Anda di halaman 1dari 10

KP.

PT. SWADAYA GRAHA


( Semen Gresik Group )
The Plant Builder Specialist

LAPORAN PROGRESS MINGGUAN


PERIODE :

PAKET PEKERJAAN :

Pengadaan Material & Instalasi Pipa Air di GGIX-27 & GGIX-28 Unit IX, GGIX-
62 & GGIX-65 Unit IX, dari Deep Well Gudang ABC ke Deep Well New SKM
Unit V, Gedung GGIX-57b & GGIX-57C Unit IX, Gedung GGIX-51A Unit IX,
Gedung GGIX-27A & GGIX-29 Unit IX, Pengadaan Material & Instalasi
Compressor Destilasi Unit V, Pengadaan Material & Instalasi Insulation
Jacketing 5 (Lima) Unit Cyclone Line E & E Destilasi Unit V.

NO. PO. : 9170037586 / 9170005757/GMP


NO. NPB : -

PROGRESS :

PT. GUDANG GARAM Tbk.

KEDIRI - JAWA TIMUR


PT. SWADAYA GRAHA
THE PLANT BUILDER SPECIALIST
JL. RA. KARTINI 25 GRESIK 61122, INDONESIA
Phone : 52-31-3984477, 3985533 Fax : 62-31-3982253, email : swgraha @rad.net.Id.
Pengadaan Material & Instalasi Pipa Air di GGIX-27 & GGIX-28 Unit IX, GGIX-62

NO DESCRIPTION Q'ty Satuan Bobot


14-Jan 21-Jan 28-Jan 4-Feb 11-Feb 18-Feb 25-Feb
1 2 3 4 5 6 7

A PENGADAAN MATERIAL #REF!

PENGADAAN MATERIAL DAN INSTALASI PIPA AIR Ø4" DARI AREA BOILER KE GROUND TANK DI GGIX-27 & GGIX-28;
I 1 LOT #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
KODE PP: E0050000

PENGADAAN MATERIAL DAN INSTALASI PIPA AIR DARI WATER TOWER KE GEDUNG GGIX-62 & GGIX-65 UNIT IX; KODE
II 1 LOT #REF! #REF! #REF! #REF! #REF! #REF! #REF!
PP: 100C00000

PENGADAAN MATERIAL DAN INSTALASI PIPA BACKUP AIR BERSIH DARI DEEP WELL GUDANG ABC KE DEEP WELL NEW
III 1 LOT #REF! #REF! #REF! #REF!
SKM UNIT V; KODE PP: 80000.143200 CIP 27456

IV PENGADAAN MATERIAL DAN INSTALASI COMPRESSOR DESTILASI UNIT V; KODE PP: 100F0200 -- DIKERJAKAN MFK

PENGADAAN MATERIAL DAN INSTALASI PIPA AIR BERSIH DI GEDUNG GGIX-57B DAN GGIX-57C UNIT IX; KODE PP:
V 1 LOT #REF! #REF! #REF!
100C0000
`
VI PENGADAAN MATERIAL DAN INSTALASI PIPA AIR BERSIH DI GEDUNG GGIX-51A UNIT IX; KODE PP: 100C0000 1 LOT #REF! #REF!

PENGADAAN MATERIAL DAN INSTALASI PIPA AIR BERSIH DI GEDUNG GGIX-27A & GGIX-29 UNIT IX; KODE PP:
VII 1 LOT #REF! #REF!
100B0000

PENGADAAN MATERIAL DAN INSTALASI INSULATION JACKETING LIMA UNIT CYCLONE LINE E&E DESTILASI UNIT V ;
VIII 1 LOT #REF! #REF! #REF! #REF! #REF!
KODE PP: 100F0200

A #REF!
FABRIKASI & INSTALASI
PENGADAAN MATERIAL DAN INSTALASI PIPA AIR Ø4" DARI AREA BOILER KE GROUND TANK DI GGIX-27 & GGIX-28;
I 1 LOT #REF! #REF! #REF! #REF!
KODE PP: E0050000

PENGADAAN MATERIAL DAN INSTALASI PIPA AIR DARI WATER TOWER KE GEDUNG GGIX-62 & GGIX-65 UNIT IX; KODE
II 1 LOT #REF! #REF! #REF!
PP: 100C00000

PENGADAAN MATERIAL DAN INSTALASI PIPA BACKUP AIR BERSIH DARI DEEP WELL GGUDANG ABC KE DEEP WELL
III 1 LOT #REF!
NEW SKM UNIT V; KODE PP: 80000.143200 CIP 27456

IV PENGADAAN MATERIAL DAN INSTALASI COMPRESSOR DESTILASI UNIT V; KODE PP: 100F0200 -- DIKERJAKAN MFK

PENGADAAN MATERIAL DAN INSTALASI PIPA AIR BERSIH DI GEDUNG GGIX-57B DAN GGIX-57C UNIT IX; KODE PP:
V 1 LOT #REF!
100C0000
`
VI PENGADAAN MATERIAL DAN INSTALASI PIPA AIR BERSIH DI GEDUNG GGIX-51A UNIT IX; KODE PP: 100C0000 1 LOT #REF!
NO DESCRIPTION Q'ty Satuan Bobot
14-Jan 21-Jan 28-Jan 4-Feb 11-Feb 18-Feb 25-Feb
PENGADAAN MATERIAL DAN INSTALASI PIPA AIR BERSIH DI GEDUNG GGIX-27A & GGIX-29 UNIT IX; KODE PP:
VII 1 LOT #REF!
100B0000

PENGADAAN MATERIAL DAN INSTALASI INSULATION JACKETING LIMA UNIT CYCLONE LINE E&E DESTILASI UNIT V ;
VIII 1 LOT #REF!
KODE PP: 100F0200

IX HIDRO TEST & FLUSHING

TOTAL #REF!

1 PROGRESS RENCANA 0.00% 0.05% 0.05% 0.05% 0.90% 0.90% 1.20% 0.90%

2 PROGRESS RENCANA KUMULATIF 0.00% 0.05% 0.10% 0.15% 1.05% 1.95% 3.15% 4.05%

3 PROGRESS REALISASI

4 PROGRESS REALISASI KUMULATIF

5 UNDER / OVER

Disetujui Oleh,
PT. GUDANG GARAM, TBK 100.00%

( )
MASTER SCHEDULE

X, GGIX-62 & GGIX-65 Unit IX, dari Deep Well Gudang ABC ke Deep Well New SKM Unit V, Gedung GGIX-57b & GGIX-57C Unit IX, Gedung GGIX-51A Unit IX, Gedung GGIX-27A & GGIX-29 Unit IX, Pengadaan Ma

PO. 9170037586 / 9170005757 / GMP

2019
4-Mar 11-Mar 18-Mar 25-Mar 1-Apr 8-Apr 15-Apr 22-Apr 29-Apr 6-May 13-May 20-May 27-May 3-Jun 10-Jun 17-Jun 24-Jun 1-Jul 8-Jul 15-Jul 22-Jul 29-Jul 5-Aug 12-Aug
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

PLAN
#REF!

#REF! #REF! #REF! 0.80%

#REF! #REF! #REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF! #REF!

#REF! #REF! #REF! #REF!

#REF! #REF! #REF! #REF! #REF! #REF!

#REF! 0.17%

#REF! #REF! #REF! 0.09%


2019
4-Mar 11-Mar 18-Mar 25-Mar 1-Apr 8-Apr 15-Apr 22-Apr 29-Apr 6-May 13-May 20-May 27-May 3-Jun 10-Jun 17-Jun 24-Jun 1-Jul 8-Jul 15-Jul 22-Jul 29-Jul 5-Aug 12-Aug
#REF! #REF! 0.30%

#REF! #REF! #REF! #REF! #REF!

1.20% 1.20% 1.20% 1.20% 1.20% 2.00% 2.00% 2.00% 2.00% 2.30% 2.30% 2.30% 2.50% 2.50% 2.50% 2.50% 2.50% 2.75% 2.75% 2.75% 2.75% 2.85% 2.85% 3.00%

5.25% 6.45% 7.65% 8.85% 10.05% 12.05% 14.05% 16.05% 18.05% 20.35% 22.65% 24.95% 27.45% 29.95% 32.45% 34.95% 37.45% 40.20% 42.95% 45.70% 48.45% 51.30% 54.15% 57.15%
gadaan Material & Instalasi Compressor Destilasi Unit V, Pengadaan Material & Instalasi Insulation Jacketing 5 (Lima) Unit Cyclone Line E & E Destilasi Unit V.

19-Aug 26-Aug 2-Sep 9-Sep 16-Sep 23-Sep 30-Sep 7-Oct 14-Oct 21-Oct 28-Oct 4-Nov 11-Nov 18-Nov 25-Nov 2-Dec 9-Dec 16-Dec 23-Dec 30-Dec 6-Jan 13-Jan 20-Jan 27-Jan
32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55

PLAN
19-Aug 26-Aug 2-Sep 9-Sep 16-Sep 23-Sep 30-Sep 7-Oct 14-Oct 21-Oct 28-Oct 4-Nov 11-Nov 18-Nov 25-Nov 2-Dec 9-Dec 16-Dec 23-Dec 30-Dec 6-Jan 13-Jan 20-Jan 27-Jan

3.00% 3.00% 3.00% 2.40% 2.40% 2.30% 2.00% 2.00% 1.50% 1.50% 1.50% 1.50% 1.50% 1.50% 1.50% 1.20% 1.20% 1.20% 1.20% 1.00% 1.00% 1.00% 0.75% 0.75%

60.15% 63.15% 66.15% 68.55% 70.95% 73.25% 75.25% 77.25% 78.75% 80.25% 81.75% 83.25% 84.75% 86.25% 87.75% 88.95% 90.15% 91.35% 92.55% 93.55% 94.55% 95.55% 96.30% 97.05%
E & E Destilasi Unit V.

2010 KETERANGAN
3-Feb 10-Feb 17-Feb 24-Feb 2-Mar 9-Mar 16-Mar
56 57 58 59 60 61 62

PLAN
2010 KETERANGAN
3-Feb 10-Feb 17-Feb 24-Feb 2-Mar 9-Mar 16-Mar

0.75% 0.50% 0.50% 0.30% 0.30% 0.30% 0.30%

97.80% 98.30% 98.80% 99.10% 99.40% 99.70% 100.00%

Dibuat Oleh,
PT. SWADAYA GRAHA

( Totok Triastomo )
Manager Proyek