RENCANA MUTU KONTRAK

PAKET KEGIATAN REHABILITASI (LONGSORAN) BETUNG – SEKAYU - MANGUNJAYA

No. Dok. : Tgl. Diterbitkan : Hal : 1 dari 58


No. Rev. : 23 Januari 2017 Paraf :

PERSETUJUAN
URAIAN DISUSUN OLEH DIPERIKSA OLEH DISAHKAN OLEH

Ir. ARIA
NAMA Ir. CECEP IRWANSYAH, MT DEDY MANDARSYAH, ST. MT
KURNIAWAN

KEPALA SATKER
DIREKTUR PPK 03 PELAKSANAAN JALAN
PELAKSANAAN JALAN
JABATAN PT. DUTA NASIONAL BETUNG – SEKAYU
NASIONAL WILAYAH I
PERMATA LESTARI - MANGUNJAYA
PROVINSI SUMATERA SELATAN

TANDA TANGAN

TANGGAL 23 Januari 2017

RENCANA MUTU KONTRAK


PAKET KEGIATAN :
REHABILITASI (LONGSORAN) BETUNG – SEKAYU - MANGUNJAYA
Kontrak No. : HK.02.03/BSM/068/I/2017
Tanggal : 20 Januari 2017

UNIT PENERIMA

1. 4.

2. 5.

3. 6.

STATUS DOKUMEN

STATUS ASLI TERKENDALI

Tanggal :
RENCANA MUTU KONTRAK
PAKET KEGIATAN REHABILITASI (LONGSORAN) BETUNG – SEKAYU - MANGUNJAYA

No. Dok. : Tgl. Diterbitkan : Hal : 2 dari 58


No. Rev. : 23 Januari 2017 Paraf :

SEJARAH DOKUMEN

TANGGAL CATATAN PERUBAHAN KETERANGAN

23 Januari 2017 RMK diterbitkan perdana Rev. 00


RENCANA MUTU KONTRAK
PAKET KEGIATAN REHABILITASI (LONGSORAN) BETUNG – SEKAYU - MANGUNJAYA

No. Dok. : Tgl. Diterbitkan : Hal : 3 dari 58


No. Rev. : 23 Januari 2017 Paraf :

DAFTAR ISI

1. Umum (Latar Belakang) .................................................................................... 4


2. Informasi Kegiatan ............................................................................................. 5
3. Sasaran Mutu Kegiatan ...................................................................................... 14
4. Persyaratan teknis dan administrasi ................................................................... 16
5. Struktur Organisasi ............................................................................................ 17
6. Tugas, tanggung jawab dan wewenang ............................................................. 19
7. Bagan Alir dan Metoda Pelaksanaan Kegiatan .................................................. 26
8. Jadwal Pelaksanaan Kegiatan ............................................................................ 32
9. Jadwal Peralatan ................................................................................................. 33
10. Jadwal Material .................................................................................................. 36
11. Jadwal Personil .................................................................................................. 37
12. Jadwal Arus Kas ................................................................................................ 39
13. Rencana & metoda verifikasi, validasi, monitoring, evaluasi, inspeksi
dan pengujian & kriteria penerimaannya ........................................................... 40
14. Daftar Kriteria Penerimaan ................................................................................ 42
15. Daftar Induk Dokumen ...................................................................................... 44
16. Daftar Induk Rekaman/Bukti Kerja .................................................................. 47
17. Lampiran ........................................................................................................... 48
RENCANA MUTU KONTRAK
PAKET KEGIATAN REHABILITASI (LONGSORAN) BETUNG – SEKAYU - MANGUNJAYA

No. Dok. : Tgl. Diterbitkan : Hal : 4 dari 58


No. Rev. : 23 Januari 2017 Paraf :

BAB 1
UMUM (LATAR BELAKANG)

Dokumen ini ( Rencana Mutu Kontrak ) disusun oleh PT. DUTA PERMATA LESTARI
selaku pelaksana pekerjaan paket ini yang memiliki kewajiban sebagaimana diatur di dalam
dokumen pelelangan “ Paket Kegiatan Rehabilitasi (Longsoran) Betung – Sekayu -
Mangunjaya’. Selain untuk memenuhi persyaratan kontrak Dokumen RMK ini disusun dalam
rangka “penjaminan mutu” pelaksanaan kepada Pengguna Jasa tentang bagaimana PT. DUTA
PERMATA LESTARI akan menyelesaikan pekerjaaannya melalui pengerahan antara lain ;

 Sumber daya manusia ;

 Sumber daya peralatan ;

 Sumber daya finansial dan ;

 Metoda pelaksanaannya.

Selain sebagai penjaminan kepada pihak eksternal, dokumen ini juga diperuntukkan bagi
kepentingan internal organisasi, agar setiap personil yang terlibat dapat memahami tujuan dan
sasaran proyek dimaksud. Untuk itu Tim Proyek Paket Kegiatan Rehabilitasi (Longsoran)
Betung – Sekayu - Mangunjaya mendistribusi dan mensosialisasikan kepada seluruh jajaran yang
terlibat untuk dipahami dan dilaksanakan.

Anda mungkin juga menyukai