BOQ Pelebaran Menambah Lajur Bts - Kab.Luwu Masamba PDF
BOQ Pelebaran Menambah Lajur Bts - Kab.Luwu Masamba PDF
1 UMUM -
2 DRAINASE -
3 PEKERJAAN TANAH DAN GEOSINTETIK -
4 PEKERJAAN PREVENTIF -
5 PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN -
6 PERKERASAN ASPAL -
7 STRUKTUR -
8 REHABILITASI JEMBATAN -
9 PEKERJAAN HARIAN DAN PEKERJAAN LAIN-LAIN -
10 PEKERJAAN PEMELIHARAAN KINERJA -
Terbilang :
DAFTAR KUANTITAS DAN HARGA
SPESIFIKASI 2018
No. Paket Kontrak : ………………………………………………
Nama Paket : Pelebaran Menambah Lajur Bts.Kota Palopo - Kab.Luwu Utara
Prop / Kab / Kodya : Sulawesi Selatan
PRESERVASI
REKONSTRUKSI/REHABILITASI JALAN
Total Harga
No. Mata Uraian Satuan Harga Perkiraan Jumlah
Pembayaran Satuan Kuantitas Harga
(Rupiah) (Rupiah) (Rupiah)
a b c e e q
DIVISI 1. UMUM
1.2 Mobilisasi LS 1,00 - -
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1,00 - -
1.17.(1a) Pengujian PH Buah 1,00 - -
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 1,00 - -
1.17.(1c) Pengujian zat Padat Terlarut (TDS) Buah 1,00 - -
1.17.(1d) Pengujian Zat Padat Tersuspensi (TSS) Buah 1,00 - -
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 1,00 - -
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 1,00 - -
1.17.(1g) Pengujian Colifornm Buah 1,00 - -
1.17.(1h) Pengujian Ecoli Buah 1,00 - -
1.17.(1i) Pengujian Destruksi Cu,Pb,Cd,Ni,Fe,Zn,Ag,Co,Mn Buah 1,00 - -
1.17.(1j) Pengujian Temperatur Suhu Buah 1,00 - -
1.17.(1k) Pengujian Parameter Kualitas Air Lainnya………….. Buah 1,00 - -
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 1,00 - -
1.17.(2c) Pengujian Parameter kebisingan dan atau Getaran Lainnya Buah 1,00 - -
1.17.(3a) Pengujian Nox Buah 1,00 - -
1.17.(3b) Pengujian Sulfur dioksida (SO:) Buah 1,00 - -
1.17.(3c) Pengujian Karbondioksida Buah 1,00 - -
1.17.(3d) Pengujian Hidro Carbon (HC)-CH4 Buah 1,00 - -
1.17.(3e) Pengujian Total Partikulat (TSP) - Debu Buah 1,00 - -
1.17.(3f) Pengujian Timah Hitam(Pb) Buah 1,00 - -
1.17.(3g) Pengujian Parameter Udara Emisi dan Ambien Lainnya………… Buah 1,00 - -
Skh.1.1.18.(2) Relokasi Tiang Listrik yang ada, Tegangan Rendah Buah 25,00 - -
1,19 Keselamatan dan Kesehatan Kerja LS 1,00 - -
1.21 Manajemen Mutu LS 1,00 - -
DIVISI 2. DRAINASE
2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 858,00 - -
2.2.(1) Pasangan Batu dengan Mortar M3 403,00 - -
1
2.3.(7) Gorong-gorong Pipa Beton Bertulang diameter dalam 100 cm M 45,00 - -
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) - -
PRESERVASI
REKONSTRUKSI/REHABILITASI JALAN
Total Harga
No. Mata Uraian Satuan Harga Perkiraan Jumlah
Pembayaran Satuan Kuantitas Harga
(Rupiah) (Rupiah) (Rupiah)
a b c e e q
DIVISI 7. STRUKTUR
7.1.(5a) Beton Struktur, fc' 30 Mpa M3 48,50 - -
7.1.(7a) Beton Struktur, fc ’20 MPa M3 7,92 - -
7.3.(1) Baja Tulangan Polos BjTP 280 Kg - - -
7.3.(2) Baja Tulangan Sirip BjTP 280 Kg 5,34 - -
7.9.(1)
3
Pasangan Batu M 2.259,80 - -
Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) - -
B. PERALATAN
Periksa lembar 1.2-2 0
C. FASILITAS KONTRAKTOR
1 Base Camp M2 100 0
2 Kantor M2 100 0
3 Barak M2 0
4 Bengkel M2 0
5 Gudang, dan lain-lain M2 0
6 .................................
D. FASILITAS LABORATORIUM
1 Ruang Laboratorium (sesuai Gambar) M2 0
2 #REF!
Compaction Test Set 0
CBR Test Set 0
Specific Gravity Set 0
Atterberg Limits Set 0
Grain Size Analysis Set 0
Field Density Test by Sand Cone Methode Set 0
Moisture Content Set 0
Abrasion of Aggregate by Los Angeles Machine Bln 0
3 #REF!
Marshall Asphalt Test Set
Extraction Test, Centrifuge/Refflux Method Set
Specific Gravity for Coarse Aggregate Set
Specific Gravity for Fine Aggregate Set
Mix Air Viod Content (Accurate Method) Set
Core Drill Set
Metal Thermometer Set
Accessories and Tolls Set
Penetration Test Bln
Softening Point Set
Refusal Density Compactor Set
4 #REF!
Slump Cone Set
Cylinder/Cube Mould for Compressive Strength Set
Beam Mould for Flexural Strength (RIGID) Set
Crushing Machine Set
E.II. LAIN-LAIN
1 Komunikasi Lapangan Lengkap Set 2 0
2 As Built Drawing Bh 2 0
3 Papan Nama Proyek bh 2 0
4 ...................... .... 0 0
5 ...................... .... 0 0
6 ...................... .... 0 0
F. DEMOBILISASI LS 1 0
Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
B. PERALATAN
1 ASPHALT MIXING PLANT E01 Unit 1
2 ASPHALT FINISHER E02 Unit 1
3 ASPHALT SPRAYER E03 Unit 1
4 BULLDOZER 100-150 HP E04 Unit
5 COMPRESSOR 4000-6500 L\M E05 Unit 1
6 CONCRETE MIXER 0.3-0.6 M3 E06 Unit 1
7 CRANE 10-15 TON E07 Unit
8 DUMP TRUCK 3.5 TON E08 Unit 10
9 DUMP TRUCK 10 TON E09 Unit 6
10 EXCAVATOR 80-140 HP E10 Unit 2
11 FLAT BED TRUCK 3-4 M3 E11 Unit
12 GENERATOR SET E12 Unit 1
13 MOTOR GRADER >100 HP E13 Unit
14 TRACK LOADER 75-100 HP E14 Unit
15 WHEEL LOADER 1.0-1.6 M3 E15 Unit 1
16 THREE WHEEL ROLLER 6-8 T E16 Unit
17 TANDEM ROLLER 6-8 T. E17 Unit 1
18 TIRE ROLLER 8-10 T. E18 Unit 1
19 VIBRATORY ROLLER 5-8 T. E19 Unit
20 CONCRETE VIBRATOR E20 Unit 1
21 STONE CRUSHER E21 Unit
22 WATER PUMP 70-100 mm E22 Unit 2
23 WATER TANKER 3000-4500 L. E23 Unit 2
24 PEDESTRIAN ROLLER E24 Unit 1
25 TAMPER E25 Unit 1
26 JACK HAMMER E26 Unit
27 FULVI MIXER E27 Unit
28 CONCRETE PUMP E28 Unit
29 TRAILER 20 TON E29 Unit
30 PILE DRIVER + HAMMER E30 Unit
31 CRANE ON TRACK 35 TON E31 Unit
32 WELDING SET E32 Unit
33 BORE PILE MACHINE E33 Unit
34 ASPHALT LIQUID MIXER E34 Unit
35 TRONTON E35 Unit 1
36 COLD MILLING MACHINE E37 Unit 1
37 ROCK DRILL BREAKER E36 Unit
38 COLD RECYCLER E38 Unit
39 HOT RECYCLER E39 Unit
40 AGGREGAT (CHIP) SPREADER E40 Unit
41 ASPHALT DISTRIBUTOR E41 Unit 1
42 SLIP FORM PAVER E42 Unit 1
43 CONCRETE PAN MIXER E43 Unit
44 CONCRETE BREAKER E44 Unit
45 ASPAHLT TANKER E45 Unit 1
46 CEMENT TANKER E46 Unit
47 CONDRETE MIXER (350) E47 Unit 1
48 VIBRATING RAMMER E48 Unit 1
49 TRUK MIXER (AGITATOR) E49 Unit
50 BORE PILE MACHINE E50 Unit
51 CRANE ON TRACK 75-100 TON E51 Unit
52 BLENDING EQUIPMENT E52 Unit
53 ASPHALT LIQUID MIXER E34a Unit 1
54 BAR BENDER E53 Unit
55 BAR CUTTER E54 Unit
56 BREAKER E55 Unit
57 GROUTING PUMP E56 Unit
58 JACK HIDROLIC E57 Unit
59 MESIN LAS E58 Unit
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
60 PILE DRIVER LEADER, 75 kw E59 Unit
61 PILE HAMMER E60 Unit
62 PILE HAMMER, 2,5 Ton E61 Unit
63 STRESSING JACK E62 Unit
64 WELDING MACHINE, 300 A E63 Unit
65 STRESSING MACHINE E64 Unit
66 SHOTMACHINE E65 Unit
67 BATCHING PLANT E66 Unit
68 SCREED PAVER E67 Unit
69 MOBIL PICK UP E68 Unit 1
70 POWER BROOM - Unit
71 RUMAH TIMBANG - Unit
c. Pelatihan K3 Org 2 -
d. Simulasi K3 Org 50 -
e. Spanduk (banner) Lb 5 -
f. Poster Lb 5 -
g. Papan Informasi K3 Bh 5 -
-
3 Alat Pelindung Kerja terdiri atas
a. Jaring Pengaman (Safety Net) Ls - -
b. Tali Keselamatan (Life Line) Ls - -
c. Penahan Jatuh (Safety Deck) Ls - -
d. Pagar Pengaman (Guard Railling) Ls - -
e. Pembatas Area (Restriced Area) Ls - -
-
4 Alat Pelindung Diri terdiri atas:
a. Topi Pelindung (Safety Helmet) ; Bh 50 -
b. Pelindung Mata (Goggles, Spectacles); Psg 6 -
c. Tameng Muka (Face Shield); Bh -
d. Masker Selam (Breathing Apparatus); Bh -
e. Pelindung Telinga (Ear Plug, Ear Muff); Psg -
f. Pelindung Pernafasan Dan Mulut (Masker); Bh 50 -
g. Sarung Tangan (Safety Gloves); Psg 20 -
h. Sepatu Keselamatan (Safety Shoes); Psg 50 -
i. Penunjang Seluruh Tubuh (Full Body Harness); Bh 5 -
j. Jaket Pelampung (Life Vest); Bh 5 -
k. Rompi Keselamatan (Safety Vest); Bh 50 -
l. Celemek (Apron/Coveralls); Bh 2 -
m. Pelindung Jatuh (Fall Arrester); Bh 10 -
-
5 Asuransi Dan Perijinan terdiri atas :
a. BPJS Ketenagakerjaan Dan Kesehatan Kerja; Ls 1 -
b. Surat Ijin Kelaikan Alat; Alat/Kend 3 -
c. Surat Ijin Operator; Lb/Alat 3 -
d. Surat Ijin Pengesahan Panitia Pembina Keselamatan Ls 1 -
Dan Kesehatan Kerja (P2K3);
-
6 Personil K3 terdiri atas :
a. Ahli K3 OB -
b. Petugas K3 OB 6 -
c. Petugas Tanggap Darurat; OB - -
d. Petugas P3K; OB - -
e. Petugas Pengatur Lalu Lintas (Flagman) OB -
f. Petugas Medis. OB - -
-
No. Uraian Satuan Volume Harga Satuan Jumlah Harga
-
Analisa El - 18
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan keselamatan jalan selama
periode konstruksi sesuai ketentuan
2 Buat rencana kerja manajemen lalu-lintas sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Kelompok kerja pengatur lalu-lintas selama konstruksi
menggunakan tenaga pengatur dan flagman dengan 3 shift
4 Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait
5 Semua rambu harus jelas dan terbaca oleh Pengguna Jalan
D. TENAGA / PERSONIL
Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya Satuan tersebut sudah termasuk biaya perlengkapan personil pengatur lalu-lintas dan
biaya perijinan yang diperlukan dengan pihak terkait dengan manajemen lalu-lintas
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan seperti material habis pakai baterai, lampu dan sebagainya
Analisa El - 117
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
B. URUTAN KERJA
1 Penyedia menyiapkan perlengkapan pengujian lingkungan
(air, udara dan kebisingan)
2 Buat rencana kerja pengujian lingkungan sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang terkait
3 Pemilihan lokasi pengujian
4 Melaksanakan pengujian
D Biaya Operasional -
Biaya peralatan Ls -
Personil Ls -
Transportasi Ls -
Catatan :
Analisa El - 121
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
B. URUTAN KERJA
1 Penyedia setelah menerima SPMK mengusulkan personil
Tenaga Ahli Mutu Pekerjaan sbg Manajer Kendali Mutu
2 Tenaga Ahli dibantu oleh Asisten Kendali Mutu yang
berpengalaman dibidangnya dan tenaga pendukung
3 Membuat RMK dan laporan mutu yg disetujui PPK
4 Melakukan pengendalian mutu semua pekerjaan dan
membuat laporan secara berkala
C. TENAGA / PERSONIL
Catatan : 1. Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
Asuransi Tenaga Kerja dan pengeluaran lainnya.
2. Biaya tersebut sudah termasuk biaya pembuatan laporan yang terkait dengan mutu pekerjaan
3. Biaya satuan tersebut sudah termasuk kebutuhan perlengkapan dan peralatan pendukung yang
diperlukan pembuatan laporan mutu seperti komputer, printer, kertas dan sebagainya.