J LAIN - LAIN - 0.000% 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
ii TERMIN II
Bobot Rencana 512,647,026.23 100.000% 0.00 3.95 14.81 10.85 10.85 12.97 3.88 1.76 1.76
Bobot Realisasi
Akumulasi Rencana 0.00 3.95 18.76 29.61 40.46 53.43 57.31 59.07 60.83
Akumulasi Realisasi
Mengetahui,
Ketua Yayasan Nuurul Hudaa Lalonggotomi
NUR CHOLOLIK
MINGGU KE
10 11 12 13 14 15 16 17
100
90
80
70
60
NO ITEM PEKERJAAN
A PEKERJAAN PERSIAPAN
B PEKERJAAN PONDASI & TANAH
C PEKERJAAN STRUKTUR
D PEKERJAAN PLAFOND
E PEKERJAAN PASANGAN
F PEKERJAAN KUSEN PINTU & JENDELA
G PEKERJAAN PENGECATAN
H PEKERJAAN PLUMBING & SANITAIR
I PEKERJAAN LISTRIK
J LAIN - LAIN
TOTAL
PEMBULATAN
TERBILANG
Mengetahui,
Ketua Yayasan Miftahul Huda
NUR CHOLIK
TOTAL
-
40,509,891.25
222,576,293.77
21,674,049.00
54,190,810.30
91,012,535.00
24,455,095.90
11,641,155.00
46,587,196.00
-
512,647,026.23
…………………. , 2018
Tetemotaha, 22 Nopember 2018
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. ( Rp. )
A PEKERJAAN PERSIAPAN
1 Papan Proyek 1.00 unt 0.00
2 Pek. Pengukuran dan Bowplank 54.00 m' 0.00
3 Pek. Listrik & Air Kerja 1.00 ls 0.00
4 Pek. Laporan & Dokumentasi 1.00 ls 0.00
Sub Total A Sub Total A
B PEKERJAAN PONDASI & TANAH
1 Pek. Galian Tanah Pondasi 75.48 m3 88,920.00
2 Pek. Urug Tanah Kembali 25.16 m3 99,110.00
3 Pek. Urug Tanah Peninggian Peil Lantai (t = 10 cm) 16.83 m3 99,110.00
4 Pek. Pasir Urug
- BawBawah Pondasi 5.67 m3 136,900.00
Bawah Bawah Lantai 22.36 m3 136,900.00
6 Pek. Pondasi Batu Belah P2 26.18 m3 521,300.00
7 Pek. Sloof Beton (15/30)
BetonBeton K-225 1.80 m3 2,134,427.46
PembPembesian 445.67 kg 13,531.04
BekisBekisting 24.00 m2 94,953.33
Sub Total B Sub Total B
C PEKERJAAN STRUKTUR
C.1 STRUKTUR BETON
1 Pek. Kolom Beton K1 (30/30)
BetonBeton K-225 6.91 m3 2,134,427.46
PembPembesian 1,005.19 kg 13,531.04
BekisBekisting 92.16 m2 94,953.33
2 Pek. Kolom Praktis KP (15/15)
BetonBeton K-175 0.55 m3 2,064,408.41
HARGA SATUAN
NO. URAIAN PEKERJAAN VOLUME SAT. ( Rp. )
Catatan:
- Ketua Unit Pengelola Kegiatan : 1 Orang x 4 Bulan = 4 Orang Bulan ( 4 OB )
- Ketua Unit Pengelola Keuangan : 1 Orang x 4 Bulan = 4 Orang Bulan ( 4 OB )
- Anggota Unit Pengelola Kegiatan : 2 Orang x 4 Bulan = 8 Orang Bulan ( 8 OB )
- Anggota Unit Pengelola Keuangan : 2 Orang x 4 Bulan = 8 Orang Bulan ( 8 OB )
- SBM Ketua Unit Pengelola : Rp. 400.000,-
- SBM Anggota Unit Pengelola : Rp. 300.000,-
OF QUANTITY
JUMLAH HARGA
( Rp. )
0.00
0.00
0.00
0.00
0.00
6,711,823.87
2,493,660.46
1,668,219.52
776,223.00
3,061,084.00
13,647,634.00
3,841,969.43
6,030,396.97
2,278,880.00
40,509,891.25
14,753,162.61
13,601,311.54
8,750,899.20
1,128,715.30
JUMLAH HARGA
( Rp. )
1,403,828.02
692,209.80
0.00
2,817,444.25
5,508,932.03
3,555,222.00
0.00
1,857,967.57
4,180,259.57
1,322,190.00
0.00
17,609,026.55
1,534,420.33
572,949.00
0.00
95,958,072.00
28,054,264.00
9,819,420.00
9,456,000.00
222,576,293.77
3,877,200.00
15,907,049.00
1,889,800.00
21,674,049.00
21,026,286.66
8,003,696.92
1,012,770.00
701,400.00
1,111,596.00
52,310.40
1,653,600.00
6,741,500.00
552,065.63
386,100.00
301,364.40
321,015.94
1,009,036.40
JUMLAH HARGA
( Rp. )
1,051,008.00
2,000,000.00
8,076,156.00
190,903.96
54,190,810.30
6,271,800.00
8,580,800.00
2,611,900.00
10,543,400.00
50,889,600.00
JUMLAH HARGA
( Rp. )
3,884,800.00
842,600.00
5,150,400.00
2,237,235.00
91,012,535.00
12,193,477.49
9,695,085.91
1,870,382.50
696,150.00
24,455,095.90
1,825,552.00
564,408.00
464,440.00
317,955.00
5,599,350.00
521,950.00
265,800.00
1,478,600.00
603,100.00
11,641,155.00
0.00
0.00
500,000.00
306,800.00
30,790,800.00
2,147,600.00
708,156.00
789,894.00
194,184.00
95,900.00
239,750.00
477,100.00
3,307,368.00
5,052,894.00
191,800.00
1,784,950.00
JUMLAH HARGA
( Rp. )
46,587,196.00
0.00
0.00
0.00
512,647,026.23
ANALISA HARGA SATUAN STRUKTUR
No Uraian
PEKERJAAN GALIAN
2 1 m3 Urugan kembali
Bahan 1.1000 m3 Tanah Urug
No Uraian
5 1 m3 Urugan tanah pilihan
Bahan An. SNI ( Revisi ) 6.11.1
1.2000 m3 Tanah campur
6 1 m3 Pemadatan tanah
Upah An. SNI ( Revisi ) 6.11.2
0.2500 OH Pekerja
0.0080 OH Mandor
Alat
0.0210 jam Sewa Stamper
1 m2 Pemadatan tanah
ANALISA HARGA SATUAN STRUKTUR
No Uraian
PEKERJAAN BETON
1 1 m3 beton mutu f'c = 14.5 Mpa (K175), slump (12 +/- 2), w/c = 0.66 sitemix
Bahan
326.000 kg Portland Cement
0.543 m3 Pasir Beton
0.762 m3 Kerikil (maks.imum 30 mm)
215.000 ltr Air
Upah
1.650 OH Pekerja
0.275 OH Tukang batu
0.083 OH Mandor
2 1 m3 beton mutu f'c = 19.3 Mpa (K225), slump (12 +/- 2), w/c = 0.58
Bahan
371.000 kg Portland Cement
0.499 m3 Pasir Beton
0.776 m3 Kerikil (maks.imum 30 mm)
215.000 ltr Air
Upah
1.650 OH Pekerja
0.275 OH Tukang batu
0.083 OH Mandor
No Uraian
Upah
0.070 OH Pekerja
0.070 OH Tukang besi
0.004 OH Mandor
Upah
0.070 OH Pekerja
0.070 OH Tukang besi
0.004 OH Mandor
Upah
0.520 OH Pekerja
0.260 OH Tukang Kayu
0.026 OH Mandor
No Uraian
0.300 kg Paku 5 cm - 10 cm
0.100 ltr Minyak Bekisting
Upah
0.520 OH Pekerja
0.260 OH Tukang Kayu
0.026 OH Mandor
Upah
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Mandor
No Uraian
2.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m
Upah
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Mandor
Upah
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Mandor
No Uraian
Upah
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Mandor
Upah
0.660 OH Pekerja
0.330 OH Tukang Kayu
0.033 OH Mandor
No Uraian
Upah
0.180 OH Pekerja
0.020 OH Tukang Kayu
0.020 OH Tukang Batu
0.020 OH Tukang Besi
0.009 OH Mandor
PEKERJAAN ATAP
1 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP ASBES/SPANDEK
Bahan
1.488 m1 Profil C-75.08
2.2 m1 Profil C-75.06
28 bh Baut (Srew driver
1.5 bh Dinabolt
3.4 m1 Reng
Upah
0.2 OH Pekerja
0.45 OH Tukang Kayu
0.05 OH Mandor
Upah
0.2 OH Pekerja
0.08 OH Tukang Kayu
0.01 OH Mandor
ANALISA HARGA SATUAN STRUKTUR
No Uraian
Upah
0.2 OH Pekerja
0.1 OH Tukang Kayu
0.01 OH Mandor
A HARGA SATUAN STRUKTUR
Rp 88,920.00
Rp 100,000.00 Rp 76,000.00
Rp 170,000.00 Rp 12,920.00
Sub total : Rp 88,920.00
Rp 99,110.00
Rp 55,000.00 Rp 60,500.00
Sub total : Rp 60,500.00
Rp 100,000.00 Rp 33,000.00
Rp 170,000.00 Rp 5,610.00
Sub total : Rp 38,610.00
Rp 136,900.00
Rp 85,000.00 Rp 93,500.00
Sub total : Rp 93,500.00
Rp 100,000.00 Rp 40,000.00
Rp 170,000.00 Rp 3,400.00
Sub total : Rp 43,400.00
Rp 329,250.00
Rp 250,000.00 Rp 275,000.00
Sub total : Rp 275,000.00
Rp 100,000.00 Rp 50,000.00
Rp 170,000.00 Rp 4,250.00
Sub total : Rp 54,250.00
A HARGA SATUAN STRUKTUR
Rp 55,000.00 Rp 66,000.00
Sub total : Rp 66,000.00
Rp 100,000.00 Rp 25,000.00
Rp 170,000.00 Rp 1,700.00
Sub total : Rp 26,700.00
Rp 28,460.00
Rp 100,000.00 Rp 25,000.00
Rp 170,000.00 Rp 1,360.00
Sub total : Rp 26,360.00
Rp 100,000.00 Rp 2,100.00
Sub total : Rp 2,100.00
20 cm Rp 5,692.00
A HARGA SATUAN STRUKTUR
Rp 2,064,408.41
Rp 1,600.00 Rp 521,600.00
Rp 120,000.00 Rp 65,142.86
Rp 250,000.00 Rp 190,555.56
Rp 5,000.00 Rp 1,075,000.00
Sub total : Rp 1,852,298.41
Rp 100,000.00 Rp 165,000.00
Rp 120,000.00 Rp 33,000.00
Rp 170,000.00 Rp 14,110.00
Sub total : Rp 212,110.00
Rp 2,134,427.46
Rp 1,600.00 Rp 593,600.00
Rp 120,000.00 Rp 59,828.57
Rp 250,000.00 Rp 193,888.89
Rp 5,000.00 Rp 1,075,000.00
Sub total : Rp 1,922,317.46
Rp 100,000.00 Rp 165,000.00
Rp 120,000.00 Rp 33,000.00
Rp 170,000.00 Rp 14,110.00
Sub total : Rp 212,110.00
Rp 135,310.43
Rp 13,531.04
Rp 10,869.57 Rp 114,130.43
Rp 20,000.00 Rp 3,000.00
Sub total : Rp 117,130.43
A HARGA SATUAN STRUKTUR
Rp 100,000.00 Rp 7,000.00
Rp 150,000.00 Rp 10,500.00
Rp 170,000.00 Rp 680.00
Sub total : Rp 18,180.00
Rp 135,310.43
Rp 13,531.04
Rp 10,869.57 Rp 114,130.43
Rp 20,000.00 Rp 3,000.00
Sub total : Rp 117,130.43
Rp 100,000.00 Rp 7,000.00
Rp 150,000.00 Rp 10,500.00
Rp 170,000.00 Rp 680.00
Sub total : Rp 18,180.00
Rp 97,120.00
Rp 200,000.00 Rp 8,000.00
Rp 10,000.00 Rp 1,000.00
Rp 100,000.00 Rp 10,000.00
Sub total : Rp 19,000.00
Rp 9,500.00
Rp 100,000.00 Rp 52,000.00
Rp 120,000.00 Rp 31,200.00
Rp 170,000.00 Rp 4,420.00
Sub total : Rp 87,620.00
Rp 94,953.33
Rp 200,000.00 Rp 9,000.00
A HARGA SATUAN STRUKTUR
Rp 100,000.00 Rp 52,000.00
Rp 120,000.00 Rp 31,200.00
Rp 170,000.00 Rp 4,420.00
Sub total : Rp 87,620.00
Rp 146,647.50
Rp 200,000.00 Rp 8,000.00
Rp 10,000.00 Rp 4,000.00
Rp 100,000.00 Rp 20,000.00
Rp 175,000.00 Rp 2,625.00
Rp 75,000.00 Rp 26,250.00
Rp 5,000.00 Rp 10,000.00
Sub total : Rp 70,875.00
Rp 35,437.50
Rp 100,000.00 Rp 66,000.00
Rp 120,000.00 Rp 39,600.00
Rp 170,000.00 Rp 5,610.00
Sub total : Rp 111,210.00
Rp 146,910.00
Rp 200,000.00 Rp 8,000.00
Rp 10,000.00 Rp 4,000.00
Rp 100,000.00 Rp 20,000.00
Rp 175,000.00 Rp 3,150.00
Rp 75,000.00 Rp 26,250.00
A HARGA SATUAN STRUKTUR
Rp 100,000.00 Rp 66,000.00
Rp 120,000.00 Rp 39,600.00
Rp 170,000.00 Rp 5,610.00
Sub total : Rp 111,210.00
Rp 156,647.50
Rp 200,000.00 Rp 8,000.00
Rp 10,000.00 Rp 4,000.00
Rp 100,000.00 Rp 20,000.00
Rp 175,000.00 Rp 2,625.00
Rp 75,000.00 Rp 26,250.00
Rp 5,000.00 Rp 30,000.00
Sub total : Rp 90,875.00
Rp 45,437.50
Rp 100,000.00 Rp 66,000.00
Rp 120,000.00 Rp 39,600.00
Rp 170,000.00 Rp 5,610.00
Sub total : Rp 111,210.00
Rp 136,126.67
Rp 200,000.00 Rp 6,000.00
Rp 10,000.00 Rp 4,000.00
Rp 100,000.00 Rp 20,000.00
Rp 175,000.00 Rp 3,500.00
Rp 75,000.00 Rp 26,250.00
Rp 5,000.00 Rp 15,000.00
A HARGA SATUAN STRUKTUR
Rp 100,000.00 Rp 66,000.00
Rp 120,000.00 Rp 39,600.00
Rp 170,000.00 Rp 5,610.00
Sub total : Rp 111,210.00
Rp 132,501.67
Rp 200,000.00 Rp 6,000.00
Rp 10,000.00 Rp 4,000.00
Rp 100,000.00 Rp 15,000.00
Rp 175,000.00 Rp 2,625.00
Rp 75,000.00 Rp 26,250.00
Rp 5,000.00 Rp 10,000.00
Sub total : Rp 63,875.00
Rp 21,291.67
Rp 100,000.00 Rp 66,000.00
Rp 120,000.00 Rp 39,600.00
Rp 170,000.00 Rp 5,610.00
Sub total : Rp 111,210.00
Rp 75,958.70
Rp 200,000.00 Rp 400.00
Rp 10,000.00 Rp 100.00
Rp 10,869.57 Rp 32,608.70
Rp 20,000.00 Rp 9,000.00
Rp 1,600.00 Rp 6,400.00
Rp 120,000.00 Rp 720.00
Rp 250,000.00 Rp 2,250.00
A HARGA SATUAN STRUKTUR
Rp 100,000.00 Rp 18,000.00
Rp 120,000.00 Rp 2,400.00
Rp 120,000.00 Rp 2,400.00
Rp 120,000.00 Rp 2,400.00
Rp 170,000.00 Rp 1,530.00
Sub total : Rp 26,730.00
Rp 414,900.00
Rp 50,000.00 Rp 74,400.00
Rp 30,000.00 Rp 66,000.00
Rp 4,000.00 Rp 112,000.00
Rp 8,000.00 Rp 12,000.00
Rp 20,000.00 Rp 68,000.00
Sub Total Rp 332,400.00
Rp 100,000.00 Rp 20,000.00
Rp 120,000.00 Rp 54,000.00
Rp 170,000.00 Rp 8,500.00
Sub Total Rp 82,500.00
Rp 121,300.00
Rp 60,000.00 Rp 66,000.00
Rp 3,000.00 Rp 18,000.00
Rp 3,000.00 Rp 6,000.00
Sub Total Rp 90,000.00
Rp 100,000.00 Rp 20,000.00
Rp 120,000.00 Rp 9,600.00
Rp 170,000.00 Rp 1,700.00
Sub Total Rp 31,300.00
A HARGA SATUAN STRUKTUR
Rp 125,890.00
Rp 80,000.00 Rp 84,000.00
Rp 20,000.00 Rp 1,000.00
Sub Total Rp 85,000.00
Rp 100,000.00 Rp 11,000.00
Rp 120,000.00 Rp 26,400.00
Rp 120,000.00 Rp 2,640.00
Rp 170,000.00 Rp 850.00
Sub Total Rp 40,890.00
Rp 59,100.00
Rp 11,000.00 Rp 12,100.00
Rp 9,000.00 Rp 9,900.00
Rp 11,000.00 Rp 12,100.00
Sub Total Rp 34,100.00
Rp 75,000.00 Rp 15,000.00
Rp 100,000.00 Rp 10,000.00
Rp - Rp -
Sub Total Rp 25,000.00
ANALISA HARGA SATUAN ARSITEKTUR
I. PEKERJAAN PERSIAPAN
II PEKERJAAN PONDASI
ACIAN M2
semen PC ( 50 kg ) tiga roda 0.1400 zak
alat bantu acian 1.0000 ls
tukang batu 0.1000 org/hr
pekerja 0.0500 org/hr
mandor 0.0050 org/hr
IV PEKERJAAN BETON
MEMBUAT LANTAI KERJA ad 1:3:5 M3
semen PC ( 50 kg ) tiga roda 2.5000 zak
pasir beton 0.5200 m3
split 0.8700 m3
tukang batu 0.8000 org/hr
pekerja 0.8000 org/hr
mandor 0.5000 org/hr
VI PEKERJAAN PLAFOND
MEMASANG PLAFOND GYPSUM TILE M2
gypsum board 4x8 ft , t = 9 mm 0.3472 lbr
hollow 20 x 40 x 0.35 mm 0.8000 btg
hollow 40 x 40 x 0.35 mm 0.5000 btg
penggantung plafond 1.0000 bh
compound 0.1000 sak
textile tape 0.2000 rol
skrup gypsum 15.0000 bh
tukang gypsum 0.1000 org/hr
kepala tukang 0.0060 org/hr
pekerja 0.1000 org/hr
mandor 0.0230 org/hr
ANALISA HARGA SATUAN ARSITEKTUR
CAT MINYAK M2
amplas 0.5000 lbr
cat besi Glotex 0.2500 kg
meni besi 0.1670 kg
thinner impala 0.1500 ltr
kuas besar 0.0476 bh
tukang cat 0.0667 org/hr
kepala tukang cat 0.0333 org/hr
pekerja 0.0333 org/hr
mandor 0.0167 org/hr
ANALISA HARGA SATUAN ARSITEKTUR
IX PEKERJAAN SANITAIR
WASTAFEL TANAM BH
wastafel gantung + accessories ex.lokal 1.0000 bh
sealant 0.5000 bh
tukang plambing 1.2500 org/hr
kepala tukang plambing 0.1250 org/hr
pekerja 0.2500 org/hr
mandor 0.0250 org/hr
ANALISA HARGA SATUAN ARSITEKTUR
X PEKERJAAN LAIN-LAIN
TRALIS VENTILASI m1
Besi Hollow 40 x 40 4.0000 btng
Besi Hollow 20 x 40 8.0000 btng
Finishing Cat minyak 3.3250 m2
upah pabrikasi dan pasang 6.6500 m1
HARGA JUMLAH
200,000 1,000
200,000 1,000
10,000 350
100,000 10,000
170,000 3,400
jumlah 15,750
dibulatkan 15,800
200,000 5,000
175,000 15,750
10,000 6,000
15,000 11,250
22,000 22,000
10,000 20,000
20,000 10,000
50,000 150,000
1,600 800
120,000 7,200
250,000 25,000
100,000 100,000
120,000 2,100
120,000 12,000
120,000 12,000
jumlah 399,100
dibulatkan 399,100
540,000 2,160,000
1,250,000 5,000,000
jumlah 7,160,000
dibulatkan 7,160,000
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
50,000 200,000
15,000 30,000
3,000 90,000
150,000 600,000
120,000 240,000
jumlah 1,160,000
dibulatkan 1,160,000
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
5,000 2,500
100,000 10,000
170,000 1,700
jumlah 14,200
dibulatkan 14,200
200,000 220,000
85,000 36,720
120,000 46,800
100,000 78,000
170,000 66,300
jumlah 447,820
dibulatkan 447,800
200,000 220,000
1,600 4,169
120,000 62,400
120,000 72,000
100,000 150,000
170,000 12,750
jumlah 521,319
dibulatkan 521,300
600 14,876
1,600 960
120,000 12,480
120,000 12,000
100,000 10,000
170,000 850
jumlah 51,166
dibulatkan 51,150
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
600 42,000
1,600 606
120,000 4,560
1,415 1,415
120,000 12,000
100,000 32,000
170,000 2,550
jumlah 95,131
dibulatkan 95,100
600 42,000
1,600 310
120,000 5,400
1,431 1,431
120,000 12,000
100,000 32,000
170,000 2,550
jumlah 95,691
dibulatkan 95,700
1,600 384
120,000 2,280
80 80
120,000 18,000
100,000 20,000
170,000 1,700
jumlah 42,444
dibulatkan 42,400
1,600 384
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
120,000 2,280
80 80
120,000 24,000
100,000 15,000
170,000 2,550
jumlah 44,294
dibulatkan 44,300
1,600 224
22 22
120,000 12,000
100,000 5,000
170,000 850
jumlah 18,096
dibulatkan 18,100
1,600 48
5 5
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
120,000 9,600
100,000 6,000
170,000 1,020
jumlah 16,673
dibulatkan 16,700
1,600 4,000
120,000 62,400
250,000 217,500
120,000 96,000
100,000 80,000
170,000 85,000
jumlah 544,900
dibulatkan 544,900
544,900 27,245
dibulatkan 27,200
75,000 17,500
10,000 4,000
200,000 4,074
175,000 5,250
5,000 1,250
500,000 2,000,000
120,000 36,000
100,000 20,000
170,000 1,700
jumlah 2,089,774
dibulatkan 2,089,800
300,000 300,000
20,000 40,000
100,000 6,000
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
100,000 4,300
120,000 5,160
170,000 357
jumlah 355,817
dibulatkan 355,800
150,000 150,000
100,000 1,500
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
120,000 1,800
170,000 1,360
jumlah 154,660
dibulatkan 154,700
150,000 157,500
100,000 -
100,000 1,500
120,000 18,000
170,000 1,360
jumlah 178,360
dibulatkan 178,400
150,000 -
150,000 1,368,000
100,000 126,000
75,000 840,000
150,000 327,120
125,000 1,230,000
150,000 1,146,000
30,000 60,000
15,000 30,000
75,000 75,000
100,000 425,000
- -
100,000 637,500
170,000 7,225
jumlah 6,271,845
dibulatkan 6,271,800
150,000 -
150,000 1,038,000
75,000 154,800
150,000 216,720
125,000 1,265,000
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
150,000 906,000
30,000 30,000
20,000 20,000
15,000 15,000
75,000 75,000
35,000 35,000
100,000 212,500
- -
100,000 318,750
170,000 3,613
jumlah 4,290,383
dibulatkan 4,290,400
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
200,000 200,000
150,000 1,038,000
75,000 -
150,000 42,000
125,000 275,000
150,000 906,000
30,000 -
15,000 15,000
40,000 -
75,000 -
120,000 60,000
- -
100,000 75,000
170,000 850
jumlah 2,611,850
dibulatkan 2,611,900
500,000 4,640,000
55,000 510,400
jumlah 5,150,400
dibulatkan 5,150,400
200,000 2,202,000
75,000 168,000
150,000 355,200
125,000 1,430,000
150,000 873,000
15,000 30,000
35,000 70,000
120,000 60,000
- -
100,000 75,000
170,000 8,500
jumlah 5,271,700
dibulatkan 5,271,700
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
250,000 540,000
150,000 32,640
125,000 270,000
jumlah 842,640
dibulatkan 842,600
200,000 2,646,000
75,000 84,000
150,000 632,913
125,000 1,859,000
125,000 945,750
15,000 15,000
35,000 35,000
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
120,000 60,000
- -
100,000 75,000
170,000 8,500
jumlah 6,361,163
dibulatkan 6,361,200
200,000 1,508,000
75,000 -
150,000 348,300
125,000 1,077,500
125,000 807,500
15,000 -
35,000 -
120,000 60,000
- -
100,000 75,000
170,000 8,500
jumlah 3,884,800
dibulatkan 3,884,800
120,000 41,667
55,000 44,000
75,000 37,500
50,000 50,000
120,000 12,000
35,000 7,000
7,000 105,000
120,000 12,000
- -
100,000 10,000
170,000 3,910
jumlah 323,077
dibulatkan 323,100
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
90,000 31,250
55,000 44,000
75,000 37,500
50,000 50,000
120,000 12,000
35,000 7,000
7,000 105,000
120,000 12,000
- -
100,000 10,000
170,000 3,910
jumlah 312,660
dibulatkan 312,700
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
70,000 73,500
120,000 3,000
120,000 7,200
- -
100,000 2,000
170,000 170
jumlah 85,870
dibulatkan 85,900
120,000 132,000
120,000 3,600
1,600 368
1,600 320
120,000 16,200
- -
100,000 27,000
170,000 2,295
jumlah 181,783
dibulatkan 181,750
65,000 71,500
120,000 3,600
1,600 368
1,600 320
120,000 16,200
- -
100,000 27,000
170,000 2,295
jumlah 121,283
dibulatkan 121,250
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
80,000 88,000
120,000 3,600
1,600 368
1,600 320
120,000 16,200
- -
100,000 27,000
170,000 2,295
jumlah 137,783
dibulatkan 137,800
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
90,000 94,500
120,000 2,160
1,600 298
1,600 160
120,000 38,400
- -
100,000 50,000
170,000 5,100
jumlah 190,618
dibulatkan 190,600
3,500 8,750
120,000 240
1,600 32
120,000 10,800
- -
100,000 9,000
170,000 850
jumlah 29,672
dibulatkan 29,700
40,000 42,000
120,000 2,160
1,600 298
120,000 38,400
- -
100,000 50,000
170,000 5,100
jumlah 137,958
dibulatkan 138,000
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
50,000 15,000
10,000 5,000
50,000 5,000
50,000 15,000
35,000 875
120,000 9,600
- -
100,000 4,000
170,000 680
jumlah 55,155
dibulatkan 55,150
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
50,000 9,524
10,000 2,500
50,000 4,762
40,000 12,000
35,000 833
120,000 9,600
- -
100,000 4,000
170,000 680
jumlah 43,899
dibulatkan 43,850
10,000 5,000
32,000 9,600
35,000 875
120,000 9,600
- -
100,000 4,000
170,000 680
jumlah 29,755
dibulatkan 29,750
10,000 5,000
50,000 12,500
15,000 2,505
10,000 1,500
20,000 952
120,000 8,000
- -
100,000 3,333
170,000 2,833
jumlah 36,624
dibulatkan 36,600
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
500,000 500,000
120,000 60,000
120,000 150,000
- -
100,000 25,000
170,000 4,250
jumlah 739,250
dibulatkan 739,300
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
250,000 250,000
1,600 32
95,700 153,120
44,300 44,300
120,000 36,000
- -
100,000 30,000
170,000 8,500
jumlah 521,952
dibulatkan 521,950
50,000 50,000
100,000 50,000
120,000 3,600
- -
100,000 25,000
170,000 4,250
jumlah 132,850
dibulatkan 132,900
100,000 100,000
20,000 120,000
100,000 300,000
120,000 48,000
- -
100,000 30,000
170,000 5,100
jumlah 603,100
dibulatkan 603,100
2,000,000 2,000,000
jumlah 2,000,000
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
dibulatkan 2,000,000
150,000 600,000
120,000 960,000
36,600 121,695
60,000 399,000
jumlah 2,080,695
312,886
dibulatkan 312,900
132,900 26,580
54,300 10,860
jumlah 37,440
dibulatkan 37,400
HARGA SATUAN ARSITEKTUR
HARGA JUMLAH
88,920 56,909
99,110 18,335
136,900 8,899
150,000 125,000
120,000 2,400
1,600 160
31,755 31,755
jumlah 243,458
dibulatkan 243,450
88,920 17,784
99,110 5,947
136,900 2,738
95,700 66,990
42,400 46,640
18,100 19,910
jumlah 160,009
dibulatkan 160,000
88,920 666,900
136,900 28,749
27,200 61,200
95,100 1,426,500
2,064,408 619,323
- -
44,300 1,329,000
50,000 250,000
329,250 345,713
- -
99,110 111,994
100,000 400,000
120,000 360,000
jumlah 5,599,378
dibulatkan 5,599,350
ANALISA HARGA PEK. ELEKTRIKAL
800,000.00
240,000.00
52,000.00
1,092,000.00
20,000.00
21,600.00
0.00
6,800.00
48,400.00
1,140,400.00
800,000.00
240,000.00
52,000.00
1,092,000.00
20,000.00
21,600.00
0.00
6,800.00
48,400.00
1,140,400.00
70,000.00
30,000.00
5,000.00
105,000.00
20,000.00
21,600.00
0.00
6,800.00
48,400.00
153,400.00
JUMLAH
15,000.00
750.00
15,750.00
10,000.00
8,400.00
0.00
2,550.00
20,950.00
36,700.00
25,000.00
1,250.00
26,250.00
10,000.00
8,400.00
0.00
2,550.00
20,950.00
47,200.00
50,000.00
2,500.00
52,500.00
10,000.00
8,400.00
0.00
2,550.00
20,950.00
73,450.00
JUMLAH
800,000.00
100,000.00
300,000.00
480,000.00
84,000.00
1,764,000.00
10,000.00
8,400.00
0.00
2,550.00
20,950.00
1,784,950.00
15,000.00
750.00
15,750.00
15,000.00
13,800.00
0.00
3,400.00
32,200.00
47,950.00
15,000.00
750.00
15,750.00
15,000.00
13,800.00
0.00
3,400.00
32,200.00
47,950.00
JUMLAH
0.00
0.00
0.00
16,600.00
19,920.00
0.00
2,822.00
39,342.00
39,342.00
750,000.00
37,500.00
787,500.00
16,600.00
19,920.00
0.00
2,822.00
39,342.00
826,842.00
650,000.00
32,500.00
682,500.00
16,600.00
19,920.00
0.00
2,822.00
39,342.00
721,842.00
3,000,000.00
150,000.00
3,150,000.00
16,600.00
19,920.00
0.00
2,822.00
39,342.00
3,189,342.00
JUMLAH
70,000.00
3,500.00
73,500.00
16,600.00
19,920.00
0.00
2,822.00
39,342.00
112,842.00
40,000.00
15,000.00
2,750.00
57,750.00
16,600.00
19,920.00
0.00
2,822.00
39,342.00
97,092.00
920,000.00
46,000.00
966,000.00
250,000.00
420,000.00
0.00
136,000.00
806,000.00
1,772,000.00
JUMLAH
7,500.00
2,625.00
10,125.00
3,600.00
7,200.00
0.00
272.00
11,072.00
21,197.00
9,000.00
3,150.00
12,150.00
3,600.00
7,200.00
0.00
272.00
11,072.00
23,222.00
15,000.00
5,250.00
20,250.00
3,600.00
7,200.00
0.00
272.00
11,072.00
31,322.00
JUMLAH
22,500.00
7,875.00
30,375.00
5,400.00
10,800.00
0.00
459.00
16,659.00
47,034.00
42,000.00
14,700.00
56,700.00
8,100.00
16,200.00
0.00
697.00
24,997.00
81,697.00
66,000.00
23,100.00
89,100.00
8,100.00
16,200.00
0.00
697.00
24,997.00
114,097.00
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS-KEJURUAN TIK
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018
I. MATERIAL ALAM
batu bata merah bh
batu kali m3
split m3
beton decking bh
pasir beton m3
pasir pasang m3
pasir urug m3
tanah urug (lokal) m3
II. SEMEN
semen PC ( 50 kg ) kg
semen PC ( 50 kg ) zak
semen putih ( 50 kg ) zak
semen isian naat / warna kg
Pintu :
Daun pintu double teakwood finish HPL bh
Daun pintu double triplek 6mm finish duco bh
Daun pintu alumunium spandrel bh
Asesories :
engsel casement 24" psg
engsel pintu 4" S/S 2BB ex.lokal psg
engsel jendela 3" S/S 2BB ex.lokal psg
lever handle pintu ex.lokal psg
kunci pintu ex.lokal set
kunci pintu keet bh
rambuncis ex.dekson bh
Kaca :
bevel kaca m'
kaca clear 5 mm m2
kaca cermin 5 mm m2
Alumunium / Frame :
jalusi/kisi/krepyak m'
frame pintu alumunium m'
kusen alumunium 3" CA m'
kusen alumunium 4" CA m'
sealant kusen m'
sealant kaca m'
sealant kusen/jendela tube
sekrup fischer bh
VI. ATAP
nok galvalum m'
atap spandek galvalum t=0.35 mm m2
Atap Spandek Zincalume m2
Screw Cteks 12-4 x 5 bh
Screw Cteks 10 x 16-16 bh
Paku biasa 2" - 5" kg
Profil C-75.08 m1
Profil C-75.06 m1
Baut (Srew driver bh
Dinabolt bh
Reng m1
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS-KEJURUAN TIK
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018
VII. PLAFOND
gypsum board 4x8 ft , t = 9 mm lbr
penggantung plafond bh
hollow 20 x 40 x 0.35 mm btg
hollow 40 x 40 x 0.35 mm btg
List gypsum 5 x 5 m'
panel GRC 4x8 ft , t - 4.5 mm lbr
Lisplang GRC 20 cm m'
compound zak
skrup gypsum bh
textile tape roll
IX. CAT
cat dasar alkali Catylac kg
amplas lbr
cat besi Glotex kg
meni kayu kg
meni besi kg
cat tembok dalam Catylac kg
cat tembok mowilex (interior) kg
cat tembok catylac (luar) kg
cat plafond putih vinilex kg
plamur tembok kg
thinner impala ltr
plamur kayu kg
kuas besar bh
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS-KEJURUAN TIK
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018
kuas roll bh
X. SANITAIR
closet jongkok INA bh
wastafel tanam + accessories ex.lokal bh
kran air lokal bh
seal tape bh
sealant silicon tube
XV BAHAN PANEL
Box Panel Standard unt
MCB : 1 P , 6/10/16/25 A unt
HARGA SATUAN
(Rp.)
600
200,000
250,000
500,000
120,000
120,000
85,000
55,000
1,600
1,600
1,600
1,600
120,000
10,870
10,870
50,000
70,000
20,000
10,000
5,000
150,000
120,000
5,000
175,000
200,000
200,000
200,000
75,000
A SATUAN BAHAN & ALAT
HARGA SATUAN
(Rp.)
150,000
150,000
200,000
15,000
20,000
40,000
38,000
125,000
50,000
35,000
100,000
150,000
100,000
150,000
150,000
300,000
350,000
300,000
150,000
100,000
20,000
30,000
60,000
60,000
3,000
3,000
20,000
50,000
30,000
4,000
8,000
20,000
A SATUAN BAHAN & ALAT
HARGA SATUAN
(Rp.)
11,000
9,000
11,000
120,000
50,000
55,000
75,000
70,000
90,000
80,000
120,000
7,000
35,000
120,000
90,000
65,000
80,000
3,500
40,000
50,000
10,000
50,000
15,000
15,000
50,000
50,000
40,000
32,000
50,000
10,000
22,000
20,000
A SATUAN BAHAN & ALAT
HARGA SATUAN
(Rp.)
35,000
250,000
500,000
50,000
100,000
120,000
150,000
100,000
3,000,000
1,500,000
100,000
5,000
2,500
100,000
70,000
80,000
60,000
70,000
40,000
15,000
15,000
15,000
25,000
50,000
3,000,000
750,000
650,000
85,000
A SATUAN BAHAN & ALAT
HARGA SATUAN
(Rp.)
170,000
75,000
2,000,000
30,000
150,000
120,000
50,000
15,000
3,000
150,000
50,000
3,000,000
500,000
100,000
25,000
30,000
50,000
75,000
140,000
220,000
200,000
HARGA SATUAN UPAH
PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS-KEJURUAN TIK
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2018
1 Mandor Org / hr
#REF! Tukang Galian Org / hr
#REF! Tukang Batu Org / hr
#REF! Tukang Las Org / hr
#REF! Tukang Besi Org / hr
#REF! Tukang Kaca/Alumunium/Gipsum Org / hr
#REF! Tukang Kayu Org / hr
#REF! Tukang Cat Org / hr
#REF! Tukang Plumbing Org / hr
#REF! Pembantu Instalator / Tukang Listrik Org / hr
#REF! Pekerja / Kenek Org / hr
#REF! Tukang foto Org / hr
#REF! Ketua Unit Pengelola Teknis Org / hr
#REF! Ketua Unit Pengelola Keuangan Org / hr
#REF! Anggota Pengelola Teknis Org / hr
#REF! Anggota Pengelola Keuangan Org / hr
HARGA SATUAN UPAH
HARGA UPAH
Rp 170,000.00
Rp 120,000.00
Rp 120,000.00
Rp 120,000.00
Rp 150,000.00
Rp 120,000.00
Rp 120,000.00
Rp 120,000.00
Rp 120,000.00
Rp 120,000.00
Rp 100,000.00
Rp 120,000.00
Rp 400,000.00
Rp 400,000.00
Rp 300,000.00
Rp 300,000.00
VOLUME ATAP
Atap
1 utama 1 17.60 11.90
2 teras 1 5.60 3.90
3
4
A Total
Listplank
1 Depan 17.6 5.60
2 Belakang 17.6 5.60
3 Smp Kiri 11.9 3.90
4 Smp Kanan 11.9 3.90
59 19.00
Plafond
1 Gipsum 4.00 3.00
1.80
Plester + Aci
231.28
78.00
12.00
-
12.00
13.92
20.00
12.00
1.44
3.51
50.87
8.00
6.00
8.00
22.00
7.46
28.00
20.00
12.00
67.46
169.00
13.00
9.75
8.61
6.01
19.50
5.60
25.60
9.20
9.60
2.32
(4.31)
(6.19)
(1.81)
(3.27)
(38.87)
(2.32)
(0.33)
221.10
442.19
19.80
12.00
55.60
3.04
1.77
5.29
-
VOLUME PONDASI PLAT DAN BATU BELAH
4 PONDASI AANSTAMPING
Panjang 74.80
Lebar -
Tinggi -
Volume - m3
2 URUGAN
Urugan Kembali : 1/3 x 75.48 = 25.16053 m3
4 3 2 2 4
0.9
m3
m2
m3
m3
m3
VOLUME KOLOM PEDESTAL
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 358 kg
c) Bekisting : 0.56 m2
20 m2/m3
Jml Vol bekisting = 6.72 m2
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 899.8 kg
c) Bekisting : 0.72 m2
13.33 m2/m3
Jml Vol bekisting = 11.52 m2
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 28.71 kg
c) Bekisting : 1.04 m2
20 m2/m3
Jml Vol bekisting = 2.08 m2
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 277.4 kg
c) Bekisting : 0.91 m2
23.33 m2/m3
Jml Vol bekisting = 3.64 m2
Pnjg Hak Ovrlap T.Pnjg Vol Vol
m m m m kg kg
0.175 0.192 0.4 6.136 9.685
0.48 0.12 0 1.8 1.110
0.35 0.192 0 4.336 6.844
0.48 0.12 0 3 1.850
0.175 0.192 0.64 8.056 12.715
0.48 0.12 0 1.8 1.110
Jumlah 29.243 4.069
0.292 0.041
29.536 4.110
0.295 0.041
29.831 4.151
1065.400 148.248
8.4
Pnjg Hak Ovrlap T.Pnjg Vol
m m m m kg
0.15 0.192 0.4 10.388 16.3957559
0.88 0.12 0 3 1.84961267
0.3 0.192 0 6.888 10.8715794
0.88 0.12 0 4 2.46615023
0.15 0.192 0.64 13.748 21.6989654
0.88 0.12 0 3 1.84961267
Jumlah 55.1316763
0.55131676
55.682993
0.55682993
56.239823
1041.4782
18.2
Pnjg Hak Ovrlap T.Pnjg Vol
m m m m kg
0.325 0.156 0.325 3.224 3.35924188
0.48 0.096 0 2.304 0.90912162
0.65 0.156 0 3.224 3.35924188
0.48 0.096 0 3.456 1.36368243
0.325 0.156 0.52 4.004 4.17196169
0.48 0.096 0 2.304 0.90912162
Jumlah 14.0723711
0.14072371
14.2130948
0.14213095
14.3552258
276.062034
18.2
Pnjg Hak Ovrlap T.Pnjg Vol
m m m m kg
0.325 0.156 0.325 19.344 20.1554513
0.38 0.096 0 1.904 0.75128801
0.65 0.156 0 19.344 20.1554513
0.38 0.096 0 2.856 1.12693201
0.325 0.156 0.52 24.024 25.0317701
0.38 0.096 0 1.904 0.75128801
Jumlah 67.9721807
0.67972181
68.6519025
0.68651902
69.3384215
1777.90824
VOLUME TIE BEAM/SLOOF
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 445.67 kg
c) Bekisting : 2 m2
13.333333 m2/m3
Jml Vol bekisting = 24 m2
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 46.51 kg
c) Bekisting : 1 m2
13.333333 m2/m3
Jml Vol bekisting = 2 m2
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 149.25 kg
c) Bekisting : 1.5 m2
13.333333 m2/m3
Jml Vol bekisting = 7.50 m2
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 46.51 kg
c) Bekisting : 1 m2
13.333333 m2/m3
Jml Vol bekisting = 2 m2
5 SLOOF S2 15/25 AS A
Jumlah : 1.00
Dimensi : 0.15 x 0.25 m
Panjang : 4.00 m
T. Plat : 0 m
Cover beton : 0.04 m
Volume :
a) Beton : 0.15 m3
Jml Volume Beton = 0.15 m3
b) Tulangan : Jml D As s
Tul n m m2 m
Bj. Besi Beton Tumpuan (kiri) 3 0.0120 0.0001131
= 7850 kg/m3 Tumpuan (kiri) 3 0.0120 0.0001131
Sk 8 0.0080 5.0265E-05 0.15
Lapangan (tengah) 3 0.0120 0.0001131
Lapangan (tengah) 3 0.0120 0.0001131
Sk 15 0.0080 5.0265E-05 0.15
Tumpuan (kanan) 3 0.0120 0.0001131
Tumpuan (kanan) 3 0.0120 0.0001131
Sk 8 0.0080 5.0265E-05 0.15
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 37.14 kg
c) Bekisting : 2 m2
13.333333 m2/m3
Jml Vol bekisting = 2 m2
Beton 2.81 m3
Besi 725.09 kg
Bekisting 37.50 m2
Berat Pnjg Hak Ovrlap T.Pnjg Vol Vol
kg/m m m m m kg kg
0.887814 1.00 0.144 0.36 4.512 4.0058
0.887814 1.00 0.144 0.36 4.512 4.0058
0.394584 0.48 0.096 0.00 4.608 1.8182
0.887814 2.00 0.144 0.36 7.512 6.6693
0.887814 2.00 0.144 0.36 7.512 6.6693
0.394584 0.48 0.096 0.00 8.640 3.4092
0.887814 1.00 0.144 0.36 4.512 4.0058
0.887814 1.00 0.144 0.36 4.512 4.0058
0.394584 0.48 0.096 0.00 4.608 1.8182
Jumlah 29.3618 7.0457
0.2936 0.0705
29.6554 7.1161
0.2966 0.0712
29.9520 7.1873
199.6797 47.9154
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 1949 kg
c) Bekisting : 3.2 m2
20 m2/m3
Jml Vol bekisting = 76.8 m2
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 2298 kg
c) Bekisting : 4.8 m2
13.33 m2/m3
Jml Vol bekisting = 76.8 m2
VOLUME KOLOM
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 48.78 kg
c) Bekisting : 0.996 m2
13.33 m2/m3
Jml Vol bekisting = 10.96 m2
D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol
m m2 m kg/m m m m m kg
0.012 0.0001130973 0.88781 1.2 0.144 0 13.44 11.93
0.008 5.0265482457E-05 0.15 0.39458 1 0.096 0 9.86 3.89
0.012 0.0001130973 0.88781 2.4 0.144 0 25.44 22.59
0.008 5.0265482457E-05 0.15 0.39458 1 0.096 0 18.63 7.35
0.012 0.0001130973 0.88781 1.2 0.144 0 13.44 11.93
0.008 5.0265482457E-05 0.15 0.39458 1 0.096 0 9.86 3.89
Jumlah 61.59
0.62
62.20
0.62
62.82
145.43
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 407.1 kg
c) Bekisting : 2.2 m2
18.33 m2/m3
Jml Vol bekisting = 24.2 m2
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 46.89 kg
c) Bekisting : 1.2 m2
15 m2/m3
Jml Vol bekisting = 2.4 m2
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 93.78 kg
c) Bekisting : 1.2 m2
15 m2/m3
Jml Vol bekisting = 4.8 m2
TOTAL
Beton = 1.8
Besi = 547.8
Bekisting = 31.4
VOLUME BALOK BL
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 48.07 kg
c) Bekisting : 3.15 m2
20 m2/m3
Jml Vol bekisting = 3.15 m2
TOTAL
Beton = 1.37
Besi = 477.72
Bekisting = 27.45
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 84.62 kg
c) Bekisting : 4.635 m2
20 m2/m3
Jml Vol bekisting = 9.27 m2
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 25.2 kg
c) Bekisting : 1.035 m2
20 m2/m3
Jml Vol bekisting = 2.07 m2
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jml Volume Besi = 94.37 kg
c) Bekisting : 1.8 m2
20 m2/m3
Jml Vol bekisting = 9 m2
TOTAL
Beton = 1.02
Besi = 204.20
Bekisting = 20.34
m
m
m
m
m
m
M, 3M ; 1 UNIT
m
m
L= 10,30 M ; 2 UNIT
m
m
L= 2,30 M ; 2 UNIT
m
m
Jml D As s Berat Pnjg Hak Ovrlap T.Pnjg Vol
n m m2 m kg/m m m m m kg
4 0.0100 8E-05 0.61654 0.575 0.12 0.3 3.98 2.454
5 0.0080 5E-05 0.15 0.39458 0.4 0.096 0 2.48 0.979
4 0.0100 8E-05 0.61654 1.15 0.12 0.4 6.68 4.118
7 0.0080 5E-05 0.20 0.39458 0.4 0.096 0 3.472 1.370
4 0.0100 8E-05 0.61654 0.575 0.12 0.3 3.98 2.454
5 0.0080 5E-05 0.15 0.39458 0.4 0.096 0 2.48 0.979
0 0.0100 8E-05 0.61654 2.3 0 0 0 0.000
Jumlah 12.353
0.124
12.477
0.125
12.602
243.508
L= 4,0 M ; 5 UNIT
m
m
Bendrat (1%)
Tot. Vol
Waste (1%)
Grand Tot. Vol
Vol (kg/m3)
Jumlah 194.61279
1.946
196.559
1.966
198.525
165.437