Anda di halaman 1dari 114
7 Wb MLL COMMITTEE FOR QUALITY CONTROL OF HIGH-RISE BUILDING CONSTRUCTION PROJECTS GUIDELINES FOR HIGH-RISE BUILDING CONSTRUCTION PROJECTS (MECHANICAL) May, 2005 Sr. 1 COMMITTEE FOR QUALITY CONTROL OF HIGH-RISE BUILDING CONSTRUCTION PROJECTS GUIDELINES FOR MECHANICAL WORKS CONTENTS Subject Guideline 1.1 Project Organization Chart (Mechanical ) 1.2 Minimum Qualification Requirements for Various Positions (Mechanical ) 1.3 Profile of Engineers Providing Mechanical and Electrical Engineering Services in Buildings 1.4 Co-ordination with Architeot and Structural Engineer for M&E Services Guideline IL 2.1 YCDCRulesand Regulations 2.2. Fire Protection, Suppression, Rescue Procedures and Plans. Guideline 11 3.1 Design & Specifications 3.2 Final Plans and Specifications Guideline’ 4.1 Mechanical Design 4.2 Mechanical Calculations 4.3. Mechanical Drawings 4.4 Mechanical Specifications 4.5 Mechanical Works Submission Guideline V 5.1. AirConditioning & Mechanical Systems 5.2 AirConditioningDesign 5.3 Mechanical Ventilation Systems 10 u 13 14 15 15 16 18 20 22 - 10. u. 12. Subject Guideline VI 6.1 Transportation System (Lifts ) 6.2 Transportation System (Escalators ) 6.3 Transportation System ( Materials / Passengers Hoists ) 6.4 Lifting and Materials Transport (Tower Cranes ) Guideline Vit 71. Selection of Steel Wire Ropes For Hoisting 7.2. Precautions Guideline VIL 8.1 Steel Scaffolding 8.2. Bamboo Scaffolding Guideline IX 9.1 Accoustics for Buildings 9.2 Outdoor Accoustic Constructions Guideline X 10.1 M&E Equipment and Service Room 10.2 Service Core Guideline XT 11.1 Smoke Control Systems 11.2. Equipment Guideline XU 12.1 Building Security 12.2 Security Planning LIST OF REFERENCES LIST OF ANNEXURES 39 aL 42 46 51 56 58 60 62 69 74 1 COMMITTEE FOR QUALITY CONTROL OF HIGH-RISE BUILDING CONSTRUCTION PROJECTS GUIDELINE FOR MECHANICAL WORKS GUIDELINE -1 1.1 PROJECT ORGANIZATION CHART (MECHANICAL) Various Sections of the Company COMMITTEE * M&E MEMBER(S) PROJECT ‘ i ' ~| DIRECTOR/ MANAGER DESIGNER]! ~~] @mmcuaNicaL | ' i L PROJECT EXTERNAL INSPECTION ENGINEER (MECH) - ENGINEER GOVT. (OR) CQHP ASSIGNED INSPECTOR ¥ INTERNAL INSPECTION ENGINEER (MECH) ‘SUPERVISION ENGINEER (MECHANICAL) + ‘SUPERVISION TECHNICIAN (SV WORK-CHARGE(S) (MECHANICAL) 2D WORKERS LABOUR (MECHANICAL) Committee for Quality Control of High-Rise Building Construction Projects (CQHP ) —> Line of command within the project organization, ~ - Relationship with other groups outside the project organization and relationship among other groups. “hous pousisse s,ro1sadsu] GHOO Go) wo} Aq wonoedsuy [ety weoudug worszodng pu soourduq woforg Aq paptoap aq 0} wonworfrTen?) pure sousLiadxg| “( sweoyTeD SumonIpuoD my * Surquyg Jo Tpjoy Ajqeazayoug ) oHwINPA, (Teormeysop.) sIOOM POTIAS | °L seautug worstazadng pur routBug yolorg Aq Paproap aq 0} toneayrend) pure oouaviadk ‘( seorie9 SuIMonIpUOD any “Buqum|q JoI9PIoy AIqeuayarg ) UoREONPA (reormeypayy{) uauraroy | “9 - WAL ag AL wat a SKE weld - ILOa /LLOV AL LLOa/LLOW SIAE LLOF/ALLOV (CTeommeyoayy) SIE wold SAP wala say wel 'a 28TH HON (SIRT (yo) ae SIAE (yoo) aa SIAb (apa) ae Jweprmpauorsiamdng | “¢ SU woot dig, SIK9 oa di sup ILOa/LLOV SIAQ LLOd/LLOW (eoqueysoyy) SILE WoL IAP wold SIK9 wel sRouidug] uonoodsuy peuseyuy SAT (oo) aa SIKE (wow) A SIKb (yoow) aa pouduguorsiaiodng |p sIky (ea) aa SIA9 (ow aa SIKS (yaw) aa (Creommeysayy) SILT (G09) a SKE (OW) AN SIKy (a0) aI swourgug uonsodsuy jeux | “€ SIKZI (qoayy) wa di SIKZT (qa) LLO SIATT (qpaWLLOV SIL6 (goo) WAL SIRI (apa) WAL“ SIAg (yoo) ae SIAS (WOW) aE SIAOL (apa) aE SIKZ (wen) aN | SIA py (qpeW.) a SIA9 (Haan |(Teommeypayy) oBxeqo- ut-soourdug | *Z [mrad pumuoyeonp eam ————armmpedi cue Aquuajang | sammy owancroafong | “1 AON AXA NOLLVONGT @ONaTaadxa | NOLLVONda GONALAAdXA NOILVONGT 2 AWODTLVD @ AWODALVD V AMODALVD 380g Jo wonwusisag | IS (TVOINVHOAW) SNOLLISOd SNOTAVA UOT SLNAWIAINOAA NOLLVOMTTVNO WAWINIA- 71 SHYOM TVIINVHOAW YOU ANITAGIND SLOALOUd NOLLIAAISNOD ONIGTIAG ASAHI XO TOULNOD ALITVAO YOA AALLUAWOD Remarks: (1) Experience means industry -related experience after obtaining Degree/ Diploma @) Category will be determined by the Committee (CQHP) based on number of storeys, size of the project, complexity of construction and other special considerations. (3) The qualification requirements shown in the table are subject to change as and where required. Category Classification, Building Category A- Buildings with more than 20 storeys butnot more than 100m in height and other buildings with special considerations, Building CategoryB- Buildings with 13 to20 storeys and other buildings with special considerations. Building CategoryC- Buildings with 9to 12 storeys and other buildings with special considerations. COMMITTEE FOR QUALITY CONTROL OF HIGH-RISE BUILDING CONSTRUCTION PROJECTS GUIDELINE FOR MECHANICAL WORKS 1.3 PROFILE OF ENGINEERS PROVIDING MECHANICAL ENGINEERING SERVICES IN BUILDINGS Mechanical Engineer (In construction ) Job Scope He/She designs and provides advice on various building services, such as lifts and escalators, air conditioning, ventilation, refrigeration, gas supply, materials handling and equipment such as engines, beilers, pumps and compressors. He/She works with architects, structural, sanitary and electrical engineers. His! Her main duties are to: + Planand design installations and test operations of mechanical services in buildings + Maintain and repair mechanical systems + Submit design and work plans to the relevant authorities + Evaluate tenders received for mechanical works Personal Qualities + Responsible, practical and flexible + Good at communication with people + Have mechanical dexterity Education and Training + Degree in Mechanical Engineering from a recognised university and some local working, experience + AGT EGTY Dip-Tech with 4-6 years experience in related work Electrical Engineer (In construction ) Job Scope He/She designs and provides expert advice on lighting, power supply, lightning protection, fire and security alarms, communication, power and control systems, instrumentation and microelectronics and other electrical systems and equipment, He/She may specialise in industrial systems for factories, commercial systems for offices, domestic systems for homes or other specialised systems. He/She may be stationed full-time on the site to supervise electrical works. His/Her dutiesare to: + Plan, design and test electrical installations + Maintain and repair electrical systems + Prepare electrical specifications and operational procedures + Submit design and work plans to the relevant authorities + Supervise electrical works to meet safety standards + Communicate with architects, structural, sanitary and mechanical engineers Personal Quali + Creative but practical in your designs + Abletothinkand plan logically + Goodat communication with people + Safety-conscious atall times Education and Training + Degreein Electrical Engineering from a recognised university and some local working experience * AGTI/EGTY/ Dip-Tech with 4-6 years experience in related work udisep amnjanzys 7 oumaayyoue SAOIAUIS FVW AOA AAANIONT TWAALINALS ¥ LOALIHOUV LIM NOLLVNIGHO-O9 FT S3IOM TVOINVHOGW YOd INITAGIND: SLOGLOUd NOLLIAALSNOD ONIGTING ISM-HOIH IO TOUINOD ALITVNO AOd ITLLIWWOD 24 COMMITTEE FOR QUALITY CONTROL OF HIGH-RISE BUILDING CONSTRUCTION PROJECTS GUIDELINE FOR MECHANICAL WORKS, GUIDELINE - II YCDC RULES AND REGULATIONS Any building construction with four storeys and more ( in Yangon Area ) must basically comply with YCDC building rules and regulations. Specifically forM & E applications, the following are to be complied with:- (1) Design and prepare Sewage & Water Supply Plan, (2) Building Plan with Gap Dimension for - Ventilation - Natural Lighting - Landscape = _ Drainage/ water flow direction’ size of drain (3) Building floor plan and roof. - Legend for M & E fittings - Type of M & E materials - Water tank positioning (4) Necessary documents to be ready for authorities INSPECTION Design calculation requested for: - Air conditioning and mechanical ventilation system : Fire Protection system - Other technical fixtures (5) Airconditioning , Mechanical Ventilation, Fire Protection Installation - Design calculations to be in compliance with requirements and regulations - Location of M&E equipment to be specified - Ceiling height must be minimum 12 ft for service rooms - Air conditioning installation to be done where required - Basement ( Car park ) exhaust air system to be installed - Fire protection system according to Fire Services Dept. requirements All Building Plans to complete with following drawings: - Airflow direction = Method of ventilation system - Airflow rate (in cu-fY/ hr ) cesh air filter location - Thermostat / remote control location - Smoke detector location - Fire detector location - Therme hydrate location - Air conditioning location, lines and ducting - _ Kitcher plan for fire safety - Fire escape way/ staircase - Cooling tower, valves, control, duet for ACMV system

Anda mungkin juga menyukai