Progres Oktober Mech - Feeding E01& F01 Kediri
Progres Oktober Mech - Feeding E01& F01 Kediri
SWADAYA GRAHA
( Semen Gresik Group )
The Plant Builder Specialist
PAKET PEKERJAAN :
PEMASANGAN MATERIAL
1 INSTALASI MECHANIKAL FEEDING & WEIGHT BELT E-01 1 LOT 50.00% 5.00% 2.50% 40.11% 20.06% 45.11% 22.56% 32.00% 16.00% 13.11% 6.56%
2 INSTALASI MECHANIKAL FEEDING & WEIGHT BELT F-01 1 LOT 50.00% 5.00% 2.50% 0.00% 0.00% 5.00% 2.50% 0.00% 0.00% 5.00% 2.50%
KETERANGAN
NO. DESKRIPSI LINE QTY SAT HARGA TOTAL
PEMASANGAN MATERIAL
1 Package 33,574,660.00
Layout-item : 10
1 Package 22,063,348.00
Layout-item : 20
1 Package 6,523,076.80
Layout-item : 20
1 E.01
1 Package 1,630,769.20
Layout-item : 30
1 Package 2,781,900.40
Layout-item : 40
1 Package 383,710.40
Layout-item : 40
Instalasi Mechanical Feeding
1 Package 33,574,660.00
Layout-item : 50
1 Package 22,063,348.00
Layout-item : 60
F.01 1 Package 6,523,076.80
Layout-item : 60
2
1 Package 1,630,769.20
Layout-item : 70
1 Package 2,781,900.40
Layout-item : 80
1 Package 383,710.40
Layout-item : 80
Disetujui oleh,
PT. GUDANG GARAM, Tbk.
KERJA KERJA Minggu lalu
BOBOT REAL Testing &
KURANG TAMBAH Preparation Instalasi
Finishing
Checklist Progress
50.00% 2.50%
25.07% 1 100% 0% 0% 0% 1.25%
16.48% 1 100% 0% 0% 0% 0.82%
4.87% 1 100% 0% 0% 0% 0.24%
1.22% 1 100% 0% 0% 0% 0.06%
2.08% 1 100% 0% 0% 0% 0.10%
0.29% 1 100% 0% 0% 0% 0.01%
50.00% 2.50%
25.07% 1 100% 0% 0% 0% 1.25%
16.48% 1 100% 0% 0% 0% 0.82%
4.87% 1 100% 0% 0% 0% 0.24%
1.22% 1 100% 0% 0% 0% 0.06%
2.08% 1 100% 0% 0% 0% 0.10%
0.29% 1 100% 0% 0% 0% 0.01%
100.00% 5.00%
PENCAPAIAN
Minggu ini s/d Minggu ini
Testing & Testing &
Preparation Instalasi Checklist Progress Preparation Instalasi Checklist
Finishing Finishing
5% 80% 10% 5% 100% 5% 80% 10% 5%
20.06%
0.00% 100.00% 0.00% 0.00% 20.06% 100% 100% 0% 0%
20.06%
ini SISA Prosent
Ket.
Progress BOBOT (%)
100%
25.06% 74.94%
Dibuat oleh,
PT. SWADAYA GRAHA