6304B200

Anda mungkin juga menyukai

Anda di halaman 1dari 97

REKAPITULASI

BILL OF QUANTITY ( BOQ )

PEKERJAAN PEMBANGUNAN RUANG PERPUSTAKAAN SMK


Lokasi : SMKN 1 Malausma Kab. Majalengka
Jl. Kartabraja Malausma Kabupaten Majalengka - Jawa Barat 45464
KEGIATAN PENGADAAN RUANG PERPUSTAKAAN SMK
DINAS PENDIDIKAN PROVINSI JAWA BARAT

JUMLAH HARGA
NO. URAIAN PEKERJAAN
Rp.

I PEKERJAAN PERSIAPAN Rp.


II PEKERJAAN TANAH Rp.
III PEKERJAAN PONDASI Rp.
IV PEKERJAAN BETON Rp.
V PEKERJAAN DINDING Rp.
VI PEKERJAAN LANTAI Rp.
VII PEKERJAAN KUSEN, PINTU, JENDELA Rp.
VIII PEKERJAAN ATAP Rp.
IX PEKERJAAN PLAFOND Rp.
X PEKERJAAN LISTRIK Rp.
XI PEKERJAAN SANITASI Rp.
XII PEKERJAAN FINISHING & PENGECATAN Rp.
XIII PEKERJAAN LAIN - LAIN Rp.
JUMLAH Rp.
PPN 10% Rp.
JUMLAH TOTAL Rp.

Terbilang :
BOQ )

PERPUSTAKAAN SMK
b. Majalengka
ngka - Jawa Barat 45464
RPUSTAKAAN SMK
JAWA BARAT

JUMLAH HARGA

Rp.

4,767,600.00
5,508,967.45
4,298,611.90
77,784,390.66
37,099,149.98
18,251,600.00
-
41,744,787.37
51,356,400.00
889,000.00
3,394,600.00
7,734,114.88
2,000,000.00
254,829,222.24
25,482,922.22
280,312,144.46

Majalengka, 27 Agustus 2018


Dibuat Oleh
Kontraktor Pelaksana
CV. GODFATHER

GITO MANDELA
Direktur
BILL OF QUANTITY ( BOQ )

PEKERJAAN PEMBANGUNAN RUANG PERPUSTAKAAN SMK


Lokasi : SMKN 1 Malausma Kab. Majalengka
Jl. Kartabraja Malausma Kabupaten Majalengka - Jawa Barat 4546
KEGIATAN PENGADAAN RUANG PERPUSTAKAAN SMK
DINAS PENDIDIKAN PROVINSI JAWA BARAT

NO. URAIAN PEKERJAAN VOL.

1 2 3
I PEKERJAAN PERSIAPAN
1 Pek. Biaya Administrasi & Dokumentasi 1.00
2 Pek. Pengukuran dan Pemasangan Bouwplank 44.00
3 Mobilisasi dan demobilisasi 1.00

II PEKERJAAN TANAH
1 Pek. Galian tanah Pondasi batu belah 33.32
2 Pek. Galian tanah Pondasi setempat batu belah 2.24
3 Pek. Urugan tanah kembali ex. galian 15.36
4 Pek. Urugan tanah peninggian lantai, + 50 cm 59.50
5 Pek. Urugan pasir dibawah lantai keramik, t = 5 cm 6.36
6 Pek. Urugan pasir dibawah pondasi batu belah , t = 5 cm 2.51

III PEKERJAAN PONDASI


1 Pek. Anstamping batu belah 5.02
2 Pek. Pondasi batu belah, 1 : 5 20.83
3 Pek. Pondasi Setempat uk. 70 x 70 cm batu belah, 1 : 5 0.81

IV PEKERJAAN BETON
1 Pek. Sloof beton S1 20/15 cm ,K - 225 2.45
2 Pek. Kolom beton K1 20 X 15 CM K - 225 1.84
3 Pek. Ring balok beton K1 20 X 15 CM K - 225 2.51
4 Pek. Kolom praktis beton KP 15/15 cm, K - 175 0.51
5 Pek. Balok Latei Beton BL 12 x 12 cm K - 175 0.51
6 Pek. Rabat beton, K - 175 untuk lantai selasar luar 4.80

V PEKERJAAN DINDING
1 Pek. Dinding bata ad. 1PC : 5PS 118.41
2 Pek. Plesteran dinding adukan 1PC : 5PS 233.87
3 Pek. Plesteran Acian 233.87
4 Pek. Keramik Dinding KM/WC 20 X 25 CM Sek. Mulia 11.20
5 Pek. Keramik Dinding Border KM/WC 8 X 20 CM Sek. Mulia 6.00
6 Pek. Plesteran Acian ban banan 42.00
Vl PEKERJAAN LANTAI
1 Pek. Keramik Lantai KM/WC 20 X 20 CM Sek. Mulia Un Polish 3.00
2 Pek. Keramik Lantai 40 x 40 cm Sek. Mulia Polish 128.00

VII PEKERJAAN KUSEN, PINTU, JENDELA


Untuk Kusen Pintu, Jendela , Daun Jendela & Pintu Alumunium
1 Pek. Kusen Jendela kaca J1 5.00
2 Pek. Kusen Jendela kaca Bouvenlight BV1 3.00
3 Pek. Kusen & Daun Pintu km/wc PVC 1.00
4 Pek. Kusen Jendela kaca Bouvenlight BV2 1.00
5 Pek. Kusen Pintu Jendela P1 1.00

VIII PEKERJAAN ATAP


1 Pek. Rangka Atap baja ringan 210.26
2 Pek. atap genteng metal 190.91
3 Pek. Nok atap genteng metal 38.15
4 Pek. Listplank GRC 6 mm x 20 cm 48.00

IX PEKERJAAN PLAFOND
1 Pek. Rangka plafond 168.00
2 Pek. Penutup plafond gypsum Perpustakaan 120.00
3 Pek. Penutup plafond GRC Perpustakaan 44.00
4 Pek. List plafond Gypsum 88.00

X PEKERJAAN LISTRIK
1 Pek. Pemas. Instalasi titik lampu 7.00
2 Pek. Pemas. Instalasi stop kontak 2.00
3 Pek. Pemas. Saklar tunggal 1.00
4 Pek. Pemas. Saklar ganda 2.00
5 Pek. Pemas. Stop kontak 2.00
6 Pek. Pemas. Lamu Down Light 4.00
7 Pek. Pemas. Box Inbow + TL 2 X 20 watt 3.00
8 Pek. Panel Distribusi Daya listrik 1.00
9 Pek. Penyambungan kabel feeder 4 x 4 mm ke panel induk 10.00

XI PEKERJAAN SANITASI
1 Pek. Pemasangan. Kran Dinding 1.00
2 Pek. Pemasangan. Kloset Jongkok Standar 1.00
3 Pek. Pemasangan. Pipa PVC (AW) 4" sek. Rucika 10.00
4 Pek. Pemasangan. Pipa PVC (AW) 3" sek. Rucika 10.00
5 Pek. Pemasangan. Pipa PVC (AW) 3/4" sek. Rucika 15.00
6 Pek. Pemasangan. Floor Drain 1.00
7 Pek. Septictank + Resapan p =1.8 m, l = 1.5 m dan t = 2 m 1.00

XII PEKERJAAN FINISHING & PENGECATAN


1 Pek. Pengecatan dinding interior sek. Sanlex 233.87
2 Pek. Pengecatan plafond interior sek. Sanlex 168.00
3 Pek. Pengecatan Plint dinding t = 10 cm,dinding luar cat kayu Avian 8.40
4 Pek. Pengecatan Lisplank GRC 11.28

XIII PEKERJAAN LAIN - LAIN


1 Pek. Pembersihan lokasi bekas pekerjaan 1.00

JUMLAH TOTAL
BOQ )

ERPUSTAKAAN SMK
Majalengka
gka - Jawa Barat 45464
PUSTAKAAN SMK
AWA BARAT

HARGA JUMLAH
SAT. SATUAN HARGA
Rp. (Rp.)
4 5 6=(3x5)

LS 750,000.00 750,000.00
M1 75,400.00 3,317,600.00
LS 700,000.00 700,000.00
JUMLAH I 4,767,600.00

M3 37,800.00 1,259,496.00
M3 37,300.00 83,552.00
M3 19,400.00 298,008.25
M3 37,300.00 2,219,350.00
M3 185,900.00 1,182,324.00
M3 185,900.00 466,237.20
JUMLAH II 5,508,967.45

M3 320,800.00 1,609,132.80
M3 124,300.00 2,588,547.50
M3 124,300.00 100,931.60
JUMLAH III 4,298,611.90

M3 6,449,200.00 15,768,294.00
KG 11,405,500.00 20,940,498.00
M3 10,509,900.00 26,327,299.50
M3 7,983,300.00 4,071,483.00
M3 10,531,800.00 5,383,856.16
M3 1,102,700.00 5,292,960.00
JUMLAH IV 77,784,390.66

M2 124,300.00 14,718,338.14
M2 60,900.00 14,242,658.64
M2 29,500.00 6,899,153.20
M2 - 0.00
M1 - 0.00
M1 29,500.00 1,239,000.00
JUMLAH V 37,099,149.98
M2 127,600.00 382,800.00
M2 139,600.00 17,868,800.00
JUMLAH VI 18,251,600.00

unit - 0.00
unit - 0.00
unit - 0.00
unit - 0.00
unit - 0.00
JUMLAH VII -

M2 181,500.00 38,163,061.20
M2 2,300.00 439,101.17
M1 5,500.00 209,825.00
M1 61,100.00 2,932,800.00
JUMLAH VIII 41,744,787.37

M2 212,600.00 35,716,800.00
M2 61,800.00 7,416,000.00
M2 61,100.00 2,688,400.00
M1 62,900.00 5,535,200.00
JUMLAH IX 51,356,400.00

TTK 90,000.00 630,000.00


TTK 90,000.00 180,000.00
BH 15,000.00 15,000.00
BH 18,000.00 36,000.00
BH 14,000.00 28,000.00
BH - 0.00
BH - 0.00
UNIT - 0.00
M1 - 0.00
JUMLAH X 889,000.00

bh - 0.00
bh - 0.00
m1 - 0.00
m1 - 0.00
m1 - 0.00
bh 394,600.00 394,600.00
unit 3,000,000.00 3,000,000.00
JUMLAH XI 3,394,600.00

M2 18,300.00 4,279,813.68
M2 18,300.00 3,074,400.00
M2 19,300.00 162,120.00
M2 19,300.00 217,781.20
JUMLAH XII 7,734,114.88

Ls 2,000,000.00 2,000,000.00
JUMLAH XIII 2,000,000.00
254,829,222.24
HARGA SATUAN PEKERJAAN

PEKERJAAN PEMBANGUNAN RUANG PERPUSTAKAAN SMK


Lokasi : SMKN 1 Malausma Kab. Majalengka
Jl. Kartabraja Malausma Kabupaten Majalengka - Jawa Barat 45464
KEGIATAN PENGADAAN RUANG PERPUSTAKAAN SMK
DINAS PENDIDIKAN PROVINSI JAWA BARAT

NO. URAIAN PEKERJAAN SAT.

1 2 4
I PEKERJAAN PERSIAPAN
1 Pek. Biaya Administrasi & Dokumentasi LS
2 Pek. Pengukuran dan Pemasangan Bouwplank M1
3 Mobilisasi dan demobilisasi LS

II PEKERJAAN TANAH
1 Pek. Galian tanah Pondasi batu belah M3
2 Pek. Galian tanah Pondasi setempat batu belah M3
3 Pek. Urugan tanah kembali ex. galian M3
4 Pek. Urugan tanah peninggian lantai, + 60 cm M3
5 Pek. Urugan pasir dibawah lantai keramik, t = 5 cm M3
6 Pek. Urugan pasir dibawah pondasi batu belah , t = 5 cm M3

III PEKERJAAN PONDASI


1 Pek. Anstamping batu belah M3
2 Pek. Pondasi batu belah, 1 : 5 M3
3 Pek. Pondasi Setempat uk. 70 x 70 cm batu belah, 1 : 5 M3

IV PEKERJAAN BETON
1 Pek. Sloof beton S1 20/15 cm ,K - 225 M3
2 Pek. Kolom beton K1 20 X 15 CM K - 225 KG
3 Pek. Ring balok beton K1 20 X 15 CM K - 225 M3
4 Pek. Kolom praktis beton KP 15/15 cm, K - 175 M3
5 Pek. Balok Latei Beton BL 12 x 12 cm K - 175 M3
6 Pek. Rabat beton, K - 175 untuk lantai selasar luar M3

V PEKERJAAN DINDING
1 Pek. Dinding bata ad. 1PC : 5PS M2
2 Pek. Plesteran dinding adukan 1PC : 5PS M2
3 Pek. Plesteran Acian M2
4 Pek. Keramik Dinding KM/WC 20 X 25 CM Sek. Mulia M2
5 Pek. Keramik Dinding Border KM/WC 8 X 20 CM Sek. Mulia M1
6 Pek. Plesteran Acian ban banan M1
Vl PEKERJAAN LANTAI
1 Pek. Keramik Lantai KM/WC 20 X 20 CM Sek. Mulia Un Polish M2
2 Pek. Keramik Lantai 40 x 40 cm Sek. Mulia Polish M2

VII PEKERJAAN KUSEN, PINTU, JENDELA


Untuk Kusen Pintu, Jendela , Daun Jendela & Pintu Bouvenlight alumunium
1 Pek. Kusen Jendela kaca J1 unit
2 Pek. Kusen Jendela kaca Bouvenlight BV1 unit
3 Pek. Kusen & Daun Pintu KM/WC PVC unit
4 Pek. Kusen Jendela kaca Bouvenlight BV2 unit
5 Pek. Kusen Pintu Jendela unit

VIII PEKERJAAN ATAP


1 Pek. Rangka Atap baja ringan M2
2 Pek. atap genteng metal M2
3 Pek. Nok atap genteng metal M1
4 Pek. Listplank GRC 6 mm x 20 cm M1

IX PEKERJAAN PLAFOND
1 Pek. Rangka plafond M2
2 Pek. Penutup plafond gypsum Perpustakaan M2
3 Pek. Penutup plafond GRC Perpustakaan M2
4 Pek. List plafond Gypsum M1

X PEKERJAAN LISTRIK
1 Pek. Pemas. Instalasi titik lampu TTK
2 Pek. Pemas. Instalasi stop kontak TTK
3 Pek. Pemas. Saklar tunggal BH
4 Pek. Pemas. Saklar ganda BH
5 Pek. Pemas. Stop kontak BH
6 Pek. Pemas. Lamu Down Light BH
7 Pek. Pemas. Box Inbow + TL 2 X 20 watt BH
8 Pek. Panel Distribusi Daya listrik UNIT
9 Pek. Penyambungan kabel feeder 4 x 4 mm ke panel induk M1

XI PEKERJAAN SANITASI
1 Pek. Pemasangan. Kran Dinding bh
2 Pek. Pemasangan. Kloset Jongkok Standar bh
3 Pek. Pemasangan. Pipa PVC (AW) 4" sek. Rucika m1
4 Pek. Pemasangan. Pipa PVC (AW) 3" sek. Rucika m1
5 Pek. Pemasangan. Pipa PVC (AW) 3/4" sek. Rucika m1
6 Pek. Pemasangan. Floor Drain bh
7 Pek. Septictank + Resapan p =1.8 m, l = 1.5 m dan t = 2 m unit

XII PEKERJAAN FINISHING & PENGECATAN


1 Pek. Pengecatan dinding interior sek. Sanlex M2
2 Pek. Pengecatan plafond interior sek. Sanlex M2
3 Pek. Pengecatan Plint dinding t = 10 cm,dinding luar cat kayu Avian M2
4 Pek. Pengecatan Lisplank GRC M2

XIII PEKERJAAN LAIN - LAIN


1 Pek. Pembersihan lokasi bekas pekerjaan Ls
AAN SMK

Barat 45464
N SMK
T

HARGA
SATUAN
Rp.
5

750,000.00
75,400.00
300,000.00

37,800.00
37,300.00
19,400.00
37,300.00
185,900.00
185,900.00

320,800.00
124,300.00
124,300.00

6,449,200.00
11,405,500.00
10,509,900.00
7,983,300.00
10,531,800.00
1,102,700.00

124,300.00
60,900.00
29,500.00
124,200.00

60,900.00
127,600.00
139,600.00

181,500.00
2,300.00
5,500.00
61,100.00

212,600.00
61,800.00
61,100.00
62,900.00

90,000.00
90,000.00
15,000.00
18,000.00
14,000.00

394,600.00
3,000,000.00

18,300.00
18,300.00
19,300.00
19,300.00

2,000,000.00
ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN PEMBANGUNAN RUANG PERPUSTAKAAN SMK


Lokasi : SMKN 1 Malausma Kab. Majalengka
Jl. Kartabraja Malausma Kabupaten Majalengka - Jawa Barat 45464
KEGIATAN PENGADAAN RUANG PERPUSTAKAAN SMK
DINAS PENDIDIKAN PROVINSI JAWA BARAT

HARGA SAT.
NO. URAIAN PEKERJAAN INDEX SAT.
(Rp.)

1 2 3 4 6
1 1M Pek. Pengukuran dan Pemasangan Bowplank
Bahan
Kayu 5/7 lokal kelas II 0.01 m3 2,750,000.00
Paku Biasa 2"-5" 0.02 kg 15,600.00
Kayu Papan 3/20 cm lokal kelas II 0.01 m3 2,950,000.00
Tenaga
Pekerja 0.10 Oh 65,000.00
Tukang kayu 0.10 Oh 70,000.00
Kepala tukang 0.01 Oh 75,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
2 1 M3 Galian Tanah biasa sedalam 1M
Tenaga
Pekerja 0.50 Oh 65,000.00
Mandor 0.03 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
3 1 M3 Urugan Tanah kembali
Tenaga
Pekerja 0.26 Oh 65,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
4 1 M3 Urugan tanah peninggian lantai (tanah setempat)
Tenaga
Pekerja 0.50 Oh 65,000.00
Mandor 0.02 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
5 1 M3 Urugan pasir urug
Bahan
Sirtu 1.00 m3 165,000.00
Tenaga
Pekerja 0.05 Oh 65,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
6 10 kg Pembesian dengan besi polos U32
Bahan
Besi Beton 10.05 kg 13,000.00
Kawat Beton 0.15 kg 13,000.00
Tenaga
Pekerja 0.07 Oh 65,000.00
Tukang besi 0.07 Oh 70,000.00
Kepala tukang besi beton 0.01 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
1 Kg Pembesian dengan besi Polos U32
7 1 M2 Pasang Bekisting untuk sloof
Bahan
Kayu Papan Kelas II 0.05 m3 2,950,000.00
Paku Biasa 2"-5" 0.30 kg 16,000.00
Minyak Bekisting 0.10 lt 5,000.00
Tenaga
Pekerja 0.52 Oh 65,000.00
Tukang Kayu 0.26 Oh 70,000.00
Kepala Tukang Kayu 0.03 Oh 75,000.00
Mandor 0.03 Oh 75,000.00
jumlah
Overhead & Profit 0.10
Dibulatkan
8 1 M2 Pasang Bekisting untuk kolom
Bahan
Kayu Papan Kelas II 0.04 m3 2,950,000.00
Paku Biasa 2"-5" 0.40 kg 16,000.00
Minyak Bekisting 0.20 lt 5,000.00
Balok Kayu Kelas II 0.03 m3 2,750,000.00
Playwood tebal 9 mm 0.04 lbr 110,000.00
Dolken Kayu ᴓ 8 - 10 cm I = 4cm 2.00 bh 17,500.00
Tenaga
Pekerja 0.66 Oh 65,000.00
Tukang Kayu 0.33 Oh 70,000.00
Kepala Tukang Kayu 0.03 Oh 75,000.00
Mandor 0.03 Oh 75,000.00
jumlah
Overhead & Profit 0.10
Dibulatkan
9 1 M2 Pasang Bekisting untuk balok
Bahan
Kayu Papan Kelas II 0.04 m3 2,950,000.00
Paku Biasa 2"-5" 0.40 kg 16,000.00
Minyak Bekisting 0.20 lt 5,000.00
Balok Kayu Kelas II 0.02 m3 2,750,000.00
Playwood tebal 9 mm 0.35 lbr 110,000.00
Dolken Kayu ᴓ 8 - 10 cm I = 4cm 2.00 bh 17,500.00
Tenaga
Pekerja 0.66 Oh 65,000.00
Tukang Kayu 0.33 Oh 70,000.00
Kepala Tukang Kayu 0.03 Oh 75,000.00
Mandor 0.03 Oh 75,000.00
jumlah
Overhead & Profit 0.10
Dibulatkan
10 1 M2 Pasang Bekisting untuk lantai
Bahan
Kayu Papan Kelas II 0.04 m3 2,950,000.00
Paku Biasa 2"-5" 0.40 kg 16,000.00
Minyak Bekisting 0.20 lt 5,000.00
Balok Kayu Kelas II 0.02 m3 2,750,000.00
Playwood tebal 9 mm 0.35 lbr 110,000.00
Dolken Kayu ᴓ 8 - 10 cm I = 4cm 6.00 bh 17,500.00
Tenaga
Pekerja 0.66 Oh 65,000.00
Tukang Kayu 0.33 Oh 70,000.00
Kepala Tukang Kayu 0.03 Oh 75,000.00
Mandor 0.03 Oh 75,000.00
jumlah
Overhead & Profit 0.10
Dibulatkan
11 1 M3 Lantai Kerja 1PC : 3PS : 5KR
Bahan
Semen Portland 197.80 kg 1,300.00
Pasir Beton 0.55 m3 165,000.00
Split 0.76 m3 185,000.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Batu 0.20 Oh 70,000.00
Kepala Tukang Batu 0.05 Oh 75,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
12 1 M3 Membuat beton mutu K-175
Bahan
Semen Portland 326.00 kg 1,300.00
Pasir Beton 0.54 m3 165,000.00
Split 0.76 m3 185,000.00
Air 215.00 Liter 1,000.00
Tenaga
Pekerja 1.65 Oh 65,000.00
Tukang Batu 0.28 Oh 70,000.00
Kepala Tukang Batu 0.03 Oh 75,000.00
Mandor 0.06 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
13 1 M3 Membuat beton mutu K-225
Bahan
Semen Portland 371.00 kg 1,300.00
Pasir Beton 0.50 m3 165,000.00
Kerikil (max 30mm) 0.78 m3 185,000.00
Air 215.00 Liter 1,000.00
Tenaga
Pekerja 1.65 Oh 65,000.00
Tukang Batu 0.28 Oh 70,000.00
Kepala Tukang Batu 0.03 Oh 75,000.00
Mandor 0.08 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
14 1 M3 Sloof beton 20 x 15, K-225
Beton K - 225 1.00 m3 1,163,800.00
Tulangan Beton 155.41 kg 15,710.00
Bekisting Papan 13.33 m2 213,300.00
Jumlah
Dibulatkan
15 1 M3 Kolom K1, 15/20, K-225
Beton K - 225 1.00 m3 1,163,800.00
Tulangan Beton 155.41 kg 15,710.00
Bekisting Papan 23.33 m2 334,300.00
Jumlah
Dibulatkan
16 1 M3 Kolom KP, 15/15, K-225
Beton K - 225 1.00 m3 1,163,800.00
Tulangan Beton 150.36 kg 15,710.00
Bekisting Papan 13.33 m2 334,300.00
Jumlah
Dibulatkan
17 1 M3 Balok Beton B2, 15/20, K - 225
Beton K - 225 1.00 m3 1,163,800.00
Tulangan Beton 185.07 kg 15,710.00
Bekisting Papan 18.33 m2 351,200.00
Jumlah
Dibulatkan
18 1 M3 Balok Lintel Beton
Beton K - 225 1.00 m3 1,163,800.00
Tulangan Beton 223.73 kg 15,710.00
Bekisting Papan 16.67 m2 351,200.00
Jumlah
Dibulatkan
19 1 M3 Pasangan pondasi batu kali 1 PC : 5 PP
Bahan
Batu Belah 15/20 cm 1.20 m3 110,000.00
Semen Portland 136.00 kg 1,300.00
Pasir Pasang 0.54 m2 150,000.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Batu 0.60 Oh 70,000.00
Kepala Tukang Batu 0.06 Oh 75,000.00
Mandor 0.08 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
20 1 M3 Pasangan pondasi batu kosong (aanstamping)
Bahan
Batu Belah 15/20 cm 1.00 m3 110,000.00
Sirtu 0.43 m3 165,000.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Batu 0.39 Oh 70,000.00
Kepala Tukang Batu 0.60 Oh 75,000.00
Mandor 0.08 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
21 1 M2 Pasangan Bata Merah 1PC : 3PP (1/2 Bata)
Bata merah 5x11x22 cm 70.00 bh 750.00
Semen Portland 14.37 kg 1,300.00
Pasir Pasang 0.04 m3 150,000.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Batu 0.10 Oh 70,000.00
Kepala Tukang Batu 0.01 Oh 75,000.00
Mandor 0.02 Oh 75,000.00
Jumlah
Overhead % Profit 0.10
Dibulatkan
22 1 M2 Pasangan Bata Merah 1PC : 5 PP (1/2 Bata)
Bahan
Bata Merah 5x11x22 cm 70.00 Bh 750.00
Semen Portland 9.68 kg 1,300.00
Pasir Pasang 0.05 m3 150,000.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Batu 0.10 Oh 70,000.00
Kepala Tukang Batu 0.01 Oh 75,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead % Profit 0.10
Dibulatkan
23 1 M2 Plesteran 1 PC : 3 PP, Tebal 20 mm
Bahan
Semen Portland 10.37 kg 1,300.00
Pasir Pasang 0.03 m3 150,000.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Batu 0.10 Oh 70,000.00
Kepala Tukang Batu 0.01 Oh 75,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead % Profit 0.10
Dibulatkan
24 1 M2 Plesteran 1 PC : 5 PP, Tebal 20 mm
Bahan
Semen Portland 6.91 kg 1,300.00
Pasir Pasang 0.04 m3 150,000.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Batu 0.10 Oh 70,000.00
Kepala Tukang Batu 0.01 Oh 75,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead % Profit 0.10
Dibulatkan
25 1 M2 Acian
Bahan
Semen Portland 3.25 kg 1,300.00
Tenaga
Pekerja 0.20 Oh 65,000.00
Tukang Batu 0.10 Oh 70,000.00
Kepala Tukang Batu 0.01 Oh 75,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead % Profit 0.15
Dibulatkan
Analisa Pekerjaan Kusen, Pintu, dan Jendela
26 1 m1 PEK. PEMASANGAN KUSEN ALUMUNIUM ( Permen PU No. 11/PRT/M/2013)
Bahan :
Kusen Alumunium 3 " sek. Alexindo 1.10 m' 90,000.00
Sekrup fisher 2.00 bh 20,000.00
Sealant 0.06 tube 6,000.00
Tenaga Kerja :
Pekerja 0.20 Oh 65,000.00
Tukang Alumunium 0.09 Oh 70,000.00
Kepala Tukang Alumunium 0.01 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
jumlah
Dibulatkan
27 1 m1 PEK. PEMASANGAN KUSEN ALUMUNIUM ( Permen PU No. 11/PRT/M/2013)
Bahan :
Kusen Alumunium 4 " sek. Alexindo 1.10 m' 100,000.00
Sekrup fisher 2.00 bh 20,000.00
Sealant 0.06 tube 6,000.00
Tenaga Kerja :
Pekerja 0.20 Oh 65,000.00
Tukang Alumunium 0.09 Oh 70,000.00
Kepala Tukang Alumunium 0.01 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & Profit 0.10
jumlah
Dibulatkan
28 1 M1 Rangka Daun Pintu Alumunium
Bahan
Rangka Daun Pintu 1.10 m'
Sekrup fisher 2.00 bh 20,000.00
Sealant 0.06 tube 6,000.00
Tenaga Kerja :
Pekerja 0.20 Oh 65,000.00
Tukang kayu 0.09 Oh 70,000.00
Kepala Tukang kayu 0.01 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & profit 0.10
jumlah
Dibulatkan
29 1 M1 Pasang Daun Jendela, Rangka Alumunium
Bahan
Rangka Daun Jendela 1.10 m' 110,000.00
Sekrup fisher 2.00 bh 20,000.00
Sealant 0.06 tube 6,000.00
Tenaga
Pekerja 0.20 Oh 65,000.00
Tukang kayu 0.09 Oh 70,000.00
Kepala Tukang kayu 0.01 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & profit 0.10
jumlah
Dibulatkan
30 1 M2 Pasangan Rangka Atap Baja Ringan Terpasang
Bahan
Baja Ringan 1.00 m2 165,000.00
Jumlah
Overhead & profit 0.10
Dibulatkan
30 1 M2 Pemasangan Besi hollo 40.40.2 Rangka Plafond
Bahan :
Rangka Vesi Metal Hollo 40.40.2 5.00 m1 35,000.00
Tenaga Kerja :
Pekerja 0.25 Oh 65,000.00
Tukang 0.03 Oh 70,000.00
Kepala Tukang 0.00 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & profit 0.10
Dibulatkan
31 1 M Pasang Listplank GRC
Bahan
Lisplank GRC T=6 mm 1.00 m1 20,000.00
Paku cacing 0.02 kg 16,200.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Gypsum 0.20 Oh 70,000.00
Kepala tukang gypsum 0.02 Oh 75,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead & profit 0.10
Dibulatkan

32 1 M2 Pasang Atap Genteng Metal


Bahan
Atap Genteng Metal 1.00 m2 2,100.00
Jumlah
Overhead & Profit 0.10
Dibulatkan
33 1 M1 Pasang Bubungan Genteng Metal
Bahan
Bubung atap genteng Metal 1.00 m1 5,000.00
Jumlah
Overhead & profit 0.10
Dibulatkan
34 1 M2 langit - langit Gypsum T=9 mm
Bahan
Gypsum T=9 mm 0.35 m2 52,000.00
Paku cacing 0.01 kg 16,200.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Gypsum 0.07 Oh 70,000.00
Kepala tukang gypsum 0.01 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & profit 0.10
Dibulatkan
35 1 M2 langit - langit GRC
Bahan
GRC 0.35 m2 50,000.00
Paku cacing 0.01 kg 16,200.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Gypsum 0.07 Oh 70,000.00
Kepala tukang gypsum 0.01 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & profit 0.10
Dibulatkan
36 1 M Pasang list plafond bahan Gypsum
Bahan
List gypsum 1.00 m1 19,000.00
Paku cacing 0.01 kg 16,200.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Gypsum 0.07 Oh 70,000.00
Kepala tukang gypsum 0.01 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & profit 0.10
Dibulatkan
37 1 M2 Pasang kaca polos , tebal 5 mm
Bahan
Kaca polos 1.00 m2 78,000.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang Kayu 0.05 Oh 70,000.00
Kepala tukang kayu 0.01 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & profit 0.10
Dibulatkan
Analisa pekerjaan lantai
38 1 M2 Pasang Lantai keramik 30 x 30 cm
Bahan
Ubin keramik 30 x 30 cm 1.00 m2 31,500.00
Semen Portland 10.00 kg 1,300.00
Pasir pasang 0.04 m3 150,000.00
Semen warna 1.00 kg 5,800.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang batu 0.30 Oh 70,000.00
Kepala tukang batu 0.04 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & profit 0.10
Dibulatkan
39 1 M2 PASANG LANTAI KERAMIK 40 x 40 cm
Bahan
Ubin keramik 40 x 40 cm 1.00 M2 42,000.00
Semen Portland 10.00 kg 1,300.00
Pasir pasang 0.04 M3 150,000.00
Semen warna 1.00 kg 5,800.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang batu 0.35 Oh 70,000.00
Kepala tukang batu 0.04 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & profit 0.10
Dibulatkan
40 1 M2 PASANG LANTAI KERAMIK 20 x 20 cm
Bahan
Ubin keramik 20 x 20 cm 1.00 M2 31,100.00
Semen Portland 10.00 kg 1,300.00
Pasir pasang 0.04 M3 150,000.00
Semen warna 1.00 kg 5,800.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang batu 0.35 Oh 70,000.00
Kepala tukang batu 0.04 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & profit 0.10
Dibulatkan
41 1 M2 PASANG LANTAI KERAMIK 20 x 25 cm
Bahan
Ubin keramik 20 x 25 cm 1.00 M2 31,500.00
Semen Portland 10.00 kg 1,300.00
Pasir pasang 0.04 M3 150,000.00
Semen warna 1.00 kg 5,800.00
Tenaga
Pekerja 0.50 Oh 65,000.00
Tukang batu 0.30 Oh 70,000.00
Kepala tukang batu 0.04 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead & profit 0.10
Dibulatkan
42 1 M1 PASANG LANTAI KERAMIK 10 x 20 cm
Bahan
Ubin keramik 10 x 20 cm 1.00 M1 34,400.00
Semen Portland 10.00 kg 1,300.00
Pasir pasang 0.04 M3 150,000.00
Semen warna 1.00 kg 5,800.00
Tenaga
Pekerja 0.05 Oh 65,000.00
Tukang batu 0.00 Oh 70,000.00
Kepala tukang batu 0.00 Oh 75,000.00
Mandor - Oh 75,000.00
Jumlah
Overhead & profit 0.10
Dibulatkan
43 1M2 PEKERJAAN FLOOR HARDNER 7 KG/M2 (Permen PU No. 11/PRT/M/2013)
Bahan :
Floor Hardner sek. FOSROC / SIKA 7.00 kg 3,000.00
Tenaga Kerja :
Pekerja 0.12 Oh 65,000.00
Tukang 0.12 Oh 70,000.00
Kepala Tukang 0.01 Oh 75,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Overhead + Profit 0.10
Jumlah
Dibulatkan
Analisa Biaya Konstruksi Pekerjaan Pengecatan
44 1 M2 PENGECATAN TEMBOK BARU 1 LAPIS PLAMIR (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup
Bahan :
Plamir 0.10 kg 7,500.00
Cat Dasar 0.10 kg 30,000.00
Cat Penutup 2x 0.26 kg 25,000.00
Tenaga
Pekerja 0.02 Oh 65,000.00
Tukang Cat 0.06 Oh 70,000.00
Kepala Tukang Cat 0.01 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead + Profit 0.10
Dibulatkan
45 1 M2 PENGECATAN PLINT DINDING DENGAN CAT MINYAK
Bahan :
Cat Minyak 0.10 kg 5,000.00
Kuas 0.01 bh 4,500.00
Tenaga
Pekerja 0.02 Oh 65,000.00
Tukang cat 0.20 Oh 70,000.00
Kepala Tukang Cat 0.02 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead + Profit 0.10
Dibulatkan
46 1 M2 POLITUR
Bahan :
Politur 0.20 kg 25,000.00
Thinner 0.20 kg 4,500.00
Oker putih 0.02 kg 23,500.00
Ampelas kayu 0.10 lbr 4,500.00
Tenaga
Pekerja 0.04 Oh 65,000.00
Tukang cat 0.06 Oh 70,000.00
Kepala Tukang Cat 0.02 Oh 75,000.00
Mandor 0.00 Oh 75,000.00
Jumlah
Overhead + Profit 0.10
Dibulatkan
47 PEMASANGAN 1 SELOT PINTU (permen PU No. 11/PRT/M/2013)
Bahan :
Selot pintu / jendela 1.00 bh 7,000.00
Tenaga kerja :
Pekerja 0.02 Oh 65,000.00
Tukang 0.20 Oh 70,000.00
Kepala tukang 0.02 Oh 75,000.00
Mandor - Oh 75,000.00
Jumlah
Keuntungan max 10% 0.10
Jumlah
Dibulatkan
48 PEMASANGAN 1 ENGSEL PINTU (Permen PU No. 11/PRT/M/2013)
Bahan :
Engsel pintu / jendela 1.00 Bh 7,000.00
Tenaga Kerja :
Pekerja 0.02 Oh 65,000.00
Tukang 0.20 Oh 70,000.00
Kepala Tukang 0.02 Oh 75,000.00
Mandor - Oh 75,000.00
Jumlah
Keuntungan max 10% 0.10
Jumlah
Dibulatkan
49 PEMASANGAN 1 KUNCI PINTU (Permen PU No. 11/PRT/M/2013)
Bahan :
Kunci Pintu 1.00 Bh 85,000.00
Tenaga Kerja :
Pekerja 0.02 Oh 65,000.00
Tukang 0.20 Oh 70,000.00
Kepala Tukang 0.02 Oh 75,000.00
Mandor - Oh 75,000.00
Jumlah
Keuntungan max 10% 0.10
Jumlah
Dibulatkan
50 PEMASANGAN 1 KUNCI PINTU DOUBLE (Permen PU No. 11/PRT/M/2013)
Bahan :
Kunci Pintu double 1.00 Bh 110,000.00
Tenaga Kerja :
Pekerja 0.02 Oh 65,000.00
Tukang 0.20 Oh 70,000.00
Kepala Tukang 0.02 Oh 75,000.00
Mandor - Oh 75,000.00
Jumlah
Keuntungan max 10% 0.10
Jumlah
Dibulatkan
51 PEMASANGAN 1 SET HANDLE PINTU (Permen PU No. 11/PRT/M/2013)
Bahan :
Handle Pintu 1.00 Bh
Tenaga Kerja :
Pekerja 0.02 Oh 65,000.00
Tukang 0.20 Oh 70,000.00
Kepala Tukang 0.02 Oh 75,000.00
Mandor - Oh 75,000.00
Jumlah
Keuntungan max 10% 0.10
Jumlah
Dibulatkan
52 PEMASANGAN 1 BH ENGSEL JENDELA (Permen PU No. 11/PRT/M/2013)
Bahan :
Engsel jendela 1.00 m' 8,500.00
Tenaga Kerja :
Pekerja 0.01 Oh 65,000.00
Tukang 0.10 Oh 70,000.00
Kepala Tukang 0.01 Oh 75,000.00
Mandor - Oh 75,000.00
Jumlah
Keuntungan max 10% 0.10
Jumlah
Dibulatkan
53 PEMASANGAN 1 BH CASEMENT HANDLE JENDELA (Permen PU No. 11/PRT/M/2013)
Bahan :
Casement Handle Jendela 1.00 Bh 85,000.00
Tenaga kerja :
Pekerja 0.01 Oh 65,000.00
Tukang 0.10 Oh 70,000.00
Kepala Tukang 0.01 Oh 75,000.00
Mandor - Oh 75,000.00
Jumlah
Keuntungan max 10% 0.10
Jumlah
Dibulatkan
54 1M' PASANG SALURAN GREVEL BETON 1/2 DIA. 20 CM + PASANGAN
Urugan Pasir 0.05 m3 135,000.00
Grevel dia. 20 cm I = 1m 1.10 bh 25,000.00
Pas. Bata 1 : 3 0.90 m2 130,400.00
Plesteran 1 : 3 2.10 m2 65,200.00
Acian 0.70 m2 29,500.00
Overhead & Profit 0.10
Jumlah
55 Memasang 1 buah kran diameter 1/2 atau 3/4
Bahan :
Kran air ex. Sun Ei 1.00 m1
Solatipe 0.03 Bh 2,000.00
Tenaga
Pekerja 0.01 Oh 65,000.00
Tukang Batu 0.40 Oh 70,000.00
Kepala Tukang Batu 0.04 Oh 75,000.00
Mandor 0.01 Oh 75,000.00

Overhead & Profit 0.10


Jumlah
56 Memasang 1 Buah kloset Duduk sek. TOTO - white
Bahan :
Kloset duduk monoblok 1.00 Bh 275,000.00
Tenaga
Pekerja 0.01 Oh 65,000.00
Tukang Batu 0.40 Oh 70,000.00
Kepala Tukang Batu 0.04 Oh 75,000.00
Mandor 0.01 Oh 75,000.00

Overhead & Profit 0.10


Jumlah
57 1 M2 PEK. PEMASANGAN KACA TEBAL 5 MM clear (Permen PU No. 11/PRT/M/2013)
Bahan :
Kaca Tebal 5 mm 1.10 m' 78,000.00
Tenaga kerja :
Pekerja 0.20 Oh 65,000.00
Tukang 0.09 Oh 70,000.00
Kepala Tukang 0.01 Oh 75,000.00
Mandor Oh 75,000.00
Jumlah
Keuntungan max 10% 0.10
Jumlah
Dibulatkan
58 Memasang 1 buah Floor Drain
Bahan
Floor Draien sek.San Ei 1.00 unit 350,000.00
Tenaga
Pekerja 0.01 Oh 65,000.00
Tukang Batu 0.10 Oh 70,000.00
Kepala Tukang Batu 0.01 Oh 75,000.00
Mandor 0.01 Oh 75,000.00
Jumlah
Keuntungan Max. 0.10
Jumlah
Dibulatkan
59 Memasang Pipa PVC 4"
Bahan
Pipa PVC 4" Sek. MASPION 1.20 M1
Perlengkapan 35.00 %
Tenaga
Pekerja 0.06 Oh
Tukang Batu 0.14 Oh
Kepala Tukang Batu 0.01 Oh
Mandor 0.00 Oh
Jumlah
Keuntungan Max. 0.15
Jumlah
Dibulatkan
60 Memasang Pipa PVC 3"
Bahan
Pipa PVC 3" Sek. MASPION 1.20 M1
Perlengkapan 35.00 %
Tenaga
Pekerja 0.04 Oh
Tukang Batu 0.06 Oh
Kepala Tukang Batu 0.01 Oh
Mandor 0.00 Oh
Jumlah
Keuntungan Max. 0.15
Jumlah
Dibulatkan
61 Memasang Pipa PVC 3/4"
Bahan
Pipa PVC 3/4" Sek. MASPION 1.20 M1
Perlengkapan 35.00 %
Tenaga
Pekerja 0.04 Oh
Tukang Batu 0.06 Oh
Kepala Tukang Batu 0.01 Oh
Mandor 0.00 Oh
Jumlah
Keuntungan Max. 0.15
Jumlah
Dibulatkan
62 Penambahan Daya Listrik 1300 VA
Biaya PLN (Dibayar ke kas PLN) 1,300.00 VA
Biaya Penyambungan 1.00 Bh
Materai
Biaya Pengurusan dan Jildak
Biaya Jildak (Gambar & Instalasi) 1,300.00 VA
Biaya Konsul 1,300.00 VA
Biaya Pengurusan 1,300.00 VA
Jumlah
Keuntungan Max. 0.15
Jumlah
Dibulatkan
63 1 M1 Kabel NYA 4x4 mm2 (kabel feeder)
Kabel NYA 4x4 mm2 (Prime) 1.00 m' 12,000.00
Cables tees 3.00 bh
Cables schoen, dia. 4 mm2 0.03 bh
Moer + baut + ring dia. 12 mm2 x 5 cm 0.03 bh
Upah kerja pemasangan kabel 1.00 m'
Jumlah
Keuntungan Max. 0.15
Jumlah
Dibulatkan
64 1 Titik instalasi penerangan
Kabel NYM 3x2,5 mm2 3.10 m'
Conduit pipe high impact, dia. 20 mm2 1.11 btg
Socket, dia. 20 mm2 1.11 bh
Elbows, dia. 20 mm2 0.52 bh
Tee doos 1.00 bh
Clamp 3.10 bh
Fisher + sekerup 6.20 bh
Flexible 0.46 m'
Biaya pemasangan 1.00 ttk
Jumlah
Keuntungan Max. 0.15
Jumlah
Dibulatkan
65 1 Titik instalasi stop kontak
Kabel NYM 3x2,5 mm2 3.10 m' 10,000.00
Conduit pipe high impact, dia. 20 mm2 1.11 btg 9,400.00
Socket, dia. 20 mm2 1.11 bh 4,500.00
Elbows, dia. 20 mm2 0.52 bh 19,500.00
Tee doos 1.00 bh 1,500.00
Clamp 3.10 bh
Fisher + sekerup 6.20 bh
Flexible 0.46 m'
Biaya pemasangan 1.00 ttk
Jumlah
Keuntungan Max. 0.15
Jumlah
Dibulatkan
66 Kusen Jendela J1
kusen alumunium 3" 14.92 m1 90,000.00
rangka daun jendela alumunium 4.40 m1 110,000.00
Kaca tebal 5 mm 2.55 m2 78,000.00
Engsel Jendela 3.00 bh 8,500.00
Casement Jendela 3.00 bh 85,000.00
Selot 3.00 bh 7,000.00

67 Kusen Jendela BV1


kusen alumunium 3" 5.14 m1 90,000.00
kaca 0.54 m2 78,000.00

68 Kusen Jendela BV2


kusen alumunium 3" 1.96 m1 90,000.00
kaca 0.18 m1 78,000.00

69 Kusen Pintu Double P1


kusen alumunium 4" 8.50 m1 100,000.00
rangka daun pintu alumunium 12.06 m1 110,000.00
kaca 0.48 m2 78,000.00
Engsel Pintu 2.00 set 8,500.00
Kunci pintu 1.00 set 85,000.00
Selot Pintu 1.00 set 7,000.00
Handle Pintu 2.00 set 90,000.00
KERJAAN

ERPUSTAKAAN SMK
Majalengka
gka - Jawa Barat 45464
PUSTAKAAN SMK
AWA BARAT

BAHAN UPAH TOTAL HRG


(Rp.) (Rp.) (Rp.)

7 = (3 x 6) 8 = (3 x 6) 9

33,000.00 33,000.00
312.00 312.00
20,650.00 20,650.00

6,500.00 6,500.00
7,000.00 7,000.00
750.00 750.00
375.00 375.00
68,587.00
6,858.70 75,445.70
75,400.00

32,500.00 32,500.00
1,875.00 1,875.00
34,375.00
3,437.50 37,812.50
37,800.00

17,062.50 17,062.50
660.00 660.00
17,722.50
1,772.25 19,494.75
19,400.00

32,500.00 32,500.00
1,425.00 1,425.00
33,925.00
3,392.50 37,317.5000
37,300.00

165,000.00 165,000.00
3,250.00 3,250.00
750.00 750.00
169,000.00
16,900.00 185,900.00
185,900.00

130,650.00 130,650.00
1,950.00 1,950.00

4,550.00 4,550.00
4,900.00 4,900.00
525.00 525.00
300.00 300.00
142,875.00
14,287.50 157,162.50
15,710.00

132,750.00 132,750.00
4,800.00 4,800.00
500.00 500.00

33,800.00 33,800.00
18,200.00 18,200.00
1,950.00 1,950.00
1,950.00 1,950.00
193,950.00
19,395.00 213,345.00
213,300.00

118,000.00 118,000.00
6,400.00 6,400.00
1,000.00 1,000.00
68,750.00 68,750.00
3,850.00 3,850.00
35,000.00 35,000.00

42,900.00 42,900.00
23,100.00 23,100.00
2,475.00 2,475.00
2,475.00 2,475.00
303,950.00
30,395.00 334,345.00
334,300.00

118,000.00 118,000.00
6,400.00 6,400.00
1,000.00 1,000.00
49,500.00 49,500.00
38,500.00 38,500.00
35,000.00 35,000.00

42,900.00 42,900.00
23,100.00 23,100.00
2,475.00 2,475.00
2,475.00 2,475.00
319,350.00
31,935.00 351,285.00
351,200.00

118,000.00 118,000.00
6,400.00 6,400.00
1,000.00 1,000.00
41,250.00 41,250.00
38,500.00 38,500.00
105,000.00 105,000.00

42,900.00 42,900.00
23,100.00 23,100.00
2,475.00 2,475.00
2,475.00 2,475.00
381,100.00
38,110.00 419,210.00
419,200.00

257,140.00 257,140.00
90,750.00 90,750.00
141,007.00 141,007.00

32,500.00 32,500.00
14,000.00 14,000.00
3,750.00 3,750.00
750.00 750.00
539,897.00
53,989.70 593,886.70
593,800.00

423,800.00 423,800.00
89,595.00 89,595.00
140,970.00 140,970.00
215,000.00 215,000.00

107,250.00 107,250.00
19,250.00 19,250.00
1,950.00 1,950.00
4,725.00 4,725.00
1,002,540.00
100,254.00 1,102,794.00
1,102,700.00
482,300.00 482,300.00
82,335.00 82,335.00
143,560.00 143,560.00
215,000.00 215,000.00

107,250.00 107,250.00
19,250.00 19,250.00
2,100.00 2,100.00
6,225.00 6,225.00
1,058,020.00
105,802.00 1,163,822.00
1,163,800.00

1,163,800.00 1,163,800.00
2,441,438.73 2,441,438.73
2,844,000.00 2,844,000.00
6,449,238.73
6,449,200.00

1,163,800.00 1,163,800.00
2,441,438.73 2,441,438.73
7,800,333.33 7,800,333.33
11,405,572.07
11,405,500.00

1,163,800.00 1,163,800.00
2,362,190.51 2,362,190.51
4,457,333.33 4,457,333.33
7,983,323.84
7,983,300.00

1,163,800.00 1,163,800.00
2,907,502.07 2,907,502.07
6,438,666.67 6,438,666.67
10,509,968.73
10,509,900.00

1,163,800.00 1,163,800.00
3,514,738.95 3,514,738.95
5,853,333.33 5,853,333.33
10,531,872.28
10,531,800.00

132,000.00 132,000.00
176,800.00 176,800.00
81,600.00 81,600.00

32,500.00 32,500.00
42,000.00 42,000.00
4,500.00 4,500.00
5,625.00 5,625.00
475,025.00
47,502.50 522,527.50
522,500.00

110,000.00 110,000.00
71,280.00 71,280.00

32,500.00 32,500.00
27,300.00 27,300.00
45,000.00 45,000.00
5,625.00 5,625.00
291,705.00
29,170.50 320,875.50
320,800.00

52,500.00 52,500.00
18,681.00 18,681.00
6,000.00 6,000.00

32,500.00 32,500.00
7,000.00 7,000.00
750.00 750.00
1,125.00 1,125.00
118,556.00
11,855.60 130,411.60
130,400.00

52,500.00 52,500.00
12,584.00 12,584.00
6,750.00 6,750.00

32,500.00 32,500.00
7,000.00 7,000.00
750.00 750.00
937.50 937.50
113,021.50
11,302.15 124,323.65
124,300.00

13,478.40 13,478.40
4,650.00 4,650.00

32,500.00 32,500.00
7,000.00 7,000.00
750.00 750.00
937.50 937.50
59,315.90
5,931.59 65,247.49
65,200.00

8,985.60 8,985.60
5,250.00 5,250.00

32,500.00 32,500.00
7,000.00 7,000.00
750.00 750.00
937.50 937.50
55,423.10
5,542.31 60,965.41
60,900.00

4,225.00 4,225.00

13,000.00 13,000.00
7,000.00 7,000.00
750.00 750.00
750.00 750.00
25,725.00
3,858.75 29,583.75
29,500.00

PRT/M/2013)

99,000.00 99,000.00
40,000.00 40,000.00
360.00 360.00

13,000.00 13,000.00
6,020.00 6,020.00
645.00 645.00
315.00 315.00
159,340.00
15,934.00 175,274.00
175,200.00

PRT/M/2013)

110,000.00 110,000.00
40,000.00 40,000.00
360.00 360.00

13,000.00 13,000.00
6,020.00 6,020.00
645.00 645.00
315.00 315.00 960.00
170,340.00
17,034.00 187,374.00
187,300.00

- -
40,000.00 40,000.00
360.00 360.00

13,000.00 13,000.00
6,020.00 6,020.00
645.00 645.00
315.00 315.00
60,340.00
6,034.00 66,374.00
66,300.00

121,000.00 121,000.00
40,000.00 40,000.00
360.00 360.00

13,000.00 13,000.00
6,020.00 6,020.00
645.00 645.00
315.00 315.00
181,340.00
18,134.00 199,474.00
199,400.00

165,000.00 165,000.00
165,000.00
16,500.00 181,500.00
181,500.00

175,000.00 175,000.00

16,250.00 16,250.00
1,750.00 1,750.00
187.50 187.50
97.50 97.50
193,285.00
19,328.50 212,613.50
212,600.00

20,000.00 20,000.00
324.00 324.00

32,500.00 32,500.00
14,000.00 14,000.00
1,500.00 1,500.00
375.00 375.00
68,699.00
6,869.90 75,568.90
75,500.00

2,100.00 2,100.00
2,100.00
210.00 2,310.00
2,300.00

5,000.00 5,000.00
5,000.00
500.00 5,500.00
5,500.00

18,054.40 18,054.40
162.00 162.00

32,500.00 32,500.00
4,900.00 4,900.00
525.00 525.00
112.50 112.50
56,253.90
5,625.39 61,879.29
61,800.00

17,360.00 17,360.00
162.00 162.00
32,500.00 32,500.00
4,900.00 4,900.00
525.00 525.00
112.50 112.50
55,559.50
5,555.95 61,115.45
61,100.00

19,000.00 19,000.00
162.00 162.00

32,500.00 32,500.00
4,900.00 4,900.00
525.00 525.00
112.50 112.50
57,199.50
5,719.95 62,919.45
62,900.00

78,000.00 78,000.00

32,500.00 32,500.00
3,500.00 3,500.00
375.00 375.00
225.00 225.00
114,600.00
11,460.00 126,060.00
126,000.00

31,500.00 31,500.00
13,000.00 13,000.00
6,300.00 6,300.00
5,800.00 5,800.00

32,500.00 32,500.00
21,000.00 21,000.00
2,625.00 2,625.00
225.00 225.00
112,950.00
11,295.00 124,245.00
124,200.00
42,000.00 42,000.00
13,000.00 13,000.00
6,300.00 6,300.00
5,800.00 5,800.00

32,500.00 32,500.00
24,500.00 24,500.00
2,625.00 2,625.00
225.00 225.00
126,950.00
12,695.00 139,645.00
139,600.00

31,100.00 31,100.00
13,000.00 13,000.00
6,300.00 6,300.00
5,800.00 5,800.00

32,500.00 32,500.00
24,500.00 24,500.00
2,625.00 2,625.00
225.00 225.00
116,050.00
11,605.00 127,655.00
127,600.00

31,500.00 31,500.00
13,000.00 13,000.00
6,300.00 6,300.00
5,800.00 5,800.00

32,500.00 32,500.00
21,000.00 21,000.00
2,625.00 2,625.00
225.00 225.00
112,950.00
11,295.00 124,245.00
124,200.00

34,400.00 34,400.00
13,000.00 13,000.00
6,300.00 6,300.00
5,800.00 5,800.00

3,250.00 3,250.00
210.00 210.00
22.50 22.50
- -
62,982.50
6,298.25 69,280.75
69,200.00
/2013)

21,000.00 21,000.00

7,800.00 7,800.00
8,400.00 8,400.00
900.00 900.00
450.00 450.00
38,550.00
3,855.00 10%
42,405.00
42,400.00

is cat dasar, 2 lapis cat penutup)

750.00 750.00
3,000.00 3,000.00
6,500.00 6,500.00

1,300.00 1,300.00
4,410.00 4,410.00
472.50 472.50
225.00 225.00
16,657.50
1,665.75 18,323.25
18,300.00

500.00 500.00
45.00 45.00

1,300.00 1,300.00
14,000.00 14,000.00
1,500.00 1,500.00
225.00 225.00
17,570.00
1,757.00 19,327.00
19,300.00

5,000.00 5,000.00
900.00 900.00
470.00 470.00
450.00 450.00

2,600.00 2,600.00
4,200.00 4,200.00
1,200.00 1,200.00
187.50 187.50
15,007.50
1,500.75 16,508.25
16,500.00

7,000.00 7,000.00

1,300.00 1,300.00
14,000.00 14,000.00
1,500.00 1,500.00
- -
23,800.00
2,380.00
26,180.00 28,560.00
28,500.00

7,000.00 7,000.00

1,300.00 1,300.00
14,000.00 14,000.00
1,500.00 1,500.00
- -
23,800.00
2,380.00 26,180.00
26,180.00
26,100.00

85,000.00 85,000.00

1,300.00 1,300.00
14,000.00 14,000.00
1,500.00 1,500.00
- -
101,800.00
10,180.00 10%
111,980.00
111,900.00
3)

110,000.00 110,000.00

1,300.00 1,300.00
14,000.00 14,000.00
1,500.00 1,500.00
- -
126,800.00
12,680.00
139,480.00
139,400.00

90,000.00 90,000.00

1,300.00 1,300.00
14,000.00 14,000.00
1,500.00 1,500.00
- -
106,800.00
10,680.00
117,480.00
117,400.00
)
8,500.00 8,500.00

650.00 650.00
7,000.00 7,000.00
750.00 750.00
- -
16,900.00
1,690.00
18,590.00
18,500.00
RT/M/2013)

85,000.00 85,000.00

650.00 650.00
7,000.00 7,000.00
750.00 750.00
- -
93,400.00
9,340.00
102,740.00
102,700.00

6,750.00 6,750.00
27,500.00 27,500.00
117,360.00 117,360.00
136,920.00 136,920.00
20,650.00 20,650.00
30,918.00 309,180.00
340,098.00

- -
50.00 50.00

650.00 650.00
28,000.00 28,000.00
3,000.00 3,000.00
375.00 375.00
32,075.00
3,207.50 35,282.50
35,200.00

275,000.00 275,000.00

650.00 650.00
28,000.00 28,000.00
3,000.00 3,000.00
375.00 375.00
307,025.00
30,702.50 337,727.50
337,700.00
PRT/M/2013)

85,800.00 85,800.00

13,000.00 13,000.00
6,300.00 6,300.00
750.00 750.00
- -
105,850.00
10,585.00
116,435.00
116,400.00

350,000.00 350,000.00

650.00 650.00
7,000.00 7,000.00
750.00 750.00
375.00 375.00
358,775.00
35,877.50 15%
394,652.50
394,600.00

- -

- -
- -
- -
- -

- -

- -
- -
- -
- -

- -

- -
- -
- -
- -

- -
- -

- -
- -
- -

12,000.00

12,000.00

31,000.00 31,000.00
10,405.80 10,405.80
4,981.50 4,981.50
10,081.50 10,081.50
1,500.00 1,500.00
- -
- -
- -
- - 57,968.80

1,342,800.00 1,342,800.00
484,000.00 484,000.00
198,900.00 198,900.00
25,500.00 25,500.00
255,000.00 255,000.00
21,000.00 21,000.00

462,600.00 462,600.00
42,120.00 42,120.00

176,400.00 176,400.00
14,040.00 14,040.00

850,000.00 850,000.00
1,326,600.00 1,326,600.00
37,440.00 37,440.00
17,000.00 17,000.00
85,000.00 85,000.00
7,000.00 7,000.00
180,000.00 180,000.00
Halaman : 50

DAFTAR HARGA SATUAN BAHAN

SATUAN KERJA : SMK NEGERI SATU KADIPATEN MAJALENGKA


PEKERJAAN : RENOVASI LABORATURIUM
LOKASI : KABUPATEN MAJALENGKA KECAMATAN KADIPATEN PROVINSI JAWA BARAT
SUMBER DANA : DIPA SMK Kehutanan Negeri Kadipaten Tahun Anggaran 2015

NO. JENIS BAHAN BANGUNAN SAT

1 2 3

A AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


1 Pasir Urug m³
2 Sirtu m³
3 Pasir Teras m³
4 Pasir Pasang Kali m³
5 Pasir Beton I m³
6 Abu Batu m³
7 Batu Gosok ( Apung ) kg
8 Batu Pecah Mesin 1/2 m³
9 Batu Pecah Mesin 2/3 m³
10 Batu Pecah Mesin 3/5 m³
11 Batu Pecah Mesin 5/7 m³
12 Batu Belah Pondasi m³
13 Batu Kerikil Beton m³
14 Batu Alam Hitam ( andesit ) m²
15 Bata Merah Bakar Kelas I bh
16 Bata Merah Bakar Kelas II bh
17 Bata Merah Oven ( Klingker ) bh
25 Roster Beton 20 x 20 bh
26 Roster Beton 30 x 30 bh
18 Grass Blok 20 x 20 bh
19 Grass Blok 30 x 30 bh
20 Paving Blok Natural 8 cm m²
21 Paving Blok Warna 8 cm m²
22 Paving Blok Natural 6 cm m²
23 Paving Blok Warna 6 cm m²
24 Kanstin Paving Blok m1
25 Semen PC Tiga Roda / 50 kg kg
26 Semen Putih kg
27 Kanstin Jalan ukuran Besar ( bina Marga ) 1 bh = 60 cm m³
28 Readymix Beton K 300, tanpa pompa ( selang ) m³
29 Readymix Beton K 225, tanpa pompa ( selang ) m³
30 Readymix Beton K 175, tanpa pompa ( selang ) m³
31 Kapur Pasang/ kapur tembok m³
32 Kapur Padam m³
33 Kapur Sirih kg
34 Semen Warna kg
Halaman : 51

NO. JENIS BAHAN BANGUNAN SAT

1 2 3
35 Tanah Liat m³
Halaman : 52

NO. JENIS BAHAN BANGUNAN SAT

1 2 3
B. BAHAN FINISHING :
LABURAN, PENGISI DAN ALATNYA
1 Plamir Tembok kg
2 Cat Tembok ICI Eksterior ( Beton ) lt
3 Cat Tembok ICI Interior ( Plafond dan Dinding ) lt
4 Cat Tembok Vinilex kg
5 Cat Dasar ICI untuk Interior ( 2 Pelapis ) lt
6 Cat Tembok Sanlex kg
7 Cat Tahan Asam kg
8 Pelapis Alkali ICI ( Cat Dasar Beton Ekterior ) lt
9 Cat Marka / Spotlight kg
10 Water Profing Emulsion kg
11 Water Profing Membrance ml
12 Rool Cat Tembok bh
13 Kape Tembok bh
14 Kape Kayu bh
15 Kwas 3" bh
16 Oker kg
17 Oyan bks
18 Oten (Pewarna Plitur ) bks
19 Spirtus lt
20 Terpentin lt
21 Tiner A lt
22 Tiner B lt
23 Minyak Cat lt
24 Kumpon kg
25 Melamik kg
26 Dempul Plastik kg
27 Dempul Duco kg
28 Ampelas lbr
29 Dempul Kayu Cap Kucing kg
30 Meni Kayu / Besi kg
31 Cat Kayu Sieve kg
32 Cat Kayu Avian kg
33 Cat Besi Sieve kg
34 Cat Besi Duco Danaglos/ICI kg
35 Cat Bron kg
36 Bahan Bakar Residu lt

C. BAHAN KAYU BERIKUT BAHAN JADINYA


1 Kayu Kamper Singkil / Kapur (K. Samarinda Klas II) m³
2 Kayu Balok Borneo Super m³
3 Kayu Papan Borneo Super m³
7 Kayu Balok Kamper Medan (kruing) m³
8 Kayu Papan Kamper Medan (Kruing) m³
9 Kayu Balok Kamper Banjar m³
Halaman : 53

NO. JENIS BAHAN BANGUNAN SAT

1 2 3
10 Kayu Papan Kamper Banjar m³
11 Kayu Balok Kamper Samarinda m³
12 Kayu Papan Kamper Samarinda m³
13 Kayu Balok Rasamala m³
14 Kayu Jati Jatim Tua dia. 40 cm m³
15 Kayu Jati Jateng Tua dia. 40 cm m³
16 Kayu Jati Jabar Tua dia. 40 cm m³
17 Kayu Jati Jabar dia. 40 cm kebawah m³
4 Kayu Hutan Kelas I ( Segeng, Mahoni, Laban ) m³
5 Kayu Terentang m³
6 Kayu Albasia m³
21 Dolken 5 s/d 7 bt
22 Dolken 8 s/d 10 bt
23 List profil kamper 1 cm m1
24 List profil kamper 2 cm m1
25 List profil kamper 4 cm m1
26 List profil kamper 5 cm m1
27 List profil kamper 10 cm m1
28 Pegangan Tangga profil Jati m1
29 Pegangan Tangga profil Kamper m1
30 Kayu Reng 2/3 Borneo Super m1
7 Kayu Reng 2/3 Kamper Banjar m1
8 Kayu Reng 3/4 Kamper Banjar m1
Halaman : 54

NO. JENIS BAHAN BANGUNAN SAT

1 2 3
D. BAHAN PENUTUP RANGKA PLAFOND
1 Bahan plafond Enternit 4 mm m²
2 Bahan plafond hardpleks 5 mm 120 x 240 lbr
3 Bahan plafond Asbes Semen 5 mm / GRC m²
4 Gypsum 120 x 240 t = 9 mm ex DN lbr
5 Gypsum 120 x 240 t = 9 mm ex Luar lbr
6 Acustik Amstrong 60 x 120 lbr
7 GRC lbr
8 List Gypsum m1

E. BAHAN KAYU LAPIS


1 Triplek 3 mm 120 x 240 lbr
2 Triplek 4 mm 120 x 240 lbr
1 Triplek 4 mm Ukuran Pintu lbr
2 Triplek 6 mm 120 x 240 lbr
3 Triplek 9 mm 120 x 240 lbr
4 Jabar Wood 4 mm lbr
7 Bilik Bambu ( tanpa kulit ) m²
8 Bilik Bambu ( dengan kulit ) m²
9 Bilik Bambu Hitam Variasi m²
5 Wall Paper ( kls menengah ) m²
6 Multiplek 9 mm 120 x 240 lbr
7 Multiplek 12 mm 120 x 240 lbr
8 Multiplek 18 mm 120 x 240 lbr
9 Play Wood 3 mm 120 x 240 lbr
10 Play Wood 4 mm 90 x 240 lbr
11 Play Wood 9 mm 120 x 240 lbr
12 Play Wood 18 mm 120 x 240 lbr
13 Teak Wood 3 mm 120 x 240 lbr
14 Teak Wood 4 mm 120 x 240 lbr
15 Teak Wood 3 mm 120 x 240 Ukuran Pintu lbr
16 Teak Wood ukuran Pintu 4 mm lbr
22 Tacon ( tahan bakar ) m²
23 Supercon m²
24 Melamin 4 mm 120 x 240 lbr
25 Melamin TOK 4 mm lbr
26 Formika 120 x 240 lbr
27 Formika Ukuran Pintu lbr

F. BAHAN LANTAI DAN PELAPIS DINDING


157 Tegel PC 20 x 20 bh
158 Plin Tegel PC 10 x 20 bh
159 Tegel PC 30 x 30 bh
160 Plin Tegel PC 15 x 30 bh
161 Tegel Warna 20 x 20 bh
162 Plin Tegel Warna 10 x 20 bh
Halaman : 55

NO. JENIS BAHAN BANGUNAN SAT

1 2 3
163 Tegel Warna 30 x 30 bh
164 Plin Tegel Warna 15 x 30 bh
165 Tegel Wafel PC 20 x 20 bh
166 Tegel Wafel Warna 20 x 20 bh
167 Tegel Badak PC 30 x 30 bh
1 Poslin 11 x 11 Warna Standar DN m²
2 Poslin 11 x 11 Warna Khusus DN m²
3 Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos m²
4 Keramik 10 x 20 KW I DN Corak / Warna / Anti Slip m²
1 Keramik 20 x 20 (KM) KW I DN Corak / Warna / Anti Slip m²
2 Keramik 20 x 20 (KM) KWI DN Putih Polos m²
3 Keramik 20 x 25 Dinding KM KWI DN Corak m²
4 Keramik 30 x 30 KW I DN putih polos m²
5 Keramik 30 x 30 KW I DN Warna/Corak ( ANTI SLIP ) m²
6 Keramik 40 x 40 KW I DN Warna/Corak ( ANTI SLIP ) m²
7 Keramik 40 x 40 KW I DN putih polos m²
8 Granit Alam LN Ukuran Besar m²
9 Granit Alam LN Ukuran Kecil m²
10 Granit Alam DN Ukuran Besar m²
11 Granit Alam DN Ukuran Kecil m²
12 Granito Tile Essenza Ukuran 40 x 40 Polis m²
13 Granito Tile Essenza Ukuran 40 x 40 Unpolis m²
14 Granito Tile Essenza 60 x 60 Polis m²
15 Granito Tile Essenza 60 x 60 Unpolis m²
16 Bata Karawang bh
17 Campuran untuk Kedap Air (AM) ltr
Halaman : 56

NO. JENIS BAHAN BANGUNAN SAT

1 2 3
G. BAHAN SALURAN AIR KOTOR / BERSIH
1 Grafel U 20 cm' m1
2 Grafel U 30 cm' m1
3 Grafel U 40 cm' m1
4 Buis Beton Ø 20 cm ( 1 m' ) m1
5 Buis Beton Ø 30 cm ( 1 m' ) m1
6 Buis Beton Ø 40 cm ( 1 m' ) m1
7 Buis Beton Ø 50 cm ( 1 m' ) stk
8 Buis Beton Ø 60 cm ( 1 m' ) stk
9 Buis Beton Ø 100 cm ( 0.50 m ) stk
10 Buis Beton Ø 80 cm ( 0.50 m ) stk
11 Buis Tanah Ø 10 cm ( 0.50 m ) stk
12 Buis Tanah Ø 15 cm ( 0.50 m ) stk
13 Buis Tanah Ø 20 cm ( 0.50 m ) stk
14 Buis Tanah Ø 25 cm ( 0.50 m ) stk
15 Injuk kg

H. BAHAN LOGAM DAN BAHAN JADINYA


1 Besi Beton U-24 Rata - Rata kg
2 Besi Beton U-39 / U-32 Rata - Rata kg
3 Baja Ringan m²
4 Pagar BRC Lengkap Tiang ( Tanpa Pondasi ) m²
5 Bondek m²
4 IWF Ex DN SII kg
5 IWF Ex Jepang kg
6 Besi Profil DN SII kg
7 Besi Profil Ex LN kg
8 Besi C Lip Chanel kg
9 Ongkos Galfanis Besi kg
10 Kawat Beton kg
13 Kawat Duri m1
14 Kawat Pengikat kg
15 Kawat Bronjong 4 mm kg
16 Kawat Tembaga kg
17 Ram Nyamuk Hijau m²
18 Ram Kawat 1 x 1 cm m²
19 Ram Ayam m²
20 Kawat Kasa 1 x 1 cm ( Putih ) m²
21 Kawat Harmonika 4 cm m²
22 Kawat Harmonika 2 cm m²
23 Kawat Las Listrik kg
24 Wiremesh M8 m²
25 Wiremesh M6 m²
26 Timah kg
27 Timah Hitam kg
28 Ram Nyamuk Aluminium m²
Halaman : 57

NO. JENIS BAHAN BANGUNAN SAT

1 2 3
11 Plat Srip Ø 2 x 30 mm ( 6 m1) bt
12 Plat Srip Ø 3 x 30 mm ( 6 m1) bt
13 Plat Alumunium 0.2 mm m²
14 Plat Alumunium 0.3 mm m²
15 Plat Alumunium 0.4 mm m²
16 Plat Alumunium 0.5 mm m²
17 Plat Alumunium 0.6 mm m²
18 Plat Alumunium 0.1 mm m²
19 Kusen Alumunium Natural 1.3 mm t=1,3 mm ( 4 " ) m1
20 Kusen Alumunium Warna 1.3 mm t=1,3 mm ( 4 " ) m1
21 Daun Jendela Alumunium Natural ( Tanpa Kaca dan accessories ) m²
22 Daun Jendela Alumunium Warna ( Tanpa Kaca dan accessories ) m²
23 Daun Pintu Alumunium Natural ( tanpa kaca dan accessories ) m²
24 Daun Pintu Alumunium Warna ( tanpa kaca dan accessories ) m²
25 Handle Alumunium ( Tarikan Pintu Alumunium ) bh
26 Kait Angin alumunium ps
27 Karet Asisoris Kusen / Pintu Alumunium m1
28 Seng Plat BJLS 30 dia. 60 cm ( 100 m1 ) rool
29 Seng Plat BJLS 30 dia. 90 cm ( 100 m1 ) rool
30 Plat Besi Tipis 1 mm kg
31 Plat Besi Tipis 0.5 mm kg
32 Plat Besi 2 mm s/d 5 mm kg
33 Plat Besi 6 mm s/d 10 mm kg
34 Plat Besi 10 mm Ke atas kg
35 Lem Kuning (aibond) kg
36 Lem Fox kg
Halaman : 58

NO. JENIS BAHAN BANGUNAN SAT

1 2 3
I. BAHAN KACA
1 Kaca Polos 2 mm ( ASAHI ) m²
2 Kaca Polos 3 mm ( ASAHI ) m²
3 Kaca Polos 5 mm ( ASAHI ) m²
4 Kaca Rayband 5 mm ( ASAHI ) m²
5 Kaca Rayband 8 mm ( ASAHI ) m²
6 Kaca Rayband 12 mm ( ASAHI ) m²
7 Kaca Patri Lokal Terpasang ( ASAHI ) m²
8 Kaca Patri EX Luar negeri terpasang m²
9 Kaca 6 mm Gravver m²
10 Glass Block DN 20 x 20 ( Kedawung ) bh
11 Glass Block DN 20 x 20 Ex LN bh

J. BAHAN PAKU DAN MUR BAUT


1 Paku 1 cm s/d 3 cm kg
2 Paku 4 cm s/d 7 cm kg
3 Paku 8 cm s/d 12 cm kg
4 Paku Beton 2 cm s/d 5 cm bh
5 Paku Kait Lengkap bh
6 Paku Cacing kg
7 Paku Skrup kg
8 Besi Beugel kuda - kuda kg
9 Duk Angker bh
10 Angker Mur Baut dia.19 / panjang 60 cm bh
11 Mur Baut HTB dia. 19 s/d 16 (5 cm) bh
12 Mur Baut Biasa dia.19 s/d 16 (5 cm) bh
13 Piser dia. 12 s/d 20 cm bh

K. BAHAN PERPIPAAN
293 Besi Pipa untuk Hydrant BSP Ø 1" bt
294 Besi Pipa untuk Hydrant BSP Ø 1,25" bt
295 Besi Pipa untuk Hydrant BSP Ø 1,5" bt
296 Besi Pipa untuk Hydrant BSP Ø 2" bt
297 Besi Pipa untuk Hydrant BSP Ø 2,5" bt
298 Besi Pipa untuk Hydrant BSP Ø 3" bt
299 Besi Pipa untuk Hydrant BSP Ø 4" bt
300 Besi Pipa untuk Hydrant BSP Ø 6" bt
301 Besi Pipa Hitam Ø 1" t=2 mm bt
302 Besi Pipa Hitam Ø 2" t=2 mm bt
303 Besi Pipa Hitam Ø 3" t=2 mm bt
304 Besi Pipa Hitam Ø 4" t=2 mm bt
305 Besi Pipa Hitam Ø 6" t=2 mm bt
306 Pipa GIP Medium A Ø 1/2" ( 6 m1 ) bt
307 Pipa GIP Medium A Ø 3/4" ( 6 m1 ) bt
308 Pipa GIP Medium A Ø 1" ( 6 m1 ) bt
309 Pipa GIP Medium A Ø 1 1/4" ( 6 m1 ) bt
Halaman : 59

NO. JENIS BAHAN BANGUNAN SAT

1 2 3
310 Pipa GIP Medium A Ø 1 1/2" ( 6 m1 ) bt
311 Pipa GIP Medium A Ø 1 3/4"( 6 m1 ) bt
312 Pipa GIP Medium A Ø 2" ( 6 m1 ) bt
313 Pipa GIP Medium A Ø 2 1/2" ( 6 m1 ) bt
314 Pipa GIP Medium A Ø 3" ( 6 m1 ) bt
315 Pipa GIP Medium A Ø 4" ( 6 m1 ) bt
316 Macam2 Sambungan GIP Ø 1/2" bh
317 Macam2 Sambungan GIP Ø 3/4" bh
318 Macam2 Sambungan GIP Ø 1" bh
319 Macam2 Sambungan GIP Ø 1 1/4" bh
320 Macam2 Sambungan GIP Ø 11/2" bh
321 Macam2 Sambungan GIP Ø 13/4" bh
322 Macam2 Sambungan GIP Ø 2" bh
323 Macam2 Sambungan GIP Ø 2 1/2" bh
324 Macam2 Sambungan GIP Ø 3" bh
325 Macam2 Sambungan GIP Ø 4" bh
326 Pipa PVC RUCIKA type AW Ø 1/2" bt
327 Pipa PVC RUCIKA type AW Ø 3/4" bt
328 Pipa PVC RUCIKA type AW Ø 1" bt
329 Pipa PVC RUCIKA type AW Ø 1 1/4" bt
330 Pipa PVC RUCIKA type AW Ø 1 1/2" bt
331 Pipa PVC RUCIKA type AW Ø 2" bt
332 Pipa PVC RUCIKA type AW Ø 2 1/2" bt
333 Pipa PVC RUCIKA type AW Ø 3" bt
334 Pipa PVC RUCIKA type AW Ø 4" bt
335 Pipa PVC RUCIKA type AW Ø 6" bt
336 Pipa PVC RUCIKA type AW Ø 8" bt
1 Pipa PVC MASPION ABU Ø 1/2" (AW) bt
2 Pipa PVC MASPION ABU Ø 3/4" (AW) bt
3 Pipa PVC MASPION ABU Ø 1" (AW) bt
4 Pipa PVC MASPION ABU Ø 1 1/4" (AW) bt
5 Pipa PVC MASPION ABU Ø 1 1/2" (AW) bt
6 Pipa PVC MASPION ABU Ø 2" (AW) bt
7 Pipa PVC MASPION ABU Ø 2 1/2" (AW) bt
8 Pipa PVC MASPION ABU Ø 3" (AW) bt
9 Pipa PVC MASPION ABU Ø 4" (AW) bt
10 Macam2 Sambungan Paralon Ø 1/2" bh
11 Macam2 Sambungan Paralon Ø 3/4" bh
12 Macam2 Sambungan Paralon Ø 1" bh
13 Macam2 Sambungan Paralon Ø 1 1/4" bh
14 Macam2 Sambungan Paralon Ø 1 1/2" bh
15 Macam2 Sambungan Paralon Ø 1 3/4" bh
16 Macam2 Sambungan Paralon Ø 2" bh
17 Macam2 Samb. Paralon Ø 2 1/2" bh
18 Macam2 Samb. Paralon Ø 3" bh
19 Macam2 Samb. Paralon Ø 4" bh
Halaman : 60

NO. JENIS BAHAN BANGUNAN SAT

1 2 3
20 Sambungan Pipa PVC Jenis AW 4 " TY bh
21 Lem Paralon tb
22 Solatip Leideng gl
23 Pipa PVC 4" berlobang jenis AW m1
Halaman : 61

NO. JENIS BAHAN BANGUNAN SAT

1 2 3
L. BAHAN SANITAIR
1 Stop Kran 3/4 " KIT bh
2 Stop Kran 1 " KIT bh
3 Stop Kran 1 1/2 " KIT bh
4 Stop Kran 2 " KIT bh
5 Stop Kran 2 1/2" KIT bh
6 Stop Kran 3 " KIT bh
7 Check Valve 1/2 " bh
8 Double Neple 1/2 " bh
9 Water Mur 1/2 " bh
10 Gate Walve 1/2 " bh
11 Saringan Air Lt KM Stainless Steel bh
12 Apooer Bath Tube bh
13 Kran stain less Lokal Kait bh
14 Shower Dengan Tiang bh
15 Shower Tanpa Tiang bh
16 Kran Tembok Sun Eui dia. 1/2 " bh
17 Kran Tembok ITAP dia. 1/2 " bh
18 Kran Bebek Sun Eui 1/2 " bh
19 Kran Bebek ITAP 1/2 " bh
20 Kran Panas Dingin San Eui Standard bh
21 Bath Cape Washteren unit
22 Tempat Sabun Poslin bh
23 Wastafel Lengkap TOTO LW 230 unit
24 Wastafel Lengkap INA unit
25 Closet Jongkok Poslin warna unit
26 Closet Jongkok Standard Putih Poslin TOTO unit
27 Closet Jongkok Lengkap Sistem Jet TOTO unit
28 Closet Duduk Warna Standard TOTO C 240 Lengkap unit
29 Wastafel Bulat Warna Standard Lengkap unit
30 Closet Duduk Warna Standard lengkap INA bh
31 Urinoar Lengkap TOTO Warna Standard lengkap unit
32 Penyekat Poslin Urinoar TOTO lbr
33 Kitchen Zink Stainless Standard Lokal ( 1 Lobang ) bh
34 Kitchen Zink Stainless Non Standard Franke ( 1 Lobang ) bh
35 Kitchen Zink Stainless Non Standard Franke ( 2 Lobang ) bh

M. BAHAN PENUTUP ATAP


1 Atap Plastik Gelombang 80 x 180 lbr
2 Atap Fiber Glass Tipis 80 x 180 (gelombang) lbr
3 Atap Fiber Glass Tebal 80 x 180 (gelombang) lbr
4 Atap Aluminium Natural USR 26 ( JAINDO ) m²
5 Atap Aluminium Warna USR 26 ( JAINDO ) m²
6 Atap Asbes Gel. Kecil 4 mm 80 x 180 lbr
7 Atap Asbes Gel. Besar 5 mm 80 x 180 lbr
8 Atap Tegola Kubota, lengkap m²
Halaman : 62

NO. JENIS BAHAN BANGUNAN SAT

1 2 3
9 Atap Tegola Kwalitas Sedang m²
10 Aluminium foile m²
11 Atap Genteng Plentong pres Bakar KW 1 bh
12 Atap Genteng Plentong pres Bakar KW 1 Glazzur bh
13 Atap Genteng Plentong pres Molen Oven KW1 bh
14 Atap Genteng Flam pres Molen Oven Jatiwangi bh
15 Bubung Genteng pres Bulat Ex Jatiwangi bh
16 Genteng Bubungan Ex Jatiwangi Segi Tiga bh
17 Genteng Murando Natural 1m2 = 20 bh bh
18 Genteng Murando Glasur 1m2 = 20 bh bh
19 Bubung Murando Natural bh
20 Bubung Murando Glasur bh
21 Bubungan Genteng Keramik bh
Halaman : 63

NO. JENIS BAHAN BANGUNAN SAT

1 2 3
N. BAHAN MEKANIKAL
1 Jockey Pump kap. 80 gln / menit 100 m1 ( 18,6 kW ) unit
2 Electrical Pump kap. 750 gln / menit 120 m1 ( 90 kW ) unit
3 Diesel Pump kap. 750 gln / menit 120 m1 ( 105 kW ) unit
4 Presure Tank kap. 500 liter lengkap unit
5 Hydran Box dalam Gedung (lengkap) unit
6 Fire House 1.5 x 30 m + nose unit
7 Exhouse Fan H 360 W 60 x 60 cm unit
8 Exhouse Fan H 380 W CFM 55 x 55 cm unit
9 Exhouse Fan H 100 W 40 x 40 cm unit
10 AC Split 3 PK Setara TOSHIBA unit
11 AC Split 2 PK Setara TOSHIBA unit
12 AC Split 1 PK Setara TOSHIBA unit
13 Mesin AC Split DAIKIN ( Indoor / Outdoor Unit ) 1 BTU

O. BAHAN ELEKTRIKAL
1 Kabel NYA 1x 1.5 Prima (1 rol = 50 m') ROLL
2 Kabel NYA 1x 2.5 Prima (1 rol = 50 m') ROLL
3 Kabel NYM 2 x 1.5 Prima (1 rol = 50 m') m'
4 Kabel NYM 3 x 1.5 Prima (1 rol = 50 m') m'
5 Kabel NYM 2 x 2.5 Prima (1 rol = 50 m') m'
6 Kabel NYM 3 x 2.5 Prima (1 rol = 50 m') m'
7 Kabel NYM 4 x 2.5 Prima (1 rol = 50 m') m'
8 Kabel NYM 2 x 4 Prima (1 rol = 50 m') m'
9 Kabel NYM 3 x 4 Prima (1 rol = 50 m') m'
10 Kabel NYM 4 x 4 Prima (1 rol = 50 m') m'
11 Kabel NYM 2 x 6 Supreme (1 rol = 50 m') m'
12 Kabel NGA 3 x 6 Supreme (1 rol = 50 m') m'
13 Kabel NGA 4 x 6 Supreme (1 rol = 50 m') m'
14 Kabel NGA 2 x 10 Supreme (1 rol = 50 m') m'
15 Kabel NGA 3 x 10 Supreme (1 rol = 50 m') m'
16 Kabel NGA 4 x 10 Supreme (1 rol = 50 m') m'
17 Kabel NGA 4 x 16 Supreme (1 rol = 50 m') m'
18 Kabel NYY 2 x 4 Supreme (1 rol = 50 m') m'
19 Kabel NYY 3 x 4 Supreme (1 rol = 50 m') m'
20 Kabel NYY 4 x 4 Supreme (1 rol = 50 m') m'
21 Kabel NYY 2 x 6 Supreme (1 rol = 50 m') m'
22 Kabel NYY 3 x 6 Supreme (1 rol = 50 m') m'
23 Kabel NYY 4 x 6 Supreme (1 rol = 50 m') m'
24 Kabel NYY 2 x 10 Supreme (1 rol = 50 m') m'
25 Kabel NYY 3 x 10 Supreme (1 rol = 50 m') m'
26 Kabel NYY 4 x 10 Supreme (1 rol = 50 m') m'
27 Kabel NYY 4 x 16 Supreme (1 rol = 50 m') m'
28 NSFB FUJI EA - 100 A bh
29 NSFB FUJI EA - 150 A bh
30 Rumah Panel 30 x 60 cm (kosong) unt
Halaman : 64

NO. JENIS BAHAN BANGUNAN SAT

1 2 3
31 Skring Kas 2 grop Biasa unt
32 Skring Kas 3 grop Biasa unt
33 Skring Kas 5 grop Biasa unt
34 MCB 1 PAS bh
35 MCB 3 PAS bh
36 Tahanan 50 A Merk Fuji bh
37 Saklar Broko Tunggal Standard ( 1 Phase ) bh
38 Saklar Broko Seri Standard ( 1 Phase ) bh
39 Stop Kontak Broko Standard ( 1 Phase ) bh
40 Stop Kontak Broko 3 Phase ( Out Bow ) bh
41 Stop Kontak Broko 3 Phase ( In Bow ) bh
42 Stop Kontak Handle 3 Phase bh
43 Instalasi Titik Lampu / Stop Kontak ( Upah dan Alat ) ttk
44 Lampu pijar 25 Watt s/d 100 Watt bh
45 Lampu Neon TL Philip 20 W bh
46 Lampu Neon TL Philip 40 W bh
47 Trapo TL 20 W ( Philip ) bh
48 Trapo TL 40 W ( Philip ) bh
49 Trapo TL 20 W ( Sinar ) bh
50 Trapo TL 40 W ( Sinar ) bh
51 Stater Neon Philip bh
52 Stater Neon Biasa bh
53 Rumah TL In Bow / Out Bow 2 x 20 W ( Kosongan ) bh
54 Down Light + SL 25 W bh
55 Lampu SL Philip 25 W bh
56 Lampu Sirkel TL 20 W Lengkap bh
57 Lampu Mercuri 80 W bh
58 Lampu Taman + Tiang + Lampu 1 Buah bh
59 Lampu Baret 30 cm + Neon bh
60 Lampu Neon Arcrilik 2 x 40 W lengkap bh
61 Jarum Penangkal Petir 16 bh
62 Kawat BC ( Tembaga ) kg
63 Pentanahan Penangkal Petir ttk
64 Pentanahan Panel ttk

O. BAHAN ALAT PENGANTUNG DAN KUNCI


1 Kunci Silinder ALFA untuk Pintu Alumunium bh
2 Tarikan Pintu Alumunium bh
3 Kunci 2 Slaag ROYAL bh
4 Rel Henderson Lengkap bh
5 Rel Maraton I Pintu unt
6 Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226 bh
7 Kunci 2 Slaag Ancor Asli bh
8 Kunci 2 Slaag ISO bh
9 Kunci KM Bulat Kualitas Biasa bh
10 Kunci KM Bulat ALFA bh
Halaman : 65

NO. JENIS BAHAN BANGUNAN SAT

1 2 3
11 Kunci 2 Slaag Silinder Utama Standard bh
12 Kunci Gembok Besar bh
13 Kunci 2 Slaag Kuda Terbang bh
14 Espangolet ps
15 Grendel 15 cm bh
16 Grendel 5 cm bh
17 Hak Angin Kait Jendela Biasa ps
18 Hak Angin Jendela Antik ps
19 Hak Angin Sendok Stainless / Kuningan bh
20 Nako Lengkap Tralis 1 Daun dn
21 Sloot Pintu berikut Rantai bh
22 Sloot Jendela Tunggal bh
23 Engsel Pintu Unilon Standard ps
24 Engsel Jendela Unilon ps
25 Engsel Patrun ps
26 Engsel Harmonika m1
27 Door Closer Kelas Standard ( Kelas Sedang ) unt
28 Door Closer Kelas Standard ( Kelas Baik ) unt
29 Door Closer Kelas Rendah unt
30 Tarikan Almari Rata - rata bh
31 Seng BJLS 30 lebar 60cm (1 rol 50 m' ) m1
32 Seng BJLS 30 lebar 90cm (1 rol 50 m' ) m1

MAJALENGKA,10 Agustus 2015


Penawar
CV. AVAARA PUTRI

ADE WAHYUDIN
Direktur
Halaman : 66

DAFTAR HARGA SATUAN BAHAN

EGERI SATU KADIPATEN MAJALENGKA


VASI LABORATURIUM
ATEN MAJALENGKA KECAMATAN KADIPATEN PROVINSI JAWA BARAT
MK Kehutanan Negeri Kadipaten Tahun Anggaran 2015

HARGA SAT.
Rp.
4

90,000.00
100,000.00
110,000.00
115,000.00
120,000.00
85,000.00
12,000.00
210,000.00
185,000.00
130,000.00
125,000.00
102,700.00
80,000.00
90,000.00
700.00
500.00
1,300.00
3,500.00
6,000.00
9,500.00
4,500.00
39,000.00
44,000.00
35,000.00
40,000.00
32,000.00
1,230.00
1,000.00
31,000.00
1,200,000.00
1,100,000.00
950,000.00
115,000.00
75,000.00
4,500.00
5,800.00
Halaman : 67

HARGA SAT.
Rp.
4
70,000.00
Halaman : 68

HARGA SAT.
Rp.
4

6,600.00
50,000.00
48,000.00
20,500.00
57,000.00
16,200.00
14,000.00
28,200.00
57,000.00
51,000.00
43,000.00
16,900.00
5,100.00
4,700.00
5,500.00
23,500.00
2,200.00
2,400.00
11,100.00
4,500.00
13,000.00
14,200.00
4,200.00
11,200.00
33,600.00
20,000.00
23,200.00
3,400.00
28,600.00
13,300.00
35,800.00
39,800.00
38,000.00
65,000.00
32,300.00
5,000.00

4,500,000.00
4,422,000.00
4,622,000.00
5,344,000.00
5,555,000.00
5,500,000.00
Halaman : 69

HARGA SAT.
Rp.
4
5,600,000.00
5,600,000.00
5,700,000.00
4,500,000.00
8,850,000.00
9,000,000.00
5,055,000.00
5,000,000.00
3,033,000.00
2,500,000.00
1,777,000.00
11,500.00
14,000.00
3,300.00
4,200.00
7,200.00
9,200.00
15,500.00
80,500.00
25,000.00
3,500.00
4,000.00
5,000.00
Halaman : 70

HARGA SAT.
Rp.
4

7,000.00
40,000.00
9,200.00
51,300.00
55,700.00
75,000.00
48,700.00
18,000.00

41,700.00
51,200.00
32,000.00
73,400.00
95,500.00
75,000.00
9,000.00
10,000.00
15,000.00
75,000.00
96,600.00
135,500.00
178,300.00
74,100.00
65,000.00
95,000.00
200,000.00
90,000.00
100,000.00
63,300.00
75,000.00
80,000.00
35,000.00
95,000.00
120,000.00
132,000.00
75,000.00

900.00
800.00
1,100.00
800.00
900.00
800.00
Halaman : 71

HARGA SAT.
Rp.
4
1,100.00
1,000.00
900.00
1,000.00
900.00
25,000.00
26,000.00
37,200.00
34,400.00
39,300.00
31,100.00
38,300.00
31,500.00
40,100.00
47,500.00
41,700.00
1,350,000.00
1,200,000.00
1,200,000.00
1,000,000.00
1,150,000.00
1,035,000.00
110,000.00
325,000.00
5,500.00
20,700.00
Halaman : 72

HARGA SAT.
Rp.
4

19,400.00
26,100.00
32,300.00
34,800.00
48,300.00
55,000.00
71,100.00
83,300.00
126,100.00
104,500.00
6,000.00
7,500.00
9,500.00
10,000.00
5,700.00

9,500.00
9,500.00
115,000.00
150,000.00
100,000.00
10,000.00
11,000.00
9,500.00
11,000.00
10,000.00
8,000.00
15,400.00
7,200.00
6,000.00
12,300.00
39,700.00
9,200.00
11,800.00
12,100.00
21,300.00
25,200.00
24,100.00
21,700.00
33,000.00
30,000.00
24,000.00
28,000.00
18,200.00
Halaman : 73

HARGA SAT.
Rp.
4
20,000.00
26,000.00
60,000.00
75,000.00
97,000.00
112,000.00
120,000.00
37,000.00
100,000.00
130,000.00
85,000.00
110,000.00
145,000.00
160,000.00
265,000.00
58,000.00
6,000.00
1,150,000.00
1,400,000.00
9,000.00
9,000.00
9,500.00
12,500.00
15,000.00
18,100.00
12,700.00
Halaman : 74

HARGA SAT.
Rp.
4

35,000.00
52,000.00
78,300.00
87,700.00
220,000.00
345,000.00
1,100,000.00
3,000,000.00
750,000.00
21,500.00
65,000.00

15,600.00
13,300.00
12,700.00
1,400.00
700.00
16,200.00
20,000.00
9,500.00
6,000.00
42,000.00
10,000.00
7,500.00
5,000.00

98,000.00
120,000.00
163,000.00
276,000.00
304,000.00
419,000.00
590,000.00
980,000.00
68,000.00
120,000.00
213,000.00
274,000.00
365,000.00
68,000.00
78,000.00
115,000.00
143,000.00
Halaman : 75

HARGA SAT.
Rp.
4
170,000.00
207,000.00
255,000.00
339,000.00
412,800.00
543,700.00
3,600.00
4,600.00
7,200.00
8,900.00
10,200.00
17,700.00
23,500.00
3,200.00
38,600.00
44,600.00
15,000.00
19,000.00
25,000.00
32,000.00
39,000.00
60,000.00
46,000.00
51,700.00
103,500.00
138,000.00
695,700.00
14,400.00
20,100.00
24,800.00
33,600.00
42,200.00
60,300.00
76,400.00
108,600.00
152,900.00
1,700.00
2,200.00
2,400.00
3,800.00
4,200.00
5,000.00
6,800.00
11,800.00
19,000.00
25,800.00
Halaman : 76

HARGA SAT.
Rp.
4
64,400.00
5,200.00
2,000.00
25,800.00
Halaman : 77

HARGA SAT.
Rp.
4

97,700.00
119,600.00
163,300.00
270,000.00
325,000.00
420,000.00
44,000.00
40,000.00
37,900.00
44,800.00
48,300.00
195,500.00
43,700.00
559,400.00
208,300.00
102,700.00
51,700.00
151,700.00
106,000.00
421,100.00
1,700,000.00
39,800.00
628,400.00
483,300.00
121,600.00
272,700.00
517,500.00
1,405,500.00
750,000.00
772,200.00
800,000.00
300,000.00
184,400.00
402,700.00
728,800.00

16,300.00
28,400.00
43,600.00
95,300.00
108,600.00
36,800.00
48,300.00
326,600.00
Halaman : 78

HARGA SAT.
Rp.
4
181,700.00
8,000.00
1,100.00
2,300.00
1,000.00
1,200.00
2,000.00
1,900.00
1,500.00
2,550.00
3,000.00
5,000.00
6,500.00
Halaman : 79

HARGA SAT.
Rp.
4

42,262,500.00
144,900,000.00
362,250,000.00
21,131,000.00
3,743,000.00
3,018,000.00
4,226,000.00
3,743,000.00
724,500.00
10,565,000.00
7,848,500.00
4,226,000.00
1,700.00

75,000.00
102,700.00
2,300.00
3,800.00
3,400.00
4,700.00
3,500.00
3,000.00
6,900.00
9,600.00
5,400.00
11,200.00
13,400.00
11,200.00
14,900.00
18,900.00
28,100.00
5,400.00
7,200.00
12,000.00
5,400.00
8,900.00
11,100.00
9,600.00
13,200.00
16,200.00
25,800.00
664,700.00
1,523,700.00
118,400.00
Halaman : 80

HARGA SAT.
Rp.
4
135,100.00
163,300.00
371,400.00
59,200.00
78,900.00
404,800.00
14,500.00
18,000.00
15,500.00
50,500.00
110,900.00
78,900.00
120,700.00
7,800.00
25,800.00
39,400.00
28,100.00
37,300.00
22,500.00
25,800.00
6,500.00
5,300.00
8,000.00
230,900.00
110,900.00
89,500.00
107,000.00
372,000.00
180,300.00
676,200.00
78,800.00
33,800.00
337,500.00
169,000.00

165,000.00
165,000.00
85,000.00
480,000.00
67,700.00
162,200.00
85,000.00
95,000.00
33,600.00
46,400.00
Halaman : 81

HARGA SAT.
Rp.
4
215,000.00
52,000.00
95,000.00
25,000.00
9,000.00
4,300.00
6,100.00
26,100.00
18,800.00
11,000.00
20,500.00
5,000.00
8,200.00
7,100.00
4,500.00
10,100.00
104,400.00
375,000.00
90,000.00
8,000.00
15,700.00
21,300.00

MAJALENGKA,10 Agustus 2015

CV. AVAARA PUTRI

ADE WAHYUDIN
DAFTAR HARGA SATUAN BAHAN

PEKERJAAN PEMBANGUNAN RUANG PERPUSTAKAAN SMK


Lokasi : SMKN 1 Malausma Kab. Majalengka
Jl. Kartabraja Malausma Kabupaten Majalengka - Jawa Barat 45464
KEGIATAN PENGADAAN RUANG PERPUSTAKAAN SMK
DINAS PENDIDIKAN PROVINSI JAWA BARAT

NO JENIS KOMODITI / BAHAN SATUAN

1 2 3
A BAHAN AGREGAT KASAR & BAHAN PEREKAT
Tanah Urug m3
Tanah Merah m3
Pasir Urug m3
Pasir Batu (sirtu) tersaring m3
Sirtu m3
Pasir pasang m3
Pasir beton m3
Pasir aspal m3
Abu batu m3
Kerikil m3
Batu gosok (apung) kg
Batu pecah mesin 1 : 2 m3
Batu pecah mesin 2 : 3 m3
Batu pecah mesin 3 : 5 m3
Batu pecah 5 : 7 m3
Batu pecah 7 : 10 m3
Batu pecah 10 : 15 m3
Batu belah pondasi m3
Batu koral beton kali m3
Batako kecil 8x10x20 buah
Batako besar 8x20x30 buah
Con Block 8x20x40 buah
Bata Merah Bakar Kelas I buah
Semen PC 50kg kg
Semen Putih zak
Semen Warna kg
Floor Hardner FOSROC/sika kg
Grevel dia. 1/2 20cm I=1m buah

B BAHAN FINISHING : LABURAN, PENGISI / ALATNYA


Plamir tembok kg
Cat tembok Sanlex kg
Cat Dasar kg
Cat Tahan Asam kg
Rool cat buah
Kape tembok buah
Kape kayu buah
Kuas 3" buah
Dempul halus / Impra (wood filler) kg
Terpentin lt
Thinner A lt
Thinner B lt
Cat Minyak lt
Lem Kayu kg

C BAHAN FINISHING : LABURAN, PENGISI / ALATNYA


Ampelas lbr
Dempul kayu kg
Meni Kayu / Besi kg
Zinkcromate kg
Cat Kayu kg
Cat Besi kg
Minyak Bekisting kg
Oker kg
Sirlak India kg

D BAHAN KAYU
Kayu Kamper Banjar m3
Kayu Albasiah m3
Kayu Papan Albasiah Kecil m3
Kayu Papan Albasiah Besar m3
Kayu Balok Albasiah Kecil m3
Kayu Balok Albasiah Besar m3
Dolken ᴓ 8 - 10 cm bh

E BAHAN PENUTUP RANGKA PLAFOND


Eternit 4 mm 100 x 100 cm m2
Gypsum 120 x 240 cm ex. DN lbr
GRC 120 x 240 cm lbr
List Gypsum C - 7 Profil m'
Listplank GRC m'
Lem Gypsum kg

F BAHAN KAYU LAPIS


Multiplek 9 mm 120 x 240 lbr

G BAHAN KAYU LAPIS


Formika 120 x 240 lbr
Formika ukuran pintu lbr
H BAHAN LANTAI DAN PELAPIS DINDING
Keramik 40 x 40 KW I DN Putih / Polos m2
Keramik 30 x 30 KW I DN Putih / Polos m2
Keramik 20 x 20 KW I DN Putih / Polos m2
Keramik 20 x 25 KW I DN Putih / Polos m2
Keramik 10 x 20 KW I DN border keramik m'

I BAHAN KACA
Kaca Polos 2 mm m2
Kaca Polos 3 mm m2
Kaca Polos 5 mm m2
Glass block bh

J BAHAN PAKU DAN MUR BAUT


Paku 1 s/d 3 cm kg
Paku 4 s/d 7 cm kg
Paku 8 s/d 12 cm kg
Paku Beton 2 s/d 5 cm bh
Paku Kait lengkap bh
Paku cacing kg
Besi Begel kuda - kuda kg
Duk Angker bh
Angker Mur Baut dia. 19 mm panjang 60 cm bh
Mur Baut HTB dia. 10 mm s/d 16 mm (5cm) bh
Mur Baut biasa dia. 10 mm s/d 16 mm (5cm) bh
Fisher dia. 12 cm s/d 20 cm bh
Baja Tulangan U 24 kg
Wermes dia. 8 mm kg
Plat bondek m2

K BAHAN PENUTUP ATAP


Konstruksi baja ringan (terpasang) m2
Atap Genteng Metal (terpasang) m2
Bubung atap Genteng Metal (terpasang) m1

L BAHAN MEKANIKAL
Saklar Tunggal bh
Saklar Ganda bh
Stop kontak bh
Lampu SL 10 watt bh
Box Inbow + TL 2 x 20 watt unit
Box panel + MCB 16 A unit
Kabel NYY 3 x 1.5 mm2 m1

M BAHAN ALAT PENGGANTUNG / KUNCI


Selot Pintu / jendela bh
Engsel pintu bh
Kunci pintu tunggal bh
Kunci pintu double bh
Engsel jendela bh
Handle pintu bh
Casement Handle Jendela bh

N BAHAN LOGAM DAN BAHAN JADINYA


Baja Tulangan U 24 Polos kg
Baja Tulangan U 32 Polos kg
Rangka Baja Jembataan kg
Kusen Alumunium 4" m1
Kusen Alumunium 3" m1
Daun jendela Alumunium m1
Daun jendela Pintu m1
Besi Profil DN SII kg
Besi Profil Ex. Luar Negeri kg
Besi Clip Chanel kg
Besi Hollo 4x4 t=0,8 mm m'
Besi Hollo 4x2 t=0,8 mm m'
Ongkos Galvanis Besi kg
Kawat Beton kg

O BAHAN LOGAM DAN BAHAN JADINYA


Kawat Duri m'
Kawat Pengikat m'
Kawat Bronjong 4 mm kg
Kawat Bronjong 3 mm kg
Kawat Tembaga kg
Kawat Las Listrik kg
Seng Plat BJLS 30 lebar 90 cm (1 Roll 50m) m'
Wermes ᴓ 8 mm kg
Wermes ᴓ 6 mm kg
Plat besi tipis 1,2 mm kg
Plat besi tipis 0,8 mm kg
Plat besi tipis 2 mm s/d 5 mm kg
Plat besi tipis 6 mm s/d 10 mm kg
Plat besi tipis 10 mm ke atas kg
Besi pipa GIP Medium galvanis 4" bt

P BAHAN SALURAN AIR & SANITASI


Pipa PVC (AW) dia. 1/2", sek. Wavin m1
Pipa Ppralon PVC. (AW)dia. 3/4" sek. Wavin m1
Pipa PVC (AW) dia. 1", sek. Wavin m1
Pipa PVC (AW) dia. 1 1/2", sek. Wavin m1
Pipa pralon PVC. (AW) dia. 2", sek.Wavin m1
Pipa pralon PVC. (AW) dia. 3", sek.Wavin m1
Pipa pralon PVC. (AW) dia. 4", sek.Wavin m1
Floor Drain bh
Kran Bak Air bh
Closet Jongkok setara TOTO bh
Lem PVC bh
Soaltipe bh

Q BAHAN PANEL, RAK & KABEL (ELEKTRIKAL)


Kabel NYY 4x4 mm2 m'
Kabel NYM 3x2.5 mm2 m'
elbow ukuran 300x100 mm bh
TL 2x18 watt RMO 300 (M2 TYPE) bh
Downlight 10 watt bh
Stop kontak tunggal bh
Saklar Tunggal bh
Saklar Ganda bh
KAAN SMK
gka
wa Barat 45464
AN SMK
AT

HARGA

95,000.00
85,000.00
135,000.00
140,000.00
165,000.00
150,000.00
165,000.00
170,000.00
200,000.00
185,000.00
13,000.00
220,000.00
210,000.00
200,000.00
195,000.00
195,000.00
195,000.00
110,000.00
165,000.00
10,000.00
12,000.00
15,000.00
750.00
1,300.00
45,000.00
5,800.00
3,000.00
25,000.00

7,500.00
25,000.00
30,000.00
20,000.00
20,000.00
7,000.00
5,000.00
4,500.00
28,000.00
4,500.00
13,000.00
14,200.00
5,000.00
13,000.00

4,500.00
28,000.00
5,000.00
7,500.00
40,000.00
65,000.00
5,000.00
23,500.00
25,000.00

5,500,000.00
2,250,000.00
2,500,000.00
2,950,000.00
2,350,000.00
2,750,000.00
17,500.00

10,000.00
52,000.00
50,000.00
19,000.00
20,000.00
5,000.00

110,000.00

132,000.00
75,000.00
42,000.00
31,500.00
31,100.00 0.02
31,500.00 1
34,400.00

35,000.00
52,000.00
78,000.00
65,000.00

15,000.00
16,000.00
17,000.00
14,000.00
700.00
16,200.00
9,500.00
6,000.00
42,000.00
10,000.00
7,500.00
7,000.00
11,000.00
-
-

165,000.00
2,100.00
5,000.00

10,000.00
14,000.00
11,000.00
190,000.00
220,000.00
175,000.00
10,000.00
7,000.00
8,500.00
85,000.00
110,000.00
8,500.00
90,000.00
85,000.00

10,500.00
13,000.00
20,000.00
100,000.00
90,000.00
110,000.00
85,000.00
95,000.00
11,000.00
10,000.00
35,000.00 140,000.00
25,000.00
8,000.00
13,000.00

7,500.00
6,000.00
12,500.00
11,000.00
39,700.00
21,700.00
12,000.00
-
-
10,000.00
9,000.00
9,500.00
12,000.00
15,000.00
590,000.00

-
-
-
-
-
-
350,000.00
200,000.00
275,000.00
6,000.00
2,000.00

12,000.00
10,000.00
-
-
230,000.00
11,000.00
10,000.00
14,000.00

Majalengka, 27 Agustus 2018


CV. GODFATHER

GITO MANDELA
Direktur
JADWAL WAKTU PELAKSANAAN

NILAI NILAI BULAN KE I BULAN KE 2 BULAN KE


No Uraian Pekerjaan PEKERJAAN BOBOT MINGGU KE MINGGU KE MINGGU KE
Rp. % 1 2 3 4 1 2 3 4 1 2

I PEKERJAAN PERSIAPAN 4,767,600.00 1.89 0.94 0.94

II PEKERJAAN TANAH 5,508,967.45 2.18 2.18

III PEKERJAAN PONDASI 4,298,611.90 1.70 1.70

IV PEKERJAAN BETON 77,784,390.66 30.77 10.26 10.26 10.26

V PEKERJAAN DINDING 37,099,149.98 14.67 2.10 2.10 2.10 2.10 2.10 2.10 2.10

VI PEKERJAAN LANTAI 18,251,600.00 7.22 1.80 1.80

VII PEKERJAAN KUSEN, PINTU, JENDELA - 0.00

VIII PEKERJAAN ATAP 41,744,787.37 16.51 5.50 5.50 5.50

IX PEKERJAAN PLAFOND 51,356,400.00 20.31

PEKERJAAN LISTRIK 889,000.00

PEKERJAAN SANITASI 3,394,600.00

PEKERJAAN FINISHING & PENGECATAN 7,734,114.88

PEKERJAAN LAIN - LAIN 2,000,000.00


252,829,222.24 95.25 0.94 2.64 2.18 7.60 2.10 2.10 17.86 12.35 14.16 9.40
0.94 3.59 5.76 13.36 15.46 17.56 35.41 47.76 61.92 71.32
MAJALENGKA,10 Agustus

GITO MANDELA
Direktur
BULAN KE BULAN KE I
MINGGU KE MINGGU KE KET.
3 4 1 2 3 4

1.80 1.80

0.00

6.77 6.77 6.77

1.80 1.80 - 6.77 6.77 6.77


73.13 74.93 74.93 81.70 88.48 95.25
MAJALENGKA,10 Agustus 2015

GITO MANDELA
Direktur
DAFTAR HARGA UPAH

PEKERJAAN PEMBANGUNAN RUANG PERPUSTAKAAN SMK


Lokasi : SMKN 1 Malausma Kab. Majalengka
Jl. Kartabraja Malausma Kabupaten Majalengka - Jawa Barat 45464
KEGIATAN PENGADAAN RUANG PERPUSTAKAAN SMK
DINAS PENDIDIKAN PROVINSI JAWA BARAT

NO. UPAH PEKERJA SATUAN

1 Pekerja Rp.
2 Tukang Batu Rp.
3 Kepala Tukang Batu Rp.
4 Tukang kayu Rp.
5 Kepala tukang kayu Rp.
6 Tukang besi profil / tukang las Rp.
7 kepala tukang besi Profil / Tukang las Rp.
8 Tukang besi beton Rp.
9 Kepala tukang besi beton Rp.
10 Tukang cat Rp.
11 Kepala tukang cat Rp.
12 Tukang gali Rp.
13 Kepala tukang gali Rp.
14 Mandor Rp.

Majalengka, 27 Agustus 2018


RPUSTAKAAN SMK
Majalengka
gka - Jawa Barat 45464
USTAKAAN SMK
WA BARAT

HARGA SATUAN

65,000.00 per hari


70,000.00 per hari
75,000.00 per hari
70,000.00 per hari
75,000.00 per hari
70,000.00 per hari
75,000.00 per hari
70,000.00 per hari
75,000.00 per hari
70,000.00 per hari
75,000.00 per hari
70,000.00 per hari
75,000.00 per hari
75,000.00 per hari

Majalengka, 27 Agustus 2018


CV. GODFATHER

GITO MANDELA
Direktur

Anda mungkin juga menyukai