Anda di halaman 1dari 24

LARSEN & TOUBRO LIMITED: ECC DIVISION

BULDINGS AND FACTORIES OPERATING COMPANY


Ref; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARH
Region : HYCO
Area/ location inspected : ALL OVER THE SITE
To: P&M incharge
cc: Project incharge
P&M Personal accompanying HSEO
SI
Points
NO. Observation Recommendation Action By
ramesh
naidu's
welding
Earthing should be electrician of the cooler
1 Earthing machine
provided. house
found with out
earthing at
cooler house
2 Neutral earthing:
3 RCCB
4 Insulation
at the weigh
bridge cables
cables are routed
5 Cable Layout are routed on ASP
above the ground level.
surface of
theground.
6 Protection from water
7 Lightning Arrester

at the raw mill


silo welding
Plug Tops & Cable Joints cable is replaced by
8 machine cable ANTONY
new one
having
multiple joints

9 Installation Cover & Seals


10 Electrical fire hazards
grinding
machine found
with out safety safety guard should be
11 Safety gaurds. TVL/MNK
guard.at provided.
fabrication
yard
Others (Specify)
12

Date:02/09/2010
C DIVISION
ING COMPANY
Ref; IM-09-C REV00
N REPORT

Target Remarks

w.i.e

w.i.e

w.i.e
w.i.e

Signed BY
HSEO
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANY
Ref; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARH
Region : HYCO
Area/ location inspected : ALL OVER THE SITE
To: P&M incharge
cc: Project incharge
P&M Personal accompanying HSEO
SI
Points
NO. Observation Recommendation Action By
cutting
machines
1 Earthing using with out earthing is provided SRINIVAS
earthing at pre
heater
2 Neutral earthing:
3 RCCB
4 Insulation
at the steel
yard rods are cables are covered by
5 Cable Layout SUDHAKAR
placing on the ledgar pipe.
cable
6 Protection from water
7 Lightning Arrester
switch board
having no proper covering is
8 PRATAP
Plug Tops & Cable Joints water provided
protection
water pump
having no proper covering is
9 PRATAP
proper provided
Installation Cover & Seals protection
10 Electrical fire hazards
11 Safety
Others gaurds.
(Specify)
12
Date:09/09/2010
C DIVISION
ING COMPANY
Ref; IM-09-C REV00
N REPORT

Target Remarks

w.i.e

w.i.e

w.i.e

w.i.e
Signed BY
HSEO
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANY
Ref; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARH
Region : HYCO
Area/ location inspected : ALL OVER THE SITE
To: P&M incharge
cc: Project incharge
P&M Personal accompanying HSEO
SI
Points
NO. Observation Recommendation Action By

P&M welding
machine Earthing should be
1 Earthing TVL/MNK
found with out provided.
earthing

2 Neutral earthing:
halogen lamps
are having cables are properly
3 TVL/MNK
loose arranged
RCCB connections
4 Insulation

In kiln pier-3
cables are cables are routed
5 Cable Layout SRINIVAS
routed through above the ground level.
ground.

6 Protection from water


7 Lightning Arrester
at the weigh
Plug Tops & Cable Joints bridge cable is cable is replaced by
8 ASP
having multiple new one
joints
welding
machine is not proper connection is
9 TVL/MNK
having proper provided
connection
Installation Cover & Seals
10 Electrical fire hazards
11 Safety gaurds.
Others (Specify)
12

Date:16/09/2010
C DIVISION
ING COMPANY
Ref; IM-09-C REV00
N REPORT

Target Remarks

w.i.e

w.i.e

w.i.e

w.i.e
w.i.e

Signed BY
HSEO
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANY
Ref; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARH
Region : HYCO
Area/ location inspected : ALL OVER THE SITE
To: P&M incharge
cc: Project incharge
P&M Personal accompanying HSEO
SI
Points
NO. Observation Recommendation Action By
pabala
welding
machine Earthing should be
1 Earthing SRINIVAS
found with out provided.
earthing at pre
heater
2 Neutral earthing:

halogen lamps
are having
3 loose proper action is taken PRATAP
connections at
cooler house
RCCB
4 Insulation
In pre heater
cables are
cables are covered with
5 Cable Layout found routed SRINIVAS
ledgar pipes
above the
ground level.
6 Protection from water
7 Lightning Arrester
at the cooler
house cable is
8 replaced by new one PRATAP
Plug Tops & Cable Joints having multiple
joints
9 Installation Cover & Seals
10 Electrical fire hazards
11 Safety gaurds.
Others (Specify)
12

Date:23/09/2010
C DIVISION
ING COMPANY
Ref; IM-09-C REV00
N REPORT

Target Remarks

w.i.e

w.i.e

w.i.e

w.i.e
Signed BY
HSEO
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANY
Ref; IM-09-C REV00
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARH
Region : HYCO
Area/ location inspected : ALL OVER THE SITE
To: P&M incharge
cc: Project incharge
P&M Personal accompanying HSEO
SI
Points
NO. Observation Recommendation Action By

welding
machine
Earthing should be
1 Earthing found with out TVL/MNK
provided.
earthing at the
batching plant

2 Neutral earthing:
halogen lamps
are not having
proper
3 connection is provided CHANDRA SEKHAR
connections at
the quality
RCCB center
4 Insulation
cables are
routed on
cables are routed
5 Cable Layout ground at pre SRINIVAS
above the ground level.
heater at
blending silo
6 Protection from water
7 Lightning Arrester
S/c. pabla
drilling
8 machine found Plug top to be provided. TEJA
Plug Tops & Cable Joints with out plug
top.
9 Installation Cover & Seals
10 Electrical fire hazards
cutting
machine found
safety guard should be
11 Safety gaurds. with out safety SUDHAKAR
provided.
guard steel
Others (Specify) yard
12

Date:10/11/08
C DIVISION
ING COMPANY
Ref; IM-09-C REV00
N REPORT

Target Remarks

w.i.e

w.i.e

w.i.e

w.i.e
w.i.e

Signed BY
HSEO
LARSEN & TOUBRO LIMITED: ECC DIVISION
BULDINGS AND FACTORIES OPERATING COMPANY
Ref; IM-09
ELECTRICAL SAFETY INSPECTION REPORT
Name of site : HCIL NARSINGARH
Region : HYCO
Area/ location inspected : ALL OVER THE SITE
To: P&M incharge
cc: Project incharge
P&M Personal accompanying HSEO
Recommendatio
Points
SI NO. Observation n Action By
earthing cable
is not properly
attached to the Earthing cable is
1 Earthing SHIVA
welding properly attached
machine at pre
heater
2 Neutral earthing:

halogen lamps
are not having
proper connection is
3 CHANDRA SEKHAR
connections at provided
the quality
center

RCCB
4 Insulation

cables are
routed on cables are routed
5 Cable Layout ground at pre above the ground SRINIVAS
heater at level.
blending silo

6 Protection from water


7 Lightning Arrester

S/c. pabla
drilling
Plug top to be
8 machine found TEJA
provided.
with out plug
Plug Tops & Cable Joints top.

9 Installation Cover & Seals


10 Electrical fire hazards
cutting
machine found safety guard
11 Safety gaurds. with out safety should be SUDHAKAR
guard steel provided.
yard
Others (Specify)
12

Date:10/11/08
ISION
COMPANY
Ref; IM-09-C REV00
PORT

Target Remarks

w.i.e

w.i.e

w.i.e

w.i.e
w.i.e

Signed BY
HSEO