TB Studio Perancangan
TB Studio Perancangan
NIM : 4116120008
Matkul : Studio Perancangan
CPMK 2
A. Rencana Ukuran Balok A. Rencana Ukuran Balok
Ukuran Balok : 1. Balok 6,2 m
l6 h= L
12 12 12
Jadi, diambil tnggi balok 50 cm b= 1
1 2
2 2. Balok 5,55 m
Jadi, diambil lebar balok 25 cm h= L
12
Tertera pada soal = 12 cm b= 1
C. Beban Mat (DL) 2
- Beban pelat lantai (tebal 12 cm = 0.12 x 2400 kg/m3) = 288 kg/m2 3. Balok anak 5,55 m
- Beban plafond + rangka = 18 kg/m2 h= L
- Beban sanitasi & plumbing = 30 kg/m2 15
- Beban ME = 28 kg/m2 b= 1
- Berat finishing = 42 kg/m2 2
- Berat keramik = 24 kg/m2 B. Rencana Ukuran Tebal Plat Lantai
Total Beban Mat (DL) = 430 kg/m2 t= L
D. Beban Hidup (LL) = 250 kg/m2 40
E. Beban Angin (WL) = 50 kg/m2 C. Beban mat (DL)
F. Mengambil kolom yang paling besar menerima beban (yang di tengah) - Beban pelat lantai = 0,15 x 2400 kg/m3
Beban Mat (DL) - Beban plafond + rangka
0.5 - Beban sanitasi & plumbing
h = x 50 = 25 - Beban ME
h=== - Berat finishing
- Beban mat pelat yang ditanggung kolom = 4.5 x 6.0 x 430 = 11.610 kg - Berat keramik
- Beban balok = 0.25 x 0.5 x 2.400 x 6.0 = 1.800 kg Total Beban Mat (DL)
= 0.25 x 0.5 x 2.400 x 4.5 = 1.350 kg D. Beban Hidup (LL)
- Beban dinding = 250 x 4.5 x 4 = 4.500 kg E. Beban angin (WL)
= 250 x 6 x 4 = 6.000 kg F. Rencana ukuran kolom
Total Beban Mat (DL) = 25.260 kg Mengambil kolom yang paling besar m
Beban Hidup (LL) - Beban mat pelat yang ditanggung ko
- Beban hidup yang ditanggung kolom = 4.5 x 6 x 250 = 6.750 kg - Beban balok 1
G. Masukkan ke kombinasi beban 2
Komb 1 1.4 DL = 1.4 x 25.260 = 35.364 kg 3
Komb 2 1.2 DL + 1.6 LL = 1.2 x 25.260 + 1.60 x 6.750 = 41.112 kg - Beban dinding
Komb 3 1.2 DL + LL + WL = 1.2 x 25.260 + 6.750 + 50 = 37.112 kg Total Beban Mat (DL)
H. Design kolom struktur - Beban hidup yang ditanggung kolom
=- Ambil kombinasi terbesar - Beban angin yang ditanggung kolom
Komb 2 1.2 DL + 1.6 LL = 41.112 kg = 41.2 ton G. Masukkan ke kombinasi beban
=- Beban dikalikan jumlah lantai Komb 1 1.4 DL
41.2 ton x 4 = ton = N Komb 2 1.2 DL + 1.6 LL
A= Komb 3 1.2 DL + LL + WL
0.85 x 30 H Desain KOLOM STRUKTUR
- Ambil Kolom 30x30 mm - Ambil kombinasi terbesar
= 254 mm Komb 2 1.2 DL + 1.6 LL
164.8 1.648.000 - Beban dikalikan per 4 lantai
P
(0.85xfc')
=
1,648,000
= 64.627 mm2 A
A
A
A
A
A
6.2 = 0.5167 55 cm
12
h = 1 55 = 27.5 30 cm
2
5.55 = 0.4625 45 cm
12
h = 1 45 = 22.5 25 cm
2
5.55 = 0.37 40 cm
15
h = 1 40 = 20 20 cm
2
ebal Plat Lantai
5.55 = 0.13875 15 cm
40
= 48041.25 = 50 ton
kolom 1-4 = 850 ton 8,500,000 N
kolom 5-8 = 650 ton 6,500,000 N
kolom 9-12 = 450 ton 4,500,000 N
kolom 13-16 = 250 ton 2,500,000 N
P x L
TRIBUTARY
6.2 x 4.075
= 13744.16
= 13247.5 kg
G KOMBINASI BEBAN
- KOMBINASI 1 = 1.4 x DL
- KOMBINASI 2 = 1.2 x DL + 1.6 x LL
- KOMBINASI 3 = 1.2 x DL + LL + WL
JUMLAH LANTAI = 16
###
* BALOK
URAIAN PANJANG UNIT P x L SNI
- Balok Induk 1 49.6 4 0.55 x 0.30 x 2400.00 = 78,566.40
- Balok Induk 2 13.7 9 0.50 x 0.25 x 2400.00 = 36,990.00
- Balok Anak 5.55 16 0.40 x 0.20 x 2400.00 = 17,049.60
* PLAT
LUAS x TEBAL PLAT x SNI
679.52 0.15 2400.00 = 244,627.20
* DINDING
URAIAN PANJANG TINGGI x SNI
Lantai 1 333.81 4.00 250.00 = 333,808.00
Lantai 2 - 15 333.81 2.70 250.00 = 225,320.40
Lantai 16 333.81 3.30 250.00 = 275,391.60
Atap 126.60 1.00 250.00 = 31,650.00
* PLAFOND
LUAS x SNI 679.52
679.52 18.00 = 12,231.36
* SANITASI
LUAS x SNI
679.52 30.00 = 20,385.60
* ME
LUAS x SNI
679.52 28.00 = 19,026.56
* FINISHING
LUAS x SNI
679.52 84.00 = 57,079.68
* KERAMIK
LUAS x SNI
679.52 24.00 = 16,308.48
Wt = ### 54.1
T1 = 1.4581940633
V = C1 x I x Wt
R
= 502,726.64 505000
= gxI
R
= 1.78
panjang' opening
4.75 2.4 0.9 4
2.40 1.71 1.2 1
2.93 0.9 1.2 2
3.75
1.14
0.45
2.55
2.55
2.83
1.08
0.53
2.52
6.25
20.86 X 16
333.81
8.64
2.052
2.16
12.852