RINCIAN ANGGARAN DAN BIAYA

Project name: Kantin Gedung A


Location: Bandung
Owner

No Item Pekerjaan Spesifikasi

I PEKERJAAN PERSIAPAN
Perijinan, listrik & air kerja By Owner

Total Pekerjaan Persia


II PEKERJAAN ARSITEKTUR
Lantai 1
Urugan Lantai 20cm
Pek. Lantai Keramik 30x30 Putih Polos ex. Asia Tile
Rangka Partisi Dinding Gypsum
Partisi Dinding Gypsum (double sisi)
Pek. Plafond Gypsum Gypsum 9mm ex Jayaboard + Rangka Metal Furring
Pek. Pengecatan Dinding Gypsum Waterbased Ex. Mowilex White Prima
Pek. Pengecatan Plafond Gypsum Waterbased Ex. Mowilex White Prima
Jendela + Jalusi 120x120
Pek. Pintu
Pek. Kusen Alumunium 4"

Total Pekerjaan Int


III PEKERJAAN PEKERJAAN MEP
Lampu TL 23 Watt ex. Philips
Instalasi Titik Lampu
Wastafel ex. Toto
Instalasi Air Besih Pipa 1/2'' Type AW ex. Wavin
Instalasi Air Kotor Pipa 3'' Type D ex. Rucika , include sambungan
Pek. Bak Kontrol 40x40

Total Pekerjaan

I PEKERJAAN PERSIAPAN
II PEKERJAAN ARSITEKTUR
III PEKERJAAN PEKERJAAN MEP
JUMLAH TOTAL
JASA 10%
GRAND TOTAL
DISKON
NETT
PPN 10%
SCAFOLDING
TRANSPORT PP 1x, AKOMODASI, PENGIRIMAN BARANG, PACKING
TOTAL PEKERJAAN
Harga Satuan Jumlah Harga
Volume Satuan
Rp Rp

1.00 Ls

Total Pekerjaan Persiapan Rp -

14.8764 m3 Rp -
74.382 m2 232,440 Rp 17,289,352.08
106.92 m2 Rp -
213.84 m2 Rp -
74.38 m2 153,000 Rp 11,380,446.00
213.84 m2 50,270 Rp 10,749,736.80
74.38 m2 232,440 Rp 17,289,352.08
3.00 Unit 1,868,470 Rp 5,605,410.00
4.00 Unit Rp -
15.60 m' Rp -

Total Pekerjaan Interior Rp 62,314,296.96

11.00 ttk 50,700 Rp 557,700.00


11.00 ttk Rp -
2.00 Unit 1,435,400 Rp 2,870,800.00
20.00 m' 27,000 Rp 540,000.00
5.00 m' 76,000 Rp 380,000.00
2.00 Unit 863,320 Rp 1,726,640.00

Total Pekerjaan MEP Rp 6,075,140.00

Rp -
Rp 62,314,297
Rp 6,075,140
Rp 68,389,437
Rp 6,838,944
Rp 75,228,381
Rp 75,228,381
Rp 7,522,838

Rp 82,751,219
1 Memasang 1 m2 Lantai Keramik 30x30
Ubin Keramik 30 x 30 cm 1.0000 m²
Portland Cement (PC) 10.0000 kg
Bahan
Pasir Pasang 0.0450 m³
Semen Warna 1.5000 kg
Pekerja 0.6200 HO
Tukang 0.3500 HO
Tenaga kerja
Kepala tukang 0.0350 HO
Mandor 0.0300 HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
2 Mengecat 1 m2 Plafond dan Dinding Interior ICI
Cat tembok ICI 0.2500 lt
Cat dasar sebelum pengecatan 0.1250 lt
Bahan
Rol cat 0.0100 bh
Ampelas 0.5000 lbr
Pekerja 0.0500 HO
Tukang cat 0.0800 HO
Tenaga kerja
Kepala tukang 0.0300 HO
Mandor 0.0200 HO
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
2 Memasang 1 Unit Wastafel
Wastafel 1.0000 bh
Perlengkapan 12% harga wastafel
Bahan
Portland Cement (PC) 6.0000 kg
Pasir Pasang 0.0100 m³
Pekerja 1.0000 OH
Tukang 0.1500 OH
Tenaga kerja
Kepala tukang 0.1500 OH
Mandor 1.5000 OH
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
2 Memasang 1 Unit Bak Kontrol
Bata Merah 5 x 12 x 22 cm 189.3939 bh
Portland Cement (PC) 77.0000 kg
Pasir Pasang 0.1300 m³
Bahan
Batu Kerikil 0.0200 m³
Besi Beton 2.6000 kg
Bahan

Pasir Beton 0.0900 m³


Pekerja 3.2000 OH
Tukang 1.0150 OH
Tenaga kerja
Kepala tukang 0.0015 OH
Mandor 0.0160 OH
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
2 Memasang 1 Unit Jendela Jalusi
Frame Alumunium 4" Alexindo 6.0000 m'
Jalusi 4.8000 m'
Bahan
Kaca clear 10mm 0.7200 m²
Alat bantu dan material tambahan 1.0000 ls
Pekerja 2.0000 OH
Tukang 1.1000 OH
Tenaga kerja
Kepala tukang 0.0500 OH
Mandor 0.0200 OH
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
2 Memasang 1m' Bata Merah
Bata Merah 70.0000 buah
Bahan Portland Cement (PC) 9.6800 kg
Pasir Pasang (PP) 0.0450 m³
Pekerja 0.3000 OH
Tukang 0.1000 OH
Tenaga kerja
Kepala tukang 0.0100 OH
Mandor 0.0150 OH
Jumlah
Overhead + Profit
Jumlah
Dibulatkan
71,500.00 71,500.00
1,700.00 17,000.00
228,000.00 10,260.00
8,200.00 12,300.00
85,000.00 52,700.00
110,000.00 38,500.00
130,000.00 4,550.00
150,000.00 4,500.00
211,310.00
21,131.00
232,441.00
232,440.00

68,000.00 17,000.00
48,000.00 6,000.00
25,000.00 250.00
5,000.00 2,500.00
85,000.00 4,250.00
110,000.00 8,800.00
130,000.00 3,900.00
150,000.00 3,000.00
45,700.00
4,570.00
50,270.00
50,270.00

845,000.00 845,000.00
101,400.00 101,400.00
1,700.00 10,200.00
231,600.00 2,316.00
85,000.00 85,000.00
110,000.00 16,500.00
130,000.00 19,500.00
150,000.00 225,000.00
1,304,916.00
130,491.60
1,435,407.60
1,435,400.00

900.00 170,454.55
1,700.00 130,900.00
228,000.00 29,640.00
232,700.00 4,654.00
15,800.00 41,080.00
243,000.00 21,870.00
85,000.00 272,000.00
110,000.00 111,650.00
130,000.00 195.00
150,000.00 2,400.00
784,843.55
78,484.35
863,327.90
863,320.00

144,000.00 864,000.00
40,800.00 195,840.00
330,935.00 238,273.20
100,000.00 100,000.00
85,000.00 170,000.00 300,500.00
110,000.00 121,000.00
130,000.00 6,500.00
150,000.00 3,000.00
1,698,613.20
169,861.32
1,868,474.52
1,868,470.00

900.00 63,000.00
1,700.00 16,456.00
228,000.00 10,260.00
85,000.00 25,500.00
110,000.00 11,000.00
130,000.00 1,300.00
150,000.00 2,250.00
129,766.00
12,976.60
142,742.60
142,740.00
RINCIAN ANGGARAN DAN BIAYA
Project name: Gudang
Location:Bandung
Owner

No Item Pekerjaan Spesifikasi Volume

I PEKERJAAN PERSIAPAN
Perijinan, listrik & air kerja By Owner 1.00

Total Pekerjaan Persiapan


II PEKERJAAN STRUKTUR
Pek. Kolom WF 150x75 20
Pek. Balok WF 150x75
Pek. Sekat UNP 100x50
Pek. Atap Canopy

Total Pekerjaan Struktur


III PEKERJAAN ARSITEKTUR
Pasangan Bata Merah Spesi 1:5 103.6725
Plesteran & Acian Spesi 1:5 207.35
Pek. Pintu Double 1.00
Pek. Pintu Single 1.00

Total Pekerjaan Arsitektur

I PEKERJAAN PERSIAPAN Rp
II PEKERJAAN STRUKTUR Rp
III PEKERJAAN ARSITEKTUR Rp
JUMLAH TOTAL Rp
JASA 10% Rp
GRAND TOTAL Rp
DISKON
NETT Rp
PPN 10% Rp
SCAFOLDING
TRANSPORT PP 1x, AKOMODASI, PENGIRIMAN BARANG, PACKING
TOTAL PEKERJAAN Rp
Harga Satuan Jumlah Harga
Satuan
Rp Rp

Ls

al Pekerjaan Persiapan Rp -

m' 301,955 6,039,091


m'
m' 125,060

tal Pekerjaan Struktur Rp 6,039,090.91

m2 Rp 142,740 Rp 14,798,212.65
m2 Rp 92,000 Rp 19,075,740.00
Unit
Unit
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
al Pekerjaan Arsitektur Rp 33,873,952.65

Rp -
Rp 6,039,091
Rp 33,873,953
Rp 39,913,044
Rp 3,991,304
Rp 43,904,348

Rp 43,904,348
Rp 4,390,435

Rp 48,294,783