PT.

SWADAYA GRAHA
( Semen Gresik Group )
The Plant Builder Specialist

LAPORAN PROGRESS BULANAN


PERIODE :
01 Oktober 2017

PAKET PEKERJAAN :

INSTALASI MECHANIKAL TOBACCO FEEDING E01, F01 NEW SKM


KEDIRI

NO. PO. : 9130043493/9130019068/LGU


NO. NPB : 0001/GG-32B/IV-17

ACTUAL PROGRESS : 25.06%

PT. GUDANG GARAM Tbk.

KEDIRI - JAWA TIMUR

PT. SWADAYA GRAHA


THE PLANT BUILDER SPECIALIST
JL. RA. KARTINI 25 GRESIK 61122, INDONESIA
Phone : 52-31-3984477, 3985533 Fax : 62-31-3982253, email : swgraha @rad.net.Id.
LAPORAN SUMMARY PROGRESS PEKERJAAN OKTOBER 2017
PEKERJAAN : PROYEK INSTALASI MECHANIKAL TOBACCO FEEDING E01 DAN F01 NEW SKM KEDIRI
LOKASI : PT. GUDANG GARAM NEW SKM UNIT V
NO. PO : 9130043493/9130019068/LGU
TANGGAL : 22/08/2017
NO. NPB : 0001/GG-32B/IV-17

PENCAPAIAN Rencana s/d Minggu Deviasi s/d Minggu ini


Minggu lalu Minggu ini s/d Minggu ini ini
Bobot
NO. DESKRIPSI QTY SATUAN Prosent Bobot Prosent Bobot Prosent Bobot Prosent Bobot Prosent Bobot Ket.
(%) (%) (%) (%) (%) (%) (%) (%) (%) (%)
h = i/ax j = k/ax
a b c=axb d=f-b e =g-c f g=axf
100%
i
100%
k=g-i

PEMASANGAN MATERIAL

1 INSTALASI MECHANIKAL FEEDING & WEIGHT BELT E-01 1 LOT 50.00% 5.00% 2.50% 40.11% 20.06% 45.11% 22.56% 32.00% 16.00% 13.11% 6.56%

2 INSTALASI MECHANIKAL FEEDING & WEIGHT BELT F-01 1 LOT 50.00% 5.00% 2.50% 0.00% 0.00% 5.00% 2.50% 0.00% 0.00% 5.00% 2.50%

TOTAL 100.00% 5.00% 20.06% 25.06% 16.00% 9.06%

Disetujui oleh, Dibuat oleh,


PT. GUDANG GARAM, Tbk. PT. SWADAYA GRAHA
LAPORAN DETAIL PROGRESS PEKERJAAN OKTOBER 2017
PEKERJAAN : PROYEK INSTALASI MECHANIKAL TOBACCO FEEDING E01 DAN F01 NEW SKM KEDIRI
LOKASI : PT. GUDANG GARAM NEW SKM UNIT V
NO. PO : 9130043493/9130019068/LGU
TANGGAL : 22/08/2017
NO. NPB : 0001/GG-32B/IV-17

KETERANGAN
NO. DESKRIPSI LINE QTY SAT HARGA TOTAL

PEMASANGAN MATERIAL

1 Package 33,574,660.00
Layout-item : 10
1 Package 22,063,348.00
Layout-item : 20
1 Package 6,523,076.80
Layout-item : 20
1 E.01
1 Package 1,630,769.20
Layout-item : 30
1 Package 2,781,900.40
Layout-item : 40
1 Package 383,710.40
Layout-item : 40
Instalasi Mechanical Feeding
1 Package 33,574,660.00
Layout-item : 50
1 Package 22,063,348.00
Layout-item : 60
F.01 1 Package 6,523,076.80
Layout-item : 60
2
1 Package 1,630,769.20
Layout-item : 70
1 Package 2,781,900.40
Layout-item : 80
1 Package 383,710.40
Layout-item : 80

TOTAL 1 Package 133,914,929.60

Disetujui oleh,
PT. GUDANG GARAM, Tbk.
KERJA KERJA Minggu lalu
BOBOT REAL Testing &
KURANG TAMBAH Preparation Instalasi
Finishing
Checklist Progress

5% 80% 10% 5% 100%

50.00% 2.50%
25.07% 1 100% 0% 0% 0% 1.25%
16.48% 1 100% 0% 0% 0% 0.82%
4.87% 1 100% 0% 0% 0% 0.24%
1.22% 1 100% 0% 0% 0% 0.06%
2.08% 1 100% 0% 0% 0% 0.10%
0.29% 1 100% 0% 0% 0% 0.01%
50.00% 2.50%
25.07% 1 100% 0% 0% 0% 1.25%
16.48% 1 100% 0% 0% 0% 0.82%
4.87% 1 100% 0% 0% 0% 0.24%
1.22% 1 100% 0% 0% 0% 0.06%
2.08% 1 100% 0% 0% 0% 0.10%
0.29% 1 100% 0% 0% 0% 0.01%

100.00% 5.00%
PENCAPAIAN
Minggu ini s/d Minggu ini
Testing & Testing &
Preparation Instalasi Checklist Progress Preparation Instalasi Checklist
Finishing Finishing
5% 80% 10% 5% 100% 5% 80% 10% 5%

20.06%
0.00% 100.00% 0.00% 0.00% 20.06% 100% 100% 0% 0%

0.00% 0.00% 0.00% 0.00% 0.00% 100% 0% 0% 0%

0.00% 0.00% 0.00% 0.00% 0.00% 100% 0% 0% 0%

0.00% 0.00% 0.00% 0.00% 0.00% 100% 0% 0% 0%

0.00% 0.00% 0.00% 0.00% 0.00% 100% 0% 0% 0%

0.00% 0.00% 0.00% 0.00% 0.00% 100% 0% 0% 0%


0.00%
0.00% 0.00% 0.00% 0.00% 0.00% 100% 0% 0% 0%

0.00% 0.00% 0.00% 0.00% 0.00% 100% 0% 0% 0%

0.00% 0.00% 0.00% 0.00% 0.00% 100% 0% 0% 0%

0.00% 0.00% 0.00% 0.00% 0.00% 100% 0% 0% 0%

0.00% 0.00% 0.00% 0.00% 0.00% 100% 0% 0% 0%

0.00% 0.00% 0.00% 0.00% 0.00% 100% 0% 0% 0%

20.06%
ini SISA Prosent
Ket.
Progress BOBOT (%)

100%

22.56% 27.44% 45.11%


21.31% 3.76% 85.00%
0.82% 15.65% 5.00%
0.24% 4.63% 5.00%
0.06% 1.16% 5.00%
0.10% 1.97% 5.00%
0.01% 0.27% 5.00%
2.50% 47.50% 5.00%
1.25% 23.82% 5.00%
0.82% 15.65% 5.00%
0.24% 4.63% 5.00%
0.06% 1.16% 5.00%
0.10% 1.97% 5.00%
0.01% 0.27% 5.00%

25.06% 74.94%

Dibuat oleh,
PT. SWADAYA GRAHA