PEKERJAAN PERSIAPAN
a PEMBERSIHAN LOKASI 12333.2 m2
b PEMASANGAN PAPAN BOUPLANK 24666.4 m2
c DIREKSI KEET 6 X 10 60 m2
d PERSIAPAN AIR KERJA 1 Ls
e PERSIAPAN LISTRIK 1 Ls
PEKERJAAN GALIAN DAN URUGAN
a GALIAN TANAH BIASA 9866.56 m3
b URUGAN PASIR 294.315 m3
c URUGAN TANAH KEMBALI 5157.52 m3
PEKERJAAN PASANGAN DAN PLESTERAN
a PASANGAAN BATU KALI 1 pc : 4 psr 3447.69 m3
b PASANGAN BATU KOSONG 1345.44 m3
c PLESTERAN 1 pc : 4 psr + ACIAN 28590.6 m2
PEKERJAAN BETON DAN BEGESTING
a LANTAI BETON INSPERSI 1 pc : 4psr 16649.82 m3
b PEKERJAAN PEMBESIAN 0 m3
c PEMBUATAN BEGESTING 0 m2
PEKERJAAN AKHIR
a PEMBERSIHAN AKHIR 0 m2
NO URAIAN PEKERJAAN DAN PERHITUNGAN VOLU
I PEKERJAAN PERSIAPAN
a PEMBERSIHAN LOKASI LXP
b PEMASANGAN PAPAN BOUPLANK LXPx2
c DIREKSI KEET 6 X 10 LXP
d PERSIAPAN AIR KERJA
e PERSIAPAN LISTRIK
II PEKERJAAN GALIAN DAN URUGAN
a GALIAN TANAH BIASA PxLxT
b URUGAN PASIR PxLxT
c URUGAN TANAH KEMBALI PxLxT
III PEKERJAAN PASANGAN DAN PLESTERAN
a PASANGAN BATU KOSONG PxLxT
b PASANGAN BATU KALI 1PC : 5PSR PxLxT
c PLESTERAN 1 pc : 5psr + ACIAN PxL*2
IV PEKERJAAN BETON DAN BEGESTING
a LANTAI BETON INSPERSI 1 pc : 2 psr : 3 krl PxLxT
b PEKERJAAN PEMBESIAN (Inspeksi)
V PEKERJAAN AKHIR PxL
VOLUME SATUAN
1 Instalator
2 Kepala Tukang
3 Kepala tukang pasang pipa
4 Mandor/ pengawas
5 Operator alat besar
6 Pekerja / knek
7 Pembantu instalator
8 Pembantu operator alat besar
9 Tukang babat rumput
10 Tukang batu
11 Tukang besi
12 Tukang gali
13 Tukang Kayu
14 Tukang pasang pipa
1 Air
2 Batu Kali
3 Batu Karang
4 Dolken Kayu Galam
5 Kawat Ikat
6 Kayu Kelas III
7 Kayu Papan
8 Kayu Usuk 5/7
9 Batu Kerikil
10 Minyak Bekisting
11 Paku 5"-7"
12 Paku 5"
13 Pasir Beton
14 Pasir Pasang
15 Pasir urug
16 Semen
17 Semen Portland
18 Kayu Balok Borneo
19 Paku
20 Besi Strip
21 Koral Beton
22 Bata merah kelas I
23 Seng Plat
24 Jendela Nako
25 Kaca Polos
26 Kunci Tanam
27 Plywood 4 mm
28 Alat Kerja
29 Alat dan Bahan
30 Besi Beton
31 Kawat Ikat Beton
32 Kerikil Beton
4 Waterpass Unit/Hari
HARGA REAL SATUAN
Rp 75,671.00 Oh
Rp 75,671.00 Oh
Rp 65,734.00 Oh
Rp 85,607.00 Oh
Rp 85,607.00 Oh
Rp 55,000.00 Oh
Rp 65,718.00 Oh
Rp 65,734.00 Oh
Rp 55,798.00 Oh
Rp 65,734.00 Oh
Rp 65,718.00 Oh
Rp 65,734.00 Oh
Rp 65,734.00 Oh
Rp 55,798.00 Oh
Rp 1,500.00 ltr
Rp 70,000.00 m3
Rp 135,000.00 m3
Rp 7,700.00 btg
Rp 15,000.00 kg
Rp 1,650,000.00 m3
Rp 3,400,000.00 m3
Rp 1,650,000.00 m3
Rp 275,000.00 m3
Rp 4,950.00 ltr
Rp 34,100.00 kg
Rp 34,100.00 kg
Rp 215,000.00 m3
Rp 215,000.00 m3
Rp 88,000.00 m3
Rp 1,250.00 kg
Rp 1,100.00 kg
Rp 1,815,000.00 m3
Rp 34,100.00 kg
Rp 11,550.00 kg
Rp 275,000.00 m3
Rp 605.00 bh
Rp 33,000.00 lbr
Rp 9,900.00 bh
Rp 71,500.00 m²
Rp 99,000.00 bh
Rp 42,900.00 lbr
Rp 52,800.00 bh
Rp 2,500,000.00
Rp 120,000.00
Rp 20,000.00
Rp 200,000.00
Rp 100,000.00
NO. URAIAN KOEF SAT
A B C D
I PEKERJAAN PERSIAPAN
ANALISA 001 1 m Pembersihan Lahan
Bahan
-
Tenaga
Perkerja 0.400 Oh
Mandor 0.020 Oh
ANALISA 003 1 m' Pemasangan Uizet/Bowplank
Bahan
Kayu Usuk 0.012 btg
Kayu Papan 0.007 btg
Paku 5"-7" 1.200 kg
Tenaga
Tukang Kayu 0.200 Oh
Perkerja 0.080 Oh
Kepala Tukang 0.020 Oh
Mandor 0.020 Oh
ANALISA 004 Pemasangan Instalasi Litstrik / Penerangan
Bahan
Alat dan Bahan 1.000 bh
Tenaga
Perkerja 2.000 oh
Mandor 1.000 oh
ANALISA 005 1 m² Pek. Kantor Direksi Keet , dengan lantai plesteran
Bahan
Dolken Kayu 1.250 btg
Kayu Balok Borneo 0.180 m3
Paku 0.850 Kg
Besi Strip 1.100 Kg
Semen Portland 35.000 Kg
Pasir Pasang 0.150 m3
Pasir Beton 0.100 m3
Koral Beton 0.150 m3
Bata merah kelas I 30.000 bh
Seng Plat 0.250 lbr
Jendela Nako 2.000 bh
Kaca Polos 0.080 m2
Kunci Tanam 0.150 bh
Plywood 4 mm 0.060 lbr
Tenaga
Tukang Kayu 2.000 Oh
Tukang Batu 1.000 Oh
Perkerja 2.000 Oh
Kepala Tukang 0.300 Oh
Mandor 0.200 Oh
ANALISA 006 Penyedian Air Kerja
Bahan
Air Bersih 15,000.000 ltr
II PEKERJAAN TANAH
ANALISA 007 1 m3 Pek. Galian Tanah Biasa
Tenaga
Perkerja 0.675 Oh
Tukang Gali 0.010 Oh
Kepala Tukang 0.020 Oh
Mandor 0.068 Oh
ANALISA 008 1 m3 Pek. Urugan Pasir
Bahan
Pasir Urug 1.200 m³
Tenaga
Perkerja 0.300 Oh
Tukang Gali 0.010 Oh
Kepala Tukang 0.013 Oh
Mandor 0.010 Oh
ANALISA 009 1 m3 Urugan Tanah Kembali (1/4 Galian)
Tenaga
Perkerja 0.192 Oh
Tukang Gali 0.030 Oh
Kepala Tukang 0.200 Oh
Mandor 0.019 Oh
III PEKERJAAN PASANGAN DAN PLESTERAN
ANALISA 010 1 m³ Pek. Pasangan Batu Kosong
Bahan
Batu kali 1.2 m³
Pasir urugan 1.2 m³
Tenaga
Pekerja 0.780 oh
Tukang Batu 0.390 oh
Kepala Tukang 0.039 oh
Mandor 0.039 oh
ANALISA 010 1 m3 Pek.Pasangan Batu Kali 1pc :4psr
Bahan
Semen 117.000 m3
Pasir Pasang 0.561 m3
Batu Karang 1.200 m3
Tenaga
Perkerja 4.950 Oh
Tukang Batu 0.488 Oh
Kepala Tukang 0.488 Oh
Mandor 0.488 Oh
ANALISA 011 1 m2 Plesteran Dinding 1 : 5 + ACIAN
Bahan
Semen Portland 5.400 kg
Pasir Pasang 0.028 m3
Tenaga
Perkerja 0.125 Oh
Tukang Batu 0.1525 Oh
Kepala Tukang 0.01 Oh
Mandor 0.009 Oh
IV PEKERJAAN BETON DAN BEKISTING
ANALISA 012 Pembesian
Bahan
Besi Beton 105 kg
Kawat Ikat Beton 12.5 kg
Tenaga
Pekerja 0.5 oh
Tukang Besi 0.50 oh
Kepala Tukang 0.50 oh
Mandor 0.5 oh
Rp23,712.14
Rp55,000.00 Rp22,000.00
Rp85,607.00 Rp1,712.14
Rp84,520.00 Rp20,772.36
Rp1,650,000.00 Rp19,800.00
Rp3,400,000.00 Rp23,800.00
Rp34,100.00 Rp40,920.00
Rp65,734.00 Rp13,146.80
Rp55,000.00 Rp4,400.00
Rp75,671.00 Rp1,513.42
Rp85,607.00 Rp1,712.14
Rp2,500,000.00 Rp195,607.00
Rp2,500,000.00 Rp2,500,000.00
Rp55,000.00 Rp110,000.00
Rp85,607.00 Rp85,607.00
Rp580,859.00 Rp347,024.70
Rp7,700.00 Rp9,625.00
Rp1,815,000.00 Rp326,700.00
Rp34,100.00 Rp28,985.00
Rp11,550.00 Rp12,705.00
Rp1,100.00 Rp38,500.00
Rp215,000.00 Rp32,250.00
Rp215,000.00 Rp21,500.00
Rp275,000.00 Rp41,250.00
Rp605.00 Rp18,150.00
Rp33,000.00 Rp8,250.00
Rp9,900.00 Rp19,800.00
Rp71,500.00 Rp5,720.00
Rp99,000.00 Rp14,850.00
Rp42,900.00 Rp2,574.00
Rp65,734.00 Rp131,468.00
Rp65,734.00 Rp65,734.00
Rp55,000.00 Rp110,000.00
Rp75,671.00 Rp22,701.30
Rp85,607.00 Rp17,121.40
Rp22,500,000.00
Rp1,500.00 Rp22,500,000.00
Rp0.00 Rp45,117.04
Rp55,000.00 Rp37,125.00
Rp65,734.00 Rp657.34
Rp75,671.00 Rp1,513.42
Rp85,607.00 Rp5,821.28
Rp105,600.00 Rp18,997.13
Rp88,000.00 Rp105,600.00
Rp55,000.00 Rp16,500.00
Rp65,734.00 Rp657.34
Rp75,671.00 Rp983.72
Rp85,607.00 Rp856.07
Rp0.00 Rp29,292.75
Rp55,000.00 Rp10,560.00
Rp65,734.00 Rp1,972.02
Rp75,671.00 Rp15,134.20
Rp85,607.00 Rp1,626.53
Rp 189,600.00 Rp 74,826.10
Rp 70,000.00 Rp 84,000.00
Rp 88,000.00 Rp 105,600.00
Rp 55,000.00 Rp 42,900.00
Rp 65,734.00 Rp 25,636.26
Rp 75,671.00 Rp 2,951.17
Rp 85,607.00 Rp 3,338.67
Rp428,865.00 Rp383,031.86
Rp1,250.00 Rp146,250.00
Rp215,000.00 Rp120,615.00
Rp135,000.00 Rp162,000.00
Rp55,000.00 Rp272,250.00
Rp65,734.00 Rp32,078.19
Rp75,671.00 Rp36,927.45
Rp85,607.00 Rp41,776.22
Rp11,960.00 Rp18,426.61
Rp1,100.00 Rp5,940.00
Rp215,000.00 Rp6,020.00
Rp55,000.00 Rp6,875.00
Rp65,734.00 Rp10,024.44
Rp75,671.00 Rp756.71
Rp85,607.00 Rp770.46
Rp 12,850,000.00 Rp 140,998.00
Rp 120,000.00 Rp 12,600,000.00
Rp 20,000.00 Rp 250,000.00
Rp 55,000.00 Rp 27,500.00
Rp 65,718.00 Rp 32,859.00
Rp 75,671.00 Rp 37,835.50
Rp 85,607.00 Rp 42,803.50
Rp697,840.00 Rp80,757.68
Rp1,650,000.00 Rp396,000.00
Rp34,100.00 Rp109,120.00
Rp4,950.00 Rp7,920.00
Rp7,700.00 Rp184,800.00
Rp55,000.00 Rp33,495.00
Rp65,734.00 Rp26,688.00
Rp75,671.00 Rp15,361.21
Rp85,607.00 Rp5,213.47
Rp 595,807.50 Rp 97,761.60
Rp 215,000.00 Rp 133,515.00
Rp 200,000.00 Rp 148,000.00
Rp 1,100.00 Rp 6,792.50
Rp 1,500.00 Rp 307,500.00
Rp 55,000.00 Rp 72,600.00
Rp 65,734.00 Rp 12,423.73
Rp 75,671.00 Rp 1,437.75
Rp 85,607.00 Rp 11,300.12
TOTAL harga
I=(G+H)
Rp23,712.14
Rp105,292.36
Rp2,695,607.00
Rp927,883.70
Rp22,500,000.00
Rp45,117.04
Rp124,597.13
Rp29,292.75
Rp 264,426.10
Rp811,896.86
Rp30,386.61
Rp 12,990,998.00
Rp778,597.68
Rp 693,569.10
No Jenis Pekerjaan Volume Satuan
I PEK. PERSIAPAN
1 Pekerjaan Pembersihan 1.000 ls
3 Pemasangan Uizet/Bowplank 1.000 ls
4 Pembuat direksi keet 1.000 ls
5 Instalasi Penerangan 1.000 ls
6 Air Bersih 1.000 ls
Sub Total 5.000
ll PEKERJAAN TANAH
1 Galian Tanah Biasa 9,866.560 m3
2 Urugan Pasir 294.315 m3
3 Urugan tanah kembali 5,157.520 m3
Sub Total 15,318.395
lll PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan batu kosong 1,345.440 m³
2 Pasangan Batu Kali 3,447.690 m³
3 Plesteran 1:5 + Acian 28,590.600 m³
Sub Total 33,383.730
lV PEKERJAAN BETON DAN BEGESTING
1 Lantai Beton Inspersi 16,649.820 m3
Pekerjaan Pembesian 0.000 m³
Begesting 0.000 m³
Sub Total 16,649.820
V PEKERJAAN AKHIR
1 Pembersihan Akhir 0.000 -
2 Administrasi - -
3 Dokumentasi - -
Sub Total
Total Biaya Pekerjaan
Harga Satuan (Rp) Jumlah Harga (Rp)
%
Rp23,712.14 Rp23,712.14 0.0001461
Rp105,292.36 Rp105,292.36
Rp927,883.70 Rp927,883.70
Rp2,695,607.00 Rp2,695,607.00
Rp22,500,000.00 Rp22,500,000.00
Rp26,252,495.20
Rp45,117.04 Rp445,149,942.72
Rp124,597.13 Rp36,670,805.20
Rp29,292.75 Rp151,077,959.45
Rp632,898,707.37
Rp264,426.10 Rp355,769,454.67
Rp811,896.86 Rp2,799,168,671.46
Rp30,386.61 Rp868,771,354.68
Rp4,023,709,480.82
Rp693,569.10 Rp11,547,800,655.91
Rp12,990,998.00 Rp0.00
Rp778,597.68 Rp0.00
Rp11,547,800,655.91
Rp1,500,000.00 Rp0.00
Rp2,000,000.00 Rp2,000,000.00
Rp750,000.00 Rp750,000.00
Rp2,750,000.00
Rp16,233,411,339.30
Rp16,233,411,339.30
No Uraian Pekerjaan Satuan Volume
1 2 3 4
Jumlah total =
PPN 10% =
Total =
Dibulatkan =
Jumlah Harga
Rp5.00
Rp26,252,495.20
Rp632,898,707.37
Rp4,023,709,480.82
Rp11,547,800,655.91
Rp2,750,000.00
Rp16,233,411,339.30
Rp1,623,341,133.93
Rp17,856,752,473.23
Rp17,856,752,000.00
PEMBERSIHAN LOKASI PEMASANGAN PAPAN BOUP
12333.2 m3 24666.4
Prdktifitas per Hari 700 m3/Hr Prdktifitas per Hari 364.5833 m3/Hr
0.42045 14.14634
Durasi Hr Kerja Durasi Hr Kerja
1 15
Prdktifitas per Hari 179.4872 m3/Hr Prdktifitas per Hari 777.7778 m3/Hr
7.496023 36.75934
Durasi Hr Kerja Durasi Hr Kerja
8 37
PEKERJAAN PEMBESIAN PEMBUATAN BEGISTING
m3 0 m3
2 13
B
6
0 A
0 1 7
0 7
7
C
2
3 9
3 9
9
10 29
29
J
1
D 4 22 F H
2 13 6 24 8 28
10 K
24 28
9 2 4
1
E 5 10 G I
3 9 7 88 9 89
3 9 5 10 7 88 9 89
9 10 88 89
1 78
1
L
1
11 30
30
No Uraian Pekerjaan Jumlah Harga (Rp)
I PEKERJAAN PERSIAPAN
Pekerjaan Pembersihan Rp 23,712.14
Pemasangan Uizet/Bowplank Rp 105,292.36
Pembuat direksi keet Rp 927,883.70
Instalasi Penerangan Rp 2,695,607.00
Air Bersih Rp 22,500,000.00
II PEKERJAAN GALIAN
Galian Tanah Biasa Rp 445,149,942.72
Urugan Pasir Rp 36,670,805.20
Urugan tanah kembali Rp 151,077,959.45
III PEKERJAAN PASANGAN DAN PLESTERAN
Pasangan batu kosong Rp 355,769,454.67
Pasangan Batu Kali Rp 2,799,168,671.46
Plesteran 1:5 + Acian Rp 868,771,354.68
IV PEKERJAAN BETON DAN BEGISTING
Lantai Beton Inspersi Rp 11,547,800,655.91
Pekerjaan Pembesian Rp -
Begesting Rp -
V PEKERJAAN AKHIR
Pembersihan Akhir Rp -
Administrasi Rp 2,000,000.00
Dokumentasi Rp 750,000.00
TOTAL Rp 16,233,411,339.30
Bobot Bulan I Bulan II
(%) 1 2 3 4 5 6 7 8
0.0001 0.0001
0.0006
0.0057
0.0166
0.1386
2.7422
0.226
0.9307
2.1916
17.2433
5.3517
71.1360
0.0000
0.0000
0.0000
0.0123
0.0046
100
Bulan III Bulan IV Bulan v
9 10 11 12 13 14 15 16
Bulan v