Anda di halaman 1dari 46

TUGAS AKHIR

GAMBAR KONSTRUKSI BANGUNAN


2018

SHOP DRAWING
PROYEK PEMBANGUNAN
RUMAH TINGGAL TYPE 177/128

DIGAMBAR OLEH :

MOHAMMAD AFIFUDIN RAMDANI


XII TGB 1 / 27

SMK NEGERI 1 SINGOSARI


C
STR-3

1 2 3 4 5
250 100 450

j j

MUSHOLLA

200

200
FFL +0.40 TAMAN
FFL -0.15

i i
T.CUCI TERAS
100

FFL -0.10 FFL -0.05

h DAPUR h

A A
STR-1 STR-1
300

R. BACA
R.MAKAN

700
UP

g g

KM/WC
FFL -0.10
200

B R.KELUARGA B
STR-2 STR-2

1600
f f

e e
350

R.TIDUR
02
ARS-2
R.TAMU
300

d d
50

c c

TERAS
150

150

FFL -0.05

b b
CARPORT TAMAN
FFL -0.15 FFL -0.15
250

250

a a

350 350 100

800

1 2 3 4 5
C 01
ARS-2
STR-3

01 DENAH LANTAI 1
ARS 01
SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) DENAH LANTAI 1 DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 01 45 A4
C
STR-3

1 2 3 4 5
250 100 450

j j

200

200
ROOFTOP
FFL +3.70

i i
TERAS
100

FFL +3.75

h h

DOWN
A A
STR-1 STR-1
300

700
g g

KM/WC
200

FFL +3.75
B R.SANTAI B
STR-2 STR-2
FFL +3.80

1600
f f

e e
350

R.TIDUR
02 FFL +3.80
ARS-2
R.TIDUR
FFL +3.80 300

d d
50

c c
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5
C 01
ARS-2
STR-3

01 DENAH LANTAI 2
ARS 01
SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) DENAH LANTAI 2 DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 02 45 A4
+10.00

+8.10

+7.50

+3.70

-0.30

350 450

800

01 TAMPAK DEPAN
ARS 01
SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) TAMPAK DEPAN DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 03 45 A4
NAMA SEKOLAH

SMKN 1 SINGOSARI

NAMA TUGAS

TUGAS AKHIR SEMESTER II


GAMBAR KONSTRUKSI BANGUNAN
+10.00
+9.63 KETERANGAN
1. SEMUA DIMENSI MENGGUNAKAN
SATUAN CENTI METER KECUALI
DITENTUKAN LAIN.

2. SEMUA ELEVASI MENGGUNAKAN


+8.10 SATUAN METER.

3. ABBRAVITION :
+7.50 - EL = ELEVASI
- FD = FLOOR DRAIN
- FFL = FINISHING FLOOR LEVEL
- GL = GROUND LEVEL

4. SIMBOL :

+3.70

JUDUL GAMBAR
-0.15

300 300 200 350 450


TAMPAK SAMPING
1600 KANAN

SKALA 1 : 100
TANGGAL 24-03-2018
01 TAMPAK SAMPING KANAN
STR 01 DIGAMBAR KELAS
SKALA 1 : 100
MOH. AFIFUDIN XII TGB 1

DIPERIKSA TTD
- B. YULI PURWITA S.Pd., MT.
- P. SUGENG HARYONO

0 1m 2m 3m 5m NO. LBR JML. LBR UK. KERTAS

04 45 A4
+10.00

+8.10

+7.50

+4.20

+3.70

-0.30

450 350

800

01 TAMPAK BELAKANG
ARS 01
SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) TAMPAK BELAKANG DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 05 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i
100

h h
300

700
g g
200

1600
f f

e e
350

300

d d
50

c c
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5

01 TAMPAK ATAS
ARS 01
SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) TAMPAK ATAS DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 06 45 A4
+10.00

+8.00

+7.50

FFL +3.80 FFL +3.75


+3.80

FFL -0.10

-0.35

-1.15
-1.38

-2.15

450 150 200

800

01 POTONGAN A-A
ARS 01
SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) POTONGAN A-A DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 07 45 A4
+10.00

+8.00

+7.50

FFL +3.80
+3.80

-0.35

-1.15
-1.38

-2.15

350 450

800

01 POTONGAN B-B
ARS 01
SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) POTONGAN B-B DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 08 45 A4
NAMA SEKOLAH

SMKN 1 SINGOSARI

NAMA TUGAS

TUGAS AKHIR SEMESTER II


+7.92 GAMBAR KONSTRUKSI BANGUNAN

+7.50
KETERANGAN
1. SEMUA DIMENSI MENGGUNAKAN
SATUAN CENTI METER KECUALI
DITENTUKAN LAIN.

2. SEMUA ELEVASI MENGGUNAKAN


SATUAN METER.

3. ABBRAVITION :
- EL = ELEVASI
- FD = FLOOR DRAIN
- FFL = FINISHING FLOOR LEVEL
- GL = GROUND LEVEL
+4.30
FFL +3.80 4. SIMBOL :
FFL +3.70
+3.70

FFL +0.40

FFL -0.15

-0.35

-1.15
-1.38

-2.15
450 350 200 300 300 JUDUL GAMBAR
1600

POTONGAN C-C

SKALA 1 : 100
TANGGAL 24-03-2018
01 POTONGAN C-C
STR 01 DIGAMBAR KELAS
SKALA 1 : 100
MOH. AFIFUDIN XII TGB 1

DIPERIKSA TTD
- B. YULI PURWITA S.Pd., MT.
- P. SUGENG HARYONO

0 1m 2m 3m 5m NO. LBR JML. LBR UK. KERTAS

09 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i
100

h h
FIBERGLASS 5mm

GENTENG FLAMS JAWA


RANGKA BESI HOLLOW
BUBUNGAN FLAMS JAWA
300

TALANG 15x10

700
g g
200

RENG GALVALUME

RANGKA ATAP GALVALUME

1600
f f

e e
350

300

PLAT ATAP 12cm

d d
50

c c
BALOK 15x20
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5

01 RENCANA ATAP
ARS 01
SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) RENCANA ATAP DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 10 45 A4
NAMA SEKOLAH

SMKN 1 SINGOSARI

NAMA TUGAS

TUGAS AKHIR SEMESTER II


GAMBAR KONSTRUKSI BANGUNAN

KETERANGAN
1. SEMUA DIMENSI MENGGUNAKAN
SATUAN CENTI METER KECUALI
DITENTUKAN LAIN.

2. SEMUA ELEVASI MENGGUNAKAN


RENG AB 25.30.0,53mm SATUAN METER.

3. ABBRAVITION :
- EL = ELEVASI
TOP CHORD C 3,5.8.1mm - FD = FLOOR DRAIN
- FFL = FINISHING FLOOR LEVEL
- GL = GROUND LEVEL
BOTTOM CHORD C 3,5.8.1mm
4. SIMBOL :

WEB C 3,5.8.1mm

TALANG AIR 15x10

BALOK RING 15x20

BALOK RING 15x25

450

JUDUL GAMBAR

DETAIL ATAP GALVALUM

01 DETAIL ATAP GALVALUM


DB 01 SKALA 1 : 50
SKALA 1 : 100
TANGGAL 24-03-2018

DIGAMBAR KELAS
MOH. AFIFUDIN XII TGB 1

DIPERIKSA TTD
- B. YULI PURWITA S.Pd., MT.
- P. SUGENG HARYONO

NO. LBR JML. LBR UK. KERTAS

11 45 A4
NAMA SEKOLAH

SMKN 1 SINGOSARI

NAMA TUGAS

TUGAS AKHIR SEMESTER II


GAMBAR KONSTRUKSI BANGUNAN

KETERANGAN
1. SEMUA DIMENSI MENGGUNAKAN
SATUAN CENTI METER KECUALI
DITENTUKAN LAIN.

2. SEMUA ELEVASI MENGGUNAKAN


SATUAN METER.
FIBERGLASS 5 mm
3. ABBRAVITION :
- EL = ELEVASI
RANGKA BESI HOLLOW 50.50.1,5 mm - FD = FLOOR DRAIN
- FFL = FINISHING FLOOR LEVEL
- GL = GROUND LEVEL
ROSTER BETON 30 x 15
4. SIMBOL :

BALOK 15 x 25

PLAT ATAP 12cm

EL +7.50 EL +7.50

300

JUDUL GAMBAR

DETAIL ATAP SIRKULASI

01 DETAIL ATAP SIRKULASI


DB 01 SKALA 1 : 50
SKALA 1 : 100
TANGGAL 24-03-2018

DIGAMBAR KELAS
MOH. AFIFUDIN XII TGB 1

DIPERIKSA TTD
- B. YULI PURWITA S.Pd., MT.
- P. SUGENG HARYONO

NO. LBR JML. LBR UK. KERTAS

12 45 A4
1 2 3 4 5
250 100 450

j j

200

200
J4
i i
P5
100 P4

h h
J3
300

700
UP

g g
J2
200

P3

1600
f f
P1

P2
e e
350

300
J1

d PJ1 d
50

c c
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5

LEGENDA
PJ = notasi kusen jenis pintu jendela
01 RENCANA KUSEN LANTAI 1
P = notasi kusen jenis pintu
ARS 01
SKALA 1 : 100
J = notasi kusen jenis jendela

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) RENCANA KUSEN LANTAI 1 DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 13 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i

100

h h
J9 P6
DOWN
300

700
g g
J2
200

P3

1600
f f
P1
J8
e e
P1
350

300
J7

J5

d PJ2 d
50

c c
150

150

J6 J6

b b
250

250

a a

350 350 100

800

1 2 3 4 5

LEGENDA
PJ = notasi kusen jenis pintu jendela
01 RENCANA KUSEN LANTAI 2
P = notasi kusen jenis pintu
ARS 01
SKALA 1 : 100
J = notasi kusen jenis jendela

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) RENCANA KUSEN LANTAI 2 DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 14 45 A4
1 2 3 4 5
250 100 450

j j

200

200
K3
K4

i i

100 K2

h h
300

K1

700
UP

g g
200

K2

1600
f f

e e

K1
350

K1

d 300 d
50

c c
150

150

K4

b b
250

250

a a

350 350 100

800

1 2 3 4 5

LEGENDA
K1 = keramik type 1 uk. 40x40
granite abu-abu
01 RENCANA POLA LANTAI 1
K2 = keramik type 2 uk. 20x20 ARS 01
abu-abu alur SKALA 1 : 100
K3 = keramik type 3 uk. 30x30
putih polos
K4 = keramik type 4 uk. 30x30

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) RENCANA POLA LANTAI 1 DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 15 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i

100 K4

h h

DOWN
300

700
g K1 g
200

K2

1600
f f

e e

K1
350

K1

d 300 d
50

c c
150

150

K1

b b
250

250

a a

350 350 100

800

1 2 3 4 5

LEGENDA
K1 = keramik type 1 uk. 40x40
granite abu-abu
01 RENCANA POLA LANTAI 2
K2 = keramik type 2 uk. 20x20 ARS 01
abu-abu alur SKALA 1 : 100
K3 = keramik type 3 uk. 30x30
putih polos
K4 = keramik type 4 uk. 30x30

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) RENCANA POLA LANTAI 2 DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 16 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i
100

h h

BALOK SLOOF 15x20

AMBANG ATAS 30cm


300

AMBANG BAWAH 80cm

GALIAN 100cm

700
100
30
80
g g
200

A A
B B

1600
f f

e e
350

300

d d
50

c c
150

150

b b
250

250
90
80
30

a a

350 350 100

800

1 2 3 4 5

01 RENCANA PONDASI BATU KALI


ARS 01
SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) RENCANA PONDASI DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 17 45 A4
NAMA SEKOLAH

SMKN 1 SINGOSARI

NAMA TUGAS

TUGAS AKHIR SEMESTER II


1
PAS. DINDING 2 BATU BATA GAMBAR KONSTRUKSI BANGUNAN
PAS. TRASSRAM KM/WC 1pc : 3psr
+150cm
KETERANGAN
PAS. TRASSRAM
+20cm 1. SEMUA DIMENSI MENGGUNAKAN
SATUAN CENTI METER KECUALI
DITENTUKAN LAIN.

GRANITE ABU-ABU GRANITE ABU-ABU 2. SEMUA ELEVASI MENGGUNAKAN


uk. 40x40 uk. 40x40 +0.20 SATUAN METER.

3. ABBRAVITION :
- EL = ELEVASI
SPECIE 1pc : 3 psr - FD = FLOOR DRAIN
FFL -0.10 - FFL = FINISHING FLOOR LEVEL
URUGAN PASIR t. 10cm -0.15 - GL = GROUND LEVEL

BALOK SLOOF 15x20 4. SIMBOL :

-0.35

URUGAN TANAH KEMBALI

PAS. BATU KALI BELAH


1pc : 3 psr

-1.15
AANSTAMPENG 15cm

-1.30
URUGAN PASIR t. 8cm
-1.38
LAP. PERMUKAAN TANAH

30 30

80 80
JUDUL GAMBAR
100 90
DETAIL PONDASI
BATU KALI

01 DETAIL PONDASI BATU KALI


DB 01 SKALA 1 : 25
SKALA 1 : 100
TANGGAL 24-03-2018

DIGAMBAR KELAS
MOH. AFIFUDIN XII TGB 1

DIPERIKSA TTD
- B. YULI PURWITA S.Pd., MT.
- P. SUGENG HARYONO

NO. LBR JML. LBR UK. KERTAS

18 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i
100

h h
300

700
100
g g

100
200

1600
f f

e e
350

300

d d
50

c c
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5

01 RENCANA PONDASI FOOTPLAT


ARS 01
SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) RENCANA PONDASI DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 19 45 A4
NAMA SEKOLAH

SMKN 1 SINGOSARI

NAMA TUGAS

TUGAS AKHIR SEMESTER II


GAMBAR KONSTRUKSI BANGUNAN

KETERANGAN
1. SEMUA DIMENSI MENGGUNAKAN
SATUAN CENTI METER KECUALI
DITENTUKAN LAIN.

2. SEMUA ELEVASI MENGGUNAKAN


SATUAN METER.
15

3. ABBRAVITION :
BADAN PONDASI - EL = ELEVASI
5 5 15

- FD = FLOOR DRAIN
- FFL = FINISHING FLOOR LEVEL
BETON RABAT 5cm
- GL = GROUND LEVEL
PASIR URUG t. 5cm
4. SIMBOL :

100 100

100

100
30

30
15 15

JUDUL GAMBAR

100 100 DETAIL PONDASI


FOOTPLAT

SKALA 1 : 25
TANGGAL 24-03-2018

01 DETAIL PONDASI FOOTPLAT DIGAMBAR KELAS


DB 01
SKALA 1 : 100 MOH. AFIFUDIN XII TGB 1

DIPERIKSA TTD
- B. YULI PURWITA S.Pd., MT.
- P. SUGENG HARYONO

NO. LBR JML. LBR UK. KERTAS

20 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i
100

h h
300

700
g g
PLAFON ETERNIT 1x1 m
200

RANGKA PLAFOND GALVALUME

1600
f f

e e
350

300

d d
50

c c
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5

01 RENCANA PLAFOND LANTAI 1


ARS 01
SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) RENCANA PLAFOND DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 21 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i
100

h h
300

700
g g
200

1600
f f
PLAFON ETERNIT 1x1 m

RANGKA PLAFOND GALVALUME


e e
350

300

d d
50

c c
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5

01 RENCANA PLAFOND LANTAI 2


ARS 01
SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) RENCANA PLAFOND DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 22 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i

100

h h
300

700
g g
200

1600
f f

e e
350

d 300 d
PLN
50

c c
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5

LEGENDA
= Lampu Gantung = Saklar Tunggal 01 RENCANA INSTALASI LISTRIK LT.1
ARS 01
= Lampu LED = Saklar Ganda SKALA 1 : 100

= Lampu Plafond = Stop Kontak

= Lampu Hias = Saklar Antena

= Lampu Taman

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA RENCANA INSTALASI
2. SEMUA ELEVASI MENGGUNAKAN
SATUAN METER.
(1PC : 4PS)
LISTRIK DIPERIKSA TTD
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 23 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i

100

h h
300

700
g g
200

1600
f f

e e
350

d 300 d
50

c c
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5

LEGENDA
= Lampu Gantung = Saklar Tunggal 01 RENCANA INSTALASI LISTRIK LT.2
ARS 01
= Lampu LED = Saklar Ganda SKALA 1 : 100

= Lampu Plafond = Stop Kontak

= Lampu Hias = Saklar Antena

= Lampu Taman

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA RENCANA INSTALASI
2. SEMUA ELEVASI MENGGUNAKAN
SATUAN METER.
(1PC : 4PS)
LISTRIK DIPERIKSA TTD
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 24 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i

100

h h
300

3
4 "
menuju lantai 2

700
g g
200

1600
f f

e e
350

d 300 d
50

c c
150

150

b b
PDAM
250

250

air dari saluran PDAM

a a

350 350 100

800

1 2 3 4 5

LEGENDA
3
" 01 RENCANA INSTALASI AIR BERSIH LT.1
4
ARS 01
SKALA 1 : 100
PDAM = Meteran air PDAM

= Pemanas Air

= Kran air dingin

= Kran air panas

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA RENCANA INSTALASI
2. SEMUA ELEVASI MENGGUNAKAN
SATUAN METER.
(1PC : 4PS)
AIR BERSIH DIPERIKSA TTD
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 25 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i

100

h h
300

3
4 "
dari lantai 1

700
g g
200

1600
f f

e e
350

d 300 d
50

c c
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5

LEGENDA
3
" 01 RENCANA INSTALASI AIR BERSIH LT.2
4
ARS 01
SKALA 1 : 100
PDAM = Meteran air PDAM

= Pemanas Air

= Kran air dingin

= Kran air panas

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA RENCANA INSTALASI
2. SEMUA ELEVASI MENGGUNAKAN
SATUAN METER.
(1PC : 4PS)
AIR BERSIH DIPERIKSA TTD
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 26 45 A4
1 3 5
250 100 450

j j

SUMUR

200

200
SEPTICTANK RESAPAN

i i

100

h h
300

dari lantai 2

700
dari lantai 2
g g
200

1600
f f

e e
350

d 300 d
50

c c
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5

LEGENDA

01 RENCANA INSTALASI AIR KOTOR LT.1


ARS 01
SKALA 1 : 100

= Lubang flooor drain/afurni

= Lubang pembuangan air bekas

= Lubang pembuangan air kotor

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA RENCANA INSTALASI
2. SEMUA ELEVASI MENGGUNAKAN
SATUAN METER.
(1PC : 4PS)
AIR KOTOR DIPERIKSA TTD
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 27 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i

100

h h
300

menuju lantai 1

700
menuju lantai 1
g g
200

1600
f f

e e
350

d 300 d
50

c c
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5

LEGENDA

01 RENCANAINSTALASI AIR KOTOR LT.2


ARS 01
SKALA 1 : 100

= Lubang flooor drain/afurni

= Lubang pembuangan air bekas

= Lubang pembuangan air kotor

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA RENCANA INSTALASI
2. SEMUA ELEVASI MENGGUNAKAN
SATUAN METER.
(1PC : 4PS)
AIR KOTOR DIPERIKSA TTD
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 28 45 A4
NAMA SEKOLAH

SMKN 1 SINGOSARI

NAMA TUGAS

TUGAS AKHIR SEMESTER II


GAMBAR KONSTRUKSI BANGUNAN

B KETERANGAN
1. SEMUA DIMENSI MENGGUNAKAN
SATUAN CENTI METER KECUALI
DITENTUKAN LAIN.

2. SEMUA ELEVASI MENGGUNAKAN

100
SATUAN METER.
A A
3. ABBRAVITION :
- EL = ELEVASI
- FD = FLOOR DRAIN
- FFL = FINISHING FLOOR LEVEL
210 - GL = GROUND LEVEL

4. SIMBOL :
B

01 TAMPAK ATAS
DB 01
SKALA 1 : 50

136 10 30 10 24 25 10 30 10 25
23
10

10
15

dari closet

(menuju resapan)
65
100

100
127

70
20

JUDUL GAMBAR
5 12

5 12
PASIR URUG t. 5cm PASIR URUG t. 5cm
PERMUKAAN TANAH PERMUKAAN TANAH
12 52 12 58 12 52 12 12 76 12

DETAIL SEPTICTANK
210

SKALA 1 : 50
01 POTONGAN A-A 01 POTONGAN B-B
DB 01 DB 01
TANGGAL 24-03-2018
SKALA 1 : 50 SKALA 1 : 50
DIGAMBAR KELAS
MOH. AFIFUDIN XII TGB 1

DIPERIKSA TTD

NO. LBR JML. LBR UK. KERTAS

29 45 A4
NAMA SEKOLAH

SMKN 1 SINGOSARI

NAMA TUGAS

TUGAS AKHIR SEMESTER II


GAMBAR KONSTRUKSI BANGUNAN

KETERANGAN
1. SEMUA DIMENSI MENGGUNAKAN
SATUAN CENTI METER KECUALI
DITENTUKAN LAIN.

2. SEMUA ELEVASI MENGGUNAKAN


SATUAN METER.

3. ABBRAVITION :
- EL = ELEVASI
- FD = FLOOR DRAIN
- FFL = FINISHING FLOOR LEVEL
- GL = GROUND LEVEL

25
4. SIMBOL :

23
IJUK 10cm

10
TRASSRAM 1pc : 2psr

50
dari septictank
TRASSRAM 1pc : 2psr

A A SUSUNAN 1
2 BATA

75

210
IJUK 10cm

75
10 12 76 12 10

120

10 12 13 50 13 12 10

120

JUDUL GAMBAR

01 TAMPAK ATAS 01 POTONGAN A-A


DB 01 DB 01
DETAIL SUMUR RESAPAN
SKALA 1 : 50 SKALA 1 : 50

SKALA 1 : 50
TANGGAL 24-03-2018

DIGAMBAR KELAS
MOH. AFIFUDIN XII TGB 1

DIPERIKSA TTD
- B. YULI PURWITA S.Pd., MT.
- P. SUGENG HARYONO

NO. LBR JML. LBR UK. KERTAS

30 45 A4
1 2 3 4 5
250 100 450

j j

200

200
15x20

15x20
i i
100

h h
300

BALOK SLOOF 15x20

15x20

700
g g
200

15x20

1600
f f

e e
350

15x20
300

d d
50

c c
150

150

15x20
b b
15x20
250

250

a a

350 350 100

800

1 2 3 4 5

CATATAN
01 RENCANA BALOK SLOOF
- Posisi dan ketinggian balok dipasang ARS 01
sesuai dengan rencana SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) RENCANA BALOK SLOOF DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 31 45 A4
1 2 3 4 5
250 100 450

j j

200

200
15x30
15x15
i i
100

h h
300

700
15x15
g 15x30 g
200

1600
f f

e e
350

300

15x30
d d
50

c c
150

150

b 15x15 b
250

250

a a

350 350 100

800

1 2 3 4 5

CATATAN
01 RENCANA KOLOM LANTAI 1
- Posisi dan ketinggian balok dipasang ARS 01
sesuai dengan rencana SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) RENCANA KOLOM DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 32 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i
100

15x15
h h
300

700
g 15x15 g
200

15x15

1600
f f

e e
350

300

15x15
d 15x15 d
50

c c
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5

CATATAN
01 RENCANA KOLOM LANTAI 2
- Posisi dan ketinggian balok dipasang ARS 01
sesuai dengan rencana SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) RENCANA KOLOM DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 33 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i
100

15x25
h h
300

700
UP

g g
15x25
200

1600
f f

e e
350

300

d d
50

c c
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5

CATATAN
01 RENCANA BALOK TANGGA
- Posisi dan ketinggian balok dipasang ARS 01
sesuai dengan rencana SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) RENCANA BALOK TANGGA DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 34 45 A4
1 2 3 4 5
250 100 450

j j

15x30

200

200
15x30
i i
100

h h

15x30
15x30
300

700
15x30
g g
200

15x30

1600
f f

15x30
e e
350

300

15x30
d d
50

c c
150

150

b b

15x30
250

250

a a

350 350 100

800

1 2 3 4 5

CATATAN
01 RENCANA BALOK EL. +3.70
- Posisi dan ketinggian balok dipasang ARS 01
sesuai dengan rencana SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) RENCANA BALOK DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 35 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i
100

15x25
h h

15x20

15x25
300

15x20

700
g g

15x25
200

15x25

1600
f f

15x25
e e
350

15x25

300

15x25
d d
50

c c
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5

CATATAN
01 RENCANA BALOK EL. +7.50
- Posisi dan ketinggian balok dipasang ARS 01
sesuai dengan rencana SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) RENCANA BALOK DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 36 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i
100

15x20
h h
300

15x20

700
15x20

g g
200

1600
f f

15x20
e e
350

300
15x20

d d
15x20
50

c c
150

150

15x20
b b
250

250

a a

350 350 100

800

1 2 3 4 5

CATATAN
01 RENCANA BALOK EL. +8.00
- Posisi dan ketinggian balok dipasang ARS 01
sesuai dengan rencana SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) RENCANA BALOK DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 37 45 A4
1 2 3 4 5
250 100 450

j j

200

200
EL. +3.70

i i
100

h h

EL. +3.70
300

700
g g
200

EL. +3.70

1600
f f

e e
EL. +3.70
350

EL. +3.70
300

d d
50

c c
150

150

b b

EL. +3.70
250

250

a a

350 350 100

800

1 2 3 4 5

CATATAN
01 RENCANA PLAT LANTAI
- Posisi dan ketinggian plat dipasang ARS 01
sesuai dengan rencana SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) RENCANA PLAT LANTAI DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 38 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i
EL. +3.70
100

h h
300

700
g g

EL. +3.70
200

1600
f f

e e
350

EL. +3.70
300

d d
50

c c
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5

CATATAN
01 RENCANA PLAT ATAP
- Posisi dan ketinggian plat dipasang ARS 01
sesuai dengan rencana SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) RENCANA PLAT ATAP DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 39 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i
100

h h
300

700
g g
200

1600
f f

e e
350

300

d d
50

c c
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5

01 PEMBESIAN PLAT LANTAI


ARS 01
SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) PEMBESIAN PLAT LANTAI DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 40 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i
100

h h
300

700
g g
200

1600
f f

e e
350

300

d d
50

c c
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5

01 PEMBESIAN PLAT ATAP 1


ARS 01
SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) PEMBESIAN PLAT ATAP DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 41 45 A4
1 2 3 4 5
250 100 450

j j

200

200
i i
100

h h
300

700
g g
200

1600
f f

e e
350

300

d d
50

c c
150

150

b b
250

250

a a

350 350 100

800

1 2 3 4 5

01 PEMBESIAN PLAT ATAP 2


ARS 01
SKALA 1 : 100

0 1m 2m 3m 5m

NAMA SEKOLAH KETERANGAN JUDUL GAMBAR DIGAMBAR KELAS


1. SEMUA DIMENSI MENGGUNAKAN 4. SIMBOL MOH. AFIFUDIN XII TGB 1
SATUAN CENTI METER KECUALI
SMKN 1 SINGOSARI DITENTUKAN LAIN. PASANGAN 1
2 BATU BATA
2. SEMUA ELEVASI MENGGUNAKAN (1PC : 4PS) PEMBESIAN PLAT ATAP DIPERIKSA TTD
SATUAN METER.
PASANGAN TRASRAM - B. YULI PURWITA S. Pd., MT.
3. ABBRAVITION :
NAMA TUGAS - EL = ELEVASI (1PC : 2PS) - P. SUGENG HARYONO
- FD = FLOOR DRAIN ARAH POTONGAN
- FFL = FINISHING FLOOR LEVEL
TUGAS AKHIR SEMESTER II - GL = GROUND LEVEL ARAH TAMPAK
SKALA TANGGAL NO. LBR JML. LBR UK. KERTAS
GAMBAR KONSTRUKSI BANGUNAN
1 : 100 24-03-2018 42 45 A4
NAMA SEKOLAH

SMKN 1 SINGOSARI

NAMA TUGAS
EL +8.00

20
TUGAS AKHIR SEMESTER II
balok ring 15x20
EL +7.50
GAMBAR KONSTRUKSI BANGUNAN

25
balok 15x25
KETERANGAN
1. SEMUA DIMENSI MENGGUNAKAN
SATUAN CENTI METER KECUALI
DITENTUKAN LAIN.

2. SEMUA ELEVASI MENGGUNAKAN

355
kolom 15x15 kolom 15x15 kolom 15x15 kolom 15x15
SATUAN METER.

3. ABBRAVITION :
- EL = ELEVASI
- FD = FLOOR DRAIN
- FFL = FINISHING FLOOR LEVEL
EL +3.80 - GL = GROUND LEVEL

4. SIMBOL :
30
balok 15x30

kolom 15x30 kolom 15x15 kolom 30x15 kolom 15x30


355
20

balok sloof 15x20


180

EL -2.15

350 450
JUDUL GAMBAR
800

DETAIL RENCANA PORTAL

01 DETAIL RENCANA PORTAL


DB 01 SKALA 1 : 100
SKALA 1 : 100
TANGGAL 24-03-2018

DIGAMBAR KELAS
MOH. AFIFUDIN XII TGB 1

DIPERIKSA TTD
- B. YULI PURWITA S.Pd., MT.
- P. SUGENG HARYONO

0 1m 2m 3m 5m NO. LBR JML. LBR UK. KERTAS

43 45 A4
NAMA SEKOLAH

SMKN 1 SINGOSARI

NAMA TUGAS

TUGAS AKHIR SEMESTER II


GAMBAR KONSTRUKSI BANGUNAN

KOLOM 15x30 KETERANGAN


1. SEMUA DIMENSI MENGGUNAKAN
SATUAN CENTI METER KECUALI
DITENTUKAN LAIN.

2. SEMUA ELEVASI MENGGUNAKAN


SATUAN METER.

3. ABBRAVITION :
- EL = ELEVASI

30
- FD = FLOOR DRAIN
- FFL = FINISHING FLOOR LEVEL
- GL = GROUND LEVEL
BALOK SLOOF 15x20
4. SIMBOL :

15
20

KOLOM 15x15

15

15
15

01 DETAIL PEMBESIAN BALOK SLOOF JUDUL GAMBAR


DB 01
SKALA 1 : 10
DETAIL PEMBESIAN
BALOK SLOOF DAN KOLOM

SKALA 1 : 10

DETAIL PEMBESIAN KOLOM TANGGAL 24-03-2018


01
DB 01
SKALA 1 : 10 DIGAMBAR KELAS
MOH. AFIFUDIN XII TGB 1

DIPERIKSA TTD
- B. YULI PURWITA S.Pd., MT.
- P. SUGENG HARYONO

NO. LBR JML. LBR UK. KERTAS

44 45 A4
NAMA SEKOLAH

SMKN 1 SINGOSARI

NAMA TUGAS

TUGAS AKHIR SEMESTER II


TULANGAN TUMPUAN TULANGAN TUMPUAN GAMBAR KONSTRUKSI BANGUNAN

EL. +3.70 EL. +7.50


KETERANGAN
1. SEMUA DIMENSI MENGGUNAKAN
SATUAN CENTI METER KECUALI
DITENTUKAN LAIN.

2. SEMUA ELEVASI MENGGUNAKAN


SATUAN METER.

3. ABBRAVITION :

25
- EL = ELEVASI
30

- FD = FLOOR DRAIN
- FFL = FINISHING FLOOR LEVEL
- GL = GROUND LEVEL

4. SIMBOL :

15

15

TULANGAN LAPANGAN TULANGAN LAPANGAN


EL. +3.70 EL. +7.50

25
30

JUDUL GAMBAR

15 DETAIL PEMBESIAN
15 BALOK RING

SKALA 1 : 10
TANGGAL 24-03-2018

01 DETAIL PEMBESIAN BALOK RING 1 01 DETAIL PEMBESIAN BALOK RING 2 DIGAMBAR KELAS
DB 01 DB 01
SKALA 1 : 10 SKALA 1 : 10 MOH. AFIFUDIN XII TGB 1

DIPERIKSA TTD
- B. YULI PURWITA S.Pd., MT.
- P. SUGENG HARYONO

NO. LBR JML. LBR UK. KERTAS

45 45 A4

Anda mungkin juga menyukai