Anda di halaman 1dari 281

DOKUMEN LAPORAN MUTUAL CHECK 40

PEMERINTAH KOTA SURABAY


DINAS PERUMAHAN RAKYAT KAWASAN
PERMUKIMAN CIPTA KARYA & TATA RUANG
Jl. TAMAN SURYA No. 1 SURABAYA

PEMBANGUNAN/REHABI
FASILITAS BANGUNAN PEND

PEKE
PEMBANGUNAN GEDUNG TYPE B2 (SMP NEG

SMPN GUNUNG ANYAR BARU SUR

NILAI KO
Rp 3,220,111

REKAPITULASI MUTUAL CHECK


PERHITUNGAN MUTUAL CHECK

BACKUP VOLUM

TIME SCHEDULE PELAKSANAA

PT. DEFICY SIGAR PRATAMA


H KOTA SURABAYA

KEGIATAN
PEMBANGUNAN/REHABILITASI
FASILITAS BANGUNAN PENDIDIKAN

PEKERJAAN
AN GEDUNG TYPE B2 (SMP NEGERI 62)

LOKASI
PN GUNUNG ANYAR BARU SURABAYA

TAHUN
2019

NILAI KONTRAK
Rp 3,220,111,000.00

REKAPITULASI MUTUAL CHECK - 0 A


PERHITUNGAN MUTUAL CHECK - 0 B

BACKUP VOLUME C

TIME SCHEDULE PELAKSANAAN D

EFICY SIGAR PRATAMA


REKAPITULASI

NAMA KEGIATAN : PEMBANGUNAN/REHABILITASI FASILITAS BANGUNAN


PEKERJAAN : PEMBANGUNAN GEDUNG TYPE B2 (SMP NEGERI 62)
LOKASI : Kota Surabaya
TAHUN : 2019

NO. URAIAN

1 2

A. BIAYA KONSTRUKSI FISIK (BKF)


I PEKERJAAN PENDAHULUAN
II PEKERJAAN TANAH
III PEKERJAAN STRUKTUR
IV PEKERJAAN ARSITEKTURAL
V PEKERJAAN MEKANIKAL
VI PEKERJAAN ELEKTRIKAL
VII PEKERJAAN LAIN - LAIN

JUMLAH TOTAL BIAYA KONSTRUKSI FISIK (BKF)

B. BIAYA PAJAK PERTAMBAHAN NILAI


Pajak Pertambahan Nilai (PPN) 10 %

D. JUMLAH ( A + B )
E. PEMBULATAN

Terbilang :
Tiga Milyar Dua Ratus Dua Puluh Juta SeRatus SeBelas Ribu
REKAPITULASI

ANGUNAN/REHABILITASI FASILITAS BANGUNAN PENDIDIKAN


ANGUNAN GEDUNG TYPE B2 (SMP NEGERI 62)

BOBOT
JUMLAH HARGA (Rp.)
FISIK (%)
3 4

Rp 2,460,668 0.08
Rp 63,431,929 2.17
Rp 1,860,388,006 63.55
Rp 867,745,456 29.64
Rp 81,335,482 2.78
Rp 47,012,871 1.61
Rp 5,000,000 0.17

Rp 2,927,374,411.84 100.00

Rp 292,737,441.18

Rp 3,220,111,853.03
Rp 3,220,111,000.00

Dua Ratus Dua Puluh Juta SeRatus SeBelas Ribu Rupiah

Jakarta, 19 Februari 2019

Dibuat oleh :
Kontraktor Pelaksana
PT. DEFICY SIGAR PRATAMA
Dibuat oleh :
Kontraktor Pelaksana
PT. DEFICY SIGAR PRATAMA

JOHNNY SIREGAR
Direktur
RENCANA ANGGARAN BIAYA (RAB)

NAMA KEGIATAN : PEMBANGUNAN/REHABILITASI FASILITAS BANGUNAN PENDIDIKAN


PEKERJAAN : PEMBANGUNAN GEDUNG TYPE B2 (SMP NEGERI 62)
LOKASI : Kota Surabaya
TAHUN : 2019

RAB KONTRAK
NO. ITEM PEKERJAAN HARGA
VOLUME
SATUAN (Rp)

1 2 3 4

I PEKERJAAN PENDAHULUAN
1 Pekerjaan Uitzet + Bowplank 40.00 Ttk 61,516.70
PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 237.58 M3 120,375.00
2 Urugan Pasir Bawah Pondasi, tbl=5cm 32.55 M3 120,480.00
3 Urugan Tanah Kembali 59.40 M3 40,125.00
4 Urugan Sirtu 87.63 M3 110,890.00
5 Urugan Pasir Bawah Lantai, tbl=5cm 25.92 M3 120,480.00
6 Pengangkutan Bekas Galian Tanah Keluar Lokasi Proyek 175.58 M3 89,349.90
PEKERJAAN PERSIAPAN
III PEKERJAAN STRUKTUR
A. PEKERJAAN PONDASI
1 Rabat Lantai Kerja K-175, tbl=5cm 14.24 M3 674,247.67
2 Rabat Bawah Lantai K-175, tbl=5cm 25.92 M3 674,247.67
Beton Strous fc = 20.75 MPa (K-250)
1 Strous 30 cm 100.33 M3 2,360,674.61
Beton Pile Caps fc = 20.75 MPa (K-250)
1 PC 1 1060X165X40 cm 69.96 M3 3,741,801.92
2 PC 2 290X165X40 cm 1.92 M3 2,140,076.97
3 PC 3 735X165X40 cm 29.11 M3 2,193,258.78
4 PC 4 165X162X40 cm 6.42 M3 1,365,135.03
RAB KONTRAK
NO. ITEM PEKERJAAN HARGA
VOLUME
SATUAN (Rp)

1 2 3 4

Beton Sloof fc = 20.75 MPa (K-250)


1 S1 30X50 cm 10.00 M3 3,181,744.68
2 S2 20X40 cm 0.22 M3 4,329,337.01
3 S3 20X35 cm 11.29 M3 3,857,633.89
4 S4 20X30 cm 4.87 M3 3,764,794.40
B. PEKERJAAN STRUKTUR LANTAI 1
Beton Kolom fc = 20.75 MPa (K-250)
1 K1 A 35X45 cm 27.58 M3 4,463,302.42
2 K2 30X30 cm 9.27 M3 4,476,146.26
3 Kp 12X12 cm K-225 3.60 M3 5,192,563.01
Beton Balok fc = 18.675 MPa (K-225)
1 Balok Latei 12X20 cm 1.35 M3 6,584,136.11
C. PEKERJAAN STRUKTUR LANTAI 2
Beton Kolom fc = 20.75 MPa (K-250)
1 K1 B 35X45 cm 21.42 M3 4,231,665.58
2 K2 30X30 cm 7.20 M3 4,476,146.26
3 Kp 12X12 cm 2.78 M3 5,192,563.01
RAB KONTRAK
NO. ITEM PEKERJAAN HARGA
VOLUME
SATUAN (Rp)

1 2 3 4

Beton Balok fc = 20.75 MPa (K-250)


1 B1 A 30X50 cm 11.83 M3 4,063,269.40
2 B2 20X40 cm 0.22 M3 4,599,021.40
3 B3 20X35 cm 11.67 M3 3,874,706.22
Beton Balok fc = 18.675 MPa (K-225)
1 Balok Latei 12X20 cm 1.35 M3 6,584,136.11
2 Beton Plat Lantai. 2, K - 250, tbl=12cm 52.76 M3 3,452,918.99
D. PEKERJAAN STRUKTUR LANTAI 3
Beton Kolom fc =
20.75 MPa (K-250)
1 K1 B 35X45 cm 4.29 M3 4,231,665.58
2 K2 30X30 cm 1.44 M3 4,476,146.26
Beton Balok fc = 20.75 MPa (K-250)
1 B1 A 30X50 cm 7.03 M3 4,063,269.40
2 B1 B 30X50 cm 11.83 M3 3,698,377.88
3 B2 20X40 cm 0.22 M3 4,599,021.40
4 B3 20/35 cm 11.67 M3 3,874,706.22
5 B4 20X30 cm 4.87 M3 3,916,553.27
6 Beton Plat Lantai. 3, K - 250, tbl=12cm 52.76 M3 3,452,918.99
E. PEKERJAAN STRUKTUR TANGGA BETON
PEKERJAAN STRUKTUR TANGGA LT. 1 Ke LT. 2
1 Balok Bordes 20X40, fc=26.4 Mpa (K-300) 0.22 M3 8,055,053.46
2 Beton Plat dan Bordes t=15cm, fc=26.4 Mpa (K-300) 2.18 M3 3,467,430.81
3 Beton Anak Tangga, fc=26.4 Mpa (K-300) 1.08 M3 2,595,393.66
4 Beton Ralling fc = 18.675 MPa (K-225) 0.12 M3 6,584,136.11
5 Pas. Pipa Stainless 2.5 8.30 M1 127,452.06
PEKERJAAN STRUKTUR TANGGA LT. 2 Ke LT. 3
1 Balok Bordes 20X40, fc=26.4 Mpa (K-300) 0.22 M3 8,055,053.46
2 Beton Plat dan Bordes t=15cm, fc=26.4 Mpa (K-300) 2.18 M3 3,467,430.81
3 Beton Anak Tangga, fc=26.4 Mpa (K-300) 1.08 M3 2,595,393.66
4 Beton Ralling fc = 18.675 MPa (K-225) 0.12 M3 6,584,136.11
RAB KONTRAK
NO. ITEM PEKERJAAN HARGA
VOLUME
SATUAN (Rp)

1 2 3 4

5 Pas. Pipa Stainless 2.5 8.30 M1 127,452.06


F. PEKERJAAN STRUKTUR ATAP CANOPY
PEKERJAAN STRUKTUR ATAP CANOPY LANTAI 1
1 Pas. Pipa Besi 2,5 Fiber Semen 55.44 M1 120,452.82
2 Pas. Pipa Besi 3 91.82 M1 212,506.87
3 Pas. Besi Pengait 10 27.43 Kg 31,283.00
4 Pas. Plat Besi, t=1cm 9.24 Kg 31,283.00
5 Pas. Dynabolt 10 88.00 Bh 15,000.00
6 Pas. Usuk Reng Galvalum 183.06 M2 118,405.00
7 Pas. Genteng Karang Pilang 183.06 M2 158,221.00
8 Pas. Talang Galvalume lebar=60cm 22.50 M1 214,920.00
9 Pas. Kalsiplank 3/30 72.81 M1 53,873.80
PEKERJAAN STRUKTUR ATAP CANOPY LANTAI 2
1 Pas. Pipa Besi 2,5 55.44 M1 120,452.82
2 Pas. Pipa Besi 3 91.82 M1 212,506.87
3 Pas. Besi Pengait 10 27.43 Kg 31,283.00
4 Pas. Plat Besi, t=1cm 9.24 Kg 31,283.00
5 Pas. Dynabolt 10 88.00 Bh 15,000.00
6 Pas. Usuk Reng Galvalum 183.06 M2 118,405.00
7 Pas. Genteng Karang Pilang 183.06 M2 158,221.00
8 Pas. Talang Galvalume lebar=60cm 22.50 M1 214,920.00
9 Pas. Kalsiplank 3/30 72.81 M1 53,873.80
PEKERJAAN STRUKTUR
IV PEKERJAAN ARSITEKTURAL
A. PEKERJAAN ARSITEKTURAL LANTAI 1
PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Rollag Batu Bata Untuk Pijakan 1pc 4p 27.06 M2 201,114.00
2 Pas. Dinding Bata Ringan Dengan Semen Mortar 453.74 M2 73,045.80
3 Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen Mortar 778.20 M2 68,365.80
4 Acian Dinding Dengan Semen Mortar 802.55 M2 36,584.10
RAB KONTRAK
NO. ITEM PEKERJAAN HARGA
VOLUME
SATUAN (Rp)

1 2 3 4

5 Acian Beton (Dihitung 15%) 448.32 M2 43,260.00


6 Benangan Dinding 368.12 M1 22,336.80
7 Benangan Beton (Dihitung 15%) 253.90 M1 22,336.80
PEKERJAAN KUSEN
1 Pasang Kusen P1 2.00 Unit 3,428,817.49
2 Pasang Kusen P2 6.00 Unit 3,115,948.91
3 Pasang Kusen P3 12.00 Unit 2,649,963.01
4 Pasang kusen P4 1.00 Unit 1,645,364.46
5 Pasang Kusen J1 15.00 Unit 1,792,970.56
6 Pasang Kusen J2 3.00 Unit 902,637.55
7 Pasang Kusen J3 3.00 Unit 519,109.07
8 Pasang Kusen BV 5.00 Unit 150,444.42
PEKERJAAN PENUTUP LANTAI
1 Pas. Keramik Lantai 40X40cm Polish Warna 358.47 M2 191,880.56
2 Pas. Keramik Lantai KM 30X30cm Unpolish Warna Untuk Toilet 88.17 M2 186,894.80
3 Pas. Keramik Dinding Toilet 30X60cm Polish Warna / Motif 124.21 M2 227,278.60
4 Pas. Keramik Plint 10x40cm 189.70 M1 45,826.95
5 Pas. Step Nosing Tangga 10x40 cm 28.32 M1 42,545.55
PEKERJAAN PLAFOND
1 Pas. Plafond Kalsiboard 4,5mm + Rangka Hollow 40.40 dan 20.40 86.48 M2 130,509.18
2 Pas. List Gypsum t=10 cm 163.80 M1 25,287.64
PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam 288.86 M2 27,674.70
2 Pengecatan Dinding Luar 176.34 M2 34,177.20
3 Pengecatan Plafond Kalsiboard 86.48 M2 23,270.20
4 Pengecatan Plafond Expose 390.00 M2 23,270.20
B. PEKERJAAN ARSITEKTURAL LANTAI 2
PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding Bata Ringan Dengan Semen Mortar 453.74 M2 73,045.80
2 Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen Mortar 864.36 M2 68,365.80
RAB KONTRAK
NO. ITEM PEKERJAAN HARGA
VOLUME
SATUAN (Rp)

1 2 3 4

3 Acian Dinding Dengan Semen Mortar 882.31 M2 36,584.10


4 Acian Beton (Dihitung 15%) 448.32 M2 43,260.00
5 Benangan Dinding 368.12 M1 22,336.80
6 Benangan Beton (Dihitung 15%) 283.83 M1 22,336.80
7 Pas. Pipa Stainless 2.5 48.26 M1 127,452.06
PEKERJAAN KUSEN
1 Pasang Kusen P1 2.00 Unit 3,428,817.49
2 Pasang Kusen P2 6.00 Unit 3,115,948.91
3 Pasang Kusen P3 12.00 Unit 2,649,963.01
4 Pasang Kusen P4 1.00 Unit 1,645,364.46
5 Pasang Kusen J1 15.00 Unit 1,792,970.56
6 Pasang Kusen J2 3.00 Unit 902,637.55
7 Pasang Kusen J3 3.00 Unit 519,109.07
8 Pasang Kusen BV 5.00 Unit 150,444.42
PEKERJAAN PENUTUP LANTAI
1 Pas. Keramik Lantai 40X40cm Polish Warna / Motif 373.49 M2 191,880.56
2 Pas. Keramik Lantai KM 30X30cm Unpolish Warna Untuk Toilet 88.17 M2 186,894.80
3 Pas. Keramik Dinding Toilet 30X60cm Polish Warna / Motif 124.21 M2 227,278.60
4 Pas. Keramik Plint 10x40cm 222.16 M1 45,826.95
5 Pas. Step Nosing Tangga 10x40 cm 28.32 M1 42,545.55
PEKERJAAN PLAFOND
1 Pas. Plafond Kalsiboard 4,5mm + Rangka Hollow 40.40 dan 20.40 86.48 M2 130,509.18
2 Pas. List Gypsum t=10 cm 163.80 M1 25,287.64
PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam 288.86 M2 27,674.70
2 Pengecatan Dinding Luar 215.91 M2 34,177.20
3 Pengecatan Plafond Kalsiboard 141.35 M2 23,270.20
4 Pengecatan Plafond Expose 218.00 M2 23,270.20
5 Waterproofing toilet 159.42 M2 34,617.50
C. PEKERJAAN ARSITEKTURAL LANTAI 3
RAB KONTRAK
NO. ITEM PEKERJAAN HARGA
VOLUME
SATUAN (Rp)

1 2 3 4

PEKERJAAN PASANGAN DAN PLESTERAN


1 Pas. Dinding Bata Ringan Dengan Semen Mortar 40.28 M2 73,045.80
2 Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen Mortar 80.56 M2 68,365.80
3 Acian Dinding Dengan Semen Mortar 80.56 M2 36,584.10
4 Kp 12X12 cm 0.12 M3 68,169.75
5 Rangka kayu 5/7 0.16 M3 2,550,000.00
6 Penutup atap asbes gelombang 24.36 M2 51,639.95
PEKERJAAN PENGECATAN
1 Pengecatan Dinding Luar 39.60 M2 34,177.20
2 Waterproofing plat lantai 3 464.22 M2 34,617.50
PEKERJAAN ARSITEKTURAL
V PEKERJAAN MEKANIKAL
A. PEKERJAAN MEKANIKAL LANTAI 1
1 Pasang pipa PVC air bersih 3/4 AW 47.60 M1 18,066.31
2 Pasang pipa PVC air bersih 1 AW 72.57 M1 18,303.72
3 Pasang pipa PVC air bekas 3 AW 84.62 M1 51,160.99
4 Pasang pipa PVC air kotor 4 AW 115.87 M1 65,801.19
5 Pasang pipa galvanis 4 43.45 M1 33,498.45
6 Pasang klosed duduk 7.00 Unit 1,901,955.60
7 Pasang jet washer 7.00 Unit 152,703.00
8 Pasang wastafell 7.00 Unit 531,699.14
9 Pasang floordrain Stainless ( Avour ) 11.00 Unit 182,628.00
10 Pasang floor clean out Stainless 3 2.00 Unit 233,078.00
11 Pasang floor clean out Stainless 4 2.00 Unit 250,578.00
12 Bio filter 3 M3 1.00 Unit 4,935,000.00
13 Pasang pompa transfer 1.00 Unit 1,080,480.00
B. PEKERJAAN MEKANIKAL LANTAI 2
1 Pasang pipa PVC air bersih 3/4 AW 47.60 M1 18,066.31
2 Pasang pipa PVC air bersih 1 AW 72.57 M1 18,303.72
3 Pasang pipa PVC air kotor 3 AW 84.62 M1 51,160.99
RAB KONTRAK
NO. ITEM PEKERJAAN HARGA
VOLUME
SATUAN (Rp)

1 2 3 4

4 Pasang pipa PVC air kotor 4 AW 115.87 M1 65,801.19


5 Pasang pipa galvanis 4 43.51 M1 33,498.45
6 Pasang klosed duduk 7.00 Unit 1,901,955.60
7 Pasang jet washer 7.00 Unit 152,703.00
8 Pasang wastafell 7.00 Unit 531,699.14
9 Pasang floordrain Stainless 11.00 Unit 182,628.00
10 Pasang floor clean out Stainless 3 2.00 Unit 233,078.00
11 Pasang floor clean out Stainless 4 2.00 Unit 250,578.00
12 Pasang Tandon Stainles kapasitas 1100lt 2.00 Unit 980,880.00
PEKERJAAN MEKANIKAL
VI PEKERJAAN ELEKTRIKAL
A. PEKERJAAN ELEKTRIKAL LANTAI 1
1 Instalasi Ttk lampu 57.00 Ttk 188,196.00
2 Pemasangan Ttk stop kontak 6.00 Ttk 106,683.30
3 Pemasangan Ttk swith socket AC 2.00 Ttk 125,013.30
4 Instalasi saklar tunggal 20.00 Unit 46,326.10
5 Instalasi saklar ganda 5.00 Unit 51,914.90
6 Pasang lampu LED 13watt bulb 20.00 Unit 212,500.00
7 Pasang lampu LED 8watt bulb 37.00 Unit 150,000.00
8 Pasang box panel + MCB 1.00 Unit 903,040.50
B. PEKERJAAN ELEKTRIKAL LANTAI 2
1 Instalasi Ttk lampu 57.00 Ttk 188,196.00
2 Pemasangan Ttk stop kontak 6.00 Ttk 106,683.30
3 Pemasangan Ttk swith socket AC 2.00 Ttk 125,013.30
4 Instalasi saklar tunggal 20.00 Unit 46,326.10
5 Instalasi saklar ganda 5.00 Unit 51,914.90
6 Pasang lampu LED 13watt bulb 20.00 Unit 212,500.00
7 Pasang lampu LED 8watt bulb 37.00 Unit 150,000.00
8 Pasang box panel + MCB 1.00 Ttk 903,040.50
PEKERJAAN ELEKTRIKAL
RAB KONTRAK
NO. ITEM PEKERJAAN HARGA
VOLUME
SATUAN (Rp)

1 2 3 4

VII PEKERJAAN LAIN - LAIN


1 Pembersihan lokasi 1.00 Ls 5,000,000.00
PEKERJAAN LAIN - LAIN
JUMLAH TOTAL SELURUH PEKERJAAN
B)

PENDIDIKAN

RAB KONTRAK

JUMLAH HARGA BOBOT


(Rp) FISIK (%)

5 = (3 x 4) 6

2,460,668.00 0.08
2,460,668.00 0.08

28,598,692.50 0.98
3,921,624.00 0.13
2,383,425.00 0.08
9,717,290.70 0.33
3,122,841.60 0.11
15,688,055.44 0.54
63,431,929.24 2.17

9,601,286.75 0.33
17,476,499.48 0.60

236,846,483.37 8.09

261,776,462.16 8.94
4,108,947.78 0.14
63,845,763.18 2.18
8,764,166.89 0.30
RAB KONTRAK

JUMLAH HARGA BOBOT


(Rp) FISIK (%)

5 = (3 x 4) 6

31,817,446.77 1.09
952,454.14 0.03
43,552,686.59 1.49
18,334,548.73 0.63

123,097,880.63 4.21
41,493,875.84 1.42
18,693,226.83 0.64

8,888,583.75 0.30

90,642,276.80 3.10
32,228,253.08 1.10
14,435,325.16 0.49
RAB KONTRAK

JUMLAH HARGA BOBOT


(Rp) FISIK (%)

5 = (3 x 4) 6

48,068,476.96 1.64
1,011,784.71 0.03
45,217,821.63 1.54

8,888,583.75 0.30
182,176,005.73 6.22

18,153,845.35 0.62
6,445,650.62 0.22

28,564,783.86 0.98
43,751,810.28 1.49
1,011,784.71 0.03
45,217,821.63 1.54
19,073,614.45 0.65
182,176,005.73 6.22

1,772,111.76 0.06
7,558,999.16 0.26
2,803,025.15 0.10
790,096.33 0.03
1,057,852.10 0.04

1,772,111.76 0.06
7,558,999.16 0.26
2,803,025.15 0.10
790,096.33 0.03
RAB KONTRAK

JUMLAH HARGA BOBOT


(Rp) FISIK (%)

5 = (3 x 4) 6

1,057,852.10 0.04

6,677,904.34 0.23
19,512,380.74 0.67
858,092.69 0.03
289,054.92 0.01
1,320,000.00 0.05
21,675,219.30 0.74
28,963,936.26 0.99
4,835,700.00 0.17
3,922,551.38 0.13

6,677,904.34 0.23
19,512,380.74 0.67
858,092.69 0.03
289,054.92 0.01
1,320,000.00 0.05
21,675,219.30 0.74
28,963,936.26 0.99
4,835,700.00 0.17
3,922,551.38 0.13
1,860,388,005.57 63.55

5,442,144.84 0.19
33,143,801.29 1.13
53,202,265.56 1.82
29,360,569.46 1.00
RAB KONTRAK

JUMLAH HARGA BOBOT


(Rp) FISIK (%)

5 = (3 x 4) 6

19,394,323.20 0.66
8,222,622.82 0.28
5,671,313.52 0.19

6,857,634.99 0.23
18,695,693.47 0.64
31,799,556.12 1.09
1,645,364.46 0.06
26,894,558.37 0.92
2,707,912.65 0.09
1,557,327.21 0.05
752,222.10 0.03

68,783,424.34 2.35
16,478,514.52 0.56
28,230,274.91 0.96
8,693,372.42 0.30
1,204,889.98 0.04

11,286,433.89 0.39
4,142,115.43 0.14

7,994,113.84 0.27
6,026,807.45 0.21
2,012,406.90 0.07
9,075,378.00 0.31

33,143,801.29 1.13
59,092,662.89 2.02
RAB KONTRAK

JUMLAH HARGA BOBOT


(Rp) FISIK (%)

5 = (3 x 4) 6

32,278,517.27 1.10
19,394,323.20 0.66
8,222,622.82 0.28
6,339,853.94 0.22
6,150,836.42 0.21

6,857,634.99 0.23
18,695,693.47 0.64
31,799,556.12 1.09
1,645,364.46 0.06
26,894,558.37 0.92
2,707,912.65 0.09
1,557,327.21 0.05
752,222.10 0.03

71,665,470.35 2.45
16,478,514.52 0.56
28,230,274.91 0.96
10,180,915.21 0.35
1,204,889.98 0.04

11,286,433.89 0.39
4,142,115.43 0.14

7,994,113.84 0.27
7,379,199.25 0.25
3,289,242.77 0.11
5,072,903.60 0.17
5,518,721.85 0.19
RAB KONTRAK

JUMLAH HARGA BOBOT


(Rp) FISIK (%)

5 = (3 x 4) 6

2,942,284.82 0.10
5,507,548.85 0.19
2,947,215.10 0.10
8,180.37 0.00
408,000.00 0.01
1,257,949.18 0.04

1,353,417.12 0.05
16,070,135.85 0.55
867,745,455.80 29.64

859,956.42 0.03
1,328,300.96 0.05
4,329,242.76 0.15
7,624,384.32 0.26
1,455,507.65 0.05
13,313,689.20 0.45
1,068,921.00 0.04
3,721,893.95 0.13
2,008,908.00 0.07
466,156.00 0.02
501,156.00 0.02
4,935,000.00 0.17
1,080,480.00 0.04

859,956.42 0.03
1,328,300.96 0.05
4,329,242.76 0.15
RAB KONTRAK

JUMLAH HARGA BOBOT


(Rp) FISIK (%)

5 = (3 x 4) 6

7,624,384.32 0.26
1,457,517.56 0.05
13,313,689.20 0.45
1,068,921.00 0.04
3,721,893.95 0.13
2,008,908.00 0.07
466,156.00 0.02
501,156.00 0.02
1,961,760.00 0.07
81,335,482.43 2.78

10,727,172.00 0.37
640,099.80 0.02
250,026.60 0.01
926,522.00 0.03
259,574.50 0.01
4,250,000.00 0.15
5,550,000.00 0.19
903,040.50 0.03

10,727,172.00 0.37
640,099.80 0.02
250,026.60 0.01
926,522.00 0.03
259,574.50 0.01
4,250,000.00 0.15
5,550,000.00 0.19
903,040.50 0.03
47,012,870.80 1.61
RAB KONTRAK

JUMLAH HARGA BOBOT


(Rp) FISIK (%)

5 = (3 x 4) 6

5,000,000.00 0.17
5,000,000.00 0.17
2,927,374,412 100.00
Jakarta, 19 Februari 2019
REKAPITULASI
MUTUAL CHECK (MC - 0)

NAMA KEGIATAN : PEMBANGUNAN/REHABILITASI FASILITAS BANGUNAN PEND


PEKERJAAN : PEMBANGUNAN GEDUNG TYPE B2 (SMP NEGERI 62)
LOKASI : Kota Surabaya
TAHUN : 2019

NO. URAIAN

1 2

A. BIAYA KONSTRUKSI FISIK (BKF)


I PEKERJAAN PENDAHULUAN
II PEKERJAAN TANAH
III PEKERJAAN STRUKTUR
IV PEKERJAAN ARSITEKTURAL
V PEKERJAAN MEKANIKAL
VI PEKERJAAN ELEKTRIKAL
VII PEKERJAAN LAIN - LAIN

JUMLAH TOTAL BIAYA KONSTRUKSI FISIK (BKF)

B. BIAYA PAJAK PERTAMBAHAN NILAI


Pajak Pertambahan Nilai (PPN) 10 %

D. JUMLAH ( A + B )
E. PEMBULATAN

Terbilang :
Tiga Milyar Dua Ratus Dua Puluh Juta SeRatus SeBelas Ribu
REKAPITULASI
MUTUAL CHECK (MC - 0)

NGUNAN/REHABILITASI FASILITAS BANGUNAN PENDIDIKAN


NGUNAN GEDUNG TYPE B2 (SMP NEGERI 62)

BOBOT FISIK
JUMLAH HARGA (Rp.)
(%)
3 4

Rp 2,460,668 0.08
Rp 169,664,316 5.80
Rp 1,849,931,127 63.19
Rp 771,969,947 26.37
Rp 81,335,482 2.78
Rp 47,012,871 1.61
Rp 5,000,000 0.17

Rp 2,927,374,411.84 100.00

Rp 292,737,441.18

Rp 3,220,111,853.03
Rp 3,220,111,000.00

Dua Ratus Dua Puluh Juta SeRatus SeBelas Ribu Rupiah


Surabaya, 16 April 2019

Dibuat oleh :
Kontraktor Pelaksana
PT. DEFICY SIGAR PRATAMA

JOHNNY SIREGAR
Direktur
PERHITUNG
RINCIAN PERHITUNGA

NAMA KEGIATAN : PEMBANGUNAN/REHABILITASI FASILITAS BANGUNAN PENDIDIKAN


PEKERJAAN : PEMBANGUNAN GEDUNG TYPE B2 (SMP NEGERI 62)
LOKASI : Kota Surabaya
TAHUN : 2019

RAB KONTRAK
NO. ITEM PEKERJAAN HARGA
VOLUME
SATUAN (Rp)

1 2 3 4

I PEKERJAAN PENDAHULUAN
1 Pekerjaan Uitzet + Bowplank 40.00 Ttk 61,516.70
PEKERJAAN PENDAHULUAN
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 237.58 M3 120,375.00
2 Urugan Pasir Bawah Pondasi, tbl=5cm 32.55 M3 120,480.00
3 Urugan Tanah Kembali 59.40 M3 40,125.00
4 Urugan Sirtu 87.63 M3 110,890.00
5 Urugan Pasir Bawah Lantai, tbl=5cm 25.92 M3 120,480.00
6 Pengangkutan Bekas Galian Tanah Keluar Lokasi Proyek 175.58 M3 89,349.90
7 Pembuatan Lubang Strous Pile Ø 30 cm kedalaman 5 m
PEKERJAAN TANAH
III PEKERJAAN STRUKTUR
A. PEKERJAAN PONDASI
1 Rabat Lantai Kerja K-175, tbl=5cm 14.24 M3 674,247.67
2 Rabat Bawah Lantai K-175, tbl=5cm 25.92 M3 674,247.67
0 Beton Strous fc = 20.75 MPa (K-250) 0.00 0
1 Strous 30 cm 100.33 M3 2,360,674.61
0 Beton Pile Caps fc = 20.75 MPa (K-250)
1 PC 1 1060X165X40 cm 69.96 M3 3,741,801.92
2 PC 2 290X165X40 cm 1.92 M3 2,140,076.97
3 PC 3 735X165X40 cm 29.11 M3 2,193,258.78
4 PC 4 165X162X40 cm 6.42 M3 1,365,135.03
RAB KONTRAK
NO. ITEM PEKERJAAN HARGA
VOLUME
SATUAN (Rp)

1 2 3 4

0 Beton Sloof fc = 20.75 MPa (K-250)


1 S1 30X50 cm 10.00 M3 3,181,744.68
2 S2 20X40 cm 0.22 M3 4,329,337.01
3 S3 20X35 cm 11.29 M3 3,857,633.89
4 S4 20X30 cm 4.87 M3 3,764,794.40
RAB KONTRAK
NO. ITEM PEKERJAAN HARGA
VOLUME
SATUAN (Rp)

1 2 3 4

B. PEKERJAAN STRUKTUR LANTAI 1


0 Beton Kolom fc = 20.75 MPa (K-250)
1 K1 A 35X45 cm 27.58 M3 4,463,302.42
2 K2 30X30 cm 9.27 M3 4,476,146.26
3 Kp 12X12 cm K-225 3.60 M3 5,192,563.01
0 Beton Balok fc = 18.675 MPa (K-225)
1 Balok Latei 12X20 cm 1.35 M3 6,584,136.11
C. PEKERJAAN STRUKTUR LANTAI 2
0 Beton Kolom fc = 20.75 MPa (K-250)
1 K1 B 35X45 cm 21.42 M3 4,231,665.58
2 K2 30X30 cm 7.20 M3 4,476,146.26
3 Kp 12X12 cm 2.78 M3 5,192,563.01
0 Beton Balok fc = 20.75 MPa (K-250)
1 B1 A 30X50 cm 11.83 M3 4,063,269.40
2 B2 20X40 cm 0.22 M3 4,599,021.40
3 B3 20X35 cm 11.67 M3 3,874,706.22
0 Beton Balok fc = 18.675 MPa (K-225)
1 Balok Latei 12X20 cm 1.35 M3 6,584,136.11
2 Beton Plat Lantai. 2, K - 250, tbl=12cm 52.76 M3 3,452,918.99
D. PEKERJAAN STRUKTUR LANTAI 3
0 Beton Kolom fc = 20.75 MPa (K-250)
1 K1 B 35X45 cm 4.29 M3 4,231,665.58
2 K2 30X30 cm 1.44 M3 4,476,146.26
0 Beton Balok fc = 20.75 MPa (K-250)
1 B1 A 30X50 cm 7.03 M3 4,063,269.40
2 B1 B 30X50 cm 11.83 M3 3,698,377.88
3 B2 20X40 cm 0.22 M3 4,599,021.40
4 B3 20/35 cm 11.67 M3 3,874,706.22
5 B4 20X30 cm 4.87 M3 3,916,553.27
6 Beton Plat Lantai. 3, K - 250, tbl=12cm 52.76 M3 3,452,918.99
E. PEKERJAAN STRUKTUR TANGGA BETON
0 PEKERJAAN STRUKTUR TANGGA LT. 1 Ke LT. 2
RAB KONTRAK
NO. ITEM PEKERJAAN HARGA
VOLUME
SATUAN (Rp)

1 2 3 4

1 Balok Bordes 20X40, fc=26.4 Mpa (K-300) 0.22 M3 8,055,053.46


2 Beton Plat dan Bordes t=15cm, fc=26.4 Mpa (K-300) 2.18 M3 3,467,430.81
3 Beton Anak Tangga, fc=26.4 Mpa (K-300) 1.08 M3 2,595,393.66
4 Beton Ralling fc = 18.675 MPa (K-225) 0.12 M3 6,584,136.11
5 Pas. Pipa Stainless 2.5 8.30 M1 127,452.06
0 PEKERJAAN STRUKTUR TANGGA LT. 2 Ke LT. 3
1 Balok Bordes 20X40, fc=26.4 Mpa (K-300) 0.22 M3 8,055,053.46
2 Beton Plat dan Bordes t=15cm, fc=26.4 Mpa (K-300) 2.18 M3 3,467,430.81
3 Beton Anak Tangga, fc=26.4 Mpa (K-300) 1.08 M3 2,595,393.66
4 Beton Ralling fc = 18.675 MPa (K-225) 0.12 M3 6,584,136.11
5 Pas. Pipa Stainless 2.5 8.30 M1 127,452.06
F. PEKERJAAN STRUKTUR ATAP CANOPY
0 PEKERJAAN STRUKTUR ATAP CANOPY LANTAI 1
1 Pas. Pipa Besi 2,5 Fiber Semen 55.44 M1 120,452.82
2 Pas. Pipa Besi 3 91.82 M1 212,506.87
3 Pas. Besi Pengait 10 27.43 Kg 31,283.00
4 Pas. Plat Besi, t=1cm 9.24 Kg 31,283.00
5 Pas. Dynabolt 10 88.00 Bh 15,000.00
6 Pas. Usuk Reng Galvalum 183.06 M2 118,405.00
7 Pas. Genteng Karang Pilang 183.06 M2 158,221.00
8 Pas. Talang Galvalume lebar=60cm 22.50 M1 214,920.00
9 Pas. Kalsiplank 3/30 72.81 M1 53,873.80
0 PEKERJAAN STRUKTUR ATAP CANOPY LANTAI 2
1 Pas. Pipa Besi 2,5 55.44 M1 120,452.82
2 Pas. Pipa Besi 3 91.82 M1 212,506.87
3 Pas. Besi Pengait 10 27.43 Kg 31,283.00
4 Pas. Plat Besi, t=1cm 9.24 Kg 31,283.00
5 Pas. Dynabolt 10 88.00 Bh 15,000.00
6 Pas. Usuk Reng Galvalum 183.06 M2 118,405.00
7 Pas. Genteng Karang Pilang 183.06 M2 158,221.00
8 Pas. Talang Galvalume lebar=60cm 22.50 M1 214,920.00
9 Pas. Kalsiplank 3/30 72.81 M1 53,873.80
RAB KONTRAK
NO. ITEM PEKERJAAN HARGA
VOLUME
SATUAN (Rp)

1 2 3 4

PEKERJAAN STRUKTUR
IV PEKERJAAN ARSITEKTURAL
A. PEKERJAAN ARSITEKTURAL LANTAI 1
0 PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Rollag Batu Bata Untuk Pijakan 1pc 4p 27.06 M2 201,114.00
2 Pas. Dinding Bata Ringan Dengan Semen Mortar 453.74 M2 73,045.80
3 Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen Mortar 778.20 M2 68,365.80
4 Acian Dinding Dengan Semen Mortar 802.55 M2 36,584.10
5 Acian Beton (Dihitung 15%) 448.32 M2 43,260.00
6 Benangan Dinding 368.12 M1 22,336.80
7 Benangan Beton (Dihitung 15%) 253.90 M1 22,336.80
0 PEKERJAAN KUSEN
1 Pasang Kusen P1 2.00 Unit 3,428,817.49
2 Pasang Kusen P2 6.00 Unit 3,115,948.91
3 Pasang Kusen P3 12.00 Unit 2,649,963.01
4 Pasang kusen P4 1.00 Unit 1,645,364.46
5 Pasang Kusen J1 15.00 Unit 1,792,970.56
6 Pasang Kusen J2 3.00 Unit 902,637.55
7 Pasang Kusen J3 3.00 Unit 519,109.07
8 Pasang Kusen BV 5.00 Unit 150,444.42
0 PEKERJAAN PENUTUP LANTAI
1 Pas. Keramik Lantai 40X40cm Polish Warna 358.47 M2 191,880.56
2 Pas. Keramik Lantai KM 30X30cm Unpolish Warna Untuk Toilet 88.17 M2 186,894.80
3 Pas. Keramik Dinding Toilet 30X60cm Polish Warna / Motif 124.21 M2 227,278.60
4 Pas. Keramik Plint 10x40cm 189.70 M1 45,826.95
5 Pas. Step Nosing Tangga 10x40 cm 28.32 M1 42,545.55
0 PEKERJAAN PLAFOND
1 Pas. Plafond Kalsiboard 4,5mm + Rangka Hollow 40.40 dan 20.40 86.48 M2 130,509.18
2 Pas. List Gypsum t=10 cm 163.80 M1 25,287.64
0 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam 288.86 M2 27,674.70
2 Pengecatan Dinding Luar 176.34 M2 34,177.20
RAB KONTRAK
NO. ITEM PEKERJAAN HARGA
VOLUME
SATUAN (Rp)

1 2 3 4

3 Pengecatan Plafond Kalsiboard 86.48 M2 23,270.20


4 Pengecatan Plafond Expose 390.00 M2 23,270.20
B. PEKERJAAN ARSITEKTURAL LANTAI 2
0 PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding Bata Ringan Dengan Semen Mortar 453.74 M2 73,045.80
2 Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen Mortar 864.36 M2 68,365.80
3 Acian Dinding Dengan Semen Mortar 882.31 M2 36,584.10
4 Acian Beton (Dihitung 15%) 448.32 M2 43,260.00
5 Benangan Dinding 368.12 M1 22,336.80
6 Benangan Beton (Dihitung 15%) 283.83 M1 22,336.80
7 Pas. Pipa Stainless 2.5 48.26 M1 127,452.06
RAB KONTRAK
NO. ITEM PEKERJAAN HARGA
VOLUME
SATUAN (Rp)

1 2 3 4

0 PEKERJAAN KUSEN
1 Pasang Kusen P1 2.00 Unit 3,428,817.49
2 Pasang Kusen P2 6.00 Unit 3,115,948.91
3 Pasang Kusen P3 12.00 Unit 2,649,963.01
4 Pasang Kusen P4 1.00 Unit 1,645,364.46
5 Pasang Kusen J1 15.00 Unit 1,792,970.56
6 Pasang Kusen J2 3.00 Unit 902,637.55
7 Pasang Kusen J3 3.00 Unit 519,109.07
8 Pasang Kusen BV 5.00 Unit 150,444.42
0 PEKERJAAN PENUTUP LANTAI
1 Pas. Keramik Lantai 40X40cm Polish Warna / Motif 373.49 M2 191,880.56
2 Pas. Keramik Lantai KM 30X30cm Unpolish Warna Untuk Toilet 88.17 M2 186,894.80
3 Pas. Keramik Dinding Toilet 30X60cm Polish Warna / Motif 124.21 M2 227,278.60
4 Pas. Keramik Plint 10x40cm 222.16 M1 45,826.95
5 Pas. Step Nosing Tangga 10x40 cm 28.32 M1 42,545.55
0 PEKERJAAN PLAFOND
1 Pas. Plafond Kalsiboard 4,5mm + Rangka Hollow 40.40 dan 20.40 86.48 M2 130,509.18
2 Pas. List Gypsum t=10 cm 163.80 M1 25,287.64
0 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam 288.86 M2 27,674.70
2 Pengecatan Dinding Luar 215.91 M2 34,177.20
3 Pengecatan Plafond Kalsiboard 141.35 M2 23,270.20
4 Pengecatan Plafond Expose 218.00 M2 23,270.20
5 Waterproofing toilet 159.42 M2 34,617.50
C. PEKERJAAN ARSITEKTURAL LANTAI 3
0 PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding Bata Ringan Dengan Semen Mortar 40.28 M2 73,045.80
2 Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen Mortar 80.56 M2 68,365.80
3 Acian Dinding Dengan Semen Mortar 80.56 M2 36,584.10
4 Kp 12X12 cm 0.12 M3 68,169.75
5 Rangka kayu 5/7 0.16 M3 2,550,000.00
6 Penutup atap asbes gelombang 24.36 M2 51,639.95
RAB KONTRAK
NO. ITEM PEKERJAAN HARGA
VOLUME
SATUAN (Rp)

1 2 3 4

0 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Luar 39.60 M2 34,177.20
2 Waterproofing plat lantai 3 464.22 M2 34,617.50
PEKERJAAN ARSITEKTURAL
V PEKERJAAN MEKANIKAL
A. PEKERJAAN MEKANIKAL LANTAI 1
1 Pasang pipa PVC air bersih 3/4 AW 47.60 M1 18,066.31
2 Pasang pipa PVC air bersih 1 AW 72.57 M1 18,303.72
3 Pasang pipa PVC air bekas 3 AW 84.62 M1 51,160.99
4 Pasang pipa PVC air kotor 4 AW 115.87 M1 65,801.19
5 Pasang pipa galvanis 4 43.45 M1 33,498.45
6 Pasang klosed duduk 7.00 Unit 1,901,955.60
7 Pasang jet washer 7.00 Unit 152,703.00
8 Pasang wastafell 7.00 Unit 531,699.14
9 Pasang floordrain Stainless ( Avour ) 11.00 Unit 182,628.00
10 Pasang floor clean out Stainless 3 2.00 Unit 233,078.00
11 Pasang floor clean out Stainless 4 2.00 Unit 250,578.00
12 Bio filter 3 M3 1.00 Unit 4,935,000.00
13 Pasang pompa transfer 1.00 Unit 1,080,480.00
B. PEKERJAAN MEKANIKAL LANTAI 2
1 Pasang pipa PVC air bersih 3/4 AW 47.60 M1 18,066.31
2 Pasang pipa PVC air bersih 1 AW 72.57 M1 18,303.72
3 Pasang pipa PVC air kotor 3 AW 84.62 M1 51,160.99
4 Pasang pipa PVC air kotor 4 AW 115.87 M1 65,801.19
5 Pasang pipa galvanis 4 43.51 M1 33,498.45
6 Pasang klosed duduk 7.00 Unit 1,901,955.60
7 Pasang jet washer 7.00 Unit 152,703.00
8 Pasang wastafell 7.00 Unit 531,699.14
9 Pasang floordrain Stainless 11.00 Unit 182,628.00
10 Pasang floor clean out Stainless 3 2.00 Unit 233,078.00
11 Pasang floor clean out Stainless 4 2.00 Unit 250,578.00
12 Pasang Tandon Stainles kapasitas 1100lt 2.00 Unit 980,880.00
RAB KONTRAK
NO. ITEM PEKERJAAN HARGA
VOLUME
SATUAN (Rp)

1 2 3 4

PEKERJAAN MEKANIKAL
VI PEKERJAAN ELEKTRIKAL
A. PEKERJAAN ELEKTRIKAL LANTAI 1
1 Instalasi Ttk lampu 57.00 Ttk 188,196.00
2 Pemasangan Ttk stop kontak 6.00 Ttk 106,683.30
3 Pemasangan Ttk swith socket AC 2.00 Ttk 125,013.30
4 Instalasi saklar tunggal 20.00 Unit 46,326.10
5 Instalasi saklar ganda 5.00 Unit 51,914.90
6 Pasang lampu LED 13watt bulb 20.00 Unit 212,500.00
7 Pasang lampu LED 8watt bulb 37.00 Unit 150,000.00
8 Pasang box panel + MCB 1.00 Unit 903,040.50
B. PEKERJAAN ELEKTRIKAL LANTAI 2
1 Instalasi Ttk lampu 57.00 Ttk 188,196.00
2 Pemasangan Ttk stop kontak 6.00 Ttk 106,683.30
3 Pemasangan Ttk swith socket AC 2.00 Ttk 125,013.30
4 Instalasi saklar tunggal 20.00 Unit 46,326.10
5 Instalasi saklar ganda 5.00 Unit 51,914.90
6 Pasang lampu LED 13watt bulb 20.00 Unit 212,500.00
7 Pasang lampu LED 8watt bulb 37.00 Unit 150,000.00
8 Pasang box panel + MCB 1.00 Ttk 903,040.50
PEKERJAAN ELEKTRIKAL
VII PEKERJAAN LAIN - LAIN
1 Pembersihan lokasi 1.00 Ls 5,000,000.00
PEKERJAAN LAIN - LAIN
JUMLAH TOTAL

Menyetujui : Menyetujui :
PMU Pelaksanaan PMU Perencanaan
RAB KONTRAK
NO. ITEM :PEKERJAAN
Menyetujui Menyetujui : HARGA
VOLUME
PMU Pelaksanaan PMU Perencanaan SATUAN (Rp)

1 2 3 4

Dr. I. Nyoman. D. Pahang Putra.,ST,MT Ir. PRAKOSA

Mengetahui :
PEJABAT PEMBUAT KOMITMEN
(PPK)

T. IMAN KRISTIAN MAHARHANDONO, ST, M.MT


Penata Tk. I / III d
NIP. 19820 707200604 1 023
PERHITUNGAN MUTUAL CHECK - 0
RHITUNGAN MC-0 TERHADAP RAB KONTRAK

DIKAN

KONTRAK MC-0 PEKERJAAN TAMBAH

JUMLAH HARGA HARGA JUMLAH HARGA JUMLAH


VOLUME VOLUME
(Rp) SATUAN (Rp) (Rp) HARGA (Rp)

5 = (3 x 4) 6 7 8 = (6 x 7) 9 10 = (4 x 9)

2,460,668.00 40.00 Ttk 61,516.70 2,460,668.00 - Ttk -


2,460,668.00 PEKERJAAN PENDAHULUAN 2,460,668.00 -

28,598,692.50 381.61 M3 120,375.00 45,935,890.14 144.03 M3 17,337,197.64


3,921,624.00 29.02 M3 120,480.00 3,496,181.58 - M3 -
2,383,425.00 59.40 M3 40,125.00 2,383,425.00 - M3 -
9,717,290.70 87.63 M3 110,890.00 9,717,290.70 - M3 -
3,122,841.60 25.92 M3 120,480.00 3,122,841.60 - M3 -
15,688,055.44 175.58 M3 89,349.90 15,688,055.44 - M3 -
1290.00 M1 69,240.80 89,320,632.00 1,290.00 M1 89,320,632.00
63,431,929.24 PEKERJAAN TANAH 169,664,316.47 106,657,829.64

9,601,286.75 14.51 M3 674,247.67 9,782,919.44 0.27 M3 181,632.69


17,476,499.48 23.95 M3 674,247.67 16,146,390.88 - M3 -
- -
236,846,483.37 93.96 M3 2,360,674.61 221,804,433.39 - M3 -
- -
261,776,462.16 71.94 M3 3,741,801.92 269,185,229.95 1.98 M3 7,408,767.80
4,108,947.78 1.91 M3 2,140,076.97 4,096,107.32 - M3 -
63,845,763.18 29.11 M3 2,193,258.78 63,836,990.14 - M3 -
8,764,166.89 6.42 M3 1,365,135.03 8,764,166.89 - M3 -
KONTRAK MC-0 PEKERJAAN TAMBAH

JUMLAH HARGA HARGA JUMLAH HARGA JUMLAH


VOLUME VOLUME
(Rp) SATUAN (Rp) (Rp) HARGA (Rp)

5 = (3 x 4) 6 7 8 = (6 x 7) 9 10 = (4 x 9)

31,817,446.77 9.79 M3 3,181,744.68 31,153,257.56 - M3 -


952,454.14 0.21 M3 4,329,337.01 917,819.45 - M3 -
43,552,686.59 11.01 M3 3,857,633.89 42,489,908.45 - M3 -
18,334,548.73 4.90 M3 3,764,794.40 18,442,643.50 0.03 M3 108,094.78
KONTRAK MC-0 PEKERJAAN TAMBAH

JUMLAH HARGA HARGA JUMLAH HARGA JUMLAH


VOLUME VOLUME
(Rp) SATUAN (Rp) (Rp) HARGA (Rp)

5 = (3 x 4) 6 7 8 = (6 x 7) 9 10 = (4 x 9)

123,097,880.63 27.58 M3 4,463,302.42 123,097,880.63 - M3 -


41,493,875.84 9.27 M3 4,476,146.26 41,493,875.84 - M3 -
18,693,226.83 3.60 M3 5,192,563.01 18,693,226.83 - M3 -

8,888,583.75 1.35 M3 6,584,136.11 8,888,583.75 - M3 -

90,642,276.80 21.42 M3 4,231,665.58 90,642,276.80 - M3 -


32,228,253.08 7.20 M3 4,476,146.26 32,228,253.08 - M3 -
14,435,325.16 2.78 M3 5,192,563.01 14,435,325.16 - M3 -

48,068,476.96 11.83 M3 4,063,269.40 48,068,476.96 - M3 -


1,011,784.71 0.22 M3 4,599,021.40 1,011,784.71 - M3 -
45,217,821.63 11.67 M3 3,874,706.22 45,217,821.63 - M3 -

8,888,583.75 1.35 M3 6,584,136.11 8,888,583.75 - M3 -


182,176,005.73 52.76 M3 3,452,918.99 182,176,005.73 - M3 -

18,153,845.35 4.29 M3 4,231,665.58 18,153,845.35 - M3 -


6,445,650.62 1.44 M3 4,476,146.26 6,445,650.62 - M3 -

28,564,783.86 7.03 M3 4,063,269.40 28,564,783.86 - M3 -


43,751,810.28 11.83 M3 3,698,377.88 43,751,810.28 - M3 -
1,011,784.71 0.22 M3 4,599,021.40 1,011,784.71 - M3 -
45,217,821.63 11.67 M3 3,874,706.22 45,217,821.63 - M3 -
19,073,614.45 4.87 M3 3,916,553.27 19,073,614.45 - M3 -
182,176,005.73 52.76 M3 3,452,918.99 182,176,005.73 - M3 -
KONTRAK MC-0 PEKERJAAN TAMBAH

JUMLAH HARGA HARGA JUMLAH HARGA JUMLAH


VOLUME VOLUME
(Rp) SATUAN (Rp) (Rp) HARGA (Rp)

5 = (3 x 4) 6 7 8 = (6 x 7) 9 10 = (4 x 9)

1,772,111.76 0.22 M3 8,055,053.46 1,772,111.76 - M3 -


7,558,999.16 2.18 M3 3,467,430.81 7,558,999.16 - M3 -
2,803,025.15 1.08 M3 2,595,393.66 2,803,025.15 - M3 -
790,096.33 0.12 M3 6,584,136.11 790,096.33 - M3 -
1,057,852.10 8.30 M1 127,452.06 1,057,852.10 - M1 -

1,772,111.76 0.22 M3 8,055,053.46 1,772,111.76 - M3 -


7,558,999.16 2.18 M3 3,467,430.81 7,558,999.16 - M3 -
2,803,025.15 1.08 M3 2,595,393.66 2,803,025.15 - M3 -
790,096.33 0.12 M3 6,584,136.11 790,096.33 - M3 -
1,057,852.10 8.30 M1 127,452.06 1,057,852.10 - M1 -

6,677,904.34 55.44 M1 120,452.82 6,677,904.34 - M1 -


19,512,380.74 91.82 M1 212,506.87 19,512,380.74 - M1 -
858,092.69 27.43 Kg 31,283.00 858,092.69 - Kg -
289,054.92 9.24 Kg 31,283.00 289,054.92 - Kg -
1,320,000.00 88.00 Bh 15,000.00 1,320,000.00 - Bh -
21,675,219.30 183.06 M2 118,405.00 21,675,219.30 - M2 -
28,963,936.26 183.06 M2 158,221.00 28,963,936.26 - M2 -
4,835,700.00 22.50 M1 214,920.00 4,835,700.00 - M1 -
3,922,551.38 72.81 M1 53,873.80 3,922,551.38 - M1 -

6,677,904.34 55.44 M1 120,452.82 6,677,904.34 - M1 -


19,512,380.74 91.82 M1 212,506.87 19,512,380.74 - M1 -
858,092.69 27.43 Kg 31,283.00 858,092.69 - Kg -
289,054.92 9.24 Kg 31,283.00 289,054.92 - Kg -
1,320,000.00 88.00 Bh 15,000.00 1,320,000.00 - Bh -
21,675,219.30 183.06 M2 118,405.00 21,675,219.30 - M2 -
28,963,936.26 183.06 M2 158,221.00 28,963,936.26 - M2 -
4,835,700.00 22.50 M1 214,920.00 4,835,700.00 - M1 -
3,922,551.38 72.81 M1 53,873.80 3,922,551.38 - M1 -
KONTRAK MC-0 PEKERJAAN TAMBAH

JUMLAH HARGA HARGA JUMLAH HARGA JUMLAH


VOLUME VOLUME
(Rp) SATUAN (Rp) (Rp) HARGA (Rp)

5 = (3 x 4) 6 7 8 = (6 x 7) 9 10 = (4 x 9)

1,860,388,005.57 PEKERJAAN STRUKTUR 1,849,931,126.73 7,698,495.26

5,442,144.84 27.06 M2 201,114.00 5,442,144.84 - M2 -


33,143,801.29 453.74 M2 73,045.80 33,143,801.29 - M2 -
53,202,265.56 778.20 M2 68,365.80 53,202,265.56 - M2 -
29,360,569.46 802.55 M2 36,584.10 29,360,569.46 - M2 -
19,394,323.20 448.32 M2 43,260.00 19,394,323.20 - M2 -
8,222,622.82 368.12 M1 22,336.80 8,222,622.82 - M1 -
5,671,313.52 253.90 M1 22,336.80 5,671,313.52 - M1 -

6,857,634.99 2.00 Unit 3,428,817.49 6,857,634.99 - Unit -


18,695,693.47 6.00 Unit 3,115,948.91 18,695,693.47 - Unit -
31,799,556.12 12.00 Unit 2,649,963.01 31,799,556.12 - Unit -
1,645,364.46 1.00 Unit 1,645,364.46 1,645,364.46 - Unit -
26,894,558.37 15.00 Unit 1,792,970.56 26,894,558.37 - Unit -
2,707,912.65 3.00 Unit 902,637.55 2,707,912.65 - Unit -
1,557,327.21 3.00 Unit 519,109.07 1,557,327.21 - Unit -
752,222.10 5.00 Unit 150,444.42 752,222.10 - Unit -

68,783,424.34 358.47 M2 191,880.56 68,783,424.34 - M2 -


16,478,514.52 88.17 M2 186,894.80 16,478,514.52 - M2 -
28,230,274.91 124.21 M2 227,278.60 28,230,274.91 - M2 -
8,693,372.42 189.70 M1 45,826.95 8,693,372.42 - M1 -
1,204,889.98 28.32 M1 42,545.55 1,204,889.98 - M1 -

11,286,433.89 86.48 M2 130,509.18 11,286,433.89 - M2 -


4,142,115.43 163.80 M1 25,287.64 4,142,115.43 - M1 -

7,994,113.84 288.86 M2 27,674.70 7,994,113.84 - M2 -


6,026,807.45 176.34 M2 34,177.20 6,026,807.45 - M2 -
KONTRAK MC-0 PEKERJAAN TAMBAH

JUMLAH HARGA HARGA JUMLAH HARGA JUMLAH


VOLUME VOLUME
(Rp) SATUAN (Rp) (Rp) HARGA (Rp)

5 = (3 x 4) 6 7 8 = (6 x 7) 9 10 = (4 x 9)

2,012,406.90 86.48 M2 23,270.20 2,012,406.90 - M2 -


9,075,378.00 390.00 M2 23,270.20 9,075,378.00 - M2 -

33,143,801.29 453.74 M2 73,045.80 33,143,801.29 - M2 -


59,092,662.89 864.36 M2 68,365.80 59,092,662.89 - M2 -
32,278,517.27 882.31 M2 36,584.10 32,278,517.27 - M2 -
19,394,323.20 448.32 M2 43,260.00 19,394,323.20 - M2 -
8,222,622.82 368.12 M1 22,336.80 8,222,622.82 - M1 -
6,339,853.94 283.83 M1 22,336.80 6,339,853.94 - M1 -
6,150,836.42 48.26 M1 127,452.06 6,150,836.42 - M1 -
KONTRAK MC-0 PEKERJAAN TAMBAH

JUMLAH HARGA HARGA JUMLAH HARGA JUMLAH


VOLUME VOLUME
(Rp) SATUAN (Rp) (Rp) HARGA (Rp)

5 = (3 x 4) 6 7 8 = (6 x 7) 9 10 = (4 x 9)

6,857,634.99 2.00 Unit 3,428,817.49 6,857,634.99 - Unit -


18,695,693.47 6.00 Unit 3,115,948.91 18,695,693.47 - Unit -
31,799,556.12 12.00 Unit 2,649,963.01 31,799,556.12 - Unit -
1,645,364.46 1.00 Unit 1,645,364.46 1,645,364.46 - Unit -
26,894,558.37 15.00 Unit 1,792,970.56 26,894,558.37 - Unit -
2,707,912.65 3.00 Unit 902,637.55 2,707,912.65 - Unit -
1,557,327.21 3.00 Unit 519,109.07 1,557,327.21 - Unit -
752,222.10 5.00 Unit 150,444.42 752,222.10 - Unit -

71,665,470.35 166.69 M2 191,880.56 31,984,556.58 - M2 -


16,478,514.52 M2 186,894.80 - - M2 -
28,230,274.91 M2 227,278.60 - - M2 -
10,180,915.21 M1 45,826.95 - - M1 -
1,204,889.98 M1 42,545.55 - - M1 -

11,286,433.89 86.48 M2 130,509.18 11,286,433.89 - M2 -


4,142,115.43 163.80 M1 25,287.64 4,142,115.43 - M1 -

7,994,113.84 288.86 M2 27,674.70 7,994,113.84 - M2 -


7,379,199.25 215.91 M2 34,177.20 7,379,199.25 - M2 -
3,289,242.77 141.35 M2 23,270.20 3,289,242.77 - M2 -
5,072,903.60 218.00 M2 23,270.20 5,072,903.60 - M2 -
5,518,721.85 159.42 M2 34,617.50 5,518,721.85 - M2 -

2,942,284.82 40.28 M2 73,045.80 2,942,284.82 - M2 -


5,507,548.85 80.56 M2 68,365.80 5,507,548.85 - M2 -
2,947,215.10 80.56 M2 36,584.10 2,947,215.10 - M2 -
8,180.37 0.12 M3 68,169.75 8,180.37 - M3 -
408,000.00 0.16 M3 2,550,000.00 408,000.00 - M3 -
1,257,949.18 24.36 M2 51,639.95 1,257,949.18 - M2 -
KONTRAK MC-0 PEKERJAAN TAMBAH

JUMLAH HARGA HARGA JUMLAH HARGA JUMLAH


VOLUME VOLUME
(Rp) SATUAN (Rp) (Rp) HARGA (Rp)

5 = (3 x 4) 6 7 8 = (6 x 7) 9 10 = (4 x 9)

1,353,417.12 39.60 M2 34,177.20 1,353,417.12 - M2 -


16,070,135.85 464.22 M2 34,617.50 16,070,135.85 - M2 -
867,745,455.80 PEKERJAAN ARSITEKTURAL 771,969,947.42 -

859,956.42 47.60 M1 18,066.31 859,956.42 - M1 -


1,328,300.96 72.57 M1 18,303.72 1,328,300.96 - M1 -
4,329,242.76 84.62 M1 51,160.99 4,329,242.76 - M1 -
7,624,384.32 115.87 M1 65,801.19 7,624,384.32 - M1 -
1,455,507.65 43.45 M1 33,498.45 1,455,507.65 - M1 -
13,313,689.20 7.00 Unit 1,901,955.60 13,313,689.20 - Unit -
1,068,921.00 7.00 Unit 152,703.00 1,068,921.00 - Unit -
3,721,893.95 7.00 Unit 531,699.14 3,721,893.95 - Unit -
2,008,908.00 11.00 Unit 182,628.00 2,008,908.00 - Unit -
466,156.00 2.00 Unit 233,078.00 466,156.00 - Unit -
501,156.00 2.00 Unit 250,578.00 501,156.00 - Unit -
4,935,000.00 1.00 Unit 4,935,000.00 4,935,000.00 - Unit -
1,080,480.00 1.00 Unit 1,080,480.00 1,080,480.00 - Unit -

859,956.42 47.60 M1 18,066.31 859,956.42 - M1 -


1,328,300.96 72.57 M1 18,303.72 1,328,300.96 - M1 -
4,329,242.76 84.62 M1 51,160.99 4,329,242.76 - M1 -
7,624,384.32 115.87 M1 65,801.19 7,624,384.32 - M1 -
1,457,517.56 43.51 M1 33,498.45 1,457,517.56 - M1 -
13,313,689.20 7.00 Unit 1,901,955.60 13,313,689.20 - Unit -
1,068,921.00 7.00 Unit 152,703.00 1,068,921.00 - Unit -
3,721,893.95 7.00 Unit 531,699.14 3,721,893.95 - Unit -
2,008,908.00 11.00 Unit 182,628.00 2,008,908.00 - Unit -
466,156.00 2.00 Unit 233,078.00 466,156.00 - Unit -
501,156.00 2.00 Unit 250,578.00 501,156.00 - Unit -
1,961,760.00 2.00 Unit 980,880.00 1,961,760.00 - Unit -
KONTRAK MC-0 PEKERJAAN TAMBAH

JUMLAH HARGA HARGA JUMLAH HARGA JUMLAH


VOLUME VOLUME
(Rp) SATUAN (Rp) (Rp) HARGA (Rp)

5 = (3 x 4) 6 7 8 = (6 x 7) 9 10 = (4 x 9)

81,335,482.43 PEKERJAAN MEKANIKAL 81,335,482.43 -

10,727,172.00 57.00 Ttk 188,196.00 10,727,172.00 - Ttk -


640,099.80 6.00 Ttk 106,683.30 640,099.80 - Ttk -
250,026.60 2.00 Ttk 125,013.30 250,026.60 - Ttk -
926,522.00 20.00 Unit 46,326.10 926,522.00 - Unit -
259,574.50 5.00 Unit 51,914.90 259,574.50 - Unit -
4,250,000.00 20.00 Unit 212,500.00 4,250,000.00 - Unit -
5,550,000.00 37.00 Unit 150,000.00 5,550,000.00 - Unit -
903,040.50 1.00 Unit 903,040.50 903,040.50 - Unit -

10,727,172.00 57.00 Ttk 188,196.00 10,727,172.00 - Ttk -


640,099.80 6.00 Ttk 106,683.30 640,099.80 - Ttk -
250,026.60 2.00 Ttk 125,013.30 250,026.60 - Ttk -
926,522.00 20.00 Unit 46,326.10 926,522.00 - Unit -
259,574.50 5.00 Unit 51,914.90 259,574.50 - Unit -
4,250,000.00 20.00 Unit 212,500.00 4,250,000.00 - Unit -
5,550,000.00 37.00 Unit 150,000.00 5,550,000.00 - Unit -
903,040.50 1.00 Ttk 903,040.50 903,040.50 - Ttk -
47,012,870.80 PEKERJAAN ELEKTRIKAL 47,012,870.80 -

5,000,000.00 1.00 Ls 5,000,000.00 5,000,000.00 - Ls -


5,000,000.00 PEKERJAAN LAIN - LAIN 5,000,000.00 -
2,927,374,411.84 JUMLAH TOTAL 2,927,374,411.84 114,356,324.90

Menyetujui : Menyetujui : Di
Konsultan Pengawas Konsultan Perencana Kontra
CV. MAHAKARYA UTAMA CV. ELEMEN TIGA TIGA PT. DEFICY
KONTRAK MC-0 PEKERJAAN TAMBAH
Menyetujui : Menyetujui : Di
Konsultan
JUMLAH HARGA Pengawas HARGA JUMLAH HARGA Perencana
Konsultan JUMLAH Kontra
VOLUME VOLUME
CV.
(Rp)MAHAKARYA UTAMASATUAN (Rp) CV.
(Rp)ELEMEN TIGA TIGA PT. DEFICY
HARGA (Rp)

5 = (3 x 4) 6 7 8 = (6 x 7) 9 10 = (4 x 9)

Ir. WAHYUDI UNTUNG DJAYA, ST JOHN


Direktur Direktur

Mengetahui :
MEN PEJABAT PELAKSANA TEKNIS PEMBANGUNAN
(PPTK)

O, ST, M.MT HARI ROJIN SUNOTO, ST


Penata / III C
23 NIP. 19800109 200902 1 005
PEKERJAAN KURANG

JUMLAH HARGA
VOLUME
(Rp)

11 12 = (4 x 11)

- Ttk -
-

- M3 -
3.53 M3 425,442.42
- M3 -
- M3 -
- M3 -
- M3 -
- M1 -
425,442.42

- M3 -
1.97 M3 1,330,108.60
-
6.37 M3 15,042,049.98
-
- M3 -
0.01 M3 12,840.46
0.00 M3 8,773.04
- M3 -
PEKERJAAN KURANG

JUMLAH HARGA
VOLUME
(Rp)

11 12 = (4 x 11)

0.21 M3 664,189.20
0.01 M3 34,634.70
0.28 M3 1,062,778.14
- M3 -
PEKERJAAN KURANG

JUMLAH HARGA
VOLUME
(Rp)

11 12 = (4 x 11)

- M3 -
- M3 -
- M3 -

- M3 -

- M3 -
- M3 -
- M3 -

- M3 -
- M3 -
- M3 -

- M3 -
- M3 -

- M3 -
- M3 -

- M3 -
- M3 -
- M3 -
- M3 -
- M3 -
- M3 -
PEKERJAAN KURANG

JUMLAH HARGA
VOLUME
(Rp)

11 12 = (4 x 11)

- M3 -
- M3 -
- M3 -
- M3 -
- M1 -

- M3 -
- M3 -
- M3 -
- M3 -
- M1 -

- M1 -
- M1 -
- Kg -
- Kg -
- Bh -
- M2 -
- M2 -
- M1 -
- M1 -

- M1 -
- M1 -
- Kg -
- Kg -
- Bh -
- M2 -
- M2 -
- M1 -
- M1 -
PEKERJAAN KURANG

JUMLAH HARGA
VOLUME
(Rp)

11 12 = (4 x 11)

18,155,374.11

- M2 -
- M2 -
- M2 -
- M2 -
- M2 -
- M1 -
- M1 -

- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -

- M2 -
- M2 -
- M2 -
- M1 -
- M1 -

- M2 -
- M1 -

- M2 -
- M2 -
PEKERJAAN KURANG

JUMLAH HARGA
VOLUME
(Rp)

11 12 = (4 x 11)

- M2 -
- M2 -

- M2 -
- M2 -
- M2 -
- M2 -
- M1 -
- M1 -
- M1 -
PEKERJAAN KURANG

JUMLAH HARGA
VOLUME
(Rp)

11 12 = (4 x 11)

- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -

206.80 M2 39,680,913.77
88.17 M2 16,478,514.52
124.21 M2 28,230,274.91
222.16 M1 10,180,915.21
28.32 M1 1,204,889.98

- M2 -
- M1 -

- M2 -
- M2 -
- M2 -
- M2 -
- M2 -

- M2 -
- M2 -
- M2 -
- M3 -
- M3 -
- M2 -
PEKERJAAN KURANG

JUMLAH HARGA
VOLUME
(Rp)

11 12 = (4 x 11)

- M2 -
- M2 -
95,775,508.38

- M1 -
- M1 -
- M1 -
- M1 -
- M1 -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -

- M1 -
- M1 -
- M1 -
- M1 -
- M1 -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
PEKERJAAN KURANG

JUMLAH HARGA
VOLUME
(Rp)

11 12 = (4 x 11)

- Ttk -
- Ttk -
- Ttk -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -

- Ttk -
- Ttk -
- Ttk -
- Unit -
- Unit -
- Unit -
- Unit -
- Ttk -
-

- Ls -
-
114,356,324.90

Surabaya, 16 April 2019

Dibuat oleh :
Kontraktor Pelaksana
PT. DEFICY SIGAR PRATAMA
PEKERJAAN KURANG
Dibuat oleh :
Kontraktor Pelaksana
JUMLAH HARGA
VOLUME
PT. DEFICY SIGAR PRATAMA
(Rp)

11 12 = (4 x 11)

JOHNNY SIREGAR
Direktur
REKAPITULASI
MUTUAL CHECK (MC - 0)

NAMA KEGIATAN : PEMBANGUNAN/REHABILITASI FASILITAS BANGUNAN PEND


PEKERJAAN : PEMBANGUNAN GEDUNG TYPE B2 (SMP NEGERI 62)
LOKASI : Kota Surabaya
TAHUN : 2019

NO. URAIAN

1 2

A. BIAYA KONSTRUKSI FISIK (BKF)


I PEKERJAAN PENDAHULUAN
II PEKERJAAN TANAH
III PEKERJAAN STRUKTUR
IV PEKERJAAN ARSITEKTURAL
V PEKERJAAN MEKANIKAL
VI PEKERJAAN ELEKTRIKAL
VII PEKERJAAN LAIN - LAIN

JUMLAH TOTAL BIAYA KONSTRUKSI FISIK (BKF)

B. BIAYA PAJAK PERTAMBAHAN NILAI


Pajak Pertambahan Nilai (PPN) 10 %

D. JUMLAH ( A + B )
E. PEMBULATAN

Terbilang :
Tiga Milyar Dua Ratus Dua Puluh Juta SeRatus SeBelas Ribu
REKAPITULASI
MUTUAL CHECK (MC - 0)

NGUNAN/REHABILITASI FASILITAS BANGUNAN PENDIDIKAN


NGUNAN GEDUNG TYPE B2 (SMP NEGERI 62)

BOBOT FISIK
JUMLAH HARGA (Rp.)
(%)
3 4

Rp 2,460,668 0.07
Rp 193,394,385 5.79
Rp 1,929,293,459 57.80
Rp 1,066,349,293 31.95
Rp 96,964,326 2.90
Rp 44,566,242 1.34
Rp 5,000,000 0.15

Rp 3,338,028,373.11 100.00

Rp 333,802,837.31

Rp 3,671,831,210.42
Rp 3,671,831,000.00

Dua Ratus Dua Puluh Juta SeRatus SeBelas Ribu Rupiah


Surabaya, 22 Juli 2019

Dibuat oleh :
Kontraktor Pelaksana
PT. DEFICY SIGAR PRATAMA

JOHNNY SIREGAR
Direktur
RENCANA ANGGARAN BIA
MUTUAL CHECK - 80

NAMA KEGIATAN : PEMBANGUNAN/REHABILITASI FASILITAS BANGUNAN PEND


PEKERJAAN : PEMBANGUNAN GEDUNG TYPE B2 (SMP NEGERI 62)
LOKASI : Kota Surabaya
TAHUN : 2019

NO. ITEM PEKERJAAN


VOLUME

1 2 3

I PEKERJAAN PENDAHULUAN
1 Pekerjaan Uitzet + Bowplank 40.00 Ttk

II PEKERJAAN TANAH
1 Galian Tanah Pondasi 391.24 M3
2 Urugan Pasir Bawah Pondasi, tbl=5cm 29.02 M3
3 Urugan Tanah Kembali 189.62 M3
4 Urugan Sirtu 154.32 M3
5 Urugan Pasir Bawah Lantai, tbl=5cm 21.54 M3
6 Pengangkutan Bekas Galian Tanah Keluar Lokasi Proyek 292.84 M3
7 Pembuatan Lubang Strous Pile Ø 30 cm kedalaman 5 m 1290.00 M1

III PEKERJAAN STRUKTUR


A. PEKERJAAN PONDASI
1 Rabat Lantai Kerja K-175, tbl=5cm 14.51 M3
2 Rabat Bawah Lantai K-175, tbl=5cm 22.72 M3
0 Beton Strous fc = 20.75 MPa (K-250) 0.00 0
1 Strous 30 cm 93.96 M3
0 Beton Pile Caps fc = 20.75 MPa (K-250)
1 PC 1 1060X165X40 cm 0.00 M3
2 PC 1 1090X165X40 cm 71.94 M3
NO. ITEM PEKERJAAN
VOLUME

1 2 3

3 PC 2 290X165X40 cm 1.91 M3
4 PC 3 735X165X40 cm 29.11 M3
5 PC 4 165X162X40 cm 6.44 M3
0 Beton Sloof fc = 20.75 MPa (K-250)
1 S1 30X50 cm 9.70 M3
2 S2 20X40 cm 0.22 M3
3 S3 20X35 cm 11.01 M3
4 S4 20X30 cm 4.88 M3
B. PEKERJAAN STRUKTUR LANTAI 1
0 Beton Kolom fc = 20.75 MPa (K-250)
1 K1 A 35X45 cm 25.96 M3
2 K2 30X30 cm 9.27 M3
3 Kp 12X12 cm K-225 3.14 M3
0 Beton Balok fc = 18.675 MPa (K-225)
1 Balok Latei 12X20 cm 2.06 M3
2 Beton Plat Wastafel, K-250, tbl = 8 cm 0.30 M3
C. PEKERJAAN STRUKTUR LANTAI 2
0 Beton Kolom fc = 20.75 MPa (K-250)
1 K1 B 35X45 cm 20.16 M3
2 K2 30X30 cm 7.20 M3
3 Kp 12X12 cm 2.65 M3
0 Beton Balok fc = 20.75 MPa (K-250)
1 B1 A 30X50 cm 6.98 M3
2 B2 20X40 cm 0.22 M3
3 B3 20X35 cm 11.66 M3
4 B1 B 30X50 cm 11.78 M3
5 B4 20X30 cm 4.99 M3
0 Beton Balok fc = 18.675 MPa (K-225)
1 Balok Latei 12X20 cm 2.06 M3
2 Beton Plat Lantai. 2, K - 250, tbl=12cm 47.62 M3
NO. ITEM PEKERJAAN
VOLUME

1 2 3

3 Beton Plat Wastafel, K-250, tbl = 8 cm 0.30 M3


D. PEKERJAAN STRUKTUR LANTAI 3
0 Beton Kolom fc = 20.75 MPa (K-250) 0.00
1 K1 B 35X45 cm 4.03 M3
2 K2 30X30 cm 1.44 M3
0 Beton Balok fc = 20.75 MPa (K-250)
1 B1 A 30X50 cm 6.98 M3
2 B1 B 30X50 cm 11.78 M3
3 B2 20X40 cm 0.22 M3
4 B3 20/35 cm 11.66 M3
5 B4 20X30 cm 4.99 M3
6 Beton Plat Lantai. 3, K - 250, tbl=12cm 47.37 M3
E. PEKERJAAN STRUKTUR TANGGA BETON
0 PEKERJAAN STRUKTUR TANGGA LT. 1 Ke LT. 2
1 Balok Bordes 20X40, fc=26.4 Mpa (K-300) 0.21 M3
2 Beton Plat dan Bordes t=15cm, fc=26.4 Mpa (K-300) 0.76 M3
3 Beton Anak Tangga, fc=26.4 Mpa (K-300) 2.13 M3
4 Beton Ralling fc = 18.675 MPa (K-225) 1.55 M3
5 Pas. Pipa Stainless 2.5 11.11 M1
0 PEKERJAAN STRUKTUR TANGGA LT. 2 Ke LT. 3
1 Balok Bordes 20X40, fc=26.4 Mpa (K-300) 0.21 M3
2 Beton Plat dan Bordes t=15cm, fc=26.4 Mpa (K-300) 0.68 M3
3 Beton Anak Tangga, fc=26.4 Mpa (K-300) 1.98 M3
4 Beton Ralling fc = 18.675 MPa (K-225) 1.41 M3
5 Pas. Pipa Stainless 2.5 10.20 M1
F. PEKERJAAN STRUKTUR ATAP CANOPY 0.00 0.00
0 PEKERJAAN STRUKTUR ATAP CANOPY LANTAI 1 0.00 0.00
1 Pas. Pipa Besi 2,5 Fiber Semen 63.65 M1
2 Pas. Pipa Besi 3 138.47 M1
3 Pas. Besi Pengait 10 12.86 Kg
NO. ITEM PEKERJAAN
VOLUME

1 2 3

4 Pas. Plat Besi, t=1cm 132.04 Kg


5 Pas. Dynabolt 10 360.00 Bh
6 Pas. Usuk Reng Galvalum 103.98 M2
7 Pas. Genteng Karang Pilang 103.98 M2
8 Pas. Talang Galvalume lebar=60cm 69.32 M1
9 Pas. Kalsiplank 3/30 73.82 M1
10 Pipa Besi Black Steel 2.5" Finishing Cat 93.72 M1
0 PEKERJAAN STRUKTUR ATAP CANOPY LANTAI 2 0.00 0.00
1 Pas. Pipa Besi 2,5 95.60 M1
2 Pas. Pipa Besi 3 138.47 M1
3 Pas. Besi Pengait 10 12.86 Kg
4 Pas. Plat Besi, t=1cm 132.04 Kg
5 Pas. Dynabolt 10 360.00 Bh
6 Pas. Usuk Reng Galvalum 103.98 M2
7 Pas. Genteng Karang Pilang 103.98 M2
8 Pas. Talang Galvalume lebar=60cm 69.32 M1
9 Pas. Kalsiplank 3/30 73.82 M1

IV PEKERJAAN ARSITEKTURAL
A. PEKERJAAN ARSITEKTURAL LANTAI 1
0 PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Rollag Batu Bata Untuk Pijakan 1pc 4p 163.98 M2
2 Pas. Dinding Bata Ringan Dengan Semen Mortar 598.22 M2
3 Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen Mortar 888.95 M2
4 Acian Dinding Dengan Semen Mortar 888.95 M2
5 Acian Beton (Dihitung 15%) 300.80 M2
6 Benangan Dinding 368.12 M1
7 Benangan Beton (Dihitung 15%) 86.72 M1
0 PEKERJAAN KUSEN
1 Pasang Kusen P1 2.00 Unit
NO. ITEM PEKERJAAN
VOLUME

1 2 3

2 Pasang Kusen P2 6.00 Unit


3 Pasang Kusen P3 12.00 Unit
4 Pasang kusen P4 1.00 Unit
5 Pasang Kusen J1 15.00 Unit
6 Pasang Kusen J2 3.00 Unit
7 Pasang Kusen J3 3.00 Unit
8 Pasang Kusen BV 5.00 Unit
0 PEKERJAAN PENUTUP LANTAI
1 Pas. Keramik Lantai 40X40cm Polish Warna 379.49 M2
2 Pas. Keramik Lantai KM 30X30cm Unpolish Warna Untuk Toilet 89.73 M2
3 Pas. Keramik Dinding Toilet 30X60cm Polish Warna / Motif 355.76 M2
4 Pas. Keramik Plint 10x40cm 172.11 M1
5 Pas. Step Nosing Tangga 10x40 cm 20.50 M1
0 PEKERJAAN PLAFOND
1 Pas. Plafond Kalsiboard 4,5mm + Rangka Hollow 40.40 dan 20.40 193.71 M2
2 Pas. List Gypsum t=10 cm 160.25 M1
0 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam 425.99 M2
2 Pengecatan Dinding Luar 466.50 M2
3 Pengecatan Plafond Kalsiboard 87.84 M2
4 Pengecatan Plafond Expose 390.00 M2
B. PEKERJAAN ARSITEKTURAL LANTAI 2
0 PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding Bata Ringan Dengan Semen Mortar 640.32 M2
2 Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen Mortar 973.14 M2
3 Acian Dinding Dengan Semen Mortar 973.14 M2
4 Acian Beton (Dihitung 15%) 448.32 M2
5 Benangan Dinding 368.12 M1
6 Benangan Beton (Dihitung 15%) 283.83 M1
7 Pas. Pipa Stainless 2.5 48.26 M1
NO. ITEM PEKERJAAN
VOLUME

1 2 3

0 PEKERJAAN KUSEN
1 Pasang Kusen P1 2.00 Unit
2 Pasang Kusen P2 6.00 Unit
3 Pasang Kusen P3 12.00 Unit
4 Pasang Kusen P4 1.00 Unit
5 Pasang Kusen J1 15.00 Unit
6 Pasang Kusen J2 3.00 Unit
7 Pasang Kusen J3 3.00 Unit
8 Pasang Kusen BV 5.00 Unit
NO. ITEM PEKERJAAN
VOLUME

1 2 3

0 PEKERJAAN PENUTUP LANTAI


1 Pas. Keramik Lantai 40X40cm Polish Warna / Motif 310.18 M2
2 Pas. Keramik Lantai KM 30X30cm Unpolish Warna Untuk Toilet 89.73 M2
3 Pas. Keramik Dinding Toilet 30X60cm Polish Warna / Motif 355.77 M2
4 Pas. Keramik Plint 10x40cm 172.11 M1
5 Pas. Step Nosing Tangga 10x40 cm 20.50 M1
0 PEKERJAAN PLAFOND
1 Pas. Plafond Kalsiboard 4,5mm + Rangka Hollow 40.40 dan 20.40 193.71 M2
2 Pas. List Gypsum t=10 cm 160.25 M1
0 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam 288.86 M2
2 Pengecatan Dinding Luar 215.91 M2
3 Pengecatan Plafond Kalsiboard 141.35 M2
4 Pengecatan Plafond Expose 218.00 M2
5 Waterproofing toilet 159.42 M2
C. PEKERJAAN ARSITEKTURAL LANTAI 3
0 PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding Bata Ringan Dengan Semen Mortar 40.28 M2
2 Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen Mortar 80.56 M2
3 Acian Dinding Dengan Semen Mortar 80.56 M2
4 Kp 12X12 cm 0.12 M3
5 Rangka kayu 5/7 0.16 M3
6 Penutup atap asbes gelombang 24.36 M2
0 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Luar 39.60 M2
2 Waterproofing plat lantai 3 464.22 M2

V PEKERJAAN MEKANIKAL 0.00 0.00


A. PEKERJAAN MEKANIKAL LANTAI 1 0.00 0.00
1 Pasang pipa PVC air bersih 3/4 AW 47.60 M1
NO. ITEM PEKERJAAN
VOLUME

1 2 3

2 Pasang pipa PVC air bersih 1 AW 72.57 M1


3 Pasang pipa PVC air bekas 3 AW 84.62 M1
4 Pasang pipa PVC air kotor 4 AW 115.87 M1
5 Pasang pipa galvanis 4 43.45 M1
6 Pasang klosed duduk 13.00 Unit
7 Pasang jet washer 13.00 Unit
8 Pasang wastafell 7.00 Unit
9 Pasang floordrain Stainless ( Avour ) 13.00 Unit
10 Pasang floor clean out Stainless 3 3.00 Unit
11 Pasang floor clean out Stainless 4 6.00 Unit
12 Bio filter 3 M3 1.00 Unit
13 Pasang pompa transfer 2.00 Unit
B. PEKERJAAN MEKANIKAL LANTAI 2
1 Pasang pipa PVC air bersih 3/4 AW 47.60 M1
2 Pasang pipa PVC air bersih 1 AW 72.57 M1
3 Pasang pipa PVC air kotor 3 AW 84.62 M1
4 Pasang pipa PVC air kotor 4 AW 115.87 M1
5 Pasang pipa galvanis 4 43.51 M1
6 Pasang klosed duduk 7.00 Unit
7 Pasang jet washer 7.00 Unit
8 Pasang wastafell 7.00 Unit
9 Pasang floordrain Stainless 13.00 Unit
10 Pasang floor clean out Stainless 3 3.00 Unit
NO. ITEM PEKERJAAN
VOLUME

1 2 3

11 Pasang floor clean out Stainless 4 6.00 Unit


12 Pasang Tandon Stainles kapasitas 1100lt 1.00 Unit

VI PEKERJAAN ELEKTRIKAL
A. PEKERJAAN ELEKTRIKAL LANTAI 1
1 Instalasi Ttk lampu 52.00 Ttk
2 Pemasangan Ttk stop kontak 6.00 Ttk
3 Pemasangan Ttk swith socket AC 3.00 Ttk
4 Instalasi saklar tunggal 22.00 Unit
5 Instalasi saklar ganda 5.00 Unit
6 Pasang lampu LED 13watt bulb 24.00 Unit
7 Pasang lampu LED 8watt bulb 28.00 Unit
8 Pasang box panel + MCB 1.00 Unit
9 Pasang Kabel Power 46.00 m1
B. PEKERJAAN ELEKTRIKAL LANTAI 2
1 Instalasi Ttk lampu 52.00 Ttk
2 Pemasangan Ttk stop kontak 6.00 Ttk
3 Pemasangan Ttk swith socket AC 3.00 Ttk
4 Instalasi saklar tunggal 22.00 Unit
5 Instalasi saklar ganda 5.00 Unit
6 Pasang lampu LED 13watt bulb 24.00 Unit
7 Pasang lampu LED 8watt bulb 28.00 Unit
8 Pasang box panel + MCB 1.00 Ttk

VII PEKERJAAN LAIN - LAIN


1 Pembersihan lokasi 1.00 Ls
CANA ANGGARAN BIAYA
MUTUAL CHECK - 80

ASI FASILITAS BANGUNAN PENDIDIKAN


YPE B2 (SMP NEGERI 62)

RAB MC - 80

BOBOT
HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
FISIK (%)

4 5 = (3 x 4) 6

61,516.70 2,460,668.00 0.07


PEKERJAAN PENDAHULUAN 2,460,668.00 0.07

120,375.00 47,095,680.64 1.41


120,480.00 3,496,850.25 0.10
40,125.00 7,608,551.61 0.23
110,890.00 17,112,406.91 0.51
120,480.00 2,594,898.09 0.08
89,349.90 26,165,365.94 0.78
69,240.80 89,320,632.00 2.68
PEKERJAAN TANAH 193,394,385.43 5.79

674,247.67 9,784,790.48 0.29


674,247.67 15,317,035.88 0.46

2,360,674.61 221,804,433.39 6.64

4,259,764.28 - 0.00
4,259,764.28 306,447,442.30 9.18
RAB MC - 80

BOBOT
HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
FISIK (%)

4 5 = (3 x 4) 6

2,140,076.97 4,096,107.32 0.12


2,193,258.78 63,836,990.14 1.91
1,365,135.03 8,784,643.91 0.26

3,181,744.68 30,866,900.54 0.92


4,329,337.01 935,136.79 0.03
3,857,633.89 42,476,406.74 1.27
3,764,794.40 18,387,255.85 0.55

4,463,302.42 115,849,477.50 3.47


4,476,146.26 41,493,875.84 1.24
5,192,563.01 16,298,250.60 0.49

6,584,136.11 13,534,350.03 0.41


3,452,918.99 1,050,377.96 0.03

4,231,665.58 85,310,378.17 2.56


4,476,146.26 32,228,253.08 0.97
5,192,563.01 13,746,999.01 0.41

4,063,269.40 28,371,778.56 0.85


4,599,021.40 993,388.62 0.03
3,874,706.22 45,159,701.04 1.35
3,698,377.88 43,562,268.41 1.31
3,916,553.27 19,533,809.46 0.59

6,584,136.11 13,534,350.03 0.41


3,452,918.99 164,436,047.44 4.93
RAB MC - 80

BOBOT
HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
FISIK (%)

4 5 = (3 x 4) 6

3,452,918.99 1,050,377.96 0.03

4,231,665.58 17,062,075.63 0.51


4,476,146.26 6,445,650.62 0.19

4,063,269.40 28,371,778.56 0.85


3,698,377.88 43,562,268.41 1.31
4,599,021.40 993,388.62 0.03
3,874,706.22 45,159,701.04 1.35
3,916,553.27 19,533,809.46 0.59
3,452,918.99 163,571,868.14 4.90

8,055,053.46 1,707,671.33 0.05


3,467,430.81 2,618,777.12 0.08
2,595,393.66 5,515,813.65 0.17
6,584,136.11 10,233,051.17 0.31
127,452.06 1,416,571.15 0.04

8,055,053.46 1,707,671.33 0.05


3,467,430.81 2,343,116.37 0.07
2,595,393.66 5,131,643.48 0.15
6,584,136.11 9,261,759.41 0.28
127,452.06 1,300,459.39 0.04

120,452.82 7,666,821.99 0.23


212,506.87 29,425,826.20 0.88
31,283.00 402,174.25 0.01
RAB MC - 80

BOBOT
HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
FISIK (%)

4 5 = (3 x 4) 6

31,283.00 4,130,513.47 0.12


15,000.00 5,400,000.00 0.16
118,405.00 12,311,751.90 0.37
158,221.00 16,451,819.58 0.49
214,920.00 14,898,254.40 0.45
53,873.80 3,976,963.92 0.12
120,452.82 11,288,838.29 0.34

120,452.82 11,515,289.59 0.34


212,506.87 29,425,826.20 0.88
31,283.00 402,174.25 0.01
31,283.00 4,130,513.47 0.12
15,000.00 5,400,000.00 0.16
118,405.00 12,311,751.90 0.37
158,221.00 16,451,819.58 0.49
214,920.00 14,898,254.40 0.45
53,873.80 3,976,963.92 0.12
PEKERJAAN STRUKTUR 1,929,293,459.23 54.85

201,114.00 32,979,579.14 0.99


73,045.80 43,697,604.57 1.31
68,365.80 60,773,777.91 1.82
36,584.10 32,521,435.70 0.97
43,260.00 13,012,608.00 0.39
22,336.80 8,222,622.82 0.25
22,336.80 1,937,047.30 0.06

3,428,817.49 6,857,634.99 0.21


RAB MC - 80

BOBOT
HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
FISIK (%)

4 5 = (3 x 4) 6

3,115,948.91 18,695,693.47 0.56


2,649,963.01 31,799,556.12 0.95
1,645,364.46 1,645,364.46 0.05
1,792,970.56 26,894,558.37 0.81
902,637.55 2,707,912.65 0.08
519,109.07 1,557,327.21 0.05
150,444.42 752,222.10 0.02

191,880.56 72,816,790.36 2.18


186,894.80 16,769,416.09 0.50
227,278.60 80,856,088.81 2.42
45,826.95 7,887,047.23 0.24
42,545.55 872,183.78 0.03

130,509.18 25,280,476.35 0.76


25,287.64 4,052,344.34 0.12

27,674.70 11,789,018.79 0.35


34,177.20 15,943,604.71 0.48
23,270.20 2,043,972.90 0.06
23,270.20 9,075,378.00 0.27

73,045.80 46,772,540.56 1.40


68,365.80 66,529,494.61 1.99
36,584.10 35,601,451.07 1.07
43,260.00 19,394,323.20 0.58
22,336.80 8,222,622.82 0.25
22,336.80 6,339,853.94 0.19
127,452.06 6,150,836.42 0.18
RAB MC - 80

BOBOT
HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
FISIK (%)

4 5 = (3 x 4) 6

3,428,817.49 6,857,634.99 0.21


3,115,948.91 18,695,693.47 0.56
2,649,963.01 31,799,556.12 0.95
1,645,364.46 1,645,364.46 0.05
1,792,970.56 26,894,558.37 0.81
902,637.55 2,707,912.65 0.08
519,109.07 1,557,327.21 0.05
150,444.42 752,222.10 0.02
RAB MC - 80

BOBOT
HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
FISIK (%)

4 5 = (3 x 4) 6

191,880.56 59,517,164.99 1.78


186,894.80 16,769,416.09 0.50
227,278.60 80,859,089.12 2.42
45,826.95 7,887,047.23 0.24
42,545.55 872,183.78 0.03

130,509.18 25,280,476.35 0.76


25,287.64 4,052,344.34 0.12

27,674.70 7,994,113.84 0.24


34,177.20 7,379,199.25 0.22
23,270.20 3,289,242.77 0.10
23,270.20 5,072,903.60 0.15
34,617.50 5,518,721.85 0.17

73,045.80 2,942,284.82 0.09


68,365.80 5,507,548.85 0.16
36,584.10 2,947,215.10 0.09
68,169.75 8,180.37 0.00
2,550,000.00 408,000.00 0.01
51,639.95 1,257,949.18 0.04

34,177.20 1,353,417.12 0.04


34,617.50 16,070,135.85 0.48
PEKERJAAN ARSITEKTURAL 1,066,349,292.61 31.95

18,066.31 859,956.42 0.03


RAB MC - 80

BOBOT
HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
FISIK (%)

4 5 = (3 x 4) 6

18,303.72 1,328,300.96 0.04


51,160.99 4,329,242.76 0.13
65,801.19 7,624,384.32 0.23
33,498.45 1,455,507.65 0.04
1,901,955.60 24,725,422.80 0.74
152,703.00 1,985,139.00 0.06
531,699.14 3,721,893.95 0.11
182,628.00 2,374,164.00 0.07
233,078.00 699,234.00 0.02
250,578.00 1,503,468.00 0.05
4,935,000.00 4,935,000.00 0.15
1,080,480.00 2,160,960.00 0.06

18,066.31 859,956.42 0.03


18,303.72 1,328,300.96 0.04
51,160.99 4,329,242.76 0.13
65,801.19 7,624,384.32 0.23
33,498.45 1,457,517.56 0.04
1,901,955.60 13,313,689.20 0.40
152,703.00 1,068,921.00 0.03
531,699.14 3,721,893.95 0.11
182,628.00 2,374,164.00 0.07
233,078.00 699,234.00 0.02
RAB MC - 80

BOBOT
HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
FISIK (%)

4 5 = (3 x 4) 6

250,578.00 1,503,468.00 0.05


980,880.00 980,880.00 0.03
PEKERJAAN MEKANIKAL 96,964,326.03 2.90

188,196.00 9,786,192.00 0.29


106,683.30 640,099.80 0.02
125,013.30 375,039.90 0.01
46,326.10 1,019,174.20 0.03
51,914.90 259,574.50 0.01
212,500.00 5,100,000.00 0.15
150,000.00 4,200,000.00 0.13
903,040.50 903,040.50 0.03
- 0.00

188,196.00 9,786,192.00 0.29


106,683.30 640,099.80 0.02
125,013.30 375,039.90 0.01
46,326.10 1,019,174.20 0.03
51,914.90 259,574.50 0.01
212,500.00 5,100,000.00 0.15
150,000.00 4,200,000.00 0.13
903,040.50 903,040.50 0.03
PEKERJAAN ELEKTRIKAL 44,566,241.80 1.34

5,000,000.00 5,000,000.00 0.15


PEKERJAAN LAIN - LAIN 5,000,000.00 0.15
JUMLAH TOTAL 3,338,028,373.11 97.05

Surabaya, 22 Juli 2019


NAMA KEGIATAN : PEMBANGUNAN/REHABILITASI FASILITAS BANGUNAN PENDIDIK
PEKERJAAN : PEMBANGUNAN GEDUNG TYPE B2 (SMP NEGERI 62)
LOKASI : Kota Surabaya
TAHUN : 2019

NO. ITEM PEKERJAAN


VOLUME

1 2 3

I PEKERJAAN PENDAHULUAN
1 Pekerjaan Uitzet + Bowplank 40.00 Ttk

II PEKERJAAN TANAH
1 Galian Tanah Pondasi 381.61 M3
2 Urugan Pasir Bawah Pondasi, tbl=5cm 29.02 M3
3 Urugan Tanah Kembali 59.40 M3
4 Urugan Sirtu 87.63 M3
5 Urugan Pasir Bawah Lantai, tbl=5cm 25.92 M3
6 Pengangkutan Bekas Galian Tanah Keluar Lokasi Proyek 175.58 M3
7 Pembuatan Lubang Strous Pile Ø 30 cm kedalaman 5 m 1290.00 M1

III PEKERJAAN STRUKTUR


A. PEKERJAAN PONDASI
1 Rabat Lantai Kerja K-175, tbl=5cm 14.51 M3
2 Rabat Bawah Lantai K-175, tbl=5cm 23.95 M3
0 Beton Strous fc = 20.75 MPa (K-250) 0.00 0
1 Strous 30 cm 93.96 M3
0 Beton Pile Caps fc = 20.75 MPa (K-250)
1 PC 1 1060X165X40 cm 71.94 M3
2 PC 1 1090X165X40 cm M3
3 PC 2 290X165X40 cm 1.91 M3
4 PC 3 735X165X40 cm 29.11 M3
NO. ITEM PEKERJAAN
VOLUME

1 2 3

5 PC 4 165X162X40 cm 6.42 M3
0 Beton Sloof fc = 20.75 MPa (K-250)
1 S1 30X50 cm 9.79 M3
2 S2 20X40 cm 0.21 M3
3 S3 20X35 cm 11.01 M3
4 S4 20X30 cm 4.90 M3
B. PEKERJAAN STRUKTUR LANTAI 1
0 Beton Kolom fc = 20.75 MPa (K-250)
1 K1 A 35X45 cm 27.58 M3
2 K2 30X30 cm 9.27 M3
3 Kp 12X12 cm K-225 3.60 M3
0 Beton Balok fc = 18.675 MPa (K-225)
1 Balok Latei 12X20 cm 1.35 M3
2 Beton Plat Wastafel, K-250, tbl = 8 cm
C. PEKERJAAN STRUKTUR LANTAI 2
0 Beton Kolom fc = 20.75 MPa (K-250)
1 K1 B 35X45 cm 21.42 M3
2 K2 30X30 cm 7.20 M3
3 Kp 12X12 cm 2.78 M3
0 Beton Balok fc = 20.75 MPa (K-250)
1 B1 A 30X50 cm 11.83 M3
2 B2 20X40 cm 0.22 M3
3 B3 20X35 cm 11.67 M3
4 B1 B 30X50 cm 0.00 0.00
5 B4 20X30 cm
0 Beton Balok fc = 18.675 MPa (K-225)
1 Balok Latei 12X20 cm 1.35 M3
2 Beton Plat Lantai. 2, K - 250, tbl=12cm 52.76 M3
3 Beton Plat Wastafel, K-250, tbl = 8 cm
D. PEKERJAAN STRUKTUR LANTAI 3
0 Beton Kolom fc = 20.75 MPa (K-250)
1 K1 B 35X45 cm 4.29 M3
NO. ITEM PEKERJAAN
VOLUME

1 2 3

2 K2 30X30 cm 1.44 M3
0 Beton Balok fc = 20.75 MPa (K-250)
1 B1 A 30X50 cm 7.03 M3
2 B1 B 30X50 cm 11.83 M3
3 B2 20X40 cm 0.22 M3
4 B3 20/35 cm 11.67 M3
5 B4 20X30 cm 4.87 M3
6 Beton Plat Lantai. 3, K - 250, tbl=12cm 52.76 M3
NO. ITEM PEKERJAAN
VOLUME

1 2 3

E. PEKERJAAN STRUKTUR TANGGA BETON


0 PEKERJAAN STRUKTUR TANGGA LT. 1 Ke LT. 2
1 Balok Bordes 20X40, fc=26.4 Mpa (K-300) 0.22 M3
2 Beton Plat dan Bordes t=15cm, fc=26.4 Mpa (K-300) 2.18 M3
3 Beton Anak Tangga, fc=26.4 Mpa (K-300) 1.08 M3
4 Beton Ralling fc = 18.675 MPa (K-225) 0.12 M3
5 Pas. Pipa Stainless 2.5 8.30 M1
0 PEKERJAAN STRUKTUR TANGGA LT. 2 Ke LT. 3
1 Balok Bordes 20X40, fc=26.4 Mpa (K-300) 0.22 M3
2 Beton Plat dan Bordes t=15cm, fc=26.4 Mpa (K-300) 2.18 M3
3 Beton Anak Tangga, fc=26.4 Mpa (K-300) 1.08 M3
4 Beton Ralling fc = 18.675 MPa (K-225) 0.12 M3
5 Pas. Pipa Stainless 2.5 8.30 M1
F. PEKERJAAN STRUKTUR ATAP CANOPY
0 PEKERJAAN STRUKTUR ATAP CANOPY LANTAI 1
1 Pas. Pipa Besi 2,5 Fiber Semen 55.44 M1
2 Pas. Pipa Besi 3 91.82 M1
3 Pas. Besi Pengait 10 27.43 Kg
4 Pas. Plat Besi, t=1cm 9.24 Kg
5 Pas. Dynabolt 10 88.00 Bh
6 Pas. Usuk Reng Galvalum 183.06 M2
7 Pas. Genteng Karang Pilang 183.06 M2
8 Pas. Talang Galvalume lebar=60cm 22.50 M1
9 Pas. Kalsiplank 3/30 72.81 M1
10 Pipa Besi Black Steel 2.5" Finishing Cat 0.00 0.00
0 PEKERJAAN STRUKTUR ATAP CANOPY LANTAI 2
1 Pas. Pipa Besi 2,5 55.44 M1
2 Pas. Pipa Besi 3 91.82 M1
3 Pas. Besi Pengait 10 27.43 Kg
4 Pas. Plat Besi, t=1cm 9.24 Kg
5 Pas. Dynabolt 10 88.00 Bh
6 Pas. Usuk Reng Galvalum 183.06 M2
NO. ITEM PEKERJAAN
VOLUME

1 2 3

7 Pas. Genteng Karang Pilang 183.06 M2


8 Pas. Talang Galvalume lebar=60cm 22.50 M1
9 Pas. Kalsiplank 3/30 72.81 M1

IV PEKERJAAN ARSITEKTURAL
A. PEKERJAAN ARSITEKTURAL LANTAI 1
0 PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Rollag Batu Bata Untuk Pijakan 1pc 4p 27.06 M2
2 Pas. Dinding Bata Ringan Dengan Semen Mortar 453.74 M2
3 Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen Mortar 778.20 M2
4 Acian Dinding Dengan Semen Mortar 802.55 M2
5 Acian Beton (Dihitung 15%) 448.32 M2
6 Benangan Dinding 368.12 M1
7 Benangan Beton (Dihitung 15%) 253.90 M1
0 PEKERJAAN KUSEN
1 Pasang Kusen P1 2.00 Unit
2 Pasang Kusen P2 6.00 Unit
3 Pasang Kusen P3 12.00 Unit
4 Pasang kusen P4 1.00 Unit
5 Pasang Kusen J1 15.00 Unit
6 Pasang Kusen J2 3.00 Unit
7 Pasang Kusen J3 3.00 Unit
8 Pasang Kusen BV 5.00 Unit
0 PEKERJAAN PENUTUP LANTAI
1 Pas. Keramik Lantai 40X40cm Polish Warna 358.47 M2
2 Pas. Keramik Lantai KM 30X30cm Unpolish Warna Untuk Toilet 88.17 M2
3 Pas. Keramik Dinding Toilet 30X60cm Polish Warna / Motif 124.21 M2
4 Pas. Keramik Plint 10x40cm 189.70 M1
5 Pas. Step Nosing Tangga 10x40 cm 28.32 M1
0 PEKERJAAN PLAFOND
1 Pas. Plafond Kalsiboard 4,5mm + Rangka Hollow 40.40 dan 20.40 86.48 M2
2 Pas. List Gypsum t=10 cm 163.80 M1
NO. ITEM PEKERJAAN
VOLUME

1 2 3

0 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam 288.86 M2
2 Pengecatan Dinding Luar 176.34 M2
3 Pengecatan Plafond Kalsiboard 86.48 M2
4 Pengecatan Plafond Expose 390.00 M2
NO. ITEM PEKERJAAN
VOLUME

1 2 3

B. PEKERJAAN ARSITEKTURAL LANTAI 2


0 PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding Bata Ringan Dengan Semen Mortar 453.74 M2
2 Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen Mortar 864.36 M2
3 Acian Dinding Dengan Semen Mortar 882.31 M2
4 Acian Beton (Dihitung 15%) 448.32 M2
5 Benangan Dinding 368.12 M1
6 Benangan Beton (Dihitung 15%) 283.83 M1
7 Pas. Pipa Stainless 2.5 48.26 M1
0 PEKERJAAN KUSEN
1 Pasang Kusen P1 2.00 Unit
2 Pasang Kusen P2 6.00 Unit
3 Pasang Kusen P3 12.00 Unit
4 Pasang Kusen P4 1.00 Unit
5 Pasang Kusen J1 15.00 Unit
6 Pasang Kusen J2 3.00 Unit
7 Pasang Kusen J3 3.00 Unit
8 Pasang Kusen BV 5.00 Unit
0 PEKERJAAN PENUTUP LANTAI
1 Pas. Keramik Lantai 40X40cm Polish Warna / Motif 166.69 M2
2 Pas. Keramik Lantai KM 30X30cm Unpolish Warna Untuk Toilet 0.00 M2
3 Pas. Keramik Dinding Toilet 30X60cm Polish Warna / Motif 0.00 M2
4 Pas. Keramik Plint 10x40cm 0.00 M1
5 Pas. Step Nosing Tangga 10x40 cm 0.00 M1
0 PEKERJAAN PLAFOND
1 Pas. Plafond Kalsiboard 4,5mm + Rangka Hollow 40.40 dan 20.40 86.48 M2
2 Pas. List Gypsum t=10 cm 163.80 M1
0 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam 288.86 M2
2 Pengecatan Dinding Luar 215.91 M2
3 Pengecatan Plafond Kalsiboard 141.35 M2
4 Pengecatan Plafond Expose 218.00 M2
NO. ITEM PEKERJAAN
VOLUME

1 2 3

5 Waterproofing toilet 159.42 M2


NO. ITEM PEKERJAAN
VOLUME

1 2 3

C. PEKERJAAN ARSITEKTURAL LANTAI 3


0 PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding Bata Ringan Dengan Semen Mortar 40.28 M2
2 Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen Mortar 80.56 M2
3 Acian Dinding Dengan Semen Mortar 80.56 M2
4 Kp 12X12 cm 0.12 M3
5 Rangka kayu 5/7 0.16 M3
6 Penutup atap asbes gelombang 24.36 M2
0 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Luar 39.60 M2
2 Waterproofing plat lantai 3 464.22 M2

V PEKERJAAN MEKANIKAL
A. PEKERJAAN MEKANIKAL LANTAI 1
1 Pasang pipa PVC air bersih 3/4 AW 47.60 M1
2 Pasang pipa PVC air bersih 1 AW 72.57 M1
3 Pasang pipa PVC air bekas 3 AW 84.62 M1
4 Pasang pipa PVC air kotor 4 AW 115.87 M1
5 Pasang pipa galvanis 4 43.45 M1
6 Pasang klosed duduk 7.00 Unit
7 Pasang jet washer 7.00 Unit
8 Pasang wastafell 7.00 Unit
9 Pasang floordrain Stainless ( Avour ) 11.00 Unit
10 Pasang floor clean out Stainless 3 2.00 Unit
11 Pasang floor clean out Stainless 4 2.00 Unit
12 Bio filter 3 M3 1.00 Unit
13 Pasang pompa transfer 1.00 Unit
B. PEKERJAAN MEKANIKAL LANTAI 2
1 Pasang pipa PVC air bersih 3/4 AW 47.60 M1
2 Pasang pipa PVC air bersih 1 AW 72.57 M1
3 Pasang pipa PVC air kotor 3 AW 84.62 M1
4 Pasang pipa PVC air kotor 4 AW 115.87 M1
NO. ITEM PEKERJAAN
VOLUME

1 2 3

5 Pasang pipa galvanis 4 43.51 M1


6 Pasang klosed duduk 7.00 Unit
7 Pasang jet washer 7.00 Unit
8 Pasang wastafell 7.00 Unit
9 Pasang floordrain Stainless 11.00 Unit
10 Pasang floor clean out Stainless 3 2.00 Unit
11 Pasang floor clean out Stainless 4 2.00 Unit
12 Pasang Tandon Stainles kapasitas 1100lt 2.00 Unit

VI PEKERJAAN ELEKTRIKAL
A. PEKERJAAN ELEKTRIKAL LANTAI 1
1 Instalasi Ttk lampu 57.00 Ttk
2 Pemasangan Ttk stop kontak 6.00 Ttk
3 Pemasangan Ttk swith socket AC 2.00 Ttk
4 Instalasi saklar tunggal 20.00 Unit
5 Instalasi saklar ganda 5.00 Unit
6 Pasang lampu LED 13watt bulb 20.00 Unit
7 Pasang lampu LED 8watt bulb 37.00 Unit
8 Pasang box panel + MCB 1.00 Unit
9 Pasang Kabel Power 46.00 m1
B. PEKERJAAN ELEKTRIKAL LANTAI 2
1 Instalasi Ttk lampu 57.00 Ttk
2 Pemasangan Ttk stop kontak 6.00 Ttk
3 Pemasangan Ttk swith socket AC 2.00 Ttk
4 Instalasi saklar tunggal 20.00 Unit
5 Instalasi saklar ganda 5.00 Unit
6 Pasang lampu LED 13watt bulb 20.00 Unit
7 Pasang lampu LED 8watt bulb 37.00 Unit
8 Pasang box panel + MCB 1.00 Ttk
NO. ITEM PEKERJAAN
VOLUME

1 2 3

VII PEKERJAAN LAIN - LAIN


1 Pembersihan lokasi 1.00 Ls

Menyetujui :
PMU Pelaksanaan

ARIFIEN NURSANDAH. ST. MT

Men
PEJABAT PEM
(

T. IMAN KRISTIAN MA
Penata
NIP. 19820 7
PERHITUNGAN MUTUAL CHEC
RINCIAN PERHITUNGAN MC-80 TERH

LITAS BANGUNAN PENDIDIKAN


(SMP NEGERI 62)

MC-0

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

4 5 = (3 x 4) 6

61,516.70 2,460,668.00 40.00 Ttk


PEKERJAAN PENDAHULUAN 2,460,668.00

120,375.00 45,935,890.14 391.24 M3


120,480.00 3,496,181.58 29.02 M3
40,125.00 2,383,425.00 189.62 M3
110,890.00 9,717,290.70 154.32 M3
120,480.00 3,122,841.60 21.54 M3
89,349.90 15,688,055.44 292.84 M3
69,240.80 89,320,632.00 1290.00 M1
PEKERJAAN TANAH 169,664,316.47

674,247.67 9,782,919.44 14.51 M3


674,247.67 16,146,390.88 22.72 M3

2,360,674.61 221,804,433.39 93.96 M3

3,741,801.92 269,185,229.95 M3
3,741,801.92 - 71.94 M3
2,140,076.97 4,096,107.32 1.91 M3
2,193,258.78 63,836,990.14 29.11 M3
MC-0

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

4 5 = (3 x 4) 6

1,365,135.03 8,764,166.89 6.44 M3

3,181,744.68 31,153,257.56 9.70 M3


4,329,337.01 917,819.45 0.22 M3
3,857,633.89 42,489,908.45 11.01 M3
3,764,794.40 18,442,643.50 4.88 M3

4,463,302.42 123,097,880.63 25.96 M3


4,476,146.26 41,493,875.84 9.27 M3
5,192,563.01 18,693,226.83 3.14 M3

6,584,136.11 8,888,583.75 2.06 M3


0.30 M3

4,231,665.58 90,642,276.80 20.16 M3


4,476,146.26 32,228,253.08 7.20 M3
5,192,563.01 14,435,325.16 2.65 M3

4,063,269.40 48,068,476.96 6.98 M3


4,599,021.40 1,011,784.71 0.22 M3
3,874,706.22 45,217,821.63 11.66 M3
- - 11.78 M3
- 4.99 M3

6,584,136.11 8,888,583.75 2.06 M3


3,452,918.99 182,176,005.73 47.62 M3
0.30 M3

4,231,665.58 18,153,845.35 4.03 M3


MC-0

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

4 5 = (3 x 4) 6

4,476,146.26 6,445,650.62 1.44 M3

4,063,269.40 28,564,783.86 6.98 M3


3,698,377.88 43,751,810.28 11.78 M3
4,599,021.40 1,011,784.71 0.22 M3
3,874,706.22 45,217,821.63 11.66 M3
3,916,553.27 19,073,614.45 4.99 M3
3,452,918.99 182,176,005.73 47.37 M3
MC-0

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

4 5 = (3 x 4) 6

8,055,053.46 1,772,111.76 0.21 M3


3,467,430.81 7,558,999.16 0.76 M3
2,595,393.66 2,803,025.15 2.13 M3
6,584,136.11 790,096.33 1.55 M3
127,452.06 1,057,852.10 11.11 M1

8,055,053.46 1,772,111.76 0.21 M3


3,467,430.81 7,558,999.16 0.68 M3
2,595,393.66 2,803,025.15 1.98 M3
6,584,136.11 790,096.33 1.41 M3
127,452.06 1,057,852.10 10.20 M1

120,452.82 6,677,904.34 63.65 M1


212,506.87 19,512,380.74 138.47 M1
31,283.00 858,092.69 12.86 Kg
31,283.00 289,054.92 132.04 Kg
15,000.00 1,320,000.00 360.00 Bh
118,405.00 21,675,219.30 103.98 M2
158,221.00 28,963,936.26 103.98 M2
214,920.00 4,835,700.00 69.32 M1
53,873.80 3,922,551.38 73.82 M1
93.72 M1

120,452.82 6,677,904.34 95.60 M1


212,506.87 19,512,380.74 138.47 M1
31,283.00 858,092.69 12.86 Kg
31,283.00 289,054.92 132.04 Kg
15,000.00 1,320,000.00 360.00 Bh
118,405.00 21,675,219.30 103.98 M2
MC-0

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

4 5 = (3 x 4) 6

158,221.00 28,963,936.26 103.98 M2


214,920.00 4,835,700.00 69.32 M1
53,873.80 3,922,551.38 73.82 M1
PEKERJAAN STRUKTUR 1,849,931,126.73

201,114.00 5,442,144.84 163.98 M2


73,045.80 33,143,801.29 598.22 M2
68,365.80 53,202,265.56 888.95 M2
36,584.10 29,360,569.46 888.95 M2
43,260.00 19,394,323.20 300.80 M2
22,336.80 8,222,622.82 368.12 M1
22,336.80 5,671,313.52 86.72 M1

3,428,817.49 6,857,634.99 2.00 Unit


3,115,948.91 18,695,693.47 6.00 Unit
2,649,963.01 31,799,556.12 12.00 Unit
1,645,364.46 1,645,364.46 1.00 Unit
1,792,970.56 26,894,558.37 15.00 Unit
902,637.55 2,707,912.65 3.00 Unit
519,109.07 1,557,327.21 3.00 Unit
150,444.42 752,222.10 5.00 Unit

191,880.56 68,783,424.34 379.49 M2


186,894.80 16,478,514.52 89.73 M2
227,278.60 28,230,274.91 355.76 M2
45,826.95 8,693,372.42 172.11 M1
42,545.55 1,204,889.98 20.50 M1

130,509.18 11,286,433.89 193.71 M2


25,287.64 4,142,115.43 160.25 M1
MC-0

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

4 5 = (3 x 4) 6

27,674.70 7,994,113.84 425.99 M2


34,177.20 6,026,807.45 466.50 M2
23,270.20 2,012,406.90 87.84 M2
23,270.20 9,075,378.00 390.00 M2
MC-0

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

4 5 = (3 x 4) 6

73,045.80 33,143,801.29 640.32 M2


68,365.80 59,092,662.89 973.14 M2
36,584.10 32,278,517.27 973.14 M2
43,260.00 19,394,323.20 448.32 M2
22,336.80 8,222,622.82 368.12 M1
22,336.80 6,339,853.94 283.83 M1
127,452.06 6,150,836.42 48.26 M1

3,428,817.49 6,857,634.99 2.00 Unit


3,115,948.91 18,695,693.47 6.00 Unit
2,649,963.01 31,799,556.12 12.00 Unit
1,645,364.46 1,645,364.46 1.00 Unit
1,792,970.56 26,894,558.37 15.00 Unit
902,637.55 2,707,912.65 3.00 Unit
519,109.07 1,557,327.21 3.00 Unit
150,444.42 752,222.10 5.00 Unit

191,880.56 31,984,556.58 310.18 M2


186,894.80 - 89.73 M2
227,278.60 - 355.77 M2
45,826.95 - 172.11 M1
42,545.55 - 20.50 M1

130,509.18 11,286,433.89 193.71 M2


25,287.64 4,142,115.43 160.25 M1

27,674.70 7,994,113.84 288.86 M2


34,177.20 7,379,199.25 215.91 M2
23,270.20 3,289,242.77 141.35 M2
23,270.20 5,072,903.60 218.00 M2
MC-0

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

4 5 = (3 x 4) 6

34,617.50 5,518,721.85 159.42 M2


MC-0

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

4 5 = (3 x 4) 6

73,045.80 2,942,284.82 40.28 M2


68,365.80 5,507,548.85 80.56 M2
36,584.10 2,947,215.10 80.56 M2
68,169.75 8,180.37 0.12 M3
2,550,000.00 408,000.00 0.16 M3
51,639.95 1,257,949.18 24.36 M2

34,177.20 1,353,417.12 39.60 M2


34,617.50 16,070,135.85 464.22 M2
PEKERJAAN ARSITEKTURAL 771,969,947.42

18,066.31 859,956.42 47.60 M1


18,303.72 1,328,300.96 72.57 M1
51,160.99 4,329,242.76 84.62 M1
65,801.19 7,624,384.32 115.87 M1
33,498.45 1,455,507.65 43.45 M1
1,901,955.60 13,313,689.20 13.00 Unit
152,703.00 1,068,921.00 13.00 Unit
531,699.14 3,721,893.95 7.00 Unit
182,628.00 2,008,908.00 13.00 Unit
233,078.00 466,156.00 3.00 Unit
250,578.00 501,156.00 6.00 Unit
4,935,000.00 4,935,000.00 1.00 Unit
1,080,480.00 1,080,480.00 2.00 Unit

18,066.31 859,956.42 47.60 M1


18,303.72 1,328,300.96 72.57 M1
51,160.99 4,329,242.76 84.62 M1
65,801.19 7,624,384.32 115.87 M1
MC-0

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

4 5 = (3 x 4) 6

33,498.45 1,457,517.56 43.51 M1


1,901,955.60 13,313,689.20 7.00 Unit
152,703.00 1,068,921.00 7.00 Unit
531,699.14 3,721,893.95 7.00 Unit
182,628.00 2,008,908.00 13.00 Unit
233,078.00 466,156.00 3.00 Unit
250,578.00 501,156.00 6.00 Unit
980,880.00 1,961,760.00 1.00 Unit
PEKERJAAN MEKANIKAL 81,335,482.43

188,196.00 10,727,172.00 52.00 Ttk


106,683.30 640,099.80 6.00 Ttk
125,013.30 250,026.60 3.00 Ttk
46,326.10 926,522.00 22.00 Unit
51,914.90 259,574.50 5.00 Unit
212,500.00 4,250,000.00 24.00 Unit
150,000.00 5,550,000.00 28.00 Unit
903,040.50 903,040.50 1.00 Unit
- 46.00 m1

188,196.00 10,727,172.00 52.00 Ttk


106,683.30 640,099.80 6.00 Ttk
125,013.30 250,026.60 3.00 Ttk
46,326.10 926,522.00 22.00 Unit
51,914.90 259,574.50 5.00 Unit
212,500.00 4,250,000.00 24.00 Unit
150,000.00 5,550,000.00 28.00 Unit
903,040.50 903,040.50 1.00 Ttk
MC-0

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

4 5 = (3 x 4) 6

PEKERJAAN ELEKTRIKAL 47,012,870.80

5,000,000.00 5,000,000.00 1.00 Ls


PEKERJAAN LAIN - LAIN 5,000,000.00
JUMLAH TOTAL 2,927,374,411.84

Menyetujui :
Konsultan Pengawas
CV. MAHAKARYA UTAMA

Ir. WAHYUDI
Direktur

Mengetahui :
PEJABAT PEMBUAT KOMITMEN
(PPK)

T. IMAN KRISTIAN MAHARHANDONO, ST, M.MT


Penata Tk. I / III d
NIP. 19820 707200604 1 023
GAN MUTUAL CHECK - 80
UNGAN MC-80 TERHADAP MC-0

MC-80 PEKERJAAN TAM

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

7 8 = (6 x 7) 9

61,516.70 2,460,668.00 - Ttk


PEKERJAAN PENDAHULUAN 2,460,668.00

120,375.00 47,095,680.64 9.63 M3


120,480.00 3,496,850.25 0.01 M3
40,125.00 7,608,551.61 130.22 M3
110,890.00 17,112,406.91 66.69 M3
120,480.00 2,594,898.09 M3
89,349.90 26,165,365.94 117.26 M3
69,240.80 89,320,632.00 M1
PEKERJAAN TANAH 193,394,385.43

674,247.67 9,784,790.48 M3
674,247.67 15,317,035.88 M3

2,360,674.61 221,804,433.39 M3

4,259,764.28 - M3
4,259,764.28 306,447,442.30 71.94 M3
2,140,076.97 4,096,107.32 - M3
2,193,258.78 63,836,990.14 - M3
MC-80 PEKERJAAN TAM

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

7 8 = (6 x 7) 9

1,365,135.03 8,784,643.91 0.02 M3

3,181,744.68 30,866,900.54 M3
4,329,337.01 935,136.79 0.00 M3
3,857,633.89 42,476,406.74 M3
3,764,794.40 18,387,255.85 M3

4,463,302.42 115,849,477.50 M3
4,476,146.26 41,493,875.84 M3
5,192,563.01 16,298,250.60 M3

6,584,136.11 13,534,350.03 0.71 M3


3,452,918.99 1,050,377.96 0.30 M3

4,231,665.58 85,310,378.17 M3
4,476,146.26 32,228,253.08 M3
5,192,563.01 13,746,999.01 M3

4,063,269.40 28,371,778.56 M3
4,599,021.40 993,388.62 M3
3,874,706.22 45,159,701.04 M3
3,698,377.88 43,562,268.41 11.78 M3
3,916,553.27 19,533,809.46 4.99 M3

6,584,136.11 13,534,350.03 0.71 M3


3,452,918.99 164,436,047.44 M3
3,452,918.99 1,050,377.96 0.30 M3

4,231,665.58 17,062,075.63 M3
MC-80 PEKERJAAN TAM

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

7 8 = (6 x 7) 9

4,476,146.26 6,445,650.62 M3

4,063,269.40 28,371,778.56 M3
3,698,377.88 43,562,268.41 M3
4,599,021.40 993,388.62 M3
3,874,706.22 45,159,701.04 M3
3,916,553.27 19,533,809.46 0.12 M3
3,452,918.99 163,571,868.14 M3
MC-80 PEKERJAAN TAM

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

7 8 = (6 x 7) 9

8,055,053.46 1,707,671.33 M3
3,467,430.81 2,618,777.12 M3
2,595,393.66 5,515,813.65 1.05 M3
6,584,136.11 10,233,051.17 1.43 M3
127,452.06 1,416,571.15 2.81 M1

8,055,053.46 1,707,671.33 M3
3,467,430.81 2,343,116.37 M3
2,595,393.66 5,131,643.48 0.90 M3
6,584,136.11 9,261,759.41 1.29 M3
127,452.06 1,300,459.39 1.90 M1

120,452.82 7,666,821.99 8.21 M1


212,506.87 29,425,826.20 46.65 M1
31,283.00 402,174.25 Kg
31,283.00 4,130,513.47 122.80 Kg
15,000.00 5,400,000.00 272.00 Bh
118,405.00 12,311,751.90 M2
158,221.00 16,451,819.58 M2
214,920.00 14,898,254.40 46.82 M1
53,873.80 3,976,963.92 1.01 M1
120,452.82 11,288,838.29 93.72 M1

120,452.82 11,515,289.59 40.16 M1


212,506.87 29,425,826.20 46.65 M1
31,283.00 402,174.25 Kg
31,283.00 4,130,513.47 122.80 Kg
15,000.00 5,400,000.00 272.00 Bh
118,405.00 12,311,751.90 M2
MC-80 PEKERJAAN TAM

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

7 8 = (6 x 7) 9

158,221.00 16,451,819.58 M2
214,920.00 14,898,254.40 46.82 M1
53,873.80 3,976,963.92 1.01 M1
PEKERJAAN STRUKTUR 1,929,293,459.23

201,114.00 32,979,579.14 136.92 M2


73,045.80 43,697,604.57 144.48 M2
68,365.80 60,773,777.91 110.75 M2
36,584.10 32,521,435.70 86.40 M2
43,260.00 13,012,608.00 M2
22,336.80 8,222,622.82 M1
22,336.80 1,937,047.30 M1

3,428,817.49 6,857,634.99 Unit


3,115,948.91 18,695,693.47 Unit
2,649,963.01 31,799,556.12 Unit
1,645,364.46 1,645,364.46 Unit
1,792,970.56 26,894,558.37 Unit
902,637.55 2,707,912.65 Unit
519,109.07 1,557,327.21 Unit
150,444.42 752,222.10 Unit

191,880.56 72,816,790.36 21.02 M2


186,894.80 16,769,416.09 1.56 M2
227,278.60 80,856,088.81 231.55 M2
45,826.95 7,887,047.23 M1
42,545.55 872,183.78 M1

130,509.18 25,280,476.35 107.23 M2


25,287.64 4,052,344.34 M1
MC-80 PEKERJAAN TAM

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

7 8 = (6 x 7) 9

27,674.70 11,789,018.79 137.13 M2


34,177.20 15,943,604.71 290.16 M2
23,270.20 2,043,972.90 1.36 M2
23,270.20 9,075,378.00 M2
MC-80 PEKERJAAN TAM

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

7 8 = (6 x 7) 9

73,045.80 46,772,540.56 186.58 M2


68,365.80 66,529,494.61 108.78 M2
36,584.10 35,601,451.07 90.83 M2
43,260.00 19,394,323.20 M2
22,336.80 8,222,622.82 M1
22,336.80 6,339,853.94 M1
127,452.06 6,150,836.42 M1

3,428,817.49 6,857,634.99 Unit


3,115,948.91 18,695,693.47 Unit
2,649,963.01 31,799,556.12 Unit
1,645,364.46 1,645,364.46 Unit
1,792,970.56 26,894,558.37 Unit
902,637.55 2,707,912.65 Unit
519,109.07 1,557,327.21 Unit
150,444.42 752,222.10 Unit

191,880.56 59,517,164.99 143.49 M2


186,894.80 16,769,416.09 89.73 M2
227,278.60 80,859,089.12 355.77 M2
45,826.95 7,887,047.23 172.11 M1
42,545.55 872,183.78 20.50 M1

130,509.18 25,280,476.35 107.23 M2


25,287.64 4,052,344.34 M1

27,674.70 7,994,113.84 M2
34,177.20 7,379,199.25 M2
23,270.20 3,289,242.77 M2
23,270.20 5,072,903.60 M2
MC-80 PEKERJAAN TAM

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

7 8 = (6 x 7) 9

34,617.50 5,518,721.85 M2
MC-80 PEKERJAAN TAM

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

7 8 = (6 x 7) 9

73,045.80 2,942,284.82 M2
68,365.80 5,507,548.85 M2
36,584.10 2,947,215.10 M2
68,169.75 8,180.37 M3
2,550,000.00 408,000.00 M3
51,639.95 1,257,949.18 M2

34,177.20 1,353,417.12 M2
34,617.50 16,070,135.85 M2
PEKERJAAN ARSITEKTURAL 1,066,349,292.61

18,066.31 859,956.42 M1
18,303.72 1,328,300.96 M1
51,160.99 4,329,242.76 M1
65,801.19 7,624,384.32 M1
33,498.45 1,455,507.65 M1
1,901,955.60 24,725,422.80 6.00 Unit
152,703.00 1,985,139.00 6.00 Unit
531,699.14 3,721,893.95 Unit
182,628.00 2,374,164.00 2.00 Unit
233,078.00 699,234.00 1.00 Unit
250,578.00 1,503,468.00 4.00 Unit
4,935,000.00 4,935,000.00 Unit
1,080,480.00 2,160,960.00 1.00 Unit

18,066.31 859,956.42 M1
18,303.72 1,328,300.96 M1
51,160.99 4,329,242.76 M1
65,801.19 7,624,384.32 M1
MC-80 PEKERJAAN TAM

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

7 8 = (6 x 7) 9

33,498.45 1,457,517.56 M1
1,901,955.60 13,313,689.20 Unit
152,703.00 1,068,921.00 Unit
531,699.14 3,721,893.95 Unit
182,628.00 2,374,164.00 2.00 Unit
233,078.00 699,234.00 1.00 Unit
250,578.00 1,503,468.00 4.00 Unit
980,880.00 980,880.00 Unit
PEKERJAAN MEKANIKAL 96,964,326.03

188,196.00 9,786,192.00 Ttk


106,683.30 640,099.80 Ttk
125,013.30 375,039.90 1.00 Ttk
46,326.10 1,019,174.20 2.00 Unit
51,914.90 259,574.50 Unit
212,500.00 5,100,000.00 4.00 Unit
150,000.00 4,200,000.00 Unit
903,040.50 903,040.50 Unit
- m1

188,196.00 9,786,192.00 Ttk


106,683.30 640,099.80 Ttk
125,013.30 375,039.90 1.00 Ttk
46,326.10 1,019,174.20 2.00 Unit
51,914.90 259,574.50 Unit
212,500.00 5,100,000.00 4.00 Unit
150,000.00 4,200,000.00 Unit
903,040.50 903,040.50 Ttk
MC-80 PEKERJAAN TAM

HARGA SATUAN (Rp) JUMLAH HARGA (Rp) VOLUME

7 8 = (6 x 7) 9

PEKERJAAN ELEKTRIKAL 44,566,241.80

5,000,000.00 5,000,000.00 - Ls
PEKERJAAN LAIN - LAIN 5,000,000.00
JUMLAH TOTAL 3,338,028,373.11

nyetujui :
an Pengawas
KARYA UTAMA

WAHYUDI
irektur

Mengetahui :
PEJABAT PELAKSANA TEKNIS PEMBANGUNAN
(PPTK)

HARI ROJIN SUNOTO, ST


Penata / III C
NIP. 19800109 200902 1 005
PEKERJAAN TAMBAH PEKERJAAN KURANG

JUMLAH HARGA (Rp) VOLUME JUMLAH HARGA (Rp)

10 = (4 x 9) 11 12 = (4 x 11)

- - Ttk -
- -

1,159,790.49 M3 -
668.66 M3 -
5,225,126.61 M3 -
7,395,116.21 M3 -
- 4.38 M3 527,943.51
10,477,310.50 M3 -
- M1 -
24,258,012.48 527,943.51

- M3 -
- 1.23 M3 829,355.00
- -
- M3 -
- -
- 71.94 M3 269,185,229.95
269,185,229.95 M3 -
- M3 -
- M3 -
PEKERJAAN TAMBAH PEKERJAAN KURANG

JUMLAH HARGA (Rp) VOLUME JUMLAH HARGA (Rp)

10 = (4 x 9) 11 12 = (4 x 11)

20,477.03 M3 -
- -
- 0.09 M3 286,357.02
17,317.35 M3 -
- M3 -
- 0.01 M3 55,387.66
- -
- -
- 1.62 M3 7,248,403.12
- M3 -
- 0.46 M3 2,394,976.22
- -
4,645,766.28 M3 -
- M3 -
- -
- -
- 1.26 M3 5,331,898.64
- M3 -
- 0.13 M3 688,326.15
- -
- 4.85 M3 19,696,698.40
- M3 -
- 0.01 M3 58,120.59
- M3 -
- M3 -
- -
4,645,766.28 M3 -
- 5.14 M3 17,739,958.29
- M3 -
- -
- -
- 0.26 M3 1,091,769.72
PEKERJAAN TAMBAH PEKERJAAN KURANG

JUMLAH HARGA (Rp) VOLUME JUMLAH HARGA (Rp)

10 = (4 x 9) 11 12 = (4 x 11)

- M3 -
- -
- 0.05 M3 193,005.30
- 0.05 M3 189,541.87
- 0.00 M3 18,396.09
- 0.01 M3 58,120.59
460,195.01 M3 -
- 5.39 M3 18,604,137.59
PEKERJAAN TAMBAH PEKERJAAN KURANG

JUMLAH HARGA (Rp) VOLUME JUMLAH HARGA (Rp)

10 = (4 x 9) 11 12 = (4 x 11)

- -
- -
- 0.01 M3 64,440.43
- 1.42 M3 4,940,222.04
2,712,788.50 M3 -
9,442,954.84 M3 -
358,719.05 M1 -
- -
- 0.01 M3 64,440.43
- 1.50 M3 5,215,882.79
2,328,618.33 M3 -
8,471,663.08 M3 -
242,607.29 M1 -
- -
- -
988,917.65 M1 -
9,913,445.46 M1 -
- 14.57 Kg 455,918.44
3,841,458.55 Kg -
4,080,000.00 Bh -
- 79.08 M2 9,363,467.40
- 79.08 M2 12,512,116.68
10,062,554.40 M1 -
54,412.54 M1 -
- M1 -
- -
4,837,385.25 M1 -
9,913,445.46 M1 -
- 14.57 Kg 455,918.44
3,841,458.55 Kg -
4,080,000.00 Bh -
- 79.08 M2 9,363,467.40
PEKERJAAN TAMBAH PEKERJAAN KURANG

JUMLAH HARGA (Rp) VOLUME JUMLAH HARGA (Rp)

10 = (4 x 9) 11 12 = (4 x 11)

- 79.08 M2 12,512,116.68
10,062,554.40 M1 -
54,412.54 M1 -
364,262,147.78 398,617,672.93

27,537,434.30 M2 -
10,553,803.28 M2 -
7,571,512.35 M2 -
3,160,866.24 M2 -
- 147.52 M2 6,381,715.20
- M1 -
- 167.18 M1 3,734,266.22
- -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- -
4,033,366.02 M2 -
290,901.57 M2 -
52,625,813.91 M2 -
- 17.60 M1 806,325.19
- 7.82 M1 332,706.20
- -
13,994,042.46 M2 -
- 3.55 M1 89,771.10
PEKERJAAN TAMBAH PEKERJAAN KURANG

JUMLAH HARGA (Rp) VOLUME JUMLAH HARGA (Rp)

10 = (4 x 9) 11 12 = (4 x 11)

- -
3,794,904.94 M2 -
9,916,797.26 M2 -
31,566.00 M2 -
- M2 -
PEKERJAAN TAMBAH PEKERJAAN KURANG

JUMLAH HARGA (Rp) VOLUME JUMLAH HARGA (Rp)

10 = (4 x 9) 11 12 = (4 x 11)

- -
- -
13,628,739.27 M2 -
7,436,831.72 M2 -
3,322,933.80 M2 -
- M2 -
- M1 -
- M1 -
- M1 -
- -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- Unit -
- -
27,532,608.40 M2 -
16,769,416.09 M2 -
80,859,089.12 M2 -
7,887,047.23 M1 -
872,183.78 M1 -
- -
13,994,042.46 M2 -
- 3.55 M1 89,771.10
- -
- M2 -
- M2 -
- M2 -
- M2 -
PEKERJAAN TAMBAH PEKERJAAN KURANG

JUMLAH HARGA (Rp) VOLUME JUMLAH HARGA (Rp)

10 = (4 x 9) 11 12 = (4 x 11)

- M2 -
PEKERJAAN TAMBAH PEKERJAAN KURANG

JUMLAH HARGA (Rp) VOLUME JUMLAH HARGA (Rp)

10 = (4 x 9) 11 12 = (4 x 11)

- -
- -
- M2 -
- M2 -
- M2 -
- M3 -
- M3 -
- M2 -
- -
- M2 -
- M2 -
305,813,900.19 11,434,555.00

- M1 -
- M1 -
- M1 -
- M1 -
- M1 -
11,411,733.60 Unit -
916,218.00 Unit -
- Unit -
365,256.00 Unit -
233,078.00 Unit -
1,002,312.00 Unit -
- Unit -
1,080,480.00 Unit -
- -
- M1 -
- M1 -
- M1 -
- M1 -
PEKERJAAN TAMBAH PEKERJAAN KURANG

JUMLAH HARGA (Rp) VOLUME JUMLAH HARGA (Rp)

10 = (4 x 9) 11 12 = (4 x 11)

- M1 -
- Unit -
- Unit -
- Unit -
365,256.00 Unit -
233,078.00 Unit -
1,002,312.00 Unit -
- 1.00 Unit 980,880.00
16,609,723.60 980,880.00

- 5.00 Ttk 940,980.00


- Ttk -
125,013.30 Ttk -
92,652.20 Unit -
- Unit -
850,000.00 Unit -
- 9.00 Unit 1,350,000.00
- Unit -
- m1 -
- -
- 5.00 Ttk 940,980.00
- Ttk -
125,013.30 Ttk -
92,652.20 Unit -
- Unit -
850,000.00 Unit -
- 9.00 Unit 1,350,000.00
- Ttk -
PEKERJAAN TAMBAH PEKERJAAN KURANG

JUMLAH HARGA (Rp) VOLUME JUMLAH HARGA (Rp)

10 = (4 x 9) 11 12 = (4 x 11)

2,135,331.00 4,581,960.00

- - Ls -
- -
713,079,115.05 416,143,011.45

Surabaya, 22 Juli 2019

Dibuat oleh :
Kontraktor Pelaksana
PT. DEFICY SIGAR PRATAMA

JOHNNY SIREGAR
Direktur

BANGUNAN

5
II PEKERJAAN TANAH
1 Galian Tanah Pondasi

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Galian Pondasi Pile Caps


PC-1 11.100 X 1.85 X 1.20 X
PC-2 3.100 X 1.85 X 1.20 X
PC-3 7.150 X 1.85 X 1.20 X
PC-4 1.625 X 1.85 X 1.20 X

b. Galian Sloof
Sloof S2 Uk. 20/40
Sloof S2 1.150 X 0.40 X 0.65 X
Sloof S3 Uk. 20/35
S3-A 1.650 X 0.40 X 0.65 X
S3-B 1.150 X 0.40 X 0.65 X
S3-C 0.125 X 0.40 X 0.65 X
Sloof S4 Uk. 20/30
S4-A 1.650 X 0.40 X 0.65 X
S4-B 0.625 X 0.40 X 0.65 X
S4-C 1.150 X 0.40 X 0.65 X
S4-D 0.375 X 0.40 X 0.65 X
S4-E 0.675 X 0.40 X 0.65 X
S4-F 6.950 X 0.40 X 0.65 X
S4-G 2.600 X 0.40 X 0.65 X
S4-H 3.600 X 0.40 X 0.65 X
S4-I 0.700 X 0.40 X 0.65 X
S4-J 2.900 X 0.40 X 0.65 X
S4-L 2.300 X 0.40 X 0.65 X
S4-M 2.900 X 0.175 X 0.65 X
S4-K 0.410 M2 X X 0.65 X

c. Pondasi Rollag Tangga Depan


3.300 X 0.30 X 0.20 X
1.150 X 0.35 X 0.20 X
Galian Tanah Po

2 Urugan Pasir Bawah Pondasi, tbl=5cm

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Urugan Pasir Dibawah Pondasi Pile Caps


PC-1 11.10 X 1.85 X 0.10 X
PC-2 3.10 X 1.85 X 0.10 X
PC-3 7.15 X 1.85 X 0.10 X
PC-4 1.625 1.85 X 0.10

Pengurang
- Strous 30 cm 0.071 M2 X 0.10 X
Urugan Pasir Bawah Pondasi, tbl
3 Urugan Tanah Kembali

LUAS
Keterangan X P X L X T X
CAD/SKP

- Dari Galian Total


Galian Tanah Total

Pengurang
a. Urugan Pasir Dibawah Pondasi Pile Caps
b. Rabat Lantai Kerja K-175, tbl=5cm
PC-1 11.100 X 1.85 X 0.05 X
PC-2 3.100 X 1.85 X 0.05 X
PC-3 7.150 X 1.85 X 0.05 X
PC-4 1.625 X 1.85 X 0.05 X

c. Beton Pile Caps fc = 20.75 MPa (K-250)


PC 1 1060X165X40 cm 10.900 x 1.650 x 0.40 x
PC 2 290X165X40 cm 2.900 x 1.650 x 0.40 x
PC 3 735X165X40 cm 7.350 x 1.650 x 0.40 x
PC 4 165X162X40 cm 1.625 x 1.650 x 0.40 x
d. Kolom
K1A 0.450 X 0.350 X 0.65 X
K2 0.300 X 0.300 X 0.65 X

e. Sloof
Sloof S1 Uk. 30/50
S1-A 7.550 X 0.30 X 0.50 X
S1-B 5.550 X 0.30 X 0.50 X
S1-C 4.625 X 0.30 X 0.50 X
S1-D 3.625 X 0.30 X 0.50 X
S1-E 2.625 X 0.30 X 0.50 X
Sloof S2 Uk. 20/40 2.700 X 0.20 X 0.40 X
Sloof S3 Uk. 20/35
S3-A 7.550 X 0.20 X 0.35 X
S3-B 3.200 X 0.20 X 0.35 X
S3-C 3.150 X 0.20 X 0.35 X
S3-D 2.700 X 0.20 X 0.35 X
S3-E 2.350 X 0.20 X 0.35 X
S3-F 2.675 X 0.20 X 0.35 X
S3-G 2.650 X 0.20 X 0.35 X
S3-H 2.325 X 0.20 X 0.35 X
Sloof S4 Uk. 20/30
S4-A 6.750 X 0.20 X 0.30 X
S4-B 3.800 X 0.20 X 0.30 X
S4-C 3.200 X 0.20 X 0.30 X
S4-D 3.100 X 0.20 X 0.30 X
S4-E 2.800 X 0.20 X 0.30 X
S4-F 2.700 X 0.20 X 0.30 X
S4-G 2.500 X 0.20 X 0.30 X
S4-H 1.700 X 0.20 X 0.30 X
S4-I 1.625 X 0.20 X 0.30 X
S4-J 1.500 X 0.20 X 0.30 X
S4-K 1.400 X 0.20 X 0.30 X
S4-L 1.250 X 0.20 X 0.30 X
S4-M 1.175 X 0.20 X 0.30 X
S4-N 0.900 X 0.20 X 0.30 X
S4-O 0.350 X 0.20 X 0.30 X

f. Pondasi Rollag Tangga Depan 0.66 M2 X 0.60 X X


g. Pondasi Tangga Utama 1.100 X 0.20 X 0.25 X
g. Pasangan Rollag Diatas Sloof
Sloof S1 47.380 X 0.22 X 0.15
Sloof S3 Panjang 125.625 X 0.22 X 0.30
Luasan 3.13 M2 X 0.22
Sloof S4 Panjang 15.521 0.22 0.35
Luasan 14.13 M2 X 0.22

Jumlah Total Penguran


Urugan Tanah Ke

4 Urugan Sirtu
LUAS
Keterangan X P X L X T X
CAD/SKP

Elevasi Lantai ±0.00


a. Kelas RKB
RKB Type 1 68.106 M2 x 0.37
RKB Type 2 68.117 M2 x 0.37
Elevasi Lantai -0.020
a. Selasar
Selasar dan R. Tangga 142.054 M2 x 0.35 X
b. KM Pria/Wanita
Wastafel & Loker 27.427 M2 x 0.35 X
Selasar KM 5.776 M2 x 0.35 X
c. KM Wanita
R. Wastafel 15.191 M2 x 0.35 X
d. KM Pria
R. Wastafel 11.085 M2 x 0.35 X
e. KM Difabel
KM Difabel Type 1 2.723 M2 x 0.35 X
KM Difabel Type 2 3.146 M2 x 0.35 X
Elevasi Lantai -0.050
a. Janitor
Janitor 2.335 M2 x 0.32 X
Void Dasar 1 0.391 M2 x 0.32 X
Void Dasar 2 0.550 M2 x 0.32 X
b. KM Pria/Wanita
KM Type 1 1.703 M2 x 0.32 X
KM Type 2 1.696 M2 x 0.32 X
c. KM Wanita
KM Type 1 1.346 M2 x 0.32 X
KM Type 2 1.339 M2 x 0.32 X
d. KM Pria
KM Type 1 1.346 M2 x 0.32 X
KM Type 2 1.339 M2 x 0.32 X
5 Urugan Pasir Bawah Lantai, tbl=5cm

LUAS
Keterangan X P X L X T X
CAD/SKP

Elevasi Lantai ±0.00


a. Kelas RKB
RKB Type 1 68.11 M2 x 0.05
RKB Type 2 68.12 M2 x 0.05
Elevasi Lantai -0.020
a. Selasar
Selasar dan R. Tangga 141.93 M2 x 0.05 X
b. KM Pria/Wanita
Wastafel & Loker 27.43 M2 x 0.05 X
Selasar KM 5.78 M2 x 0.05 X
c. KM Wanita
R. Wastafel 15.19 M2 x 0.05 X
d. KM Pria
R. Wastafel 11.09 M2 x 0.05 X
e. KM Difabel
KM Difabel Type 1 2.73 M2 x 0.05 X
KM Difabel Type 2 3.15 M2 x 0.05 X
Elevasi Lantai -0.050
a. Janitor
Janitor 2.33 M2 x 0.05 X
Void Dasar 1 0.39 M2 x 0.05 X
Void Dasar 2 0.55 M2 x 0.05 X
b. KM Pria/Wanita
KM Type 1 1.70 M2 x 0.05 X
KM Type 2 1.70 M2 x 0.05 X
c. KM Wanita
KM Type 1 1.35 M2 x 0.05 X
KM Type 2 1.34 M2 x 0.05 X
d. KM Pria
KM Type 1 1.35 M2 x 0.05 X
KM Type 2 1.34 M2 x 0.05 X
Urugan Pasir Bawah Lantai, tbl
6 Pengangkutan Bekas Galian Tanah Keluar Lokasi Proyek

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Pengangkutan Bekas Galian Tanah Keluar Lokasi Proyek


- Galian Tanah Total
- Strous 30 cm 0.07 M2 x 5.00

Pengurang
- Urugan Tanah Kembali
Pengangkutan Bekas Galian Tanah Keluar Lokasi P

7 Pembuatan Lubang Strous Pile Ø 30 cm kedalaman 5 m

LUAS
Keterangan X P X L X T X
CAD/SKP

1 Galian Strous Dia.30cm


PC-1 1 5.00 x
2 5.00 x
3 5.00 x
4 5.00 x
5 5.00 x
6 5.00 x
7 5.00 x
8 5.00 x
9 5.00 x
10 5.00 x
PC-2 1 5.00 x
PC-3 1 5.00 x
2 5.00 x
3 5.00 x
4 5.00 x
5 5.00 x
6 5.00 x
PC-4 1 5.00 x
2 5.00 x
3 5.00 x
4 5.00 x
5 5.00 x
6 5.00 x
Pembuatan Lubang Strous Pile Ø 30 cm kedalama
Volume
Jumlah =
(P*L*T*Jumlah)

10.00 = 246.420 M3
1.00 = 6.882 M3
6.00 = 95.238 M3
6.00 = 21.645 M3
Jumlah 370.19 M3

1.00 = 0.299 M3

8.00 = 3.432 M3
24.00 = 7.176 M3
2.00 = 0.065 M3

2.00 = 0.858 M3
7.00 = 1.138 M3
2.00 = 0.598 M3
1.00 = 0.098 M3
2.00 = 0.351 M3
1.00 = 1.807 M3
1.00 = 0.676 M3
1.00 = 0.936 M3
2.00 = 0.364 M3
2.00 = 1.508 M3
1.00 = 0.598 M3
1.00 = 0.330 M3
1.00 = 0.267 M3
Jumlah 20.50 M3

2.00 = 0.396 M3
2.00 = 0.161 M3
Jumlah 0.56 M3
Galian Tanah Pondasi 391.241 M3

Volume
Jumlah =
(P*L*T*Jumlah)

10.00 = 20.535 M3
1.00 = 0.574 M3
6.00 = 7.937 M3
6.00 = 1.804 M3
30.849 M3

258.00 1.824 M3
Urugan Pasir Bawah Pondasi, tbl=5cm 29.024 M3
Volume
Jumlah =
(P*L*T*Jumlah)

391.241 M3

30.849 M3

10.00 = 10.268 M3
1.00 = 0.287 M3
6.00 = 3.968 M3
6.00 = 0.902 M3
Jumlah = 15.424 M3

10.00 = 71.940 M3
1.00 = 1.914 M3
6.00 = 29.106 M3
6.00 = 6.435 M3
Jumlah = 109.395 M3
32.00 = 3.276 M3
20.00 = 1.170 M3
Jumlah = 4.446 M3

3.00 = 3.398 M3
3.00 = 2.498 M3
2.00 = 1.388 M3
3.00 = 1.631 M3
2.00 = 0.788 M3
1.00 = 0.216 M3

2.00 = 1.057 M3
4.00 = 0.896 M3
4.00 = 0.882 M3
16.00 = 3.024 M3
1.00 = 0.165 M3
1.00 = 0.187 M3
25.00 = 4.638 M3
1.00 = 0.163 M3

1.00 = 0.405 M3
1.00 = 0.228 M3
2.00 = 0.384 M3
3.00 = 0.558 M3
2.00 = 0.336 M3
2.00 = 0.324 M3
1.00 = 0.150 M3
1.00 = 0.102 M3
13.00 = 1.268 M3
7.00 = 0.630 M3
1.00 = 0.084 M3
1.00 = 0.075 M3
3.00 = 0.212 M3
2.00 = 0.108 M3
1.00 = 0.021 M3
Jumlah = 25.812 M3
2.00 = 0.792 M3
1.00 = 0.055 M3

= 1.564
= 8.291
= 0.689
= 1.195
= 3.108
Jumlah = 14.847 M3
Jumlah Total Pengurang = 201.620 M3
Urugan Tanah Kembali 189.621 M3
Volume
Jumlah =
(P*L*T*Jumlah)

1.00 = 25.199 M3
2.00 = 50.407 M3

1.00 = 49.719 M3

1.00 = 9.599 M3
1.00 = 2.022 M3

1.00 = 5.317 M3

1.00 = 3.880 M3

1.00 = 0.953 M3
1.00 = 1.101 M3

1.00 = 0.747 M3
1.00 = 0.125 M3
1.00 = 0.176 M3

2.00 = 1.090 M3
1.00 = 0.543 M3

3.00 = 1.292 M3
1.00 = 0.428 M3

3.00 = 1.292 M3
1.00 = 0.428 M3
Urugan Sirtu 154.319 M3
Volume
Jumlah =
(P*L*T*Jumlah)

1.00 = 3.405 M3
2.00 = 6.812 M3

1.00 = 7.096 M3

1.00 = 1.371 M3
1.00 = 0.289 M3

1.00 = 0.760 M3

1.00 = 0.554 M3

1.00 = 0.136 M3
1.00 = 0.157 M3

1.00 = 0.117 M3
1.00 = 0.020 M3
1.00 = 0.028 M3

2.00 = 0.170 M3
1.00 = 0.085 M3

3.00 = 0.202 M3
1.00 = 0.067 M3

3.00 = 0.202 M3
1.00 = 0.067 M3
Urugan Pasir Bawah Lantai, tbl=5cm 21.538 M3
Volume
Jumlah =
(P*L*T*Jumlah)

= 391.241 M3
258.00 = 91.221 M3
482.463 M3

189.621 M3
Pengangkutan Bekas Galian Tanah Keluar Lokasi Proyek 292.842 M3

Volume
Jumlah =
(P*L*T*Jumlah)

14.00 = 70.00 M1
22.00 = 110.00 M1
26.00 = 130.00 M1
20.00 = 100.00 M1
18.00 = 90.00 M1
18.00 = 90.00 M1
18.00 = 90.00 M1
22.00 = 110.00 M1
22.00 = 110.00 M1
14.00 = 70.00 M1
4.00 = 20.00 M1
8.00 = 40.00 M1
8.00 = 40.00 M1
8.00 = 40.00 M1
8.00 = 40.00 M1
8.00 = 40.00 M1
8.00 = 40.00 M1
2.00 = 10.00 M1
2.00 = 10.00 M1
2.00 = 10.00 M1
2.00 = 10.00 M1
2.00 = 10.00 M1
2.00 = 10.00 M1
Pembuatan Lubang Strous Pile Ø 30 cm kedalaman 5 m 1,290.00 M1
III PEKERJAAN STRUKTUR
A. PEKERJAAN PONDASI
1 Rabat Lantai Kerja K-175, tbl=5cm

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Rabat Lantai Kerja


PC-1 11.10 X 1.85 X 0.05 X
PC-2 3.10 X 1.85 X 0.05 X
PC-3 7.15 X 1.85 X 0.05 X
PC-4 1.63 X 1.85 X 0.05 X

Pengurang
- Strous 30 cm 0.07 M2 X 0.05 x
Rabat Lantai Kerja K-175, t

2 Rabat Bawah Lantai K-175, tbl=5cm

LUAS
Keterangan X P X L X T X
CAD/SKP

Elevasi Lantai (±0.00)


a. Kelas RKB
RKB Type 1 69.31 M2 x 0.05
RKB Type 2 69.33 M2 x 0.05
Elevasi Lantai (-0.020)
a. Selasar
Selasar dan R. Tangga 155.22 M2 x 0.05 X
b. KM Pria/Wanita
Wastafel & Loker 28.45 M2 x 0.05 X
Selasar KM 6.50 M2 x 0.05 X
c. KM Wanita
R. Wastafel 16.26 M2 x 0.05 X
d. KM Pria
R. Wastafel 12.31 M2 x 0.05 X
e. KM Difabel
KM Difabel Type 1 2.95 M2 x 0.05 X
KM Difabel Type 2 3.41 M2 x 0.05 X
Elevasi Lantai (-0.050)
a. Janitor
Janitor 2.55 M2 x 0.05 X
Void Dasar 1 0.50 M2 x 0.05 X
Void Dasar 2 0.68 M2 x 0.05 X
b. KM Pria/Wanita
KM Type 1 1.89 M2 x 0.05 X
KM Type 2 1.88 M2 x 0.05 X
c. KM Wanita
KM Type 1 1.49 M2 x 0.05 X
KM Type 2 1.48 M2 x 0.05 X
d. KM Pria
KM Type 1 1.49 M2 x 0.05 X
KM Type 2 1.48 M2 x 0.05 X
Rabat Bawah Lantai K-175, t

Beton Strous fc = 20.75 MPa (K-250)


1 Strous 30 cm

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Strous 30 cm 0.07 x 5.15


Beton Strous fc = 20.75 MPa

Beton Pile Caps fc = 20.75 MPa (K-250)

LUAS
Keterangan X P X L X T X
CAD/SKP

Beton Pile Caps fc = 20.75 MPa (K-250)


1 PC 1 1060X165X40 cm 10.90 x 1.65 x 0.40 x
3 PC 2 290X165X40 cm 2.90 x 1.65 x 0.40 x
4 PC 3 735X165X40 cm 7.35 x 1.65 x 0.40 x
5 PC 4 165X162X40 cm 1.625 x 1.65 x 0.40 x
Beton Pile Caps fc = 20.75 MPa

Beton Sloof fc = 20.75 MPa (K-250)

LUAS
Keterangan X P X L X T X
CAD/SKP
LUAS
Keterangan X P X L X T X
CAD/SKP

1 S1 30X50 cm
S1-A 7.55 x 0.30 x 0.50 x
S1-B 5.55 x 0.30 x 0.50 x
S1-C 4.63 x 0.30 x 0.50 x
S1-D 3.63 x 0.30 x 0.50 x
S1-E 2.63 x 0.30 x 0.50 x

2 S2 20X40 cm 2.70 x 0.20 x 0.40 x

3 S3 20X35 cm
S3-A 7.55 x 0.20 x 0.35 x
S3-B 3.20 x 0.20 x 0.35 x
S3-C 3.15 x 0.20 x 0.35 x
S3-D 2.70 x 0.20 x 0.35 x
S3-E 2.35 x 0.20 x 0.35 x
S3-F 2.68 x 0.20 x 0.35 x
S3-G 2.65 x 0.20 x 0.35 x
S3-H 2.33 x 0.20 x 0.35 x

4 S4 20X30 cm
S4-A 6.75 x 0.20 x 0.30 x
S4-B 3.80 x 0.20 x 0.30 x
S4-C 3.20 x 0.20 x 0.30 x
S4-D 3.10 x 0.20 x 0.30 x
S4-E 2.80 x 0.20 x 0.30 x
S4-F 2.70 x 0.20 x 0.30 x
S4-G 2.50 x 0.20 x 0.30 x
S4-H 1.70 x 0.20 x 0.30 x
S4-I 1.63 x 0.20 x 0.30 x
S4-J 1.50 x 0.20 x 0.30 x
S4-K 1.40 x 0.20 x 0.30 x
S4-L 1.25 x 0.20 x 0.30 x
S4-M 1.18 x 0.20 x 0.30 x
S4-N 0.90 x 0.20 x 0.30 x
S4-O 0.35 x 0.20 x 0.30 x

Beton Sloof fc = 20.75 MPa


B. PEKERJAAN STRUKTUR LANTAI 1
Beton Kolom fc = 20.75 MPa (K-250)

LUAS
Keterangan X P X L X T X
CAD/SKP

1 K1 A 35X45 cm 0.35 x 0.45 x 5.15 x


2 K2 30X30 cm 0.30 0.30 5.15
3 Kp 12X12 cm K-225
- Diatas Sloof S1 0.12 x 0.12 x 4.07 x
- Diatas Sloof S3
0.12 x 0.12 x 4.37 x
0.12 x 0.12 x 4.22 x
- Diatas Sloof S4
0.12 x 0.12 x 4.47 x

Beton Kolom fc = 20.75 MPa

Beton Balok fc = 18.675 MPa (K-225)


1 Balok Latei 12X20 cm

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Diatas Jendela
J1 2.65 x 0.12 x 0.20 x
J2 dan P2 2.65 x 0.12 x 0.20
J3 4.35 x 0.12 x 0.20
BV 7.65 x 0.12 x 0.20 x
Jendela Void 1.35 x 0.12 x 0.20 x
b. Diatas Pintu
P1 3.95 x 0.12 x 0.20 x
P2 6.65 x 0.12 x 0.20 x
P3 12.90 x 0.12 x 0.20 x
P4 1.10 x 0.12 x 0.20 x
Balok Latei 12

2 Beton Plat Wastafel, K-250, tbl = 8 cm

LUAS
Keterangan X P X L X T X
CAD/SKP
LUAS
Keterangan X P X L X T X
CAD/SKP

a. KM Pria/ Wanita 1.25 x 0.65 x 0.08 x


b. KM Wanita 3.15 x 0.65 x 0.08 x
c. KM Pria 1.45 x 0.65 x 0.08 x
Beton Plat Wastafel, K-250, tbl

C. PEKERJAAN STRUKTUR LANTAI 2


Beton Kolom fc = 20.75 MPa (K-250)

LUAS
Keterangan X P X L X T X
CAD/SKP

1 K1 B 35X45 cm 0.35 x 0.45 x 4.00 x


2 K2 30X30 cm 0.30 x 0.30 x 4.00 x
3 Kp 12X12 cm 0.12 x 0.12 x 3.50 x
0.12 x 0.12 x 3.70 x
0.12 x 0.12 x 3.65 x

Beton Kolom fc = 20.75 MPa


Beton Balok fc = 20.75 MPa (K-250)

LUAS
Keterangan X P X L X T X
CAD/SKP

1 B1 A 30X50 cm
7.55 x 0.30 x 0.50 x
4.63 x 0.30 x 0.50 x
2.63 x 0.30 x 0.50 x
5.55 x 0.30 x 0.50 x

2 B2 20X40 cm 2.70 x 0.20 x 0.40


3 B3 20X35 cm
3.15 x 0.20 x 0.35 x
2.65 x 0.20 x 0.35 x
3.20 x 0.20 x 0.35 x
2.70 x 0.20 x 0.35 x
2.35 x 0.20 x 0.35 x
2.33 x 0.20 x 0.35 x
2.68 x 0.20 x 0.35 x

4 B1 B 30X50 cm
7.55 x 0.30 x 0.50 x
3.63 x 0.30 x 0.50 x
2.63 x 0.30 x 0.50 x
4.63 x 0.30 x 0.50 x

5 B4 20X30 cm 1.63 x 0.20 x 0.30 x


3.80 x 0.20 x 0.30 x
1.50 x 0.20 x 0.30 x
2.80 0.20 x 0.30 x
0.35 0.20 x 0.30 x
3.20 0.20 x 0.30 x
1.70 0.20 x 0.30 x
1.75 0.20 x 0.30 x
6.75 0.20 x 0.30 x
3.10 0.20 x 0.30 x
2.50 0.20 x 0.30 x
0.90 0.20 x 0.30 x
1.40 0.20 x 0.30 x
2.70 0.20 x 0.30 x
1.25 0.20 x 0.30 x

Beton Balok fc = 20.75 MPa

Beton Balok fc = 18.675 MPa (K-225)


1 Balok Latei 12X20 cm

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Diatas Jendela
J1 2.65 x 0.12 x 0.20 x
J2 dan P2 2.65 x 0.12 x 0.20 x
J3 4.35 x 0.12 x 0.20 x
BV 7.65 x 0.12 x 0.20 x
Jendela Void 1.35 x 0.12 x 0.20 x
b. Diatas Pintu
P1 3.95 x 0.12 x 0.20 x
P2 6.65 x 0.12 x 0.20 x
P3 12.90 x 0.12 x 0.20 x
P4 1.10 x 0.12 x 0.20 x
Beton Balok fc = 18.675 MPa

2 Beton Plat Lantai. 2, K - 250, tbl=12cm

LUAS
Keterangan X P X L X T X
CAD/SKP

1 RKB
61.52 M2 x 0.07 x
2 Selasar
5.016 M2 x 0.09
5.916 M2 x 0.09
4.038 M2 x 0.09
3.452 M2 x 0.09
4.393 M2 x 0.09
10.254 M2 x 0.09
10.327 M2 x 0.09
2.554 M2 x 0.09
7.554 M2 x 0.09
3 KM P/W
R.Wastafel 7.963 M2 x 0.09 x
R. Locker 17.554 M2 x 0.09 x
Selasar KM P/W 5.697 M2 x 0.09 x
KM Difabel 2.700 M2 x 0.09 x
R. KM P/W 5.097 M2 x 0.12 x
4 KM W
R.Wastafel 15.209 M2 x 0.09 x
R. KM W 5.397 M2 x 0.12 x
KM Difabel 3.150 M2 x 0.12 x
4 KM P
R.Wastafel 7.771 M2 x 0.09 x
R. KM P/W 5.397 M2 x 0.12 x
Janitor 2.309 M2 x 0.12 x
5 Elevasi Lantai
Selasar, R. Locker, R. Wastafel, KM 201.919 M2 x 0.03
RKB 207.98 M2 x 0.05 x
Beton Plat Lantai. 2, K - 250, tb

3 Beton Plat Wastafel, K-250, tbl = 8 cm

LUAS
Keterangan X P X L X T X
CAD/SKP

a. KM Pria/ Wanita 1.25 x 0.65 x 0.08 x


b. KM Wanita 3.15 x 0.65 x 0.08 x
c. KM Pria 1.45 x 0.65 x 0.08 x
Beton Plat Wastafel, K-250, tbl
D. PEKERJAAN STRUKTUR LANTAI 3
Beton Kolom fc = 20.75 MPa (K-250)

LUAS
Keterangan X P X L X T X
CAD/SKP

1 K1 B 35X45 cm 0.35 x 0.45 x 0.80 x


2 K2 30X30 cm 0.30 x 0.30 x 0.80 x

PEKERJAAN STRUKTUR LA

Beton Balok fc = 20.75 MPa (K-250)

LUAS
Keterangan X P X L X T X
CAD/SKP

1 B1 A 30X50 cm
7.55 x 0.30 x 0.50 x
4.63 x 0.30 x 0.50 x
2.63 x 0.30 x 0.50 x
5.55 x 0.30 x 0.50 x

2 B1 B 30X50 cm
7.55 x 0.30 x 0.50 x
3.63 x 0.30 x 0.50 x
2.63 x 0.30 x 0.50 x
4.63 x 0.30 x 0.50 x

3 B2 20X40 cm 2.70 x 0.20 x 0.40


4 B3 20/35 cm
3.15 x 0.20 x 0.35 x
2.65 x 0.20 x 0.35 x
3.20 x 0.20 x 0.35 x
2.70 x 0.20 x 0.35 x
2.35 x 0.20 x 0.35 x
2.33 x 0.20 x 0.35 x
2.68 x 0.20 x 0.35 x

5 B4 20X30 cm 1.63 x 0.20 x 0.30 x


3.80 x 0.20 x 0.30 x
1.50 x 0.20 x 0.30 x
2.80 0.20 x 0.30 x
0.35 0.20 x 0.30 x
3.20 0.20 x 0.30 x
1.70 0.20 x 0.30 x
1.75 0.20 x 0.30 x
6.75 0.20 x 0.30 x
3.10 0.20 x 0.30 x
2.50 0.20 x 0.30 x
0.90 0.20 x 0.30 x
1.40 0.20 x 0.30 x
2.70 0.20 x 0.30 x
1.25 0.20 x 0.30 x

Beton Balok fc = 20.75 MPa

6 Beton Plat Lantai. 3, K - 250, tbl=12cm

LUAS
Keterangan X P X L X T X
CAD/SKP

1 RKB
61.52 M2 x 0.09 x
2 Selasar
5.016 M2 x 0.09
5.916 M2 x 0.09
4.038 M2 x 0.09
3.452 M2 x 0.09
4.393 M2 x 0.09
10.254 M2 x 0.09
10.327 M2 x 0.09
2.554 M2 x 0.09
7.554 M2 x 0.09
3 KM P/W
R.Wastafel 7.963 M2 x 0.09 x
R. Locker 17.554 M2 x 0.09 x
Selasar KM P/W 5.697 M2 x 0.09 x
KM Difabel 2.700 M2 x 0.09 x
R. KM P/W 5.097 M2 x 0.12 x
4 KM W
R.Wastafel 15.209 M2 x 0.09 x
R. KM W 5.397 M2 x 0.12 x
KM Difabel 3.150 M2 x 0.12 x
4 KM P
R.Wastafel 7.771 M2 x 0.09 x
R. KM P/W 5.397 M2 x 0.12 x
Janitor 2.309 M2 x 0.12 x
5 Elevasi Lantai
417.167 M2 x 0.03
Beton Plat Lantai. 3, K - 250, tb

E. PEKERJAAN STRUKTUR TANGGA BETON


PEKERJAAN STRUKTUR TANGGA LT. 1 Ke LT. 2

LUAS
Keterangan X P X L X T X
CAD/SKP

1 Balok Bordes 20X40, fc=26.4 Mpa (K-300) 2.65 x 0.20 x 0.40 x


2 Beton Plat dan Bordes t=15cm, fc=26.4 Mpa (K-30 2.65 x 1.90 x 0.15 x
3 Beton Anak Tangga, fc=26.4 Mpa 2.1252 M3
4 Beton Ralling fc = 18.675 MPa (K 1.5542 M3
5 Pas. Pipa Stainless 2.5 11.1145 M1

PEKERJAAN STRUKTUR TANGGA LT. 2 Ke LT. 3

LUAS
Keterangan X P X L X T X
CAD/SKP

1 Balok Bordes 20X40, fc=26.4 Mpa (K-300) 2.65 x 0.20 x 0.40 x


2 Beton Plat dan Bordes t=15cm, fc=26.4 Mpa (K-30 2.65 x 1.70 x 0.15 x
3 Beton Anak Tangga, fc=26.4 Mpa 1.9772 M3
4 Beton Ralling fc = 18.675 MPa (K 1.4067 M3
5 Pas. Pipa Stainless 2.5 10.2035 M1

F. PEKERJAAN STRUKTUR ATAP CANOPY


PEKERJAAN STRUKTUR ATAP CANOPY LANTAI 1

LUAS
Keterangan X P X L X T X
CAD/SKP

1 Pas. Pipa Besi 2,5 Fiber Semen


Pengaku Gording
Lantai 1 Depan 0.95 x
Lantai 1 Belakang 0.95 x

2 Pas. Pipa Besi 3


Lantai 1 Depan 22.93 x
Lantai 1 Belakang 46.31 x

3 Pas. Besi Pengait 10


Lantai 1 Depan 0.62 Kg 0.40 x
Lantai 1 Belakang 0.62 Kg 0.40 x
4 Pas. Plat Besi, t=1cm
Lantai 1 Depan
Base Plate Bawah 7850 Kg 0.15 X 0.20 0.01 x
Rip Plate 7850 Kg 0.07 X 0.20 0.01 x
Base Plate Atas 7850 Kg 0.10 X 0.10 0.01 x
Lantai 1 Belakang
Base Plate Bawah 7850 Kg 0.15 X 0.20 0.01 x
Rip Plate 7850 Kg 0.07 X 0.20 0.01 x
Base Plate Atas 7850 Kg 0.10 X 0.10 0.01 x

5 Pas. Dynabolt 10
Lantai 1 Depan
Base Plate Bawah
Base Plate Atas
Lantai 1 Belakang
Base Plate Bawah
Base Plate Atas

6 Pas. Usuk Reng Galvalum


Lantai 1 Depan 1.50 X 22.97
Lantai 1 Belakang 1.50 X 46.35

7 Pas. Genteng Karang Pilang


Lantai 1 Depan 1.50 X 22.97
Lantai 1 Belakang 1.50 X 46.35

8 Pas. Talang Galvalume lebar=60cm


Lantai 1 Depan 22.97
Lantai 1 Belakang 46.35

9 Pas. Kalsiplank 3/30


Lantai 1 Depan 24.47
Lantai 1 Belakang 49.35

10 Pipa Besi Black Steel 2.5" Finishing Cat


Tiang Canopy
Lantai 1 Depan 2.13
Lantai 1 Belakang 2.13

PEKERJAAN STRUKTUR ATAP CANOPY LANTAI 2

LUAS
Keterangan X P X L X T X
CAD/SKP

1 Pas. Pipa Besi 2,5


Pengaku Gording
Lantai 2 Depan 0.95 x
Lantai 2 Belakang 0.95 x
Tiang Canopy
Lantai 2 Depan 2.13
Lantai 2 Belakang 2.13

2 Pas. Pipa Besi 3


Lantai 2 Depan 22.93 x
Lantai 2 Belakang 46.31 x
3 Pas. Besi Pengait 10
Lantai 2 Depan 0.62 Kg 0.40 x
Lantai 2 Belakang 0.62 Kg 0.40 x

4 Pas. Plat Besi, t=1cm


Lantai 2 Depan
Base Plate Bawah 7850 Kg 0.15 X 0.20 0.01 x
Rip Plate 7850 Kg 0.07 X 0.20 0.01 x
Base Plate Atas 7850 Kg 0.10 X 0.10 0.01 x
Lantai 2 Belakang
Base Plate Bawah 7850 Kg 0.15 X 0.20 0.01 x
Rip Plate 7850 Kg 0.07 X 0.20 0.01 x
Base Plate Atas 7850 Kg 0.10 X 0.10 0.01 x

5 Pas. Dynabolt 10
Lantai 2 Depan
Base Plate Bawah
Base Plate Atas
Lantai 2 Belakang
Base Plate Bawah
Base Plate Atas

6 Pas. Usuk Reng Galvalum


Lantai 2 Depan 1.50 X 22.97
Lantai 2 Belakang 1.50 X 46.35

7 Pas. Genteng Karang Pilang


Lantai 2 Depan 1.50 X 22.97
Lantai 2 Belakang 1.50 X 46.35

8 Pas. Talang Galvalume lebar=60cm


Lantai 2 Depan 22.97
Lantai 2 Belakang 46.35

9 Pas. Kalsiplank 3/30


Lantai 2 Depan 24.47
Lantai 2 Belakang 49.35
Volume
Jumlah =
(P*L*T*Jumlah)

10 = 10.27 M3
1 = 0.29 M3
6 = 3.97 M3
6 = 0.90 M3
15.42 M3

258.00 0.91 M3
Rabat Lantai Kerja K-175, tbl=5cm 14.51 M3

Volume
Jumlah =
(P*L*T*Jumlah)

1.00 = 3.466 M3
2.00 = 6.933 M3

1.00 = 7.761 M3

1.00 = 1.422 M3
1.00 = 0.325 M3

1.00 = 0.813 M3

1.00 = 0.616 M3

1.00 = 0.148 M3
1.00 = 0.170 M3
1.00 = 0.128 M3
1.00 = 0.025 M3
1.00 = 0.034 M3

2.00 = 0.189 M3
1.00 = 0.094 M3

3.00 = 0.223 M3
1.00 = 0.074 M3

3.00 = 0.223 M3
1.00 = 0.074 M3
Rabat Bawah Lantai K-175, tbl=5cm 22.717 M3

Volume
Jumlah =
(P*L*T*Jumlah)
258.00 = 93.96 M3
Beton Strous fc = 20.75 MPa (K-250) 93.96 M3

Volume
Jumlah =
(P*L*T*Jumlah)

10.00 = 71.94 M3
1.00 = 1.91 M3
6.00 = 29.11 M3
6.00 = 6.44 M3
Beton Pile Caps fc = 20.75 MPa (K-250) 109.40 M3

Volume
Jumlah =
Jumlah =
(P*L*T*Jumlah)

3.00 = 3.40 M3
3.00 = 2.50 M3
2.00 = 1.39 M3
3.00 = 1.63 M3
2.00 = 0.79 M3
Jumlah 9.70 M3
1.00 = 0.22 M3
Jumlah 0.22 M3

2.00 = 1.06 M3
4.00 = 0.90 M3
4.00 = 0.88 M3
16.00 = 3.02 M3
1.00 = 0.16 M3
1.00 = 0.19 M3
25.00 = 4.64 M3
1.00 = 0.16 M3
Jumlah 11.01 M3

1.00 = 0.41 M3
1.00 = 0.23 M3
2.00 = 0.38 M3
3.00 = 0.56 M3
2.00 = 0.34 M3
2.00 = 0.32 M3
1.00 = 0.15 M3
1.00 = 0.10 M3
13.00 = 1.27 M3
7.00 = 0.63 M3
1.00 = 0.08 M3
1.00 = 0.08 M3
3.00 = 0.21 M3
2.00 = 0.11 M3
1.00 = 0.02 M3
Jumlah 4.88 M3
Beton Sloof fc = 20.75 MPa (K-250) 25.81 M3
Volume
Jumlah =
(P*L*T*Jumlah)
32.00 = 25.96 M3
20.00 9.27 M3

21.00 = 1.23 M3

11.00 = 0.69 M3
2.00 = 0.12 M3

17.00 = 1.09 M3
Jumlah 3.14 M3
Beton Kolom fc = 20.75 MPa (K-250) 38.36 M3

Volume
Jumlah =
(P*L*T*Jumlah)

15.00 = 0.95 M3
3.00 = 0.19 M3
1.00 = 0.10 M3
1.00 = 0.18 M3
1.00 = 0.03 M3

1.00 = 0.09 M3
1.00 = 0.16 M3
1.00 = 0.31 M3
1.00 = 0.03 M3
Balok Latei 12X20 cm 2.06 M3

Volume
Jumlah =
Jumlah =
(P*L*T*Jumlah)
1.00 = 0.07 M3
1.00 = 0.16 M3
1.00 = 0.08 M3
Beton Plat Wastafel, K-250, tbl = 8 cm 0.30 M3

Volume
Jumlah =
(P*L*T*Jumlah)
32.00 = 20.16 M3
20.00 = 7.20 M3
21.00 = 1.06 M3
17.00 = 0.91 M3
13.00 = 0.68 M3
Jumlah 2.65 M3
Beton Kolom fc = 20.75 MPa (K-250) 30.01 M3
Volume
Jumlah =
(P*L*T*Jumlah)

3.00 = 3.40 M3
1.00 = 0.69 M3
1.00 = 0.39 M3
3.00 = 2.50 M3
Jumlah 6.98 M3
1.00 0.22 M3

4.00 0.88
25.00 4.64
4.00 0.90
25.00 4.73
1.00 0.16
1.00 0.16
1.00 0.19
Jumlah 11.66 M3

8.00 = 9.06 M3
3.00 = 1.63 M3
1.00 = 0.39 M3
1.00 = 0.69 M3
Jumlah 11.78 M3
13.00 = 1.27 M3
1.00 = 0.23 M3
7.00 = 0.63 M3
2.00 = 0.34 M3
1.00 = 0.02 M3
2.00 = 0.38 M3
1.00 = 0.10 M3
3.00 = 0.32 M3
1.00 = 0.41 M3
3.00 = 0.56 M3
1.00 = 0.15 M3
2.00 = 0.11 M3
1.00 = 0.08 M3
2.00 = 0.32 M3
1.00 = 0.08 M3
Jumlah 4.99 M3
Beton Balok fc = 20.75 MPa (K-250) 35.62 M3

Volume
Jumlah =
(P*L*T*Jumlah)

15.00 = 0.95 M3
3.00 = 0.19 M3
1.00 = 0.10 M3
1.00 = 0.18 M3
1.00 = 0.03 M3
1.00 = 0.09 M3
1.00 = 0.16 M3
1.00 = 0.31 M3
1.00 = 0.03 M3
Beton Balok fc = 18.675 MPa (K-225) 2.06 M3

Volume
Jumlah =
(P*L*T*Jumlah)

3.00 = 12.92 M3

10.00 = 4.51 M3
2.00 = 1.06 M3
1.00 = 0.36 M3
1.00 = 0.31 M3
1.00 = 0.40 M3
2.00 = 1.85 M3
1.00 = 0.93 M3
2.00 = 0.46 M3
1.00 = 0.68 M3

1.00 = 0.72 M3
1.00 = 1.58 M3
1.00 = 0.51 M3
1.00 = 0.24 M3
1.00 = 0.61 M3

1.00 = 1.37 M3
1.00 = 0.65 M3
1.00 = 0.38 M3

1.00 = 0.70 M3
1.00 = 0.65 M3
1.00 = 0.28 M3

1.00 = 6.06 M3
1.00 = 10.40 M3
Beton Plat Lantai. 2, K - 250, tbl=12cm 47.62 M3

Volume
Jumlah =
(P*L*T*Jumlah)
1.00 = 0.07 M3
1.00 = 0.16 M3
1.00 = 0.08 M3
Beton Plat Wastafel, K-250, tbl = 8 cm 0.30 M3

Volume
Jumlah =
(P*L*T*Jumlah)
32.00 = 4.03 M3
20.00 = 1.44 M3
Jumlah 5.47 M3
PEKERJAAN STRUKTUR LANTAI 3 10.94 M3

Volume
Jumlah =
(P*L*T*Jumlah)

3.00 = 3.40 M3
1.00 = 0.69 M3
1.00 = 0.39 M3
3.00 = 2.50 M3
Jumlah 6.98 M3

8.00 = 9.06 M3
3.00 = 1.63 M3
1.00 = 0.39 M3
1.00 = 0.69 M3
Jumlah 11.78 M3
1.00 0.22 M3

4.00 0.88
25.00 4.64
4.00 0.90
25.00 4.73
1.00 0.16
1.00 0.16
1.00 0.19
Jumlah 11.66 M3
13.00 = 1.27 M3
1.00 = 0.23 M3
7.00 = 0.63 M3
2.00 = 0.34 M3
1.00 = 0.02 M3
2.00 = 0.38 M3
1.00 = 0.10 M3
3.00 = 0.32 M3
1.00 = 0.41 M3
3.00 = 0.56 M3
1.00 = 0.15 M3
2.00 = 0.11 M3
1.00 = 0.08 M3
2.00 = 0.32 M3
1.00 = 0.08 M3
Jumlah 4.99 M3
Beton Balok fc = 20.75 MPa (K-250) 35.62 M3

Volume
Jumlah =
(P*L*T*Jumlah)

3.00 = 16.61 M3
10.00 = 4.51 M3
2.00 = 1.06 M3
1.00 = 0.36 M3
1.00 = 0.31 M3
1.00 = 0.40 M3
2.00 = 1.85 M3
1.00 = 0.93 M3
2.00 = 0.46 M3
1.00 = 0.68 M3
1.00 = 0.72 M3
1.00 = 1.58 M3
1.00 = 0.51 M3
1.00 = 0.24 M3
1.00 = 0.61 M3

1.00 = 1.37 M3
1.00 = 0.65 M3
1.00 = 0.38 M3

1.00 = 0.70 M3
1.00 = 0.65 M3
1.00 = 0.28 M3

1.00 = 12.52 M3
Beton Plat Lantai. 3, K - 250, tbl=12cm 47.37 M3

Volume
Jumlah =
(P*L*T*Jumlah)
1.00 = 0.21 M3
1.00 = 0.76 M3
= 2.13 M3
= 1.55 M3
= 11.11 M1

Volume
Jumlah =
(P*L*T*Jumlah)
1.00 = 0.21 M3
1.00 = 0.68 M3
= 1.98 M3
= 1.41 M3
= 10.20 M1

Volume
Jumlah =
(P*L*T*Jumlah)

21.00 = 19.95 M1
46.00 = 43.70 M1
Jumlah 63.65 M1

2.00 = 45.85 M1
2.00 = 92.62 M1
Jumlah 138.47 M1

47.00 = 11.66 Kg
3.00 = 1.20 Kg
Jumlah 12.86 Kg
7.00 = 16.49 Kg
7.00 = 7.69 Kg
21.00 = 16.49 Kg

16.00 = 37.68 Kg
16.00 = 17.58 Kg
46.00 = 36.11 Kg
Jumlah 132.04 Kg

28.00 = 28.00 Bh
84.00 = 84.00 Bh

64.00 = 64.00 Bh
184.00 = 184.00 Bh
Jumlah 360.00 Bh

= 34.46 M2
= 69.53 M2
Jumlah 103.98 M2

= 34.46 M2
= 69.53 M2
Jumlah 103.98 M2

= 22.97 M1
= 46.35 M1
Jumlah 69.32 M1

= 24.47 M1
= 49.35 M1
Jumlah 73.82 M1
14.00 = 29.82 M1
30.00 = 63.90 M1
Jumlah 93.72 M1

Volume
Jumlah =
(P*L*T*Jumlah)

21.00 = 19.95 M1
46.00 = 43.70 M1

14.00 = 29.82 M1
30.00 = 2.13 M1
Jumlah 95.60 M1

2.00 = 45.85 M1
2.00 = 92.62 M1
Jumlah 138.47 M1
47.00 = 11.66 Kg
3.00 = 1.20 Kg
Jumlah 12.86 Kg

7.00 = 16.49 Kg
7.00 = 7.69 Kg
21.00 = 16.49 Kg

16.00 = 37.68 Kg
16.00 = 17.58 Kg
46.00 = 36.11 Kg
Jumlah 132.04 Kg

28.00 = 28.00 Bh
84.00 = 84.00 Bh

64.00 = 64.00 Bh
184.00 = 184.00 Bh
Jumlah 360.00 Bh

= 34.46 M2
= 69.53 M2
Jumlah 103.98 M2

= 34.46 M2
= 69.53 M2
Jumlah 103.98 M2

= 22.97 M1
= 46.35 M1
Jumlah 69.32 M1
= 24.47 M1
= 49.35 M1
Jumlah 73.82 M1
IV PEKERJAAN ARSITEKTURAL
A. PEKERJAAN ARSITEKTURAL LANTAI 1
PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Rollag Batu Bata Untuk Pijakan 1pc 4p

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Diatas Sloof S1
Type Panjang X Lebar 7.550 X 0.55 X
3.885 X 0.55 X
2.135 X 0.55 X
4.625 X 0.55 X
2.625 X 0.55 X
4.625 X 0.57 X
2.625 X 0.57 X
7.550 X 0.57 X
2.585 X 0.55 X
5.550 X 0.55 X
3.625 X 0.55 X
b. Diatas Sloof S3
Type Panjang X Lebar 3.150 X 0.70 X
2.650 X 0.70 X
7.550 X 0.72 X
2.700 X 0.70 X
2.325 X 0.70 X
3.200 X 0.70 X
Type Luasan 2.284 X
1.065 X
1.895 X
c. Diatas Sloof S4
Type Panjang X Lebar 1.700 X 0.75 X
1.150 X 0.75 X
6.750 X 0.75 X
1.250 X 0.75 X
1.780 X 0.75 X
1.710 X 0.75 X
Type Luasan 2.836 X
1.1395 X
0.277 X
2.444001 X
1.1395 X
3.1255 X
1.867 X
1.0355 X
1.3045 X
0.952 X
1.044 X
1.861 X
2.311 X
TOTAL Pas. Rollag Batu Bata Untuk Pijakan
2 Pas. Dinding Bata Ringan Dengan Semen Mortar

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Diatas Sloof S1
Type Panjang X Lebar 7.550 X 3.52 X
2.100 X 3.52 X
3.850 X 3.52 X
2.625 X 3.52 X
4.625 X 3.52 X
4.625 X 3.50 X
2.625 X 3.50 X
7.550 X 3.50 X
2.550 X 3.52 X
5.550 X 3.52 X
b. Diatas Sloof S3
Type Panjang X Lebar 3.150 X 3.67 X
2.650 X 3.67 X
7.700 X 3.50 X
0.525 X 1.58 X
Type Luasan 6.4113 X
5.8288 X
5.4938 X
7.4391 X
c. Diatas Sloof S4
Type Panjang X Lebar 1.250 X 3.72 X
2.000 X 3.72 X
1.525 X 3.72 X
1.200 X 3.72 X
6.700 X 3.72 X
Type Luasan 9.1247 X
5.937 X
10.091199 X
1.659 X
9.825199 X
5.905 X
6.46 X
5.007 X
8.680 X
5.91875 X
11.7155 X
8.84975 X
9.4835 X

A. Dinding diatas S1 Dikurangi


a. Kolom KP
1 KP 0.120 X 3.50 X
2 KP 0.120 X 3.52 X
b. Kusen Pintu
1 Kusen P3 1.100 X 1.54 X
2 Kusen P4 0.780 X 2.14 X
c. Balok Latai
1 Kusen P3 1.750 X 0.20 X
2 Kusen P4 1.100 X 0.20 X
B. Dinding diatas S3 Dikurangi
a. Kolom KP
1 KP 0.120 X 3.50 X
2 KP 0.120 X 3.65 X
3 KP 0.120 X 3.67 X
b. Kusen Pintu
1 Kusen P2 0.880 X 2.58 X
c. Balok Latai
1 Kusen P1 2.350 X 0.20 X
2 Kusen P2 2.650 X 0.20 X
1.250 X 0.20 X
3 Kusen P2 dan J2 2.650 X 0.20 X
4 Kusen P3 1.500 X 0.20 X
5 Kusen BV 1.500 X 0.20 X
3.150 X 0.20 X
6 Kusen J1 2.650 X 0.20 X
7 Kusen J3 1.850 X 0.20 X
1.000 X 0.20 X
d. Kusen Jendela
1 Kusen J1 1.960 X 1.28 X
2 Kusen J2 1.320 X 1.28 X
3 Kusen J3 0.680 X 1.28 X
4 Kusen BV 0.580 X 0.68 X
C. Dinding diatas S4 Dikurangi
a. Kolom KP
1 KP 0.120 X 3.72 X
2 KP 0.120 X 3.70 X
3 KP 0.120 X 3.65 X
b. Balok Latai
1 Kusen P1 1.600 X 0.20 X
2 Kusen P2 2.750 X 0.20 X
3 Kusen P3 1.183 X 0.20 X
0.950 X 0.20 X
4 Kusen Void 1.350 X 0.20 X

TOTAL Pas. Dinding Bata Ringan Dengan Semen

3 Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen Mortar

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Pas. Dinding Bata Ringan Dengan Semen Mortar


Jumlah Total
2 Kali Luar dan Dalam X

Dikurangi
a. Dinding Toilet KM P/W
1 Dinding KM Type 1 12.693 X
2 Dinding KM Type 2 13.783 X
3 Dinding Dalam KM P/W 93.704 X X
b. Dinding Toilet KM W
1 Dinding KM Type 1 11.396 X
2 Dinding KM Type 2 12.485 X
3 Dinding Dalam KM P/W 38.302 X
c. Dinding Toilet KM P
1 Dinding KM Type 1 11.396 X
2 Dinding KM Type 2 12.485 X
3 Dinding Wastafel 39.350 X
d. Dinding Toilet Difabel
1 Dinding KM Type 1 16.237 X
2 Dinding KM Type 2 18.600 X

Jumlah Plesteran Dinding La


b. Plesteran Dinding Rollag
Bagian Depan 6.750 X 0.40 X
1.375 X 0.40 X
3.200 X 0.40 X
2.700 X 0.40 X
Bagian Belakang 2.325 X 0.40 X
7.550 X 0.40 X
3.150 X 0.40 X
2.650 X 0.40 X

TOTAL Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen

4 Acian Dinding Dengan Semen Mortar

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen Mortar

TOTAL Acian Dinding Dengan Semen

5 Acian Beton (Dihitung 15%)

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Kolom
K1 A 35X45 cm 1.600 X 4.00 X
K2 30X30 cm 1.200 X X 4.00 X
b. Balok
B1 A 30X50 cm 7.550 0.65 X X
Diatas Sloof S3 - X X - X
TOTAL Acian Beton (Dihitun

6 Benangan Dinding

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Kolom
Beton Balok fc = 18.675 MPa (K-225) - X 4.00 X
Balok Latei 12X20 cm - X X 4.00 X
b. Balok
2.325 0.65 X X
Diatas Jendela - X X - X
TOTAL Benangan D

7 Benangan Beton (Dihitung 15%)

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Kolom
P1 8.140 X 4.00 X
P2 13.540 X X 4.00 X
b. Balok
0 1.500 0.65 X X
0 - X X - X
TOTAL Benangan Beton (Dihitun
PEKERJAAN KUSEN

LUAS
Keterangan X P X L X T X
CAD/SKP

1 Pasang Kusen P1
2 Pasang Kusen P2
3 Pasang Kusen P3
4 Pasang kusen P4
5 Pasang Kusen J1
6 Pasang Kusen J2
7 Pasang Kusen J3
8 Pasang Kusen BV

PEKERJAAN PENUTUP LANTAI

LUAS
Keterangan X P X L X T X
CAD/SKP

1 Pas. Keramik Lantai 40X40cm Polish Warna


RKB Type 1 0.00 69.312 X
RKB Type 2 0.00 69.3345 X
Selasar dan Tangg- 0.02 155.12909 X
Tangga Depan 3.360 X 1.08 X
Tangga Utama Lt. 1 1.025 X 0.20 X
Plat Bordes Tangga Lt.1 5.0225 X

2 Pas. Keramik Lantai KM 30X30cm Unpolish Warna Untuk Toilet


KM Wanita/Pria
KM Wanita/Pria - 0.02 35.107 X
Toilet - 0.05 1.878 X
- 0.05 1.893 X
KM Wanita
KM Wanita - 0.02 16.263 X
Toilet - 0.05 1.505 X
- 0.05 1.520 X
KM Pria
KM Pria - 0.02 12.310 X
Toilet - 0.05 1.505 X
- 0.05 1.520 X
KM Difabel
KM Pria - 0.05 2.954 X
KM Wanita - 0.05 3.408 X
Janitor
- 0.05 1.890 X

3 Pas. Keramik Dinding Toilet 30X60cm Polish Warna / Motif


KM Wanita/Pria
KM Wanita/Pria - 0.02 96.206 X
Toilet - 0.05 13.388 X
- 0.05 13.783 X
KM Wanita
KM Wanita - 0.02 41.916 X
Toilet - 0.05 12.091 X
- 0.05 12.485 X
KM Pria
KM Pria - 0.02 42.347 X
Toilet - 0.05 12.091 X
- 0.05 12.485 X
KM Difabel
KM Pria - 0.05 16.650 X
KM Wanita - 0.05 18.590 X

4 Pas. Keramik Plint 10x40cm


Selasar 70.795 X
RKB 1 33.870 X
RKB 2 dan 3 33.720 X

5 Pas. Step Nosing Tangga 10x40 cm


Tangga Utama Lt. 1 1.025 X

PEKERJAAN PLAFOND

LUAS
Keterangan X P X L X T X
CAD/SKP

1 Pas. Plafond Kalsiboard 4,5mm + Rangka Hollow 40.40 dan 20.40


KM Wanita/Pria
KM Wanita/Pria 35.107 X
Toilet 1.878 X
1.893 X
KM Wanita
KM Wanita 16.263 X
Toilet 1.505 X
1.520 X
KM Pria
KM Pria 12.310 X
Toilet 1.505 X
1.520 X
KM Difabel
KM Pria 2.954 X
KM Wanita 3.408 X
Janitor
1.890 X
Canopy
Canopy Depan 1.500 X 22.970
Canopy Belakang 1.500 X 46.350

2 Pas. List Gypsum t=10 cm


KM Wanita/Pria
KM Wanita/Pria 39.850 X
Toilet 5.567 X
KM Wanita
KM Wanita 19.900 X
Toilet 5.100 X
KM Pria
KM Pria ` 21.000 X
Toilet 5.100 X
KM Difabel
KM Pria 6.900 X
KM Wanita 7.600 X
Janitor 7.500 X
PEKERJAAN PENGECATAN

LUAS
Keterangan X P X L X T X
CAD/SKP

1 Pengecatan Dinding Dalam


a. Dinding Dalam RKB
RKB 1 114.12 X
RKB 2 112.16 X
b. KM Wanita/Pria
KM Wanita/Pria 17.06 X
Toilet 2.67 X
c. KM Wanita
KM Wanita 8.41 X
Toilet 2.45 X
d. KM Pria
KM Pria 8.77 X
Toilet 2.45 X
e. KM Difabel
KM Pria 3.42 X
KM Wanita 3.11 X
f. KM Difabel 19.17 X

2 Pengecatan Dinding Luar


a. Dinding Luar
Selasar dan Kolom 466.49827 X

3 Pengecatan Plafond Kalsiboard


KM Wanita/Pria - 0.02 35.107 X
Toilet - 0.05 1.878 X
- 0.05 1.893 X
KM Wanita
KM Wanita - 0.02 16.263 X
Toilet - 0.05 1.505 X
- 0.05 1.520 X
KM Pria
KM Pria - 0.02 12.310 X
Toilet - 0.05 1.505 X
- 0.05 1.520 X
KM Difabel
KM Pria - 0.05 2.954 X
KM Wanita - 0.05 3.408 X
Janitor
- 0.05 1.890 X

4 Pengecatan Plafond Expose


B. PEKERJAAN ARSITEKTURAL LANTAI 2
PEKERJAAN PASANGAN DAN PLESTERAN

LUAS
Keterangan X P X L X T X
CAD/SKP

1 Pas. Dinding Bata Ringan Dengan Semen Mortar


a. Diatas Sloof S1
Type Panjang X Lebar 7.550 X 3.52 X
2.100 X 3.52 X
3.850 X 3.52 X
2.625 X 3.52 X
4.625 X 3.52 X
4.625 X 3.50 X
2.625 X 3.50 X
7.550 X 3.50 X
2.550 X 3.52 X
5.550 X 3.52 X
b. Diatas Sloof S3
Type Panjang X Lebar 3.150 X 3.67 X
2.650 X 3.67 X
7.700 X 3.50 X
0.525 X 1.58 X
Type Luasan 6.4113 X
5.8288 X
5.4938 X
7.4391 X
c. Diatas Sloof S4
Type Panjang X Lebar 1.250 X 3.72 X
2.000 X 3.72 X
1.525 X 3.72 X
1.200 X 3.72 X
6.700 X 3.72 X
Type Luasan 9.1247 X
5.937 X
10.091199 X
1.659 X
9.825199 X
5.905 X
6.46 X
5.007 X
8.680 X
5.91875 X
11.7155 X
8.84975 X
9.4835 X

A. Dinding diatas S1 Dikurangi


a. Kolom KP
1 KP 0.120 X 3.50 X
2 KP 0.120 X 3.52 X
b. Kusen Pintu
1 Kusen P3 1.100 X 1.54 X
2 Kusen P4 0.780 X 2.14 X
c. Balok Latai
1 Kusen P3 1.750 X 0.20 X
2 Kusen P4 1.100 X 0.20 X
B. Dinding diatas S3 Dikurangi
a. Kolom KP
1 KP 0.120 X 3.50 X
2 KP 0.120 X 3.65 X
3 KP 0.120 X 3.67 X
b. Kusen Pintu
1 Kusen P2 0.880 X 2.58 X
c. Balok Latai
1 Kusen P1 2.350 X 0.20 X
2 Kusen P2 2.650 X 0.20 X
1.250 X 0.20 X
3 Kusen P2 dan J2 2.650 X 0.20 X
4 Kusen P3 1.500 X 0.20 X
5 Kusen BV 1.500 X 0.20 X
3.150 X 0.20 X
6 Kusen J1 2.650 X 0.20 X
7 Kusen J3 1.850 X 0.20 X
1.000 X 0.20 X
d. Kusen Jendela
1 Kusen J1 1.960 X 1.28 X
2 Kusen J2 1.320 X 1.28 X
3 Kusen J3 0.680 X 1.28 X
4 Kusen BV 0.580 X 0.68 X
C. Dinding diatas S4 Dikurangi
a. Kolom KP
1 KP 0.120 X 3.72 X
2 KP 0.120 X 3.70 X
3 KP 0.120 X 3.65 X
b. Balok Latai
1 Kusen P1 1.600 X 0.20 X
2 Kusen P2 2.750 X 0.20 X
3 Kusen P3 1.183 X 0.20 X
0.950 X 0.20 X
4 Kusen Void 1.350 X 0.20 X
TOTAL Pas. Dinding Bata Ringan Dengan Semen

2 Pas. Dinding Bata Ringan Dengan Semen Mortar

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Pas. Dinding Bata Ringan Dengan Semen Mortar


Jumlah Total
2 Kali Luar dan Dalam X

Dikurangi
a. Dinding Toilet KM P/W
1 Dinding KM Type 1 12.693 X
2 Dinding KM Type 2 13.783 X
3 Dinding Dalam KM P/W 93.704 X X
b. Dinding Toilet KM W
1 Dinding KM Type 1 11.396 X
2 Dinding KM Type 2 12.485 X
3 Dinding Dalam KM P/W 38.302 X
c. Dinding Toilet KM P
1 Dinding KM Type 1 11.396 X
2 Dinding KM Type 2 12.485 X
3 Dinding Wastafel 39.350 X
d. Dinding Toilet Difabel
1 Dinding KM Type 1 16.237 X
2 Dinding KM Type 2 18.600 X

Jumlah Plesteran Dinding La


b. Plesteran Dinding Rollag
Bagian Depan 6.750 X 0.40 X
1.375 X 0.40 X
3.200 X 0.40 X
2.700 X 0.40 X
Bagian Belakang 2.325 X 0.40 X
7.550 X 0.40 X
3.150 X 0.40 X
2.650 X 0.40 X

TOTAL Pas. Dinding Bata Ringan Dengan Semen

3 Acian Dinding Dengan Semen Mortar

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Pas. Dinding Bata Ringan Dengan Semen Mortar

TOTAL Acian Dinding Dengan Semen

4 Acian Beton (Dihitung 15%)

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Kolom
PEKERJAAN STRUKTUR ATAP CANOPY LANTAI - X 4.00 X
0 #VALUE! X X 4.00 X
b. Balok
0 - 0.65 X X
Pengaku Gording - X X - X
TOTAL Acian Beton (Dihitun
5 Benangan Dinding

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Kolom
Lantai 2 Depan 45.850 X 4.00 X
Lantai 2 Belakang 92.620 X X 4.00 X
b. Balok
0 - 0.65 X X
Lantai 2 Depan 0.800 X X - X
TOTAL Benangan D

6 Benangan Beton (Dihitung 15%)

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Kolom
Base Plate Atas 0.400 X 4.00 X
Lantai 2 Belakang - X X 4.00 X
b. Balok
0 - 0.65 X X
Base Plate Atas 0.400 X X - X
TOTAL Benangan Beton (Dihitun
7 Pas. Pipa Stainless 2.5

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Kolom
Base Plate Bawah - X 4.00 X
Base Plate Atas - X X 4.00 X
b. Balok
0 - 0.65 X X
Lantai 2 Depan 48.940 X X - X
TOTAL Pas. Pipa Stainl

PEKERJAAN KUSEN

LUAS
Keterangan X P X L X T X
CAD/SKP

1 Pasang Kusen P1
2 Pasang Kusen P2
3 Pasang Kusen P3
4 Pasang Kusen P4
5 Pasang Kusen J1
6 Pasang Kusen J2
7 Pasang Kusen J3
8 Pasang Kusen BV

PEKERJAAN PENUTUP LANTAI

LUAS
Keterangan X P X L X T X
CAD/SKP

1 Pas. Keramik Lantai 40X40cm Polish Warna / Motif


RKB Type 1 0.00 69.312 X
RKB Type 2 0.00 69.3345 X
Selasar dan Tangg- 0.02 155.12909 X
Tangga Depan 3.360 X 1.08 X
Tangga Utama Lt. 1 1.025 X 0.20 X
Plat Bordes Tangga Lt.1 5.0225 X

2 Pas. Keramik Lantai KM 30X30cm Unpolish Warna Untuk Toilet


KM Wanita/Pria
KM Wanita/Pria - 0.02 35.107 X
Toilet - 0.05 1.878 X
- 0.05 1.893 X
KM Wanita
KM Wanita - 0.02 16.263 X
Toilet - 0.05 1.505 X
- 0.05 1.520 X
KM Pria
KM Pria - 0.02 12.310 X
Toilet - 0.05 1.505 X
- 0.05 1.520 X
KM Difabel
KM Pria - 0.05 2.954 X
KM Wanita - 0.05 3.408 X
Janitor
- 0.05 1.890 X

3 Pas. Keramik Dinding Toilet 30X60cm Polish Warna / Motif


KM Wanita/Pria
KM Wanita/Pria - 0.02 96.206 X
Toilet - 0.05 13.388 X
- 0.05 13.783 X
KM Wanita
KM Wanita - 0.02 41.916 X
Toilet - 0.05 12.091 X
- 0.05 12.485 X
KM Pria
KM Pria - 0.02 42.347 X
Toilet - 0.05 12.091 X
- 0.05 12.485 X
KM Difabel
KM Pria - 0.05 16.654 X
KM Wanita - 0.05 18.600 X
4 Pas. Keramik Plint 10x40cm
Selasar 70.795 X
RKB 1 33.870 X
RKB 2 dan 3 33.720 X

5 Pas. Step Nosing Tangga 10x40 cm


Tangga Utama Lt. 1 1.025 X

PEKERJAAN PLAFOND

LUAS
Keterangan X P X L X T X
CAD/SKP

1 Pas. Plafond Kalsiboard 4,5mm + Rangka Hollow 40.40 dan 20.40


KM Wanita/Pria
KM Wanita/Pria 35.107 X
Toilet 1.878 X
1.893 X
KM Wanita
KM Wanita 16.263 X
Toilet 1.505 X
1.520 X
KM Pria
KM Pria 12.310 X
Toilet 1.505 X
1.520 X
KM Difabel
KM Pria 2.954 X
KM Wanita 3.408 X
Janitor
1.890 X
Canopy
Canopy Depan 1.500 X 22.970
Canopy Belakang 1.500 X 46.350

2 Pas. List Gypsum t=10 cm


KM Wanita/Pria
KM Wanita/Pria 39.850 X
Toilet 5.567 X
KM Wanita
KM Wanita 19.900 X
Toilet 5.100 X
KM Pria
KM Pria ` 21.000 X
Toilet 5.100 X
KM Difabel
KM Pria 6.900 X
KM Wanita 7.600 X
Janitor 7.500 X

PEKERJAAN PENGECATAN

LUAS
Keterangan X P X L X T X
CAD/SKP

1 Pengecatan Dinding Dalam


a. Dinding Dalam RKB
RKB 1 114.12 X
RKB 2 112.16 X
b. KM Wanita/Pria
KM Wanita/Pria 17.06 X
Toilet 2.67 X
c. KM Wanita
KM Wanita 8.41 X
Toilet 2.45 X
d. KM Pria
KM Pria 8.77 X
Toilet 2.45 X
e. KM Difabel
KM Pria 3.42 X
KM Wanita 3.11 X
f. KM Difabel 19.17 X

2 Pengecatan Dinding Luar


a. Dinding Luar
Selasar dan Kolom 466.49827 X

3 Pengecatan Plafond Kalsiboard


KM Wanita/Pria - 0.02 35.107 X
Toilet - 0.05 1.878 X
- 0.05 1.893 X
KM Wanita
KM Wanita - 0.02 16.263 X
Toilet - 0.05 1.505 X
- 0.05 1.520 X
KM Pria
KM Pria - 0.02 12.310 X
Toilet - 0.05 1.505 X
- 0.05 1.520 X
KM Difabel
KM Pria - 0.05 2.954 X
KM Wanita - 0.05 3.408 X
Janitor
- 0.05 1.890 X

4 Pengecatan Plafond Expose


a. Dinding Luar
Selasar dan Kolom 466.49827 X

5 Waterproofing toilet
a. Dinding Luar
Selasar dan Kolom 466.49827 X
Volume
Jumlah =
(P*L*T*Jumlah)

1.00 = 4.15 M2
1.00 = 2.14 M2
1.00 = 1.17 M2
1.00 = 2.54 M2
1.00 = 1.44 M2
1.00 = 2.64 M2
1.00 = 1.50 M2
1.00 = 4.30 M2
1.00 = 1.42 M2
1.00 = 3.05 M2
1.00 = 1.99 M2

2.00 = 4.41 M2
24.00 = 44.52 M2
2.00 = 10.87 M2
13.00 = 24.57 M2
1.00 = 1.63 M2
1.00 = 2.24 M2
1.00 = 2.28 M2
2.00 = 2.13 M2
1.00 = 1.89 M2

1.00 = 1.28 M2
2.00 = 1.73 M2
1.00 = 5.06 M2
1.00 = 0.94 M2
1.00 = 1.34 M2
1.00 = 1.28 M2
1.00 = 2.84 M2
2.00 = 2.28 M2
1.00 = 0.28 M2
2.00 = 4.89 M2
4.00 = 4.56 M2
2.00 = 6.25 M2
1.00 = 1.87 M2
1.00 = 1.04 M2
1.00 = 1.30 M2
1.00 = 0.95 M2
1.00 = 1.04 M2
1.00 = 1.86 M2
1.00 = 2.31 M2
Pas. Rollag Batu Bata Untuk Pijakan 1pc 4p 163.98 M2
Volume
Jumlah =
(P*L*T*Jumlah)

1.00 = 26.58 M2
1.00 = 7.39 M2
1.00 = 13.55 M2
1.00 = 9.24 M2
1.00 = 16.28 M2
1.00 = 16.19 M2
1.00 = 9.19 M2
1.00 = 26.43 M2
1.00 = 8.98 M2
1.00 = 19.54 M2

2.00 = 23.12 M2
24.00 = 233.41 M2
2.00 = 53.90 M2
1.00 = 0.83 M2
1.00 = 6.41 M2
2.00 = 11.66 M2
1.00 = 5.49 M2
1.00 = 7.44 M2
6.00
1.00 = 4.65 M2
1.00 = 7.44 M2
1.00 = 5.67 M2
2.00 = 8.93 M2
1.00 = 24.92 M2
1.00 = 9.12 M2
2.00 = 11.87 M2
1.00 = 10.09 M2
1.00 = 1.66 M2
1.00 = 9.83 M2
4.00 = 23.62 M2
1.00 = 6.46 M2
1.00 = 5.01 M2
1.00 = 8.68 M2
1.00 = 5.92 M2
1.00 = 11.72 M2
2.00 = 17.70 M2
1.00 = 9.48 M2
Jumlah 678.39 M2

7.00 = 2.94 M2
14.00 = 5.91 M2

1.00 = 1.69 M2
1.00 = 1.67 M2

1.00 = 0.35 M2
1.00 = 0.22 M2

2.00 = 0.84 M2
3.00 = 1.31 M2
9.00 = 3.96 M2

5.00 = 11.35 M2

1.00 = 0.47 M2
1.00 = 0.53 M2
1.00 = 0.25 M2
3.00 = 1.59 M2
1.00 = 0.30 M2
3.00 = 0.90 M2
1.00 = 0.63 M2
15.00 = 7.95 M2
9.00 = 3.33 M2
9.00 = 1.80 M2

15.00 = 37.63 M2
3.00 = 5.07 M2
3.00 = 2.61 M2
5.00 = 1.97 M2

10.00 = 4.46 M2
7.00 = 3.11 M2
2.00 = 0.88 M2

1.00 = 0.32 M2
1.00 = 0.55 M2
3.00 = 0.71 M2
8.00 = 1.52 M2
3.00 = 0.81 M2
Jumlah 107.65 M2
Pas. Dinding Bata Ringan Dengan Semen Mortar 570.74 M2

Volume
Jumlah =
(P*L*T*Jumlah)

= 570.74 M2
Jumlah 1,141.48 M2

1.00 = 12.69 M2
2.00 = 27.57 M2
1.00 = 93.70 M2

1.00 = 11.40 M2
3.00 = 37.46 M2
1.00 = 38.30 M2

1.00 = 11.40 M2
3.00 = 37.46 M2
1.00 = 39.35 M2

1.00 = 16.24 M2
1.00 = 18.60 M2
Jumlah 344.16 M2
Jumlah Plesteran Dinding Lantai 1 797.33 M2
1.00 = 2.70 M2
1.00 = 0.55 M2
1.00 = 1.28 M2
11.00 = 11.88 M2
1.00 = 0.93 M2
1.00 = 3.02 M2
2.00 = 2.52 M2
13.00 = 13.78 M2
Jumlah 36.66 M2
Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen Mortar 833.99 M2

Volume
Jumlah =
(P*L*T*Jumlah)

= 833.99 M2
Acian Dinding Dengan Semen Mortar 833.99 M2

Volume
Jumlah =
(P*L*T*Jumlah)

32.00 = 204.80 M2
20.00 = 96.00 M2

3.00 = 14.72 M2
- = - M2
Acian Beton (Dihitung 15%) 300.80 M2

Volume
Jumlah =
(P*L*T*Jumlah)

- = - M2
- = - M2

1.00 = 1.51 M2
- = - M2
Benangan Dinding - M2

Volume
Jumlah =
(P*L*T*Jumlah)

1.00 = 32.56 M2
1.00 = 54.16 M2

7.00 = 6.83 M2
- = - M2
Benangan Beton (Dihitung 15%) 86.72 M2
Volume
Jumlah =
(P*L*T*Jumlah)
2.00 = 2.00 Unit
6.00 = 6.00 Unit
12.00 = 12.00 Unit
1.00 = 1.00 Unit
15.00 = 15.00 Unit
3.00 = 3.00 Unit
3.00 = 3.00 Unit
5.00 = 5.00 Unit

Volume
Jumlah =
(P*L*T*Jumlah)

1.00 = 69.31 M2
2.00 = 138.67 M3
1.00 = 155.13 M4
2.00 = 7.26 M4
20.00 = 4.10 M4
1.00 = 5.02 M4
Jumlah 379.49 M2

1.00 = 35.11 M2
1.00 = 1.88 M2
2.00 = 3.79 M2

1.00 = 16.26 M3
1.00 = 1.51 M2
3.00 = 4.56 M2

1.00 = 12.31 M4
1.00 = 1.51 M2
3.00 = 4.56 M2

1.00 = 2.95 M4
1.00 = 3.41 M2

1.00 = 1.89 M4
Jumlah 89.73 M2

1.00 = 96.21 M2
1.00 = 13.39 M2
2.00 = 27.57 M2

1.00 = 41.92 M3
1.00 = 12.09 M2
3.00 = 37.46 M2

1.00 = 42.35 M4
1.00 = 12.09 M2
3.00 = 37.46 M2
1.00 = 16.65 M4
1.00 = 18.59 M2
Jumlah 355.76 M2

1.00 = 70.80 M1
1.00 = 33.87 M1
2.00 = 67.44 M1
Jumlah 172.11 M1

20.00 = 20.50 M1
Jumlah 20.50 M1

Volume
Jumlah =
(P*L*T*Jumlah)

1.00 = 35.11 M3
1.00 = 1.88 M3
2.00 = 3.79 M3

1.00 = 16.26 M3
1.00 = 1.51 M3
3.00 = 4.56 M3

1.00 = 12.31 M3
1.00 = 1.51 M3
3.00 = 4.56 M3

1.00 = 2.95 M3
1.00 = 3.41 M3

1.00 = 1.89 M3
= 34.46 M3
= 69.53 M3
Jumlah 193.71 M1

1.00 = 39.85 M1
3.00 = 16.70 M1

1.00 = 19.90 M1
4.00 = 20.40 M1

1.00 = 21.00 M1
4.00 = 20.40 M1

1.00 = 6.90 M1
1.00 = 7.60 M1
1.00 = 7.50 M1
Jumlah 160.25 M1
Volume
Jumlah =
(P*L*T*Jumlah)

1.00 = 114.12 M2
2.00 = 224.32 M2

1.00 = 17.06 M2
3.00 = 8.02 M2

1.00 = 8.41 M2
4.00 = 9.79 M2

1.00 = 8.77 M2
4.00 = 9.79 M2

1.00 = 3.42 M2
1.00 = 3.11 M2
1.00 = 19.17 M2
Jumlah 425.99 M2

1.00 = 466.50 M2
Jumlah 466.50 M2

1.00 = 35.11 M2
1.00 = 1.88 M2
2.00 = 3.79 M2

1.00 = 16.26 M3
1.00 = 1.51 M2
3.00 = 4.56 M2

1.00 = 12.31 M4
1.00 = 1.51 M2
3.00 = 4.56 M2

1.00 = 2.95 M4
1.00 = 3.41 M2

1.00 = M4
Jumlah 87.84 M2

Jumlah M2
Volume
Jumlah =
(P*L*T*Jumlah)

1.00 = 26.58 M2
1.00 = 7.39 M2
1.00 = 13.55 M2
1.00 = 9.24 M2
1.00 = 16.28 M2
1.00 = 16.19 M2
1.00 = 9.19 M2
1.00 = 26.43 M2
1.00 = 8.98 M2
1.00 = 19.54 M2

2.00 = 23.12 M2
24.00 = 233.41 M2
2.00 = 53.90 M2
1.00 = 0.83 M2
1.00 = 6.41 M2
2.00 = 11.66 M2
1.00 = 5.49 M2
1.00 = 7.44 M2
6.00
1.00 = 4.65 M2
1.00 = 7.44 M2
1.00 = 5.67 M2
2.00 = 8.93 M2
1.00 = 24.92 M2
1.00 = 9.12 M2
2.00 = 11.87 M2
1.00 = 10.09 M2
1.00 = 1.66 M2
1.00 = 9.83 M2
4.00 = 23.62 M2
1.00 = 6.46 M2
1.00 = 5.01 M2
1.00 = 8.68 M2
1.00 = 5.92 M2
1.00 = 11.72 M2
2.00 = 17.70 M2
1.00 = 9.48 M2
Jumlah 678.39 M2

7.00 = 2.94 M2
14.00 = 5.91 M2

1.00 = 1.69 M2
1.00 = 1.67 M2

1.00 = 0.35 M2
1.00 = 0.22 M2
2.00 = 0.84 M2
3.00 = 1.31 M2
9.00 = 3.96 M2

5.00 = 11.35 M2

1.00 = 0.47 M2
1.00 = 0.53 M2
1.00 = 0.25 M2
3.00 = 1.59 M2
1.00 = 0.30 M2
3.00 = 0.90 M2
1.00 = 0.63 M2
15.00 = 7.95 M2
9.00 = 3.33 M2
9.00 = 1.80 M2

15.00 = 37.63 M2
3.00 = 5.07 M2
3.00 = 2.61 M2
5.00 = 1.97 M2

10.00 = 4.46 M2
7.00 = 3.11 M2
2.00 = 0.88 M2

1.00 = 0.32 M2
1.00 = 0.55 M2
3.00 = 0.71 M2
8.00 = 1.52 M2
3.00 = 0.81 M2
Jumlah 107.65 M2
Pas. Dinding Bata Ringan Dengan Semen Mortar 570.74 M2

Volume
Jumlah =
(P*L*T*Jumlah)

= 570.74 M2
Jumlah 1,141.48 M2

1.00 = 12.69 M2
2.00 = 27.57 M2
1.00 = 93.70 M2

1.00 = 11.40 M2
3.00 = 37.46 M2
1.00 = 38.30 M2

1.00 = 11.40 M2
3.00 = 37.46 M2
1.00 = 39.35 M2
1.00 = 16.24 M2
1.00 = 18.60 M2
Jumlah 344.16 M2
Jumlah Plesteran Dinding Lantai 1 797.33 M2

1.00 = 2.70 M2
1.00 = 0.55 M2
1.00 = 1.28 M2
11.00 = 11.88 M2
1.00 = 0.93 M2
1.00 = 3.02 M2
2.00 = 2.52 M2
13.00 = 13.78 M2
Jumlah 36.66 M2
Pas. Dinding Bata Ringan Dengan Semen Mortar 833.99 M2

Volume
Jumlah =
(P*L*T*Jumlah)

= 833.99 M2
Acian Dinding Dengan Semen Mortar 833.99 M2

Volume
Jumlah =
(P*L*T*Jumlah)

- = - M2
Jumlah = M2

- = - M2
- = - M2
Acian Beton (Dihitung 15%) - M2
Volume
Jumlah =
(P*L*T*Jumlah)

2.00 = M2
2.00 = M2

- = - M2
47.00 = - M2
Benangan Dinding - M2

Volume
Jumlah =
(P*L*T*Jumlah)

21.00 = 33.60 M2
- = - M2

- = - M2
46.00 = - M2
Benangan Beton (Dihitung 15%) 33.60 M2
Volume
Jumlah =
(P*L*T*Jumlah)

64.00 = - M2
184.00 = - M2

- = - M2
- = - M2
Pas. Pipa Stainless 2.5 - M2

Volume
Jumlah =
(P*L*T*Jumlah)
2.00 = 2.00 Unit
6.00 = 6.00 Unit
12.00 = 12.00 Unit
1.00 = 1.00 Unit
15.00 = 15.00 Unit
3.00 = 3.00 Unit
3.00 = 3.00 Unit
5.00 = 5.00 Unit

Volume
Jumlah =
(P*L*T*Jumlah)

- = - M2
2.00 = 138.67 M3
1.00 = 155.13 M4
2.00 = 7.26 M4
20.00 = 4.10 M4
1.00 = 5.02 M4
Jumlah 310.18 M2
1.00 = 35.11 M2
1.00 = 1.88 M2
2.00 = 3.79 M2

1.00 = 16.26 M3
1.00 = 1.51 M2
3.00 = 4.56 M2

1.00 = 12.31 M4
1.00 = 1.51 M2
3.00 = 4.56 M2

1.00 = 2.95 M4
1.00 = 3.41 M2

1.00 = 1.89 M4
Jumlah 89.73 M2

1.00 = 96.21 M2
1.00 = 13.39 M2
2.00 = 27.57 M2

1.00 = 41.92 M3
1.00 = 12.09 M2
3.00 = 37.46 M2

1.00 = 42.35 M4
1.00 = 12.09 M2
3.00 = 37.46 M2

1.00 = 16.65 M4
1.00 = 18.60 M2
Jumlah 355.77 M2
1.00 = 70.80 M1
1.00 = 33.87 M1
2.00 = 67.44 M1
Jumlah 172.11 M1

20.00 = 20.50 M1
Jumlah 20.50 M1

Volume
Jumlah =
(P*L*T*Jumlah)

1.00 = 35.11 M3
1.00 = 1.88 M3
2.00 = 3.79 M3

1.00 = 16.26 M3
1.00 = 1.51 M3
3.00 = 4.56 M3

1.00 = 12.31 M3
1.00 = 1.51 M3
3.00 = 4.56 M3

1.00 = 2.95 M3
1.00 = 3.41 M3

1.00 = 1.89 M3

= 34.46 M3
= 69.53 M3
Jumlah 193.71 M1
1.00 = 39.85 M1
3.00 = 16.70 M1

1.00 = 19.90 M1
4.00 = 20.40 M1

1.00 = 21.00 M1
4.00 = 20.40 M1
1.00 = 6.90 M1
1.00 = 7.60 M1
1.00 = 7.50 M1
Jumlah 160.25 M1

Volume
Jumlah =
(P*L*T*Jumlah)

1.00 = 114.12 M2
2.00 = 224.32 M2

1.00 = 17.06 M2
3.00 = 8.02 M2

1.00 = 8.41 M2
4.00 = 9.79 M2

1.00 = 8.77 M2
4.00 = 9.79 M2

1.00 = 3.42 M2
1.00 = 3.11 M2
1.00 = 19.17 M2
Jumlah 425.99 M2

1.00 = 466.50 M2
Jumlah 466.50 M2

1.00 = 35.11 M2
1.00 = 1.88 M2
2.00 = 3.79 M2
1.00 = 16.26 M3
1.00 = 1.51 M2
3.00 = 4.56 M2

1.00 = 12.31 M4
1.00 = 1.51 M2
3.00 = 4.56 M2

1.00 = 2.95 M4
1.00 = 3.41 M2

1.00 = 1.89 M4
Jumlah 89.73 M2

1.00 = M2
Jumlah - M2

1.00 = M2
Jumlah - M2
V PEKERJAAN MEKANIKAL
A. PEKERJAAN MEKANIKAL LANTAI 1
PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasang pipa PVC air bersih 3/4 AW

LUAS
Keterangan X P X L X T X
CAD/SKP

a.

TOTAL Pasang pipa PVC air bersih

2 Pasang pipa PVC air bersih 1 AW

LUAS
Keterangan X P X L X T X
CAD/SKP

a.

TOTAL Pasang pipa PVC air bersi

3 Pasang pipa PVC air bekas 3 AW

LUAS
Keterangan X P X L X T X
CAD/SKP

a.

TOTAL Pasang pipa PVC air beka

4 Pasang pipa PVC air kotor 4 AW

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Pasang pipa PVC air bekas 3 AW

TOTAL Pasang pipa PVC air koto

5 Pasang pipa galvanis 4


LUAS
Keterangan X P X L X T X
CAD/SKP

LUAS
Keterangan X P X L X T X
CAD/SKP

6 Pasang klosed duduk


a. KM Pria/Wanita X
b KM Difabel 1 X
c KM Wanita X
d KM Pria X
e KM Difabel 2 X

7 Pasang jet washer


a. KM Pria/Wanita X
b KM Difabel 1 X
c KM Wanita X
d KM Pria X
e KM Difabel 2 X

8 Pasang wastafell
a. KM Pria/Wanita X
b KM Wanita X
c KM Pria X

9 Pasang floordrain Stainless ( Avour )


a. KM Pria/Wanita X
b KM Wanita X
c KM Pria X
d KM Difabel 1 X
e KM Difabel 2 X

10 Pasang floor clean out Stainless 3


a. KM Pria/Wanita X
b KM Wanita X
c KM Pria X

11 Pasang floor clean out Stainless 4


a. Selasar X

12 Bio filter 3 M3
X

13 Pasang pompa transfer


X
B. PEKERJAAN MEKANIKAL LANTAI 2
1 Pasang pipa PVC air bersih 3/4 AW

LUAS
Keterangan X P X L X T X
CAD/SKP

a.

TOTAL Pasang pipa PVC air bersih

2 Pasang pipa PVC air bersih 1 AW

LUAS
Keterangan X P X L X T X
CAD/SKP

a.

TOTAL Pasang pipa PVC air bersi

3 Pasang pipa PVC air kotor 3 AW

LUAS
Keterangan X P X L X T X
CAD/SKP

a.

TOTAL Pasang pipa PVC air koto

4 Pasang pipa PVC air kotor 4 AW

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Pasang pipa PVC air kotor 3 AW

TOTAL Pasang pipa PVC air koto

5 Pasang pipa galvanis 4

LUAS
Keterangan X P X L X T X
CAD/SKP
LUAS
Keterangan X P X L X T X
CAD/SKP

6 Pasang klosed duduk


a. KM Pria/Wanita X
b KM Difabel 1 X
c KM Wanita X
d KM Pria X
e KM Difabel 2 X

7 Pasang jet washer


a. KM Pria/Wanita X
b KM Difabel 1 X
c KM Wanita X
d KM Pria X
e KM Difabel 2 X

8 Pasang wastafell
a. KM Pria/Wanita X
b KM Wanita X
c KM Pria X

9 Pasang floordrain Stainless


a. KM Pria/Wanita X
b KM Wanita X
c KM Pria X
d KM Difabel 1 X
e KM Difabel 2 X

10 Pasang floor clean out Stainless 3


a. KM Pria/Wanita X
b KM Wanita X
c KM Pria X

11 Pasang floor clean out Stainless 4


a. Selasar X

12 Pasang Tandon Stainles kapasitas 1100lt


X
Volume
Jumlah =
(P*L*T*Jumlah)

= M1
= M1
= M1
Pasang pipa PVC air bersih 3/4 AW M1

Volume
Jumlah =
(P*L*T*Jumlah)

- M1
M1
Pasang pipa PVC air bersih 1 AW M1

Volume
Jumlah =
(P*L*T*Jumlah)

Jumlah M1
Pasang pipa PVC air bekas 3 AW M1

Volume
Jumlah =
(P*L*T*Jumlah)

= - M1
Pasang pipa PVC air kotor 4 AW - M1
Volume
Jumlah =
(P*L*T*Jumlah)

M1
M1

M1
M1
Jumlah M1

Volume
Jumlah =
(P*L*T*Jumlah)

3.00 = 3.00 Unit


1.00 = 1.00 Unit
4.00 = 4.00 Unit
4.00 = 4.00 Unit
1.00 = 1.00 Unit
Jumlah 13.00 Unit

3.00 = 3.00 Unit


1.00 = 1.00 Unit
4.00 = 4.00 Unit
4.00 = 4.00 Unit
1.00 = 1.00 Unit
Jumlah 13.00 Unit

1.00 = 1.00 Unit


4.00 = 4.00 Unit
2.00 = 2.00 Unit
Jumlah 7.00 Unit

3.00 = 3.00 Unit


4.00 = 4.00 Unit
4.00 = 4.00 Unit
1.00 = 1.00 Unit
1.00 = 1.00 Unit
Jumlah 13.00 Unit

1.00 = 1.00 Unit


1.00 = 1.00 Unit
1.00 = 1.00 Unit
Jumlah 3.00 Unit

6.00 = 6.00 Unit


Jumlah 6.00 Unit

1.00 = 1.00 Unit


Jumlah 1.00 Unit

2.00 = 2.00 Unit


Jumlah 2.00 Unit
Volume
Jumlah =
(P*L*T*Jumlah)

= M1
= M1
= M1
Pasang pipa PVC air bersih 3/4 AW M1

Volume
Jumlah =
(P*L*T*Jumlah)

- M1
M1
Pasang pipa PVC air bersih 1 AW M1

Volume
Jumlah =
(P*L*T*Jumlah)

Jumlah M1
Pasang pipa PVC air kotor 3 AW M1

Volume
Jumlah =
(P*L*T*Jumlah)

= - M1
Pasang pipa PVC air kotor 4 AW - M1

Volume
Jumlah =
(P*L*T*Jumlah)
M1
M1

M1
M1
Jumlah M1

Volume
Jumlah =
(P*L*T*Jumlah)

3.00 = 3.00 Unit


= - Unit
= - Unit
= - Unit
= - Unit
Jumlah 3.00 Unit

3.00 = 3.00 Unit


1.00 = 1.00 Unit
4.00 = 4.00 Unit
4.00 = 4.00 Unit
1.00 = 1.00 Unit
Jumlah 13.00 Unit

1.00 = 1.00 Unit


4.00 = 4.00 Unit
2.00 = 2.00 Unit
Jumlah 7.00 Unit

3.00 = 3.00 Unit


4.00 = 4.00 Unit
4.00 = 4.00 Unit
1.00 = 1.00 Unit
1.00 = 1.00 Unit
Jumlah 13.00 Unit

1.00 = 1.00 Unit


1.00 = 1.00 Unit
1.00 = 1.00 Unit
Jumlah 3.00 Unit

6.00 = 6.00 Unit


Jumlah 6.00 Unit

1.00 = 1.00 Unit


Jumlah 1.00 Unit
VI PEKERJAAN ELEKTRIKAL
A. PEKERJAAN ELEKTRIKAL LANTAI 1
1 Instalasi Ttk lampu

LUAS
Keterangan X P X L X T X
CAD/SKP

a. RKB
RKB 1
RKB 2
RKB 3
b. KM Wanita/Pria
R. Toilet
R. Wastafel
R. Locker
Selasar KM
c. KM Wanita
R. Toilet
R. Wastafel
d. KM Pria
R. Toilet
R. Wastafel
e. KM Difabel
R. Toilet Pria
f. KM Difabel
R. Toilet Pria
g. R. Janitor
R. Janitor
h. Selasar
Selasar
TOTAL Instalasi Ttk

2 Pemasangan Ttk stop kontak

LUAS
Keterangan X P X L X T X
CAD/SKP

a. RKB
RKB 1
RKB 2
RKB 3
TOTAL Pemasangan Ttk stop

3 Pemasangan Ttk swith socket AC

LUAS
Keterangan X P X L X T X
CAD/SKP

a. RKB
RKB 1
RKB 2
RKB 3
TOTAL Pemasangan Ttk swith soc

4 Instalasi saklar tunggal

LUAS
Keterangan X P X L X T X
CAD/SKP

a, KM Wanita/Pria
R. Toilet
R. Wastafel
Selasar KM
b. KM Wanita
R. Toilet
R. Wastafel
c. KM Pria
R. Toilet
R. Wastafel
d. KM Difabel
R. Toilet Pria
e. KM Difabel
R. Toilet Pria
f. R. Janitor
R. Janitor
g. Selasar
Selasar
TOTAL Instalasi saklar t
5 Instalasi saklar ganda

LUAS
Keterangan X P X L X T X
CAD/SKP

a. RKB
RKB 1
RKB 2
RKB 3
b. KM Wanita/Pria
R. Locker
c. Selasar
Selasar

6 Pasang lampu LED 13watt bulb

LUAS
Keterangan X P X L X T X
CAD/SKP

a. RKB
RKB 1
RKB 2
RKB 3
b. Selasar
Selasar
TOTAL Pasang lampu LED 13wa

7 Pasang lampu LED 8watt bulb

LUAS
Keterangan X P X L X T X
CAD/SKP

a. KM Wanita/Pria
R. Toilet
R. Wastafel
R. Locker
Selasar KM
b. KM Wanita
R. Toilet
R. Wastafel
c. KM Pria
R. Toilet
R. Wastafel
d. KM Difabel
R. Toilet Pria
e. KM Difabel
R. Toilet Pria
f. R. Janitor
R. Janitor
TOTAL Pasang lampu LED 8wa
8 Pasang box panel + MCB

LUAS
Keterangan X P X L X T X
CAD/SKP

a. Pasang box panel + MCB

TOTAL Pasang box panel

B. PEKERJAAN ELEKTRIKAL LANTAI 2


1 Instalasi Ttk lampu

LUAS
Keterangan X P X L X T X
CAD/SKP

a. RKB
RKB 1
RKB 2
RKB 3
b. KM Wanita/Pria
R. Toilet
R. Wastafel
R. Locker
Selasar KM
c. KM Wanita
R. Toilet
R. Wastafel
d. KM Pria
R. Toilet
R. Wastafel
e. KM Difabel
R. Toilet Pria
f. KM Difabel
R. Toilet Pria
g. R. Janitor
R. Janitor
h. Selasar
Selasar
TOTAL Instalasi Ttk

2 Pemasangan Ttk stop kontak

LUAS
Keterangan X P X L X T X
CAD/SKP

a. RKB
RKB 1
RKB 2
RKB 3
TOTAL Pemasangan Ttk stop

3 Pemasangan Ttk swith socket AC

LUAS
Keterangan X P X L X T X
CAD/SKP

a. RKB
RKB 1
RKB 2
RKB 3
TOTAL Pemasangan Ttk swith soc
4 Instalasi saklar tunggal

LUAS
Keterangan X P X L X T X
CAD/SKP

a, KM Wanita/Pria
R. Toilet
R. Wastafel
Selasar KM
b. KM Wanita
R. Toilet
R. Wastafel
c. KM Pria
R. Toilet
R. Wastafel
d. KM Difabel
R. Toilet Pria
e. KM Difabel
R. Toilet Pria
f. R. Janitor
R. Janitor
g. Selasar
Selasar
TOTAL Instalasi saklar t

5 Instalasi saklar ganda

LUAS
Keterangan X P X L X T X
CAD/SKP

a. RKB
RKB 1
RKB 2
RKB 3
b. KM Wanita/Pria
R. Locker
c. Selasar
Selasar
6 Pasang lampu LED 13watt bulb

LUAS
Keterangan X P X L X T X
CAD/SKP

a. RKB
RKB 1
RKB 2
RKB 3
b. Selasar
Selasar
TOTAL Pasang lampu LED 13wa

7 Pasang lampu LED 8watt bulb

LUAS
Keterangan X P X L X T X
CAD/SKP

a. KM Wanita/Pria
R. Toilet
R. Wastafel
R. Locker
Selasar KM
b. KM Wanita
R. Toilet
R. Wastafel
c. KM Pria
R. Toilet
R. Wastafel
d. KM Difabel
R. Toilet Pria
e. KM Difabel
R. Toilet Pria
f. R. Janitor
R. Janitor
TOTAL Pasang lampu LED 8wa

8 Pasang box panel + MCB


LUAS
Keterangan X P X L X T X
CAD/SKP

a. Pasang box panel + MCB

TOTAL Pasang box panel


Volume
Jumlah =
(P*L*T*Jumlah)

6.00 = 6.00 Ttk


6.00 = 6.00 Ttk
6.00 = 6.00 Ttk

3.00 = 3.00 Ttk


2.00 = 2.00 Ttk
3.00 = 3.00 Ttk
2.00 = 2.00 Ttk

4.00 = 4.00 Ttk


3.00 = 3.00 Ttk

4.00 = 4.00 Ttk


4.00 = 4.00 Ttk

1.00 = 1.00 Ttk

1.00 = 1.00 Ttk

1.00 = 1.00 Ttk

6.00 = 6.00 Ttk


Instalasi Ttk lampu 52.00 Ttk

Volume
Jumlah =
(P*L*T*Jumlah)

2.00 = 2.00 Ttk


2.00 = 2.00 Ttk
2.00 = 2.00 Ttk
Pemasangan Ttk stop kontak 6.00 Ttk

Volume
Jumlah =
(P*L*T*Jumlah)

1.00 = 1.00 Ttk


1.00 = 1.00 Ttk
1.00 = 1.00 Ttk
Pemasangan Ttk swith socket AC 3.00 Ttk

Volume
Jumlah =
(P*L*T*Jumlah)

3.00 = 3.00 Ttk


1.00 = 1.00 Ttk
1.00 = 1.00 Ttk

4.00 = 4.00 Ttk


1.00 = 1.00 Ttk

4.00 = 4.00 Ttk


1.00 = 1.00 Ttk

1.00 = 1.00 Ttk

1.00 = 1.00 Ttk

1.00 = 1.00 Ttk

4.00 = 4.00 Ttk


Instalasi saklar tunggal 22.00 Ttk
Volume
Jumlah =
(P*L*T*Jumlah)

1.00 = 1.00 Ttk


1.00 = 1.00 Ttk
1.00 = 1.00 Ttk

1.00 = 1.00 Ttk

1.00 = 1.00 Ttk


Jumlah 5.00 Unit

Volume
Jumlah =
(P*L*T*Jumlah)

6.00 = 6.00 Ttk


6.00 = 6.00 Ttk
6.00 = 6.00 Ttk

6.00 = 6.00 Ttk


Pasang lampu LED 13watt bulb 24.00 Ttk

Volume
Jumlah =
(P*L*T*Jumlah)

3.00 = 3.00 Ttk


2.00 = 2.00 Ttk
3.00 = 3.00 Ttk
2.00 = 2.00 Ttk

4.00 = 4.00 Ttk


3.00 = 3.00 Ttk

4.00 = 4.00 Ttk


4.00 = 4.00 Ttk

1.00 = 1.00 Ttk

1.00 = 1.00 Ttk

1.00 = 1.00 Ttk


Pasang lampu LED 8watt bulb 28.00 Ttk
Volume
Jumlah =
(P*L*T*Jumlah)

1.00 = 1.00 Ttk


Pasang box panel + MCB 1.00 Ttk

Volume
Jumlah =
(P*L*T*Jumlah)

6.00 = 6.00 Ttk


6.00 = 6.00 Ttk
6.00 = 6.00 Ttk

3.00 = 3.00 Ttk


2.00 = 2.00 Ttk
3.00 = 3.00 Ttk
2.00 = 2.00 Ttk

4.00 = 4.00 Ttk


3.00 = 3.00 Ttk

4.00 = 4.00 Ttk


4.00 = 4.00 Ttk

1.00 = 1.00 Ttk

1.00 = 1.00 Ttk

1.00 = 1.00 Ttk

6.00 = 6.00 Ttk


Instalasi Ttk lampu 52.00 Ttk

Volume
Jumlah =
(P*L*T*Jumlah)

2.00 = 2.00 Ttk


2.00 = 2.00 Ttk
2.00 = 2.00 Ttk
Pemasangan Ttk stop kontak 6.00 Ttk

Volume
Jumlah =
(P*L*T*Jumlah)

1.00 = 1.00 Ttk


1.00 = 1.00 Ttk
1.00 = 1.00 Ttk
Pemasangan Ttk swith socket AC 3.00 Ttk
Volume
Jumlah =
(P*L*T*Jumlah)

3.00 = 3.00 Ttk


1.00 = 1.00 Ttk
1.00 = 1.00 Ttk

4.00 = 4.00 Ttk


1.00 = 1.00 Ttk

4.00 = 4.00 Ttk


1.00 = 1.00 Ttk

1.00 = 1.00 Ttk

1.00 = 1.00 Ttk

1.00 = 1.00 Ttk

4.00 = 4.00 Ttk


Instalasi saklar tunggal 22.00 Ttk

Volume
Jumlah =
(P*L*T*Jumlah)

1.00 = 1.00 Ttk


1.00 = 1.00 Ttk
1.00 = 1.00 Ttk

1.00 = 1.00 Ttk

1.00 = 1.00 Ttk


Jumlah 5.00 Unit
Volume
Jumlah =
(P*L*T*Jumlah)

6.00 = 6.00 Ttk


6.00 = 6.00 Ttk
6.00 = 6.00 Ttk

6.00 = 6.00 Ttk


Pasang lampu LED 13watt bulb 24.00 Ttk

Volume
Jumlah =
(P*L*T*Jumlah)

3.00 = 3.00 Ttk


2.00 = 2.00 Ttk
3.00 = 3.00 Ttk
2.00 = 2.00 Ttk

4.00 = 4.00 Ttk


3.00 = 3.00 Ttk

4.00 = 4.00 Ttk


4.00 = 4.00 Ttk

1.00 = 1.00 Ttk

1.00 = 1.00 Ttk

1.00 = 1.00 Ttk


Pasang lampu LED 8watt bulb 28.00 Ttk
Volume
Jumlah =
(P*L*T*Jumlah)

1.00 = 1.00 Ttk


Pasang box panel + MCB 1.00 Ttk
TIME RE-SCHEDULE PELAKSANAAN
DI MUTUAL CHECK - 40
185 (SERATUS DELAPAN PULUH LIMA) HARI KALENDER

NAMA KEGIATAN : PEMBANGUNAN/REHABILITASI FASILITAS BANGUNAN PENDIDIKAN


PEKERJAAN : PEMBANGUNAN GEDUNG TYPE B2 (SMP NEGERI 62)
LOKASI : Kota Surabaya
TAHUN : 2019

185 (SERATUS DELAPAN PULUH LIMA) HARI KALEN


BOBOT
NO. ITEM PEKERJAAN MARET APRIL MEI JUNI
FISIK (%)
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15
18 s/d 24 25 s/d 31 01 s/d 07 08 s/d 14 15 s/d 21 22 s/d 28 29 s/d 05 06 s/d 12 13 s/d 19 20 s/d 26 27 s/d 02 03 s/d 09 10 s/d 16 17 s/d 23 24 s/d 30

I PEKERJAAN PENDAHULUAN
1 Pekerjaan Uitzet + Bowplank 0.07 0.07
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 1.41 0.42 0.42 0.42 0.14
2 Urugan Pasir Bawah Pondasi, tbl=5cm 0.10 0.10
3 Urugan Tanah Kembali 0.23 0.11 0.11
4 Urugan Sirtu 0.51
5 Urugan Pasir Bawah Lantai, tbl=5cm 0.08
6 Pengangkutan Bekas Galian Tanah Keluar Lokasi Proyek 0.78 0.78
7 Pembuatan Lubang Strous Pile Ø 30 cm kedalaman 5 m 2.68 1.34 1.34
III PEKERJAAN STRUKTUR
A. PEKERJAAN PONDASI
1 Rabat Lantai Kerja K-175, tbl=5cm 0.29 0.15 0.15
2 Rabat Bawah Lantai K-175, tbl=5cm 0.46
0 Beton Strous fc = 20.75 MPa (K-250) 0.00
1 Strous 30 cm 6.64 3.32 3.32
0 Beton Pile Caps fc = 20.75 MPa (K-250)
1 PC 1 1060X165X40 cm 0.00 0.00 0.00 0.00 0.00
3 PC 2 290X165X40 cm 0.12 0.02 0.04 0.04 0.02
4 PC 3 735X165X40 cm 1.91 0.38 0.57 0.57 0.38
5 PC 4 165X162X40 cm 0.26 0.05 0.08 0.08 0.05
0 Beton Sloof fc = 20.75 MPa (K-250)
185 (SERATUS DELAPAN PULUH LIMA) HARI KALEN
BOBOT
NO. ITEM PEKERJAAN MARET APRIL MEI JUNI
FISIK (%)
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15
18 s/d 24 25 s/d 31 01 s/d 07 08 s/d 14 15 s/d 21 22 s/d 28 29 s/d 05 06 s/d 12 13 s/d 19 20 s/d 26 27 s/d 02 03 s/d 09 10 s/d 16 17 s/d 23 24 s/d 30

1 S1 30X50 cm 0.92 0.28 0.28 0.37


2 S2 20X40 cm 0.03 0.01 0.01
3 S3 20X35 cm 1.27 0.38 0.38 0.51
4 S4 20X30 cm 0.55 0.28 0.28
B. PEKERJAAN STRUKTUR LANTAI 1
0 Beton Kolom fc = 20.75 MPa (K-250)
1 K1 A 35X45 cm 3.47 0.87 0.87 1.74
2 K2 30X30 cm 1.24 0.31 0.31 0.62
3 Kp 12X12 cm K-225 0.49
0 Beton Balok fc = 18.675 MPa (K-225)
1 Balok Latei 12X20 cm 0.41
2 Beton Plat Wastafel, K-250, tbl = 8 cm 0.03
C. PEKERJAAN STRUKTUR LANTAI 2
0 Beton Kolom fc = 20.75 MPa (K-250)
1 K1 B 35X45 cm 2.56
2 K2 30X30 cm 0.97
3 Kp 12X12 cm 0.41
0 Beton Balok fc = 20.75 MPa (K-250)
1 B1 A 30X50 cm 0.85 0.08
2 B2 20X40 cm 0.03 0.00
3 B3 20X35 cm 1.35 0.14
4 B1 B 30X50 cm 1.31 0.13
5 B4 20X30 cm 0.59 0.06
0 Beton Balok fc = 18.675 MPa (K-225)
1 Balok Latei 12X20 cm 0.41
2 Beton Plat Lantai. 2, K - 250, tbl=12cm 4.93
3 Beton Plat Wastafel, K-250, tbl = 8 cm 0.03
D. PEKERJAAN STRUKTUR LANTAI 3
0 Beton Kolom fc = 20.75 MPa (K-250) 0.00
1 K1 B 35X45 cm 0.51
2 K2 30X30 cm 0.19
0 Beton Balok fc = 20.75 MPa (K-250)
185 (SERATUS DELAPAN PULUH LIMA) HARI KALEN
BOBOT
NO. ITEM PEKERJAAN MARET APRIL MEI JUNI
FISIK (%)
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15
18 s/d 24 25 s/d 31 01 s/d 07 08 s/d 14 15 s/d 21 22 s/d 28 29 s/d 05 06 s/d 12 13 s/d 19 20 s/d 26 27 s/d 02 03 s/d 09 10 s/d 16 17 s/d 23 24 s/d 30

1 B1 A 30X50 cm 0.85
2 B1 B 30X50 cm 1.31
3 B2 20X40 cm 0.03
4 B3 20/35 cm 1.35
5 B4 20X30 cm 0.59
6 Beton Plat Lantai. 3, K - 250, tbl=12cm 4.90
E. PEKERJAAN STRUKTUR TANGGA BETON
0 PEKERJAAN STRUKTUR TANGGA LT. 1 Ke LT. 2
1 Balok Bordes 20X40, fc=26.4 Mpa (K-300) 0.05
2 Beton Plat dan Bordes t=15cm, fc=26.4 Mpa (K-300) 0.08
3 Beton Anak Tangga, fc=26.4 Mpa (K-300) 0.17
4 Beton Ralling fc = 18.675 MPa (K-225) 0.31
5 Pas. Pipa Stainless 2.5 0.04
0 PEKERJAAN STRUKTUR TANGGA LT. 2 Ke LT. 3
1 Balok Bordes 20X40, fc=26.4 Mpa (K-300) 0.05
2 Beton Plat dan Bordes t=15cm, fc=26.4 Mpa (K-300) 0.07
3 Beton Anak Tangga, fc=26.4 Mpa (K-300) 0.15
4 Beton Ralling fc = 18.675 MPa (K-225) 0.28
5 Pas. Pipa Stainless 2.5 0.04
F. PEKERJAAN STRUKTUR ATAP CANOPY 0.00
0 PEKERJAAN STRUKTUR ATAP CANOPY LANTAI 1 0.00
1 Pas. Pipa Besi 2,5 Fiber Semen 0.23
2 Pas. Pipa Besi 3 0.88
3 Pas. Besi Pengait 10 0.01
4 Pas. Plat Besi, t=1cm 0.12
5 Pas. Dynabolt 10 0.16
6 Pas. Usuk Reng Galvalum 0.37
7 Pas. Genteng Karang Pilang 0.49
8 Pas. Talang Galvalume lebar=60cm 0.45
9 Pas. Kalsiplank 3/30 0.12
10 Pipa Besi Black Steel 2.5" Finishing Cat 0.34
0 PEKERJAAN STRUKTUR ATAP CANOPY LANTAI 2 0.00
185 (SERATUS DELAPAN PULUH LIMA) HARI KALEN
BOBOT
NO. ITEM PEKERJAAN MARET APRIL MEI JUNI
FISIK (%)
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15
18 s/d 24 25 s/d 31 01 s/d 07 08 s/d 14 15 s/d 21 22 s/d 28 29 s/d 05 06 s/d 12 13 s/d 19 20 s/d 26 27 s/d 02 03 s/d 09 10 s/d 16 17 s/d 23 24 s/d 30

1 Pas. Pipa Besi 2,5 0.34


2 Pas. Pipa Besi 3 0.88
3 Pas. Besi Pengait 10 0.01
4 Pas. Plat Besi, t=1cm 0.12
5 Pas. Dynabolt 10 0.16
6 Pas. Usuk Reng Galvalum 0.37
7 Pas. Genteng Karang Pilang 0.49
8 Pas. Talang Galvalume lebar=60cm 0.45
9 Pas. Kalsiplank 3/30 0.12
IV PEKERJAAN ARSITEKTURAL
A. PEKERJAAN ARSITEKTURAL LANTAI 1
0 PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Rollag Batu Bata Untuk Pijakan 1pc 4p 0.99 0.10 0.10 0.10 0.10
2 Pas. Dinding Bata Ringan Dengan Semen Mortar 1.31
3 Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen Mortar 1.82
4 Acian Dinding Dengan Semen Mortar 0.97
5 Acian Beton (Dihitung 15%) 0.39
6 Benangan Dinding 0.25
7 Benangan Beton (Dihitung 15%) 0.06
0 PEKERJAAN KUSEN
1 Pasang Kusen P1 0.21
2 Pasang Kusen P2 0.56
3 Pasang Kusen P3 0.95
4 Pasang kusen P4 0.05
5 Pasang Kusen J1 0.81
6 Pasang Kusen J2 0.08
7 Pasang Kusen J3 0.05
8 Pasang Kusen BV 0.02
0 PEKERJAAN PENUTUP LANTAI
1 Pas. Keramik Lantai 40X40cm Polish Warna 2.18
2 Pas. Keramik Lantai KM 30X30cm Unpolish Warna Untuk Toilet 0.50
3 Pas. Keramik Dinding Toilet 30X60cm Polish Warna / Motif 2.42
185 (SERATUS DELAPAN PULUH LIMA) HARI KALEN
BOBOT
NO. ITEM PEKERJAAN MARET APRIL MEI JUNI
FISIK (%)
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15
18 s/d 24 25 s/d 31 01 s/d 07 08 s/d 14 15 s/d 21 22 s/d 28 29 s/d 05 06 s/d 12 13 s/d 19 20 s/d 26 27 s/d 02 03 s/d 09 10 s/d 16 17 s/d 23 24 s/d 30

4 Pas. Keramik Plint 10x40cm 0.24


5 Pas. Step Nosing Tangga 10x40 cm 0.03
0 PEKERJAAN PLAFOND
1 Pas. Plafond Kalsiboard 4,5mm + Rangka Hollow 40.40 dan 20 0.76
2 Pas. List Gypsum t=10 cm 0.12
0 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam 0.35
2 Pengecatan Dinding Luar 0.48
3 Pengecatan Plafond Kalsiboard 0.06
4 Pengecatan Plafond Expose 0.27
B. PEKERJAAN ARSITEKTURAL LANTAI 2
0 PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding Bata Ringan Dengan Semen Mortar 1.40
2 Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen Mortar 1.99
3 Acian Dinding Dengan Semen Mortar 1.07
4 Acian Beton (Dihitung 15%) 0.58
5 Benangan Dinding 0.25
6 Benangan Beton (Dihitung 15%) 0.19
7 Pas. Pipa Stainless 2.5 0.18
0 PEKERJAAN KUSEN
1 Pasang Kusen P1 0.21
2 Pasang Kusen P2 0.56
3 Pasang Kusen P3 0.95
4 Pasang Kusen P4 0.05
5 Pasang Kusen J1 0.81
6 Pasang Kusen J2 0.08
7 Pasang Kusen J3 0.05
8 Pasang Kusen BV 0.02
0 PEKERJAAN PENUTUP LANTAI
1 Pas. Keramik Lantai 40X40cm Polish Warna / Motif 1.78
2 Pas. Keramik Lantai KM 30X30cm Unpolish Warna Untuk Toilet 0.50
3 Pas. Keramik Dinding Toilet 30X60cm Polish Warna / Motif 2.42
185 (SERATUS DELAPAN PULUH LIMA) HARI KALEN
BOBOT
NO. ITEM PEKERJAAN MARET APRIL MEI JUNI
FISIK (%)
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15
18 s/d 24 25 s/d 31 01 s/d 07 08 s/d 14 15 s/d 21 22 s/d 28 29 s/d 05 06 s/d 12 13 s/d 19 20 s/d 26 27 s/d 02 03 s/d 09 10 s/d 16 17 s/d 23 24 s/d 30

4 Pas. Keramik Plint 10x40cm 0.24


5 Pas. Step Nosing Tangga 10x40 cm 0.03
0 PEKERJAAN PLAFOND
1 Pas. Plafond Kalsiboard 4,5mm + Rangka Hollow 40.40 dan 20 0.76
2 Pas. List Gypsum t=10 cm 0.12
0 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Dalam 0.24
2 Pengecatan Dinding Luar 0.22
3 Pengecatan Plafond Kalsiboard 0.10
4 Pengecatan Plafond Expose 0.15
5 Waterproofing toilet 0.17
C. PEKERJAAN ARSITEKTURAL LANTAI 3
0 PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding Bata Ringan Dengan Semen Mortar 0.09
2 Plesteran Halus Tebal 10 mm ( 1 cm ) Dengan Semen Mortar 0.16
3 Acian Dinding Dengan Semen Mortar 0.09
4 Kp 12X12 cm 0.00
5 Rangka kayu 5/7 0.01
6 Penutup atap asbes gelombang 0.04
0 PEKERJAAN PENGECATAN
1 Pengecatan Dinding Luar 0.04
2 Waterproofing plat lantai 3 0.48
V PEKERJAAN MEKANIKAL 0.00
A. PEKERJAAN MEKANIKAL LANTAI 1 0.00
1 Pasang pipa PVC air bersih 3/4 AW 0.03
2 Pasang pipa PVC air bersih 1 AW 0.04
3 Pasang pipa PVC air bekas 3 AW 0.13
4 Pasang pipa PVC air kotor 4 AW 0.23
5 Pasang pipa galvanis 4 0.04
6 Pasang klosed duduk 0.74
7 Pasang jet washer 0.06
8 Pasang wastafell 0.11
185 (SERATUS DELAPAN PULUH LIMA) HARI KALEN
BOBOT
NO. ITEM PEKERJAAN MARET APRIL MEI JUNI
FISIK (%)
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15
18 s/d 24 25 s/d 31 01 s/d 07 08 s/d 14 15 s/d 21 22 s/d 28 29 s/d 05 06 s/d 12 13 s/d 19 20 s/d 26 27 s/d 02 03 s/d 09 10 s/d 16 17 s/d 23 24 s/d 30

9 Pasang floordrain Stainless ( Avour ) 0.07


10 Pasang floor clean out Stainless 3 0.02
11 Pasang floor clean out Stainless 4 0.05
12 Bio filter 3 M3 0.15
13 Pasang pompa transfer 0.06
B. PEKERJAAN MEKANIKAL LANTAI 2
1 Pasang pipa PVC air bersih 3/4 AW 0.03
2 Pasang pipa PVC air bersih 1 AW 0.04
3 Pasang pipa PVC air kotor 3 AW 0.13
4 Pasang pipa PVC air kotor 4 AW 0.23
5 Pasang pipa galvanis 4 0.04
6 Pasang klosed duduk 0.40
7 Pasang jet washer 0.03
8 Pasang wastafell 0.11
9 Pasang floordrain Stainless 0.07
10 Pasang floor clean out Stainless 3 0.02
11 Pasang floor clean out Stainless 4 0.05
12 Pasang Tandon Stainles kapasitas 1100lt 0.03
VI PEKERJAAN ELEKTRIKAL
A. PEKERJAAN ELEKTRIKAL LANTAI 1
1 Instalasi Ttk lampu 0.29
2 Pemasangan Ttk stop kontak 0.02
3 Pemasangan Ttk swith socket AC 0.01
4 Instalasi saklar tunggal 0.03
5 Instalasi saklar ganda 0.01
6 Pasang lampu LED 13watt bulb 0.15
7 Pasang lampu LED 8watt bulb 0.13
8 Pasang box panel + MCB 0.03
B. PEKERJAAN ELEKTRIKAL LANTAI 2
1 Instalasi Ttk lampu 0.29
2 Pemasangan Ttk stop kontak 0.02
3 Pemasangan Ttk swith socket AC 0.01
185 (SERATUS DELAPAN PULUH LIMA) HARI KALEN
BOBOT
NO. ITEM PEKERJAAN MARET APRIL MEI JUNI
FISIK (%)
M1 M2 M3 M4 M5 M6 M7 M8 M9 M10 M11 M12 M13 M14 M15
18 s/d 24 25 s/d 31 01 s/d 07 08 s/d 14 15 s/d 21 22 s/d 28 29 s/d 05 06 s/d 12 13 s/d 19 20 s/d 26 27 s/d 02 03 s/d 09 10 s/d 16 17 s/d 23 24 s/d 30

4 Instalasi saklar tunggal 0.03


5 Instalasi saklar ganda 0.01
6 Pasang lampu LED 13watt bulb 0.15
7 Pasang lampu LED 8watt bulb 0.13
8 Pasang box panel + MCB 0.03
VII PEKERJAAN LAIN - LAIN
1 Pembersihan lokasi 0.15
0 0

NOTASI: RENC. FISIK 90.82 0.07 0.42 0.42 0.42 1.48 4.77 3.47 0.61 0.69 1.75 2.31 0.98 1.28 1.28 2.87

RENCANA : RENC. FISIK KOMULATIF 0 0.07 0.50 0.92 1.34 2.82 7.59 11.06 11.66 12.35 14.10 16.41 17.39 18.67 19.94 22.81
SCHEDULE PELAKSANAAN
MUTUAL CHECK - 40
APAN PULUH LIMA) HARI KALENDER

185 (SERATUS DELAPAN PULUH LIMA) HARI KALENDER PERIODE


JULI AGUSTUS SEPTEMBER BULAN
M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 MINGGU KE
01 s/d 07 08 s/d 14 15 s/d 21 22 s/d 28 29 s/d 04 05 s/d 11 12 s/d 18 19 s/d 25 26 s/d 01 02 s/d 08 09 s/d 15 16 s/d 19 TANGGAL

0.51
0.08

0.23 0.23
185 (SERATUS DELAPAN PULUH LIMA) HARI KALENDER PERIODE
JULI AGUSTUS SEPTEMBER BULAN
M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 MINGGU KE
01 s/d 07 08 s/d 14 15 s/d 21 22 s/d 28 29 s/d 04 05 s/d 11 12 s/d 18 19 s/d 25 26 s/d 01 02 s/d 08 09 s/d 15 16 s/d 19 TANGGAL

0.24 0.24

0.04 0.16 0.16 0.04


0.03

0.51 0.51 0.77 0.77


0.19 0.19 0.29 0.29
0.21 0.21

0.17 0.17 0.21 0.21


0.01 0.01 0.01 0.01
0.27 0.27 0.34 0.34
0.26 0.26 0.33 0.33
0.12 0.12 0.15 0.15

0.20 0.20
0.99 0.99 0.99 1.97
0.03

0.00
0.26 0.26
0.10 0.10
185 (SERATUS DELAPAN PULUH LIMA) HARI KALENDER PERIODE
JULI AGUSTUS SEPTEMBER BULAN
M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 MINGGU KE
01 s/d 07 08 s/d 14 15 s/d 21 22 s/d 28 29 s/d 04 05 s/d 11 12 s/d 18 19 s/d 25 26 s/d 01 02 s/d 08 09 s/d 15 16 s/d 19 TANGGAL

0.42 0.42
0.65 0.65
0.01 0.01
0.68 0.68
0.29 0.29
2.45 2.45

0.00
0.02 0.02 0.01
0.03 0.03 0.02
0.07 0.07 0.03
0.12 0.12 0.06
0.04

0.02 0.02 0.01


0.03 0.03 0.01
0.06 0.06 0.03
0.11 0.11 0.06
0.04

0.09 0.09 0.05


0.35 0.35 0.18
0.00 0.00 0.00
0.05 0.05 0.02
0.06 0.06 0.03
0.15 0.15 0.07
0.20 0.20 0.10
0.18 0.18 0.09
0.05 0.05 0.02
0.14 0.14 0.07
185 (SERATUS DELAPAN PULUH LIMA) HARI KALENDER PERIODE
JULI AGUSTUS SEPTEMBER BULAN
M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 MINGGU KE
01 s/d 07 08 s/d 14 15 s/d 21 22 s/d 28 29 s/d 04 05 s/d 11 12 s/d 18 19 s/d 25 26 s/d 01 02 s/d 08 09 s/d 15 16 s/d 19 TANGGAL

0.10 0.20 0.20 0.10


0.26 0.26 0.79
0.36 0.36 1.09
0.19 0.19 0.58
0.08 0.08 0.23
0.05 0.05 0.15
0.01 0.01 0.03

0.10 0.10
0.28 0.28
0.48 0.48
0.02 0.02
0.40 0.40
0.04 0.04
0.02 0.02
0.01 0.01

0.55 0.55 0.55 0.55


0.13 0.13 0.13 0.13
0.61 0.61 0.61 0.61
185 (SERATUS DELAPAN PULUH LIMA) HARI KALENDER PERIODE
JULI AGUSTUS SEPTEMBER BULAN
M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 MINGGU KE
01 s/d 07 08 s/d 14 15 s/d 21 22 s/d 28 29 s/d 04 05 s/d 11 12 s/d 18 19 s/d 25 26 s/d 01 02 s/d 08 09 s/d 15 16 s/d 19 TANGGAL

0.06 0.06 0.06 0.06


0.01 0.01 0.01 0.01

0.19 0.19 0.38


0.03 0.03 0.06

0.09 0.09 0.09 0.09


0.12 0.12 0.12 0.12
0.02 0.02 0.02 0.02
0.07 0.07 0.07 0.07

0.28 0.28 0.84


0.40 0.40 1.20
0.21 0.21 0.64
0.12 0.12 0.35
0.05 0.05 0.15
0.04 0.04 0.11
0.18

0.89 0.45 0.45


0.25 0.13 0.13
1.21 0.61 0.61
185 (SERATUS DELAPAN PULUH LIMA) HARI KALENDER PERIODE
JULI AGUSTUS SEPTEMBER BULAN
M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 MINGGU KE
01 s/d 07 08 s/d 14 15 s/d 21 22 s/d 28 29 s/d 04 05 s/d 11 12 s/d 18 19 s/d 25 26 s/d 01 02 s/d 08 09 s/d 15 16 s/d 19 TANGGAL

0.12 0.06 0.06


0.01 0.01 0.01

0.76
0.12

0.06 0.06 0.12


0.06 0.06 0.11
0.02 0.02 0.05

0.04 0.04 0.08

0.02 0.02 0.04


0.04 0.04 0.08
0.02 0.02 0.04
0.00 0.00 0.00
0.00 0.00 0.01
0.01 0.01 0.02

0.04
0.48

0.01 0.01
0.02 0.02
0.06 0.06
0.11 0.11
0.02 0.02
0.37 0.37
0.03 0.03
0.06 0.06
185 (SERATUS DELAPAN PULUH LIMA) HARI KALENDER PERIODE
JULI AGUSTUS SEPTEMBER BULAN
M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 MINGGU KE
01 s/d 07 08 s/d 14 15 s/d 21 22 s/d 28 29 s/d 04 05 s/d 11 12 s/d 18 19 s/d 25 26 s/d 01 02 s/d 08 09 s/d 15 16 s/d 19 TANGGAL

0.04 0.04
0.01 0.01
0.02 0.02
0.07 0.07
0.03 0.03
0.00 0.00
0.01 0.01
0.02 0.02
0.06 0.06
0.11 0.11
0.02 0.02
0.20 0.20
0.02 0.02
0.06 0.06
0.04 0.04
0.01 0.01
0.02 0.02
0.01 0.01

0.15 0.15
0.01 0.01
0.01 0.01
0.02 0.02
0.00 0.00
0.08 0.08
0.06 0.06
0.03
0.00 0.00
0.15 0.15
0.01 0.01
0.01 0.01
185 (SERATUS DELAPAN PULUH LIMA) HARI KALENDER PERIODE
JULI AGUSTUS SEPTEMBER BULAN
M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27 MINGGU KE
01 s/d 07 08 s/d 14 15 s/d 21 22 s/d 28 29 s/d 04 05 s/d 11 12 s/d 18 19 s/d 25 26 s/d 01 02 s/d 08 09 s/d 15 16 s/d 19 TANGGAL

0.02 0.02
0.00 0.00
0.08 0.08
0.06 0.06
0.01 0.01

0.15

1.91 2.01 2.36 3.45 2.92 3.67 12.66 13.11 9.94 5.29 2.91 1.96

24.72 26.73 29.09 32.53 35.45 39.12 51.78 64.89 74.83 80.12 83.03 84.99

Surabaya, 22 Juli 2019


REKAPITULASI
HARGA SATUAN POKOK DAN HARGA SATUAN KEGIATAN
ITEM PEKERJAAN TAMBAHAN

NAMA KEGIATAN : PEMBANGUNAN/REHABILITASI FASILITAS BANGUNAN PENDIDIKAN


PEKERJAAN : PEMBANGUNAN GEDUNG TYPE B2 (SMP NEGERI 62)
LOKASI : Kota Surabaya
TAHUN : 2019

NO. URAIAN KEGIATAN SATUAN NILAI HSPK

1 2 3 4

1 Pembuatan Lubang Strous Pile Ø30 cm kedalaman 3 m M1 Rp 69,200.00


2 PC1 10900x165x40 k-250 M3 Rp 4,259,764.28

Rekapitulasi Analisa
Pembangunan Pasar Mojo 2016 Harga Satuan Pokok Kegiatan Item Pekerjaan Tambahan
REKAPITULASI
KOK DAN HARGA SATUAN KEGIATAN
EKERJAAN TAMBAHAN

EHABILITASI FASILITAS BANGUNAN PENDIDIKAN

KETERANGAN

HSPK Surabaya 24.02.01.23


HSPK Surabaya 24.07.03.20

Surabaya, 22 Juli 2019

Rekapitulasi Analisa
Pembangunan Pasar Mojo 2016 Harga Satuan Pokok Kegiatan Item Pekerjaan Tambahan
ANALISA
HARGA SATUAN POKOK DAN HARGA SATUAN KE
ITEM PEKERJAAN TAMBAHAN

NAMA KEGIATAN : PEMBANGUNAN/REHABILITASI FASILITAS BANGUNAN P


PEKERJAAN : PEMBANGUNAN GEDUNG TYPE B2 (SMP NEGERI 62)
LOKASI : Kota Surabaya

No. URAIAN KEGIATAN Koef. SATUAN

1 2 3 4

1 Pembuatan Lubang Strous Pile Ø30 cm kedalaman 3 m Titik


Upah:
4.1 Mandor 0.072 O.H
4.4 Pembantu Tukang 1.440 O.H
1.512
Sewa Peralatan:
3.1 Sewa Alat Bantu Strouss Pile 1.200 Jam

2 PC1 10900x165x40 k-250 M3


Pekerjaan Beton K-250 (Slump 12+2) 1,0000 M3
Pekerjaan Pembesian dengan besi ulir 241.560 Kg
Pekerjaan Bekisting Poer 2x pakai 1.322 M2
Pembongkaran Cetakan 1.396 M2

Analisa
Pembangunan Pasar Mojo 2016 Harga Satuan Pokok Kegiatan Item Pekerjaan Tambahan
ANALISA
AN POKOK DAN HARGA SATUAN KEGIATAN
TEM PEKERJAAN TAMBAHAN

NGUNAN/REHABILITASI FASILITAS BANGUNAN PENDIDIKAN


NGUNAN GEDUNG TYPE B2 (SMP NEGERI 62)

HARGA SATUAN JUMLAH HARGA

5 6

Rp 69,200.00

Rp 129,000.00 Rp 9,288.00
Rp 127,300.00 Rp 183,312.00
Jumlah: Rp 192,600.00

Rp 12,500.00 Rp 15,000.00
Jumlah: Rp 15,000.00
Nilai HSPK : Rp 207,600.00
Nilai HSPK Per M1: Rp 69,200.00
Rp 4,259,764.28
Rp 1,027,648.15 Rp 1,027,648.15
Rp 11,501.10 Rp 2,778,205.72
Rp 333,128.80 Rp 440,467.22
Rp 9,632.50 Rp 13,443.19
Jumlah: Rp 4,259,764.28
Nilai HSPK : Rp 4,259,764.28

Surabaya, 22 Juli 2019

Analisa
Pembangunan Pasar Mojo 2016 Harga Satuan Pokok Kegiatan Item Pekerjaan Tambahan
HARGA SATUAN MATERIAL
BAHAN BANGUNAN
ITEM PEKERJAAN TAMBAHAN

HARGA KONTRAK
NO JENIS BAHAN SATUAN
RAB
1 2 3 4

I. Material
1.1 Semen PC (Portland Cement) 40 kg Zak Rp 38,000.00
1.2 Pasir Pasang M3 Rp 75,600.00

II. Material Pabrikan


2.1 Closet Jongkok Porselin Bh Rp -

III. Sewa Peralatan


3.1 Sewa Alat Bantu Strouss Pile Jam Rp -

IV. TENAGA KERJA


4.1 Mandor O.H Rp 129,000.00
4.2 Kepala Tukang Kayu O.H Rp 128,000.00
4.3 Tukang Kayu O.H Rp 127,600.00
4.4 Pembantu Tukang O.H Rp 127,300.00

Harga Satuan
Pembangunan Pasar Mojo 2016 Bahan Material dan Upah Item Pekerjaan Tambahan
RGA SATUAN MATERIAL
BAHAN BANGUNAN
M PEKERJAAN TAMBAHAN

KOREKSI
HARGA PENAWARAN
HARGA
5 6

Rp 38,000.00 TETAP
Rp 75,600.00 TETAP

Rp 464,200.00 BARU

Rp 12,500.00 BARU

Rp 129,000.00 TETAP
Rp 128,000.00 TETAP
Rp 127,600.00 TETAP
Rp 127,300.00 TETAP

Surabaya, 22 Juli 2019

Harga Satuan
Pembangunan Pasar Mojo 2016 Bahan Material dan Upah Item Pekerjaan Tambahan

Anda mungkin juga menyukai