CRONOGRAMA DE EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

: REFACCION DE LOS AMBIENTES PARA LAS NUEVAS OFICINAS ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCH
OBRA
N° 101 - HUAMANGA - AYACUCHO
MODALIDAD : POR ADMINISTRACION DIRECTA - CONTRATA DISTRITO : AYACUCHO
FECHA : MARZO 2016 PROVINCIA : HUAMANGA
LUGAR : CALLE SAN JUAN DE DIOS N° 101 REGIÓN : AYACUCHO
MONTO CD S/.210,352.71

45 Dias Calendarios
ITEM PARTIDAS TOTAL
1ra Semana 2da Semana 3ra Semana
01 TRABAJOS PRELIMINARES
01.01 OBRAS PRELIMINARES
01.01.01 LIMPIEZA GENERAL DE MODULOS S/. 281.08
P 100% 100%
E S/. 281.08 S/. 281.08

01.01.02 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M S/. 576.36


P 100% 100%
E S/. 576.36 S/. 576.36

01.01.03 FLETE S/. 8,860.85


P 100% 50%
E S/. 8,860.85 S/. 4,430.43

01.02 DEMOLICIÓN
01.02.01 DESMONTAJE DE CIELO RASO DE TRIPLAY S/. 614.32
P 100% 100%
E S/. 614.32 S/. 614.32

01.02.02 DEMOLICION DE ALBAÑELERIA S/. 625.55


P 100% 100%
E S/. 625.55 S/. 625.55

01.02.03 DEMOLICION DE MUROS DE ADOBE S/. 75.14


P 100% 100%
E S/. 75.14 S/. 75.14

01.02.04 DEMOLICION DE PISO DE CONCRETO S/. 1,258.84


P 100% 50% 50%
E S/. 1,258.84 S/. 629.42 S/. 629.42

01.02.05 PICADO DE PARED DE YESO S/. 2,856.78


P 100% 30% 70%
E S/. 2,856.78 S/. 857.03 S/. 1,999.75

01.02.06 RETIRO Y ELEMINACION DE DESMONTE S/. 3,271.25


P 100% 100%
E S/. 3,271.25 S/. 3,271.25

02 REFACCION EXTERIOR
02.01 FACHADA
02.01.01 TRABAJOS PRELIMINARES
02.01.01.01 LIMPIEZA EN MUROS EXTERIORES S/. 669.87
P 100% 100%
E S/. 669.87 S/. 669.87

02.01.02 REVOQUES ENLUCIDOS Y MOLDURAS


02.01.02.01 TARRAJEO DE MUROS CON YESO S/. 3,515.55
P 100% 50% 50%
E S/. 3,515.55 S/. 1,757.78 S/. 1,757.78

02.01.03 CARPINTERIA DE MADERA


02.01.03.01 PUERTA MADERA SEGUN DETALLE S/. 1,937.43
P 100%
E S/. 1,937.43

02.01.03.02 VENTANA DE MADERA SEGUN DISEÑO DE VIDRIO S/. 2,970.65


P 100%
CRONOGRAMA DE EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

: REFACCION DE LOS AMBIENTES PARA LAS NUEVAS OFICINAS ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCH
OBRA
N° 101 - HUAMANGA - AYACUCHO
MODALIDAD : POR ADMINISTRACION DIRECTA - CONTRATA DISTRITO : AYACUCHO
FECHA : MARZO 2016 PROVINCIA : HUAMANGA
LUGAR : CALLE SAN JUAN DE DIOS N° 101 REGIÓN : AYACUCHO
MONTO CD S/.210,352.71

45 Dias Calendarios
ITEM PARTIDAS TOTAL
1ra Semana 2da Semana 3ra Semana
E S/. 2,970.65

02.01.04 PINTURA
02.01.04.01 PINTURA LATEX EN MUROS EXTERIORES S/. 3,341.78
P 100%
E S/. 3,341.78

02.01.05 ESTRUCTURA DE MADERA


02.01.05.01 VIGAS DE ROLLIZO DE EUCALIPTO Ø 3" L=5.0 ML S/. 1,386.00
P 100% 100%
E S/. 1,386.00 S/. 1,386.00

02.01.05.02 VIGA MADERA 2"X3"X9 PIES S/. 3,934.00


P 100% 100%
E S/. 3,934.00 S/. 3,934.00

02.01.06 CUBIERTAS
02.01.06.01 COBERTURA CON TEJA ARTESANAL S/. 11,469.02
P 100% 100%
E S/. 11,469.02 S/. 11,469.02

02.01.06.02 CUMBRERA DE TEJA S/. 216.60


P 100% 100%
E S/. 216.60 S/. 216.60

02.01.06.03 ENCHACADO DE CARRIZO Ø 3/4" A 1" S/. 8,169.39


P 100% 100%
E S/. 8,169.39 S/. 8,169.39

02.01.07 INSTALACIONES DE REJAS METALICAS


02.01.07.01 REJA FIERRO CIRCULAR 1 1/2" EN EXTERIOR S/. 2,373.36
P 100%
E S/. 2,373.36

03 REFACCION INTERIOR
03.01 MODULO A
03.01.01 TRABAJOS PRELIMINARES
03.01.01.01 LIMPIEZA EN MUROS INTERIORES S/. 522.77
P 100% 100%
E S/. 522.77 S/. 522.77

03.01.02 REVOQUES ENLUCIDOS Y MOLDURAS


03.01.02.01 TARRAJEO DE MUROS CON YESO S/. 2,743.56
P 100% 50% 50%
E S/. 2,743.56 S/. 1,371.78 S/. 1,371.78

03.01.03 PISOS Y PAVIMENTOS


03.01.03.01 PISO MACHIEMBRADO MADERA 1"x4" S/. 2,337.45
P 100% 100%
E S/. 2,337.45 S/. 2,337.45

03.01.03.02 CORREAS 2" x 3" S/. 524.32


P 100% 100%
E S/. 524.32 S/. 524.32

03.01.04 ZOCALOS Y CONTRAZOCALOS


03.01.04.01 CONTRAZOCALO DE LOSETA H=10 CM S/. 730.79
P 100% 100%
CRONOGRAMA DE EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

: REFACCION DE LOS AMBIENTES PARA LAS NUEVAS OFICINAS ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCH
OBRA
N° 101 - HUAMANGA - AYACUCHO
MODALIDAD : POR ADMINISTRACION DIRECTA - CONTRATA DISTRITO : AYACUCHO
FECHA : MARZO 2016 PROVINCIA : HUAMANGA
LUGAR : CALLE SAN JUAN DE DIOS N° 101 REGIÓN : AYACUCHO
MONTO CD S/.210,352.71

45 Dias Calendarios
ITEM PARTIDAS TOTAL
1ra Semana 2da Semana 3ra Semana
E S/. 730.79 S/. 730.79

03.01.04.02 CONTRAZOCALO DE MADERA H=10 cm S/. 794.84


P 100% 100%
E S/. 794.84 S/. 794.84

03.01.05 CARPINTERIA DE MADERA


03.01.05.01 PUERTA MADERA SEGUN DETALLE S/. 978.50
P 100%
E S/. 978.50

03.01.05.02 TABIQUERIA DRYWALL E=13CM C/RELLENO ACUSTICO C/PLANCHA 5/8" S/. 830.40
P 100% 100%
E S/. 830.40 S/. 830.40

03.01.06 CARPINTERIA METALICA


03.01.06.01 VENTANA C/PERFILES DE ALUMINIO - CRISTAL TEMPLADO INCOLORO 6MM S/. 469.90
P 100% 100%
E S/. 469.90 S/. 469.90

03.01.07 CERRAJERIA
03.01.07.01 BISAGRA CAPUCHINA DE 4" X 4" S/. 39.90
P 100%
E S/. 39.90

03.01.07.02 CERRADURA PARA PUERTA TRES GOLPES S/. 44.61


P 100%
E S/. 44.61

03.01.08 PINTURA
03.01.08.01 PINTURA LATEX DOS MANOS MUROS INTERIORES S/. 2,606.10
P 100%
E S/. 2,606.10

03.01.08.02 PINTURA BARNIZ EN CARPINTERIA DE MADERA S/. 69.46


P 100%
E S/. 69.46

03.01.09 INSTALACION CIELORRASOS


03.01.09.01 CIELORASO CON BALDOSA ACUSTICA S/. 11,243.83
P 100%
E S/. 11,243.83

03.02 MODULO B
03.02.01 TRABAJOS PRELIMINARES
03.02.01.01 LIMPIEZA EN MUROS INTERIORES S/. 128.96
P 100% 100%
E S/. 128.96 S/. 128.96

03.02.02 REVOQUES ENLUCIDOS Y MOLDURAS


03.02.02.01 TARRAJEO DE MUROS CON YESO S/. 676.78
P 100% 100%
E S/. 676.78 S/. 676.78

03.02.03 PISOS Y PAVIMENTOS


03.02.03.01 FALSO PISO 4" CONCRETO C-H 1:10 S/. 1,314.78
P 100% 100%
E S/. 1,314.78 S/. 1,314.78
CRONOGRAMA DE EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

: REFACCION DE LOS AMBIENTES PARA LAS NUEVAS OFICINAS ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCH
OBRA
N° 101 - HUAMANGA - AYACUCHO
MODALIDAD : POR ADMINISTRACION DIRECTA - CONTRATA DISTRITO : AYACUCHO
FECHA : MARZO 2016 PROVINCIA : HUAMANGA
LUGAR : CALLE SAN JUAN DE DIOS N° 101 REGIÓN : AYACUCHO
MONTO CD S/.210,352.71

45 Dias Calendarios
ITEM PARTIDAS TOTAL
1ra Semana 2da Semana 3ra Semana

03.02.03.02 CONTRAPISO DE 48 MM S/. 1,234.79


P 100% 100%
E S/. 1,234.79 S/. 1,234.79

03.02.03.03 PISO DE PORCELANATO 50X50 S/. 3,938.03


P 100% 100%
E S/. 3,938.03 S/. 3,938.03

03.02.04 ZOCALOS Y CONTRAZOCALOS


03.02.04.01 CONTRAZOCALO DE LOSETA H=10 CM S/. 501.77
P 100% 100%
E S/. 501.77 S/. 501.77

03.02.05 CARPINTERIA DE MADERA


03.02.05.01 PUERTA MADERA SEGUN DETALLE S/. 861.08
P 100%
E S/. 861.08

03.02.05.02 VENTANA DE MADERA SEGUN DISEÑO DE VIDRIO S/. 280.25


P 100%
E S/. 280.25

03.02.06 CERRAJERIA
03.02.06.01 BISAGRA CAPUCHINA DE 4" X 4" S/. 39.90
P 100%
E S/. 39.90

03.02.06.02 CERRADURA PARA PUERTA TRES GOLPES S/. 44.61


P 100%
E S/. 44.61

03.02.07 PINTURA
03.02.07.01 PINTURA LATEX DOS MANOS MUROS INTERIORES S/. 643.33
P 100%
E S/. 643.33

03.02.08 INSTALACION CIELORRASOS


03.02.08.01 CIELORASO CON BALDOSA ACUSTICA S/. 3,757.28
P 100%
E S/. 3,757.28
03.02.09 ESTRUCTURA DE MADERA
03.02.09.01 VIGAS DE ROLLIZO DE EUCALIPTO Ø 3" L=6.0 ML S/. 125.50
P 100% 100%
E S/. 125.50 S/. 125.50

03.02.09.02 VIGA MADERA 2"X3"X9 PIES S/. 550.76


P 100% 100%
E S/. 550.76 S/. 550.76

03.02.10 CUBIERTAS
03.02.10.01 COBERTURA CON TEJA ARTESANAL S/. 1,632.57
P 100%
E S/. 1,632.57

03.02.10.02 ENCHACADO DE CARRIZO Ø 3/4" A 1" S/. 1,162.88


P 100%
CRONOGRAMA DE EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

: REFACCION DE LOS AMBIENTES PARA LAS NUEVAS OFICINAS ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCH
OBRA
N° 101 - HUAMANGA - AYACUCHO
MODALIDAD : POR ADMINISTRACION DIRECTA - CONTRATA DISTRITO : AYACUCHO
FECHA : MARZO 2016 PROVINCIA : HUAMANGA
LUGAR : CALLE SAN JUAN DE DIOS N° 101 REGIÓN : AYACUCHO
MONTO CD S/.210,352.71

45 Dias Calendarios
ITEM PARTIDAS TOTAL
1ra Semana 2da Semana 3ra Semana
E S/. 1,162.88

03.03 MODULO C
03.03.01 TRABAJOS PRELIMINARES
03.03.01.01 LIMPIEZA EN MUROS INTERIORES S/. 49.16
P 100% 100%
E S/. 49.16 S/. 49.16

03.03.02 REVOQUES ENLUCIDOS Y MOLDURAS


03.03.02.01 TARRAJEO DE MUROS CON YESO S/. 257.98
P 100% 100%
E S/. 257.98 S/. 257.98

03.03.03 PISOS Y PAVIMENTOS


03.03.03.01 FALSO PISO 4" CONCRETO C-H 1:10 S/. 619.42
P 100% 100%
E S/. 619.42 S/. 619.42

03.03.03.02 CONTRAPISO DE 48 MM S/. 581.73


P 100% 100%
E S/. 581.73 S/. 581.73

03.03.03.03 PISO DE PORCELANATO 50X50 S/. 1,301.30


P 100% 100%
E S/. 1,301.30 S/. 1,301.30

03.03.03.04 PISO DE MAYOLICA 30X30 CM EN SS.HH S/. 512.80


P 100% 100%
E S/. 512.80 S/. 512.80

03.03.04 ZOCALOS Y CONTRAZOCALOS


03.03.04.01 CONTRAZOCALO DE LOSETA H=10 CM S/. 767.31
P 100% 100%
E S/. 767.31 S/. 767.31

03.03.05 CARPINTERIA DE MADERA


03.03.05.01 PUERTA MADERA SEGUN DETALLE S/. 2,117.47
P 100%
E S/. 2,117.47

03.03.06 CERRAJERIA
03.03.06.01 BISAGRA CAPUCHINA DE 4" X 4" S/. 119.70
P 100%
E S/. 119.70

03.03.06.02 CERRADURA PARA PUERTA TRES GOLPES S/. 89.22


P 100%
E S/. 89.22

03.03.07 PINTURA
03.03.07.01 PINTURA LATEX DOS MANOS MUROS INTERIORES S/. 588.52
P 100%
E S/. 588.52

03.03.08 INSTALACION CIELORRASOS


03.03.08.01 CIELORASO CON BALDOSA ACUSTICA S/. 3,462.36
P 100%
CRONOGRAMA DE EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

: REFACCION DE LOS AMBIENTES PARA LAS NUEVAS OFICINAS ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCH
OBRA
N° 101 - HUAMANGA - AYACUCHO
MODALIDAD : POR ADMINISTRACION DIRECTA - CONTRATA DISTRITO : AYACUCHO
FECHA : MARZO 2016 PROVINCIA : HUAMANGA
LUGAR : CALLE SAN JUAN DE DIOS N° 101 REGIÓN : AYACUCHO
MONTO CD S/.210,352.71

45 Dias Calendarios
ITEM PARTIDAS TOTAL
1ra Semana 2da Semana 3ra Semana
E S/. 3,462.36

03.03.09 ESTRUCTURA DE MADERA


03.03.09.01 VIGAS DE ROLLIZO DE EUCALIPTO Ø 3" L=6.0 ML S/. 125.50
P 100% 100%
E S/. 125.50 S/. 125.50

03.03.09.02 VIGA MADERA 2"X3"X9 PIES S/. 472.08


P 100% 100%
E S/. 472.08 S/. 472.08

03.03.10 CUBIERTAS
03.03.10.01 COBERTURA CON TEJA ARTESANAL S/. 1,247.85
P 100%
E S/. 1,247.85

03.03.10.02 ENCHACADO DE CARRIZO Ø 3/4" A 1" S/. 888.85


P 100%
E S/. 888.85

03.04 MODULO K
03.04.01 TRABAJOS PRELIMINARES
03.04.01.01 LIMPIEZA EN MUROS INTERIORES S/. 131.88
P 100% 100%
E S/. 131.88 S/. 131.88

03.04.02 REVOQUES ENLUCIDOS Y MOLDURAS


03.04.02.01 TARRAJEO DE MUROS CON YESO S/. 692.14
P 100% 100%
E S/. 692.14 S/. 692.14

03.04.03 PISOS Y PAVIMENTOS


03.04.03.01 FALSO PISO 4" CONCRETO C-H 1:10 S/. 619.42
P 100% 100%
E S/. 619.42 S/. 619.42

03.04.03.02 CONTRAPISO DE 48 MM S/. 678.78


P 100% 100%
E S/. 678.78 S/. 678.78

03.04.03.03 PISO DE PORCELANATO 50X50 S/. 2,164.78


P 100%
E S/. 2,164.78

03.04.04 ZOCALOS Y CONTRAZOCALOS


03.04.04.01 CONTRAZOCALO DE LOSETA H=10 CM S/. 513.19
P 100%
E S/. 513.19

03.04.05 CARPINTERIA DE MADERA


03.04.05.01 PUERTA MADERA SEGUN DETALLE S/. 1,722.16
P 100%
E S/. 1,722.16

03.04.06 CERRAJERIA
03.04.06.01 BISAGRA CAPUCHINA DE 4" X 4" S/. 79.80
P 100%
E S/. 79.80
CRONOGRAMA DE EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

: REFACCION DE LOS AMBIENTES PARA LAS NUEVAS OFICINAS ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCH
OBRA
N° 101 - HUAMANGA - AYACUCHO
MODALIDAD : POR ADMINISTRACION DIRECTA - CONTRATA DISTRITO : AYACUCHO
FECHA : MARZO 2016 PROVINCIA : HUAMANGA
LUGAR : CALLE SAN JUAN DE DIOS N° 101 REGIÓN : AYACUCHO
MONTO CD S/.210,352.71

45 Dias Calendarios
ITEM PARTIDAS TOTAL
1ra Semana 2da Semana 3ra Semana

03.04.06.02 CERRADURA PARA PUERTA TRES GOLPES S/. 89.22


P 100%
E S/. 89.22

03.04.07 PINTURA
03.04.07.01 PINTURA LATEX DOS MANOS MUROS INTERIORES S/. 657.93
P 100%
E S/. 657.93

03.04.08 INSTALACION CIELORRASOS


03.04.08.01 CIELORASO CON BALDOSA ACUSTICA S/. 3,929.81
P 100%
E S/. 3,929.81

03.04.09 ESTRUCTURA DE MADERA


03.04.09.01 VIGAS DE ROLLIZO DE EUCALIPTO Ø 3" L=6.0 ML S/. 125.50
P 100% 100%
E S/. 125.50 S/. 125.50

03.04.09.02 VIGA MADERA 2"X3"X9 PIES S/. 550.76


P 100% 100%
E S/. 550.76 S/. 550.76

03.04.10 CUBIERTAS
03.04.10.01 COBERTURA CON TEJA ARTESANAL S/. 1,641.49
P 100%
E S/. 1,641.49

03.04.10.02 ENCHACADO DE CARRIZO Ø 3/4" A 1" S/. 1,169.24


P 100%
E S/. 1,169.24

03.05 MODULO D,E,F y G


03.05.01 TRABAJOS PRELIMINARES
03.05.01.01 LIMPIEZA GENERAL DEL AREA S/. 57.76
P 100% 100%
E S/. 57.76 S/. 57.76

03.05.02 MOVIMIENTO DE TIERRA


03.05.02.01 EXCAVACION DE CIMIENTO EN AMBIENTES D,E,F,G S/. 149.31
P 100% 100%
E S/. 149.31 S/. 149.31

03.05.02.02 ELIMINACION DE MATERIAL EXCEDENTE MANUAL D=30 M S/. 93.45


P 100% 100%
E S/. 93.45 S/. 93.45

03.05.03 CONCRETO SIMPLE


03.05.03.01 CIMIENTOS CORRIDOS MEZCLA C:H - 1:10 + 30% PG S/. 1,168.63
P 100% 100%
E S/. 1,168.63 S/. 1,168.63

03.05.03.02 CONCRETO EN SOBRECIMIENTO DE 1:8 CEMENTO - HORMIGON + 25%PM S/. 403.51


P 100% 100%
E S/. 403.51 S/. 403.51

03.05.03.03 ENCOFRADO Y DESENCOFRADO EN SOBRECIMIENTO S/. 457.82


CRONOGRAMA DE EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

: REFACCION DE LOS AMBIENTES PARA LAS NUEVAS OFICINAS ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCH
OBRA
N° 101 - HUAMANGA - AYACUCHO
MODALIDAD : POR ADMINISTRACION DIRECTA - CONTRATA DISTRITO : AYACUCHO
FECHA : MARZO 2016 PROVINCIA : HUAMANGA
LUGAR : CALLE SAN JUAN DE DIOS N° 101 REGIÓN : AYACUCHO
MONTO CD S/.210,352.71

45 Dias Calendarios
ITEM PARTIDAS TOTAL
1ra Semana 2da Semana 3ra Semana
P 100% 100%
E S/. 457.82 S/. 457.82

03.05.04 MUROS Y TABIQUES DE ALBAÑILERIA


03.05.04.01 MURO DE CABEZA LADRILLO KK 9X12X22 S/. 2,762.61
P 100%
E S/. 2,762.61

03.05.04.02 MURO DE SOGA LADRILLO KK 9X12X22 S/. 1,189.48


P 100%
E S/. 1,189.48

03.05.05 REVOQUES ENLUCIDOS Y MOLDURAS


03.05.05.01 TARRAJEO EN MURO INTERIOR C:A E=1.5CM S/. 1,781.86
P 100%
E S/. 1,781.86

03.05.06 PISOS Y PAVIMENTOS


03.05.06.01 FALSO PISO 4" CONCRETO C-H 1:10 S/. 2,182.89
P 100%
E S/. 2,182.89

03.05.06.02 CONTRAPISO DE 48 MM S/. 2,050.08


P 100%
E S/. 2,050.08

03.05.06.03 PISO DE PORCELANATO 50X50 S/. 6,538.20


P 100%
E S/. 6,538.20

03.05.07 ZOCALOS Y CONTRAZOCALOS


03.05.07.01 CONTRAZOCALO DE LOSETA H=10 CM S/. 2,455.43
P 100%
E S/. 2,455.43

03.05.08 CARPINTERIA DE MADERA


03.05.08.01 VIGA MADERA 3"X4"X13 PIES S/. 1,280.00
P 100%
E S/. 1,280.00

03.05.08.02 TABLONES PARA CIELO RASO S/. 4,500.00


P 100%
E S/. 4,500.00

03.05.09 CARPINTERIA METALICA


03.05.09.01 PUERTA DE ALUMINIO SEGÚN DISEÑO CON VIDRIOS S/. 1,400.00
P 100%
E S/. 1,400.00

03.05.09.02 VENTANA DE MADERA SEGÚN DISEÑO CON VIDRIOS S/. 1,800.00


P 100%
E S/. 1,800.00

03.05.10 CERRAJERIA
03.05.10.01 BISAGRA CAPUCHINA DE 3" X 3" S/. 135.60
P 100%
E S/. 135.60
CRONOGRAMA DE EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

: REFACCION DE LOS AMBIENTES PARA LAS NUEVAS OFICINAS ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCH
OBRA
N° 101 - HUAMANGA - AYACUCHO
MODALIDAD : POR ADMINISTRACION DIRECTA - CONTRATA DISTRITO : AYACUCHO
FECHA : MARZO 2016 PROVINCIA : HUAMANGA
LUGAR : CALLE SAN JUAN DE DIOS N° 101 REGIÓN : AYACUCHO
MONTO CD S/.210,352.71

45 Dias Calendarios
ITEM PARTIDAS TOTAL
1ra Semana 2da Semana 3ra Semana
03.05.10.02 CERRADURA DE BOLA S/. 187.60
P 100%
E S/. 187.60

03.05.11 PINTURA
03.05.11.01 PINTURA LATEX DOS MANOS MUROS INTERIORES S/. 1,465.01
P 100%
E S/. 1,465.01

03.05.12 INSTALACION CIELORRASOS


03.05.12.01 CIELORASO CON BALDOSA ACUSTICA S/. 11,869.06
P 100%
E S/. 11,869.06

03.06 MODULO I,J


03.06.01 TRABAJOS PRELIMINARES
03.06.01.01 LIMPIEZA EN MUROS INTERIORES S/. 108.18
P 100%
E S/. 108.18

03.06.02 REVOQUES ENLUCIDOS Y MOLDURAS


03.06.02.01 TARRAJEO DE MUROS CON YESO S/. 567.75
P 100%
E S/. 567.75

03.06.03 PISOS Y PAVIMENTOS


03.06.03.01 PISO MACHIEMBRADO MADERA 1"x4" S/. 4,614.25
P 100%
E S/. 4,614.25

03.06.03.02 CORREAS 2" x 3" S/. 980.49


P 100%
E S/. 980.49

03.06.04 ZOCALOS Y CONTRAZOCALOS


03.06.04.01 CONTRAZOCALO DE MADERA H=10 cm S/. 799.41
P 100%
E S/. 799.41

03.06.05 CARPINTERIA DE MADERA


03.06.05.01 PUERTA MADERA SEGUN DETALLE S/. 821.94
P 100%
E S/. 821.94

03.06.05.02 TABIQUERIA DRYWALL E=13CM C/RELLENO ACUSTICO C/PLANCHA 5/8" S/. 797.18
P 100%
E S/. 797.18

03.06.06 CARPINTERIA METALICA


03.06.06.01 VENTANA C/PERFILES DE ALUMINIO - CRISTAL TEMPLADO INCOLORO 6MM S/. 234.95
P 100%
E S/. 234.95

03.06.07 CERRAJERIA
03.06.07.01 BISAGRA CAPUCHINA DE 4" X 4" S/. 39.90
P 100%
E S/. 39.90
CRONOGRAMA DE EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

: REFACCION DE LOS AMBIENTES PARA LAS NUEVAS OFICINAS ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCH
OBRA
N° 101 - HUAMANGA - AYACUCHO
MODALIDAD : POR ADMINISTRACION DIRECTA - CONTRATA DISTRITO : AYACUCHO
FECHA : MARZO 2016 PROVINCIA : HUAMANGA
LUGAR : CALLE SAN JUAN DE DIOS N° 101 REGIÓN : AYACUCHO
MONTO CD S/.210,352.71

45 Dias Calendarios
ITEM PARTIDAS TOTAL
1ra Semana 2da Semana 3ra Semana
03.06.07.02 CERRADURA PARA PUERTA TRES GOLPES S/. 44.61
P 100%
E S/. 44.61

03.06.08 PINTURA
03.06.08.01 PINTURA LATEX DOS MANOS MUROS INTERIORES S/. 1,295.28
P 100%
E S/. 1,295.28

03.06.08.02 PINTURA ANTICORROSIVO - ESMALTE 02 MANOS EN CARP. METALICA S/. 43.79


P 100%
E S/. 43.79

03.06.09 INSTALACION CIELORRASOS


03.06.09.01 CIELORASO CON BALDOSA ACUSTICA S/. 12,929.29
P 100%
E S/. 12,929.29

04 INSTALACIONES ELÉCTRICAS
04.01 SALIDA PARA ELECTRICIDAD Y FUERZA
04.01.01 SALIDA DE TECHO (CENTRO DE LUZ) S/. 6,101.12
P 100%
E S/. 6,101.12

04.01.02 SALIDA DE PARED P/INTERRUPTOR DOBLE S/. 1,983.80


P 100%
E S/. 1,983.80

04.01.03 SALIDA DE PARED P/INTERRUPTOR SIMPLE S/. 1,954.40


P 100%
E S/. 1,954.40

04.02 CANALIZACIONES Y/O TUBERIAS


04.02.01 TUBERIA PVC - P 20MM S/. 1,926.00
P 100%
E S/. 1,926.00

04.03 ARTEFACTOS
04.03.01 LAMPARA CON REJILLAS Y FLUORESCENTE 2 X20 W S/. 2,572.48
P 100%
E S/. 2,572.48

05 INSTALACIONES SANITARIAS
05.01 APARATOS SANITARIOS Y ACCESORIOS
05.01.01 INODORO TANQUE BAJO BLANCO S/. 500.00
P 100%
E S/. 500.00

05.01.02 GRIFO CROMADO DE 1/2" S/. 110.38


P 100%
E S/. 110.38

05.02 INSTALACIONES SANITARIAS


05.02.01 EXCAVACION DE ZANJA PARA TUBERIA DE DESAGUE PVC DE 2" Y 4" S/. 20.82
P 100%
E S/. 20.82

05.02.02 RED DE DISTRIBUCION TUBERIA PVC DE 4" S/. 80.12


CRONOGRAMA DE EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

: REFACCION DE LOS AMBIENTES PARA LAS NUEVAS OFICINAS ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCH
OBRA
N° 101 - HUAMANGA - AYACUCHO
MODALIDAD : POR ADMINISTRACION DIRECTA - CONTRATA DISTRITO : AYACUCHO
FECHA : MARZO 2016 PROVINCIA : HUAMANGA
LUGAR : CALLE SAN JUAN DE DIOS N° 101 REGIÓN : AYACUCHO
MONTO CD S/.210,352.71

45 Dias Calendarios
ITEM PARTIDAS TOTAL
1ra Semana 2da Semana 3ra Semana
P 100%
E S/. 80.12

05.02.03 SALIDA DE DESAGUE EN PVC 4" S/. 106.34


P 100%
E S/. 106.34

05.02.04 CODO PVC SAL 4"X45° S/. 16.88


P 100%
E S/. 16.88

05.02.05 SALIDA PARA VENTILACION S/. 183.30


P 100%
E S/. 183.30

05.02.06 YEE PVC SAL 2" S/. 48.40


P 100%
E S/. 48.40

05.02.07 YEE PVC SAL 4" S/. 10.08


P 100%
E S/. 10.08

05.02.08 CAJA REGISTRO ALBAÑILERIA 0.4X0.6M, TAPA CONCRETO S/. 332.40


P 100%
E S/. 332.40
AVANCE SEMANAL 210,352.71 S/. 6,609.32 S/. 12,168.02 S/. 51,814.48
AVANCE SEMANAL (%) 100.00% 3.14% 5.78% 24.63%
AVANCE ACUMULADO S/. 6,609.32 S/. 18,777.34 S/. 70,591.82
AVANCE ACUMULADO (%) 3.14% 8.93% 33.56%

S/. MONTO PRESUPUESTADO COSTO DIRECTO


P PORCENTAJE TOTAL DEL CRONOGRAMA
E MONTO TOTAL DEL CROGRAMA PARA EJECUTAR
EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

S ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCHO, CALLE SAN JUAN DE DIOS


N° 101 - HUAMANGA - AYACUCHO

: HUAMANGA

S/.210,352.71

45 Dias Calendarios
4ta Semana 5ta Semana 6ta Semana

25% 25%
S/. 2,215.21 S/. 2,215.21

100%
S/. 1,937.43

100%
EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

S ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCHO, CALLE SAN JUAN DE DIOS


N° 101 - HUAMANGA - AYACUCHO

: HUAMANGA

S/.210,352.71

45 Dias Calendarios
4ta Semana 5ta Semana 6ta Semana
S/. 2,970.65

100%
S/. 3,341.78

100%
S/. 2,373.36
EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

S ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCHO, CALLE SAN JUAN DE DIOS


N° 101 - HUAMANGA - AYACUCHO

: HUAMANGA

S/.210,352.71

45 Dias Calendarios
4ta Semana 5ta Semana 6ta Semana

100%
S/. 978.50

100%
S/. 39.90

100%
S/. 44.61

100%
S/. 2,606.10

100%
S/. 69.46

100%
S/. 11,243.83
EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

S ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCHO, CALLE SAN JUAN DE DIOS


N° 101 - HUAMANGA - AYACUCHO

: HUAMANGA

S/.210,352.71

45 Dias Calendarios
4ta Semana 5ta Semana 6ta Semana

100%
S/. 861.08

100%
S/. 280.25

100%
S/. 39.90

100%
S/. 44.61

100%
S/. 643.33

50% 50%
S/. 1,878.64 S/. 1,878.64

100%
S/. 1,632.57

100%
EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

S ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCHO, CALLE SAN JUAN DE DIOS


N° 101 - HUAMANGA - AYACUCHO

: HUAMANGA

S/.210,352.71

45 Dias Calendarios
4ta Semana 5ta Semana 6ta Semana
S/. 1,162.88

100%
S/. 2,117.47

100%
S/. 119.70

100%
S/. 89.22

100%
S/. 588.52

100%
EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

S ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCHO, CALLE SAN JUAN DE DIOS


N° 101 - HUAMANGA - AYACUCHO

: HUAMANGA

S/.210,352.71

45 Dias Calendarios
4ta Semana 5ta Semana 6ta Semana
S/. 3,462.36

100%
S/. 1,247.85

100%
S/. 888.85

100%
S/. 2,164.78

100%
S/. 513.19

100%
S/. 1,722.16

100%
S/. 79.80
EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

S ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCHO, CALLE SAN JUAN DE DIOS


N° 101 - HUAMANGA - AYACUCHO

: HUAMANGA

S/.210,352.71

45 Dias Calendarios
4ta Semana 5ta Semana 6ta Semana

100%
S/. 89.22

100%
S/. 657.93

100%
S/. 3,929.81

100%
S/. 1,641.49

100%
S/. 1,169.24
EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

S ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCHO, CALLE SAN JUAN DE DIOS


N° 101 - HUAMANGA - AYACUCHO

: HUAMANGA

S/.210,352.71

45 Dias Calendarios
4ta Semana 5ta Semana 6ta Semana

100%
S/. 2,762.61

100%
S/. 1,189.48

100%
S/. 1,781.86

100%
S/. 2,182.89

100%
S/. 2,050.08

100%
S/. 6,538.20

100%
S/. 2,455.43

100%
S/. 1,280.00

100%
S/. 4,500.00

100%
S/. 1,400.00

100%
S/. 1,800.00

100%
S/. 135.60
EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

S ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCHO, CALLE SAN JUAN DE DIOS


N° 101 - HUAMANGA - AYACUCHO

: HUAMANGA

S/.210,352.71

45 Dias Calendarios
4ta Semana 5ta Semana 6ta Semana

100%
S/. 187.60

100%
S/. 1,465.01

100%
S/. 11,869.06

100%
S/. 108.18

100%
S/. 567.75

100%
S/. 4,614.25

100%
S/. 980.49

100%
S/. 799.41

100%
S/. 821.94

100%
S/. 797.18

100%
S/. 234.95

100%
S/. 39.90
EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

S ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCHO, CALLE SAN JUAN DE DIOS


N° 101 - HUAMANGA - AYACUCHO

: HUAMANGA

S/.210,352.71

45 Dias Calendarios
4ta Semana 5ta Semana 6ta Semana

100%
S/. 44.61

100%
S/. 1,295.28

100%
S/. 43.79

100%
S/. 12,929.29

100%
S/. 6,101.12

100%
S/. 1,983.80

100%
S/. 1,954.40

100%
S/. 1,926.00

100%
S/. 2,572.48

100%
S/. 500.00

100%
S/. 110.38

100%
S/. 20.82
EJECUCIÓN FÍSICO-FINANCIERO DE OBRA

S ADMINISTRATIVAS DE LA SOCIEDAD DE BENEFICIENCIA PUBLICA DE AYACUCHO, CALLE SAN JUAN DE DIOS


N° 101 - HUAMANGA - AYACUCHO

: HUAMANGA

S/.210,352.71

45 Dias Calendarios
4ta Semana 5ta Semana 6ta Semana
100%
S/. 80.12

100%
S/. 106.34

100%
S/. 16.88

100%
S/. 183.30

100%
S/. 48.40

100%
S/. 10.08

100%
S/. 332.40
S/. 54,263.86 S/. 61,233.58 S/. 24,263.45
25.80% 29.11% 11.53%
S/. 124,855.68 S/. 186,089.26 S/. 210,352.71
59.36% 88.47% 100.00%