 0.06 Oh 75,000.00
Mandor 0.08 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
20 1 M3 Pasangan pondasi batu kosong (aanstamping)
Bahan
Batu Belah 15/20 cm 1.00 m3 110,000.00
Sirtu 0.43 m3 165,000.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Batu 0.39 Oh 70,000.00
Kepala Tukang Batu 0.60 Oh 75,000.00
Mandor 0.08 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
21 1 M2 Pasangan Bata Merah 1PC : 3PP (1/2 Bata)
Bata merah 5x11x22 cm 70.00 bh 750.00
Semen Portland 14.37 kg 1,300.00
Pasir Pasang 0.04 m3 150,000.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Batu 0.10 Oh 70,000.00
Kepala Tukang Batu 0.01 Oh 75,000.00
Mandor 0.02 Oh 75,000.00
Jumlah
Overhead % Profit 0.10
Dibulatkan
22 1 M2 Pasangan Bata Merah 1PC : 5 PP (1/2 Bata)
Bahan
Bata Merah 5x11x22 cm 70.00 Bh 750.00
Semen Portland 9.68 kg 1,300.00
Pasir Pasang 0.05 m3 150,000.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Batu 0.10 Oh 70,000.00
Kepala Tukang Batu 0.01 Oh 75,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead % Profit 0.10
Dibulatkan
23 1 M2 Plesteran 1 PC : 3 PP, Tebal 20 mm
Bahan
Semen Portland 10.37 kg 1,300.00
Pasir Pasang 0.03 m3 150,000.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Batu 0.10 Oh 70,000.00
Kepala Tukang Batu 0.01 Oh 75,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead % Profit 0.10
Dibulatkan
24 1 M2 Plesteran 1 PC : 5 PP, Tebal 20 mm
Bahan
Semen Portland 6.91 kg 1,300.00
Pasir Pasang 0.04 m3 150,000.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Batu 0.10 Oh 70,000.00
Kepala Tukang Batu 0.01 Oh 75,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead % Profit 0.10
Dibulatkan
25 1 M2 Acian
Bahan
Semen Portland 3.25 kg 1,300.00
Tenaga
Pekerja 0.20 Oh 65,000.00
Tukang Batu 0.10 Oh 70,000.00
Kepala Tukang Batu 0.01 Oh 75,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead % Profit 0.15
Dibulatkan
Analisa Pekerjaan Kusen, Pintu, dan Jendela
26 1 m1 PEK. PEMASANGAN KUSEN ALUMUNIUM ( Permen PU No. 11/PRT/M/2013)
Bahan :
Kusen Alumunium 3 " sek. Alexindo 1.10 m' 90,000.00
Sekrup fisher 2.00 bh 20,000.00
Sealant 0.06 tube 6,000.00
Tenaga Kerja :
Pekerja 0.20 Oh 65,000.00
Tukang Alumunium 0.09 Oh 70,000.00
Kepala Tukang Alumunium 0.01 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
jumlah
Dibulatkan
27 1 m1 PEK. PEMASANGAN KUSEN ALUMUNIUM ( Permen PU No. 11/PRT/M/2013)
Bahan :
Kusen Alumunium 4 " sek. Alexindo 1.10 m' 100,000.00
Sekrup fisher 2.00 bh 20,000.00
Sealant 0.06 tube 6,000.00
Tenaga Kerja :
Pekerja 0.20 Oh 65,000.00
Tukang Alumunium 0.09 Oh 70,000.00
Kepala Tukang Alumunium 0.01 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
jumlah
Dibulatkan
28 1 M1 Rangka Daun Pintu Alumunium
Bahan
Rangka Daun Pintu 1.10 m'
Sekrup fisher 2.00 bh 20,000.00
Sealant 0.06 tube 6,000.00
Tenaga Kerja :
Pekerja 0.20 Oh 65,000.00
Tukang kayu 0.09 Oh 70,000.00
Kepala Tukang kayu 0.01 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & profit 0.10
jumlah
Dibulatkan
29 1 M1 Pasang Daun Jendela, Rangka Alumunium
Bahan
Rangka Daun Jendela 1.10 m' 110,000.00
Sekrup fisher 2.00 bh 20,000.00
Sealant 0.06 tube 6,000.00
Tenaga
Pekerja 0.20 Oh 65,000.00
Tukang kayu 0.09 Oh 70,000.00
Kepala Tukang kayu 0.01 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & profit 0.10
jumlah
Dibulatkan
30 1 M2 Pasangan Rangka Atap Baja Ringan Terpasang
Bahan
Baja Ringan 1.00 m2 165,000.00
Jumlah
Overhead & profit 0.10
Dibulatkan
30 1 M2 Pemasangan Besi hollo 40.40.2 Rangka Plafond
Bahan :
Rangka Vesi Metal Hollo 40.40.2 5.00 m1 35,000.00
Tenaga Kerja :
Pekerja 0.25 Oh 65,000.00
Tukang 0.03 Oh 70,000.00
Kepala Tukang 0.00 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & profit 0.10
Dibulatkan
31 1 M Pasang Listplank GRC
Bahan
Lisplank GRC T=6 mm 1.00 m1 20,000.00
Paku cacing 0.02 kg 16,200.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Gypsum 0.20 Oh 70,000.00
Kepala tukang gypsum 0.02 Oh 75,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead & profit 0.10
Dibulatkan
ERPUSTAKAAN SMK
Majalengka
gka - Jawa Barat 45464
PUSTAKAAN SMK
AWA BARAT
7 = (3 x 6) 8 = (3 x 6) 9
33,000.00 33,000.00
312.00 312.00
20,650.00 20,650.00
6,500.00 6,500.00
7,000.00 7,000.00
750.00 750.00
375.00 375.00
68,587.00
6,858.70 75,445.70
75,400.00
32,500.00 32,500.00
1,875.00 1,875.00
34,375.00
3,437.50 37,812.50
37,800.00
17,062.50 17,062.50
660.00 660.00
17,722.50
1,772.25 19,494.75
19,400.00
32,500.00 32,500.00
1,425.00 1,425.00
33,925.00
3,392.50 37,317.5000
37,300.00
165,000.00 165,000.00
3,250.00 3,250.00
750.00 750.00
169,000.00
16,900.00 185,900.00
185,900.00
130,650.00 130,650.00
1,950.00 1,950.00
4,550.00 4,550.00
4,900.00 4,900.00
525.00 525.00
300.00 300.00
142,875.00
14,287.50 157,162.50
15,710.00
132,750.00 132,750.00
4,800.00 4,800.00
500.00 500.00
33,800.00 33,800.00
18,200.00 18,200.00
1,950.00 1,950.00
1,950.00 1,950.00
193,950.00
19,395.00 213,345.00
213,300.00
118,000.00 118,000.00
6,400.00 6,400.00
1,000.00 1,000.00
68,750.00 68,750.00
3,850.00 3,850.00
35,000.00 35,000.00
42,900.00 42,900.00
23,100.00 23,100.00
2,475.00 2,475.00
2,475.00 2,475.00
303,950.00
30,395.00 334,345.00
334,300.00
118,000.00 118,000.00
6,400.00 6,400.00
1,000.00 1,000.00
49,500.00 49,500.00
38,500.00 38,500.00
35,000.00 35,000.00
42,900.00 42,900.00
23,100.00 23,100.00
2,475.00 2,475.00
2,475.00 2,475.00
319,350.00
31,935.00 351,285.00
351,200.00
118,000.00 118,000.00
6,400.00 6,400.00
1,000.00 1,000.00
41,250.00 41,250.00
38,500.00 38,500.00
105,000.00 105,000.00
42,900.00 42,900.00
23,100.00 23,100.00
2,475.00 2,475.00
2,475.00 2,475.00
381,100.00
38,110.00 419,210.00
419,200.00
257,140.00 257,140.00
90,750.00 90,750.00
141,007.00 141,007.00
32,500.00 32,500.00
14,000.00 14,000.00
3,750.00 3,750.00
750.00 750.00
539,897.00
53,989.70 593,886.70
593,800.00
423,800.00 423,800.00
89,595.00 89,595.00
140,970.00 140,970.00
215,000.00 215,000.00
107,250.00 107,250.00
19,250.00 19,250.00
1,950.00 1,950.00
4,725.00 4,725.00
1,002,540.00
100,254.00 1,102,794.00
1,102,700.00
482,300.00 482,300.00
82,335.00 82,335.00
143,560.00 143,560.00
215,000.00 215,000.00
107,250.00 107,250.00
19,250.00 19,250.00
2,100.00 2,100.00
6,225.00 6,225.00
1,058,020.00
105,802.00 1,163,822.00
1,163,800.00
1,163,800.00 1,163,800.00
2,441,438.73 2,441,438.73
2,844,000.00 2,844,000.00
6,449,238.73
6,449,200.00
1,163,800.00 1,163,800.00
2,441,438.73 2,441,438.73
7,800,333.33 7,800,333.33
11,405,572.07
11,405,500.00
1,163,800.00 1,163,800.00
2,362,190.51 2,362,190.51
4,457,333.33 4,457,333.33
7,983,323.84
7,983,300.00
1,163,800.00 1,163,800.00
2,907,502.07 2,907,502.07
6,438,666.67 6,438,666.67
10,509,968.73
10,509,900.00
1,163,800.00 1,163,800.00
3,514,738.95 3,514,738.95
5,853,333.33 5,853,333.33
10,531,872.28
10,531,800.00
132,000.00 132,000.00
176,800.00 176,800.00
81,600.00 81,600.00
32,500.00 32,500.00
42,000.00 42,000.00
4,500.00 4,500.00
5,625.00 5,625.00
475,025.00
47,502.50 522,527.50
522,500.00
110,000.00 110,000.00
71,280.00 71,280.00
32,500.00 32,500.00
27,300.00 27,300.00
45,000.00 45,000.00
5,625.00 5,625.00
291,705.00
29,170.50 320,875.50
320,800.00
52,500.00 52,500.00
18,681.00 18,681.00
6,000.00 6,000.00
32,500.00 32,500.00
7,000.00 7,000.00
750.00 750.00
1,125.00 1,125.00
118,556.00
11,855.60 130,411.60
130,400.00
52,500.00 52,500.00
12,584.00 12,584.00
6,750.00 6,750.00
32,500.00 32,500.00
7,000.00 7,000.00
750.00 750.00
937.50 937.50
113,021.50
11,302.15 124,323.65
124,300.00
13,478.40 13,478.40
4,650.00 4,650.00
32,500.00 32,500.00
7,000.00 7,000.00
750.00 750.00
937.50 937.50
59,315.90
5,931.59 65,247.49
65,200.00
8,985.60 8,985.60
5,250.00 5,250.00
32,500.00 32,500.00
7,000.00 7,000.00
750.00 750.00
937.50 937.50
55,423.10
5,542.31 60,965.41
60,900.00
4,225.00 4,225.00
13,000.00 13,000.00
7,000.00 7,000.00
750.00 750.00
750.00 750.00
25,725.00
3,858.75 29,583.75
29,500.00
PRT/M/2013)
99,000.00 99,000.00
40,000.00 40,000.00
360.00 360.00
13,000.00 13,000.00
6,020.00 6,020.00
645.00 645.00
315.00 315.00
159,340.00
15,934.00 175,274.00
175,200.00
PRT/M/2013)
110,000.00 110,000.00
40,000.00 40,000.00
360.00 360.00
13,000.00 13,000.00
6,020.00 6,020.00
645.00 645.00
315.00 315.00 960.00
170,340.00
17,034.00 187,374.00
187,300.00
- -
40,000.00 40,000.00
360.00 360.00
13,000.00 13,000.00
6,020.00 6,020.00
645.00 645.00
315.00 315.00
60,340.00
6,034.00 66,374.00
66,300.00
121,000.00 121,000.00
40,000.00 40,000.00
360.00 360.00
13,000.00 13,000.00
6,020.00 6,020.00
645.00 645.00
315.00 315.00
181,340.00
18,134.00 199,474.00
199,400.00
165,000.00 165,000.00
165,000.00
16,500.00 181,500.00
181,500.00
175,000.00 175,000.00
16,250.00 16,250.00
1,750.00 1,750.00
187.50 187.50
97.50 97.50
193,285.00
19,328.50 212,613.50
212,600.00
20,000.00 20,000.00
324.00 324.00
32,500.00 32,500.00
14,000.00 14,000.00
1,500.00 1,500.00
375.00 375.00
68,699.00
6,869.90 75,568.90
75,500.00
2,100.00 2,100.00
2,100.00
210.00 2,310.00
2,300.00
5,000.00 5,000.00
5,000.00
500.00 5,500.00
5,500.00
18,054.40 18,054.40
162.00 162.00
32,500.00 32,500.00
4,900.00 4,900.00
525.00 525.00
112.50 112.50
56,253.90
5,625.39 61,879.29
61,800.00
17,360.00 17,360.00
162.00 162.00
32,500.00 32,500.00
4,900.00 4,900.00
525.00 525.00
112.50 112.50
55,559.50
5,555.95 61,115.45
61,100.00
19,000.00 19,000.00
162.00 162.00
32,500.00 32,500.00
4,900.00 4,900.00
525.00 525.00
112.50 112.50
57,199.50
5,719.95 62,919.45
62,900.00
78,000.00 78,000.00
32,500.00 32,500.00
3,500.00 3,500.00
375.00 375.00
225.00 225.00
114,600.00
11,460.00 126,060.00
126,000.00
31,500.00 31,500.00
13,000.00 13,000.00
6,300.00 6,300.00
5,800.00 5,800.00
32,500.00 32,500.00
21,000.00 21,000.00
2,625.00 2,625.00
225.00 225.00
112,950.00
11,295.00 124,245.00
124,200.00
42,000.00 42,000.00
13,000.00 13,000.00
6,300.00 6,300.00
5,800.00 5,800.00
32,500.00 32,500.00
24,500.00 24,500.00
2,625.00 2,625.00
225.00 225.00
126,950.00
12,695.00 139,645.00
139,600.00
31,100.00 31,100.00
13,000.00 13,000.00
6,300.00 6,300.00
5,800.00 5,800.00
32,500.00 32,500.00
24,500.00 24,500.00
2,625.00 2,625.00
225.00 225.00
116,050.00
11,605.00 127,655.00
127,600.00
31,500.00 31,500.00
13,000.00 13,000.00
6,300.00 6,300.00
5,800.00 5,800.00
32,500.00 32,500.00
21,000.00 21,000.00
2,625.00 2,625.00
225.00 225.00
112,950.00
11,295.00 124,245.00
124,200.00
34,400.00 34,400.00
13,000.00 13,000.00
6,300.00 6,300.00
5,800.00 5,800.00
3,250.00 3,250.00
210.00 210.00
22.50 22.50
- -
62,982.50
6,298.25 69,280.75
69,200.00
/2013)
21,000.00 21,000.00
7,800.00 7,800.00
8,400.00 8,400.00
900.00 900.00
450.00 450.00
38,550.00
3,855.00 10%
42,405.00
42,400.00
750.00 750.00
3,000.00 3,000.00
6,500.00 6,500.00
1,300.00 1,300.00
4,410.00 4,410.00
472.50 472.50
225.00 225.00
16,657.50
1,665.75 18,323.25
18,300.00
500.00 500.00
45.00 45.00
1,300.00 1,300.00
14,000.00 14,000.00
1,500.00 1,500.00
225.00 225.00
17,570.00
1,757.00 19,327.00
19,300.00
5,000.00 5,000.00
900.00 900.00
470.00 470.00
450.00 450.00
2,600.00 2,600.00
4,200.00 4,200.00
1,200.00 1,200.00
187.50 187.50
15,007.50
1,500.75 16,508.25
16,500.00
7,000.00 7,000.00
1,300.00 1,300.00
14,000.00 14,000.00
1,500.00 1,500.00
- -
23,800.00
2,380.00
26,180.00 28,560.00
28,500.00
7,000.00 7,000.00
1,300.00 1,300.00
14,000.00 14,000.00
1,500.00 1,500.00
- -
23,800.00
2,380.00 26,180.00
26,180.00
26,100.00
85,000.00 85,000.00
1,300.00 1,300.00
14,000.00 14,000.00
1,500.00 1,500.00
- -
101,800.00
10,180.00 10%
111,980.00
111,900.00
3)
110,000.00 110,000.00
1,300.00 1,300.00
14,000.00 14,000.00
1,500.00 1,500.00
- -
126,800.00
12,680.00
139,480.00
139,400.00
90,000.00 90,000.00
1,300.00 1,300.00
14,000.00 14,000.00
1,500.00 1,500.00
- -
106,800.00
10,680.00
117,480.00
117,400.00
)
8,500.00 8,500.00
650.00 650.00
7,000.00 7,000.00
750.00 750.00
- -
16,900.00
1,690.00
18,590.00
18,500.00
RT/M/2013)
85,000.00 85,000.00
650.00 650.00
7,000.00 7,000.00
750.00 750.00
- -
93,400.00
9,340.00
102,740.00
102,700.00
6,750.00 6,750.00
27,500.00 27,500.00
117,360.00 117,360.00
136,920.00 136,920.00
20,650.00 20,650.00
30,918.00 309,180.00
340,098.00
- -
50.00 50.00
650.00 650.00
28,000.00 28,000.00
3,000.00 3,000.00
375.00 375.00
32,075.00
3,207.50 35,282.50
35,200.00
275,000.00 275,000.00
650.00 650.00
28,000.00 28,000.00
3,000.00 3,000.00
375.00 375.00
307,025.00
30,702.50 337,727.50
337,700.00
PRT/M/2013)
85,800.00 85,800.00
13,000.00 13,000.00
6,300.00 6,300.00
750.00 750.00
- -
105,850.00
10,585.00
116,435.00
116,400.00
350,000.00 350,000.00
650.00 650.00
7,000.00 7,000.00
750.00 750.00
375.00 375.00
358,775.00
35,877.50 15%
394,652.50
394,600.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
12,000.00
12,000.00
31,000.00 31,000.00
10,405.80 10,405.80
4,981.50 4,981.50
10,081.50 10,081.50
1,500.00 1,500.00
- -
- -
- -
- - 57,968.80
1,342,800.00 1,342,800.00
484,000.00 484,000.00
198,900.00 198,900.00
25,500.00 25,500.00
255,000.00 255,000.00
21,000.00 21,000.00
462,600.00 462,600.00
42,120.00 42,120.00
176,400.00 176,400.00
14,040.00 14,040.00
850,000.00 850,000.00
1,326,600.00 1,326,600.00
37,440.00 37,440.00
17,000.00 17,000.00
85,000.00 85,000.00
7,000.00 7,000.00
180,000.00 180,000.00
Halaman : 50
1 2 3
1 2 3
35 Tanah Liat m³
Halaman : 52
1 2 3
B. BAHAN FINISHING :
LABURAN, PENGISI DAN ALATNYA
1 Plamir Tembok kg
2 Cat Tembok ICI Eksterior ( Beton ) lt
3 Cat Tembok ICI Interior ( Plafond dan Dinding ) lt
4 Cat Tembok Vinilex kg
5 Cat Dasar ICI untuk Interior ( 2 Pelapis ) lt
6 Cat Tembok Sanlex kg
7 Cat Tahan Asam kg
8 Pelapis Alkali ICI ( Cat Dasar Beton Ekterior ) lt
9 Cat Marka / Spotlight kg
10 Water Profing Emulsion kg
11 Water Profing Membrance ml
12 Rool Cat Tembok bh
13 Kape Tembok bh
14 Kape Kayu bh
15 Kwas 3" bh
16 Oker kg
17 Oyan bks
18 Oten (Pewarna Plitur ) bks
19 Spirtus lt
20 Terpentin lt
21 Tiner A lt
22 Tiner B lt
23 Minyak Cat lt
24 Kumpon kg
25 Melamik kg
26 Dempul Plastik kg
27 Dempul Duco kg
28 Ampelas lbr
29 Dempul Kayu Cap Kucing kg
30 Meni Kayu / Besi kg
31 Cat Kayu Sieve kg
32 Cat Kayu Avian kg
33 Cat Besi Sieve kg
34 Cat Besi Duco Danaglos/ICI kg
35 Cat Bron kg
36 Bahan Bakar Residu lt
1 2 3
10 Kayu Papan Kamper Banjar m³
11 Kayu Balok Kamper Samarinda m³
12 Kayu Papan Kamper Samarinda m³
13 Kayu Balok Rasamala m³
14 Kayu Jati Jatim Tua dia. 40 cm m³
15 Kayu Jati Jateng Tua dia. 40 cm m³
16 Kayu Jati Jabar Tua dia. 40 cm m³
17 Kayu Jati Jabar dia. 40 cm kebawah m³
4 Kayu Hutan Kelas I ( Segeng, Mahoni, Laban ) m³
5 Kayu Terentang m³
6 Kayu Albasia m³
21 Dolken 5 s/d 7 bt
22 Dolken 8 s/d 10 bt
23 List profil kamper 1 cm m1
24 List profil kamper 2 cm m1
25 List profil kamper 4 cm m1
26 List profil kamper 5 cm m1
27 List profil kamper 10 cm m1
28 Pegangan Tangga profil Jati m1
29 Pegangan Tangga profil Kamper m1
30 Kayu Reng 2/3 Borneo Super m1
7 Kayu Reng 2/3 Kamper Banjar m1
8 Kayu Reng 3/4 Kamper Banjar m1
Halaman : 54
1 2 3
D. BAHAN PENUTUP RANGKA PLAFOND
1 Bahan plafond Enternit 4 mm m²
2 Bahan plafond hardpleks 5 mm 120 x 240 lbr
3 Bahan plafond Asbes Semen 5 mm / GRC m²
4 Gypsum 120 x 240 t = 9 mm ex DN lbr
5 Gypsum 120 x 240 t = 9 mm ex Luar lbr
6 Acustik Amstrong 60 x 120 lbr
7 GRC lbr
8 List Gypsum m1
1 2 3
163 Tegel Warna 30 x 30 bh
164 Plin Tegel Warna 15 x 30 bh
165 Tegel Wafel PC 20 x 20 bh
166 Tegel Wafel Warna 20 x 20 bh
167 Tegel Badak PC 30 x 30 bh
1 Poslin 11 x 11 Warna Standar DN m²
2 Poslin 11 x 11 Warna Khusus DN m²
3 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos m²
4 Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip m²
1 Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip m²
2 Keramik 20 x 20 (KM) KWI DN Putih Polos m²
3 Keramik 20 x 25 Dinding KM KWI DN Corak m²
4 Keramik 30 x 30 KW I DN putih polos m²
5 Keramik 30 x 30 KW I DN Warna/Corak ( ANTI SLIP ) m²
6 Keramik 40 x 40 KW I DN Warna/Corak ( ANTI SLIP ) m²
7 Keramik 40 x 40 KW I DN putih polos m²
8 Granit Alam LN Ukuran Besar m²
9 Granit Alam LN Ukuran Kecil m²
10 Granit Alam DN Ukuran Besar m²
11 Granit Alam DN Ukuran Kecil m²
12 Granito Tile Essenza Ukuran 40 x 40 Polis m²
13 Granito Tile Essenza Ukuran 40 x 40 Unpolis m²
14 Granito Tile Essenza 60 x 60 Polis m²
15 Granito Tile Essenza 60 x 60 Unpolis m²
16 Bata Karawang bh
17 Campuran untuk Kedap Air (AM) ltr
Halaman : 56
1 2 3
G. BAHAN SALURAN AIR KOTOR / BERSIH
1 Grafel U 20 cm' m1
2 Grafel U 30 cm' m1
3 Grafel U 40 cm' m1
4 Buis Beton Ø 20 cm ( 1 m' ) m1
5 Buis Beton Ø 30 cm ( 1 m' ) m1
6 Buis Beton Ø 40 cm ( 1 m' ) m1
7 Buis Beton Ø 50 cm ( 1 m' ) stk
8 Buis Beton Ø 60 cm ( 1 m' ) stk
9 Buis Beton Ø 100 cm ( 0.50 m ) stk
10 Buis Beton Ø 80 cm ( 0.50 m ) stk
11 Buis Tanah Ø 10 cm ( 0.50 m ) stk
12 Buis Tanah Ø 15 cm ( 0.50 m ) stk
13 Buis Tanah Ø 20 cm ( 0.50 m ) stk
14 Buis Tanah Ø 25 cm ( 0.50 m ) stk
15 Injuk kg
1 2 3
11 Plat Srip Ø 2 x 30 mm ( 6 m1) bt
12 Plat Srip Ø 3 x 30 mm ( 6 m1) bt
13 Plat Alumunium 0.2 mm m²
14 Plat Alumunium 0.3 mm m²
15 Plat Alumunium 0.4 mm m²
16 Plat Alumunium 0.5 mm m²
17 Plat Alumunium 0.6 mm m²
18 Plat Alumunium 0.1 mm m²
19 Kusen Alumunium Natural 1.3 mm t=1,3 mm ( 4 " ) m1
20 Kusen Alumunium Warna 1.3 mm t=1,3 mm ( 4 " ) m1
21 Daun Jendela Alumunium Natural ( Tanpa Kaca dan accessories ) m²
22 Daun Jendela Alumunium Warna ( Tanpa Kaca dan accessories ) m²
23 Daun Pintu Alumunium Natural ( tanpa kaca dan accessories ) m²
24 Daun Pintu Alumunium Warna ( tanpa kaca dan accessories ) m²
25 Handle Alumunium ( Tarikan Pintu Alumunium ) bh
26 Kait Angin alumunium ps
27 Karet Asisoris Kusen / Pintu Alumunium m1
28 Seng Plat BJLS 30 dia. 60 cm ( 100 m1 ) rool
29 Seng Plat BJLS 30 dia. 90 cm ( 100 m1 ) rool
30 Plat Besi Tipis 1 mm kg
31 Plat Besi Tipis 0.5 mm kg
32 Plat Besi 2 mm s/d 5 mm kg
33 Plat Besi 6 mm s/d 10 mm kg
34 Plat Besi 10 mm Ke atas kg
35 Lem Kuning (aibond) kg
36 Lem Fox kg
Halaman : 58
1 2 3
I. BAHAN KACA
1 Kaca Polos 2 mm ( ASAHI ) m²
2 Kaca Polos 3 mm ( ASAHI ) m²
3 Kaca Polos 5 mm ( ASAHI ) m²
4 Kaca Rayband 5 mm ( ASAHI ) m²
5 Kaca Rayband 8 mm ( ASAHI ) m²
6 Kaca Rayband 12 mm ( ASAHI ) m²
7 Kaca Patri Lokal Terpasang ( ASAHI ) m²
8 Kaca Patri EX Luar negeri terpasang m²
9 Kaca 6 mm Gravver m²
10 Glass Block DN 20 x 20 ( Kedawung ) bh
11 Glass Block DN 20 x 20 Ex LN bh
K. BAHAN PERPIPAAN
293 Besi Pipa untuk Hydrant BSP Ø 1" bt
294 Besi Pipa untuk Hydrant BSP Ø 1,25" bt
295 Besi Pipa untuk Hydrant BSP Ø 1,5" bt
296 Besi Pipa untuk Hydrant BSP Ø 2" bt
297 Besi Pipa untuk Hydrant BSP Ø 2,5" bt
298 Besi Pipa untuk Hydrant BSP Ø 3" bt
299 Besi Pipa untuk Hydrant BSP Ø 4" bt
300 Besi Pipa untuk Hydrant BSP Ø 6" bt
301 Besi Pipa Hitam Ø 1" t=2 mm bt
302 Besi Pipa Hitam Ø 2" t=2 mm bt
303 Besi Pipa Hitam Ø 3" t=2 mm bt
304 Besi Pipa Hitam Ø 4" t=2 mm bt
305 Besi Pipa Hitam Ø 6" t=2 mm bt
306 Pipa GIP Medium A Ø 1/2" ( 6 m1 ) bt
307 Pipa GIP Medium A Ø 3/4" ( 6 m1 ) bt
308 Pipa GIP Medium A Ø 1" ( 6 m1 ) bt
309 Pipa GIP Medium A Ø 1 1/4" ( 6 m1 ) bt
Halaman : 59
1 2 3
310 Pipa GIP Medium A Ø 1 1/2" ( 6 m1 ) bt
311 Pipa GIP Medium A Ø 1 3/4"( 6 m1 ) bt
312 Pipa GIP Medium A Ø 2" ( 6 m1 ) bt
313 Pipa GIP Medium A Ø 2 1/2" ( 6 m1 ) bt
314 Pipa GIP Medium A Ø 3" ( 6 m1 ) bt
315 Pipa GIP Medium A Ø 4" ( 6 m1 ) bt
316 Macam2 Sambungan GIP Ø 1/2" bh
317 Macam2 Sambungan GIP Ø 3/4" bh
318 Macam2 Sambungan GIP Ø 1" bh
319 Macam2 Sambungan GIP Ø 1 1/4" bh
320 Macam2 Sambungan GIP Ø 11/2" bh
321 Macam2 Sambungan GIP Ø 13/4" bh
322 Macam2 Sambungan GIP Ø 2" bh
323 Macam2 Sambungan GIP Ø 2 1/2" bh
324 Macam2 Sambungan GIP Ø 3" bh
325 Macam2 Sambungan GIP Ø 4" bh
326 Pipa PVC RUCIKA type AW Ø 1/2" bt
327 Pipa PVC RUCIKA type AW Ø 3/4" bt
328 Pipa PVC RUCIKA type AW Ø 1" bt
329 Pipa PVC RUCIKA type AW Ø 1 1/4" bt
330 Pipa PVC RUCIKA type AW Ø 1 1/2" bt
331 Pipa PVC RUCIKA type AW Ø 2" bt
332 Pipa PVC RUCIKA type AW Ø 2 1/2" bt
333 Pipa PVC RUCIKA type AW Ø 3" bt
334 Pipa PVC RUCIKA type AW Ø 4" bt
335 Pipa PVC RUCIKA type AW Ø 6" bt
336 Pipa PVC RUCIKA type AW Ø 8" bt
1 Pipa PVC MASPION ABU Ø 1/2" (AW) bt
2 Pipa PVC MASPION ABU Ø 3/4" (AW) bt
3 Pipa PVC MASPION ABU Ø 1" (AW) bt
4 Pipa PVC MASPION ABU Ø 1 1/4" (AW) bt
5 Pipa PVC MASPION ABU Ø 1 1/2" (AW) bt
6 Pipa PVC MASPION ABU Ø 2" (AW) bt
7 Pipa PVC MASPION ABU Ø 2 1/2" (AW) bt
8 Pipa PVC MASPION ABU Ø 3" (AW) bt
9 Pipa PVC MASPION ABU Ø 4" (AW) bt
10 Macam2 Sambungan Paralon Ø 1/2" bh
11 Macam2 Sambungan Paralon Ø 3/4" bh
12 Macam2 Sambungan Paralon Ø 1" bh
13 Macam2 Sambungan Paralon Ø 1 1/4" bh
14 Macam2 Sambungan Paralon Ø 1 1/2" bh
15 Macam2 Sambungan Paralon Ø 1 3/4" bh
16 Macam2 Sambungan Paralon Ø 2" bh
17 Macam2 Samb. Paralon Ø 2 1/2" bh
18 Macam2 Samb. Paralon Ø 3" bh
19 Macam2 Samb. Paralon Ø 4" bh
Halaman : 60
1 2 3
20 Sambungan Pipa PVC Jenis AW 4 " TY bh
21 Lem Paralon tb
22 Solatip Leideng gl
23 Pipa PVC 4" berlobang jenis AW m1
Halaman : 61
1 2 3
L. BAHAN SANITAIR
1 Stop Kran 3/4 " KIT bh
2 Stop Kran 1 " KIT bh
3 Stop Kran 1 1/2 " KIT bh
4 Stop Kran 2 " KIT bh
5 Stop Kran 2 1/2" KIT bh
6 Stop Kran 3 " KIT bh
7 Check Valve 1/2 " bh
8 Double Neple 1/2 " bh
9 Water Mur 1/2 " bh
10 Gate Walve 1/2 " bh
11 Saringan Air Lt KM Stainless Steel bh
12 Apooer Bath Tube bh
13 Kran stain less Lokal Kait bh
14 Shower Dengan Tiang bh
15 Shower Tanpa Tiang bh
16 Kran Tembok Sun Eui dia. 1/2 " bh
17 Kran Tembok ITAP dia. 1/2 " bh
18 Kran Bebek Sun Eui 1/2 " bh
19 Kran Bebek ITAP 1/2 " bh
20 Kran Panas Dingin San Eui Standard bh
21 Bath Cape Washteren unit
22 Tempat Sabun Poslin bh
23 Wastafel Lengkap TOTO LW 230 unit
24 Wastafel Lengkap INA unit
25 Closet Jongkok Poslin warna unit
26 Closet Jongkok Standard Putih Poslin TOTO unit
27 Closet Jongkok Lengkap Sistem Jet TOTO unit
28 Closet Duduk Warna Standard TOTO C 240 Lengkap unit
29 Wastafel Bulat Warna Standard Lengkap unit
30 Closet Duduk Warna Standard lengkap INA bh
31 Urinoar Lengkap TOTO Warna Standard lengkap unit
32 Penyekat Poslin Urinoar TOTO lbr
33 Kitchen Zink Stainless Standard Lokal ( 1 Lobang ) bh
34 Kitchen Zink Stainless Non Standard Franke ( 1 Lobang ) bh
35 Kitchen Zink Stainless Non Standard Franke ( 2 Lobang ) bh
1 2 3
9 Atap Tegola Kwalitas Sedang m²
10 Aluminium foile m²
11 Atap Genteng Plentong pres Bakar KW 1 bh
12 Atap Genteng Plentong pres Bakar KW 1 Glazzur bh
13 Atap Genteng Plentong pres Molen Oven KW1 bh
14 Atap Genteng Flam pres Molen Oven Jatiwangi bh
15 Bubung Genteng pres Bulat Ex Jatiwangi bh
16 Genteng Bubungan Ex Jatiwangi Segi Tiga bh
17 Genteng Murando Natural 1m2 = 20 bh bh
18 Genteng Murando Glasur 1m2 = 20 bh bh
19 Bubung Murando Natural bh
20 Bubung Murando Glasur bh
21 Bubungan Genteng Keramik bh
Halaman : 63
1 2 3
N. BAHAN MEKANIKAL
1 Jockey Pump kap. 80 gln / menit 100 m1 ( 18,6 kW ) unit
2 Electrical Pump kap. 750 gln / menit 120 m1 ( 90 kW ) unit
3 Diesel Pump kap. 750 gln / menit 120 m1 ( 105 kW ) unit
4 Presure Tank kap. 500 liter lengkap unit
5 Hydran Box dalam Gedung (lengkap) unit
6 Fire House 1.5 x 30 m + nose unit
7 Exhouse Fan H 360 W 60 x 60 cm unit
8 Exhouse Fan H 380 W CFM 55 x 55 cm unit
9 Exhouse Fan H 100 W 40 x 40 cm unit
10 AC Split 3 PK Setara TOSHIBA unit
11 AC Split 2 PK Setara TOSHIBA unit
12 AC Split 1 PK Setara TOSHIBA unit
13 Mesin AC Split DAIKIN ( Indoor / Outdoor Unit ) 1 BTU
O. BAHAN ELEKTRIKAL
1 Kabel NYA 1x 1.5 Prima (1 rol = 50 m') ROLL
2 Kabel NYA 1x 2.5 Prima (1 rol = 50 m') ROLL
3 Kabel NYM 2 x 1.5 Prima (1 rol = 50 m') m'
4 Kabel NYM 3 x 1.5 Prima (1 rol = 50 m') m'
5 Kabel NYM 2 x 2.5 Prima (1 rol = 50 m') m'
6 Kabel NYM 3 x 2.5 Prima (1 rol = 50 m') m'
7 Kabel NYM 4 x 2.5 Prima (1 rol = 50 m') m'
8 Kabel NYM 2 x 4 Prima (1 rol = 50 m') m'
9 Kabel NYM 3 x 4 Prima (1 rol = 50 m') m'
10 Kabel NYM 4 x 4 Prima (1 rol = 50 m') m'
11 Kabel NYM 2 x 6 Supreme (1 rol = 50 m') m'
12 Kabel NGA 3 x 6 Supreme (1 rol = 50 m') m'
13 Kabel NGA 4 x 6 Supreme (1 rol = 50 m') m'
14 Kabel NGA 2 x 10 Supreme (1 rol = 50 m') m'
15 Kabel NGA 3 x 10 Supreme (1 rol = 50 m') m'
16 Kabel NGA 4 x 10 Supreme (1 rol = 50 m') m'
17 Kabel NGA 4 x 16 Supreme (1 rol = 50 m') m'
18 Kabel NYY 2 x 4 Supreme (1 rol = 50 m') m'
19 Kabel NYY 3 x 4 Supreme (1 rol = 50 m') m'
20 Kabel NYY 4 x 4 Supreme (1 rol = 50 m') m'
21 Kabel NYY 2 x 6 Supreme (1 rol = 50 m') m'
22 Kabel NYY 3 x 6 Supreme (1 rol = 50 m') m'
23 Kabel NYY 4 x 6 Supreme (1 rol = 50 m') m'
24 Kabel NYY 2 x 10 Supreme (1 rol = 50 m') m'
25 Kabel NYY 3 x 10 Supreme (1 rol = 50 m') m'
26 Kabel NYY 4 x 10 Supreme (1 rol = 50 m') m'
27 Kabel NYY 4 x 16 Supreme (1 rol = 50 m') m'
28 NSFB FUJI EA - 100 A bh
29 NSFB FUJI EA - 150 A bh
30 Rumah Panel 30 x 60 cm (kosong) unt
Halaman : 64
1 2 3
31 Skring Kas 2 grop Biasa unt
32 Skring Kas 3 grop Biasa unt
33 Skring Kas 5 grop Biasa unt
34 MCB 1 PAS bh
35 MCB 3 PAS bh
36 Tahanan 50 A Merk Fuji bh
37 Saklar Broko Tunggal Standard ( 1 Phase ) bh
38 Saklar Broko Seri Standard ( 1 Phase ) bh
39 Stop Kontak Broko Standard ( 1 Phase ) bh
40 Stop Kontak Broko 3 Phase ( Out Bow ) bh
41 Stop Kontak Broko 3 Phase ( In Bow ) bh
42 Stop Kontak Handle 3 Phase bh
43 Instalasi Titik Lampu / Stop Kontak ( Upah dan Alat ) ttk
44 Lampu pijar 25 Watt s/d 100 Watt bh
45 Lampu Neon TL Philip 20 W bh
46 Lampu Neon TL Philip 40 W bh
47 Trapo TL 20 W ( Philip ) bh
48 Trapo TL 40 W ( Philip ) bh
49 Trapo TL 20 W ( Sinar ) bh
50 Trapo TL 40 W ( Sinar ) bh
51 Stater Neon Philip bh
52 Stater Neon Biasa bh
53 Rumah TL In Bow / Out Bow 2 x 20 W ( Kosongan ) bh
54 Down Light + SL 25 W bh
55 Lampu SL Philip 25 W bh
56 Lampu Sirkel TL 20 W Lengkap bh
57 Lampu Mercuri 80 W bh
58 Lampu Taman + Tiang + Lampu 1 Buah bh
59 Lampu Baret 30 cm + Neon bh
60 Lampu Neon Arcrilik 2 x 40 W lengkap bh
61 Jarum Penangkal Petir 16 bh
62 Kawat BC ( Tembaga ) kg
63 Pentanahan Penangkal Petir ttk
64 Pentanahan Panel ttk
1 2 3
11 Kunci 2 Slaag Silinder Utama Standard bh
12 Kunci Gembok Besar bh
13 Kunci 2 Slaag Kuda Terbang bh
14 Espangolet ps
15 Grendel 15 cm bh
16 Grendel 5 cm bh
17 Hak Angin Kait Jendela Biasa ps
18 Hak Angin Jendela Antik ps
19 Hak Angin Sendok Stainless / Kuningan bh
20 Nako Lengkap Tralis 1 Daun dn
21 Sloot Pintu berikut Rantai bh
22 Sloot Jendela Tunggal bh
23 Engsel Pintu Unilon Standard ps
24 Engsel Jendela Unilon ps
25 Engsel Patrun ps
26 Engsel Harmonika m1
27 Door Closer Kelas Standard ( Kelas Sedang ) unt
28 Door Closer Kelas Standard ( Kelas Baik ) unt
29 Door Closer Kelas Rendah unt
30 Tarikan Almari Rata - rata bh
31 Seng BJLS 30 lebar 60cm (1 rol 50 m' ) m1
32 Seng BJLS 30 lebar 90cm (1 rol 50 m' ) m1
ADE WAHYUDIN
Direktur
Halaman : 66
HARGA SAT.
Rp.
4
90,000.00
100,000.00
110,000.00
115,000.00
120,000.00
85,000.00
12,000.00
210,000.00
185,000.00
130,000.00
125,000.00
102,700.00
80,000.00
90,000.00
700.00
500.00
1,300.00
3,500.00
6,000.00
9,500.00
4,500.00
39,000.00
44,000.00
35,000.00
40,000.00
32,000.00
1,230.00
1,000.00
31,000.00
1,200,000.00
1,100,000.00
950,000.00
115,000.00
75,000.00
4,500.00
5,800.00
Halaman : 67
HARGA SAT.
Rp.
4
70,000.00
Halaman : 68
HARGA SAT.
Rp.
4
6,600.00
50,000.00
48,000.00
20,500.00
57,000.00
16,200.00
14,000.00
28,200.00
57,000.00
51,000.00
43,000.00
16,900.00
5,100.00
4,700.00
5,500.00
23,500.00
2,200.00
2,400.00
11,100.00
4,500.00
13,000.00
14,200.00
4,200.00
11,200.00
33,600.00
20,000.00
23,200.00
3,400.00
28,600.00
13,300.00
35,800.00
39,800.00
38,000.00
65,000.00
32,300.00
5,000.00
4,500,000.00
4,422,000.00
4,622,000.00
5,344,000.00
5,555,000.00
5,500,000.00
Halaman : 69
HARGA SAT.
Rp.
4
5,600,000.00
5,600,000.00
5,700,000.00
4,500,000.00
8,850,000.00
9,000,000.00
5,055,000.00
5,000,000.00
3,033,000.00
2,500,000.00
1,777,000.00
11,500.00
14,000.00
3,300.00
4,200.00
7,200.00
9,200.00
15,500.00
80,500.00
25,000.00
3,500.00
4,000.00
5,000.00
Halaman : 70
HARGA SAT.
Rp.
4
7,000.00
40,000.00
9,200.00
51,300.00
55,700.00
75,000.00
48,700.00
18,000.00
41,700.00
51,200.00
32,000.00
73,400.00
95,500.00
75,000.00
9,000.00
10,000.00
15,000.00
75,000.00
96,600.00
135,500.00
178,300.00
74,100.00
65,000.00
95,000.00
200,000.00
90,000.00
100,000.00
63,300.00
75,000.00
80,000.00
35,000.00
95,000.00
120,000.00
132,000.00
75,000.00
900.00
800.00
1,100.00
800.00
900.00
800.00
Halaman : 71
HARGA SAT.
Rp.
4
1,100.00
1,000.00
900.00
1,000.00
900.00
25,000.00
26,000.00
37,200.00
34,400.00
39,300.00
31,100.00
38,300.00
31,500.00
40,100.00
47,500.00
41,700.00
1,350,000.00
1,200,000.00
1,200,000.00
1,000,000.00
1,150,000.00
1,035,000.00
110,000.00
325,000.00
5,500.00
20,700.00
Halaman : 72
HARGA SAT.
Rp.
4
19,400.00
26,100.00
32,300.00
34,800.00
48,300.00
55,000.00
71,100.00
83,300.00
126,100.00
104,500.00
6,000.00
7,500.00
9,500.00
10,000.00
5,700.00
9,500.00
9,500.00
115,000.00
150,000.00
100,000.00
10,000.00
11,000.00
9,500.00
11,000.00
10,000.00
8,000.00
15,400.00
7,200.00
6,000.00
12,300.00
39,700.00
9,200.00
11,800.00
12,100.00
21,300.00
25,200.00
24,100.00
21,700.00
33,000.00
30,000.00
24,000.00
28,000.00
18,200.00
Halaman : 73
HARGA SAT.
Rp.
4
20,000.00
26,000.00
60,000.00
75,000.00
97,000.00
112,000.00
120,000.00
37,000.00
100,000.00
130,000.00
85,000.00
110,000.00
145,000.00
160,000.00
265,000.00
58,000.00
6,000.00
1,150,000.00
1,400,000.00
9,000.00
9,000.00
9,500.00
12,500.00
15,000.00
18,100.00
12,700.00
Halaman : 74
HARGA SAT.
Rp.
4
35,000.00
52,000.00
78,300.00
87,700.00
220,000.00
345,000.00
1,100,000.00
3,000,000.00
750,000.00
21,500.00
65,000.00
15,600.00
13,300.00
12,700.00
1,400.00
700.00
16,200.00
20,000.00
9,500.00
6,000.00
42,000.00
10,000.00
7,500.00
5,000.00
98,000.00
120,000.00
163,000.00
276,000.00
304,000.00
419,000.00
590,000.00
980,000.00
68,000.00
120,000.00
213,000.00
274,000.00
365,000.00
68,000.00
78,000.00
115,000.00
143,000.00
Halaman : 75
HARGA SAT.
Rp.
4
170,000.00
207,000.00
255,000.00
339,000.00
412,800.00
543,700.00
3,600.00
4,600.00
7,200.00
8,900.00
10,200.00
17,700.00
23,500.00
3,200.00
38,600.00
44,600.00
15,000.00
19,000.00
25,000.00
32,000.00
39,000.00
60,000.00
46,000.00
51,700.00
103,500.00
138,000.00
695,700.00
14,400.00
20,100.00
24,800.00
33,600.00
42,200.00
60,300.00
76,400.00
108,600.00
152,900.00
1,700.00
2,200.00
2,400.00
3,800.00
4,200.00
5,000.00
6,800.00
11,800.00
19,000.00
25,800.00
Halaman : 76
HARGA SAT.
Rp.
4
64,400.00
5,200.00
2,000.00
25,800.00
Halaman : 77
HARGA SAT.
Rp.
4
97,700.00
119,600.00
163,300.00
270,000.00
325,000.00
420,000.00
44,000.00
40,000.00
37,900.00
44,800.00
48,300.00
195,500.00
43,700.00
559,400.00
208,300.00
102,700.00
51,700.00
151,700.00
106,000.00
421,100.00
1,700,000.00
39,800.00
628,400.00
483,300.00
121,600.00
272,700.00
517,500.00
1,405,500.00
750,000.00
772,200.00
800,000.00
300,000.00
184,400.00
402,700.00
728,800.00
16,300.00
28,400.00
43,600.00
95,300.00
108,600.00
36,800.00
48,300.00
326,600.00
Halaman : 78
HARGA SAT.
Rp.
4
181,700.00
8,000.00
1,100.00
2,300.00
1,000.00
1,200.00
2,000.00
1,900.00
1,500.00
2,550.00
3,000.00
5,000.00
6,500.00
Halaman : 79
HARGA SAT.
Rp.
4
42,262,500.00
144,900,000.00
362,250,000.00
21,131,000.00
3,743,000.00
3,018,000.00
4,226,000.00
3,743,000.00
724,500.00
10,565,000.00
7,848,500.00
4,226,000.00
1,700.00
75,000.00
102,700.00
2,300.00
3,800.00
3,400.00
4,700.00
3,500.00
3,000.00
6,900.00
9,600.00
5,400.00
11,200.00
13,400.00
11,200.00
14,900.00
18,900.00
28,100.00
5,400.00
7,200.00
12,000.00
5,400.00
8,900.00
11,100.00
9,600.00
13,200.00
16,200.00
25,800.00
664,700.00
1,523,700.00
118,400.00
Halaman : 80
HARGA SAT.
Rp.
4
135,100.00
163,300.00
371,400.00
59,200.00
78,900.00
404,800.00
14,500.00
18,000.00
15,500.00
50,500.00
110,900.00
78,900.00
120,700.00
7,800.00
25,800.00
39,400.00
28,100.00
37,300.00
22,500.00
25,800.00
6,500.00
5,300.00
8,000.00
230,900.00
110,900.00
89,500.00
107,000.00
372,000.00
180,300.00
676,200.00
78,800.00
33,800.00
337,500.00
169,000.00
165,000.00
165,000.00
85,000.00
480,000.00
67,700.00
162,200.00
85,000.00
95,000.00
33,600.00
46,400.00
Halaman : 81
HARGA SAT.
Rp.
4
215,000.00
52,000.00
95,000.00
25,000.00
9,000.00
4,300.00
6,100.00
26,100.00
18,800.00
11,000.00
20,500.00
5,000.00
8,200.00
7,100.00
4,500.00
10,100.00
104,400.00
375,000.00
90,000.00
8,000.00
15,700.00
21,300.00
ADE WAHYUDIN
DAFTAR HARGA SATUAN BAHAN
1 2 3
A BAHAN AGREGAT KASAR & BAHAN PEREKAT
Tanah Urug m3
Tanah Merah m3
Pasir Urug m3
Pasir Batu (sirtu) tersaring m3
Sirtu m3
Pasir pasang m3
Pasir beton m3
Pasir aspal m3
Abu batu m3
Kerikil m3
Batu gosok (apung) kg
Batu pecah mesin 1 : 2 m3
Batu pecah mesin 2 : 3 m3
Batu pecah mesin 3 : 5 m3
Batu pecah 5 : 7 m3
Batu pecah 7 : 10 m3
Batu pecah 10 : 15 m3
Batu belah pondasi m3
Batu koral beton kali m3
Batako kecil 8x10x20 buah
Batako besar 8x20x30 buah
Con Block 8x20x40 buah
Bata Merah Bakar Kelas I buah
Semen PC 50kg kg
Semen Putih zak
Semen Warna kg
Floor Hardner FOSROC/sika kg
Grevel dia. 1/2 20cm I=1m buah
D BAHAN KAYU
Kayu Kamper Banjar m3
Kayu Albasiah m3
Kayu Papan Albasiah Kecil m3
Kayu Papan Albasiah Besar m3
Kayu Balok Albasiah Kecil m3
Kayu Balok Albasiah Besar m3
Dolken ᴓ 8 - 10 cm bh
I BAHAN KACA
Kaca Polos 2 mm m2
Kaca Polos 3 mm m2
Kaca Polos 5 mm m2
Glass block bh
L BAHAN MEKANIKAL
Saklar Tunggal bh
Saklar Ganda bh
Stop kontak bh
Lampu SL 10 watt bh
Box Inbow + TL 2 x 20 watt unit
Box panel + MCB 16 A unit
Kabel NYY 3 x 1.5 mm2 m1
HARGA
95,000.00
85,000.00
135,000.00
140,000.00
165,000.00
150,000.00
165,000.00
170,000.00
200,000.00
185,000.00
13,000.00
220,000.00
210,000.00
200,000.00
195,000.00
195,000.00
195,000.00
110,000.00
165,000.00
10,000.00
12,000.00
15,000.00
750.00
1,300.00
45,000.00
5,800.00
3,000.00
25,000.00
7,500.00
25,000.00
30,000.00
20,000.00
20,000.00
7,000.00
5,000.00
4,500.00
28,000.00
4,500.00
13,000.00
14,200.00
5,000.00
13,000.00
4,500.00
28,000.00
5,000.00
7,500.00
40,000.00
65,000.00
5,000.00
23,500.00
25,000.00
5,500,000.00
2,250,000.00
2,500,000.00
2,950,000.00
2,350,000.00
2,750,000.00
17,500.00
10,000.00
52,000.00
50,000.00
19,000.00
20,000.00
5,000.00
110,000.00
132,000.00
75,000.00
42,000.00
31,500.00
31,100.00 0.02
31,500.00 1
34,400.00
35,000.00
52,000.00
78,000.00
65,000.00
15,000.00
16,000.00
17,000.00
14,000.00
700.00
16,200.00
9,500.00
6,000.00
42,000.00
10,000.00
7,500.00
7,000.00
11,000.00
-
-
165,000.00
2,100.00
5,000.00
10,000.00
14,000.00
11,000.00
190,000.00
220,000.00
175,000.00
10,000.00
7,000.00
8,500.00
85,000.00
110,000.00
8,500.00
90,000.00
85,000.00
10,500.00
13,000.00
20,000.00
100,000.00
90,000.00
110,000.00
85,000.00
95,000.00
11,000.00
10,000.00
35,000.00 140,000.00
25,000.00
8,000.00
13,000.00
7,500.00
6,000.00
12,500.00
11,000.00
39,700.00
21,700.00
12,000.00
-
-
10,000.00
9,000.00
9,500.00
12,000.00
15,000.00
590,000.00
-
-
-
-
-
-
350,000.00
200,000.00
275,000.00
6,000.00
2,000.00
12,000.00
10,000.00
-
-
230,000.00
11,000.00
10,000.00
14,000.00
GITO MANDELA
Direktur
JADWAL WAKTU PELAKSANAAN
V PEKERJAAN DINDING 37,099,149.98 14.67 2.10 2.10 2.10 2.10 2.10 2.10 2.10
GITO MANDELA
Direktur
BULAN KE BULAN KE I
MINGGU KE MINGGU KE KET.
3 4 1 2 3 4
1.80 1.80
0.00
GITO MANDELA
Direktur
DAFTAR HARGA UPAH
1 Pekerja Rp.
2 Tukang Batu Rp.
3 Kepala Tukang Batu Rp.
4 Tukang kayu Rp.
5 Kepala tukang kayu Rp.
6 Tukang besi profil / tukang las Rp.
7 kepala tukang besi Profil / Tukang las Rp.
8 Tukang besi beton Rp.
9 Kepala tukang besi beton Rp.
10 Tukang cat Rp.
11 Kepala tukang cat Rp.
12 Tukang gali Rp.
13 Kepala tukang gali Rp.
14 Mandor Rp.
HARGA SATUAN