Anda di halaman 1dari 324

REKAPITULASI

RENCANA ANGGARAN DAN BIAYA

KEGIATAN : TUGAS BESAR MANAGEMENT PROYEK


PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL GEDUNG 3 LANTAI
LOKASI : KEC. TAHUNAN, KAB. JEPARA, PROVINSI JAWA TENGAH
TAHUN ANGGARAN : 2019
VOLUME : 1 UNIT

NOMOR URAIAN PEKERJAAN SUB JUMLAH JUMLAH


( Rp. ) ( Rp. )
A PEKERJAAN PERSIAPAN 6,490,480.00
6,490,480.00
B PEKERJAAN PELAKSANAAN
I PEKERJAAN TANAH 3,909,925.56
II PEKERJAAN PONDASI 24,662,313.52
III PEKERJAAN PASANGAN DINDING 37,234,537.63
IV PEKERJAAN PLESTERAN 54,476,363.51
V PEKERJAAN BETON 185,063,187.25
VI PEKERJAAN TANGGA BETON BERTULANG 25,377,957.18
VII PEKERJAAN PENUTUP ATAP 80,109,013.39
VIII PEKERJAAN LANGIT - LANGIT 17,371,078.58
IX PEKERJAAN PENUTUP LANTAI DAN DINDING 68,465,513.33
X PEKERJAAN BESI dan ALUMUNIUM 85,215,721.44
XI PEKERJAAN PENGECATAN 33,003,208.47
XII PEKERJAAN AKSESORIS 705,553.50
XIII PEKERJAAN SANITASI 24,689,887.36
XIV PEKERJAAN LISTRIK 8,995,000.00

649,279,260.72

JUMLAH 655,769,740.72
PPN 10 % 65,576,974.07
JUMLAH TOTAL 721,346,714.79
DIBULATKAN 721,340,000.00

TERBILANG : Err:511

Jepara, 20 Desember 2019

Diperiksa Oleh : Di Buat Oleh ;


DOSEN UNISNU JEPARA Mahasiswa Teknik Sipil Smt 5
Management Proyek

Nor Hidayati, S.T. M.T. CV.SUMBER KARYA


Dosen UNISNU Teknik Sipil R2
RENCANA ANGGARAN BIAYA
KEGIATAN : TUGAS BESAR MANAGEMENT PROYEK
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL GEDUNG 3 LANTAI
LOKASI : KEC. TAHUNAN, KAB. JEPARA, PROVINSI JAWA TENGAH
TAHUN ANGGARAN : 2019
VOLUME : 1 UNIT

HARGA SATUAN JUMLAH HARGA JUMLAH


NO URAIAN PEKERJAAN VOLUME ANALISA
Rp Rp Rp
A PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan 80.00 m1 A.2.2.1.9 13,750.00 1,100,000.00
2 Pengukuran dan Pemasangan Bouwplank 80.00 m1 A.2.2.1.4 61,131.00 4,890,480.00
3 Air Kerja 1.00 ls Taksir 500,000.00 500,000.00

6,490,480.00
B PEKERJAAN PELAKSANAAN
I PEKERJAAN TANAH
1 Menggali Tanah Biasa Sedalam 1 m 58.62 m3 A.2.3.1.1 62,875.00 3,685,826.81
2 Pengurugan Kembali 14.70 m3 A.2.3.1.9 15,250.00 224,098.75

3,909,925.56
II PEKERJAAN PONDASI
1 Pemasang Batu Kosong/Anstamping 10.85 m3 A.3.2.1.9 452,513.40 4,907,507.82
2 Pemasangan Pondasi Batu Belah 1SP : 8 PP muntilan 21.09 m3 A.3.2.1.5.1 899,089.00 18,959,539.29
3 Pasang Pondasi Rolag Trashraam BT Mrh 1 Pc : 3 Ps 0.22 m3 A.3.2.1.12 1,207,075.00 267,970.65
4 Urugan Pasir Bawah Pondasi 2.71 m3 A.2.3.1.11 194,484.38 527,295.76

24,662,313.52
III PEKERJAAN PASANGAN DINDING
1 Pasang Din Bt Mrh Kalipucang tbl 1/2 bt 1 SP:8PP Muntilan 336.20 m2 A.4.4.1.12.2 110,750.00 37,234,537.63

37,234,537.63
IV PEKERJAAN PLESTERAN
1 Pasang Plesteran 1 Pc : 3 Pp tbl 15 mm Ps Muntilan 79.19 m2 A.4.4.2.3 64,000.20 5,068,367.84
2 Pasang Plesteran 1 Pc : 8 Pp tbl 15 mm Ps Muntilan 672.41 m2 A.4.4.2.19 40,516.80 27,243,779.94
3 Pemasangan Acian 672.41 m2 A.4.4.2.27 32,962.50 22,164,215.74

54,476,363.51
V PEKERJAAN BETON
1 Membuat Beton mutu f'c=7,4 Mpa (K100) 0.89 m3 A.4.1.1.1 973,662.43 868,506.89
2 Membuat Foot Plat 100x100
a Membuat Beton mutu MPa (K225) 1.50 m3 A.4.1.1.7 1,106,174.59 1,659,261.88
b Pembesian dg Besi Polos atau Besi Ulir 212.31 kg A.4.1.1.17 13,683.00 2,904,983.39
c Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 6.00 m2 A.4.1.1.37 99,770.00 598,620.00
3 Membuat Foot Plat 80x80
a Membuat Beton mutu MPa (K225) 0.96 m3 A.4.1.1.7 1,106,174.59 1,061,927.60
b Pembesian dg Besi Polos atau Besi Ulir 103.08 kg A.4.1.1.17 13,683.00 1,410,427.22
c Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 4.80 m2 A.4.1.1.37 99,770.00 478,896.00
4 Membuat Sloof Beton Bertulang 20x30
a Membuat Beton mutu MPa (K225) 3.98 m3 A.4.1.1.7 1,106,174.59 4,403,681.03
b Pembesian dg Besi Polos atau Besi Ulir 537.08 kg A.4.1.1.17 13,683.00 7,348,933.18
c Memasang Bekisting untuk Sloof 39.81 m2 A.4.1.1.21 137,576.25 5,476,910.51
5 Membuat Kolom Beton Bertulang 30x30
a Membuat Beton mutu MPa (K225) 3.13 m3 A.4.1.1.7 1,106,174.59 3,464,538.81
b Pembesian dg Besi Polos atau Besi Ulir 361.57 kg A.4.1.1.17 13,683.00 4,947,427.77
c Memasang Bekisting untuk Kolom 41.76 m2 A.4.1.1.22 205,045.00 8,562,679.20
6 Membuat Beton bertulang Kolom Praktis 11x11 cm 147.85 m1 A.4.1.1.35 69,841.10 10,326,006.64
7 Membuat Kolom Beton Bertulang 20x20
a Membuat Beton mutu MPa (K225) 1.39 m3 A.4.1.1.7 1,106,174.59 1,539,795.03
b Pembesian dg Besi Polos atau Besi Ulir 201.38 kg A.4.1.1.17 13,683.00 2,755,529.39
c Memasang Bekisting untuk Kolom 26.45 m2 A.4.1.1.22 205,045.00 5,423,030.16
8 Membuat Balok Beton Bertulang 15x30
a Membuat Beton mutu MPa (K225) 0.86 m3 A.4.1.1.7 1,106,174.59 955,734.84
b Pembesian dg Besi Polos atau Besi Ulir 146.21 kg A.4.1.1.17 13,683.00 2,000,566.17
c Memasang Bekisting untuk Kolom 16.51 m2 A.4.1.1.22 205,045.00 3,385,703.04
9 Membuat Balok Beton Bertulang 20x40 (B1)
a Membuat Beton mutu MPa (K225) 2.48 m3 A.4.1.1.7 1,106,174.59 2,743,312.98
b Pembesian dg Besi Polos atau Besi Ulir 428.91 kg A.4.1.1.17 13,683.00 5,868,816.91
c Memasang Bekisting untuk Kolom 29.76 m2 A.4.1.1.23 208,045.00 6,191,419.20
10 Membuat Balok Beton Bertulang 20x30 (B2)
a Membuat Beton mutu MPa (K225) 1.77 m3 A.4.1.1.7 1,106,174.59 1,957,929.02
b Pembesian dg Besi Polos atau Besi Ulir 314.47 kg A.4.1.1.17 13,683.00 4,302,914.27
c Memasang Bekisting untuk Balok 22.42 m2 A.4.1.1.23 208,045.00 4,664,368.90
11 Membuat Balok Beton Bertulang 15x30 (B4)
a Membuat Beton mutu MPa (K225) 3.80 m3 A.4.1.1.7 1,106,174.59 4,206,228.87
b Pembesian dg Besi Polos atau Besi Ulir 652.72 kg A.4.1.1.17 13,683.00 8,931,140.09
c Memasang Bekisting untuk Balok 60.00 m2 A.4.1.1.23 208,045.00 12,481,659.78
12 Membuat Balok Beton Bertulang 15x20 (B3)
a Membuat Beton mutu MPa (K225) 1.65 m3 A.4.1.1.7 1,106,174.59 1,821,869.55
b Pembesian dg Besi Polos atau Besi Ulir 217.94 kg A.4.1.1.17 13,683.00 2,982,007.56
c Memasang Bekisting untuk Balok 18.67 m2 A.4.1.1.23 208,045.00 3,883,367.97
13 Membuat Latiu Balok Beton Bertulang (10 x 15) cm 38.86 m1 A.4.1.1.36 109,298.81 4,247,351.85
14 Membuat Ring Balok Beton Bertulang 15 x 20 cm
a Membuat Beton mutu MPa (K225) 0.60 m3 A.4.1.1.7 1,106,174.59 663,704.75
b Pembesian dg Besi Polos atau Besi Ulir 70.49 kg A.4.1.1.17 13,683.00 964,485.90
c Memasang Bekisting untuk Balok 8.00 m2 A.4.1.1.23 208,045.00 1,664,360.00
15 Membuat Dak Plat Beton tbl 12 cm
a Membuat Beton mutu MPa (K225) 15.37 m3 A.4.1.1.7 1,106,174.59 17,001,682.17
b Pembesian dg Besi Polos atau Besi Ulir 2028.26 kg A.4.1.1.17 13,683.00 27,752,686.23
c Memasang Bekisting untuk Lantai 15.37 m2 A.4.1.1.24 205,645.00 3,160,722.52

185,063,187.25
VI PEKERJAAN TANGGA BETON BERTULANG
1 Membuat Balok Beton Bertulang 15x30 (B4)
a Membuat Beton mutu MPa (K225) 0.78 m3 A.4.1.1.7 1,106,174.59 859,165.80
b Pembesian dg Besi Polos atau Besi Ulir 133.97 kg A.4.1.1.17 13,683.00 1,833,100.09
c Memasang Bekisting untuk Balok 12.25 m2 A.4.1.1.23 208,045.00 2,549,508.26
3 Membuat Plat Tangga
a Membuat Beton mutu MPa (K225) 0.00 m3 A.4.1.1.7 1,106,174.59 -
b Pembesian dg Besi Polos atau Besi Ulir 0.77 kg A.4.1.1.17 13,683.00 10,535.91
c Memasang Bekisting untuk Lantai 0.00 m2 A.4.1.1.21 137,576.25 -
2 Membuat Plat Tangga
a Membuat Beton mutu MPa (K225) 3.24 m3 A.4.1.1.7 1,106,174.59 3,585,664.92
b Pembesian dg Besi Polos atau Besi Ulir 849.82 kg A.4.1.1.17 13,683.00 11,628,151.37
c Memasang Bekisting untuk Lantai 23.89 m2 A.4.1.1.24 205,645.00 4,911,830.83

25,377,957.18
VII PEKERJAAN PENUTUP ATAP
1 Pasang Kasau & Reng Kayu Kruing (SNI) 77.90 m2 A.4.6.1.30 115,419.38 8,991,169.31

2 Pemasangan Atap Genteng Kodok / lokal 77.90 m2 A.4.5.2.2 60,525.00 4,714,897.50


3 Pemasangan 1 m2 Dinding Lambriziring dari Papan Kayu Jati 155.80 m2 A.4.6.1.26 419,180.63 65,308,341.38
4Pemasangan 1 m2 rangka besi hollow 1x40.40.0.6 mm, modul 60 x 60 cm, plafon
9.36 m3 A.4.2.1.21 116,945.00 1,094,605.20

80,109,013.39
VIII PEKERJAAN LANGIT - LANGIT
1 Pemasangan 1 m2 rangka besi hollow 1x40.40.0.6 mm, modul 60 x 60 cm, plafon
92.16 m2 A.4.2.1.21 116,945.00 10,777,534.26
2 Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm 92.16 m2 A.4.5.1.7 39,215.00 3,614,015.19
3 List Langit-Langit Kayu Profil 145.18 m1 A.4.5.1.10 20,523.00 2,979,529.14

17,371,078.58
IX PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pemasangan lantai Ubin Granitile Uk. 60 x 60 cm 190.81 m2 A.4.4.3.9 302,949.00 57,807,031.67
2 Pemasangan Lantai Keramik 20 x 20 cm 5.84 m2 A.4.4.3.36 206,645.00 1,206,393.51
3 Pemasangan Dinding Keramik 20x25 cm, 28.19 m2 A.4.4.3.55 225,990.00 6,370,658.10
4 Pemasangan Lantai Keramik 30 x 30 cm warna 2.01 m2 A.4.4.3.35 201,479.00 404,972.79
ng tebal 6 cm5dengan paving mutu K 225 (SNI) 15.68 m2 A.4.4.3.65 170,746.88 2,676,457.27

68,465,513.33
X PEKERJAAN BESI dan ALUMUNIUM
1 Pemasangan Kusen Pintu Allumunium 64.12 m1 A.4.2.1.11 126,524.50 8,112,750.94
2 Pasang Kusen Jendela Alumunium 85.60 m1 A.4.2.1.11 126,524.50 10,830,497.20
3 Pasang Daun Pintu dan Jendela Kaca Alumunium 58.36 m2 A.4.2.1.13 477,020.00 27,836,597.50
4 Pemasangan Pintu Allumunium Strip Lebar 8 cm 1.23 m2 A.4.2.1.12 971,578.00 1,195,040.94
5 Pemasangan Kaca tebal 5 mm 122.45 m2 A.4.6.2.17 149,936.25 18,359,543.88
6 Pemasangan 1 m2 terali besi strip (2 x 3) mm 37.46 m2 A.4.2.1.15 504,106.02 18,881,290.98

85,215,721.44
XI PEKERJAAN PENGECATAN
1 Pengecat Tembok Baru dengan Mowilex 672.41 m2 A.4.7.1.11.2 42,072.75 28,290,011.61
2 Pengecat 1m2 Waterproof untuk atap dag beton 84.16 m2 A.4.7.1.24 26,438.00 2,225,088.18
3 Pengecat Plafond Baru dengan Mowilex 92.16 m2 A.4.7.1.10.1 26,998.00 2,488,108.68

33,003,208.47
XII PEKERJAAN AKSESORIS
1 Pemasangan Kunci Tanam Biasa 1.00 bh A.4.6.2.2 134,075.00 134,075.00
2 Pemasangan Kunci Kamar Mandi 1.00 bh A.4.6.2.3 102,587.50 102,587.50
3 Pemasangan Engsel Pintu 3.00 bh A.4.6.2.5 44,042.00 132,126.00
4 Pemasangan Engsel Jendela Kupu-kupu 6.00 bh A.4.6.2.6 30,457.50 182,745.00
5 Pemasangan Kait Angin 6.00 bh A.4.6.2.9 25,670.00 154,020.00

705,553.50
XIII PEKERJAAN SANITASI
1 Pemasangan 1 m pipa PVC Ø 25 mm (1") 32.00 m1 A.8.4.1.1.1 31,636.36 1,012,363.64
2 Pemasangan 1 m pipa PVC Ø 50 mm (2") 23.00 m1 A.8.4.1.1 69,255.00 1,592,865.00
3 Pemasangan 1 m pipa PVC Ø 90 mm (4") 18.00 m1 A.8.4.1.3 90,335.00 1,626,030.00
4 Pemasangan Kran Ø ½" atau Ø ¾" 7.00 bh A.5.1.1.19 71,577.50 501,042.50
5 Pemasangan Bak Cuci Piring Stainless stell 1.00 bh A.5.1.1.12 273,525.00 273,525.00
6 Memasang Closet Jongkok Porselen 3.00 bh A.5.1.1.2 413,157.50 1,239,472.50
7 Septiktank Buis Beton 3.00 bh Dihitung 3,892,659.63 11,677,978.89
8 Resapan Air kotor Buis Beton 1.00 bh Dihitung 2,749,434.84 2,749,434.84
9 Tandon Air 1000 L 1.00 bh Taksir 1,500,000.00 1,500,000.00
10 Pemasangan Kran Shower Mandi 2.00 bh Taksir 500,000.00 1,000,000.00
11 Ember Air 3.00 bh Taksir 50,000.00 150,000.00
12 Pemasangan Floor Drain 5.00 bh A.5.1.1.14 35,575.00 177,875.00
13 Pemasangan Pipa PVC tipe AW Ø 3" 17.50 m1 A.5.1.1.31 67,960.00 1,189,300.00

24,689,887.36
XIV PEKERJAAN LISTRIK
1 Pasang Meteran Listrik 2000VA 1.00 bh Taksir 2,000,000.00 2,000,000.00
2 Pasang Instalasi Listrik 43.00 ttk Taksir 80,000.00 3,440,000.00
3 Pasang Lampu LED 15 watt 19.00 bh Taksir 40,000.00 760,000.00
4 Pasang Lampu LED 20 watt 11.00 bh Taksir 60,000.00 660,000.00
5 Pasang Saklar Ganda 11.00 bh Taksir 25,000.00 275,000.00
6 Pasang Stop Kontak 12.00 bh Taksir 30,000.00 360,000.00
7 Pasang Mesin Pompa Air Jet Pump Otomatis 1.00 bh Taksir 1,500,000.00 1,500,000.00

8,995,000.00
TOTAL 655,769,740.72
PPN 10 % 65,576,974.07
JUMLAH TOTAL 721,346,714.79
DIBULATKAN 721,340,000.00
TERBILANG :
Err:511

Jepara, 20 Desember 2019


Diperiksa Oleh : Di Buat Oleh ;
DOSEN UNISNU JEPARA Mahasiswa Teknik Sipil Smt 5
Management Proyek

Nor Hidayati, S.T. M.T. CV.SUMBER KARYA


Dosen UNISNU Teknik Sipil R2
655,769,740.72

BACK UP HITUNG VOLUME

I PEKERJAAN PERSIAPAN
P L T Q PxLxTxQ total sat
1 Membersihkan Lapangan dan Perataan
8.00 x 10.00 x 1.00 = 80.00
= 80.00 m1
2 Pengukuran dan Pemasangan Bouwplank = 80.00 m1
3 Air Kerja = 1.00 Ls

B PEKERJAAN PELAKSANAAN
I PEKERJAAN TANAH
P L T Q PxLxTxQ unit total sat
1 Menggali Tanah Biasa Sedalam 1 m
a. Mengali foot plat 1.00 x 1.00 x 2.10 x 6.00 = 12.60 1.00 = 12.60
0.80 x 0.80 x 2.10 x 6.00 = 8.06 1.00 = 8.06
b. Mengali pondasi
- Pondasi A 27.00 x 0.90 x 0.70 x 1.00 = 17.01 1.00 = 17.01
x x x = - = -
- Pondasi B 33.25 x 0.90 x 0.70 x 1.00 = 20.95 1.00 = 20.95

= 58.62 m3
2 Pengurugan Kembali = 14.70 m3
footplat - 0.70 x 0.70 x 1.70 x 6.00 = 5.00
0.60 x 0.60 x 1.70 x 6.00 = 3.67
Pondasi - 27.00 x 0.90 x 0.70 x 1.00 = 17.01
33.25 x 0.90 x 0.70 x 1.00 = 20.95
Dikurang 46.63
Pondasi - 21.09
Anstamping - 10.85 = 31.93 -
14.70

II PEKERJAAN PONDASI
P L T Q PxLxTxQ total sat

1 Pemasangan Pondasi Batu Belah 1SP : 8 PP muntilan


- Pondasi A 27.00 x 0.50 x 0.70 x 1.00 = 9.45 1.00 = 9.45
- Pondasi B 33.25 x 0.50 x 0.70 x 1.00 = 11.64 1.00 = 11.64 +
21.09 m3
2 Pemasang Batu Kosong/Anstamping
- Pondasi A 27.00 x 0.90 x 0.20 x 1.00 = 4.86 1.00 = 4.86
- Pondasi B 33.25 x 0.90 x 0.20 x 1.00 = 5.99 1.00 = 5.99 +
10.85 m3
3 Pasang Pondasi Rolag Trashraam BT Mrh 1 Pc : 3 Ps 3.70 x 0.30 x 0.20 x 1.00 = 0.22 1.00 = 0.22 m3
4 Urugan Pasir Bawah Pondasi 60.25 x 0.90 x 0.05 x 1.00 = 2.71 1.00 = 2.71 m3

III PEKERJAAN PASANGAN DINDING


P L T Q PxLxTxQ total sat
1 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata
Camp. 1SP : 8PP Muntilan
a. Lantai 1 42.50 x 3.70 x 1.00 = 157.25 1.00 = 157.25
pagar lt1 1.83 x 1.65 x 1.00 = 3.02 1.00 = 3.02
b. Lantai 2 58.40 x 3.20 x 1.00 = 186.88 1.00 = 186.88
c. Lantai 3 4.50 x 3.50 x 1.00 = 15.75 1.00 = 15.75
talang luar 9.75 x 0.22 x 1.00 = 2.15 1.00 = 2.15
talan dalam 8.05 x 0.60 x 1.00 = 4.83 1.00 = 4.83
2.35 x 1.60 x 0.50 = 1.88 1.00 = 1.88
2.35 x 2.00 x 1.00 = 4.70 1.00 = 4.70 +
376.45 m2
dikurangi
P1 1.4 x 2.23 1.00 = 3.12 1 = 3.12
P2 1.3 x 2.23 1.00 = 2.90 1 = 2.90
P3 0.9 x 2.25 1.00 = 2.03 7 = 14.18
P4 0.7 x 2.1 1.00 = 1.47 3 = 4.41
J1 1.5 x 1.3 1.00 = 1.95 2 = 3.90
J2 1.5 x 1.7 1.00 = 2.55 2 = 5.10
J3 1.35 x 1.7 1.00 = 2.30 1 = 2.30
J4 2 x 1.3 1.00 = 2.60 1 = 2.60
BV 1.5 x 0.7 1.00 = 1.05 1 = 1.05
BV 1 x 0.7 1.00 = 0.70 1 = 0.70 +
40.25 m2

376.45 - 40.25 = 336.20 m2

IV PEKERJAAN PLESTERAN
P L T Q PxLxTxQ total sat
1 Pasang Plesteran 1 Pc : 3 Pp tbl 15 mm Ps Muntilan
Lantai 1
a. kolom 30x30 2.74 2.30 x 4 = 25.21 = 25.21
b. kolom 15x15 0.30 x 3.7 10.00 = 11.10 = 11.10
0.30 x 2.4 2.00 = 1.44 = 1.44
0.30 x 1.65 1.00 = 0.50 = 0.50
c. kolom 20x20 1.95 1.05 x 4 = 8.19 = 8.19
Lainai 2 =
kolom 15x30 3.00 0.45 3.2 1.00 = 1.44 = 1.44
kolom 15x15 0.3 3.2 20.00 = 19.20 = 19.20
Lantai 3 = - =
kolom 15x15 0.3 3.5 8.00 = 8.40 = 8.40
0.3 2 5.00 = 3.00 = 3.00
0.3 0.6 4.00 = 0.72 = 0.72
79.19 m2

2 Pasang Plesteran 1 Pc : 8 Pp tbl 15 mm Ps Muntilan 2.00 x 336.20 = 672.41 m2


3 Pemasangan Acian + 672.41 = 672.41 m2
V PEKERJAAN BETON
P L T Q PxLxTxQ total sat
1 Membuat Beton mutu f'c=7,4 Mpa (K100) 1.00 x 1.00 x 0.05 x 14.00 = 0.70 1.00 = 0.70
x x x = = -
2 Membuat Foot Plat 100x100 0.89 m3
a Membuat Beton mutu MPa (K225) 1.00 x 1.00 x 0.25 x 6.00 = 1.50 1.00 = 1.50 m3
b Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan atas 1.50 x 15.33 x 0.89 x 6.00 = 122.48 1.00 = 122.48
- tulangan bawah 1.10 x 15.33 x 0.89 x 6.00 = 89.82 1.00 = 89.82 +
212.31 kg
c Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 4.00 x 0.25 x 6.00 = 6.00 1.00 = 6.00 m2

Membuat Beton mutu f'c=7,4 Mpa (K100) P L T Q PxLxTxQ total sat


3 Membuat Foot Plat 80x80 0.80 x 0.80 x 0.05 x 6.00 = 0.19 1.00 = 0.19 m3
a Membuat Beton mutu MPa (K225) 0.80 x 0.80 x 0.25 x 6.00 = 0.96 1.00 = 0.96 m3
b Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan atas 1.30 x 12.67 x 0.62 x 6.00 = 60.91 1.00 = 60.91
- tulangan bawah 0.90 x 12.67 x 0.62 x 6.00 = 42.17 1.00 = 42.17
103.08 kg
c Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 3.20 x 0.25 x 6.00 = 4.80 1.00 = 4.80 m2

4 Membuat Sloof Beton Bertulang 20x30


66.35 x 1.00 = 66.35 1.00 = 66.35
P L T Q PxLxTxQ total sat
a Membuat Beton mutu MPa (K225) 66.35 x 0.20 0.30 x 1.00 = 3.98 1.00 = 3.98 m3
b Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 66.35 x 6.00 x 0.89 x 1.00 = 353.42 1.00 = 353.42
- begel 1.05 x 443.33 x 0.39 x 1.00 = 183.67 1.00 = 183.67 +
537.08 kg
c Memasang Bekisting untuk Sloof 0.60 x 66.35 x 1.00 = 39.81 1.00 = 39.81 m2

5 Membuat Kolom Beton Bertulang 30x30


panjang 2.5 m kolom foot plat 2.10 x 6.00 = 12.60 = 34.80
panjang 4 m 3.70 x 6.00 = 22.20

P L T Q PxLxTxQ total sat


a Membuat Beton mutu MPa (K225) 34.80 x 0.30 x 0.30 x 1.00 = 3.13 1.00 = 3.13 m3
b Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 34.80 x 8.00 x 0.89 x 1.00 = 247.15 1.00 = 247.15

- begel 1.25 x 232.00 x 0.39 x 1.00 = 114.42 1.00 = 114.42 +


- 361.57 kg
c Memasang Bekisting untuk Kolom 1.20 x 34.80 x 1.00 = 41.76 1.00 = 41.76 m2

6 Membuat Beton bertulang Kolom Praktis 11x11 cm -


3.7 x 10.00 = 37.00 1.00 = 37.00
2.4 x 2.00 = 4.80 1.00 = 4.80
1.65 x 1.00 = 1.65 1.00 = 1.65
3.2 x 20.00 = 64.00 1.00 = 64.00
3.5 x 8.00 = 28.00 1.00 = 28.00
2 x 5.00 = 10.00 1.00 = 10.00
0.6 x 4.00 = 2.4 1.00 = 2.40
147.85 m1
7 Membuat Kolom Beton Bertulang 20x20
panjang 2.5 m kolom foot plat - 2.10 x 6.00 = 12.60 = 34.80
panjang 4 m - 3.70 x 6.00 = 22.20
P L T Q PxLxTxQ total sat
a Membuat Beton mutu MPa (K225) 34.80 x 0.20 x 0.20 x 1.00 = 1.39 1.00 = 1.39 m3
b Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 34.80 x 4.00 x 0.89 x 1.00 = 123.58 1.00 = 123.58

- begel 0.85 x 232.00 x 0.39 x 1.00 = 77.81 1.00 = 77.81 +


201.38 kg
c Memasang Bekisting untuk Kolom 0.76 x 34.80 x 1.00 = 26.45 1.00 = 26.45 m2

8 Membuat Balok Beton Bertulang 15x30


panjang 4m - 3.20 x 6.00 = 19.20 = 19.20 m1

P L T Q PxLxTxQ total sat


Membuat Beton mutu MPa (K225) 19.20 x 0.15 x 0.30 x 1.00 = 0.86 1.00 = 0.86 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 19.20 x 6.00 x 0.89 x 1.00 = 102.27 1.00 = 102.27

- begel 0.87 x 128 x 0.39 x 1.00 = 43.94 1.00 = 43.94


146.21 kg
Memasang Bekisting untuk Kolom 0.86 x 19.20 x 1.00 = 16.51 1.00 = 16.51 m2

9 Membuat Balok Beton Bertulang 20x40 (B1)


- Lt 2 + 4.00 31.00 x 1.00 = 31.00 = 31.00 m1
P L T Q PxLxTxQ total sat
Membuat Beton mutu MPa (K225) 31.00 x 0.20 x 0.40 x 1.00 = 2.48 1.00 = 2.48 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 31.00 x 12.00 x 0.89 x 1.00 = 330.25 1.00 = 330.25
-
- begel 1.21 x 207 x 0.39 x 1.00 = 98.67 1.00 = 98.67
428.91 kg
Memasang Bekisting untuk Balok 0.96 x 31.00 x 1.00 = 29.76 1.00 = 29.76 m2

10 Membuat Balok Beton Bertulang 20x30 (B2)


- Lt 2 +4.00 29.50 x 1.00 = 29.50 1.00 = 29.50 m1
P L T Q PxLxTxQ total sat
Membuat Beton mutu MPa (K225) 29.50 x 0.20 x 0.30 x 1.00 = 1.77 1.00 = 1.77 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 29.50 x 9.00 x 0.89 x 1.00 = 235.70 1.00 = 235.70

- begel 1.01 x 198 x 0.39 x 1.00 = 78.77 1.00 = 78.77


314.47 kg
Memasang Bekisting untuk Balok 0.76 x 29.50 x 1.00 = 22.42 1.00 = 22.42 m2

11 Membuat Balok Beton Bertulang 15x30 (B4)


- Lt 3 +7.50 64.50 x 1.00 = 64.50 1.00 = 64.50
- +12.00 20.00 x 1.00 = 20.00 1.00 = 20.00
84.50 m1
P L T Q PxLxTxQ total sat
Membuat Beton mutu MPa (K225) 84.50 x 0.15 x 0.30 x 1.00 = 3.80 1.00 = 3.80 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 84.50 x 6.00 x 0.89 x 1.00 = 450.09 1.00 = 450.09

- begel 0.91 x 564 x 0.39 x 1.00 = 202.62 1.00 = 202.62


652.72 kg
Memasang Bekisting untuk Balok 0.71 x 84.50 x 1.00 = 60.00 1.00 = 60.00 m2

12 Membuat Balok Beton Bertulang 15x20 (B3)


- Lt 2 +4.00 22.60 x 1.00 = 22.60 1.00 = 22.60
- Lt 3 +7.50 14.00 x 1.00 = 14.00 1.00 = 14.00
36.60 m1
P L T Q PxLxTxQ total sat
Membuat Beton mutu MPa (K225) 36.60 x 0.15 x 0.30 x 1.00 = 1.65 1.00 = 1.65 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 36.60 x 4.00 x 0.89 x 1.00 = 129.97 1.00 = 129.97
- begel 0.91 x 245 x 0.39 x 1.00 = 87.97 1.00 = 87.97
217.94 kg
Memasang Bekisting untuk Balok 0.51 x 36.60 x 1.00 = 18.67 1.00 = 18.67 m2

13 Membuat Latiu Balok Beton Bertulang (10 x 15) cm 14.64 x 1.00 = 14.64 = 38.86 m1
21.87 x 1.00 = 21.87
2.35 x 1.00 = 2.35
14 Membuat Ring Balok Beton Bertulang 15 x 20 cm 20.00 x 1.00 = 20.00 1.00 = 20.00 m1
P L T Q PxLxTxQ total sat
Membuat Beton mutu MPa (K225) 20.00 x 0.15 x 0.20 x 1.00 = 0.60 1.00 = 0.60 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 20.00 x 4.00 x 0.62 x 1.00 = 49.32 1.00 = 49.32
- begel 0.71 x 134 x 0.22 x 1.00 = 21.17 1.00 = 21.17
70.49 kg
Memasang Bekisting untuk Balok 0.40 x 20.00 x 1.00 = 8.00 1.00 = 8.00 m2

15 Membuat Dak Plat Beton tbl 12 cm


- Lt 2 +4.00 8.15 x 10.15 x 0.12 x 1.00 = 9.93 15.37 m3
kantin lever 1.46 x 0.50 x 0.80 x 1.00 = 0.58
kurang 3.75 x 1.00 x 0.12 x 2.00 = 0.90
balok 10.51
Balok Beton Bertulang 20x40 (B1) 31.00 x 0.20 x 0.12 x 1.00 = 0.74
Balok Beton Bertulang 20x30 (B2) 29.50 x 0.20 x 0.12 x 1.00 = 0.71
Balok Beton Bertulang 15x20 (B3) 22.60 x 0.15 x 0.12 x 1.00 = 0.41
2.88 x 0.50 x 0.12 x 1.00 = 0.17
8.48
- Lt 3 +7.50 8.15 x 8.65 x 0.12 x 1.00 = 8.46
1.00 x 3.00 x 0.12 x 1.00 = 0.36
kurang 4.30 x 1.00 x 0.12 x 1.00 = 0.52
Balok Beton Bertulang 15x30 (B4) 64.50 x 0.15 x 0.12 x 1.00 = 1.16
Balok Beton Bertulang 15x20 (B3) 14.00 x 0.15 x 0.12 x 1.00 = 0.25
6.89
Membuat Beton mutu MPa (K225) 15.37 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- Lt 2 +4.00
- tulangan pokok 8.15 x 51.75 x 0.62 x 2.00 = 520.03 1.00 = 520.03
extra - 0.24 x 51.75 x 0.62 x 2.00 = 15.31 1.00 = 15.31
10.15 x 41.75 x 0.62 x 2.00 = 522.50 1.00 = 522.50
extra - 0.24 x 41.75 x 0.62 x 2.00 = 12.35 2.00 = 24.71
kurang tangga 3.75 x 1.00 x 0.62 x 2.00 = 4.62 2.00 = 9.25
1,073.31
- Lt 3 +7.50
- tulangan pokok 8.15 x 44.25 x 0.62 x 2.00 = 444.67 1.00 = 444.67
extra - 0.48 x 44.25 x 0.62 x 2.00 = 26.19 1.00 = 26.19
8.65 x 41.75 x 0.62 x 2.00 = 445.28 1.00 = 445.28
extra - 0.48 x 41.75 x 0.62 x 2.00 = 24.71 2.00 = 49.42
kurang tangga 4.30 x 1.00 x 0.62 x 2.00 = 5.30 2.00 = 10.60
954.95
2,028.26 kg
Memasang Bekisting untuk Lantai 15.37 15.37 = 15.37 m2

VI PEKERJAAN TANGGA BETON BERTULANG


1 Membuat Balok Beton Bertulang 15x30 (B4) 8.63 x 1.00 = 8.63 8.63 m1
P L T Q PxLxTxQ unit total sat
Membuat Beton mutu MPa (K225) 8.63 x 0.15 x 0.30 x 1.00 = 0.39 2.00 = 0.78 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 8.63 x 6.00 x 0.89 x 1.00 = 45.97 2.00 = 133.97 kg

- begel 0.91 x 58.53 x 0.39 x 1.00 = 21.02 2.00


-
Memasang Bekisting untuk Balok 0.71 x 8.63 x 1.00 = 6.13 2.00 = 12.25 m2

2 Membuat Plat Tangga


a. Bordes P L T Q PxLxTxQ total sat
Membuat Beton mutu MPa (K225) 1.00 x 1.00 x 0.12 x 2.00 = 0.24 = 0.24 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 1.00 x 7.67 x 0.62 x 2.00 = 9.45 = 18.91 kg
1.00 x 7.67 x 0.62 x 2.00 = 9.45

Memasang Bekisting untuk Lantai 1.00 x 1.00 = 1.00 = 1.00 m2

b. Plat Tangga P L T Q PxLxTxQ total sat


Membuat Beton mutu MPa (K225) 12.50 x 1.15 x 0.12 x 1.00 = 1.73 1.00 = 1.73 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 12.50 x 84.33 x 0.62 x 1.00 = 649.89 1.00 = 649.89
1.15 x 8.67 x 0.62 x 1.00 = 6.14 1.00 = 6.14
656.04 kg
Memasang Bekisting untuk Lantai 12.50 x 1.15 x 1.00 = 14.38 1.00 = 14.38 m2

c. Anak Tangga P L T Q PxLxTxQ total sat


Membuat Beton mutu MPa (K225) 1.15 x 0.30 x 0.20 x 0.50 = 0.03 37.00 = 1.28 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 1.15 x 3 x 0.62 x 1.00 = 2.36 37.00 = 87.44
0.50 x 8 x 0.62 x 1.00 = 2.36 37.00 = 87.44
174.88 kg
Memasang Bekisting untuk Lantai 1.15 x 0.20 x 1.00 = 0.23 37.00 = 8.51 m2

3 Membuat Plat Tangga 2 Unit (lt.1 dan lt.2) Total unit


Membuat Beton mutu MPa (K225) 3.24 1.00 = 3.24 m3
Pembesian dg Besi Polos atau Besi Ulir 849.82 1.00 = 849.82 kg
Memasang Bekisting untuk Lantai 23.89 1.00 = 23.89 m2

VII PEKERJAAN PENUTUP ATAP


1 Pasang Kasau & Reng Kayu Kruing (SNI)
P L total sat
9.50 x 8.20
2 Pemasangan Atap Genteng Kodok / lokal = 77.90 m2
3 Pemasangan 1 m2 Dinding Lambriziring dari Papan Kayu Jati 77.90 x 2.00 = 155.80 m2
4 Pemasangan 1 m2 rangka besi hollow 1x40.40.0.6 mm, modul 60 9.36 = 9.36 m3

VIII PEKERJAAN LANGIT - LANGIT


1 Pemasangan 1 m2 rangka besi hollow 1x40.40.0.6 mm, modul 60 x 60 cm, plafon = 92.16 m2
lt. 1 -
wc 1.35 x 1.60 = 2.16
watafel 1.35 x 1.60 = 2.16
kamar 2.85 x 2.60 = 7.41
carport 2.85 x 5.38 = 15.33
utama 7.93 x 4.85 = 38.46
65.52 +
tangga 1.00 x 6.00 = 6.00 -
59.52
lt. 2 -
wc 1.35 x 1.60 1.00 = 2.16
wastafel 1.35 x 1.60 1.00 = 2.16
kamar 1 2.85 x 2.60 1.00 = 7.41
kamar 2 2.35 x 2.85 2.00 = 13.40
kamar 3 2.35 x 3.35 1.00 = 7.87
1.60 x 1.53 1.00 = 2.45
wc 1.40 x 1.10 1.00 = 1.54
= 36.99 +
tangga 1.00 x 4.35 1.00 = 4.35 -
32.64

92.16

2 Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm = 92.16 m2


3 List Langit-Langit Kayu Profil 31.58 + 41.01 x 2.00 = 145.18 = 145.18 m1

IX PEKERJAAN PENUTUP LANTAI DAN DINDING P L KL P x L - KL total sat


1 Pemasangan lantai Ubin Granitile Uk. 60 x 60 cm = 190.81 m2
lt. 1 -
wastafel 1.35 x 1.60 - 0.023 = 2.14
kamar 2.85 x 2.60 - 0.200 = 7.21
utama 7.93 x 4.85 - 0.345 = 38.12
teras 1.88 x 1.25 - = 2.35
1.58 x 0.50 - 0.100 = 0.69
1.28 x 3.28 - 0.008 = 4.19

lt. 2 -
lodir room 1.50 x 1.60 - 0.011 = 2.39
tama 5.35 x 4.85 - 3.700 = 22.25
kamar 1 2.60 x 2.85 - = 7.41
kamar 2 3.35 x 2.85 - = 9.55
1.35 x 1.60 - = 2.16
kamar 3 2.35 x 2.85 - x 2.00 = 13.40
balkon 1.35 x 4.75 - = 6.41
-
lt. 3 -
gudang + jemur 7.00 x 8.35 - 4.39 = 54.06

Tangga -
Antrean 0.30 x 1.00 37.00 = 11.10
Optrade 0.20 x 1.00 37.00 = 7.40
Bordes 1.00 x 1.00 2.00 = 2.00

190.81

P L T Q PxLxTxQ total sat


2 Pemasangan Lantai Keramik 20 x 20 cm 1.35 x 1.60 = 2.16 = 5.84 m2
1.35 x 1.60 = 2.16
1.10 x 1.38 = 1.52
3 Pemasangan Dinding Keramik 20x25 cm, = 28.19 m2
5.20 x 1.50 = 7.80
5.20 x 1.50 = 7.80
4.26 x 1.50 = 6.39
2.00 x 1.00 = 2.00
1.35 x 1.00 = 1.35
1.90 x 1.50 = 2.85

4 Pemasangan Lantai Keramik 30 x 30 cm warna = 2.01 m2


Meja Dapur - 2.00 x 0.60 = 1.20
1.35 x 0.60 = 0.81
5 Blok paving tebal 6 cm dengan paving mutu K 225 (SNI) 5.50 x 2.85 = 15.68 = 15.68 m2

X PEKERJAAN BESI dan ALUMUNIUM


1 Pemasangan Kusen Pintu Allumunium P L T Q PxLxTxQ total sat
P1- 5.86 x 1.00 = 5.86 = 64.12 m1
P2- 5.76 x 1.00 = 5.76
P3- 5.40 x 7.00 = 37.80
P4- 4.90 x 3.00 = 14.70
2 Pasang Kusen Jendela Alumunium = 85.60 m1
J1- 6.90 x 2.00 = 13.80
J2- 8.10 x 2.00 = 16.20
J3- 7.45 x 1.00 = 7.45
J4- 7.90 x 1.00 = 7.90
BV1- 5.10 x 1.00 = 5.10
BV2- 3.40 x 1.00 = 3.40
J5A- 13.95 x 1.00 = 13.95
J5B- 17.80 x 1.00 = 17.80
3 Pasang Daun Pintu dan Jendela Kaca Alumunium
P1- 1.28 x 4.34 x 1.00 = 5.56 = 58.36 m2
P2- 1.18 x 4.34 x 1.00 = 5.12
P3- 0.80 x 4.34 x 7.00 = 24.30
J1- 1.56 x 2.40 x 2.00 = 7.49
J2- 1.52 x 1.60 x 2.00 = 4.86
J3- 1.24 x 0.83 x 1.00 = 1.03
J4- 1.86 x 2.40 x 1.00 = 4.46
BV1- 1.36 x 0.60 x 1.00 = 0.82
BV2- 0.90 x 0.60 x 1.00 = 0.54
J5A- 0.74 x 1.88 x 1.00 = 1.39
J5B- 1.48 x 1.88 x 1.00 = 2.78
4 Pemasangan Pintu Allumunium Strip Lebar 8 cm
P4- 0.60 x 2.05 x 1.00 = 1.23 = 1.23 m2

5 Pemasangan Kaca tebal 5 mm


P1- 0.88 x 1.97 x 1.00 = 1.73 = 122.45 m2
P2- 0.78 x 1.97 x 1.00 = 1.54
P3- 0.64 x 1.97 x 7.00 = 8.83
J1- 1.12 x 1.08 x 2.00 = 2.42
J2- 1.10 x 1.48 x 2.00 = 3.26
J3- 2.34 x 1.42 x 1.00 = 3.32
J4- 1.62 x 1.08 x 1.00 = 1.75
BV1- 1.12 x 0.48 x 1.00 = 0.54
BV2- 0.78 x 0.48 x 1.00 = 0.37
J5A- 55.68 x 1.68 x 1.00 = 93.54
J5B- 2.74 x 1.88 x 1.00 = 5.15
6 Pemasangan 1 m2 terali besi strip (2 x 3) mm = 37.46 m2
Railing Tangga - 12.50 x 1.10 1.00 = 13.75
Railing Tangga Void - 4.20 x 1.10 1.00 = 4.62
4.30 x 1.10 1.00 = 4.73
Bordes Teras - 8.05 x 1.10 1.00 = 8.86
5.00 x 1.10 1.00 = 5.50
XI PEKERJAAN PENGECATAN
1 Pengecat Tembok Baru dengan Mowilex = 672.41 m2

2 Pengecat 1m2 Waterproof untuk atap dag beton = 84.16 m2


3 Pengecat Plafond Baru dengan Mowilex = 92.16 m2

XII PEKERJAAN AKSESORIS


1 Pemasangan Kunci Tanam Biasa = 1.00 bh
2 Pemasangan Kunci Kamar Mandi = 1.00 bh
3 Pemasangan Engsel Pintu = 3.00 bh
4 Pemasangan Engsel Jendela Kupu-kupu = 6.00 bh
5 Pemasangan Kait Angin = 6.00 bh

XIII PEKERJAAN SANITASI


1 Pemasangan 1 m pipa PVC Ø 25 mm (1") = 32.00 m1
2 Pemasangan 1 m pipa PVC Ø 50 mm (2") = 23.00 m1
3 Pemasangan 1 m pipa PVC Ø 90 mm (4") = 18.00 m1
4 Pemasangan Kran Ø ½" atau Ø ¾" = 7.00 bh
5 Pemasangan Bak Cuci Piring Stainless stell = 1.00 bh
6 Memasang Closet Jongkok Porselen = 3.00 bh
7 Septiktank Buis Beton = 1.00 bh
8 Resapan Air kotor Buis Beton = 1.00 bh
9 Tandon Air 1000 L = 2.00 bh
10 Pemasangan Kran Shower Mandi = 3.00 bh
11 Ember Air = 3.00 bh
12 Pemasangan Floor Drain = 5.00 bh
13 Pemasangan Pipa PVC tipe AW Ø 3" = 17.50 m1

XIV PEKERJAAN LISTRIK


1 Pasang Meteran Listrik 2000VA = 1.00 bh
2 Pasang Instalasi Listrik = 43.00 ttk
3 Pasang Lampu LED 15 watt = 19.00 bh
4 Pasang Lampu LED 20 watt = 11.00 bh
5 Pasang Saklar Ganda = 11.00 bh
6 Pasang Stop Kontak = 12.00 bh
7 Pasang Mesin Pompa Air Jet Pump Otomatis = 1.00 bh
RENCANA ANGGARAN BIAYA
KEGIATAN : TUGAS BESAR MANAGEMENT PROYEK
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL GEDUNG 3 LANTAI
LOKASI : KEC. TAHUNAN, KAB. JEPARA, PROVINSI JAWA TENGAH
TAHUN ANGGARAN : 2019
VOLUME : 1 UNIT

HARGA SATUAN JUMLAH HARGA BOBOT


NO URAIAN PEKERJAAN VOLUME ANALISA
Rp Rp
A PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan 80.00 m1 A.2.2.1.9 13,750.00 1,100,000.00 0.1677
2 Pengukuran dan Pemasangan Bouwplank 80.00 m1 A.2.2.1.4 61,131.00 4,890,480.00 0.7458
3 Air Kerja 1.00 ls Taksir 500,000.00 500,000.00 0.0762

B PEKERJAAN PELAKSANAAN
I PEKERJAAN TANAH
1 Menggali Tanah Biasa Sedalam 1 m 58.62 m3 A.2.3.1.1 62,875.00 3,685,826.81 0.5621
2 Pengurugan Kembali 14.70 m3 A.2.3.1.9 15,250.00 224,098.75 0.0342

II PEKERJAAN PONDASI
1 Pemasang Batu Kosong/Anstamping 10.85 m3 A.3.2.1.9 452,513.40 4,907,507.82 0.7484
2 Pemasangan Pondasi Batu Belah 1SP : 8 PP muntilan 21.09 m3 A.3.2.1.5.1 899,089.00 18,959,539.29 2.8912
3 Pasang Pondasi Rolag Trashraam BT Mrh 1 Pc : 3 Ps 0.22 m3 A.3.2.1.12 1,207,075.00 267,970.65 0.0409
4 Urugan Pasir Bawah Pondasi 2.71 m3 A.2.3.1.11 194,484.38 527,295.76 0.0804

III PEKERJAAN PASANGAN DINDING


1 Pasang Din Bt Mrh Kalipucang tbl 1/2 bt 1 SP:8PP Muntilan 336.20 m2 A.4.4.1.12.2 110,750.00 37,234,537.63 5.6780

IV PEKERJAAN PLESTERAN
1 Pasang Plesteran 1 Pc : 3 Pp tbl 15 mm Ps Muntilan 79.19 m2 A.4.4.2.3 64,000.20 5,068,367.84 0.7729
2 Pasang Plesteran 1 Pc : 8 Pp tbl 15 mm Ps Muntilan 672.41 m2 A.4.4.2.19 40,516.80 27,243,779.94 4.1545
3 Pemasangan Acian 672.41 m2 A.4.4.2.27 32,962.50 22,164,215.74 3.3799

V PEKERJAAN BETON
1 Membuat Beton mutu f'c=7,4 Mpa (K100) 0.89 m3 A.4.1.1.1 973,662.43 868,506.89 0.1324
2 Membuat Foot Plat 100x100
a Membuat Beton mutu MPa (K225) 1.50 m3 A.4.1.1.7 1,106,174.59 1,659,261.88 0.2530
b Pembesian dg Besi Polos atau Besi Ulir 212.31 kg A.4.1.1.17 13,683.00 2,904,983.39 0.4430
c Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 6.00 m2 A.4.1.1.37 99,770.00 598,620.00 0.0913
3 Membuat Foot Plat 80x80
a Membuat Beton mutu MPa (K225) 0.96 m3 A.4.1.1.7 1,106,174.59 1,061,927.60 0.1619
b Pembesian dg Besi Polos atau Besi Ulir 103.08 kg A.4.1.1.17 13,683.00 1,410,427.22 0.2151
c Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 4.80 m2 A.4.1.1.37 99,770.00 478,896.00 0.0730
4 Membuat Sloof Beton Bertulang 20x30
a Membuat Beton mutu MPa (K225) 3.98 m3 A.4.1.1.7 1,106,174.59 4,403,681.03 0.6715
b Pembesian dg Besi Polos atau Besi Ulir 537.08 kg A.4.1.1.17 13,683.00 7,348,933.18 1.1207
c Memasang Bekisting untuk Sloof 39.81 m2 A.4.1.1.21 137,576.25 5,476,910.51 0.8352
5 Membuat Kolom Beton Bertulang 30x30 0.0000
a Membuat Beton mutu MPa (K225) 3.13 m3 A.4.1.1.7 1,106,174.59 3,464,538.81 0.5283
b Pembesian dg Besi Polos atau Besi Ulir 361.57 kg A.4.1.1.17 13,683.00 4,947,427.77 0.7544
c Memasang Bekisting untuk Kolom 41.76 m2 A.4.1.1.22 205,045.00 8,562,679.20 1.3057
6 Membuat Beton bertulang Kolom Praktis 11x11 cm 147.85 m1 A.4.1.1.35 69,841.10 10,326,006.64 1.5746
7 Membuat Kolom Beton Bertulang 20x20
a Membuat Beton mutu MPa (K225) 1.39 m3 A.4.1.1.7 1,106,174.59 1,539,795.03 0.2348
b Pembesian dg Besi Polos atau Besi Ulir 201.38 kg A.4.1.1.17 13,683.00 2,755,529.39 0.4202
c Memasang Bekisting untuk Kolom 26.45 m2 A.4.1.1.22 205,045.00 5,423,030.16 0.8270
8 Membuat Balok Beton Bertulang 15x30
a Membuat Beton mutu MPa (K225) 0.86 m3 A.4.1.1.7 1,106,174.59 955,734.84 0.1457
b Pembesian dg Besi Polos atau Besi Ulir 146.21 kg A.4.1.1.17 13,683.00 2,000,566.17 0.3051
c Memasang Bekisting untuk Kolom 16.51 m2 A.4.1.1.22 205,045.00 3,385,703.04 0.5163
9 Membuat Balok Beton Bertulang 20x40 (B1)
a Membuat Beton mutu MPa (K225) 2.48 m3 A.4.1.1.7 1,106,174.59 2,743,312.98 0.4183
b Pembesian dg Besi Polos atau Besi Ulir 428.91 kg A.4.1.1.17 13,683.00 5,868,816.91 0.8950
c Memasang Bekisting untuk Kolom 29.76 m2 A.4.1.1.23 208,045.00 6,191,419.20 0.9441
10 Membuat Balok Beton Bertulang 20x30 (B2)
a Membuat Beton mutu MPa (K225) 1.77 m3 A.4.1.1.7 1,106,174.59 1,957,929.02 0.2986
b Pembesian dg Besi Polos atau Besi Ulir 314.47 kg A.4.1.1.17 13,683.00 4,302,914.27 0.6562
c Memasang Bekisting untuk Balok 22.42 m2 A.4.1.1.23 208,045.00 4,664,368.90 0.7113
11 Membuat Balok Beton Bertulang 15x30 (B4) 0.0000
a Membuat Beton mutu MPa (K225) 3.80 m3 A.4.1.1.7 1,106,174.59 4,206,228.87 0.6414
b Pembesian dg Besi Polos atau Besi Ulir 652.72 kg A.4.1.1.17 13,683.00 8,931,140.09 1.3619
c Memasang Bekisting untuk Balok 60.00 m2 A.4.1.1.23 208,045.00 12,481,659.78 1.9034
12 Membuat Balok Beton Bertulang 15x20 (B3)
a Membuat Beton mutu MPa (K225) 1.65 m3 A.4.1.1.7 1,106,174.59 1,821,869.55 0.2778
b Pembesian dg Besi Polos atau Besi Ulir 217.94 kg A.4.1.1.17 13,683.00 2,982,007.56 0.4547
c Memasang Bekisting untuk Balok 18.67 m2 A.4.1.1.23 208,045.00 3,883,367.97 0.5922
13 Membuat Latiu Balok Beton Bertulang (10 x 15) cm 38.86 m1 A.4.1.1.36 109,298.81 4,247,351.85 0.6477
14 Membuat Ring Balok Beton Bertulang 15 x 20 cm
a Membuat Beton mutu MPa (K225) 0.60 m3 A.4.1.1.7 1,106,174.59 663,704.75 0.1012
b Pembesian dg Besi Polos atau Besi Ulir 70.49 kg A.4.1.1.17 13,683.00 964,485.90 0.1471
c Memasang Bekisting untuk Balok 8.00 m2 A.4.1.1.23 208,045.00 1,664,360.00 0.2538
15 Membuat Dak Plat Beton tbl 12 cm
a Membuat Beton mutu MPa (K225) 15.37 m3 A.4.1.1.7 1,106,174.59 17,001,682.17 2.5926
b Pembesian dg Besi Polos atau Besi Ulir 2028.26 kg A.4.1.1.17 13,683.00 27,752,686.23 4.2321
c Memasang Bekisting untuk Lantai 15.37 m2 A.4.1.1.24 205,645.00 3,160,722.52 0.4820

VI PEKERJAAN TANGGA BETON BERTULANG


1 Membuat Balok Beton Bertulang 15x30 (B4)
a Membuat Beton mutu MPa (K225) 0.78 m3 A.4.1.1.7 1,106,174.59 859,165.80 0.1310
b Pembesian dg Besi Polos atau Besi Ulir 133.97 kg A.4.1.1.17 13,683.00 1,833,100.09 0.2795
c Memasang Bekisting untuk Balok 12.25 m2 A.4.1.1.23 208,045.00 2,549,508.26 0.3888
3 Membuat Plat Tangga
a Membuat Beton mutu MPa (K225) 0.00 m3 A.4.1.1.7 1,106,174.59 - 0.0000
b Pembesian dg Besi Polos atau Besi Ulir 0.77 kg A.4.1.1.17 13,683.00 10,535.91 0.0016
c Memasang Bekisting untuk Lantai 0.00 m2 A.4.1.1.21 137,576.25 - 0.0000
2 Membuat Plat Tangga
a Membuat Beton mutu MPa (K225) 3.24 m3 A.4.1.1.7 1,106,174.59 3,585,664.92 0.5468
b Pembesian dg Besi Polos atau Besi Ulir 849.82 kg A.4.1.1.17 13,683.00 11,628,151.37 1.7732
c Memasang Bekisting untuk Lantai 23.89 m2 A.4.1.1.24 205,645.00 4,911,830.83 0.7490

VII PEKERJAAN PENUTUP ATAP


1 Pasang Kasau & Reng Kayu Kruing (SNI) 77.90 m2 A.4.6.1.30 115,419.38 8,991,169.31 1.3711

2 Pemasangan Atap Genteng Kodok / lokal 77.90 m2 A.4.5.2.2 60,525.00 4,714,897.50 0.7190
3 Pemasangan 1 m2 Dinding Lambriziring dari Papan Kayu Jati 155.80 m2 A.4.6.1.26 419,180.63 65,308,341.38 9.9590
4Pemasangan 1 m2 rangka besi hollow 1x40.40.0.6 mm, modul 60 x 60 cm, plafon
9.36 m3 A.4.2.1.21 116,945.00 1,094,605.20 0.1669

VIII PEKERJAAN LANGIT - LANGIT


1 Pemasangan 1 m2 rangka besi hollow 1x40.40.0.6 mm, modul 60 x 60 cm, plafon
92.16 m2 A.4.2.1.21 116,945.00 10,777,534.26 1.6435
2 Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm 92.16 m2 A.4.5.1.7 39,215.00 3,614,015.19 0.5511
3 List Langit-Langit Kayu Profil 145.18 m1 A.4.5.1.10 20,523.00 2,979,529.14 0.4544

IX PEKERJAAN PENUTUP LANTAI DAN DINDING


1 Pemasangan lantai Ubin Granitile Uk. 60 x 60 cm 190.81 m2 A.4.4.3.9 302,949.00 57,807,031.67 8.8151
2 Pemasangan Lantai Keramik 20 x 20 cm 5.84 m2 A.4.4.3.36 206,645.00 1,206,393.51 0.1840
3 Pemasangan Dinding Keramik 20x25 cm, 28.19 m2 A.4.4.3.55 225,990.00 6,370,658.10 0.9715
4 Pemasangan Lantai Keramik 30 x 30 cm warna 2.01 m2 A.4.4.3.35 201,479.00 404,972.79 0.0618
ng tebal 6 cm5dengan paving mutu K 225 (SNI) 15.68 m2 A.4.4.3.65 170,746.88 2,676,457.27 0.4081

X PEKERJAAN BESI dan ALUMUNIUM


1 Pemasangan Kusen Pintu Allumunium 64.12 m1 A.4.2.1.11 126,524.50 8,112,750.94 1.2371
2 Pasang Kusen Jendela Alumunium 85.60 m1 A.4.2.1.11 126,524.50 10,830,497.20 1.6516
3 Pasang Daun Pintu dan Jendela Kaca Alumunium 58.36 m2 A.4.2.1.13 477,020.00 27,836,597.50 4.2449
4 Pemasangan Pintu Allumunium Strip Lebar 8 cm 1.23 m2 A.4.2.1.12 971,578.00 1,195,040.94 0.1822
5 Pemasangan Kaca tebal 5 mm 122.45 m2 A.4.6.2.17 149,936.25 18,359,543.88 2.7997
6 Pemasangan 1 m2 terali besi strip (2 x 3) mm 37.46 m2 A.4.2.1.15 504,106.02 18,881,290.98 2.8793

XI PEKERJAAN PENGECATAN
1 Pengecat Tembok Baru dengan Mowilex 672.41 m2 A.4.7.1.11.2 42,072.75 28,290,011.61 4.3140
2 Pengecat 1m2 Waterproof untuk atap dag beton 84.16 m2 A.4.7.1.24 26,438.00 2,225,088.18 0.3393
3 Pengecat Plafond Baru dengan Mowilex 92.16 m2 A.4.7.1.10.1 26,998.00 2,488,108.68 0.3794
XII PEKERJAAN AKSESORIS
1 Pemasangan Kunci Tanam Biasa 1.00 bh A.4.6.2.2 134,075.00 134,075.00 0.0204
2 Pemasangan Kunci Kamar Mandi 1.00 bh A.4.6.2.3 102,587.50 102,587.50 0.0156
3 Pemasangan Engsel Pintu 3.00 bh A.4.6.2.5 44,042.00 132,126.00 0.0201
4 Pemasangan Engsel Jendela Kupu-kupu 6.00 bh A.4.6.2.6 30,457.50 182,745.00 0.0279
5 Pemasangan Kait Angin 6.00 bh A.4.6.2.9 25,670.00 154,020.00 0.0235

XIII PEKERJAAN SANITASI


1 Pemasangan 1 m pipa PVC Ø 25 mm (1") 32.00 m1 A.8.4.1.1.1 31,636.36 1,012,363.64 0.1544
2 Pemasangan 1 m pipa PVC Ø 50 mm (2") 23.00 m1 A.8.4.1.1 69,255.00 1,592,865.00 0.2429
3 Pemasangan 1 m pipa PVC Ø 90 mm (4") 18.00 m1 A.8.4.1.3 90,335.00 1,626,030.00 0.2480
4 Pemasangan Kran Ø ½" atau Ø ¾" 7.00 bh A.5.1.1.19 71,577.50 501,042.50 0.0764
5 Pemasangan Bak Cuci Piring Stainless stell 1.00 bh A.5.1.1.12 273,525.00 273,525.00 0.0417
6 Memasang Closet Jongkok Porselen 3.00 bh A.5.1.1.2 413,157.50 1,239,472.50 0.1890
7 Septiktank Buis Beton 3.00 bh Dihitung 3,892,659.63 11,677,978.89 1.7808
8 Resapan Air kotor Buis Beton 1.00 bh Dihitung 2,749,434.84 2,749,434.84 0.4193
9 Tandon Air 1000 L 1.00 bh Taksir 1,500,000.00 1,500,000.00 0.2287
10 Pemasangan Kran Shower Mandi 2.00 bh Taksir 500,000.00 1,000,000.00 0.1525
11 Ember Air 3.00 bh Taksir 50,000.00 150,000.00 0.0229
12 Pemasangan Floor Drain 5.00 bh A.5.1.1.14 35,575.00 177,875.00 0.0271
13 Pemasangan Pipa PVC tipe AW Ø 3" 17.50 m1 A.5.1.1.31 67,960.00 1,189,300.00 0.1814

XIV PEKERJAAN LISTRIK


1 Pasang Meteran Listrik 2000VA 1.00 bh Taksir 2,000,000.00 2,000,000.00 0.3050
2 Pasang Instalasi Listrik 43.00 ttk Taksir 80,000.00 3,440,000.00 0.5246
3 Pasang Lampu LED 15 watt 19.00 bh Taksir 40,000.00 760,000.00 0.1159
4 Pasang Lampu LED 20 watt 11.00 bh Taksir 60,000.00 660,000.00 0.1006
5 Pasang Saklar Ganda 11.00 bh Taksir 25,000.00 275,000.00 0.0419
6 Pasang Stop Kontak 12.00 bh Taksir 30,000.00 360,000.00 0.0549
7 Pasang Mesin Pompa Air Jet Pump Otomatis 1.00 bh Taksir 1,500,000.00 1,500,000.00 0.2287

100.00
RENCANA ANGGARAN BIAYA
KEGIATAN

LOGIKA KETERGANTUNGAN

NO URAIAN PEKERJAAN KETERANGAN LOGIKA

A PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan A1 0
2 Pengukuran dan Pemasangan Bouwplank A2 A1
3 Air Kerja A3 0 -

B PEKERJAAN PELAKSANAAN
I PEKERJAAN TANAH
1 Menggali Tanah Biasa Sedalam 1 m I1 A2
2 Pengurugan Kembali I2 III 1

II PEKERJAAN PONDASI
1 Pemasang Batu Kosong/Anstamping II 1 II 4
2 Pemasangan Pondasi Batu Belah 1SP : 8 PP muntilan II 2 II 3
3 Pasang Pondasi Rolag Trashraam BT Mrh 1 Pc : 3 Ps II 3 II 2
4 Urugan Pasir Bawah Pondasi II 4 I1

III PEKERJAAN PASANGAN DINDING


1 Pasang Din Bt Mrh Kalipucang tbl 1/2 bt 1 SP:8PP Muntilan III 1 III 1

IV PEKERJAAN PLESTERAN
1 Pasang Plesteran 1 Pc : 3 Pp tbl 15 mm Ps Muntilan IV 1 VII 4
2 Pasang Plesteran 1 Pc : 8 Pp tbl 15 mm Ps Muntilan IV 2 IV 1
3 Pemasangan Acian IV 3 IV 1

V PEKERJAAN BETON
1 Membuat Beton mutu f'c=7,4 Mpa (K100) V1 V1
2 Membuat Foot Plat 100x100
a Membuat Beton mutu MPa (K225) V 2A V 2C
b Pembesian dg Besi Polos atau Besi Ulir V 2B II 1
c Pasang Bekisting Beton dg Kayu Randu tbl 2 cm V 2C V 2B
3 Membuat Foot Plat 80x80
a Membuat Beton mutu MPa (K225) V 3A V 3C
b Pembesian dg Besi Polos atau Besi Ulir V 3B II 1
c Pasang Bekisting Beton dg Kayu Randu tbl 2 cm V 3C V 3B
4 Membuat Sloof Beton Bertulang 20x30
a Membuat Beton mutu MPa (K225) V 4A V 4C
b Pembesian dg Besi Polos atau Besi Ulir V 4B V 4B
c Memasang Bekisting untuk Sloof V 4C V 4B
5 Membuat Kolom Beton Bertulang 30x30
a Membuat Beton mutu MPa (K225) V 5A V 5C
b Pembesian dg Besi Polos atau Besi Ulir V 5B V 4B
c Memasang Bekisting untuk Kolom V 5C V 5B
6 Membuat Beton bertulang Kolom Praktis 11x11 cm V6 III 1
7 Membuat Kolom Beton Bertulang 20x20
a Membuat Beton mutu MPa (K225) V 7A V 7C
b Pembesian dg Besi Polos atau Besi Ulir V 7B V 5B
c Memasang Bekisting untuk Kolom V 7C V 7B
8 Membuat Balok Beton Bertulang 15x30
a Membuat Beton mutu MPa (K225) V 8A V 8A
b Pembesian dg Besi Polos atau Besi Ulir V 8B V 8B
c Memasang Bekisting untuk Kolom V8C V8C
9 Membuat Balok Beton Bertulang 20x40 (B1)
a Membuat Beton mutu MPa (K225) V 9A V 8A
b Pembesian dg Besi Polos atau Besi Ulir V 9B V 9B
c Memasang Bekisting untuk Kolom V 9C V 9C
10 Membuat Balok Beton Bertulang 20x30 (B2)
a Membuat Beton mutu MPa (K225) V 10A V 9A
b Pembesian dg Besi Polos atau Besi Ulir V 10B V 9B
c Memasang Bekisting untuk Balok V 10C V 9C
11 Membuat Balok Beton Bertulang 15x30 (B4)
a Membuat Beton mutu MPa (K225) V 11A V 15A
b Pembesian dg Besi Polos atau Besi Ulir V 11B V 15B
c Memasang Bekisting untuk Balok V 11C V 15C
12 Membuat Balok Beton Bertulang 15x20 (B3)
a Membuat Beton mutu MPa (K225) V 12A V 10A
b Pembesian dg Besi Polos atau Besi Ulir V 12B V 10B
c Memasang Bekisting untuk Balok V 12C V 10C
13 Membuat Latiu Balok Beton Bertulang (10 x 15) cm V 13 V6
14 Membuat Ring Balok Beton Bertulang 15 x 20 cm
a Membuat Beton mutu MPa (K225) V 14A V 14C
b Pembesian dg Besi Polos atau Besi Ulir V 14B III 1
c Memasang Bekisting untuk Balok V 14C V 14B
15 Membuat Dak Plat Beton tbl 12 cm
a Membuat Beton mutu MPa (K225) V 15A V 12A
b Pembesian dg Besi Polos atau Besi Ulir V 15B V 10B
c Memasang Bekisting untuk Lantai V 15C V 10C

VI PEKERJAAN TANGGA BETON BERTULANG


1 Membuat Balok Beton Bertulang 15x30 (B4)
a Membuat Beton mutu MPa (K225) VI 1A V 15A
b Pembesian dg Besi Polos atau Besi Ulir VI 1B V 15B
c Memasang Bekisting untuk Balok VI 1C V 15C
2 Membuat Plat Tangga
a Membuat Beton mutu MPa (K225) VI 2A VI 1A
b Pembesian dg Besi Polos atau Besi Ulir VI 2B VI 1B
c Memasang Bekisting untuk Lantai VI 2C VI 1C
3 Membuat Plat Tangga
a Membuat Beton mutu MPa (K225) VI 3A VI 1A
b Pembesian dg Besi Polos atau Besi Ulir VI 3B VI 1B
c Memasang Bekisting untuk Lantai VI 3C VI 1C
-
VII PEKERJAAN PENUTUP ATAP
1 Pasang Kasau & Reng Kayu Kruing (SNI) VII 1 VII 4

2 Pemasangan Atap Genteng Kodok / lokal VII 2 VII 1


3 Pemasangan 1 m2 Dinding Lambriziring dari Papan Kayu Jati VII 3 VII 1
4Pemasangan 1 m2 rangka besi hollow 1x40.40.0.6 mm, modul 60 x 60 cm, plafon VII 4 VII 4

VIII PEKERJAAN LANGIT - LANGIT


1 Pemasangan 1 m2 rangka besi hollow 1x40.40.0.6 mm, modul 60 x 60 VIII 1 X1

2 Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm VIII 2 VIII 1


3 List Langit-Langit Kayu Profil VIII 3 VIII 2

IX PEKERJAAN PENUTUP LANTAI DAN DINDING


1 Pemasangan lantai Ubin Granitile Uk. 60 x 60 cm IX 1 IX 1
2 Pemasangan Lantai Keramik 20 x 20 cm IX 2 IX 1
3 Pemasangan Dinding Keramik 20x25 cm, IX 3 IX 2
4 Pemasangan Lantai Keramik 30 x 30 cm warna IX 4 IX 3
ng tebal 6 cm5dengan paving mutu K 225 (SNI) IX 5 IX 4

X PEKERJAAN BESI dan ALUMUNIUM


1 Pemasangan Kusen Pintu Allumunium X1 IX 4
2 Pasang Kusen Jendela Alumunium X2 X1
3 Pasang Daun Pintu dan Jendela Kaca Alumunium X3 XII 3
4 Pemasangan Pintu Allumunium Strip Lebar 8 cm X4 XII 4
5 Pemasangan Kaca tebal 5 mm X5 X4
6 Pemasangan 1 m2 terali besi strip (2 x 3) mm X6 X5

XI PEKERJAAN PENGECATAN
1 Pengecat Tembok Baru dengan Mowilex XI 1 XI 3
2 Pengecat 1m2 Waterproof untuk atap dag beton XI 2 VII 2
3 Pengecat Plafond Baru dengan Mowilex XI 3 XI 1
XII PEKERJAAN AKSESORIS
1 Pemasangan Kunci Tanam Biasa XII 1 XII 1
2 Pemasangan Kunci Kamar Mandi XII 2 XII 4
3 Pemasangan Engsel Pintu XII 3 XII 1
4 Pemasangan Engsel Jendela Kupu-kupu XII 4 XII 2
5 Pemasangan Kait Angin XII 5 XII 3

XIII PEKERJAAN SANITASI


1 Pemasangan 1 m pipa PVC Ø 25 mm (1") XIII 1 IX 1
2 Pemasangan 1 m pipa PVC Ø 50 mm (2") XIII 2 XIII 1
3 Pemasangan 1 m pipa PVC Ø 90 mm (4") XIII 3 XIII 2
4 Pemasangan Kran Ø ½" atau Ø ¾" XIII 4 XIII 3
5 Pemasangan Bak Cuci Piring Stainless stell XIII 5 XIII 2
6 Memasang Closet Jongkok Porselen XIII 6 XIII 3
7 Septiktank Buis Beton XIII 7 IX 5
8 Resapan Air kotor Buis Beton XIII 8 IX 5
9 Tandon Air 1000 L XIII 9 XIII 4
10 Pemasangan Kran Shower Mandi XIII 10 XIII 4
11 Ember Air XIII 11 XIII 12
12 Pemasangan Floor Drain XIII 12 XIII 2
13 Pemasangan Pipa PVC tipe AW Ø 3" XIII 13 XIII 2

XIV PEKERJAAN LISTRIK


1 Pasang Meteran Listrik 2000VA XIV 1 XIV 2
2 Pasang Instalasi Listrik XIV 2 VIII 2
3 Pasang Lampu LED 15 watt XIV 3 XIV 2
4 Pasang Lampu LED 20 watt XIV 4 XIV 2
5 Pasang Saklar Ganda XIV 5 XIV 1
6 Pasang Stop Kontak XIV 6 XIV 5
7 Pasang Mesin Pompa Air Jet Pump Otomatis XIV 7 XIII 9

- 8,995,000.00
655,769,740.72
65,576,974.07
721,346,714.79
721,340,000.00
TERBILANG :
Err:511

Diperiksa Oleh :
DOSEN UNISNU JEPARA
Management Proyek

Nor Hidayati, S.T. M.T.


Dosen UNISNU
KOEFESIEN PEKERJA
NO URAIAN PEKERJAAN VOLUME ANALISA
PEKERJA K. TUKANG MANDOR T. KAYU T. BATU T. BESI
A PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan 80.00 m1 A.2.2.1.9 0.1 0.05
2 Pengukuran dan Pemasangan Bouwplank 80.00 m1 A.2.2.1.4 0.1 0.1 0.01 0.005
3 Air Kerja 1.00 ls Taksir

B PEKERJAAN PELAKSANAAN
I PEKERJAAN TANAH
1 Menggali Tanah Biasa Sedalam 1 m 58.62 m3 A.2.3.1.1 0.75 0.025
2 Pengurugan Kembali 14.70 m3 A.2.3.1.9 0.5000 0.0500

II PEKERJAAN PONDASI
1 Pemasang Batu Kosong/Anstamping 10.85 m3 A.3.2.1.9 0.7800 0.0390 0.0390 0.3900
2 Pemasangan Pondasi Batu Belah 1SP : 8 PP muntilan 21.09 m3 A.3.2.1.5.1 1.5000 0.0750 0.0750 0.7500
3 Pasang Pondasi Rolag Trashraam BT Mrh 1 Pc : 3 Ps 0.22 m3 A.3.2.1.12 4.5000 0.1500 0.2250 1.5000
4 Urugan Pasir Bawah Pondasi 2.71 m3 A.2.3.1.11 0.3000 0.0100

III PEKERJAAN PASANGAN DINDING


1 Pasang Din Bt Mrh Kalipucang tbl 1/2 bt 1 SP:8PP Muntilan 336.20 m2 A.4.4.1.12.2 0.3000 0.0150 0.0150 0.1000

IV PEKERJAAN PLESTERAN
1 Pasang Plesteran 1 Pc : 3 Pp tbl 15 mm Ps Muntilan 79.19 m2 A.4.4.2.3 0.3000 0.0150 0.0150 0.1500
2 Pasang Plesteran 1 Pc : 8 Pp tbl 15 mm Ps Muntilan 672.41 m2 A.4.4.2.19 0.1500 0.0080 0.0080 0.0750
3 Pemasangan Acian 672.41 m2 A.4.4.2.27 0.2000 0.0100 0.0100 0.1000

V PEKERJAAN BETON
1 Membuat Beton mutu f'c=7,4 Mpa (K100) 0.89 m3 A.4.1.1.1 1.65 0.028 0.083 0.275
2 Membuat Foot Plat 100x100
a Membuat Beton mutu MPa (K225) 1.50 m3 A.4.1.1.7 1.65 0.028 0.083 0.275
b Pembesian dg Besi Polos atau Besi Ulir 212.31 kg A.4.1.1.17 0.07 0.007 0.004 0.07
c Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 6.00 m2 A.4.1.1.37 0.2 0.05 0.01 0.5
3 Membuat Foot Plat 80x80
a Membuat Beton mutu MPa (K225) 0.96 m3 A.4.1.1.7 1.65 0.028 0.083 0.275
b Pembesian dg Besi Polos atau Besi Ulir 103.08 kg A.4.1.1.17 0.07 0.007 0.004 0.07
c Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 4.80 m2 A.4.1.1.37 0.2 0.05 0.01 0.5
4 Membuat Sloof Beton Bertulang 20x30
a Membuat Beton mutu MPa (K225) 3.98 m3 A.4.1.1.7 1.65 0.028 0.083 0.275
b Pembesian dg Besi Polos atau Besi Ulir 537.08 kg A.4.1.1.17 0.07 0.007 0.004 0.07
c Memasang Bekisting untuk Sloof 39.81 m2 A.4.1.1.21 0.52 0.026 0.026 0.26
5 Membuat Kolom Beton Bertulang 30x30
a Membuat Beton mutu MPa (K225) 3.13 m3 A.4.1.1.7 1.65 0.028 0.083 0.275
b Pembesian dg Besi Polos atau Besi Ulir 361.57 kg A.4.1.1.17 0.07 0.007 0.004 0.07
c Memasang Bekisting untuk Kolom 41.76 m2 A.4.1.1.22 0.66 0.033 0.033 0.33
6 Membuat Beton bertulang Kolom Praktis 11x11 cm 147.85 m1 A.4.1.1.35 0.18 0.006 0.009 0.02 0.02 0.02
7 Membuat Kolom Beton Bertulang 20x20
a Membuat Beton mutu MPa (K225) 1.39 m3 A.4.1.1.7 1.65 0.028 0.083 0.275
b Pembesian dg Besi Polos atau Besi Ulir 201.38 kg A.4.1.1.17 0.07 0.007 0.004 0.07
c Memasang Bekisting untuk Kolom 26.45 m2 A.4.1.1.22 0.66 0.033 0.033 0.33
8 Membuat Balok Beton Bertulang 15x30
a Membuat Beton mutu MPa (K225) 0.86 m3 A.4.1.1.7 1.65 0.028 0.083 0.275
b Pembesian dg Besi Polos atau Besi Ulir 146.21 kg A.4.1.1.17 0.07 0.007 0.004 0.07
c Memasang Bekisting untuk Kolom 16.51 m2 A.4.1.1.22 0.66 0.033 0.033 0.33
9 Membuat Balok Beton Bertulang 20x40 (B1)
a Membuat Beton mutu MPa (K225) 2.48 m3 A.4.1.1.7 1.65 0.028 0.083 0.275
b Pembesian dg Besi Polos atau Besi Ulir 428.91 kg A.4.1.1.17 0.07 0.007 0.004 0.07
c Memasang Bekisting untuk Balok 29.76 m2 A.4.1.1.23 0.66 0.033 0.033 0.33
10 Membuat Balok Beton Bertulang 20x30 (B2)
a Membuat Beton mutu MPa (K225) 1.77 m3 A.4.1.1.7 1.65 0.028 0.083 0.275
b Pembesian dg Besi Polos atau Besi Ulir 314.47 kg A.4.1.1.17 0.07 0.007 0.004 0.07
c Memasang Bekisting untuk Balok 22.42 m2 A.4.1.1.23 0.66 0.033 0.033 0.33
11 Membuat Balok Beton Bertulang 15x30 (B4)
a Membuat Beton mutu MPa (K225) 3.80 m3 A.4.1.1.7 1.65 0.028 0.083 0.275
b Pembesian dg Besi Polos atau Besi Ulir 652.72 kg A.4.1.1.17 0.07 0.007 0.004 0.07
c Memasang Bekisting untuk Balok 60.00 m2 A.4.1.1.23 0.66 0.033 0.033 0.33
12 Membuat Balok Beton Bertulang 15x20 (B3)
a Membuat Beton mutu MPa (K225) 1.65 m3 A.4.1.1.7 1.65 0.028 0.083 0.275
b Pembesian dg Besi Polos atau Besi Ulir 217.94 kg A.4.1.1.17 0.07 0.007 0.004 0.07
c Memasang Bekisting untuk Balok 18.67 m2 A.4.1.1.23 0.66 0.033 0.033 0.33
13 Membuat Latiu Balok Beton Bertulang (10 x 15) cm 38.86 m1 A.4.1.1.36 0.297 0.01 0.015 0.033 0.033 0.033
14 Membuat Ring Balok Beton Bertulang 15 x 20 cm
a Membuat Beton mutu MPa (K225) 0.60 m3 A.4.1.1.7 1.65 0.028 0.083 0.275
b Pembesian dg Besi Polos atau Besi Ulir 70.49 kg A.4.1.1.17 0.07 0.007 0.004 0.07
c Memasang Bekisting untuk Balok 8.00 m2 A.4.1.1.23 0.66 0.033 0.033 0.33
15 Membuat Dak Plat Beton tbl 12 cm
a Membuat Beton mutu MPa (K225) 15.37 m3 A.4.1.1.7 1.65 0.028 0.083 0.275
b Pembesian dg Besi Polos atau Besi Ulir 2028.26 kg A.4.1.1.17 0.07 0.007 0.004 0.07
c Memasang Bekisting untuk Lantai 15.37 m2 A.4.1.1.24 0.66 0.033 0.033 0.33

VI PEKERJAAN TANGGA BETON BERTULANG


1 Membuat Balok Beton Bertulang 15x30 (B4)
a Membuat Beton mutu MPa (K225) 0.78 m3 A.4.1.1.7 1.65 0.028 0.083 0.275
b Pembesian dg Besi Polos atau Besi Ulir 133.97 kg A.4.1.1.17 0.07 0.007 0.004 0.07
c Memasang Bekisting untuk Balok 12.25 m2 A.4.1.1.23 0.66 0.033 0.033 0.33
3 Membuat Plat Tangga
a Membuat Beton mutu MPa (K225) 0.00 m3 A.4.1.1.7 1.65 0.028 0.083 0.275
b Pembesian dg Besi Polos atau Besi Ulir 0.77 kg A.4.1.1.17 0.07 0.007 0.004 0.07
c Memasang Bekisting untuk Lantai 0.00 m2 A.4.1.1.21 0.52 0.026 0.026 0.26
2 Membuat Plat Tangga
a Membuat Beton mutu MPa (K225) 3.24 m3 A.4.1.1.7 1.65 0.028 0.083 0.275
b Pembesian dg Besi Polos atau Besi Ulir 849.82 kg A.4.1.1.17 0.07 0.007 0.004 0.07
c Memasang Bekisting untuk Lantai 23.89 m2 A.4.1.1.24 0.66 0.033 0.033 0.33

VII PEKERJAAN PENUTUP ATAP


1 Pasang Kasau & Reng Kayu Kruing (SNI) 77.90 m2 A.4.6.1.30 0.1 0.005 0.005 0.1

2 Pemasangan Atap Genteng Kodok / lokal 77.90 m2 A.4.5.2.2 0.15 0.008 0.008 0.075
3 Pemasangan 1 m2 Dinding Lambriziring dari Papan Kayu Jati 155.80 m2 A.4.6.1.26 0.6 0.18 0.03 1.8
4Pemasangan 1 m2 rangka besi hollow 1x40.40.0.6 mm, modul 60 x 60 cm, plafon
9.36 m3 A.4.2.1.21 0.35 0.018 0.018 0.35

VIII PEKERJAAN LANGIT - LANGIT


1 Pemasangan 1 m2 rangka besi hollow 1x40.40.0.6 mm, modul 60 x 60 cm, plafon
92.16 m2 A.4.2.1.21 0.35 0.018 0.018 0.35
2 Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm 92.16 m2 A.4.5.1.7 0.1 0.005 0.005 0.05
3 List Langit-Langit Kayu Profil 145.18 m1 A.4.5.1.10 0.05 0.003 0.003 0.05

IX PEKERJAAN PENUTUP LANTAI DAN DINDING


1 Pemasangan lantai Ubin Granitile Uk. 60 x 60 cm 190.81 m2 A.4.4.3.9 0.25 0.013 0.013 0.125
2 Pemasangan Lantai Keramik 20 x 20 cm 5.84 m2 A.4.4.3.36 0.7 0.035 0.035 0.35
3 Pemasangan Dinding Keramik 20x25 cm, 28.19 m2 A.4.4.3.55 0.9 0.045 0.045 0.45
4 Pemasangan Lantai Keramik 30 x 30 cm warna 2.01 m2 A.4.4.3.35 0.70 0.04 0.035 0.35
ng tebal 6 cm5dengan paving mutu K 225 (SNI) 15.68 m2 A.4.4.3.65 0.5 0.025 0.025 0.15

X PEKERJAAN BESI dan ALUMUNIUM


1 Pemasangan Kusen Pintu Allumunium 64.12 m1 A.4.2.1.11 0.043 0.0043 0.0021 0.043
2 Pasang Kusen Jendela Alumunium 85.60 m1 A.4.2.1.11 0.043 0.0043 0.0021 0.043
3 Pasang Daun Pintu dan Jendela Kaca Alumunium 58.36 m2 A.4.2.1.13 0.085 0.009 0.005 0.085
4 Pemasangan Pintu Allumunium Strip Lebar 8 cm 1.23 m2 A.4.2.1.12 0.085 0.0085 0.0042 0.085
5 Pemasangan Kaca tebal 5 mm 122.45 m2 A.4.6.2.17 0.015 0.015 0.00075 0.15
6 Pemasangan 1 m2 terali besi strip (2 x 3) mm 37.46 m2 A.4.2.1.15 1.67 0.17 0.08

XI PEKERJAAN PENGECATAN
1 Pengecat Tembok Baru dengan Mowilex 672.41 m2 A.4.7.1.11.2 0.028 0.0042 0.003
2 Pengecat 1m2 Waterproof untuk atap dag beton 84.16 m2 A.4.7.1.24 0.02 0.0063 0.003
3 Pengecat Plafond Baru dengan Mowilex 92.16 m2 A.4.7.1.10.1 0.02 0.003 0.003
XII PEKERJAAN AKSESORIS
1 Pemasangan Kunci Tanam Biasa 1.00 bh A.4.6.2.2 0.01 0.05 0.005 0.5
2 Pemasangan Kunci Kamar Mandi 1.00 bh A.4.6.2.3 0.005 0.05 0.0025 0.5
3 Pemasangan Engsel Pintu 3.00 bh A.4.6.2.5 0.015 0.015 0.0008 0.15
4 Pemasangan Engsel Jendela Kupu-kupu 6.00 bh A.4.6.2.6 0.01 0.01 0.0005 0.1
5 Pemasangan Kait Angin 6.00 bh A.4.6.2.9 0.015 0.008 0.008 0.15

XIII PEKERJAAN SANITASI


1 Pemasangan 1 m pipa PVC Ø 25 mm (1") 32.00 m1 A.8.4.1.1.1 0.0669 0.0066
2 Pemasangan 1 m pipa PVC Ø 50 mm (2") 23.00 m1 A.8.4.1.1 0.081 0.008
3 Pemasangan 1 m pipa PVC Ø 90 mm (4") 18.00 m1 A.8.4.1.3 0.105 0.011
4 Pemasangan Kran Ø ½" atau Ø ¾" 7.00 bh A.5.1.1.19 0.010 0.040 0.005 0.400
5 Pemasangan Bak Cuci Piring Stainless stell 1.00 bh A.5.1.1.12 0.030 0.030 0.015 0.300
6 Memasang Closet Jongkok Porselen 3.00 bh A.5.1.1.2 1 0.150 0.160 1.500
7 Septiktank Buis Beton 3.00 bh Dihitung 1 0.15 0.16 1.5
8 Resapan Air kotor Buis Beton 1.00 bh Dihitung 1 0.15 0.16 1.5
9 Tandon Air 1000 L 1.00 bh Taksir 1 0.15 0.16 1.5
10 Pemasangan Kran Shower Mandi 2.00 bh Taksir 1 0.15 0.16 1.5
11 Ember Air 3.00 bh Taksir 0.1 0.16 1.5
12 Pemasangan Floor Drain 5.00 bh A.5.1.1.14 0.010 0.010 0.005 0.100
13 Pemasangan Pipa PVC tipe AW Ø 3" 17.50 m1 A.5.1.1.31 0.081 0.004 0.004 0.135

XIV PEKERJAAN LISTRIK


1 Pasang Meteran Listrik 2000VA 1.00 bh Taksir 0.5 0.15 0.16
2 Pasang Instalasi Listrik 43.00 ttk Taksir 0.5 0.15 0.16
3 Pasang Lampu LED 15 watt 19.00 bh Taksir 0.5 0.15 0.16
4 Pasang Lampu LED 20 watt 11.00 bh Taksir 0.5 0.15 0.16
5 Pasang Saklar Ganda 11.00 bh Taksir 0.5 0.15 0.16
6 Pasang Stop Kontak 12.00 bh Taksir 0.5 0.15 0.16
7 Pasang Mesin Pompa Air Jet Pump Otomatis 1.00 bh Taksir 0.5 0.15 0.16

TERBILANG :
Err:511

Diperiksa Oleh :
DOSEN UNISNU JEPARA
Management Proyek

Nor Hidayati, S.T. M.T.


Dosen UNISNU
VOLME X KOEF
T. CAT T. LAS T. PIPA t listrik PEKERJA K. TUKANG MANDOR T. KAYU T. BATU T. BESI T. CAT T. LAS

8.00 8 - 0 4.00 4 4.00 4 - 0 - 0 - 0 -


8.00 8 8.00 8 0.80 1 0.40 0 - 0 - 0 - 0 -
- 0 - 0 - 0 - 0 - 0 - 0 - 0 -

43.97 44 - 0 1.47 1 - 0 - 0 - 0 - 0 -
7.35 7 - 0 0.73 1 - 0 - 0 - 0 - 0 -

8.46 8 0.42 0 0.42 0 - 0 4.23 4 - 0 - 0 -


31.63 32 1.58 2 1.58 2 - 0 15.82 16 - 0 - 0 -
1.00 1 0.03 0 0.05 0 - 0 0.33 0 - 0 - 0 -
0.81 1 - 0 0.03 0 - 0 - 0 - 0 - 0 -

100.86 101 5.04 5 5.04 5 - 0 33.62 34 - 0 - 0 -

23.76 24 1.19 1 1.19 1 - 0 11.88 12 - 0 - 0 -


100.86 101 5.38 5 5.38 5 - 0 50.43 50 - 0 - 0 -
134.48 134 6.72 7 6.72 7 - 0 67.24 67 - 0 - 0 -

1.47 1 0.02 0 0.07 0 - 0 0.25 0 - 0 - 0 -

2.48 2 0.04 0 0.12 0 - 0 0.41 0 - 0 - 0 -


14.86 15 1.49 1 0.85 1 - 0 - 0 14.86 15 - 0 -
1.20 1 0.30 0 0.06 0 3.00 3 - 0 - 0 - 0 -

1.58 2 0.03 0 0.08 0 - 0 0.26 0 - 0 - 0 -


7.22 7 0.72 1 0.41 0 - 0 - 0 7.22 7 - 0 -
0.96 1 0.24 0 0.05 0 2.40 2 - 0 - 0 - 0 -

6.57 7 0.11 0 0.33 0 - 0 1.09 1 - 0 - 0 -


37.60 38 3.76 4 2.15 2 - 0 - 0 37.60 38 - 0 -
20.70 21 1.04 1 1.04 1 10.35 10 - 0 - 0 - 0 -

5.17 5 0.09 0 0.26 0 - 0 0.86 1 - 0 - 0 -


25.31 25 2.53 3 1.45 1 - 0 - 0 25.31 25 - 0 -
27.56 28 1.38 1 1.38 1 13.78 14 - 0 - 0 - 0 -
26.61 27 0.89 1 1.33 1 2.96 3 2.96 3 2.96 3 - 0 -

2.30 2 0.04 0 0.12 0 - 0 0.38 0 - 0 - 0 -


14.10 14 1.41 1 0.81 1 - 0 - 0 14.10 14 - 0 -
17.46 17 0.87 1 0.87 1 8.73 9 - 0 - 0 - 0 -

1.43 1 0.02 0 0.07 0 - 0 0.24 0 - 0 - 0 -


10.23 10 1.02 1 0.58 1 - 0 - 0 10.23 10 - 0 -
10.90 11 0.54 1 0.54 1 5.45 5 - 0 - 0 - 0 -

4.09 4 0.07 0 0.21 0 - 0 0.68 1 - 0 - 0 -


30.02 30 3.00 3 1.72 2 - 0 - 0 30.02 30 - 0 -
19.64 20 0.98 1 0.98 1 9.82 10 - 0 - 0 - 0 -

2.92 3 0.05 0 0.15 0 - 0 0.49 0 - 0 - 0 -


22.01 22 2.20 2 1.26 1 - 0 - 0 22.01 22 - 0 -
14.80 15 0.74 1 0.74 1 7.40 7 - 0 - 0 - 0 -
6.27 6 0.11 0 0.32 0 - 0 1.05 1 - 0 - 0 -
45.69 46 4.57 5 2.61 3 - 0 - 0 45.69 46 - 0 -
39.60 40 1.98 2 1.98 2 19.80 20 - 0 - 0 - 0 -

2.72 3 0.05 0 0.14 0 - 0 0.45 0 - 0 - 0 -


15.26 15 1.53 2 0.87 1 - 0 - 0 15.26 15 - 0 -
12.32 12 0.62 1 0.62 1 6.16 6 - 0 - 0 - 0 -
11.54 12 0.39 0 0.58 1 1.28 1 1.28 1 1.28 1 - 0 -

0.99 1 0.02 0 0.05 0 - 0 0.17 0 - 0 - 0 -


4.93 5 0.49 0 0.28 0 - 0 - 0 4.93 5 - 0 -
5.28 5 0.26 0 0.26 0 2.64 3 - 0 - 0 - 0 -

25.36 25 0.43 0 1.28 1 - 0 4.23 4 - 0 - 0 -


141.98 142 14.20 14 8.11 8 - 0 - 0 141.98 142 - 0 -
10.14 10 0.51 1 0.51 1 5.07 5 - 0 - 0 - 0 -

1.28 1 0.02 0 0.06 0 - 0 0.21 0 - 0 - 0 -


9.38 9 0.94 1 0.54 1 - 0 - 0 9.38 9 - 0 -
8.09 8 0.40 0 0.40 0 4.04 4 - 0 - 0 - 0 -

- 0 - 0 - 0 - 0 - 0 - 0 - 0 -
0.05 0 0.01 0 0.00 0 - 0 - 0 0.05 0 - 0 -
- 0 - 0 - 0 - 0 - 0 - 0 - 0 -

5.35 5 0.09 0 0.27 0 - 0 0.89 1 - 0 - 0 -


59.49 59 5.95 6 3.40 3 - 0 - 0 59.49 59 - 0 -
15.76 16 0.79 1 0.79 1 7.88 8 - 0 - 0 - 0 -

7.79 8 0.39 0 0.39 0 7.79 8 - 0 - 0 - 0 -

11.69 12 0.62 1 0.62 1 5.84 6 - 0 - 0 - 0 -


93.48 93 28.04 28 4.67 5 280.44 280 - 0 - 0 - 0 -
3.28 3 0.17 0 0.17 0 3.28 3 - 0 - 0 - 0 -

32.26 32 1.66 2 1.66 2 32.26 32 - 0 - 0 - 0 -


9.22 9 0.46 0 0.46 0 4.61 5 - 0 - 0 - 0 -
7.26 7 0.44 0 0.44 0 7.26 7 - 0 - 0 - 0 -

47.70 48 2.48 2 2.48 2 - 0 23.85 24 - 0 - 0 -


4.09 4 0.20 0 0.20 0 - 0 2.04 2 - 0 - 0 -
25.37 25 1.27 1 1.27 1 - 0 12.69 13 - 0 - 0 -
1.41 1 0.07 0 0.07 0 - 0 0.70 1 - 0 - 0 -
7.84 8 0.39 0 0.39 0 - 0 2.35 2 - 0 - 0 -

2.76 3 0.28 0 0.13 0 - 0 - 0 2.76 3 - 0 -


3.68 4 0.37 0 0.18 0 - 0 - 0 3.68 4 - 0 -
4.96 5 0.53 1 0.29 0 - 0 - 0 4.96 5 - 0 -
0.10 0 0.01 0 0.01 0 - 0 - 0 0.10 0 - 0 -
1.84 2 1.84 2 0.09 0 18.37 18 - 0 - 0 - 0 -
1.67 62.55 63 6.25 6 3.11 3 - 0 - 0 - 0 - 0 63

0.042 18.83 19 2.82 3 2.02 2 - 0 - 0 - 0 28 28 -


0.063 1.68 2 0.53 1 0.25 0 - 0 - 0 - 0 5 5 -
0.063 1.84 2 0.28 0 0.28 0 - 0 - 0 - 0 6 6 -
0.01 0 0.05 0 0.01 0 0.50 1 - 0 - 0 - 0 -
0.01 0 0.05 0 0.00 0 0.50 1 - 0 - 0 - 0 -
0.05 0 0.05 0 0.00 0 0.45 0 - 0 - 0 - 0 -
0.06 0 0.06 0 0.00 0 0.60 1 - 0 - 0 - 0 -
0.09 0 0.05 0 0.05 0 0.90 1 - 0 - 0 - 0 -

0.0339 2.14 2 - 0 0.21 0 - 0 - 0 - 0 - 0 -


0.041 1.86 2 - 0 0.18 0 - 0 - 0 - 0 - 0 -
0.053 1.89 2 - 0 0.20 0 - 0 - 0 - 0 - 0 -
0.07 0 0.28 0 0.04 0 - 0 2.80 3 - 0 - 0 -
0.03 0 0.03 0 0.02 0 - 0 0.30 0 - 0 - 0 -
3.00 3 0.45 0 0.48 0 - 0 4.50 5 - 0 - 0 -
3.00 3 0.45 0 0.48 0 - 0 4.50 5 - 0 - 0 -
1.00 1 0.15 0 0.16 0 - 0 1.50 2 - 0 - 0 -
1.00 1 0.15 0 0.16 0 - 0 1.50 2 - 0 - 0 -
2.00 2 0.30 0 0.32 0 - 0 3.00 3 - 0 - 0 -
0.30 0 - 0 0.48 0 - 0 4.50 5 - 0 - 0 -
0.05 0 0.05 0 0.03 0 - 0 0.50 1 - 0 - 0 -
1.42 1 0.07 0 0.07 0 - 0 2.36 2 - 0 - 0 -

1.5 0.50 1 0.15 0 0.16 0 - 0 - 0 - 0 - 0 -


1.5 21.50 22 6.45 6 6.88 7 - 0 - 0 - 0 - 0 -
0.5 9.50 10 2.85 3 3.04 3 - 0 - 0 - 0 - 0 -
0.5 5.50 6 1.65 2 1.76 2 - 0 - 0 - 0 - 0 -
0.5 5.50 6 1.65 2 1.76 2 - 0 - 0 - 0 - 0 -
0.5 6.00 6 1.80 2 1.92 2 - 0 - 0 - 0 - 0 -
0.5 0.50 1 0.15 0 0.16 0 - 0 - 0 - 0 - 0 -
TOTAL HARI JUMLAH PEKERJA
T. LAS T. PIPA

0 - 0 16 12 1.33 1
0 - 0 17 8 2.15 2
0 - 0 0 1 0.00 0

0 - 0 45 15 3.03 3
0 - 0 8 5 1.62 2

0 - 0 14 5 2.71 3
0 - 0 51 7 7.23 7
0 - 0 1 1 1.42 1
0 - 0 1 1 0.84 1

0 - 0 145 20 7.23 7

0 - 0 38 10 3.80 4
0 - 0 162 14 11.58 12
0 - 0 215 10 21.52 22

0 - 0 2 1 1.82 2

0 - 0 3 2 1.53 2
0 - 0 32 3 10.69 11
0 - 0 5 3 1.52 2

0 - 0 2 1 1.95 2
0 - 0 16 3 5.19 5
0 - 0 4 1 3.65 4

0 - 0 8 3 2.70 3
0 - 0 81 7 11.59 12
0 - 0 33 5 6.62 7

0 - 0 6 2 3.19 3
0 - 0 55 4 13.65 14
0 - 0 44 5 8.82 9
0 - 0 38 7 5.39 5

0 - 0 3 1 2.83 3
0 - 0 30 1 30.41 30
0 - 0 28 1 27.93 28

0 - 0 2 1 1.76 2
0 - 0 22 1 22.08 22
0 - 0 17 2 8.72 9

0 - 0 5 1 5.05 5
0 - 0 65 3 21.59 22
0 - 0 31 2 15.71 16

0 - 0 4 2 1.80 2
0 - 0 47 7 6.78 7
0 - 0 24 4 5.92 6
0 - 0 8 3 2.58 3
0 - 0 99 10 9.86 10
0 - 0 63 8 7.92 8

0 - 0 3 2 1.68 2
0 - 0 33 3 10.97 11
0 - 0 20 3 6.57 7
0 - 0 16 3 5.45 5

0 - 0 1 1 1.22 1
0 - 0 11 7 1.52 2
0 - 0 8 4 2.11 2

0 - 0 31 5 6.26 6
0 - 0 306 9 34.03 34
0 - 0 16 7 2.32 2

0 - 0 2 1 1.58 2
0 - 0 20 1 20.23 20
0 - 0 13 1 12.94 13

0 - 0 0 0 #DIV/0! ###
0 - 0 0 0 #DIV/0! ###
0 - 0 0 0 #DIV/0! ###

0 - 0 7 3 2.20 2
0 - 0 128 7 18.33 18
0 - 0 25 4 6.31 6

0 - 0 16 5 3.27 3

0 - 0 19 7 2.68 3
0 - 0 407 10 40.66 41
0 - 0 7 1 6.89 7

0 - 0 68 15 4.52 5
0 - 0 15 7 2.11 2
0 - 0 15 7 2.20 2

0 - 0 77 10 7.65 8
0 - 0 7 1 6.54 7
0 - 0 41 7 5.80 6
0 - 0 2 1 2.25 2
0 - 0 11 5 2.19 2

0 - 0 6 3 1.97 2
0 - 0 8 2 3.95 4
0 - 0 11 5 2.15 2
0 - 0 1 1 1.00 1
0 - 0 22 5 4.43 4
63 - 0 134 13 10.34 10

0 - 0 52 10 5.19 5
0 - 0 8 1 7.77 8
0 - 0 8 1 8.20 8
0 - 0 1 1 0.57 1
0 - 0 1 1 0.56 1
0 - 0 1 1 0.54 1
0 - 0 1 1 0.72 1
0 - 0 1 1 1.09 1

0 1 1 3 1 3.44 3
0 1 1 3 1 2.99 3
0 1 1 3 1 3.04 3
0 - 0 3 1 3.19 3
0 - 0 1 1 1.00 1
0 - 0 8 2 4.22 4
0 - 0 8 2 4.22 4
0 - 0 3 1 2.81 3
0 - 0 3 1 2.81 3
0 - 0 6 1 5.62 6
0 - 0 5 1 5.28 5
0 - 0 1 1 0.63 1
0 - 0 4 1 3.92 4

0 - 0 1 1 0.81 1
0 - 0 35 1 34.83 35
0 - 0 15 1 15.39 15
0 - 0 9 1 8.91 9
0 - 0 9 1 8.91 9
0 - 0 10 1 9.72 10
0 - 0 1 1 0.81 1
0.01465925 0.10787947 0.14535022 0.14535022 0.14535022 0.14535022 0.14535022 0.14535022 0.1453502 0.1997928 0.3263053 0.3263053 0.0685799 0.1402731 0.3752372 0.2831491 0.3479171 0.3908551 0.3104464 0.3104464
0.01465925 0.12253873 0.26788895 0.41323916 0.55858938 0.7039396 0.84928981 0.99464003 1.1399902 1.339783 1.6660883 1.9923936 2.0609735 2.2012466 2.5764838 2.8596329 3.20755 3.5984051 3.9088515 4.2192978
HARGA SATUAN 100 Minggu 1 Minggu 2 Minggu 3
NO URAIAN PEKERJAAN BOBOT cek jumlah sdm hari
Rp 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6
A PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan 13,750.00 0.1677 0.1677418 16 12 0.01397848 0.01397848 0.01397848 0.01397848 0.01397848 0.01397848 0.01397848 0.01397848 0.0139785 0.0139785 0.0139785 0.0139785
2 Pengukuran dan Pemasangan Bouwplank 61,131.00 0.7458 0.7457618 17 8 0.09322022 0.09322022 0.09322022 0.09322022 0.09322022 0.09322022 0.09322022 0.0932202
3 Air Kerja 500,000.00 0.0762 0.0762463 0 1 0.00068077 0.00068077 0.00068077 0.00068077 0.00068077 0.00068077 0.00068077 0.00068077 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808
0 0
B PEKERJAAN PELAKSANAAN 0 0
I PEKERJAAN TANAH 0 0
1 Menggali Tanah Biasa Sedalam 1 m 62,875.00 0.5621 0.5620611 45 15 0.03747074 0.03747074 0.03747074 0.03747074 0.03747074 0.03747074 0.0374707 0.0374707 0.0374707 0.0374707 0.0374707 0.0374707 0.0374707 0.0374707 0.0374707
2 Pengurugan Kembali 15,250.00 0.0342 0.0341734 8 5
0 0
II PEKERJAAN PONDASI 0 0
1 Pemasang Batu Kosong/Anstamping 452,513.40 0.7484 0.7483584 14 5 0.1496717 0.1496717 0.1496717 0.1496717
2 Pemasangan Pondasi Batu Belah 1SP : 8 PP muntilan 899,089.00 2.8912 2.8911885 51 7
3 Pasang Pondasi Rolag Trashraam BT Mrh 1 Pc : 3 Ps 1,207,075.00 0.0409 0.0408635 1 1 0.0408635
1 90 1
4 Urugan Pasir Bawah Pondasi 194,484.38 0.0804 0.0804087 0.0804087
0 0
III PEKERJAAN PASANGAN DINDING 0 0
1 Pasang Din Bt Mrh Kalipucang tbl 1/2 bt 1 SP:8PP Muntilan 110,750.00 5.6780 5.6779896 145 20
0 0
IV PEKERJAAN PLESTERAN 0 0
1 Pasang Plesteran 1 Pc : 3 Pp tbl 15 mm Ps Muntilan 64,000.20 0.7729 0.7728883 38 10
2 Pasang Plesteran 1 Pc : 8 Pp tbl 15 mm Ps Muntilan 40,516.80 4.1545 4.1544735 162 14
3 Pemasangan Acian 32,962.50 3.3799 3.3798778 215 10
0 0
V PEKERJAAN BETON 0 0
1 Membuat Beton mutu f'c=7,4 Mpa (K100) 973,662.43 0.1324 0.1324408 2 1 0.1324408
2 Membuat Foot Plat 100x100 0 0
a Membuat Beton mutu MPa (K225) 1,106,174.59 0.2530 0.2530251 3 2 0.1265125 0.1265125
b Pembesian dg Besi Polos atau Besi Ulir 13,683.00 0.4430 0.4429883 32 3 0.1476628 0.1476628 0.1476628
c Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 99,770.00 0.0913 0.0912851 5 3 0.0304284 0.0304284 0.0304284
80
3 Membuat Foot Plat 80x80 0 0
a Membuat Beton mutu MPa (K225) 1,106,174.59 0.1619 0.161936 2 1 0.161936
b Pembesian dg Besi Polos atau Besi Ulir 13,683.00 0.2151 0.2150796 16 3 0.0716932 0.0716932 0.0716932
c Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 99,770.00 0.0730 0.0730281 4 1 0.0730281
4 Membuat Sloof Beton Bertulang 20x30 0 0
a Membuat Beton mutu MPa (K225) 1,106,174.59 0.6715 0.6715286 8 3
b Pembesian dg Besi Polos atau Besi Ulir 13,683.00 1.1207 1.1206576 81 7 0.1600939 0.1600939 0.1600939 0.1600939
c Memasang Bekisting untuk Sloof 137,576.25 0.8352 0.8351881 33 5
5 Membuat Kolom Beton Bertulang 30x30 0 0
a Membuat Beton mutu MPa (K225) 1,106,174.59 0.5283 0.5283164 6 2
b Pembesian dg Besi Polos atau Besi Ulir 13,683.00 0.7544 0.7544459 55 4
c Memasang Bekisting untuk Kolom 205,045.00 1.3057 1.3057448 44 5
6 Membuat Beton bertulang Kolom Praktis 11x11 cm 69,841.10 1.5746 1.5746391 38 7
7 Membuat Kolom Beton Bertulang 20x20 0 0
a Membuat Beton mutu MPa (K225) 1,106,174.59 0.2348 0.2348073 3 1
b Pembesian dg Besi Polos atau Besi Ulir 13,683.00 0.4202 0.4201977 30 1
70
c Memasang Bekisting untuk Kolom 205,045.00 0.8270 0.8269717 28 1
8 Membuat Balok Beton Bertulang 15x30 0 0
a Membuat Beton mutu MPa (K225) 1,106,174.59 0.1457 0.1457424 2 1
b Pembesian dg Besi Polos atau Besi Ulir 13,683.00 0.3051 0.3050714 22 1
c Memasang Bekisting untuk Kolom 205,045.00 0.5163 0.5162945 17 2
9 Membuat Balok Beton Bertulang 20x40 (B1) 0 0
a Membuat Beton mutu MPa (K225) 1,106,174.59 0.4183 0.4183348 5 1
b Pembesian dg Besi Polos atau Besi Ulir 13,683.00 0.8950 0.8949509 65 3
c Memasang Bekisting untuk Kolom 208,045.00 0.9441 0.9441453 31 2
10 Membuat Balok Beton Bertulang 20x30 (B2) 0 0
a Membuat Beton mutu MPa (K225) 1,106,174.59 0.2986 0.2985696 4 2
b Pembesian dg Besi Polos atau Besi Ulir 13,683.00 0.6562 0.6561624 47 7
c Memasang Bekisting untuk Balok 208,045.00 0.7113 0.7112815 24 4
11 Membuat Balok Beton Bertulang 15x30 (B4) 0 0
a Membuat Beton mutu MPa (K225) 1,106,174.59 0.6414 0.6414186 8 3
b Pembesian dg Besi Polos atau Besi Ulir 13,683.00 1.3619 1.2257391 99 10
60
c Memasang Bekisting untuk Balok 208,045.00 1.9034 1.9033601 63 8
12 Membuat Balok Beton Bertulang 15x20 (B3) 0 0
a Membuat Beton mutu MPa (K225) 1,106,174.59 0.2778 0.2778215 3 2
b Pembesian dg Besi Polos atau Besi Ulir 13,683.00 0.4547 0.4547339 33 3
c Memasang Bekisting untuk Balok 208,045.00 0.5922 0.5921847 20 3
13 Membuat Latiu Balok Beton Bertulang (10 x 15) cm 109,298.81 0.6477 0.6476895 16 3
14 Membuat Ring Balok Beton Bertulang 15 x 20 cm 0 0
a Membuat Beton mutu MPa (K225) 1,106,174.59 0.1012 0.10121 1 1
b Pembesian dg Besi Polos atau Besi Ulir 13,683.00 0.1471 0.1470769 11 7
c Memasang Bekisting untuk Balok 208,045.00 0.2538 0.2538025 8 4
15 Membuat Dak Plat Beton tbl 12 cm 0 0
a Membuat Beton mutu MPa (K225) 1,106,174.59 2.5926 2.5926299 31 5
b Pembesian dg Besi Polos atau Besi Ulir 13,683.00 4.2321 4.2320779 306 9
c Memasang Bekisting untuk Lantai 205,645.00 0.4820 0.4819866 16 7
0 0
VI PEKERJAAN TANGGA BETON BERTULANG 0 0
50
1 Membuat Balok Beton Bertulang 15x30 (B4) 0 0
a Membuat Beton mutu MPa (K225) 1,106,174.59 0.1310 0.1310164 2 1
b Pembesian dg Besi Polos atau Besi Ulir 13,683.00 0.2795 0.2795341 20 1
c Memasang Bekisting untuk Balok 208,045.00 0.3888 0.388781 13 1
3 Membuat Plat Tangga 0 0
a Membuat Beton mutu MPa (K225) 1,106,174.59 0.0000 0 0 0
b Pembesian dg Besi Polos atau Besi Ulir 13,683.00 0.0016 0 0 0
c Memasang Bekisting untuk Lantai 137,576.25 0.0000 0 0 0
2 Membuat Plat Tangga 0 0
a Membuat Beton mutu MPa (K225) 1,106,174.59 0.5468 0.5467872 7 3
b Pembesian dg Besi Polos atau Besi Ulir 13,683.00 1.7732 1.7732065 128 7
c Memasang Bekisting untuk Lantai 205,645.00 0.7490 0.7490176 25 4
0 0
VII PEKERJAAN PENUTUP ATAP 0 0
1 Pasang Kasau & Reng Kayu Kruing (SNI) 115,419.38 1.3711 1.3710863 16 5
0 40 0
2 Pemasangan Atap Genteng Kodok / lokal 60,525.00 0.7190 0.7189867 19 7
3 Pemasangan 1 m2 Dinding Lambriziring dari Papan Kayu Jati 419,180.63 9.9590 9.9590355 407 10
4Pemasangan 1 m2 rangka besi hollow 1x40.40.0.6 mm, modul 60 x 60 cm, plafon 116,945.00 0.1669 0.1669191 7 1
0 0
VIII PEKERJAAN LANGIT - LANGIT 0 0
1 Pemasangan 1 m2 rangka besi hollow 1x40.40.0.6 mm, modul 60 x 60 cm, plafon 0 0
116,945.00 1.6435 1.6434937 68 15
2 Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm 39,215.00 0.5511 0.5511104 15 7
3 List Langit-Langit Kayu Profil 20,523.00 0.4544 0.454356 15 7
0 0
IX PEKERJAAN PENUTUP LANTAI DAN DINDING 0 0
1 Pemasangan lantai Ubin Granitile Uk. 60 x 60 cm 302,949.00 8.8151 8.8151417 77 10
2 Pemasangan Lantai Keramik 20 x 20 cm 206,645.00 0.1840 0.183966 7 1
3 Pemasangan Dinding Keramik 20x25 cm, 225,990.00 0.9715 0.9714779 41 7
4 Pemasangan Lantai Keramik 30 x 30 cm warna 201,479.00 0.0618 0.0617553 2 1
Blok paving tebal 6 cm5dengan paving mutu K 225 (SNI) 170,746.88 0.4081 0.4081398 11 30 5
0 0
X PEKERJAAN BESI dan ALUMUNIUM 0 0
1 Pemasangan Kusen Pintu Allumunium 126,524.50 1.2371 1.2371341 6 3
2 Pasang Kusen Jendela Alumunium 126,524.50 1.6516 1.6515701 8 2
3 Pasang Daun Pintu dan Jendela Kaca Alumunium 477,020.00 4.2449 4.2448737 11 5
4 Pemasangan Pintu Allumunium Strip Lebar 8 cm 971,578.00 0.1822 0.1822348 1 1
5 Pemasangan Kaca tebal 5 mm 149,936.25 2.7997 2.7996937 22 5
6 Pemasangan 1 m2 terali besi strip (2 x 3) mm 504,106.02 2.8793 2.8792562 134 13
0 0
0 0
XI PEKERJAAN PENGECATAN 0 0
1 Pengecat Tembok Baru dengan Mowilex 42,072.75 4.3140 4.314016 52 10
2 Pengecat 1m2 Waterproof untuk atap dag beton 26,438.00 0.3393 0.3393094 8 1
3 Pengecat Plafond Baru dengan Mowilex 26,998.00 0.3794 0.379418 8 1
0 0
XII PEKERJAAN AKSESORIS 0 20 0
1 Pemasangan Kunci Tanam Biasa 134,075.00 0.0204 0.0204454 1 1
2 Pemasangan Kunci Kamar Mandi 102,587.50 0.0156 0.0156438 1 1
3 Pemasangan Engsel Pintu 44,042.00 0.0201 0.0201482 1 1
4 Pemasangan Engsel Jendela Kupu-kupu 30,457.50 0.0279 0.0278673 1 1
5 Pemasangan Kait Angin 25,670.00 0.0235 0.0234869 1 1
0 0
XIII PEKERJAAN SANITASI 0 0
1 Pemasangan 1 m pipa PVC Ø 25 mm (1") 31,636.36 0.1544 0.1543779 3 1
2 Pemasangan 1 m pipa PVC Ø 50 mm (2") 69,255.00 0.2429 0.2429 3 1
3 Pemasangan 1 m pipa PVC Ø 90 mm (4") 90,335.00 0.2480 0.2479575 3 1
4 Pemasangan Kran Ø ½" atau Ø ¾" 71,577.50 0.0764 0.0764052 3 1
5 Pemasangan Bak Cuci Piring Stainless stell 273,525.00 0.0417 0.0417105 1 1
6 Memasang Closet Jongkok Porselen 413,157.50 0.1890 0.1890103 8 2
7 Septiktank Buis Beton 3,892,659.63 1.7808 1.7808048 8 2
8 Resapan Air kotor Buis Beton 2,749,434.84 0.4193 0.4192683 3 1
9 Tandon Air 1000 L 1,500,000.00 0.2287 0.2287388 3 10 1
10 Pemasangan Kran Shower Mandi 500,000.00 0.1525 0.1524926 6 1
11 Ember Air 50,000.00 0.0229 0.0228739 5 1
12 Pemasangan Floor Drain 35,575.00 0.0271 0.0271246 1 1 7.8
13 Pemasangan Pipa PVC tipe AW Ø 3" 67,960.00 0.1814 0.1813594 4 1
7.0413841422
0 0
XIV PEKERJAAN LISTRIK 0 0 6.0755964564
1 Pasang Meteran Listrik 2000VA 2,000,000.00 0.3050 0.3049851 1 1
5.1098087707
2 Pasang Instalasi Listrik 80,000.00 0.5246 0.5245744 35 1
3 Pasang Lampu LED 15 watt 40,000.00 0.1159 0.1158943 15 1 4.2192978489
3.908851465
4 Pasang Lampu LED 20 watt 60,000.00 0.1006 0.1006451 9 1 3.598405081
3.2075500217
5 Pasang Saklar Ganda 25,000.00 0.0419 0.0419355 9 1 2.8596328957
2.5764838113
6 Pasang Stop Kontak 30,000.00 0.0549 0.0548973 10 1 2.2012466006
2.0609735104
1.9923936347
7 Pasang Mesin Pompa Air Jet Pump Otomatis 1,500,000.00 0.2287 0.2287388 1 1 1.6660883261
1.3397830174
1.1399902465
0 0 0.9946400297
0.8492898129
0.7039395961
100.00 0.5585893793
0.4132391625
0.2678889457
0.1225387289
progres mingguan 0 0.0146592541
0.01465925 0.10787947 0.14535022 0.14535022 0.14535022 0.14535022 0.14535022 0.14535022 0.1453502 0.1997928 0.3263053 0.3263053 0.0685799 0.1402731 0.3752372 0.2831491 0.3479171 0.3908551 0.3104464 0.3104464
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
progres komulatif 0.01465925 0.12253873 0.26788895 0.41323916 0.55858938 0.7039396 0.84928981 0.99464003 1.1399902 1.339783 1.6660883 1.9923936 2.0609735 2.2012466 2.5764838 2.8596329 3.20755 3.5984051 3.9088515 4.2192978
0.8905109 0.9657877 0.9657877 0.8045882 0.8045882 0.862499 0.6386561 0.6822243 0.6822243 0.6822243 0.7214341 0.5328226 0.8276525 0.704778 0.735284 0.5896517 0.5427275 0.6884699 0.7566529 0.7566529 0.5828972 0.5828972 0.7173325 0.5397669 0.5397669 0.5397669 0.4709116 0.588062 0.5192067 0.6335531 0.6335531 0.6335531 0.6013114 0.6701666
5.1098088 6.0755965 7.0413841 7.8459723 8.6505605 9.5130594 10.151716 10.83394 11.516164 12.198389 12.919823 13.452645 14.280298 14.985076 15.72036 16.310011 16.852739 17.541209 18.297862 19.054515 19.637412 20.220309 20.937641 21.477408 22.017175 22.556942 23.027854 23.615916 24.135122 24.768676 25.402229 26.035782 26.637093 27.30726
u3 Minggu 4 Minggu 5 Minggu 6 Minggu 7 Minggu 8
7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5

0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808

0.0068347 0.0068347 0.0068347 0.0068347 0.0068347

0.1496717
0.4130269 0.4130269 0.4130269 0.4130269 0.4130269 0.4130269 0.4130269

0.2838995 0.2838995 0.2838995 0.2838995 0.2838995 0.2838995 0.2838995 0.2838995 0.2838995 0.2838995 0.2838995 0.2838995 0.2838995 0.2838995

0.2238429 0.2238429 0.2238429


0.1600939 0.1600939 0.1600939
0.1670376 0.1670376 0.1670376 0.1670376 0.1670376

0.2641582 0.2641582
0.1886115 0.1886115 0.1886115 0.1886115
0.261149 0.261149 0.261149 0.261149 0.261149
0.2249484 0.2249484 0.2249484 0.2249484 0.2249484 0.2249484 0.2249484

0.2348073
0.4201977
0.8269717

0.1457424
0.3050714
0.2581472 0.2581472

0.4183348
0.298317 0.298317 0.298317
0.4720727 0.4720727

0.1778204 0.1778204

0.1389108 0.1389108
0.151578 0.151578 0.151578
0.1973949 0.1973949 0.1973949
0.2158965

0.518526 0.518526
0.4702309 0.4702309 0.4702309 0.4702309
0.0688552 0.0688552 0.0688552 0.0688552 0.0688552

29.899
29.0884399719

28.2398913636

27.3072598596
26.6370932324
26.0357818391
25.4022287154
24.7686755916
24.1351224678
23.6159157236
23.0278537456
22.5569420981
22.0171752168
21.4774083355
20.9376414542
20.2203089406
19.6374117387
19.0545145368
18.2978616358
17.5412087349
16.8527387964
16.3100113014
15.7203596153
14.9850755904
14.280297637
13.4526451687
12.9198225844
12.1983885309
11.5161642157
10.8339399005
10.1517155853
9.5130594468

8.6505604583
7.8459723002
7.0413841422

6.0755964564

5.1098087707

4.2192978489
8851465

0.8905109 0.9657877 0.9657877 0.8045882 0.8045882 0.862499 0.6386561 0.6822243 0.6822243 0.6822243 0.7214341 0.5328226 0.8276525 0.704778 0.735284 0.5896517 0.5427275 0.6884699 0.7566529 0.7566529 0.5828972 0.5828972 0.7173325 0.5397669 0.5397669 0.5397669 0.4709116 0.588062 0.5192067 0.6335531 0.6335531 0.6335531 0.6013114 0.6701666
20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57
5.1098088 6.0755965 7.0413841 7.8459723 8.6505605 9.5130594 10.151716 10.83394 11.516164 12.198389 12.919823 13.452645 14.280298 14.985076 15.72036 16.310011 16.852739 17.541209 18.297862 19.054515 19.637412 20.220309 20.937641 21.477408 22.017175 22.556942 23.027854 23.615916 24.135122 24.768676 25.402229 26.035782 26.637093 27.30726
0.9326315 0.8485486 0.8113247 0.8494009 0.6491107 0.6974058 0.6974058 0.9941539 0.7056447 0.9191267 0.871052 1.0868187 1.0868187 1.1788516 1.1159486 0.9796153 0.9289497 0.9289497 1.2224592 1.3287343 1.3148167 1.1968768 1.8135826 2.0018789 1.5714925 1.6364005 1.6364005 1.6364005 1.2497886 1.2497886 1.3098411 1.3098411 1.1305437 1.1305437
28.239891 29.08844 29.899765 30.749166 31.398276 32.095682 32.793088 33.787242 34.492887 35.412013 36.283065 37.369884 38.456703 39.635554 40.751503 41.731118 42.660068 43.589018 44.811477 46.140211 47.455028 48.651905 50.465487 52.467366 54.038859 55.675259 57.31166 58.94806 60.197849 61.447638 62.757479 64.06732 65.197863 66.328407
Minggu 8 Minggu 9 Minggu 10 Minggu 11 Minggu 12 Minggu 13
6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4

0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808

0.2838995 0.2838995 0.2838995 0.2838995 0.2838995 0.2838995

0.0772888 0.0772888 0.0772888 0.0772888 0.0772888 0.0772888 0.0772888 0.0772888 0.0772888 0.0772888
0.2967481 0.2967481 0.2967481 0.2967481 0.2967481 0.2967481 0.2967481 0.2967481 0.2967481 0.2967481 0.2967481
0.3379878 0.3379878 0.3379878 0.3379878 0.3379878 0.3379878 0.3379878

69.35980651

67.8643982372

66.328407228

65.1978634883

64.0673197487
0.1492848 0.1492848
0.0937375 0.0937375 0.0937375 0.0937375 0.0937375 0.0937375 0.0937375 62.7574786249
0.1778204 0.1778204
61.4476375011
0.2138062 0.2138062 0.2138062
0.1361932 0.1361932 0.1361932 0.1361932 0.1361932 0.1361932 0.1361932 0.1361932 0.1361932 60.1978488785
0.23792 0.23792 0.23792 0.23792 0.23792 0.23792 0.23792 0.23792
58.9480602558

57.3116597617

0.2158965 0.2158965
55.6752592676
0.10121
0.021011 0.021011 0.021011 0.021011 0.021011 0.021011 0.021011
0.0634506 0.0634506 0.0634506 0.0634506 54.0388587734

0.518526 0.518526 0.518526


52.4673662788
0.4702309 0.4702309 0.4702309 0.4702309 0.4702309
0.0688552 0.0688552

50.4654873765

0.1310164
48.6519047756
0.2795341
0.388781
47.4550279506

46.1402112634

44.8114769301

0.1822624 0.1822624 0.1822624


43.5890177554
0.2533152 0.2533152 0.2533152 0.2533152 0.2533152 0.2533152 0.2533152
42.6600680417
0.1872544 0.1872544 0.1872544 0.1872544

41.7311183281

40.7515030005
0.2742173 0.2742173 0.2742173 0.2742173 0.2742173

39.6355544487 0.1027124 0.1027124 0.1027124 0.1027124 0.1027124 0.1027124 0.1027124


0.9959036 0.9959036 0.9959036 0.9959036 0.9959036 0.9959036 0.9959036 0.9959036 0.9959036 0.9959036
38.4567028029
0.1669191
37.3698840672

36.2830653315

35.4120133556 0.1095662 0.1095662 0.1095662 0.1095662 0.1095662 0.1095662 0.1095662 0.1095662 0.1095662 0.1095662 0.1095662 0.1095662 0.1095662
0.0787301 0.0787301 0.0787301 0.0787301 0.0787301 0.0787301 0.0787301
34.4928866154 0.064908 0.064908 0.064908 0.064908 0.064908 0.064908 0.064908
33.7872419415

32.7930879977
0.8815142 0.8815142
32.0956821593
31.3982763208
0.1387826 0.1387826 0.1387826 0.1387826
30.7491655792

29.8997647115
29.0884399719

28.2398913636

27.3072598596
26.6370932324
8391

0.9326315 0.8485486 0.8113247 0.8494009 0.6491107 0.6974058 0.6974058 0.9941539 0.7056447 0.9191267 0.871052 1.0868187 1.0868187 1.1788516 1.1159486 0.9796153 0.9289497 0.9289497 1.2224592 1.3287343 1.3148167 1.1968768 1.8135826 2.0018789 1.5714925 1.6364005 1.6364005 1.6364005 1.2497886 1.2497886 1.3098411 1.3098411 1.1305437 1.1305437
53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91
28.239891 29.08844 29.899765 30.749166 31.398276 32.095682 32.793088 33.787242 34.492887 35.412013 36.283065 37.369884 38.456703 39.635554 40.751503 41.731118 42.660068 43.589018 44.811477 46.140211 47.455028 48.651905 50.465487 52.467366 54.038859 55.675259 57.31166 58.94806 60.197849 61.447638 62.757479 64.06732 65.197863 66.328407
1.535991 1.4954083 1.7364647 1.8944303 2.2324181 2.6458251 2.267449 2.3840525 2.0624771 2.2447119 2.0624771 1.4095943 1.2135024 0.992873 0.9190921 0.8293603 0.8509502 1.0817672 0.8910832 0.753994 0.8910832 0.5206804 0.5167819 0.1013259
67.864398 69.359807 71.096271 72.990702 75.22312 77.868945 80.136394 82.520446 84.582923 86.827635 88.890112 90.299707 91.513209 92.506082 93.425174 94.254534 95.105485 96.187252 97.078335 97.832329 98.723412 99.244092 99.760874 99.8622
Minggu 13 Minggu 14 Minggu 15 Minggu 16 99.8622001195
99.7608742662
5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6
99.2440923973 7
98.7234120314

97.832328871
97.0783349035
0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808 0.0006808
96.1872517431

95.1054845836

94.2545343415
93.4251740119

92.5060819504

91.5132089622

90.2997066113

88.8901123608

86.8276352623

0.2967481 0.2967481 0.2967481


0.3379878 0.3379878 0.3379878 84.5829233235

82.520446225

80.1363936923

77.8689446624

75.2231195684

72.9907015163

71.0962712419

69.3598065159

67.8643982372

66.328407228

65.1978634883

0673197487

0.1095662 0.1095662

0.8815142 0.8815142 0.8815142 0.8815142 0.8815142 0.8815142 0.8815142 0.8815142


0.183966
0.1387826 0.1387826 0.1387826
0.0617553
0.081628 0.081628 0.081628 0.081628 0.081628

0.412378 0.412378 0.412378


0.8257851 0.8257851
0.8489747 0.8489747 0.8489747 0.8489747 0.8489747
0.1822348
0.5599387 0.5599387 0.5599387 0.5599387 0.5599387
0.2214812 0.2214812 0.2214812 0.2214812 0.2214812 0.2214812 0.2214812 0.2214812 0.2214812 0.2214812 0.2214812 0.2214812 0.2214812

0.4314016 0.4314016 0.4314016 0.4314016 0.4314016 0.4314016 0.4314016 0.4314016 0.4314016 0.4314016
0.3393094
0.379418

0.0204454
0.0156438
0.0201482
0.0278673
0.0234869

0.1543779
0.2429
0.2479575
0.0764052
0.0417105
0.0945052 0.0945052
0.8904024 0.8904024
0.4192683
0.2287388
0.1524926
0.0228739
0.0271246
0.1813594

0.3049851
0.5245744
0.1158943
0.1006451
0.0419355
0.0548973
0.2287388

1.535991 1.4954083 1.7364647 1.8944303 2.2324181 2.6458251 2.267449 2.3840525 2.0624771 2.2447119 2.0624771 1.4095943 1.2135024 0.992873 0.9190921 0.8293603 0.8509502 1.0817672 0.8910832 0.753994 0.8910832 0.5206804 0.5167819 0.1013259
87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112
67.864398 69.359807 71.096271 72.990702 75.22312 77.868945 80.136394 82.520446 84.582923 86.827635 88.890112 90.299707 91.513209 92.506082 93.425174 94.254534 95.105485 96.187252 97.078335 97.832329 98.723412 99.244092 99.760874 99.8622
1
MINGGU 1 MINGGU 2 MINGGU 3
NO URAIAN PEKERJAAN TOTAL HARI KETERANGAN LOGIKA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
A PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan 16 12.00 A1 0 1 1 1 1 1 1 1 1 2 2 2 2
2 Pengukuran dan Pemasangan Bouwplank 17 8.00 A2 A1 2 2 2 2 2 2 2 3
3 Air Kerja 0 1.00 A3 0

B PEKERJAAN PELAKSANAAN
I PEKERJAAN TANAH
1 Menggali Tanah Biasa Sedalam 1 m 45 15.00 I1 A2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
2 Pengurugan Kembali 8 5.00 I2 VII

II PEKERJAAN PONDASI
1 Pemasang Batu Kosong/Anstamping 14 5.00 II 1 II 4 2 3 3 3 3
2 Pemasangan Pondasi Batu Belah 1SP : 8 PP muntilan 51 7.00 II 2 II 3 7
3 Pasang Pondasi Rolag Trashraam BT Mrh 1 Pc : 3 Ps 1 1.00 II 3 II 2 1
4 Urugan Pasir Bawah Pondasi 1 1.00 II 4 I1 1

III PEKERJAAN PASANGAN DINDING


1 Pasang Din Bt Mrh Kalipucang tbl 1/2 bt 1 SP:8PP Muntilan 145 20.00 III 1 III 1

IV PEKERJAAN PLESTERAN
1 Pasang Plesteran 1 Pc : 3 Pp tbl 15 mm Ps Muntilan 38 10.00 IV 1 VII 4
2 Pasang Plesteran 1 Pc : 8 Pp tbl 15 mm Ps Muntilan 162 14.00 IV 2 IV 1
3 Pemasangan Acian 215 10.00 IV 3 IV 1

V PEKERJAAN BETON
1 Membuat Beton mutu f'c=7,4 Mpa (K100) 2 1.00 V1 V1 2
2 Membuat Foot Plat 100x100
a Membuat Beton mutu MPa (K225) 3 2.00 V 2A V 2C 1 2
b Pembesian dg Besi Polos atau Besi Ulir 32 3.00 V 2B II 1 10 12 10
c Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 5 3.00 V 2C V 2B 1 2 2
3 Membuat Foot Plat 80x80
a Membuat Beton mutu MPa (K225) 2 1.00 V 3A V 3C 2
b Pembesian dg Besi Polos atau Besi Ulir 16 3.00 V 3B II 1 5 5 6
c Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 4 1.00 V 3C V 3B 4
4 Membuat Sloof Beton Bertulang 20x30
a Membuat Beton mutu MPa (K225) 8 3.00 V 4A V 4C
b Pembesian dg Besi Polos atau Besi Ulir 81 7.00 V 4B V 4B 11 11 11 11 12
c Memasang Bekisting untuk Sloof 33 5.00 V 4C V 4B 7
5 Membuat Kolom Beton Bertulang 30x30
a Membuat Beton mutu MPa (K225) 6 2.00 V 5A V 5C
b Pembesian dg Besi Polos atau Besi Ulir 55 4.00 V 5B V 4B
c Memasang Bekisting untuk Kolom 44 5.00 V 5C V 5B
6 Membuat Beton bertulang Kolom Praktis 11x11 cm 38 7.00 V6 III 1
7 Membuat Kolom Beton Bertulang 20x20
a Membuat Beton mutu MPa (K225) 3 1.00 V 7A V 7C
b Pembesian dg Besi Polos atau Besi Ulir 30 1.00 V 7B V 5B
c Memasang Bekisting untuk Kolom 28 1.00 V 7C V 7B
8 Membuat Balok Beton Bertulang 15x30
a Membuat Beton mutu MPa (K225) 2 1.00 V 8A V 8A
b Pembesian dg Besi Polos atau Besi Ulir 22 1.00 V 8B V 8B
c Memasang Bekisting untuk Kolom 17 2.00 V8C V8C
9 Membuat Balok Beton Bertulang 20x40 (B1)
a Membuat Beton mutu MPa (K225) 5 1.00 V 9A V 8A
b Pembesian dg Besi Polos atau Besi Ulir 65 3.00 V 9B V 9B
c Memasang Bekisting untuk Balok 31 2.00 V 9C V 9C
10 Membuat Balok Beton Bertulang 20x30 (B2)
a Membuat Beton mutu MPa (K225) 4 2.00 V 10A V 9A
b Pembesian dg Besi Polos atau Besi Ulir 47 7.00 V 10B V 9B
c Memasang Bekisting untuk Balok 24 4.00 V 10C V 9C
11 Membuat Balok Beton Bertulang 15x30 (B4)
a Membuat Beton mutu MPa (K225) 8 3.00 V 11A V 15A
b Pembesian dg Besi Polos atau Besi Ulir 99 10.00 V 11B V 15B
c Memasang Bekisting untuk Balok 63 8.00 V 11C V 15C
12 Membuat Balok Beton Bertulang 15x20 (B3)
a Membuat Beton mutu MPa (K225) 3 2.00 V 12A V 10A
b Pembesian dg Besi Polos atau Besi Ulir 33 3.00 V 12B V 10B
c Memasang Bekisting untuk Balok 20 3.00 V 12C V 10C
13 Membuat Latiu Balok Beton Bertulang (10 x 15) cm 16 3.00 V 13 V6
14 Membuat Ring Balok Beton Bertulang 15 x 20 cm
a Membuat Beton mutu MPa (K225) 1 1.00 V 14A V 14C
b Pembesian dg Besi Polos atau Besi Ulir 11 7.00 V 14B III 1
c Memasang Bekisting untuk Balok 8 4.00 V 14C V 14B
15 Membuat Dak Plat Beton tbl 12 cm
a Membuat Beton mutu MPa (K225) 31 5.00 V 15A V 12A
b Pembesian dg Besi Polos atau Besi Ulir 306 9.00 V 15B V 10B
c Memasang Bekisting untuk Lantai 16 7.00 V 15C V 10C

VI PEKERJAAN TANGGA BETON BERTULANG


1 Membuat Balok Beton Bertulang 15x30 (B4)
a Membuat Beton mutu MPa (K225) 2 1.00 VI 1A V 15A
b Pembesian dg Besi Polos atau Besi Ulir 20 1.00 VI 1B V 15B
c Memasang Bekisting untuk Balok 13 1.00 VI 1C V 15C
3 Membuat Plat Tangga
a Membuat Beton mutu MPa (K225) 0 0.00 VI 2A VI 1A
b Pembesian dg Besi Polos atau Besi Ulir 0 0.00 VI 2B VI 1B
c Memasang Bekisting untuk Lantai 0 0.00 VI 2C VI 1C
2 Membuat Plat Tangga
a Membuat Beton mutu MPa (K225) 7 3.00 VI 3A VI 1A
b Pembesian dg Besi Polos atau Besi Ulir 128 7.00 VI 3B VI 1B
c Memasang Bekisting untuk Lantai 25 4.00 VI 3C VI 1C

VII PEKERJAAN PENUTUP ATAP


1 Pasang Kasau & Reng Kayu Kruing (SNI) 16 5.00 VII 1 VII 4

2 Pemasangan Atap Genteng Kodok / lokal 19 7.00 VII 2 VII 1


3 Pemasangan 1 m2 Dinding Lambriziring dari Papan Kayu Jati 407 10.00 VII 3 VII 1
7
4Pemasangan 1 m2 rangka besi hollow 1x40.40.0.6 mm, modul 60 x 60 cm, plafon 1.00 VII 4 VII 4

VIII PEKERJAAN LANGIT - LANGIT


1 Pemasangan 1 m2 rangka besi hollow 1x40.40.0.6 mm, modul 60 x 60 68 15.00 VIII 1 X1

2 Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm 15 7.00 VIII 2 VIII 1


3 List Langit-Langit Kayu Profil 15 7.00 VIII 3 VIII 2

IX PEKERJAAN PENUTUP LANTAI DAN DINDING


1 Pemasangan lantai Ubin Granitile Uk. 60 x 60 cm 77 10.00 IX 1 IX 1
2 Pemasangan Lantai Keramik 20 x 20 cm 7 1.00 IX 2 IX 1
3 Pemasangan Dinding Keramik 20x25 cm, 41 7.00 IX 3 IX 2
4 Pemasangan Lantai Keramik 30 x 30 cm warna 2 1.00 IX 4 IX 3
5 Blok paving tebal 6 cm dengan paving mutu K 225 (SNI) 11 5.00 IX 5 IX 4

X PEKERJAAN BESI dan ALUMUNIUM


1 Pemasangan Kusen Pintu Allumunium 6 3.00 X1 IX 4
2 Pasang Kusen Jendela Alumunium 8 2.00 X2 X1
3 Pasang Daun Pintu dan Jendela Kaca Alumunium 11 5.00 X3 XII 3
4 Pemasangan Pintu Allumunium Strip Lebar 8 cm 1 1.00 X4 XII 4
5 Pemasangan Kaca tebal 5 mm 22 5.00 X5 X4
6 Pemasangan 1 m2 terali besi strip (2 x 3) mm 134 13.00 X6 X5

XI PEKERJAAN PENGECATAN
1 Pengecat Tembok Baru dengan Mowilex 52 10.00 XI 1 XI 3
2 Pengecat 1m2 Waterproof untuk atap dag beton 8 1.00 XI 2 VII 2
3 Pengecat Plafond Baru dengan Mowilex 8 1.00 XI 3 XI 1

XII PEKERJAAN AKSESORIS


1 Pemasangan Kunci Tanam Biasa 1 1.00 XII 1 XII 1
2 Pemasangan Kunci Kamar Mandi 1 1.00 XII 2 XII 4
3 Pemasangan Engsel Pintu 1 1.00 XII 3 XII 1
4 Pemasangan Engsel Jendela Kupu-kupu 1 1.00 XII 4 XII 2
5 Pemasangan Kait Angin 1 1.00 XII 5 XII 3

XIII PEKERJAAN SANITASI


1 Pemasangan 1 m pipa PVC Ø 25 mm (1") 3 1.00 XIII 1 IX 1
2 Pemasangan 1 m pipa PVC Ø 50 mm (2") 3 1.00 XIII 2 XIII 1
3 Pemasangan 1 m pipa PVC Ø 90 mm (4") 3 1.00 XIII 3 XIII 2
4 Pemasangan Kran Ø ½" atau Ø ¾" 3 1.00 XIII 4 XIII 3
5 Pemasangan Bak Cuci Piring Stainless stell 1 1.00 XIII 5 XIII 2
6 Memasang Closet Jongkok Porselen 8 2.00 XIII 6 XIII 3
7 Septiktank Buis Beton 8 2.00 XIII 7 IX 5
8 Resapan Air kotor Buis Beton 3 1.00 XIII 8 IX 5
9 Tandon Air 1000 L 3 1.00 XIII 9 XIII 4
10 Pemasangan Kran Shower Mandi 6 1.00 XIII 10 XIII 4
11 Ember Air 5 1.00 XIII 11 XIII 12
12 Pemasangan Floor Drain 1 1.00 XIII 12 XIII 2
13 Pemasangan Pipa PVC tipe AW Ø 3" 4 1.00 XIII 13 XIII 2

XIV PEKERJAAN LISTRIK


1 Pasang Meteran Listrik 2000VA 1 1.00 XIV 1 XIV 2
2 Pasang Instalasi Listrik 35 1.00 XIV 2 VIII 2
3 Pasang Lampu LED 15 watt 15 1.00 XIV 3 XIV 2
4 Pasang Lampu LED 20 watt 9 1.00 XIV 4 XIV 2
5 Pasang Saklar Ganda 9 1.00 XIV 5 XIV 1
6 Pasang Stop Kontak 10 1.00 XIV 6 XIV 5
7 Pasang Mesin Pompa Air Jet Pump Otomatis 1 1.00 XIV 7 XIII 9

jumlah pekerja 1 3 6 6 6 6 6 6 8 15 18 17 4 10 16 12 16 15 14 14 29
34 78 116
90

80

70

60

50

40

30

20

10

0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 3
MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8
22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56

2 2 2 1 1

7 7 7 7 8 8

8.00 8.00 8.00 7.00 7.00 7.00 7.00 7.00 7.00 8.00 8.00 8.00 8.00 7.00 7.00 7.00

2 3 3
12 13
7 7 6 6

3 3
13 14 14 14
8 9 9 9 9
5 5 5 5 6 6 6

3
30
28

2
22
8 9

5
21 22 22
15 16

6
6 6 6

1 2
11 11 11
7 7 6
6

6 6
34 34 34 34 34 34
2 2 2 3 2 2

31 32 15 16 16 13 29 31 31 27 13 28 38 11 36 15 18 22 23 28 29 27 36 36 36 34 6 9 8 26 26 31 16 49 49
152 179 171 184 205

19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64
MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13
57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91

7.00 7.00 6.00 6.00

4 4 4 4 4 4 4 4 3 3
11 11 11 11 11 11 12 12 12 12 12
21 21 21 21 21 22 22

2 2
6 7 7 7 7 7
6

3 3 2
10 9 10 10 10 10 10 10 10 10
7 8 8 8 8 8 8 8

6 4

1
1 1 1 2 2 2 2
2 2 2 2

6 6 7
34 34 34
3

2
20
13

2 2 3
18 18 18 18 19 18 19
6 6 6 7

3 3 3 3 4

2 2 3 3 3 3 3
40 40 40 41 41 41 41 41 41 41
7

4 4 4 4 4 4 4 5 5 5 5 5 5 5 5

2 2 2 2 2 2 3
2 2 2 2 2 2 3

7 7 7 8 8
7
5 6 6 6 6 6 6
2
2 2

10 10 10

55 41 44 16 16 31 15 24 36 53 54 43 35 62 43 40 47 53 70 58 46 82 56 58 58 58 53 51 53 55 59 18 35 33 28
218 307 357 416 281

55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 1
MINGGU 14 MINGGU 15 MINGGU 16
92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112

12 12 12
22 22 22

8 8 8 8 8

2 2 3

2 2
4 4
2 2 2 2 3
1
4 4 4 5 5
10 10 10 10 10 10 11 11 11 11

6 5 5 5 5 5 5 5 5 6
8
8

1
1
1
1
1

3
3
3
3
1
4 4
4 4
3
3
6
5
1
4

1
35
15
9
9
10
1

34 34 59 44 48 21 23 22 8 21 24 18 11 15 17 4 38 4 27 22 9
263 119 121

90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112
DAFTAR ANALISIS HARGA SATUAN PEKERJAAN
(AHSP)
KABUPATEN JEPARA
TAHUN 2019

HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN

1 A.2.2.1.2 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m


A TENAGA
Pekerja L.01 OH 0.2 80,000.00 16,000.00
Tukang Kayu L.02 OH 0.4 100,000.00 40,000.00
Kepala Tukang L.03 OH 0.02 110,000.00 2,200.00
Mandor L.04 OH 0.02 115,000.00 2,300.00
60,500.00
B BAHAN
Bambu Btg 1.25 8,000.00 10,000.00
Portalnd Semen Kg 2.5 1,450.00 3,625.00
Seng Gelombang 3" - 5" Lbr 1.2 40,700.00 48,840.00
Pasir Beton m3 0.005 450,000.00 2,250.00
Koral Beton m3 0.009 215,900.00 1,943.10
Kayu 5/7X4m Kayu Hutan m3 0.072 2,850,000.00 205,200.00
Paku Biasa 2" - 5" Kg 0.06 12,800.00 768.00
Meni Besi Kg 0.45 30,600.00 13,770.00
286,396.10
C PERALATAN
D Jumlah A + B + C 346,896.10
E Overhead & Profit 12.5% 43,362.01
F Harga Satuan Pekerjaan (D+E) 390,258.11
Overhead & Profit
2 A.2.2.1.4 Pengukuran dan Pemasangan Bouwplank
A Tenaga
Pekerja L.01 OH 0.1 80,000.00 8,000.00
Tukang Kayu L.02 OH 0.1 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.01 110,000.00 1,100.00
Mandor L.04 OH 0.005 115,000.00 575.00
19,675.00
B Bahan
Kayu 5/7x 4m Kayu Hutan m3 0.012 2,850,000.00 34,200.00
Paku Biasa 2" - 5" Kg 0.02 12,800.00 256.00
Kayu Papan 3/20 randu m3 0.007 1,000,000.00 7,000.00
41,456.00
C PERALATAN
D Jumlah A + B + C 61,131.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 61,131.00
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
3 A.2.2.1.9 Membersihkan Lapangan dan Perataan
A Tenaga
Pekerja L.01 OH 0.1 80,000.00 8,000.00
Mandor L.04 OH 0.05 115,000.00 5,750.00
13,750.00
B Bahan
C PERALATAN
D Jumlah A + B + C 13,750.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 13,750.00

4 A.2.2.1.13 Bongkaran Beton Bertulang


A Tenaga
Pekerja L.01 OH 13.334 80,000.00 1,066,720.00
Mandor L.04 OH 0.666 115,000.00 76,590.00
1,143,310.00
B Bahan
C PERALATAN
D Jumlah A + B + C 1,143,310.00
E Overhead & Profit 12.5% 142,913.75
F Harga Satuan Pekerjaan (D+E) 1,286,223.75

5 A.2.2.1.14 Bongkaran Dinding Tembok Bata Merah


A Tenaga
Pekerja L.01 OH 6.667 80,000.00 533,360.00
Mandor L.04 OH 0.333 115,000.00 38,295.00
571,655.00
B Bahan
C PERALATAN
D Jumlah A + B + C 571,655.00
E Overhead & Profit 12.5% 71,456.88
F Harga Satuan Pekerjaan (D+E) 643,111.88

6 A.2.2.1.17 Bongkaran 1 m3 Pasangan Batu


A Tenaga
AHSP-SDA Pekerja L.01 OH 1.850 80,000.00 148,000.00
Mandor L.04 OH 0.185 115,000.00 21,275.00
169,275.00
B Bahan
C PERALATAN
D Jumlah A + B + C 169,275.00
E Overhead & Profit 12.5% 21,159.38
F Harga Satuan Pekerjaan (D+E) 190,434.38
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
7 A.2.2.1.18 Pembuatan Steger/Perancah dari Bambu
A Tenaga
AHSP-SDA Pekerja L.01 OH 0.33 80,000.00 26,400.00
Tukang Kayu L.02 OH 0.66 100,000.00 66,000.00
Kepala Tukang L.03 OH 0.066 110,000.00 7,260.00
Mandor L.04 OH 0.0330 115,000.00 3,795.00
103,455.00
B Bahan
Bambu diameter 6 - 8 / 600 cm Btg 1.250 8,000.00 10,000.00
Paku 5 - 7 cm Kg 0.350 12,800.00 4,480.00
14,480.00
C PERALATAN
D Jumlah A + B + C 117,935.00
E Overhead & Profit 12.5% 14,741.88
F Harga Satuan Pekerjaan (D+E) 132,676.88

1m2 tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/
8 A.2.2.1.19 tumbuhan diameter < 15cm

A Tenaga
AHSP-SDA Pekerja L.01 OH 0.0750 80,000.00 6,000.00
Mandor L.04 OH 0.0075 115,000.00 862.50
6,862.50
B Bahan
Minyak tanah ltr 0.010 15,000.00 150.00
150.00
C PERALATAN
D Jumlah A + B + C 7,012.50
E Overhead & Profit 12.5% 876.56
F Harga Satuan Pekerjaan (D+E) 7,889.06
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
NO URAIAN PEKERJAAN TOTAL HARI
minggu 1 minggu 2 minggu 3 minggu 4 minggu 5 minggu 6 minggu 7 minggu 8 minggu 9 minggu 10 minggu 11 minggu 12 minggu 13 minggu 14 minggu 15 minggu 16
A PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan 16 12.00 7 9
2 Pengukuran dan Pemasangan Bouwplank 17 8.00 17
3 Air Kerja 0 1.00

B PEKERJAAN PELAKSANAAN
I PEKERJAAN TANAH
1 Menggali Tanah Biasa Sedalam 1 m 45 15.00 15 21 9
2 Pengurugan Kembali 8 5.00 2 6

II PEKERJAAN PONDASI
1 Pemasang Batu Kosong/Anstamping 14 5.00 14
2 Pemasangan Pondasi Batu Belah 1SP : 8 PP muntilan 51 7.00 14 37
3 Pasang Pondasi Rolag Trashraam BT Mrh 1 Pc : 3 Ps 1 1.00 1
4 Urugan Pasir Bawah Pondasi 1 1.00 1

III PEKERJAAN PASANGAN DINDING


1 Pasang Din Bt Mrh Kalipucang tbl 1/2 bt 1 SP:8PP Muntilan 145 20.00 16 43 53 7 26

IV PEKERJAAN PLESTERAN
1 Pasang Plesteran 1 Pc : 3 Pp tbl 15 mm Ps Muntilan 38 10.00 12 16 10
2 Pasang Plesteran 1 Pc : 8 Pp tbl 15 mm Ps Muntilan 162 14.00 66 48 12 36
3 Pemasangan Acian 215 10.00 21 42 86 66

V PEKERJAAN BETON
1 Membuat Beton mutu f'c=7,4 Mpa (K100) 2 1.00 2
2 Membuat Foot Plat 100x100
a Membuat Beton mutu MPa (K225) 3 2.00 3
b Pembesian dg Besi Polos atau Besi Ulir 32 3.00 32
c Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 5 3.00 3 2
3 Membuat Foot Plat 80x80
a Membuat Beton mutu MPa (K225) 2 1.00 2
b Pembesian dg Besi Polos atau Besi Ulir 16 3.00 5 11
c Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 4 1.00 4
4 Membuat Sloof Beton Bertulang 20x30
a Membuat Beton mutu MPa (K225) 8 3.00 8
b Pembesian dg Besi Polos atau Besi Ulir 81 7.00 56 25
c Memasang Bekisting untuk Sloof 33 5.00 7 26
5 Membuat Kolom Beton Bertulang 30x30
a Membuat Beton mutu MPa (K225) 6 2.00 6
b Pembesian dg Besi Polos atau Besi Ulir 55 4.00 55
c Memasang Bekisting untuk Kolom 44 5.00 35 9
6 Membuat Beton bertulang Kolom Praktis 11x11 cm 38 7.00 26 12
7 Membuat Kolom Beton Bertulang 20x20
a Membuat Beton mutu MPa (K225) 3 1.00 3
b Pembesian dg Besi Polos atau Besi Ulir 30 1.00 25 6
c Memasang Bekisting untuk Kolom 28 1.00 22 6
8 Membuat Balok Beton Bertulang 15x30
a Membuat Beton mutu MPa (K225) 2 1.00 2
b Pembesian dg Besi Polos atau Besi Ulir 22 1.00 9 13
c Memasang Bekisting untuk Kolom 17 2.00 17
9 Membuat Balok Beton Bertulang 20x40 (B1)
a Membuat Beton mutu MPa (K225) 5 1.00 5
b Pembesian dg Besi Polos atau Besi Ulir 65 3.00 36 29
c Memasang Bekisting untuk Balok 31 2.00 31
10 Membuat Balok Beton Bertulang 20x30 (B2)
a Membuat Beton mutu MPa (K225) 4 2.00 4
b Pembesian dg Besi Polos atau Besi Ulir 47 7.00 33 14
c Memasang Bekisting untuk Balok 24 4.00 24
11 Membuat Balok Beton Bertulang 15x30 (B4)
a Membuat Beton mutu MPa (K225) 8 3.00 8
b Pembesian dg Besi Polos atau Besi Ulir 99 10.00 49 50
c Memasang Bekisting untuk Balok 63 8.00 63
12 Membuat Balok Beton Bertulang 15x20 (B3)
a Membuat Beton mutu MPa (K225) 3 2.00 3
b Pembesian dg Besi Polos atau Besi Ulir 33 3.00 33
c Memasang Bekisting untuk Balok 20 3.00 20
13 Membuat Latiu Balok Beton Bertulang (10 x 15) cm 16 3.00 6 6 4
14 Membuat Ring Balok Beton Bertulang 15 x 20 cm
a Membuat Beton mutu MPa (K225) 1 1.00 1
b Pembesian dg Besi Polos atau Besi Ulir 11 7.00 1 10
c Memasang Bekisting untuk Balok 8 4.00 8
15 Membuat Dak Plat Beton tbl 12 cm
a Membuat Beton mutu MPa (K225) 31 5.00 15 16
b Pembesian dg Besi Polos atau Besi Ulir 306 9.00 30 121 155
c Memasang Bekisting untuk Lantai 16 7.00 8 2 6

VI PEKERJAAN TANGGA BETON BERTULANG


1 Membuat Balok Beton Bertulang 15x30 (B4)
a Membuat Beton mutu MPa (K225) 2 1.00 2
b Pembesian dg Besi Polos atau Besi Ulir 20 1.00 14 6
c Memasang Bekisting untuk Balok 13 1.00 6 7
3 Membuat Plat Tangga
a Membuat Beton mutu MPa (K225) 0 0.00
b Pembesian dg Besi Polos atau Besi Ulir 0 0.00
c Memasang Bekisting untuk Lantai 0 0.00
2 Membuat Plat Tangga
a Membuat Beton mutu MPa (K225) 7 3.00 7
b Pembesian dg Besi Polos atau Besi Ulir 128 7.00 10 74 44
c Memasang Bekisting untuk Lantai 25 4.00 3 22

VII PEKERJAAN PENUTUP ATAP


1 Pasang Kasau & Reng Kayu Kruing (SNI) 16 5.00 6 10

2 Pemasangan Atap Genteng Kodok / lokal 19 7.00 10 9


3 Pemasangan 1 m2 Dinding Lambriziring dari Papan Kayu Jati 407 10.00 161 246
7
4Pemasangan 1 m2 rangka besi hollow 1x40.40.0.6 mm, modul 60 x 60 cm, plafon 1.00 7

VIII PEKERJAAN LANGIT - LANGIT


1 Pemasangan 1 m2 rangka besi hollow 1x40.40.0.6 mm, modul 60 x 60 68 15.00 12 31 25

2 Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm 15 7.00 2 13


3 List Langit-Langit Kayu Profil 15 7.00 12 3

IX PEKERJAAN PENUTUP LANTAI DAN DINDING


1 Pemasangan lantai Ubin Granitile Uk. 60 x 60 cm 77 10.00 14 55 5
2 Pemasangan Lantai Keramik 20 x 20 cm 7 1.00 7
3 Pemasangan Dinding Keramik 20x25 cm, 41 7.00 5 36
4 Pemasangan Lantai Keramik 30 x 30 cm warna 2 1.00 2
5 Blok paving tebal 6 cm dengan paving mutu K 225 (SNI) 11 5.00 11

X PEKERJAAN BESI dan ALUMUNIUM


1 Pemasangan Kusen Pintu Allumunium 6 3.00 6
2 Pasang Kusen Jendela Alumunium 8 2.00 8
3 Pasang Daun Pintu dan Jendela Kaca Alumunium 11 5.00 11
4 Pemasangan Pintu Allumunium Strip Lebar 8 cm 1 1.00 1
5 Pemasangan Kaca tebal 5 mm 22 5.00 8 14
6 Pemasangan 1 m2 terali besi strip (2 x 3) mm 134 13.00 60 74

XI PEKERJAAN PENGECATAN
1 Pengecat Tembok Baru dengan Mowilex 52 10.00 10 36 6
2 Pengecat 1m2 Waterproof untuk atap dag beton 8 1.00 8
3 Pengecat Plafond Baru dengan Mowilex 8 1.00 8
XII PEKERJAAN AKSESORIS
1 Pemasangan Kunci Tanam Biasa 1 1.00 1
2 Pemasangan Kunci Kamar Mandi 1 1.00 1
3 Pemasangan Engsel Pintu 1 1.00 1
4 Pemasangan Engsel Jendela Kupu-kupu 1 1.00 1
5 Pemasangan Kait Angin 1 1.00 1

XIII PEKERJAAN SANITASI


1 Pemasangan 1 m pipa PVC Ø 25 mm (1") 3 1.00 3
2 Pemasangan 1 m pipa PVC Ø 50 mm (2") 3 1.00 3
3 Pemasangan 1 m pipa PVC Ø 90 mm (4") 3 1.00 3
4 Pemasangan Kran Ø ½" atau Ø ¾" 3 1.00 3
5 Pemasangan Bak Cuci Piring Stainless stell 1 1.00 1
6 Memasang Closet Jongkok Porselen 8 2.00 8
7 Septiktank Buis Beton 8 2.00 8
8 Resapan Air kotor Buis Beton 3 1.00 3
9 Tandon Air 1000 L 3 1.00 3
10 Pemasangan Kran Shower Mandi 6 1.00 6
11 Ember Air 5 1.00 5
12 Pemasangan Floor Drain 1 1.00 1
13 Pemasangan Pipa PVC tipe AW Ø 3" 4 1.00 4

XIV PEKERJAAN LISTRIK


1 Pasang Meteran Listrik 2000VA 1 1.00 1
2 Pasang Instalasi Listrik 35 1.00 35
3 Pasang Lampu LED 15 watt 15 1.00 15
4 Pasang Lampu LED 20 watt 9 1.00 9
5 Pasang Saklar Ganda 9 1.00 9
6 Pasang Stop Kontak 10 1.00 10
7 Pasang Mesin Pompa Air Jet Pump Otomatis 1 1.00 1

jumlah pekerja 15 64 123 124 130 114 152 281 453 272 438 368 139 211 157 125

500
450
400
350
300
250
200
150
100
50
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
DAFTAR HARGA SATUAN PEKERJAAN KONSTRUKSI
KABUPATEN JEPARA
TAHUN ANGGARAN 2019
( Harga sudah termasuk bahan,upah tenaga,alat tahun 2019, Overhead & Profit 12.5%)
(Ket :belum termasuk PPN 10%)

NO. URAIAN PEKERJAAN SAT KODE HARGA SATUAN


(Rp)

I HARGA SATUAN PEKERJAAN PERSIAPAN A. 2.2.1


2 Pengukuran dan Pemasangan Bouwplank m' A.2.2.1.4 61,131.00
3 Membersihkan Lapangan dan Perataan m2 A.2.2.1.9 13,750.00

II HARGA SATUAN PEKERJAAN TANAH A.2.3.1


1 Menggali Tanah Biasa Sedalam 1 m m3 A.2.3.1.1 62,875.00
9 Pengurugan Kembali m3 A.2.3.1.9 15,250.00
11 Urugan Pasir hurug m3 A.2.3.1.11 184,151.25
12 Pemasangan Lapisan Ijuk tebal 10 cm unt Bidang Resapan m2 A.2.3.1.13 184,190.63
18 Pemasangan trucuk bambu Ø 10 cm panjang 6 m (SNI) ttk A.2.3.1.19 22,884.33

III HARGA SATUAN PEKERJAAN PONDASI A.3.2.1.


10 Pemasangan Pondasi Batu Belah 1SP : 8 PP muntilan m3 A.3.2.1.5.1 899,089.00
11 Pemasang Batu Kosong/Anstamping m3 A.3.2.1.9 452,513.40
12 Pasang Pondasi Sumuran diameter 100 cm m3 A.3.2.1.11 959,879.48
13 Pasang Pondasi Rolag Trashraam Bata Merah 1 Pc : 3 Ps (SNI) m3 A.3.2.1.12 1,207,075.00

IV HARGA SATUAN PEKERJAAN PASANGAN DINDING A.4.4.1


Dinding dengan bata merah Kalipucang
29 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 8PP Muntilan m2 A.4.4.1.12.2 110,750.00

V HARGA SATUAN PEKERJAAN PLESTERAN A.4.4.2


1 Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm Pasir Muntilan m2 A.4.4.2.3 64,000.20
13 Pemasangan Berapen 1 Pc : 5Pp Tebal 15 mm Pasir Muntilan m2 A.4.4.2.19 40,516.80
22 Pemasangan Acian m2 A.4.4.2.27 32,962.50
23 Pemasangan Plesteran Mortar m2 A.4.4.2.28 62,831.25
24 Pemasangan Acian Mortar m2 A.4.4.2.29 31,803.75
25 Pemasangan Plesteran + Acian Mortar m2 A.4.4.2.30 83,503.13

VI HARGA SATUAN PEKERJAAN K A Y U A.4.6.1


1 Pembuatan & Pemasangan 1 m3 Kosen Pintu & Jendela Kayu bengkirai m3 A.4.6.1.1 15,086,306.25
2 Pembuatan & Pemasangan 1 m3 Kosen Pintu & Jendela Kayu Kamfer m3 A.4.6.1.2 15,008,962.50
3 Pembuatan & Pemasangan 1 m2 Daun Pintu Panel, Kayu Jati m2 A.4.6.1.5 1,231,188.75
4 Pembuatan & Pemasangan 1 m2 Daun Pintu Panel, Kayu Kamfer m2 A.4.6.1.5.1 876,813.75
5 Pembuatan & Pemasangan 1 m2 Pintu & Jendela Kaca Kayu Jati m2 A.4.6.1.6 836,820.00
6 Pembuatan & Pemasangan 1 m2 Pintu & Jendela Kaca Kayu kamfer m2 A.4.6.1.6.1 624,195.00
7 Pembuatan&Pemasangan 1 m2 Pintu kayu lapis (Plywood) Rangkap rangka Kayu Kamfer m2 A.4.6.1.8 680,522.63
8 Pembuatan&Pemasangan 1 m2 Pintu Plywood rangkap, rangka expose kayu Kamfer m2 A.4.6.1.9 733,707.00
9 Pembuatan & Pemasangan 1 m2 Jalusi mati Kosen Kayu Bengkirai m2 A.4.6.1.10 996,800.63
10 Pembuatan & Pemasangan 1 m2 Pintu Teakwood Rangkap, Rangka Expose Kayu Bengkirai m2 A.4.6.1.11 738,814.50
11 Pembuatan&Pemasangan 1 m2 Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu kamfer m2 A.4.6.1.12 777,828.38
12 Pembuatan&Memasang 1 m3 Konstruksi Kuda-kuda Konvensional Kayu bengkirai m3 A.4.6.1.13 14,062,140.00
13 Pembuatan&Memasang 1 m3 Konstruksi Kuda-kuda Konvensional Kayu Kruing m3 A.4.6.1.13.1 10,659,015.00
14 Pemasangan 1 m3 konstruksi Gording, Kayu bengkirai m3 A.4.6.1.15 13,270,950.00
15 Pemasangan konstruksi 1 m3 Gording, Kayu Kruing m3 A.4.6.1.15.1 9,867,825.00
16 Pemasangan 1 m2 Rangka Atap Genteng Keramik, Kayu bengkirai m2 A.4.6.1.16 213,834.38
17 Pemasangan 1 m2 Rangka Atap Genteng Beton, Kayu bengkirai m2 A.4.6.1.17 252,309.38
18 Pemasangan 1 m2 Rangka Langit-langit (50x1,00) m, kayu Kruing m2 A.4.6.1.19 180,489.38
20 Pemasangan 1 m2 Rangka Langit-langit (60x60) cm, kayu Kruing m2 A.4.6.1.20 184,134.38
22 Pemasangan 1 m' Listplank Uk. (3x20)cm Kayu Bengkirai m' A.4.6.1.21 151,486.88
23 Pemasangan 1 m' Listplank Uk. (3x30)cm Kayu Bengkirai m' A.4.6.1.22 152,904.38
24 Pemasangan 1 m2 Rangka Dinding Pemisah (60x120) cm Kayu Kruing m2 A.4.6.1.23 285,513.75
25 Pemasangan 1 m2 Dinding Pemisah Teakwood Rangkap Rangka Kayu Kruing m2 A.4.6.1.24 370,977.75
26 Pemasangan 1 m2 Dinding Pemisah Plywood Rangkap Rangka Kayu Kruing m2 A.4.6.1.25 378,267.75
27 Pemasangan 1 m2 Dinding Lambriziring dari Papan Kayu Jati m2 A.4.6.1.26 419,180.63
28 Pasang Kasau & Reng Kayu Bengkirai (SNI) m2 A.4.6.1.29 152,544.38
29 Pasang Kasau & Reng Kayu Kruing (SNI) m2 A.4.6.1.30 115,419.38
30 Pasang Papan sirip (SNI) m' A.4.6.1.31 66,645.00
VII HARGA SATUAN PEKERJAAN BETON A.4.1.1
1 Membuat Beton mutu f'c=7,4 Mpa (K100) m3 A.4.1.1.1 973,662.43
6 Membuat Beton mutu MPa (K225) m3 A.4.1.1.7 1,106,174.59

10 Pembesian dg Besi Polos atau Besi Ulir 1 kg A.4.1.1.17 13,683.00

12 Memasang Bekisting untuk Pondasi m2 A.4.1.1.20 131,951.25

13 Memasang Bekisting untuk Sloof m2 A.4.1.1.21 137,576.25

14 Memasang Bekisting untuk Kolom m2 A.4.1.1.22 205,045.00


15 Memasang Bekisting untuk Balok m2 A.4.1.1.23 208,045.00
16 Memasang Bekisting untuk Lantai m2 A.4.1.1.24 205,645.00
17 Memasang bekisting untuk dinding m2 A.4.1.1.25 216,725.63
19 Memasang Bekisting untuk Tangga m2 A.4.1.1.26 202,100.63
20 Membuat Kolom Penguat Beton Bertulang/kolom praktis (11 x 11) cm m' A.4.1.1.35 69,841.10
21 Membuat Ring Balok Beton Bertulang (10 x 15) cm m' A.4.1.1.36 109,298.81
21 1 m² bekisting untuk permukaan beton biasa dengan kayu randu tebal 2 cm m2 A.4.1.1.37 99,770.00

VIII HARGA SATUAN PEKERJAAN PENUTUP ATAP A.4.5.2


1 Pemasangan Atap Genteng Jatiwangi Kecil m2 A.4.5.2.1 108,275.63
2 Pemasangan Atap Genteng Kodok / lokal m2 A.4.5.2.2 60,525.00
3 Pemasangan Atap Genteng Jatiwangi Super / Besar m2 A.4.5.2.3 145,462.50
4 Pemasangan Genteng Bubung jatiwangi kecil m' A.4.5.2.4 137,580.75
5 Pemasangan Genteng Bubung Kodok / lokal m' A.4.5.2.5 137,580.75
6 Pemasangan Genteng Bubung Jatiwangi Besar m' A.4.5.2.6 126,330.75
7 Pemasangan 1 m2 roof light fibreglass 90 x 180 m2 A.4.5.2.7 56,154.38
8 Pemasangan Atap Asbes Gelombang Besar m2 A.4.5.2.9 80,100.00
9 Pemasangan Atap Asbes Gelombang Kecil m2 A.4.5.2.12 37,513.13
10 Pemasangan 1 m’ bubung Asbes m' A.4.5.2.22 64,698.75
11 Pemasangan Atap Genteng Beton m2 A.4.5.2.30 102,750.75
12 Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana m2 A.4.5.2.32 151,661.25
13 Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai m2 A.4.5.2.33 214,661.25
14 Pemasangan 1 m’ nok genteng metal m' A.4.5.2.37 86,945.63
15 Pemasangan Nok Genteng Beton m' A.4.5.2.34 155,603.25
16 Pemasangan 1 m2 atap sirap kayu m2 A.4.5.2.35 232,323.75
17 Pemasangan 1 m’ nok sirap m' A.4.5.2.36 63,000.00
18 Pemasangan Atap Seng Gelombang m2 A.4.5.2.38 51,288.75
19 Pemasangan Atap Nok Seng m' A.4.5.2.39 30,444.75
20 Pemasangan 1 m2 alumunium foil/sisalation m2 A.4.5.2.40 38,216.25
21 Pemasangan 1 m2 onduline ukuran 95 x 200 m2 A.4.5.2.41 147,217.50
22 Pemasangan 1 m2 onduvila ukuran 40 x 105 m2 A.4.5.2.42 185,200.00

IX HARGA SATUAN PEKERJAAN LANGIT-LANGIT A.4.5.1


4 Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm m2 A.4.5.1.7 39,215.00
5 Memasang Langit-langit Kalsiboard, Uk (120x240) tebal 3,5 mm m2 A.4.5.1.8 37,155.38
6 List Langit-Langit Kayu Profil m1 A.4.5.1.10 20,523.00

X HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG A.5.1.1


2 Memasang Closet Jongkok Porselen Unit A.5.1.1.2 413,157.50
8 Pemasangan Bak Cuci Piring Stainless stell buah A.5.1.1.12 273,525.00
9 Pemasangan Floor Drain buah A.5.1.1.14 35,575.00
14 Pemasangan Kran Ø ½" atau Ø ¾" bh A.5.1.1.19 71,577.50

20 Pemasangan Pipa PVC tipe AW Ø ½" m' A.5.1.1.25 17,268.75

21 Pemasangan Pipa PVC tipe AW Ø ¾" m' A.5.1.1.26 19,361.25

22 Pemasangan Pipa PVC tipe AW Ø 1" m' A.5.1.1.27 22,500.00

23 Pemasangan Pipa PVC tipe AW Ø 1½" m' A.5.1.1.28 36,191.25

24 Pemasangan Pipa PVC tipe AW Ø 2" m' A.5.1.1.29 41,771.25

25 Pemasangan Pipa PVC tipe AW Ø 3" m' A.5.1.1.31 67,960.00

26 Pemasangan Pipa PVC tipe AW Ø 4" m' A.5.1.1.32 110,283.75

XI HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM A.4.2.1


8 Pemasangan Kusen Pintu Allumunium m' A.4.2.1.11 126,524.50
9 Pemasangan Pintu Allumunium Strip Lebar 8 cm m2 A.4.2.1.12 971,578.00
10 Pemasangan Pintu Kaca Rangka Allumunium m2 A.4.2.1.13 477,020.00
11 Pemasangan 1 m2 terali besi strip (2 x 3) mm m2 A.4.2.1.15 504,106.02
15 Pemasangan 1 m2 rangka besi hollow 1x40.40.0.6 mm, modul 60 x 60 cm, plafon m2 A.4.2.1.21 116,945.00
17 Pemasangan 1 m2 atap jurai/limasan rangka atap baja ringan m2 Taksir 200.000,00 - 245.000,00

XII HARGA SATUAN PEKERJAAN KUNCI dan KACA A.4.6.2


1 Pemasangan Kunci Tanam Biasa Buah A.4.6.2.2 134,075.00
2 Pemasangan Kunci Kamar Mandi Buah A.4.6.2.3 102,587.50
4 Pemasangan Engsel Pintu Buah A.4.6.2.5 44,042.00
5 Pemasangan Engsel Jendela Kupu-kupu Buah A.4.6.2.6 30,457.50
6 Pemasangan Engsel Angin Buah A.4.6.2.7 56,314.69
7 Pemasangan Kait Angin Buah A.4.6.2.9 25,670.00
9 Pemasangan Kunci Selot Buah A.4.6.2.11 36,916.88
13 Pemasangan Kaca tebal 5 mm m2 A.4.6.2.17 149,936.25

XIII HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING A.4.4.3


9 Pemasangan lantai Ubin Granito Uk. 40 x 40 cm m2 A.4.4.3.9 302,949.00
10 Pemasangan Lantai Keramik 30 x 30 cm warna m2 A.4.4.3.35 201,479.00
14 Pemasangan Lantai Keramik 20 x 20 cm m2 A.4.4.3.36 206,645.00
15 Pemasangan 1 m2 lantai karpet m2 A.4.4.3.44 206,755.00
14 Pemasangan Dinding Keramik 20x25 cm, m2 A.4.4.3.55 225,990.00
21 Pemasangan Dinding Batu Paras / Batu Tempel Hitam m2 A.4.4.3.58 278,057.81
22 Pemasangan Plint Kayu Klas II Ukuran 2x10 cm m' A.4.4.3.63 50,073.75
23 Pemasangan 1 m2 lantai vynil ukuran 30 cm x 30 cm m2 A.4.4.3.59 137,784.38
24 Pemasangan 1m2 floor harderner m2 A.4.4.3.61 279,686.25
25 Pemasangan 1 m’ plint vynil 15cm x 30cm m' A.4.4.3.62 34,627.50
26 Pasang blok pafing tebal 6 cm K.125 (SNI) m2 A.4.4.3.64 131,709.38
27 Blok paving tebal 6 cm dengan paving mutu K 225 (SNI) m2 A.4.4.3.65 170,746.88
28 Blok paving tebal 8 cm dengan paving mutu K 300 (SNI) m2 A.4.4.3.66 226,996.88
29 Blok paving tebal 8 cm dengan paving mutu K 400 (SNI) m2 A.4.4.3.67 243,871.88
30 Blok paving warna tebal 6 cm K.125 (SNI) m2 A.4.4.3.68 126,871.88
31 Blok paving warna tebal 8 cm K.125 (SNI) m2 A.4.4.3.69 134,184.38
32 pasang saluran U-20 cm (+ Plester Aci) m' A.4.4.3.70 264,269.47
33 pasang saluran U-30 cm (+ Plester Aci) m' A.4.4.3.71 298,019.47
34 Pemasangan lantai Ubin Granitile Uk. 60 x 60 cm m2 A.4.4.3.9.1 347,270.63
34 Pemasangan Lantai Keramik 60 x 60 cm warna m2 A.4.4.3.35.4 263,176.88

XIV HARGA SATUAN PEKERJAAN PENGECATAN A.4.7.1


1 Pengikisan / pengerokan Permukaan Cat Tembok Lama m2 A.4.7.1.1 15,193.13
2 Pencucian Bidang Permukaan Tembok yang Pernah dicat m2 A.4.7.1.2 14,338.13
3 Pengerokan Karat Cat Lama permukaan Baja dg cara manual m2 A.4.7.1.3 14,985.00
4 Pengecatan Bidang Kayu Baru 2x cat m2 A.4.7.1.4 45,902.25
5 Pengecatan Bidang Kayu Baru 3x cat m2 A.4.7.1.5 61,770.38
6 Pelaburan Bidang Kayu dg Teak Oil m2 A.4.7.1.6 35,881.88
7 Pelaburan Bidang Kayu dg Politur m2 A.4.7.1.7 35,217.00
8 Pelaburan Bidang Kayu dg Cat Residu & Ter m2 A.4.7.1.8 11,115.00
9 Pelaburan Bidang Kayu dg Vernis m2 A.4.7.1.9 42,052.50
10 Pengecat Tembok Baru dengan Decolite m2 A.4.7.1.10 28,032.75
11 Pengecat Tembok Baru dengan Mowilex dalam ruangan m2 A.4.7.1.10.1 26,998.00
12 Pengecat Tembok Baru dengan Mowilex luar ruangan m2 A.4.7.1.10.2 42,072.75
13 Pengecatan Tembok Lama dengan Decolite m2 A.4.7.1.11 20,437.88
14 Pengecatan Tembok Lama dengan Mowilex dalam ruangan m2 A.4.7.1.11.1 22,057.88
15 Pengecatan Tembok Lama dengan Mowilex luar ruangan m2 A.4.7.1.11.2 26,807.00
16 Pemasangan 1 m2 wallpaper m2 A.4.7.1.15 117,087.50
17 Pengecatan Permukaan Baja dg Meni Besi m2 A.4.7.1.16 30,934.69
18 Pengecatan 1 m2 permukaan Besi 3x (SNI) m2 A.4.7.1.22 41,160.94
19 Pengecatan 1 m2 permukaan Trotoir 3x (SNI) m2 A.4.7.1.23 38,579.06
20 Pengecat 1m2 Waterproof untuk atap dag beton m2 A.4.7.1.24 26,438.00

XV HARGA SATUAN PEKERJAAN PEMASANGAN PIPA A.8.4.1


1 Pemasangan 1 m pipa PVC Ø 50 mm (2") m' A.8.4.1.1 69,255.00
2 Pemasangan 1 m pipa PVC Ø 25 mm (1") m' A.8.4.1.1.1 31,636.36
3 Pemasangan 1 m pipa PVC Ø 40 mm (1½") m' A.8.4.1.1.2 44,156.25
4 Pemasangan 1 m pipa PVC Ø 75 mm (3") m' A.8.4.1.2 72,157.50
5 Pemasangan 1 m pipa PVC Ø 90 mm (4") m' A.8.4.1.3 90,335.00
6 Pemasangan 1 m pipa HDPE OD 63 mm m' A.8.4.1.17 61,543.13
7 Pemasangan 1 m pipa HDPE OD 75 mm m' A.8.4.1.17.1 84,398.06
8 Pemasangan 1 m pipa HDPE OD 90 mm m' A.8.4.1.17.2 120,082.50
9 Biaya 1 m' pemasangan pipa PVC Ø 25 mm (galian 0,25m x 0,3m + Bahan) m' A.8.4.1.80 39,998.05
10 Biaya 1 m' pemasangan pipa PVC Ø 40 mm (galian 0,25m x 0,4m + Bahan) m' A.8.4.1.81 55,410.13
11 Biaya 1 m' pemasangan pipa PVC Ø 50 mm (galian 0,25m x 0,5m + Bahan) m' A.8.4.1.82 83,401.06
12 Biaya 1 m' pemasangan pipa PVC Ø 75 mm (galian 0,25m x 0,6m + Bahan) m' A.8.4.1.83 89,038.31
13 Biaya 1 m' pemasangan pipa PVC Ø 100 mm (galian 0,30m x 1,00m + Bahan) m' A.8.4.1.84 123,703.03
14 Biaya 1 m' pemasangan pipa HDPE OD 63 mm (galian 0,25m x 0,5m + Bahan) m' A.8.4.1.85 75,689.19
15 Biaya 1 m' pemasangan pipa HDPE OD 75 mm (galian 0,25m x 0,6m + Bahan) m' A.8.4.1.86 101,278.88
16 Biaya 1 m' pemasangan pipa HDPE OD 90 mm (galian 0,25m x 0,70m + Bahan) m' A.8.4.1.87 139,776.78

XVI HARGA SATUAN PEKERJAAN PENGETESAN PIPA A.8.4.5


1 Pengetesan 1 m pipa Ø 50 mm m' A.8.4.5.1 1,301.18
2 Pengetesan 1 m pipa Ø 75 mm m' A.8.4.5.2 1,346.18
3 Pengetesan 1 m pipa Ø 100 mm m' A.8.4.5.3 1,436.18
4 Pengetesan 1 m pipa Ø 150 mm m' A.8.4.5.4 1,661.18
5 Pengetesan 1 m pipa Ø 200 mm m' A.8.4.5.5 1,953.68

XVII HARGA SATUAN PEKERJAAN PEMBUATAN SUMUR PRODUKSI A.8.4.1


1 Mobilisasi/demobilisasi driling rig dan peralatan pemboran Ls An.1 1,485,000.00
2 Pemboran pilot hole diameter 6 ", 0 -- 50 m m' An.2 203,670.00
3 Pemboran pilot hole diameter 6 ", 50 -- 100 m m' An.3 215,520.00
4 Pemboran pilot hole diameter 6 ", 100 -- 150 m m' An.4 239,660.00
5 Pekerjaan raming 0 -- 65 m m' An.5 191,740.00
6 Pekerjaan raming 65 -- 130 m m' An.6 228,060.00
7 Pekerjaan electric logging m' An.7 23,400.00
8 Pekerjaan pengadaan dan pemasangan pipa jambang diameter 8" m' An.8 470,000.00
9 Pekerjaan pengadaan dan pemasangan pipa buta diameter 6" m' An.9 349,000.00
10 Pekerjaan pengadaan dan pemasangan pipa saringan stainless steel 6" m' An.10 1,994,000.00
11 Pekerjaan pengadaan dan pemasangan pipa jambang diameter 6" (GIP) m' An.8' 332,000.00
12 Pekerjaan pengadaan dan pemasangan pipa buta diameter 4" (GIP) m' An.9' 237,000.00
13 Pekerjaan pengadaan dan pemasangan pipa saringan stainless steel 4" m' An.10' 1,374,000.00

Jepara, Desember 2018

KEPALA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


KABUPATEN JEPARA

Ir. BUDIARTO, MT
Pembina Utama Madya
NIP. 19590410 198603 1 015

Jepara, Maret 2018

KEPALA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


KABUPATEN JEPARA

Ir. BUDIARTO, MT
Pembina Utama Madya
NIP. 19590410 198603 1 015
200.000,00 - 245.000,00
BACK UP VOLUME

I PEKERJAAN PERSIAPAN
P L T Q PxLxTxQ total sat
1 Pengukuran dan Pemasangan Bouwplank
- kios makanan 36.00 + 6.00 x 1.00 = 42.00
- kioa kerajinan 35.00 + 6.00 x 1.00 = 41.00
= 83.00 m
2 Membersihkan Lapangan dan Perataan
- kios makanan 36.00 x 6.00 x 2.00 = 432.00
- kioa kerajinan 35.00 x 6.00 x 1.00 = 210.00
= 642.00 m2
3 Air Kerja

A LOS KIOS MAKANAN


I PEKERJAAN TANAH
MT -0,2 P L T Q PxLxTxQ unit total sat
1 Menggali Tanah Biasa Sedalam 1 m
a. Mengali foot plat 0.80 x 0.80 x 1.50 x 8.00 = 7.68 2.00 = 15.36
b. Mengali pondasi 0.00 = 0.00
- lajur horisontal 36.00 x 0.60 x 0.60 x 2.00 = 25.92 2.00 = 51.84
- lajur vertikal kios 6.00 x 0.60 x 0.60 x 7.00 = 15.12 2.00 = 30.24
- lajur horisontal kios tengah 36.00 x 0.50 x 0.50 x 0.00 = 0.00 2.00 = 0.00
= 97.44 m3
2 Pengurugan Kembali 0.30 x 97.44 = 29.23 m3

3 Urugan tanah padas dan dipadatkan 36.00 x 6.00 x 0.20 x 1.00 = 43.20 2.00 86.40 m3

4 Pemasangan trucuk bambu Ø 10 cm panjang 6 m (SNI) = 16.00 ttk

II PEKERJAAN PONDASI
P L T Q PxLxTxQ total sat
1 Pemasang Batu Kosong/Anstamping 36.00 x 0.60 x 0.20 x 2.00 = 8.64 2.00 17.28
6.00 x 0.60 x 0.20 x 7.00 = 5.04 2.00 10.08
36.00 x 0.50 x 0.20 x 0.00 = 0.00 2.00 0.00
= 27.36 m3
2 Pemasangan Pondasi Batu Belah 1SP : 8 PP muntilan 36.00 x 0.35 x 0.40 x 2.00 = 10.08 2.00 20.16
6.00 x 0.35 x 0.40 x 7.00 = 5.88 2.00 11.76
36.00 x 0.25 x 0.30 x 0.00 = 0.00 2.00 0.00
= 31.92 m3
3 Pasang Pondasi Rolag Trashraam BT Mrh 1 Pc : 3 Ps 36.00 x 0.20 x 0.10 x 1.00 = 0.72 2.00 = 1.44 m3

III PEKERJAAN PASANGAN DINDING


P L T Q PxTxQ total sat
1 Pasang Din Bt Mrh Kalipucang tbl 1/2 bt 1 SP:8PP Muntilan
a. pas dinding bata lajur horisontal 36.00 x 2.85 x 2.00 = 205.20 2.00 410.40
- pas dinding bata lajur horisontal teras 36.00 x 0.00 x 1.00 = 0.00 2.00 0.00
b. pas dinding bata lajur vertikal 3.00 x 2.85 x 7.00 = 59.85 2.00 119.70

c. gunungan 0.50 x 6.00 x 1.80 x 2.00 = 10.80 2.00 21.60


dikurangi
1. rolling door 2.75 x 2.10 x 12.00 = 69.30 2.00 138.60
2, pintu besi strip 0.90 x 2.10 x 12.00 = 22.68 2.00 45.36
3, jendela 1.20 x 1.10 x 12.00 = 15.84 2.00 31.68
= 336.06 m2
IV PEKERJAAN PLESTERAN
P L T Q PxLxTxQ total sat
1 Pasang Plesteran 1 Pc : 3 Pp tbl 15 mm Ps Muntilan
a. kolom 15x20 0.70 x 3.00 x 7.00 = 14.70 2.00 29.40
b. kolom 15x15 teras 0.45 x 3.00 x 6.00 = 8.10 2.00 16.20
c. kolom 15x15 dinding partisi 0.45 x 3.00 x 12.00 = 16.20 2.00 32.40
d. Balok 15x30 teras 36.00 x 0.75 x 1.00 = 27.00 2.00 54.00
- balok 15x30 teras 3.00 x 0.75 x 7.00 = 15.75 2.00 31.50
e. balok latiu 15x15 36.00 x 0.15 x 1.00 = 5.40 2.00 10.80
f. ringbalk 15x20 36.00 x 0.55 x 0.00 = 0.00 2.00 0.00
3.00 x 0.55 x 0.00 = 0.00 2.00 0.00
= 174.30 m2
2 Pasang Plesteran 1 Pc : 8 Pp tbl 15 mm Ps Muntilan 2.00 x 336.06 = 672.12 m2
3 Pemasangan Acian 174.30 + 672.12 = 846.42 m2
V PEKERJAAN BETON
P L T Q PxLxTxQ total sat
1 Membuat Beton mutu f'c=7,4 Mpa (K100) 0.80 X 0.80 X 0.05 X 8.00 = 0.26 2.00 0.51 m3
2 Membuat Foot Plat 80x80
Membuat Beton mutu MPa (K225) 0.80 x 0.80 x 0.20 x 8.00 = 1.02 2.00 2.05 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan atas 1.20 x 13 x 0.62 x 8.00 = 74.97 2.00 149.93
- tulangan bawah 1.00 x 13 x 0.62 x 8.00 = 62.47 2.00 124.94
274.88 kg
Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 3.20 x 0.20 x 8.00 = 5.12 2.00 10.24 m2
3 Membuat Sloof Beton Bertulang 15x25
36.00 x 2.00 = 72.00 2.00 144.00
6.00 x 7.00 = 42.00 2.00 84.00
3.00 x 0.00 = 0.00 2.00 0.00
228.00
P L T Q PxLxTxQ total sat
Membuat Beton mutu MPa (K225) 228.00 x 0.15 x 0.25 x 1.00 = 8.55 8.55 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 228.00 x 4.00 x 0.89 x 1.00 = 809.64
228.00 x 2.00 x 0.62 x 1.00 = 281.12
- begel 0.80 x 1,520.00 x 0.39 x 1.00 = 479.78
= 1,570.55 kg
Memasang Bekisting untuk Sloof 228.00 x 0.50 x 1.00 = 114.00 m2

4 Membuat Kolom Beton Bertulang 15x20


panjang 1,25, kolom foot plat 1.25 x 8.00 = 10.00 2.00 = 20.00
Panjang 3 m 2.80 x 21.00 = 58.80 2.00 = 117.60
137.60

Membuat Beton mutu MPa (K225) 137.60 x 0.15 x 0.20 x 1.00 = 4.13 4.13 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 137.60 x 6.00 x 0.62 x 1.00 = 508.98
137.60 x 0.00 x 0.39 x 1.00 = 0.00
- begel 0.75 x 917 x 0.22 x 1.00 = 152.69
661.68 kg
Memasang Bekisting untuk Kolom 0.70 x 137.60 x 1.00 = 96.32 96.32 m2

5 Membuat Beton bertulang Kolom Praktis 11x11 cm


2.80 x 18.00 = 50.40 2.00 = 100.80 m
6 Membuat Balok Beton Bertulang 15x30
36.00 x 1.00 = 36.00 2.00 = 72.00
6.00 x 7.00 = 42.00 2.00 = 84.00
m 156.00 m
Membuat Beton mutu MPa (K225) 156.00 x 0.15 x 0.30 x 1.00 = 7.02 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 156.00 x 4.00 x 0.89 x 1.00 = 553.96
156.00 x 2.00 x 0.62 x 1.00 = 192.35
- begel 0.95 x 1,041.00 x 0.39 x 1.00 = 390.20
1,136.51 kg
Memasang Bekisting untuk Balok 156.00 x 0.75 x 1.00 117.00

7 Membuat Ring Balok Beton Bertulang (10 x 15) cm 36.00 x 2.00 = 72.00 2.00 = 144.00 m

8 Membuat Ring Balk 15x20


36.00 x 2.00 = 72.00 2.00 = 144.00
3.00 x 0.00 = 0.00 2.00 = 0.00
144.00
Membuat Beton mutu MPa (K225) 144.00 x 0.15 x 0.20 x 1.00 = 4.32 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 144.00 x 4.00 x 0.62 x 1.00 = 355.10
- 144.00 x 0.00 x 0.39 x 1.00 = 0.00
- begel 0.75 x 961.00 x 0.39 x 1.00 = 284.38
= 639.48 kg
Memasang Bekisting untuk Balok 144.00 x 0.55 x 1.00 = 79.20 m2
9 Membuat Meja Dapur Beton tbl 10 cm
24 bh
Membuat Beton mutu MPa (K225) 2.00 x 0.80 x 0.08 x 24.00 = 3.07 = 3.07 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 2.00 x 12.67 x 0.39 x 24.00 = 239.89
0.80 x 28.67 x 0.39 x 24.00 = 217.17
- tulangan Ekstra = 457.06 kg
Memasang Bekisting untuk Lantai 2.00 x 0.80 x 24.00 = 38.40 m2
VI PEKERJAAN ATAP
P L T Q PxL xQ total sat
1 Pasang Konstruksi Atap Baja Ringan SNI 37.00 x 4.10 x 2.00 = 303.40 2.00 = 606.80 m2
2 Pemasangan 1 m2 onduline ukuran 95 x 200 37.00 x 4.20 x 2.00 = 310.80 2.00 = 621.60 m2
3 Pasang List Plank Grc L 20 cm 37.00 x 2.00 = 74.00 2.00 = 148.00
4.50 x 4.00 = 18.00 2.00 = 36.00
= 184.00 m
4 Pasang Krepus Onduline = 37.00 2.00 = 74.00
VII PEKERJAAN LANGIT - LANGIT

1 Pas Rangka Hollow 1x40.40.0,6 mm Modul 60x60 cm 5.85 x 5.85 x 6.00 = 205.34 2.00 = 410.67 m2
2 Pas Langit2 Kalsiboard, Uk 120x240 tbl 3,5 mm = 410.67 m2
3 List Langit-Langit Kayu Profil
- teras 18.00 x 6.00 = 108.00 2.00 = 216.00
- ruang 18.00 x 6.00 = 108.00 2.00 = 216.00
= 432.00 m
VIII PEKERJAAN BESI dan ALUMUNIUM
P L T Q LxT xQ total sat
1 Pemasangan Rolling Door Allumunium 2.75 x 2.10 x 24.00 = 138.60 138.60 m2
2 Pasang Kusen dan Pintu Besi Strip finishing cat 0.90 x 2.10 x 24.00 = 45.36 45.36 m2
3 Pasang Kusen Jendela Alumunium 4.60 x 24.00 = 110.40 110.40 m
4 Pasang Jendela kaca 4.60 x 0.08 x 24.00 = 8.83 8.83 m2
5 Pasang Rangka Kusen Partisi Alumunium 17.40 x 24.00 = = 417.60 m
6 Pasang Kaca Es 5mm
- kaca jendela sleding 0.94 x 1.04 x 24.00 = 23.46
- kaca partisi 0.95 x 0.95 x 144.00 = 129.96
= 153.42 m2
IX PEKERJAAN KUNCI dan AKSESORIS

X PEKERJAAN PENUTUP LANTAI dan DINDING


P L T Q PxL xQ total sat
1 Pemasangan Lantai Keramik 40 x 40 cm warna 5.85 x 2.85 x 6.00 = 100.04 2.00 = 200.07
Selasar 36.00 x 3.00 x 1.00 = 108.00 2.00 = 216.00
416.07 m2
2 Pemasangan Dinding Keramik 20x25 cm, 2.00 x 1.00 x 24.00 = 48.00 = 48.00 m2
3 Pemasangan Paving Grees Block

XI PEKERJAAN PENGECATAN
1 Pengecat Tembok Baru dengan Mowilex luar ruangan
- dinding baru = 846.42 m2
2 Pengecat Plafond Baru dengan Mowilex = 410.67 m2

B LOS KIOS KERAJINAN

I PEKERJAAN TANAH
MT -0,2 P L T Q PxLxT xQ total sat
1 Menggali Tanah Biasa Sedalam 1 m 35.00 x 2.00 = 70.00
6.00 x 8.00 = 48.00
3.00 x 7.00 = 21.00
139.00
139.00 x 0.50 x 0.50 x 1.00 = 34.75 = 34.75 m3
2 Pengurugan Kembali 0.30 x 34.75 = 10.43 m3
3 Urugan tanah padas dan dipadatkan 35.00 x 6.00 x 0.20 x 1.00 = 42.00 = 42.00 m3
4 Pemasangan trucuk bambu Ø 10 cm panjang 6 m (SNI) = 12.00 ttk

II PEKERJAAN PONDASI
P L T Q PxLxT xQ total sat
1 Pemasang Batu Kosong/Anstamping 139.00 x 0.50 x 0.20 x 1.00 = 13.90 = 13.90 m3
2 Pemasangan Pondasi Batu Belah 1SP : 8 PP muntilan 139.00 x 0.30 x 0.40 x 1.00 = 16.68 = 16.68 m3
3 Pas Pond Rollag Trashraam bt mrh 1PC : 3PS 35.00 x 0.20 x 0.10 x 1.00 = 0.70 0.70 m3

III PEKERJAAN PASANGAN DINDING


P L T Q P xT xQ total sat
1 Pasang Din Bt Mrh Kalipucang tbl 1/2 bt 1 SP:8PP Muntilan 226.86 m2
a. pas dinding bata lajur horisontal 35.00 x 2.85 x 2.00 = 199.50
b. pas dinding bata lajur vertikal 3.00 x 2.85 x 15.00 = 128.25

c. gunungan 0.50 x 6.00 x 1.70 x 2.00 = 10.20


337.95
dikurangi
1. rolling door 2.25 x 2.10 x 14.00 = 66.15
2, pintu besi strip 0.90 x 2.10 x 14.00 = 26.46
3, jendela 1.20 x 1.10 x 14.00 = 18.48
111.09
IV PEKERJAAN PLESTERAN
P L T Q L xT xQ total sat
1 Pasang Plesteran 1 Pc : 3 Pp tbl 15 mm Ps Muntilan
a. kolom 15x15 teras 0.60 x 2.85 x 7.00 = 11.97
b. kolom 15/20 teras 0.70 x 2.80 x 8.00 = 15.68
c. latiu 15x15 35.00 x 0.60 x = 0.00
d. ring balk 15x30 35.00 x 0.75 x 1.00 = 26.25
= 53.90 m2
2 Pasang Plesteran 1 Pc : 8 Pp tbl 15 mm Ps Muntilan 2.00 x 226.86 = 453.72 m2
3 Pemasangan Acian 53.90 + 453.72 = 507.62 m2

V PEKERJAAN BETON
P L T Q PxLxTxQ total sat
1 Membuat Kolom Beton Bertulang 15x20
Membuat Beton mutu MPa (K225) 2.85 x 0.15 x 0.20 x 24.00 = 2.05 = 2.05 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 2.85 x 4.00 x 0.62 x 24.00 = 168.67
- begel 0.65 x 19.00 x 0.39 x 24.00 = 116.95
= 285.62 kg
Memasang Bekisting untuk Kolom 2.85 x 0.60 x 24.00 = 41.04 m2

2 Membuat Beton Bertulang Kolom Praktis 11x11 cm 2.85 x 21.00 = 59.85 m


3 Membuat Sloof Beton Bertulang 15x20
Membuat Beton mutu MPa (K225) 174.00 x 0.15 x 0.20 x 1.00 = 5.22 = 5.22 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 174.00 x 4.00 x 0.89 x 1.00 = 617.88
- begel 0.70 x 1,161.00 x 0.39 x 1.00 = 320.66
= 938.54
Memasang Bekisting untuk Sloof 174.00 x 0.40 x 1.00 = 69.60 m2

4 Membuat Ring Balok Beton Bertulang (10 x 15) cm


Membuat Ring Balk Bertulang 10x15 35.00 x 2.00 = 70.00
3.00 x 7.00 = 21.00
Membuat Latiu Beton Bertulang 10x15 35.00 x 2.00 = 70.00
= 161.00 m

5 Membuat Ring Balk Beton Bertulang 15x30


Membuat Beton mutu MPa (K225) 83.00 x 0.15 x 0.30 x 1.00 = 3.74 = 3.74 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 83.00 x 4.00 x 0.89 x 1.00 = 294.74
83.00 x 2.00 x 0.62 x 1.00 = 102.34
- begel 0.95 x 553.33 x 0.22 x 1.00 = 116.67
= 513.74 kg
Memasang Bekisting untuk Balok 83.00 x 0.75 x 1.00 = 62.25 m2
VI PEKERJAAN ATAP
P L T Q PxL xQ total sat
1 Pasang Konstruksi Atap Baja Ringan SNI 36.00 x 4.10 x 2.00 = 295.20 = 295.20 m2
2 Pemasangan 1 m2 onduline ukuran 95 x 200 36.00 x 4.20 x 2.00 = 302.40 302.40 m2
3 Pasang List Plank Grc L 20 cm 49.40 x 2.00 = 98.80 m
4 Pasang Krepus Onduline = 36.00

VII PEKERJAAN LANGIT - LANGIT


P L T Q PxL xQ total sat
1 Pas Rangka Hollow 1x40.40.0,6 mm Modul 60x60 cm 35.85 x 5.85 x 1.00 = 209.72 = 209.72 m2
2 Pas Langit2 Kalsiboard, Uk 120x240 tbl 3,5 mm = 209.72 m2
3 List Langit-Langit Kayu Profil
- dlm ruang 16.00 x 7.00 = 112.00
- teras 16.00 x 7.00 = 112.00
6.00 x 0.00 = 0.00
224.00 m
VIII PEKERJAAN BESI dan ALUMUNIUM
P L T Q PxL xQ total sat
Pemasangan Rolling Door Allumunium 2.25 x 2.10 x 14.00 = 66.15 = 66.15 m2
Pasang Kusen dan Pintu Besi Strip finishing cat 0.90 x 2.10 x 14.00 = 26.46 = 26.46 m2
Pasang Kusen Jendela Alumunium 4.40 x 14.00 = 61.60 = 61.60 m
Pasang Jendela kaca 4.40 x 0.08 x 14.00 = 4.93 = 4.93 m2
Pasang Rangka Kusen Partisi Alumunium 17.40 x 14.00 = 243.60 = 243.60 m2
Pasang Kaca Es 5mm
- kaca jendela sleding 0.94 x 1.04 x 14.00 = 13.69 = 26.32 m2
- kaca partisi 0.95 x 0.95 x 14.00 = 12.64

IX PEKERJAAN KUNCI dan AKSESORIS

X PEKERJAAN PENUTUP LANTAI dan DINDING


P L T Q PxL xQ total sat
1 Pemasangan Lantai Keramik 40 x 40 cm warna 2.85 x 2.35 x 14.00 93.77 = 198.77 m2
teras 35.00 x 3.00 x 1.00 105.00

2 Pemasangan Dinding Keramik 20x25 cm,


3 Pemasangan Paving Grees Block

XI PEKERJAAN PENGECATAN
1 Pengecat Tembok Baru dengan Mowilex luar ruangan = 507.62 m2
- dinding baru
2 Pengecat Plafond Baru dengan Mowilex = 209.72 m2

C KAMAR MANDI / WC

I PEKERJAAN TANAH
P L T Q PxLxT xQ total sat
1 Menggali Tanah Biasa Sedalam 1 m
- Foot Plat 0.90 x 0.90 x 1.60 x 4.00 = 5.18
- Galian Pondasi
vertikal 8.00 x 2.00 = 16.00
3.00 x 3.00 = 9.00
2.50 x 1.00 = 2.50
horisontal 6.00 x 4.00 = 24.00
3.00 x 1.00 = 3.00
54.50
54.50 x 0.60 x 0.60 x 1.00 = 19.62
= 24.80 m3
2 Pengurugan Kembali 0.30 x 24.80 = 7.44 m3
3 Urugan tanah padas dan dipadatkan 9.00 x 6.00 x 0.20 x 1.00 = 10.80 m3
4 Pemasangan trucuk bambu Ø 10 cm panjang 6 m (SNI) = 4.00 ttk

II PEKERJAAN PONDASI
P L T Q PxLxT xQ total sat
1 Pemasang Batu Kosong/Anstamping 54.50 x 0.60 x 0.20 x 1.00 = 6.54 = 6.54 m3
2 Pemasangan Pondasi Batu Belah 1SP : 8 PP muntilan 54.50 x 0.35 x 0.40 x 1.00 = 7.63 = 7.63 m3
3 Pas Pond Rollag Trashraam bt mrh 1PC : 3PS

III PEKERJAAN PASANGAN DINDING


P L T Q PxLxT xQ total sat
1 Pasang Din Bt Mrh Kalipucang tbl 1/2 bt 1 SP:8PP Muntilan
a. pas dinding bata lajur horisontal 3.00 x 2.25 x 3.00 = 20.25
2.00 x 2.25 x 2.00 = 9.00
b. pas dinding bata lajur vertikal 3.00 x 2.25 x 3.00 = 20.25
c. pas dinding tempat bilas 2.50 x 2.25 x 1.00 = 5.63
d. Umpak 0.60 x 0.50 x 14.00 = 4.20
59.33
dikurangi
a. pintu alumunium 0.75 x 1.80 x 4.00 = 5.40
b. boven 0.75 x 0.40 x 4.00 = 1.20
6.60 52.73 m2
IV PEKERJAAN PLESTERAN
Q ttl total sat
1 Pasang Plesteran 1 Pc : 3 Pp tbl 15 mm Ps Muntilan 2.00 x 52.73 = 72.09 m2
kolom praktis 11x11 3.00 x 0.44 x 8.00 = 10.56
Membuat Ring Balk Beton Bertulang 15/20 8.00 x 0.55 x 2.00 = 8.80

2 Pemasangan Acian = 72.09 m2

V PEKERJAAN BETON
P L T Q PxLxTxQ total sat
1 Membuat Beton mutu f'c=7,4 Mpa (K100) 0.80 x 0.80 x 0.05 x 4.00 = 0.13 m3
2 Membuat Foot Plat 80x80
Membuat Beton mutu MPa (K225) 0.80 x 0.80 x 0.20 x 4.00 = 0.51 m3
Pembesian dg Besi Polos atau Besi Ulir P x jmlh x bj = 68.72 kg
- tulangan atas 1.20 x 12.67 x 0.62 x 4.00 = 37.48
- tulangan bawah 1.00 x 12.67 x 0.62 x 4.00 = 31.24
68.72
Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 3.20 x 0.00 x 0.20 x 4.00 = 2.56 m2
1 Membuat Kolom Beton Bertulang 15x20 3.55 x 4.00 14.20 m
Membuat Beton mutu MPa (K225) 0.20 x 0.15 x 3.55 x 4.00 = 0.43 = 0.43 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 14.20 x 4.00 x 0.89 = 50.42
14.20 x 2.00 x 0.62 = 17.51
- begel 0.75 x 94.67 x 0.39 = 28.01
= 95.95 kg
Memasang Bekisting untuk Kolom 0.70 x 3.55 x 4.00 = 9.94 m2
2 Membuat Beton Bertulang Kolom Praktis 11x11 cm 3.55 x 9.00 = 31.95 = 62.95 m
umpak 0.50 x 14.00 = 7.00
kolom tepi 3.00 x 8.00 = 24.00

3 Membuat Ring Balk Beton Bertulang 15x30 P L T Q PxLxTxQ total sat


3.00 x 4.00 = 12.00 m
Membuat Beton mutu MPa (K225) 12.00 x 0.15 x 0.30 x 1.00 = 0.54 = 0.54 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 12.00 x 6.00 x 0.89 = 63.92

- begel 0.95 x 80.00 x 0.39 = 29.99


= 93.91 kg
Memasang Bekisting untuk Balok 12.00 x 0.75 x 1.00 = 9.00 m2
4 Membuat Ring Balk Beton Bertulang 15/20 P L T Q PxLxTxQ total sat
3.00 x 2.00 = 6.00
2.50 x 1.00 = 2.50
8.00 x 2.00 = 16.00
= 24.50 m
Membuat Beton mutu MPa (K225) 24.50 x 0.15 x 0.20 x 1.00 = 0.74 = 0.74 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 24.50 x 4.00 x 0.89 = 87.00
24.50 x 2.00 x 0.62 = 30.21
- begel 0.60 x 163.33 x 0.22 = 21.75
= 138.96 kg
Memasang Bekisting untuk Balok 24.50 x 0.55 x 1.00 = 13.48 m2
5 Membuat Dak Plat Beton Tebal 12 cm P L T Q PxLxTxQ total sat
Membuat Beton mutu MPa (K225) 3.00 x 3.00 x 0.12 x 1.00 = 1.08 = 1.08 m3
Pembesian dg Besi Polos atau Besi Ulir P jmlh bj
- tulangan pokok 3.00 x 20.00 x 0.62 x 2.00 = 73.98
3.00 x 20.00 x 0.62 x 2.00 = 73.98
= 147.96 kg
Memasang Bekisting untuk Lantai
3.00 x 3.00 x 1.00 = 9.00 m2
VI PEKERJAAN ATAP
1 Pekerjaan Besi Konstruksi Atap w/m2(kg) P L Q Kg x P x L x Q unit Total sat
a. Plat Landas Tebal 8 mm 64.50 x 0.20 x 0.15 x 1.00 = 1.94 7.00 = 13.55 kg
b. Pengaku Pipa Galvanis dia 2 " tbl 2,9 mm 4.11 x 1.00 x 0.00 = 0.00 14.00 = 0.00 kg
c. Kolom Besi Pipa Galvanis dia 2,5" tbl 3,2 mm 5.80 x 2.75 x 0.00 = 0.00 16.00 = 0.00 kg
b. Kuda - Kuda Canal CNP Rangkap 125x50x20x2,3 4.51 x 8.80 x 2.00 = 79.38 7.00 = 555.63 kg
Pengaku kuda2 4.51 x 1.00 x 1.00 = 4.51 7.00 = 31.57
587.20
c. Gording Besi Canal CNP 125x50x20x2,3 4.51 x 9.50 x 1.00 = 42.85 5.00 = 214.23 kg
f. Mur Baut dia 13 mm 1.04 x 0.15 x 0.00 = 0.00 14.00 = 0.00 kg
g. Regel Pengaku Besi Pipa Galvanis dia 2" tbl 2,9 mm 4.11 x 8.30 x 0.00 = 0.00 2.00 = 0.00

2 Pemasangan 1 m2 onduline ukuran 95 x 200 P L T Q PxLxTxQ total sat


9.50 x 4.50 x 2.00 = 85.50 = 85.50 m2
3 Pasang List Plank Grc L 20 cm 19.00 + 18.00 x 1.00 = = 37.00 m
4 Pasang Krepus Onduline = 9.50

VII PEKERJAAN BESI dan ALUMUNIUM


1 Pemasangan Pintu Allumunium Strip Lebar 8 cm 0.75 x 1.80 x 4.00 = 5.40 m2
2 Pasang Kosen Pintu dan Boven Allumunium = 26.60 m
- pintu 4.35 x 4.00 = 17.40
- boven 2.30 x 4.00 = 9.20
3 Pemasangan Kaca tebal 5 mm 0.75 x 0.40 x 4.00 = 1.20 m2

VIII PEKERJAAN SANITASI


1 Memasang Closet Jongkok Porselen 4.00 bh
2 Pemasangan Floor Drain 8.00 bh
3 Pemasangan Kran Ø ½" atau Ø ¾" 4.00 bh
4 Pemasangan Kran Shower Mandi 4.00 bh
5 Tandon Air 550 ltr 4.00 bh
6 Ember Air 4.00 bh
7 Pasang Instalasi Air Bersih
8 Pemasangan Instalasi Air Kotor
9 Resapan Air Kotor
10 Septiktank

IX PEKERJAAN PENUTUP LANTAI dan DINDING P L T Q PxLxTxQ total sat


1 Pemasangan Lantai Keramik 30 x 30 cm warna = 39.50 m2
8.75 x 6.00 x 1.00 = 52.50
dikurangi
- km/wc 3.00 x 3.00 x 1.00 = 9.00
- t bilas 2.50 x 0.80 x 2.00 = 4.00
13.00
2 Pemasangan Lantai Keramik 20 x 20 cm = 13.00 m2
3 Pemasangan Dinding Keramik 20x25 cm, 1.50 x 1.00 x 16.00 = 24.00 = 26.00 m2
- tempat bilas 2.50 x 1.00 x 2.00 = 5.00
dikurangi
pintu 0.75 x 1.00 x 4.00 = 3.00
4 Pemasangan Dinding Batu Paras / Batu Tempel Hitam 2.00 x 2.25 x 2.00 = 9.00 m2

X PEKERJAAN PENGECATAN
1 Pengecat Tembok Baru dengan Mowilex luar ruangan = 72.09 m2
2 Pengecatan 1 m2 permukaan Besi 3x (SNI)
a. Plat Landas Tebal 8 mm 0.20 x 0.15 x 7.00 = 0.21
b. Pengaku Pipa Galvanis dia 2 " tbl 2,9 mm 0.15 x 1.00 x 14.00 = 0.00
c. Kolom Besi Pipa Galvanis dia 2,5" tbl 3,2 mm 0.19 x 2.75 x 16.00 = 8.46
b. Kuda - Kuda Canal CNP Rangkap 125x50x20x2,3 0.45 x 8.80 x 7.00 = 27.72
c. Gording Besi Canal CNP 125x50x20x2,3 0.22 x 9.50 5.00 = 10.21
f. Mur Baut dia 13 mm
g. Regel Pengaku Besi Pipa Galvanis dia 2" tbl 2,9 mm 0.15 x 8.30 x 4.00 = 4.98
= 51.58

Hitung Septiktank P L T Q
1 Menggali Tanah Biasa Sedalam 1 m 1.20 x 1.50 x 2.00 = 3.60 62,875.00 = 226,350.00
2 Pemasangan Pipa Beton Ø 100 cm 3.00 = 3.00 1,119,528.90 = 3,358,586.70
3 Membuat Beton mutu f'c=7,4 Mpa (K100) 0.79 x 0.05 x 1.00 = 0.04 973,662.43 = 38,216.25
4 Agregat Pecah Kasar 0.79 x 0.70 x 1.00 = 0.55 220,000.00 = 120,890.00
5 Ijuk 0.10 x 1.00 = 0.10 50,000.00 = 5,000.00
6 Plat Beton 0.79 x 0.10 x 2.00 = 0.20 1,106,174.59 = 221,234.92
besi 110 kg/m3 0.20 x 110.00 = 22.00 13,683.00 = 301,026.00
begisting papan randu 0.79 x 2.00 = 1.57 99,770.00 = 156,638.90
7 Pipa PVC DN 25 ( ¾" ) AW 3.00 m 3.00 4,800.00 = 14,400.00
8 Pipa PVC DN 90 ( 3" ) AW 1.00 m 1.00 29,700.00 = 29,700.00

4,472,042.77
Hitung Resapan
1 Menggali Tanah Biasa Sedalam 1 m 1.00 x 0.50 x 1.00 = 0.50 62,875.00 ;= 31,437.50
Pemasangan Pipa Beton Ø 100 cm 1.00 = 1.00 1,119,528.90 ;= 1,119,528.90
Agregat Pecah Kasar 0.79 x 0.70 x 0.00 = 0.00 220,000.00 ;= 0.00
Ijuk 0.10 x 0.05 = 0.01 50,000.00 ;= 250.00
Plat Beton 0.79 x 0.10 x 1.00 = 0.10 1,106,174.59 ;= 110,617.46
besi 110 kg/m3 0.10 x 80.00 = 8.00 13,683.00 ;= 109,464.00
begisting papan randu 0.79 x 1.00 = 0.79 99,770.00 ;= 78,319.45
Pipa PVC DN 25 ( ¾" ) AW
Pipa PVC DN 90 ( 3" ) AW 1,449,617.31
REKAPITULASI
RENCANA ANGGARAN DAN BIAYA

KEGIATAN : PENATAAN KAWASAN OBYEK WISATA PANTAI BANDENGAN


(DAK PENUGASAN)
PEKERJAAN : PEMBANGUNAN KIOS KULINER DAN CINDERAMATA DI KAWASAN
OBYEK WISATA BANDENGAN
LOKASI : KECAMATAN JEPARA
TAHUN ANGGARAN : 2019
VOLUME : 1 UNIT

NOMOR URAIAN PEKERJAAN SUB JUMLAH JUMLAH


( Rp. ) ( Rp. )
A PEKERJAAN PERSIAPAN 14,426,373.00
14,426,373.00
B LOS KIOS MAKANAN
I PEKERJAAN TANAH 17,139,444.42
II PEKERJAAN PONDASI 42,817,875.50
III PEKERJAAN PASANGAN DINDING 37,218,645.00
IV PEKERJAAN PLESTERAN 39,055,354.11
V PEKERJAAN BETON 169,845,652.12
VI PEKERJAAN ATAP 214,128,398.00
VII PEKERJAAN LANGIT - LANGIT 63,284,401.00
VIII PEKERJAAN BESI dan ALUMUNIUM 197,332,499.71
IX PEKERJAAN KUNCI dan AKSESORIS 5,071,843.75
X PEKERJAAN SANITASI 20,031,954.23
XI PEKERJAAN LISTRIK 21,360,000.00
XII PEKERJAAN PENUTUP LANTAI dan DINDING 99,195,248.70
XII PEKERJAAN PENGECATAN 46,698,485.72
973,179,802.26
C LOS KIOS KERAJINAN
I PEKERJAAN TANAH 7,302,690.98
II PEKERJAAN PONDASI 22,131,693.28
III PEKERJAAN PASANGAN DINDING 25,124,745.00
IV PEKERJAAN PLESTERAN 20,182,035.03
V PEKERJAAN BETON 74,981,733.08
VI PEKERJAAN ATAP 104,170,572.00
VII PEKERJAAN LANGIT - LANGIT 32,318,315.90
VIII PEKERJAAN BESI dan ALUMUNIUM 95,903,878.03
IX PEKERJAAN KUNCI dan AKSESORIS 2,088,406.25
X PEKERJAAN LISTRIK 11,460,000.00
XI PEKERJAAN PENUTUP LANTAI dan DINDING 47,387,563.65
XII PEKERJAAN PENGECATAN 27,019,057.41
470,070,690.61
KAMAR
D MANDI / WC
I PEKERJAAN TANAH 3,039,688.01
II PEKERJAAN PONDASI 9,819,486.71
III PEKERJAAN PASANGAN DINDING 5,839,293.75
IV PEKERJAAN PLESTERAN 2,376,101.81
V PEKERJAAN BETON 20,967,969.06
VI PEKERJAAN ATAP 48,889,603.90
VII PEKERJAAN BESI dan ALUMUNIUM 3,572,424.00
VIII PEKERJAAN SANITASI 16,805,200.08
NOMOR URAIAN PEKERJAAN SUB JUMLAH JUMLAH
( Rp. ) ( Rp. )
IX PEKERJAAN PENUTUP LANTAI dan DINDING 21,423,065.81
X PEKERJAAN PENGECATAN 5,156,092.91
XI PEKERJAAN LISTRIK 4,620,000.00
- 142,508,926.03

JUMLAH 1,600,185,791.91
PPN 10 % 160,018,579.19
JUMLAH TOTAL 1,760,204,371.10
DIBULATKAN 1,760,200,000.00

TERBILANG : Err:511

Jepara, 2019
PEJABAT PEMBUAT KOMITMEN Konsultan Perencana
DINAS PARIWISATA DAN KEBUDAYAAN CV. ARDIKON CIPTA ARTISTIKA
KABUPATEN JEPARA

ZAMRONI LESTIAZA, AP, M.Si. TRI HARTATI , S.Sos.I.


NIP. 19750406 199311 1 001 Direktur
Mengetahui ;
Plt. KEPALA DINAS KEPALA DINAS
PARIWISATA DAN KEBUDAYAAN PEKERJAAN UMUM DAN PENATAAN RUANG
KABUPATEN JEPARA

ZAMRONI LESTIAZA, AP, M.Si. Ir. BUDIARTO, MT


NIP. 19750406 199311 1 001 NIP. 19590410 198603 1 015
RENCANA ANGGARAN BIAYA
KEGIATAN : PENATAAN KAWASAN OBYEK WISATA PANTAI BANDENGAN
(DAK PENUGASAN)
PEKERJAAN : PEMBANGUNAN KIOS KULINER DAN CINDERAMATA DI KAWASAN
OBYEK WISATA BANDENGAN
LOKASI : KECAMATAN JEPARA
TAHUN ANGGARAN : 2019
VOLUME : 1 UNIT

HARGA SATUAN JUMLAH HARGA JUMLAH


NO URAIAN PEKERJAAN VOLUME ANALISA
Rp Rp Rp
A PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank 83.00 m1 A.2.2.1.4 61,131.00 5,073,873.00
2 Membersihkan Lapangan dan Perataan 642.00 m2 A.2.2.1.9 13,750.00 8,827,500.00
3 Air Kerja 1 ls Taksir 525,000.00 525,000.00

14,426,373.00
B LOS KIOS MAKANAN
I PEKERJAAN TANAH
1 Menggali Tanah Biasa Sedalam 1 m 97.44 m3 A.2.3.1.1 62,875.00 6,126,540.00
2 Pengurugan Kembali 29.23 m3 A.2.3.1.9 15,250.00 445,788.00
3 Urugan tanah padas dan dipadatkan 86.40 m3 A.2.3.1.17 118,066.75 10,200,967.17
4 Pemasangan trucuk bambu Ø 10 cm panjang 6 m (SNI) 16.00 ttk A.2.3.1.19 22,884.33 366,149.25

17,139,444.42
II PEKERJAAN PONDASI
1 Pemasang Batu Kosong/Anstamping 27.360 m3 A.3.2.1.9 452,513.40 12,380,766.62
2 Pemasangan Pondasi Batu Belah 1SP : 8 PP muntilan 31.920 m3 A.3.2.1.5.1 899,089.00 28,698,920.88
3 Pasang Pondasi Rolag Trashraam BT Mrh 1 Pc : 3 Ps 1.440 m3 A.3.2.1.12 1,207,075.00 1,738,188.00

42,817,875.50
III PEKERJAAN PASANGAN DINDING
1 Pasang Din Bt Mrh Kalipucang tbl 1/2 bt 1 SP:8PP Muntilan 336.060 m2 A.4.4.1.12.2 110,750.00 37,218,645.00

37,218,645.00
IV PEKERJAAN PLESTERAN
1 Pasang Plesteran 1 Pc : 3 Pp tbl 15 mm Ps Muntilan 174.300 m2 A.4.4.2.3 64,000.20 11,155,234.86
2 Pasang Plesteran 1 Pc : 8 Pp tbl 15 mm Ps Muntilan 672.120 m2 A.4.4.2.8 - -
3 Pemasangan Acian 846.420 m2 A.4.4.2.27 32,962.50 27,900,119.25

39,055,354.11
V PEKERJAAN BETON
1 Membuat Beton mutu f'c=7,4 Mpa (K100) 0.512 m3 A.4.1.1.1 973,662.43 498,515.16
Membuat
2 Foot Plat 80x80
a. Membuat Beton mutu MPa (K225) 2.048 m3 A.4.1.1.7 1,106,174.59 2,265,445.55
b. Pembesian dg Besi Polos atau Besi Ulir 274.877 kg A.4.1.1.17 13,683.00 3,761,139.25
c. Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 10.240 m2 A.4.1.1.37 99,770.00 1,021,644.80
3 Membuat Sloof Beton Bertulang 15x25
a. Membuat Beton mutu MPa (K225) 8.550 m3 A.4.1.1.7 1,106,174.59 9,457,792.72
b. Pembesian dg Besi Polos atau Besi Ulir 1570.546 kg A.4.1.1.17 13,683.00 21,489,782.01
c. Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 114.000 m2 A.4.1.1.37 99,770.00 11,373,780.00
4 Membuat Kolom Beton Bertulang 15x20
a. Membuat Beton mutu MPa (K225) 4.128 m3 A.4.1.1.7 1,106,174.59 4,566,288.70
b. Pembesian dg Besi Polos atau Besi Ulir 661.677 kg A.4.1.1.17 13,683.00 9,053,728.03
c. Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 96.320 m2 A.4.1.1.37 99,770.00 9,609,846.40
5 Membuat Beton bertulang Kolom Praktis 11x11 cm 100.800 m1 A.4.1.1.35 69,841.10 7,039,982.88
6 Membuat Balok Beton Bertulang 15x30
a. Membuat Beton mutu MPa (K225) 7.020 m3 A.4.1.1.7 1,106,174.59 7,765,345.60
b. Pembesian dg Besi Polos atau Besi Ulir 1136.510 kg A.4.1.1.17 13,683.00 15,550,871.15
c. Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 117.000 m2 A.4.1.1.37 99,770.00 11,673,090.00
7 Membuat Ring Balok Beton Bertulang (10 x 15) cm 144.000 m1 A.4.1.1.36 109,298.81 15,739,029.00
8 Membuat Ring Balk 15x20
a. Membuat Beton mutu MPa (K225) 4.320 m3 A.4.1.1.7 1,106,174.59 4,778,674.22
b. Pembesian dg Besi Polos atau Besi Ulir 639.483 kg A.4.1.1.17 13,683.00 8,750,047.53
c. Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 79.200 m2 A.4.1.1.37 99,770.00 7,901,784.00
HARGA SATUAN JUMLAH HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME ANALISA
Rp Rp Rp
9 Membuat Meja Dapur Beton tbl 10 cm
a. Membuat Beton mutu MPa (K225) 3.072 m3 A.4.1.1.7 1,106,174.59 3,398,168.33
b. Pembesian dg Besi Polos atau Besi Ulir 457.058 kg A.4.1.1.17 13,683.00 6,253,928.77
c. Memasang Bekisting untuk Lantai 38.400 m2 A.4.1.1.24 205,645.00 7,896,768.00

169,845,652.12
VI PEKERJAAN ATAP
1 Pasang Konstruksi Atap Baja Ringan SNI 606.800 m2 Taksir 185,000.00 112,258,000.00
2 Pemasangan 1 m2 onduline ukuran 95 x 200 621.600 m2 A.4.5.2.41 147,217.50 91,510,398.00
3 Pasang Krepus Onduline 74.000 m1 Taksir 140,000.00 10,360,000.00

214,128,398.00
VII PEKERJAAN LANGIT - LANGIT
1 Pas Rangka Hollow 1x40.40.0,6 mm Modul 60x60 cm 410.670 m2 A.4.2.1.21 116,945.00 48,025,803.15
2 Pas Langit2 Kalsiboard, Uk 120x240 tbl 3,5 mm 410.670 m2 A.4.5.1.8 37,155.38 15,258,597.85

63,284,401.00
VIII PEKERJAAN BESI dan ALUMUNIUM
1 Pemasangan Rolling Door Allumunium 138.600 m2 A.4.2.1.10 630,843.75 87,434,943.75
2 Pasang Kusen dan Pintu Besi Strip finishing cat 45.360 m2 Taksir 350,000.00 15,876,000.00
3 Pasang Kusen Jendela Alumunium 110.400 m1 A.4.2.1.11 126,524.50 13,968,304.80
4 Pasang Jendela kaca 8.832 m2 A.4.2.1.13 477,020.00 4,213,040.64
5 Pasang Rangka Kusen Partisi Alumunium 417.600 m1 A.4.2.1.11 126,524.50 52,836,631.20
6 Pasang Kaca Es 5mm 153.422 m2 A.4.6.2.17 149,936.25 23,003,579.32

197,332,499.71
IX PEKERJAAN KUNCI dan AKSESORIS
1 Pemasangan Kunci Selot 34.000 bh A.4.6.2.11 36,916.88 1,255,173.75
2 Pemasangan Engsel Jendela Kupu-kupu 68.000 bh A.4.6.2.6 30,457.50 2,071,110.00
3 Pemasangan Kait Angin 68.000 bh A.4.6.2.9 25,670.00 1,745,560.00

5,071,843.75
X PEKERJAAN SANITASI
1 Pasang Instalasi Air Bersih 1.000 ls Taksir 1,500,000.00 1,500,000.00
2 Pemasangan Instalasi Air Kotor 1.000 ls Taksir 1,000,000.00 1,000,000.00
3 Resapan Air Kotor 4.000 ls Taksir 1,449,617.31 5,798,469.23
4 Pemasangan Kran Ø ½" atau Ø ¾" 34.000 bh A.5.1.1.19 71,577.50 2,433,635.00
5 Pemasangan Bak Cuci Piring Stainless stell 34.000 bh A.5.1.1.12 273,525.00 9,299,850.00

20,031,954.23
XI PEKERJAAN LISTRIK
1 Pasang Meteran Listrik 2200VA 4.000 bh Taksir 3,000,000.00 12,000,000.00
2 Pasang Instalasi Listrik 48.000 ttk Taksir 110,000.00 5,280,000.00
3 Pasang Lampu SL 15 watt 48.000 bh Taksir 45,000.00 2,160,000.00
4 Pasang Saklar Ganda 24.000 bh Taksir 45,000.00 1,080,000.00
5 Pasang Stop Kontak 24.000 bh Taksir 35,000.00 840,000.00

21,360,000.00
XII PEKERJAAN PENUTUP LANTAI dan DINDING
1 Pemasangan Lantai Keramik 40 x 40 cm warna 416.070 m2 A.4.4.3.35.2 238,410.00 99,195,248.70

99,195,248.70
XII PEKERJAAN PENGECATAN
1 Pengecat Tembok Baru dengan Mowilex luar ruangan 846.420 m2 A.4.7.1.10.2 42,072.75 35,611,217.06
2 Pengecat Plafond Baru dengan Mowilex 410.670 m2 A.4.7.1.10.1 26,998.00 11,087,268.66

46,698,485.72
C LOS KIOS KERAJINAN
I PEKERJAAN TANAH
1 Menggali Tanah Biasa Sedalam 1 m 34.750 m3 A.2.3.1.1 62,875.00 2,184,906.25
2 Pengurugan Kembali 10.425 m3 A.2.3.1.9 15,250.00 158,981.25
3 Urugan tanah padas dan dipadatkan 42.000 m3 A.2.3.1.17 118,066.75 4,958,803.48

7,302,690.98
HARGA SATUAN JUMLAH HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME ANALISA
Rp Rp Rp
II PEKERJAAN PONDASI
1 Pemasang Batu Kosong/Anstamping 13.900 m3 A.3.2.1.9 452,513.40 6,289,936.26
2 Pemasangan Pondasi Batu Belah 1SP : 8 PP muntilan 16.680 m3 A.3.2.1.5.1 899,089.00 14,996,804.52
3 Pas Pond Rollag Trashraam bt mrh 1PC : 3PS 0.700 m3 A.3.2.1.12 1,207,075.00 844,952.50

22,131,693.28
III PEKERJAAN PASANGAN DINDING
1 Pasang Din Bt Mrh Kalipucang tbl 1/2 bt 1 SP:8PP Muntilan 226.860 m2 A.4.4.1.12.2 110,750.00 25,124,745.00

25,124,745.00
IV PEKERJAAN PLESTERAN
1 Pasang Plesteran 1 Pc : 3 Pp tbl 15 mm Ps Muntilan 53.900 m2 A.4.4.2.3 64,000.20 3,449,610.78
2 Pasang Plesteran 1 Pc : 8 Pp tbl 15 mm Ps Muntilan 453.720 m2 A.4.4.2.8 - -
3 Pemasangan Acian 507.620 m2 A.4.4.2.27 32,962.50 16,732,424.25

20,182,035.03
V PEKERJAAN BETON
1 Membuat Kolom Beton Bertulang 15x20
a. Membuat Beton mutu MPa (K225) 2.052 m3 A.4.1.1.7 1,106,174.59 2,269,870.25
b. Pembesian dg Besi Polos atau Besi Ulir 285.622 kg A.4.1.1.17 13,683.00 3,908,165.61
c. Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 41.040 m2 A.4.1.1.37 99,770.00 4,094,560.80
2 Membuat Sloof Beton Bertulang 15x20
a. Membuat Beton mutu MPa (K225) 5.220 m3 A.4.1.1.7 1,106,174.59 5,774,231.35
b. Pembesian dg Besi Polos atau Besi Ulir 938.540 kg A.4.1.1.17 13,683.00 12,842,041.07
c. Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 69.600 m2 A.4.1.1.37 99,770.00 6,943,992.00
3 Membuat Beton Bertulang Kolom Praktis 11x11 cm 59.850 m1 A.4.1.1.35 69,841.10 4,179,989.84
4 Membuat Ring Balok Beton Bertulang (10 x 15) cm 161.000 m1 A.4.1.1.36 109,298.81 17,597,108.81
5 Membuat Ring Balk Beton Bertulang 15x30
a. Membuat Beton mutu MPa (K225) 3.735 m3 A.4.1.1.7 1,106,174.59 4,131,562.08
b. Pembesian dg Besi Polos atau Besi Ulir 513.742 kg A.4.1.1.17 13,683.00 7,029,528.78
c. Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 62.250 m2 A.4.1.1.37 99,770.00 6,210,682.50

74,981,733.08
VI PEKERJAAN ATAP
1 Pasang Konstruksi Atap Baja Ringan SNI 295.200 m2 Taksir 185,000.00 54,612,000.00
2 Pemasangan 1 m2 onduline ukuran 95 x 200 302.400 m2 A.4.5.2.41 147,217.50 44,518,572.00
3 Pasang Krepus Onduline 36.000 m1 Taksir 140,000.00 5,040,000.00

104,170,572.00
VII PEKERJAAN LANGIT - LANGIT
1 Pas Rangka Hollow 1x40.40.0,6 mm Modul 60x60 cm 209.723 m2 A.4.2.1.21 116,945.00 24,525,997.76
2 Pas Langit2 Kalsiboard, Uk 120x240 tbl 3,5 mm 209.723 m2 A.4.5.1.8 37,155.38 7,792,318.13

32,318,315.90
VIII PEKERJAAN BESI dan ALUMUNIUM
1 Pemasangan Rolling Door Allumunium 66.150 m2 A.4.2.1.10 630,843.75 41,730,314.06
2 Pasang Kusen dan Pintu Besi Strip finishing cat 26.460 m2 Taksir 350,000.00 9,261,000.00
3 Pasang Kusen Jendela Alumunium 61.600 m1 A.4.2.1.11 126,524.50 7,793,909.20
4 Pasang Jendela kaca 4.928 m2 A.4.2.1.13 477,020.00 2,350,754.56
5 Pasang Rangka Kusen Partisi Alumunium 243.600 m1 A.4.2.1.11 126,524.50 30,821,368.20
6 Pasang Kaca Es 5mm 26.321 m2 A.4.6.2.17 149,936.25 3,946,532.01

95,903,878.03
IX PEKERJAAN KUNCI dan AKSESORIS
1 Pemasangan Kunci Selot 14.000 bh A.4.6.2.11 36,916.88 516,836.25
2 Pemasangan Engsel Jendela Kupu-kupu 28.000 bh A.4.6.2.6 30,457.50 852,810.00
3 Pemasangan Kait Angin 28.000 bh A.4.6.2.9 25,670.00 718,760.00

2,088,406.25
X PEKERJAAN LISTRIK
1 Pasang Meteran Listrik 1300VA 3.000 bh Taksir 2,000,000.00 6,000,000.00
2 Pasang Instalasi Listrik 28.000 ttk Taksir 110,000.00 3,080,000.00
3 Pasang Lampu SL 15 watt 28.000 bh Taksir 45,000.00 1,260,000.00
4 Pasang Saklar Ganda 14.000 bh Taksir 45,000.00 630,000.00
5 Pasang Stop Kontak 14.000 bh Taksir 35,000.00 490,000.00

11,460,000.00
HARGA SATUAN JUMLAH HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME ANALISA
Rp Rp Rp
XI PEKERJAAN PENUTUP LANTAI dan DINDING
1 Pemasangan Lantai Keramik 40 x 40 cm warna 198.765 m2 A.4.4.3.35.2 238,410.00 47,387,563.65
2 Pemasangan Dinding Keramik 20x25 cm,
3 Pemasangan Paving Grees Block

47,387,563.65
XII PEKERJAAN PENGECATAN
1 Pengecat Tembok Baru dengan Mowilex luar ruangan 507.620 m2 A.4.7.1.10.2 42,072.75 21,356,969.36
2 Pengecat Plafond Baru dengan Mowilex 209.723 m2 A.4.7.1.10.1 26,998.00 5,662,088.06

27,019,057.41
D KAMAR MANDI / WC
I PEKERJAAN TANAH
1 Menggali Tanah Biasa Sedalam 1 m 24.804 m3 A.2.3.1.1 62,875.00 1,559,551.50
2 Pengurugan Kembali 7.441 m3 A.2.3.1.9 15,250.00 113,478.30
3 Urugan tanah padas dan dipadatkan 10.800 m3 A.2.3.1.17 118,066.75 1,275,120.90
4 Pemasangan trucuk bambu Ø 10 cm panjang 6 m (SNI) 4.000 ttk A.2.3.1.19 22,884.33 91,537.31

3,039,688.01
II PEKERJAAN PONDASI
1 Pemasang Batu Kosong/Anstamping 6.540 m3 A.3.2.1.9 452,513.40 2,959,437.64
2 Pemasangan Pondasi Batu Belah 1SP : 8 PP muntilan 7.630 m3 A.3.2.1.5.1 899,089.00 6,860,049.07
3 Pas Pond Rollag Trashraam bt mrh 1PC : 3PS

9,819,486.71
III PEKERJAAN PASANGAN DINDING
1 Pasang Din Bt Mrh Kalipucang tbl 1/2 bt 1 SP:8PP Muntilan 52.725 m2 A.4.4.1.12.2 110,750.00 5,839,293.75

5,839,293.75
IV PEKERJAAN PLESTERAN
1 Pasang Plesteran 1 Pc : 3 Pp tbl 15 mm Ps Muntilan 72.085 m2 A.4.4.2.8 - -
2 Pemasangan Acian 72.085 m2 A.4.4.2.27 32,962.50 2,376,101.81

2,376,101.81
V PEKERJAAN BETON
1 Membuat Beton mutu f'c=7,4 Mpa (K100) Foot Plat 80x80 0.128 m3 A.4.1.1.1 973,662.43 124,628.79
a. Membuat Beton mutu MPa (K225) 0.512 m3 A.4.1.1.7 1,106,174.59 566,361.39
b. Pembesian dg Besi Polos atau Besi Ulir 68.719 kg A.4.1.1.17 13,683.00 940,284.81
c. Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 2.560 m2 A.4.1.1.37 99,770.00 255,411.20
1 Membuat Kolom Beton Bertulang 15x20
a. Membuat Beton mutu MPa (K225) 0.426 m3 A.4.1.1.7 1,106,174.59 471,230.37
b. Pembesian dg Besi Polos atau Besi Ulir 95.947 kg A.4.1.1.17 13,683.00 1,312,844.55
c. Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 9.940 m2 A.4.1.1.37 99,770.00 991,713.80
2 Membuat Beton Bertulang Kolom Praktis 11x11 cm 62.950 m1 A.4.1.1.35 69,841.10 4,396,497.25
3 Membuat Ring Balk Beton Bertulang 15x30
a. Membuat Beton mutu MPa (K225) 0.540 m3 A.4.1.1.7 1,106,174.59 597,334.28
b. Pembesian dg Besi Polos atau Besi Ulir 93.905 kg A.4.1.1.17 13,683.00 1,284,905.95
c. Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 9.000 m2 A.4.1.1.37 99,770.00 897,930.00
4 Membuat Ring Balk Beton Bertulang 15/20
a. Membuat Beton mutu MPa (K225) 0.735 m3 A.4.1.1.7 1,106,174.59 813,038.32
b. Pembesian dg Besi Polos atau Besi Ulir 138.959 kg A.4.1.1.17 13,683.00 1,901,377.37
c. Pasang Bekisting Beton dg Kayu Randu tbl 2 cm 13.475 m2 A.4.1.1.37 99,770.00 1,344,400.75
5 Membuat Dak Plat Beton Tebal 12 cm
a. Membuat Beton mutu MPa (K225) 1.080 m3 A.4.1.1.7 1,106,174.59 1,194,668.55
b. Pembesian dg Besi Polos atau Besi Ulir 147.960 kg A.4.1.1.17 13,683.00 2,024,536.68
c. Memasang Bekisting untuk Lantai 9.000 m2 A.4.1.1.24 205,645.00 1,850,805.00

20,967,969.06
VI PEKERJAAN ATAP
1 Pekerjaan Besi Konstruksi Atap
a. Plat Landas Tebal 8 mm 13.545 kg A.4.2.1.1 39,280.50 532,054.37
b. Kuda - Kuda Canal CNP Rangkap 125x50x20x2,3 587.202 kg A.4.2.1.1 39,280.50 23,065,588.16
c. Gording Besi Canal CNP 125x50x20x2,3 214.225 kg A.4.2.1.1 39,280.50 8,414,865.11
2 Pemasangan 1 m2 onduline ukuran 95 x 200 85.500 m2 A.4.5.2.41 147,217.50 12,587,096.25
3 Pasang List Plank Grc L 20 cm 37.000 m1 Taksir 80,000.00 2,960,000.00
4 Pasang Krepus Onduline 9.500 m1 Taksir 140,000.00 1,330,000.00

48,889,603.90
HARGA SATUAN JUMLAH HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME ANALISA
Rp Rp Rp
VII PEKERJAAN BESI dan ALUMUNIUM
1 Pasang Kosen + Pintu PVC ber Motif 4.000 bh Taksir 750,000.00 3,000,000.00
2 Pemasangan Kaca tebal 5 mm 1.200 m2 A.4.2.1.13 477,020.00 572,424.00

3,572,424.00
VIII PEKERJAAN SANITASI
1 Memasang Closet Jongkok Porselen 4.000 bh A.5.1.1.2 413,157.50 1,652,630.00
2 Pemasangan Floor Drain 8.000 bh A.5.1.1.14 35,575.00 284,600.00
3 Pemasangan Kran Ø ½" atau Ø ¾" 4.000 bh A.5.1.1.19 71,577.50 286,310.00
4 Pemasangan Kran Shower Mandi 4.000 bh Taksir 300,000.00 1,200,000.00
5 Tandon Air 550 ltr 4.000 bh Taksir 1,200,000.00 4,800,000.00
6 Ember Air 4.000 bh Taksir 40,000.00 160,000.00
7 Pasang Instalasi Air Bersih 1.000 ls Taksir 1,500,000.00 1,500,000.00
8 Pemasangan Instalasi Air Kotor 1.000 ls Taksir 1,000,000.00 1,000,000.00
9 Resapan Air Kotor 1.000 bh Taksir 1,449,617.31 1,449,617.31
10 Septiktank 1.000 bh Taksir 4,472,042.77 4,472,042.77

16,805,200.08
IX PEKERJAAN PENUTUP LANTAI dan DINDING
1 Pemasangan Lantai Keramik 30 x 30 cm warna 39.500 m2 A.4.4.3.35 201,479.00 7,958,420.50
2 Pemasangan Lantai Keramik 20 x 20 cm 13.000 m2 A.4.4.3.36 206,645.00 2,686,385.00
3 Pemasangan Dinding Keramik 20x25 cm, 26.000 m2 A.4.4.3.55 225,990.00 5,875,740.00
4 Pemasangan Dinding Batu Paras / Batu Tempel Hitam 9.000 m2 A.4.4.3.58 278,057.81 2,502,520.31
5 Pasang Batu Paras Motif Ukir 2.000 m2 Taksir 1,200,000.00 2,400,000.00

21,423,065.81
X PEKERJAAN PENGECATAN
1 Pengecat Tembok Baru dengan Mowilex luar ruangan 72.085 m2 A.4.7.1.10.2 42,072.75 3,032,814.18
2 Pengecatan 1 m2 permukaan Besi 3x (SNI) 51.585 m2 A.4.7.1.22 41,160.94 2,123,278.73

5,156,092.91
XI PEKERJAAN LISTRIK
1 Pasang Meteran Listrik 1300VA 1.000 bh Taksir 2,000,000.00 2,000,000.00
2 Pasang Instalasi Listrik 8.000 ttk Taksir 110,000.00 880,000.00
3 Pasang Lampu SL 15 watt 8.000 bh Taksir 45,000.00 360,000.00
4 Pasang Saklar Ganda 4.000 bh Taksir 45,000.00 180,000.00
5 Pasang Stop Kontak 2.000 bh Taksir 35,000.00 70,000.00
6 Pasang Mesin Pompa Air Otomatis 1.000 bh Taksir 1,130,000.00 1,130,000.00

4,620,000.00
TOTAL 1,600,185,791.91
PPN 10 % 160,018,579.19
JUMLAH TOTAL 1,760,204,371.10
DIBULATKAN 1,760,200,000.00
TERBILANG :
Err:511

Jepara, 2019
PEJABAT PEMBUAT KOMITMEN Konsultan Perencana
DINAS PARIWISATA DAN KEBUDAYAAN CV. ARDIKON CIPTA ARTISTIKA
KABUPATEN JEPARA

ZAMRONI LESTIAZA, AP, M.Si. TRI HARTATI , S.Sos.I.


NIP. 19750406 199311 1 001 Direktur
Mengetahui ;
Plt. KEPALA DINAS KEPALA
PEKERJAAN UMUM DANDINAS
PENATAAN RUANG
PARIWISATA DAN KEBUDAYAAN
KABUPATEN JEPARA KABUPATEN JEPARA

ZAMRONI LESTIAZA, AP, M.Si. Ir. BUDIARTO, MT


NIP. 19750406 199311 1 001 NIP. 19590410 198603 1 015
DAFTAR HARGA SEWA PERALATAN
KABUPATEN JEPARA TAHUN 2019

HARGA
NO. PERALATAN SATUAN SEWA ALAT KET.
(Rp)

1 Dump Truck 3 ton Jam 71,500

2 Dump Truck E08 Jam 191,907

3 Dump Truck E09 Jam 343,827

4 Truck Bak Terbuka Hari 250,000

5 Truk Tanki Air Jam 191,907


6 Motor Grader Jam 250,987

7 Wheel Loader Jam 192,500

8 Wheel Loader 1.0-1.6 M3 E16 Jam 320,730

9 Tandem Roller 6-8 T E24 Jam 37,962

10 Tandem Roller E17 Jam 161,523

11 3-Wheel Roller Jam 115,947

12 Asp. Sprayer Jam 39,209

13 Asp. Distributor Jam 296,191

14 Blending Equpment E52 Jam 127,687

15 Compressor Jam 153,871

16 Vibro roller 1 ton Jam 30,200

17 Water Pump Jam 20,000

18 Molen hr 250,000

Jepara, Desember 2018

KEPALA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


KABUPATEN JEPARA

Ir. BUDIARTO, MT
Pembina Utama Madya
NIP. 19590410 198603 1 015
DAFTAR UPAH TENAGA KERJA
KABUPATEN JEPARA TAHUN 2019

NO. JENIS BAHAN SATUAN HARGA SATUAN KET.


(Rp)
1 Pekerja Hr 80,000

2 Mandor Hr 115,000

3 Tukang listrik Hr 100,000

4 Tukang kayu Hr 100,000

5 Kep. tk. kayu Hr 110,000

6 Tukang batu Hr 100,000

7 Kep. tk. batu Hr 110,000

8 Tukang besi Hr 100,000

9 Kep. tk. besi Hr 110,000

10 Tukang cat Hr 100,000

11 Kep. tk. cat Hr 110,000

12 Tukang plitur Hr 100,000

13 Tukang gali Hr 100,000

14 Mandor Pipa Hr 110,000

15 Tk. Pipa Hr 100,000

16 Pekerja. Pipa Hr 75,000

17 Tk. leideng Hr 100,000

18 Ka. Tukang Aspal Hr 130,000

19 Pekerja Aspal Hr 80,000

20 Tukang Aspal Hr 120,000

21 Mandor Aspal Hr 130,000

22 Operator Excavator & atau Loader Jam 100,000

23 Operator Hr 100,000

24 Pembantu Operator Excavator & atau Loader Jam 75,000

25 Pembantu Operator Hr 75,000

26 Supir Hr 100,000

27 Pembantu Supir Hr 75,000

28 Mekanik Hr 100,000

29 Pembantu Mekanik Hr 75,000

Jepara, Desember 2018

KEPALA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


KABUPATEN JEPARA

Ir. BUDIARTO, MT
Pembina Utama Madya
NIP. 19590410 198603 1 015
DAFTAR HARGA SATUAN BAHAN BANGUNAN
KABUPATEN JEPARA TAHUN 2018

HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)

I. B A H A N DASAR
1 BATU KALI
Pecah 15/20 m3 243,720
Pecah 5/7 m3 275,000
Pecah 3/5 m3 275,000
2 KERIKIL Timbun/Sirtu m3 125,000
Beton/Ciping 0,5/1 m3 215,000
Beton ,1/2 m3 217,100
Beton ,2/3 m3 215,900
Abu batu m3 190,000
AGREGAT (ANALISA SARINGAN)
Agregat Pecah Kasar M3 220,000
Agg. Halus LP A M3 220,000
Lolos screen1 ukuran ( 0 - 5) / aggr. 3 -5 m3 275,000
Lolos screen2 ukuran ( 0 - 5) / abu batu m3 190,000
Lolos screen2 ukuran ( 5 - 9,5) / chipping m3 275,000
Lolos screen2 ukuran ( 9.5 - 19,0) / aggr. 1 - 2 m3 275,000
3 BATU BATA Kudus bh 900
Kalipucang/Clering bh 560
4 BATA RINGAN Uk. 60x20x7,5 cm bh 10,000
Uk. 60x20x10 cm bh 12,000
5 PASIR Urug m3 115,450
Pasang lokal m3 195,750
Beton/Muntilan m3 450,000
6 TANAH Padas m3 60,600
Liat/tanah merah m3 54,000
7 KAPUR Pasang m3 402,800
Semen Merah m3 172,500
8 PORTLAND CEMENT
Semen PC kg 1,450
Semen Putih kg 2,180
Semen warna kg 12,000
9 SEMEN MORTAR Mortar Perekat kg 2,125
Mortar Plesteran kg 1,380
Mortar Acian kg 2,125

II. B A H A N PENUTUP ATAP


HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)

1 GENTENG BETON Genteng Beton Warna standard bh 5,700


Kerpus Beton Warna Standard bh 13,500
2 GENTENG TANAH LIAT
Jatiwangi kecil tak berwarna bh 3,000
Jatiwangi besar tak berwarna bh 6,000
Genteng Pres Lokal bh 1,300
Genteng Murando bh 2,900
Genteng Murando Standar bh 5,200
Genteng M-Class bh 9,500
Genteng KIA bh 9,200
Nok kerpus Jatiwangi bh 10,000
Nok kerpus Lokal bh 5,600
Nok Kerpus Murando bh …………….
Nok Kerpus M-Class bh …………….
Nok Kerpus KIA bh …………….
GENTENG METAL
Genteng Metal bh …………….
Nok Genteng Metal bh …………….
GENTENG SIRAP
Sirap Kayu bh …………….
3 ASBES GELOMBANG
Asbes Gelombang Besar bh 83,000
Asbes Gelombang Kecil bh 36,200
NOK Jabes nok bh 28,000
. Stel Asbes bh 30,000

4 ASBES PLAT
. 100cm X 100 cm X 4 mm bh 25,700

5 FIBRE GLASS (JABES)


Fiber Glass Plat bh 29,800
Fiber Glass Gelombang bh 51,600
6 SENG PLAT
BJLS 0,18 lebar 55 cm m' 20,300
BJLS 0,28 lebar 55 cm m' 28,000
7 SENG GELOMBANG
BJLS 0,20 panjang 180 cm lbr 40,700
8 PENUTUP ATAP LAIN
Rooflight/Multiroof Uk 80/80 tb m2 120,000
Alumunium Foil m2 …………..
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)
Woodplank Lebar 20 cm m1 17,000
Atap Seng Galvalum m2 45,000
III . B A H A N K A Y U
1 JATI m3 16,875,000
2 KAMPER m3 9,000,000
3 KRUING m3 6,750,000
4 MERANTI m3 6,750,000
5 SENGON/HUTAN m3 2,850,000
6 BENGKIRAI m3 9,500,000
7 KAYU KELAPA/GLUGU m3 3,400,000
8 DOLKEN
Kayu cetakan/Randu m3 1,000,000
Kayu bakar m3 203,200
Bambu bt 28,000
9 UKIRAN
Gebyok m2 5,500,000
Kleweran m1 1,250,000
Kleweran Ukiran + Bingkai m1 2,000,000
IV . BAHAN PENUTUP DINDING / LANTAI
1 UBIN (TEGEL BIASA)
PC polos 30 X 30 cm bh 2,950
20 X 20 cm bh 2,950
PC warna 30 X 30 cm bh 6,750
20 X 20 cm bh 6,750
Teraso 30 X 30 cm bh 3,800

2 KERAMIK 40 X 40 cm warna(sekualitas Asia/Mu bh 9,500


40 X 40 cm putih (sekualitas Asia/Mul bh 9,000
30 X 30 cm warna (sekualitas Asia/M bh 4,200
30 X 30 cm putih (sekualitas Asia/Mu bh 4,000
20 X 20 cm bh 2,000
20 X 25 cm bh 2,700
3 Parquet Jati m2 210,000
4 Batu Paras/alam m2 105,000
5 Batu Tempel Hitam m2 111,600
6 GRANITO 40 x 40 cm bh 32,800

60 x 60 cm bh 55,800
V.BAHAN CETAK
1 BUIS BETON
Ø 20 cm - 100 cm bh 78,700
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)
Ø 30 cm - 100 cm bh 102,900
Ø 60 cm - 100 cm bh 227,400
Ø 80 cm - 100 cm bh 387,300
Ø 100 cm - 100 cm bh 486,700
U 15 cm - 100 cm bh 38,700
U 20 cm - 100 cm bh 46,200
U 30 cm - 100 cm bh 76,200

2 LUBANG ANGIN (ROSTER)


Roster Tanah Merah bh 3,800
Roster Beton bh 10,500
Roster Kayu bh 18,400

VI . B A H A N B E S I
1 BESI BETON besi beton polos/Ulir kg 9,500
besi beton prestress kg 16,000

2 BESI PLAT Besi Strip kg 20,200

3 BESI PROFIL Besi Profil kg 18,500

4 JARING - JARING BAJA


Kawat Bronjong/wiremesh kg 17,000
5 BESI SIKU L
L 50 X 50 X 5 m' 35,800
6 KAWAT - Ikat beton/bendrat kg 15,000
- Kawat Kasa m2 21,800
- Saringan pasir m2 15,000
- Kawat bronjong kg 17,300

VII . B A H A N P I P A
1 Pipa PVC AW
Pipa PVC DN 20 ( ½" ) AW m' 6,625
Pipa PVC DN 25 ( ¾" ) AW m' 7,750
Pipa PVC DN 32 ( 1" ) AW m' 9,625
Pipa PVC DN 40 ( 1½" ) AW m' 11,250
Pipa PVC DN 63 ( 2" ) AW m' 13,125
Pipa PVC DN 90 ( 3" ) AW m' 27,500
Pipa PVC DN 110 ( 4" ) AW m' 36,250
Pipa PVC DN 160 ( 6" ) AW m' 43,750
Pipa PVC DN 200 ( 8" ) AW m' 52,500
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)
Pipa PVC DN 250 ( 10" ) AW m' 87,500

VIII . B A H A N L A N G I T - L A N G I T
1 List Kayu Profil Mahoni m' 11,000
2 SOFT BOARD-uk: 4'X 8'
Gypsum tebal 9 mm lbr 65,000
List Gypsum m' 25,000
3 PLY WOOD
Teak wood
. 90 X 210 X 4 mm lbr 80,000
Tripleks
. 120 X 240 X 3 mm lbr 50,000
. 120 X 240 X 4 mm lbr 58,000
. 120 X 240 X 6 mm lbr 71,300
. 120 X 240 X 9 mm lbr 125,000
Multipleks
. 120 X 240 X 9 mm lbr 102,000
4 KalsiBoard
. 120 X 240 X 3,5 mm lbr 48,000
. 120 X 240 X 4,5 mm lbr 55,000
5 Formika ukuran pintu lbr 58,000

IX . B A H A N F I N I S H I N G
1 KAYU
Menie kg 35,000
Dempul plamur kg 32,800
Ambril/amplas lbr 6,500
Cat dasar kg 33,500
cat kayu kg 52,500
Kuas bh 13,200
Sirlak ons 16,900
Spiritus ltr 12,000
Vernish ltr 27,900

2 TEMBOK
Kalkarium kg 6,900
Kapur sirih kg 6,600
Plamur kg 16,000
Undercoat/cat dasar kg 19,000
Cat Tembok Decolite kg 48,000
Mowilex Dalam Ruangan kg 56,000
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)
Mowilex Luar Ruangan kg 96,000
Cat Waterproof sekualitas No Drop kg 50,000
3 BESI
Menie kg 30,600
Cat besi kg 65,000
Minyak cat/Afduner ltr 20,000
Residu (teer/aspal) drum 68,000
Fibre glass (tanki air)
kapasitas 550 liter. bh 855,700
kapasitas 1100 liter. bh 1,506,400
Lem Aica Aibon kg 35,000

4 BAHAN PENUTUP LANTAI DAN DINDING


Wallpaper m2 70,000.00
Lem Kg 45,000.00
Karpet m2 ……………….
Underlayer m2 ……………….
X.BAHAN KACA
1 POLOS 3 mm m2 85,000
5 mm m2 120,000
8 mm m2 135,000
2 KACA HITAM 3 mm m2 135,000
5 mm m2 150,000
8 mm m2 200,000

XI . BAHAN INSTALASI LISTRIK


Stop kontak Broco bh 15,200
Saklar tunggal Broco bh 14,200
Saklar ganda Broco bh 17,000

XII . ALAT - ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM
Biasa 2 X slag bh 77,200
Kamar mandi 1 X slag bh 46,400

2 ENGSEL DAN GERENDEL


Engsel Angin bh 19,800
Engsel Jendela bh 18,500
Engsel Pintu kuningan bh 26,100
Espagnoled - bh 32,000
Grendel biasa bh 8,900
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)
Kait Angin bh 6,900
Door Stop bh 35,000
Door Closer bh 118,400

XIII . BAHAN SANITAIR


1 KLOSET DUDUK bh 1,192,800
2 KLOSET JONGKOK bh 137,600
3 WASTAFEL GANTUNG BULAT bh 355,700
4 TEMPAT SABUN TANAM bh 41,200
5 URINOIR bh 367,500
6 BAK MANDI FIBER bh 280,000
7 BAK CUCI PIRING STAINLES bh 176,100

8 LAIN - LAIN
Kran Air bh 25,700
Seal tape bh 4,100
Floor drain bh 23,100
Water drain bh 60,000
XIV . ALAT PENGIKAT KAYU
1 PAKU - ukuran 1" s/d 5" kg 12,800
2 PAKU - sekrup kg 13,000
3 PAKU - sekrup fizzer bh 1,600
4 PAKU - sumbat / kait kg 7,500
5 MUR BAUT (kuda-kuda) kg 16,000
6 ANGKUR BAUT bh 14,000
7 LEM KAYU bh 12,800
8 Tali Ijuk kg 25,000

X V . PAVING BLOCK
1 Blok pafing tebal 6 cm lokal m2 55,300
2 Blok pafing tebal 8 cm lokal m2 75,000
3 Blok pafing warna tebal 6 cm lokal m2 51,000
4 Blok pafing warna tebal 8 cm lokal m2 57,500
5 Blok pafing blok tebal 6 cm K.225 Holand m2 89,900
Blok pafing blok tebal 6 cm K.225 Hexagonal m2 89,900
6 Blok pafing blok tebal 8 cm K.300 Holland m2 142,400
Blok pafing blok tebal 8 cm K.300 Unipave/Hexagonal m2 142,400
Blok pafing blok tebal 8 cm K.300 Grassblock m2 140,000
7 Blok pafing blok tebal 8 cm K.400 Holland m2 165,000
Blok pafing blok tebal 8 cm K.400 Unipave/Hexagonal m2 165,000
8 KANSTEEN 15/20x30x50 bh 50,000
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)
9 BATACO bh 4,500
10 Glass blox bh 22,600
XVI. L A I N - L A I N
1 Rel Pintu dorong bh 216,200
2 Naco per Daun bh 11,500
3 Rolling door Besi m2 350,000
4 Rolling door Almunium m2 364,000
5 Awning Almunium m2 190,000
6 Profil Alumunium m' 103,200
7 Alumunium strip m' 34,300
8 Besi Hollow 40x40x2 m' 11,300
9 ASPAL.
Aspal Ex Pertamina kg 10,000
10 K A C A
Cermin tebal 5 mm m2 170,000

11 PAGAR BRC. Pagar BRC 90 A2 /lb 198,500


Pagar BRC 120 A2 /lb 272,500
Pagar BRC 90 hot dip galvanis /lb 1,144,300
12 LAIN-LAIN
Minyak Beton & bekisting ltr 10,000
Pintu Lipat Besi m2 434,000
Sealent tube 22,500
Soda api kg 23,200
Sabun kg 8,000
Air ltr 20
Premium ltr 7,050
Minyak Tanah/Kerosen ltr 15,000
Vynil 30x30 cm bh 6,500
Pintu PVC Kamar Madi Sekualitas Willmore bh 475,000

XVII. INSTALASI AIR BERSIH PERDESAAN/PERKOTAAN


1 " Pipa PVC "SII, S 10
Diameter nominal 1/2" m' 3,400
Diameter nominal 3/4" m' 5,000
Diameter nominal 1" m' 22,500
Diameter nominal 1 1/2" m' 29,200
2 " Pipa PVC "SII, S 12.5
Diameter nominal 2" m' 58,200
Diameter nominal 3" m' 51,400
Diameter nominal 4" m' 75,950
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)
3 " Pipa Galvanis " medium
Diameter nominal 1/2" m' 19,900
Diameter nominal 3/4" m' 26,000
Diameter nominal 1" m' 40,000
Diameter nominal 1 1/2" m' 60,100
Diameter nominal 2" m' 173,100
Diameter nominal 3" m' 280,000
Diameter nominal 4" m' 297,200
Diameter nominal 6" m' 417,400
4 " Pipa HDPE " SDR 11(PN16)
Diameter nominal OD 40mm m' 20,400
Diameter nominal OD 50mm m' 31,650
Diameter nominal OD 63mm m' 50,050
Diameter nominal OD 75mm m' 69,900
Diameter nominal OD 90mm m' 101,300
5 " Stop valve "
Diameter nominal 3/4" Bh 75,100
Diameter nominal 1" Bh 121,800
Diameter nominal 1 1/2" Bh 235,700
Diameter nominal 2" Bh 336,500
6 " Gate valve "
Diameter nominal 3" Bh 683,000
Diameter nominal 4" Bh 820,000
Diameter nominal 6" Bh 1,525,000
7 " Reduser " SC/SC
Diameter nominal 160 x 110 mm Bh 285,000
Diameter nominal 110 x 90 mm Bh 135,000
Diameter nominal 63 x 50 mm Bh 22,000
Diameter nominal 50 x 40 mm Bh 5,600
Diameter nominal 40 x 25 mm Bh 3,600
Diameter nominal 25 x 20 mm Bh 2,300
8 " Tee all socket " PVC
Diameter nominal 100 x 100 mm Bh 363,000
Diameter nominal 75 x 75 mm Bh
Diameter nominal 50 x 50 mm Bh 22,000
Diameter nominal 40 x 40 mm Bh 7,800
Diameter nominal 25 x 25 mm Bh 4,700
9 " Bend all socket " PVC
Diameter nominal 75 mm RRJ Bh
Diameter nominal 50 mm RRJ Bh
Diameter nominal 40 mm Bh 5,600
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)
Diameter nominal 25 mm Bh 3,200
Diameter nominal 20 mm Bh 2,000
10 " Bend all socket " GI
Diameter nominal 2" Bh 21,550
Diameter nominal 1 1/2" Bh 14,000
Diameter nominal 1" Bh 6,900
Diameter nominal 3/4" Bh 4,750
11 " Clamp sadle " GI
Diameter nominal 3" x 3/4" Bh 24,600
Diameter nominal 2" x 3/4" Bh 15,000
Diameter nominal 1 1/2" x 3/4" Bh 13,800
Diameter nominal 1" x 3/4" Bh 13,800
12 " Valve socket " PVC
Diameter nominal 50 mm Bh 5,200
Diameter nominal 40 mm Bh 3,800
Diameter nominal 25 mm Bh 2,100
Diameter nominal 20 mm Bh 1,400
13 " Flange socket " PVC
Diameter nominal 50 mm Bh 41,000
Diameter nominal 63 mm Bh 126,000
Diameter nominal 110 mm Bh 236,000
Diameter nominal 160 mm Bh 525,000
14 " Faucet socket " PVC
Diameter nominal 50 mm Bh 6,300
Diameter nominal 40 mm Bh 4,600
Diameter nominal 25 mm Bh 3,000
Diameter nominal 20 mm Bh 1,800
15 " D o f " PVC
Diameter nominal 100 mm Bh 121,000
Diameter nominal 75 mm Bh 14,300
Diameter nominal 50 mm Bh 8,150
Diameter nominal 40 mm Bh 5,600
Diameter nominal 25 mm Bh 1,600
Diameter nominal 20 mm Bh 1,000
16 " Water meter 1/2"
Water Meter Baik Bh 265,000
Water Meter Sedang Bh 150,000
Water Meter Biasa Bh 70,000
17 " Chek valve "
Diameter nominal 3" Bh 840,000
Diameter nominal 4" Bh 1,205,000
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)
Diameter nominal 6" Bh 2,100,000
18 " Bend all flange " CI - 45'
Diameter nominal 3" Bh 176,000
Diameter nominal 4" Bh 265,000
Diameter nominal 6" Bh 410,000
19 " Air valve " CI
Diameter nominal 1" Bh 215,000
Diameter nominal 3/4" Bh 195,000
20 " Stred boox "
Diameter nominal 3" Bh 110,000
Diameter nominal 4" Bh 165,000
21 "Accessories"
Float Valve 2" Bh 950,000
Doble neple GI dia 3/4" Bh 1,800
Tee all socket GI dia 3/4" Bh 4,600
Valve socket GI dia 3/4" Bh 2,600
Kran stainless steel Bh 18,600
Verlop ring 1 " x 3/4" Bh 8,300
Sock GIP dia 1" Bh 3,300
Sock GIP dia 3/4" Bh 2,600
Tee faucet dia 20 mm PVC Bh 5,400
Bend faucet dia 20 mm PVC Bh 3,400
Submersible pump 5.5 KW/1 Phase Unit 29,508,000
Submersible pump 11 KW/3 Phase Unit 53,655,900
Panel submersible pump 5.5 KW Unit 2,864,600
Panel submersible pump 11 KW Unit 4,688,400
Submersible pump 2.2 KW/1 Phase Unit 14,000,000
Panel submersible pump 2.2 KW Unit 2,500,000
Bend all sock GIP diameter 3" Bh 21,400
Tee all sock GIP diameter 3" Bh 17,900
Pasang tangga bahan pipa GIP dn 1" Bh 198,500
Tutup man hole & tutup pengaman lengkap 3 mm Unit 297,700
Speed Kran DN 20 mm Bh 18,600
Gate Valev DN 50 mm Bh 168,700
Flends diameter 150 mm Bh 99,200
Pelurus / Centering tiap 30 mm set 36,000
Reduser DN 100 x 150 mm set 509,300
Filter Grevel m3 180,000
Grouting m 480,300
Tangki fiberglas kapasitas 1 m3 m' 3,959,100
Tangki fiberglas kapasitas 2 m3 m' 4,688,400
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)
Float Valve 2" Bh 860,000
Box Meter Bh 45,000
Adaptor Coupler PE 2" Bh 134,000
Adaptor Coupler PE 3" Bh 350,000
Adaptor Coupler PE 1 1/2" Bh 90,000
K. Sadle 2 x 1/2 Bh 15,000
22 "Pembuatan Sumur Produksi"
Solar ltr 5,900
Olie ltr 35,300
Bentonite kg 11,400
Veet/grease kg 33,100
Gravel pack m3 173,900
Kawat las btg 900
Pipa jambang diameter 8" ( GI) m' 440,000
Pipa jambang diameter 6" (GI) m' 302,000
Pipa buta diamter 6" ( GI ) m' 310,000
Pipa buta diamter 4" (GI ) m' 198,000
Pipa saringan stainless steel diameter 6" m' 1,955,000
Pipa saringan stainless steel diameter 4" m' 1,335,000

Jepara, Desember 2018

KEPALA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


KABUPATEN JEPARA

Ir. BUDIARTO, MT
Pembina Utama Madya
NIP. 19590410 198603 1 015
DAFTAR HARGA SATUAN BAHAN BANGUNAN
KABUPATEN JEPARA TAHUN 2019

HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)

I. B A H A N DASAR
1 BATU KALI
Pecah 15/20 m3 243,720
Pecah 5/7 m3 275,000
Pecah 3/5 m3 275,000
2 KERIKIL Timbun/Sirtu m3 125,000
Beton/Ciping 0,5/1 m3 215,000
Beton ,1/2 m3 217,100
Beton ,2/3 m3 215,900
Abu batu m3 190,000
AGREGAT (ANALISA SARINGAN)
Agregat Pecah Kasar M3 220,000
Agg. Halus LP A M3 220,000
Lolos screen1 ukuran ( 0 - 5) / aggr. 3 -5 m3 275,000
Lolos screen2 ukuran ( 0 - 5) / abu batu m3 190,000
Lolos screen2 ukuran ( 5 - 9,5) / chipping m3 275,000
Lolos screen2 ukuran ( 9.5 - 19,0) / aggr. 1 - 2 m3 275,000
3 BATU BATA Kudus bh 900
Kalipucang/Clering bh 560
4 BATA RINGAN Uk. 60x20x7,5 cm bh 10,000
Uk. 60x20x10 cm bh 12,000
5 PASIR Urug m3 115,450
Pasang lokal m3 195,750
Beton/Muntilan m3 450,000
6 TANAH Padas m3 60,600
Liat/tanah merah m3 54,000
7 KAPUR Pasang m3 402,800
Semen Merah m3 172,500
8 PORTLAND CEMENT
Semen PC kg 1,450
Semen Putih kg 2,180
Semen warna kg 12,000
9 SEMEN MORTAR Mortar Perekat kg 2,125
Mortar Plesteran kg 1,380
Mortar Acian kg 2,125

II. B A H A N PENUTUP ATAP

1 GENTENG BETON Genteng Beton Warna standard bh 5,700


Kerpus Beton Warna Standard bh 13,500
2 GENTENG TANAH LIAT
Jatiwangi kecil tak berwarna bh 3,000
Jatiwangi besar tak berwarna bh 6,000
Genteng Pres Lokal Kecil bh 1,300
Genteng Pres Lokal Besar bh 2,000
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)
Genteng Pres Lokal Kecil Fin.Cat bh 2,000
Genteng Pres Lokal Besar Fin.Ca bh 3,000
Genteng Murando bh 2,900
Genteng Murando Standar bh 5,200
Genteng M-Class bh 9,500
Genteng KIA bh 9,200
Nok kerpus Jatiwangi Kecil bh 10,000
Nok kerpus Jatiwangi Besar bh 19,000
Nok kerpus Lokal Besar bh 10,000
Nok Kerpus Murando bh 12,000
Nok Kerpus M-Class bh 23,000
Nok Kerpus KIA bh 23,000
GENTENG METAL
Genteng Metal bh 80,000
Nok Genteng Metal bh 35,000
GENTENG SIRAP
Sirap Kayu bh 2,700
3 ASBES GELOMBANG
Asbes Gelombang Besar bh 83,000
Asbes Gelombang Kecil bh 36,200
NOK Jabes nok bh 28,000
. Stel Asbes bh 30,000

4 ASBES PLAT
. 100cm X 100 cm X 4 mm bh 25,700

5 FIBRE GLASS (JABES)


Fiber Glass Plat bh 29,800
Fiber Glass Gelombang bh 51,600
6 SENG PLAT
BJLS 0,18 lebar 55 cm m' 20,300
BJLS 0,28 lebar 55 cm m' 28,000
7 SENG GELOMBANG
BJLS 0,20 panjang 180 cm lbr 40,700
8 PENUTUP ATAP LAIN
Rooflight m2 120,000
Alumunium Foil tb 4 mm m2 15,800
Woodplank Lebar 20 cm m1 17,000
Atap Seng Galvalum m2 45,000
Onduline 95 x 200 m2 81,600
Onduvila 40 x 105 m2 131,000
Metalroof Berpasir 40 x 100 m2 100,000
Screw bh 1,000
III . B A H A N KAYU
1 JATI m3 16,875,000
2 KAMPER m3 9,000,000
3 KRUING m3 6,750,000
4 MERANTI m3 6,750,000
5 SENGON/HUTAN m3 2,850,000
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)
6 BENGKIRAI m3 9,500,000
7 KAYU KELAPA/GLUGU m3 3,400,000
8 DOLKEN
Kayu cetakan/Randu m3 1,000,000
Kayu bakar m3 203,200
Bambu bt 8,000
9 UKIRAN
Gebyok + Finishing m2 2,000,000
Kleweran Finishing Waterbase m2 1,250,000
Ukiran Tempel m2 1,000,000
IV . BAHAN PENUTUP DINDING / LANTAI
1 UBIN (TEGEL BIASA)
PC polos 30 X 30 cm bh 2,950
20 X 20 cm bh 2,950
40 X 40 cm bh 2,950
PC warna 30 X 30 cm bh 6,750
20 X 20 cm bh 6,750
40 X 40 cm bh 6,750
Teraso 30 X 30 cm bh 9,000

2 KERAMIK 40 X 40 cm warna(sekualitas Asi bh 9,500


40 X 40 cm putih (sekualitas Asi bh 9,000
30 X 30 cm warna (sekualitas As bh 4,200
30 X 30 cm putih (sekualitas Asi bh 4,000
20 X 20 cm bh 2,000
20 X 25 cm bh 2,700
60 X 60 cm warna (Sekualitas As bh 21,250
3 Parquet Jati m2 210,000
4 Batu Paras/alam m2 105,000
5 Batu Tempel Hitam m2 111,600
6 GRANITILE/HOMOGEN40 x 40 cm bh 32,800

60 x 60 cm bh 55,800
V.BAHAN CETAK
1 BUIS BETON
Ø 20 cm - 100 cm bh 78,700
Ø 30 cm - 100 cm bh 102,900
Ø 60 cm - 100 cm bh 227,400
Ø 80 cm - 100 cm bh 387,300
Ø 100 cm - 100 cm bh 486,700
U 15 cm - 100 cm bh 38,700
U 20 cm - 100 cm bh 46,200
U 30 cm - 100 cm bh 76,200

2 LUBANG ANGIN (ROSTER)


Roster Tanah Merah bh 3,800
Roster Beton bh 10,500
Roster Kayu bh 18,400
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)
VI . B A H A N BESI
1 BESI BETON besi beton polos/Ulir kg 11,500
besi beton prestress kg 16,000

2 BESI PLAT Besi Strip kg 20,200

3 BESI PROFIL Besi Profil kg 18,500

4 JARING - JARING BAJA


Kawat Bronjong/wiremesh kg 17,000
5 BESI SIKU L
L 50 X 50 X 5 m' 35,800
6 KAWAT - Ikat beton/bendrat kg 15,000
- Kawat Kasa m2 21,800
- Saringan pasir m2 15,000
- Kawat bronjong kg 17,300

VII . B A H A N PIPA
1 Pipa PVC AW
Pipa PVC DN 20 ( ½" ) AW m' 3,600
Pipa PVC DN 25 ( ¾" ) AW m' 4,800
Pipa PVC DN 32 ( 1" ) AW m' 6,600
Pipa PVC DN 40 ( 1½" ) AW m' 11,300
Pipa PVC DN 63 ( 2" ) AW m' 14,500
Pipa PVC DN 90 ( 3" ) AW m' 29,700
Pipa PVC DN 110 ( 4" ) AW m' 49,100
Pipa PVC DN 160 ( 6" ) AW m' 109,150
Pipa PVC DN 200 ( 8" ) AW m' 183,150
Pipa PVC DN 250 ( 10" ) AW m' 283,150

VIII . B A H A N LANGIT - LANGIT


1 List Kayu Profil Mahoni m' 10,000
2 SOFT BOARD-uk: 4'X 8'
Gypsum tebal 9 mm lbr 65,000
List Gypsum m' 25,000
3 PLY WOOD
Teak wood
. 90 X 210 X 4 mm lbr 80,000
Tripleks
. 120 X 240 X 3 mm lbr 50,000
. 120 X 240 X 4 mm lbr 58,000
. 120 X 240 X 6 mm lbr 71,300
. 120 X 240 X 9 mm lbr 125,000
Multipleks
. 120 X 240 X 9 mm lbr 102,000
4 KalsiBoard
. 120 X 240 X 3,5 mm lbr 48,000
. 120 X 240 X 4,5 mm lbr 55,000
5 Formika ukuran pintu lbr 58,000
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)

IX . B A H A N FINISHING
1 KAYU
Menie kg 35,000
Dempul plamur kg 32,800
Ambril/amplas lbr 6,500
Cat dasar kg 33,500
cat kayu kg 52,500
Kuas bh 13,200
Sirlak ons 16,900
Spiritus ltr 12,000
Vernish ltr 27,900

2 TEMBOK
Kalkarium kg 6,900
Kapur sirih kg 6,600
Plamur kg 16,000
Undercoat/cat dasar kg 19,000
Cat Tembok Decolite kg 48,000
Mowilex Dalam Ruangan kg 56,000
Mowilex Luar Ruangan kg 96,000
Cat Waterproof sekualitas No Drop kg 50,000
Wallpaper peuntup dinding m2 70,000
3 BESI
Menie kg 30,600
Cat besi kg 65,000
Minyak cat/Afduner ltr 20,000
Residu (teer/aspal) drum 68,000
Fibre glass (tanki air)
kapasitas 550 liter. bh 855,700
kapasitas 1100 liter. bh 1,506,400
Lem Aica Aibon kg 35,000

4 BAHAN PENUTUP LANTAI DAN DINDING


Wallpaper m2 70,000.00
Lem Kg 45,000.00
Karpet tb 6 mm ex.Atrium m2 150,000.00
Underlayer m2 6,000.00

X.BAHAN KACA
1 POLOS 3 mm m2 85,000
5 mm m2 120,000
8 mm m2 135,000
2 KACA HITAM 3 mm m2 135,000
5 mm m2 150,000
8 mm m2 200,000

XI . BAHAN INSTALASI LISTRIK


Instalasi Listrik titik 150,000
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)
Stop kontak Broco bh 15,000
Saklar tunggal Broco bh 13,000
Saklar ganda Broco bh 17,500
Fitting bh 4,000
Kabel 1x1.5 m1 10,500
Kabel 2x2.6 m1 25,000

XII . ALAT - ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM
Biasa 2 X slag bh 77,200
Kamar mandi 1 X slag bh 46,400

2 ENGSEL DAN GERENDEL


Engsel Angin bh 19,800
Engsel Jendela bh 18,500
Engsel Pintu kuningan bh 26,100
Espagnoled - bh 32,000
Grendel biasa bh 8,900
Kait Angin bh 6,900
Door Stop bh 35,000
Door Closer bh 118,400

XIII . BAHAN SANITAIR


1 KLOSET DUDUK bh 1,192,800
2 KLOSET JONGKOK bh 137,600
3 WASTAFEL GANTUNG BULAT bh 355,700
4 TEMPAT SABUN TANAM bh 41,200
5 URINOIR bh 367,500
6 BAK MANDI FIBER bh 280,000
7 BAK CUCI PIRING STAINLES bh 176,100

8 LAIN - LAIN
Kran Air bh 25,700
Seal tape bh 4,100
Floor drain bh 23,100
Water drain bh 60,000
XIV . ALAT PENGIKAT KAYU
1 PAKU - ukuran 1" s/d 5" kg 12,800
2 PAKU - sekrup kg 13,000
3 PAKU - sekrup fizzer bh 1,600
4 PAKU - sumbat / kait kg 7,500
5 MUR BAUT (kuda-kuda) kg 16,000
6 ANGKUR BAUT bh 14,000
7 LEM KAYU bh 12,800
8 Tali Ijuk kg 25,000

X V . PAVING BLOCK
1 Blok pafing tebal 6 cm lokal m2 55,300
2 Blok pafing tebal 8 cm lokal m2 75,000
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)
3 Blok pafing warna tebal 6 cm lokal m2 51,000
4 Blok pafing warna tebal 8 cm lokal m2 57,500
5 Blok pafing blok tebal 6 cm K.225 Holand m2 90,000
Blok pafing blok tebal 6 cm K.225 Hexagonal m2 104,000
6 Blok pafing blok tebal 8 cm K.300 Holland m2 140,000
Blok pafing blok tebal 8 cm K.300 Unipave/Hexagonal m2 145,000
Blok pafing blok tebal 8 cm K.300 Grassblock m2 150,000
7 Blok pafing blok tebal 8 cm K.400 Holland m2 155,000
Blok pafing blok tebal 8 cm K.400 Unipave/Hexagonal m2 160,000
8 KANSTEEN 15/20x30x50 bh 50,000
9 BATACO bh 4,500
10 Glass blox bh 22,600
XVI. L A I N - L A I N
1 Rel Pintu dorong bh 216,200
2 Naco per Daun bh 11,500
3 Rolling door Besi m2 350,000
4 Rolling door Almunium m2 364,000
5 Awning Almunium m2 190,000
6 Profil Alumunium m' 103,200
7 Alumunium strip m' 34,300
8 Besi Hollow 40x40x0.6 mm m' 11,300
9 ASPAL.
Aspal Ex Pertamina kg 10,000
10 KACA
Cermin tebal 5 mm m2 170,000

11 PAGAR BRC. Pagar BRC 90 A2 /lb 198,500


Pagar BRC 120 A2 /lb 272,500
Pagar BRC 90 hot dip galvanis /lb 1,144,300
12 LAIN-LAIN
Minyak Beton & bekisting ltr 10,000
Pintu Lipat Besi m2 434,000
Sealent tube 22,500
Soda api kg 23,200
Sabun kg 8,000
Air ltr 20
Premium ltr 7,050
Minyak Tanah/Kerosen ltr 15,000
Vynil 30x30 cm bh 6,500
Pintu PVC Kamar Madi Sekualitas Willmore bh 475,000

XVII. INSTALASI AIR BERSIH PERDESAAN/PERKOTAAN


1 " Pipa PVC "SII, S 10
Diameter nominal 1/2" m' 3,400
Diameter nominal 3/4" m' 5,000
Diameter nominal 1" m' 22,500
Diameter nominal 1 1/2" m' 29,200
2 " Pipa PVC "SII, S 12.5
Diameter nominal 2" m' 58,200
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)
Diameter nominal 3" m' 51,400
Diameter nominal 4" m' 75,950
3 " Pipa Galvanis " medium
Diameter nominal 1/2" m' 19,900
Diameter nominal 3/4" m' 26,000
Diameter nominal 1" m' 40,000
Diameter nominal 1 1/2" m' 60,100
Diameter nominal 2" m' 173,100
Diameter nominal 3" m' 280,000
Diameter nominal 4" m' 297,200
Diameter nominal 6" m' 417,400
4 " Pipa HDPE " SDR 11(PN16)
Diameter nominal OD 40mm m' 20,400
Diameter nominal OD 50mm m' 31,650
Diameter nominal OD 63mm m' 50,050
Diameter nominal OD 75mm m' 69,900
Diameter nominal OD 90mm m' 101,300
5 " Stop valve "
Diameter nominal 3/4" Bh 75,100
Diameter nominal 1" Bh 121,800
Diameter nominal 1 1/2" Bh 235,700
Diameter nominal 2" Bh 336,500
6 " Gate valve "
Diameter nominal 3" Bh 683,000
Diameter nominal 4" Bh 820,000
Diameter nominal 6" Bh 1,525,000
7 " Reduser " SC/SC
Diameter nominal 160 x 110 mm Bh 285,000
Diameter nominal 110 x 90 mm Bh 135,000
Diameter nominal 63 x 50 mm Bh 22,000
Diameter nominal 50 x 40 mm Bh 5,600
Diameter nominal 40 x 25 mm Bh 3,600
Diameter nominal 25 x 20 mm Bh 2,300
8 " Tee all socket " PVC
Diameter nominal 100 x 100 mm Bh 363,000
Diameter nominal 75 x 75 mm Bh
Diameter nominal 50 x 50 mm Bh 22,000
Diameter nominal 40 x 40 mm Bh 7,800
Diameter nominal 25 x 25 mm Bh 4,700
9 " Bend all socket " PVC
Diameter nominal 75 mm RRJ Bh
Diameter nominal 50 mm RRJ Bh
Diameter nominal 40 mm Bh 5,600
Diameter nominal 25 mm Bh 3,200
Diameter nominal 20 mm Bh 2,000
10 " Bend all socket " GI
Diameter nominal 2" Bh 21,550
Diameter nominal 1 1/2" Bh 14,000
Diameter nominal 1" Bh 6,900
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)
Diameter nominal 3/4" Bh 4,750
11 " Clamp sadle " GI
Diameter nominal 3" x 3/4" Bh 24,600
Diameter nominal 2" x 3/4" Bh 15,000
Diameter nominal 1 1/2" x 3/4" Bh 13,800
Diameter nominal 1" x 3/4" Bh 13,800
12 " Valve socket " PVC
Diameter nominal 50 mm Bh 5,200
Diameter nominal 40 mm Bh 3,800
Diameter nominal 25 mm Bh 2,100
Diameter nominal 20 mm Bh 1,400
13 " Flange socket " PVC
Diameter nominal 50 mm Bh 41,000
Diameter nominal 63 mm Bh 126,000
Diameter nominal 110 mm Bh 236,000
Diameter nominal 160 mm Bh 525,000
14 " Faucet socket " PVC
Diameter nominal 50 mm Bh 6,300
Diameter nominal 40 mm Bh 4,600
Diameter nominal 25 mm Bh 3,000
Diameter nominal 20 mm Bh 1,800
15 " D o f " PVC
Diameter nominal 100 mm Bh 121,000
Diameter nominal 75 mm Bh 14,300
Diameter nominal 50 mm Bh 8,150
Diameter nominal 40 mm Bh 5,600
Diameter nominal 25 mm Bh 1,600
Diameter nominal 20 mm Bh 1,000
16 " Water meter 1/2"
Water Meter Baik Bh 265,000
Water Meter Sedang Bh 150,000
Water Meter Biasa Bh 70,000
17 " Chek valve "
Diameter nominal 3" Bh 840,000
Diameter nominal 4" Bh 1,205,000
Diameter nominal 6" Bh 2,100,000
18 " Bend all flange " CI - 45'
Diameter nominal 3" Bh 176,000
Diameter nominal 4" Bh 265,000
Diameter nominal 6" Bh 410,000
19 " Air valve " CI
Diameter nominal 1" Bh 215,000
Diameter nominal 3/4" Bh 195,000
20 " Stred boox "
Diameter nominal 3" Bh 110,000
Diameter nominal 4" Bh 165,000
21 "Accessories"
Float Valve 2" Bh 950,000
Doble neple GI dia 3/4" Bh 1,800
HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)
Tee all socket GI dia 3/4" Bh 4,600
Valve socket GI dia 3/4" Bh 2,600
Kran stainless steel Bh 18,600
Verlop ring 1 " x 3/4" Bh 8,300
Sock GIP dia 1" Bh 3,300
Sock GIP dia 3/4" Bh 2,600
Tee faucet dia 20 mm PVC Bh 5,400
Bend faucet dia 20 mm PVC Bh 3,400
Submersible pump 5.5 KW/1 Phase Unit 29,508,000
Submersible pump 11 KW/3 Phase Unit 53,655,900
Panel submersible pump 5.5 KW Unit 2,864,600
Panel submersible pump 11 KW Unit 4,688,400
Submersible pump 2.2 KW/1 Phase Unit 14,000,000
Panel submersible pump 2.2 KW Unit 2,500,000
Bend all sock GIP diameter 3" Bh 21,400
Tee all sock GIP diameter 3" Bh 17,900
Pasang tangga bahan pipa GIP dn 1" Bh 198,500
Tutup man hole & tutup pengaman lengkap 3 mm Unit 297,700
Speed Kran DN 20 mm Bh 18,600
Gate Valev DN 50 mm Bh 168,700
Flends diameter 150 mm Bh 99,200
Pelurus / Centering tiap 30 mm set 36,000
Reduser DN 100 x 150 mm set 509,300
Filter Grevel m3 180,000
Grouting m 480,300
Tangki fiberglas kapasitas 1 m3 m' 3,959,100
Tangki fiberglas kapasitas 2 m3 m' 4,688,400
Float Valve 2" Bh 860,000
Box Meter Bh 45,000
Adaptor Coupler PE 2" Bh 134,000
Adaptor Coupler PE 3" Bh 350,000
Adaptor Coupler PE 1 1/2" Bh 90,000
K. Sadle 2 x 1/2 Bh 15,000
22 "Pembuatan Sumur Produksi"
Solar ltr 5,900
Olie ltr 35,300
Bentonite kg 11,400
Veet/grease kg 33,100
Gravel pack m3 173,900
Kawat las btg 900
Pipa jambang diameter 8" ( GI) m' 440,000
Pipa jambang diameter 6" (GI) m' 302,000
Pipa buta diamter 6" ( GI ) m' 310,000
Pipa buta diamter 4" (GI ) m' 198,000
Pipa saringan stainless steel diameter 6" m' 1,955,000
Pipa saringan stainless steel diameter 4" m' 1,335,000

Jepara, Desember 2018


HARGA
NO. J E N I S B A H A N SATUAN BAHAN KETERANGAN
(Rp)

KEPALA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG


KABUPATEN JEPARA

Ir. BUDIARTO, MT
Pembina Utama Madya
NIP. 19590410 198603 1 015
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp

VII ATAP HARGA SATUAN ASESORIS PEKERJAAN ATAP


1 H.A.1 Pasang Nok Onduvila
A Tenaga
Pekerja L.01 OH 0.250 80,000.00 20,000.00
Tukang Batu L.02 OH 0.000 100,000.00 -
Kepala Tukang L.03 OH 0.000 110,000.00 -
Mandor L.04 OH 0.000 115,000.00 -
20,000.00
B Bahan
Nok bh 1.000 115,000.00 115,000.00
Asesoris ls 6.000 3,000.00 18,000.00
0.000 0.00 -
0.000 0.00 -
133,000.00
C PERALATAN
D Jumlah A + B + C 153,000.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 153,000.00
Overhead & Profit 12.5%
2 H.A.2 Pasang List Plank Conwood IF 2 in 1
A Tenaga
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang Batu L.02 OH 0.000 100,000.00 -
Kepala Tukang L.03 OH 0.000 110,000.00 -
Mandor L.04 OH 0.000 115,000.00 -
16,000.00
B Bahan
List Plank Conwood If 2 in 1 Lebar 23,5 cm m 1.000 40,000.00 40,000.00
Asesoris dan Conector ls 1.000 15,000.00 15,000.00
Dudukan List Plank Menerus dg Baja ringan ls 1.000 60,000.00 60,000.00
Air 0 0.000 0.00 -
115,000.00
C PERALATAN
D Jumlah A + B + C 131,000.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 131,000.00
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp
3
A Tenaga
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
Mandor L.04 OH 0.083 115,000.00 9,545.00
172,125.00
B Bahan
Portland Semen Kg 299.000 40,000.00 11,960,000.00
Pasir Beton kg 799.000 15,000.00 11,985,000.00
Kerikil (maksimum 30 mm) kg 1017.000 60,000.00 61,020,000.00
Air ltr 215.000 0.00 -
84,965,000.00
C PERALATAN
D Jumlah A + B + C 85,137,125.00
E Overhead & Profit 12.5% 10,642,140.63
F Harga Satuan Pekerjaan (D+E) 95,779,265.63

4 H.A.3 PEKERJAAN SANITASI DALAM GEDUNG


A Tenaga
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.02 OH 0.000 100,000.00 -
Kepala Tukang L.03 OH 0.000 110,000.00 -
Mandor L.04 OH 0.000 115,000.00 -
24,000.00
B Bahan
Pipa PVC 3" m 4.500 72,157.50 324,708.75
Keni bh 2.000 20,000.00 40,000.00
Lem bh 0.500 15,000.00 7,500.00
ltr 0.000 20.00 -
372,208.75
C PERALATAN
D Jumlah A + B + C 396,208.75
E Overhead & Profit 12.5% 49,526.09
F Harga Satuan Pekerjaan (D+E) 445,734.84
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp
5 A.4.1.1.6 Pekerjaan Pemasangan Pipa Air Bersih
A Tenaga
Pekerja L.01 OH 0.300 80,000.00 24,000.00
Tukang Batu L.02 OH 0.000 100,000.00 -
Kepala Tukang L.03 OH 0.000 110,000.00 -
Mandor L.04 OH 0.000 115,000.00 -
24,000.00
B Bahan
Pemasangan Pipa PVC tipe AW Ø ½" m 1.500 72,157.50 108,236.25
Pasir Beton Kg 731.000 20,000.00 14,620,000.00
Kerikil (maksimum 30 mm) Kg 1031.000 15,000.00 15,465,000.00
Air ltr 215.000 20.00 4,300.00
30,197,536.25
C PERALATAN
D Jumlah A + B + C 30,221,536.25
E Overhead & Profit 12.5% 3,777,692.03
F Harga Satuan Pekerjaan (D+E) 33,999,228.28

6 A.4.1.1.7 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
A Tenaga
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.000 100,000.00 -
Kepala Tukang L.03 OH 0.000 110,000.00 -
Mandor L.04 OH 0.000 115,000.00 -
132,000.00
B Bahan
Portland Semen Kg 371.000 72,157.50 26,770,432.50
Pasir Beton Kg 698.000 20,000.00 13,960,000.00
Kerikil (maksimum 30 mm) Kg 1047.000 15,000.00 15,705,000.00
Air ltr 215.000 20.00 4,300.00
56,439,732.50
C PERALATAN
D Jumlah A + B + C 56,571,732.50
E Overhead & Profit 12.5% 7,071,466.56
F Harga Satuan Pekerjaan (D+E) 63,643,199.06
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp
7 A.4.1.1.8 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
A Tenaga
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.000 100,000.00 -
Kepala Tukang L.03 OH 0.000 110,000.00 -
Mandor L.04 OH 0.000 115,000.00 -
132,000.00
B Bahan
Portland Semen Kg 384.000 72,157.50 27,708,480.00
Pasir Beton Kg 692.000 20,000.00 13,840,000.00
Kerikil (maksimum 30 mm) Kg 1039.000 15,000.00 15,585,000.00
Air ltr 215.000 20.00 4,300.00
57,137,780.00
C PERALATAN
D Jumlah A + B + C 57,269,780.00
E Overhead & Profit 12.5% 7,158,722.50
F Harga Satuan Pekerjaan (D+E) 64,428,502.50

8 A.4.1.1.9 Membuat Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53
A Tenaga
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.000 100,000.00 -
Kepala Tukang L.03 OH 0.000 110,000.00 -
Mandor L.04 OH 0.000 115,000.00 -
132,000.00
B Bahan
Portland Semen Kg 406.000 72,157.50 29,295,945.00
Pasir Beton kg 684.000 20,000.00 13,680,000.00
Kerikil (maksimum 30 mm) kg 1026.000 15,000.00 15,390,000.00
Air ltr 215.000 20.00 4,300.00
58,370,245.00
C PERALATAN
D Jumlah A + B + C 58,502,245.00
E Overhead & Profit 12.5% 7,312,780.63
F Harga Satuan Pekerjaan (D+E) 65,815,025.63
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp
9 A.4.1.1.10 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52
A Tenaga
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.000 100,000.00 -
Kepala Tukang L.03 OH 0.000 110,000.00 -
Mandor L.04 OH 0.000 115,000.00 -
132,000.00
B Bahan
Portland Semen Kg 413.000 72,157.50 29,801,047.50
Pasir Beton Kg 681.000 20,000.00 13,620,000.00
Kerikil (maksimum 30 mm) Kg 1021.000 15,000.00 15,315,000.00
Air ltr 215.000 20.00 4,300.00
58,740,347.50
C PERALATAN
D Jumlah A + B + C 58,872,347.50
E Overhead & Profit 12.5% 7,359,043.44
F Harga Satuan Pekerjaan (D+E) 66,231,390.94

10 A.4.1.1.17 Pembesian 10 kg dg Besi Polos atau Besi Ulir


A Tenaga
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang Besi L.02 OH 0.070 100,000.00 7,000.00
Kepala Tukang L.03 OH 0.007 110,000.00 770.00
Mandor L.04 OH 0.004 115,000.00 460.00
13,830.00
B Bahan
Besi Beton (polos/ulir) Kg 10.500 11,500.00 120,750.00
Kawat Beton Kg 0.150 15,000.00 2,250.00
123,000.00
C PERALATAN
D Jumlah A + B + C 136,830.00
E Overhead & Profit 12.5% 17,103.75
F Harga Satuan Pekerjaan (D+E) 153,933.75
Jadi untuk pembesian 1 kg dibagi 10 15,393.38

11 A.4.1.1.19 Jaring Kawat baja/Wire Mesh / 10 kg


A Tenaga
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang Besi L.02 OH 0.025 100,000.00 2,500.00
Kepala Tukang L.03 OH 0.002 110,000.00 220.00
Mandor L.04 OH 0.001 115,000.00 115.00
4,835.00
B Bahan
Jaring Kawat Baja dilas/wiremesh Kg 10.200 17,000.00 173,400.00
Kawat Beton Kg 0.050 15,000.00 750.00
174,150.00
C PERALATAN
D Jumlah A + B + C 178,985.00
E Overhead & Profit 12.5% 22,373.13
F Harga Satuan Pekerjaan (D+E) 201,358.13
Jadi untuk pembesian 1 kg dibagi 10 20,135.81
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp

12 A.4.1.1.20 Memasang Bekisting untuk Pondasi


A Tenaga
Pekerja L.01 OH 0.520 80,000.00 41,600.00
Tukang Kayu L.02 OH 0.260 100,000.00 26,000.00
Kepala Tukang L.03 OH 0.026 110,000.00 2,860.00
Mandor L.04 OH 0.026 115,000.00 2,990.00
73,450.00
B Bahan
Kayu Klas III (Randu) m3 0.040 1,000,000.00 40,000.00
Paku Biasa 2" - 5" Kg 0.300 12,800.00 3,840.00
Minyak Bekisting Ltr 0.100 -
43,840.00
C PERALATAN
D Jumlah A + B + C 117,290.00
E Overhead & Profit 12.5% 14,661.25
F Harga Satuan Pekerjaan (D+E) 131,951.25

13 A.4.1.1.21 Memasang Bekisting untuk Sloof


A Tenaga
Pekerja L.01 OH 0.520 80,000.00 41,600.00
Tukang Kayu L.02 OH 0.260 100,000.00 26,000.00
Kepala Tukang L.03 OH 0.026 110,000.00 2,860.00
Mandor L.04 OH 0.026 115,000.00 2,990.00
73,450.00
B Bahan
Kayu Klas III (Randu) m3 0.045 1,000,000.00 45,000.00
Paku Biasa 2" - 5" Kg 0.300 12,800.00 3,840.00
Minyak Bekisting Ltr 0.100 0.00 -
48,840.00
C PERALATAN
D Jumlah A + B + C 122,290.00
E Overhead & Profit 12.5% 15,286.25
F Harga Satuan Pekerjaan (D+E) 137,576.25
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp
14 A.4.1.1.22 Memasang Bekisting untuk Kolom
A Tenaga
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.330 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.033 110,000.00 3,630.00
Mandor L.04 OH 0.033 115,000.00 3,795.00
93,225.00
B Bahan
Kayu Klas III (Randu) m3 0.040 1,000,000.00 40,000.00
Paku Biasa 2" - 5" Kg 0.400 12,800.00 5,120.00
Minyak Bekisting Ltr 0.200 0.00 -
Balok Kayu m3 0.015 1,000,000.00 15,000.00
Plywood tebal 9mm Lbr 0.350 102,000.00 35,700.00
Bambu Btg 2.000 8,000.00 16,000.00
111,820.00
C PERALATAN
D Jumlah A + B + C 205,045.00
E Overhead & Profit 12.5% 25,630.63
F Harga Satuan Pekerjaan (D+E) 230,675.63

15 A.4.1.1.23 Memasang Bekisting untuk Balok


A Tenaga
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.330 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.033 110,000.00 3,630.00
Mandor L.04 OH 0.033 115,000.00 3,795.00
93,225.00
B Bahan
Kayu Klas III (Randu) m3 0.040 1,000,000.00 40,000.00
Paku Biasa 2" - 5" Kg 0.400 12,800.00 5,120.00
Minyak Bekisting Ltr 0.200 0.00 -
Balok Kayu m3 0.018 1,000,000.00 18,000.00
Plywood tebal 9mm Lbr 0.350 102,000.00 35,700.00
Bambu Btg 2.000 8,000.00 16,000.00
114,820.00
C PERALATAN
D Jumlah A + B + C 208,045.00
E Overhead & Profit 12.5% 26,005.63
F Harga Satuan Pekerjaan (D+E) 234,050.63
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp
16 A.4.1.1.24 Memasang Bekisting untuk Lantai
A Tenaga
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.330 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.033 110,000.00 3,630.00
Mandor L.04 OH 0.033 115,000.00 3,795.00
93,225.00
B Bahan
Kayu Klas III (Randu) m3 0.040 1,000,000.00 40,000.00
Paku Biasa 2" - 5" Kg 0.400 12,800.00 5,120.00
Minyak Bekisting Ltr 0.200 0.00 -
Balok Kayu m3 0.015 1,000,000.00 15,000.00
Triplek 4 mm Lbr 0.350 58,000.00 20,300.00
Bambu Btg 4.000 8,000.00 32,000.00
112,420.00
C PERALATAN
D Jumlah A + B + C 205,645.00
E Overhead & Profit 12.5% 25,705.63
F Harga Satuan Pekerjaan (D+E) 231,350.63

17 A.4.1.1.25 Pemasangan 1 m2 bekisting untuk dinding


A TENAGA
Pekerja L.01 OH 0.66 80,000.00 52,800.00
Tukang kayu L.02 OH 0.33 100,000.00 33,000.00
Kepala tukang L.03 OH 0.03 110,000.00 3,630.00
Mandor L.04 OH 0.03 115,000.00 3,795.00
93,225.00
B BAHAN
Kayu kelas III m3 0.03 ### 30,000.00
Paku 5 cm – 12 cm kg 0.40 12,800.00 5,120.00
Minyak bekisting Liter 0.20 - -
Balok kayu kelas II m3 0.02 ### 20,000.00
Triplek 4 mm Lbr 0.35 58,000.00 20,300.00
Bambu Batang 3.00 8,000.00 24,000.00
99,420.00
C PERALATAN

D Jumlah A + B + C 192,645.00
E Overhead & Profit 12.5% 24,080.63
F Harga Satuan Pekerjaan (D+E) 216,725.63
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp
19 A.4.1.1.26 Memasang Bekisting untuk Tangga
A Tenaga
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.330 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.033 110,000.00 3,630.00
Mandor L.04 OH 0.033 115,000.00 3,795.00
93,225.00
B Bahan
Kayu Klas III (Randu) m3 0.030 1,000,000.00 30,000.00
Paku Biasa 2" - 5" Kg 0.400 12,800.00 5,120.00
Minyak Bekisting Ltr 0.150 0.00 -
Balok Kayu m3 0.015 1,000,000.00 15,000.00
Triplek 4 mm Lbr 0.350 58,000.00 20,300.00
Bambu Btg 2.000 8,000.00 16,000.00
86,420.00
C PERALATAN
D Jumlah A + B + C 179,645.00
E Overhead & Profit 12.5% 22,455.63
F Harga Satuan Pekerjaan (D+E) 202,100.63

20 A.4.1.1.35 Membuat Kolom Praktis Beton Bertulang (11 x 11) cm


A Tenaga
Pekerja L.01 OH 0.180 80,000.00 14,400.00
Tukang batu L.02 OH 0.020 100,000.00 2,000.00
Tukang Kayu L.02 OH 0.020 100,000.00 2,000.00
Tukang Besi L.02 OH 0.020 100,000.00 2,000.00
Kepala Tukang L.03 OH 0.006 110,000.00 660.00
Mandor L.04 OH 0.009 115,000.00 1,035.00
22,095.00
B Bahan
Kayu Klas III (Randu) m3 0.002 1,000,000.00 2,000.00
Paku Biasa 2" - 5" Kg 0.010 12,800.00 128.00
Besi Beton Polos Kg 3.000 11,500.00 34,500.00
Kawat Beton Kg 0.045 15,000.00 675.00
Portland Semen Kg 4.000 1,450.00 5,800.00
Pasir Beton m3 0.006 450,000.00 2,700.00
Kerikil Beton m3 0.009 215,900.00 1,943.10
47,746.10
C PERALATAN
D Jumlah A + B + C 69,841.10
E Overhead & Profit 12.5% 8,730.14
F Harga Satuan Pekerjaan (D+E) 78,571.24
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp
21 A.4.1.1.36 Membuat Ring Balok Beton Bertulang (10 x 15) cm
A Tenaga
Pekerja L.01 OH 0.297 80,000.00 23,760.00
Tukang batu L.02 OH 0.033 100,000.00 3,300.00
Tukang Kayu L.02 OH 0.033 100,000.00 3,300.00
Tukang Besi L.02 OH 0.033 100,000.00 3,300.00
Kepala Tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.015 115,000.00 1,725.00
36,485.00
B Bahan
Kayu Klas III (Randu) m3 0.003 1,000,000.00 3,000.00
Paku Biasa 2" - 5" Kg 0.020 12,800.00 256.00
Besi Beton Polos Kg 3.600 11,500.00 41,400.00
Kawat Beton Kg 0.050 15,000.00 750.00
Portland Semen Kg 5.500 1,450.00 7,975.00
Pasir Beton m3 0.009 450,000.00 4,050.00
Kerikil Beton m3 0.015 215,900.00 3,238.50
60,669.50
C PERALATAN
D Jumlah A + B + C 97,154.50
E Overhead & Profit 12.5% 12,144.31
F Harga Satuan Pekerjaan (D+E) 109,298.81

22 A.4.1.1.37 1 m² bekisting untuk permukaan beton biasa dengan kayu randu tebal 2 cm
A Tenaga
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang Kayu L.02 OH 0.500 100,000.00 50,000.00
Kepala Tukang L.03 OH 0.050 110,000.00 5,500.00
Mandor L.04 OH 0.010 115,000.00 1,150.00
72,650.00
B Bahan
kayu randu tebal 2 cm m3 0.022 1,000,000.00 22,000.00
Paku Biasa 2" - 5" Kg 0.400 12,800.00 5,120.00
27,120.00
C PERALATAN
D Jumlah A + B + C 99,770.00
E Overhead & Profit 12.5% 12,471.25
F Harga Satuan Pekerjaan (D+E) 112,241.25
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH

1 A.2.3.1.1 Menggali Tanah Biasa Sedalam 1 m


A TENAGA
Pekerja L.01 OH 0.7500 80,000.00 60,000.00
Mandor L.04 OH 0.0250 115,000.00 2,875.00
62,875.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 62,875.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 62,875.00
Overhead & Profit
2 A.2.3.1.2 Menggali Tanah Biasa Sedalam 2 m
A TENAGA
Pekerja L.01 OH 0.9000 80,000.00 72,000.00
Mandor L.04 OH 0.0450 115,000.00 5,175.00
77,175.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 77,175.00
E Overhead & Profit 12.5% 9,646.88
F Harga Satuan Pekerjaan (D+E) 86,821.88

3 A.2.3.1.3 Menggali Tanah Biasa Sedalam 3 m


A TENAGA
Pekerja L.01 OH 1.0500 80,000.00 84,000.00
Mandor L.04 OH 0.0670 115,000.00 7,705.00
91,705.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 91,705.00
E Overhead & Profit 12.5% 11,463.13
F Harga Satuan Pekerjaan (D+E) 103,168.13

4 A.2.3.1.4 Menggali Tanah Keras Sedalam 1 m


A TENAGA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Mandor L.04 OH 0.0320 115,000.00 3,680.00
83,680.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 83,680.00
E Overhead & Profit 12.5% 10,460.00
F Harga Satuan Pekerjaan (D+E) 94,140.00

5 A.2.3.1.5 Menggali Tanah Cadas Sedalam 1 m


A TENAGA
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Mandor L.04 OH 0.0600 115,000.00 6,900.00
126,900.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 126,900.00
E Overhead & Profit 12.5% 15,862.50
F Harga Satuan Pekerjaan (D+E) 142,762.50

6 A.2.3.1.6 Menggali Tanah Lumpur Sedalam 1 m


A TENAGA
Pekerja L.01 OH 1.2000 80,000.00 96,000.00
Mandor L.04 OH 0.0450 115,000.00 5,175.00
101,175.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 101,175.00
E Overhead & Profit 12.5% 12,646.88
F Harga Satuan Pekerjaan (D+E) 113,821.88

7 A.2.3.1.7 Mengerjakan Striping Tebing Setinggi 1 m


A TENAGA
Pekerja L.01 OH 0.0500 80,000.00 4,000.00
Mandor L.04 OH 0.0050 115,000.00 575.00
4,575.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 4,575.00
E Overhead & Profit 12.5% 571.88
F Harga Satuan Pekerjaan (D+E) 5,146.88

8 A.2.3.1.8 MembuangTanah sejauh 30 m'


A TENAGA
Pekerja L.01 OH 0.3300 80,000.00 26,400.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
27,550.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 27,550.00
E Overhead & Profit 12.5% 3,443.75
F Harga Satuan Pekerjaan (D+E) 30,993.75

9 A.2.3.1.9 Pengurugan Kembali


Pengurugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian
A TENAGA
Pekerja L.01 OH 0.5000 80,000.00 40,000.00
Mandor L.04 OH 0.0500 115,000.00 5,750.00
45,750.00
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
B BAHAN
C PERALATAN
D Jumlah A + B + C 45,750.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 15,250.00

10 A.2.3.1.10 Pemadatan Tanah (per 20 cm)


A TENAGA
Pekerja L.01 OH 0.5000 80,000.00 40,000.00
Mandor L.04 OH 0.0500 115,000.00 5,750.00
45,750.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 45,750.00
E Overhead & Profit 12.5% 5,718.75
F Harga Satuan Pekerjaan (D+E) 51,468.75

11 A.2.3.1.11 Urugan Pasir


A TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
25,150.00
B BAHAN
Pasir Urug m3 1.2000 115,450.00 138,540.00
138,540.00
C PERALATAN
D Jumlah A + B + C 163,690.00
E Overhead & Profit 12.5% 20,461.25
F Harga Satuan Pekerjaan (D+E) 184,151.25

12 A.2.3.1.13 Pemasangan Lapisan Ijuk tebal 10 cm unt Bidang Resapan


A TENAGA
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
13,725.00
B BAHAN
Ijuk kg 6.0000 25,000.00 150,000.00
150,000.00
C PERALATAN
D Jumlah A + B + C 163,725.00
E Overhead & Profit 12.5% 20,465.63
F Harga Satuan Pekerjaan (D+E) 184,190.63

13 A.2.3.1.14 Mengurug Sirtu Padat


A TENAGA
Pekerja L.01 OH 0.2500 80,000.00 20,000.00
Mandor L.04 OH 0.0250 115,000.00 2,875.00
22,875.00
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
B BAHAN
Sirtu m3 1.2000 125,000.00 150,000.00
150,000.00
C PERALATAN
D Jumlah A + B + C 172,875.00
E Overhead & Profit 12.5% 21,609.38
F Harga Satuan Pekerjaan (D+E) 194,484.38

14 A.2.3.1.15 Urugan tanah biasa dan dipadatkan


SNI A TENAGA
Pekerja L.01 OH 0.0714 80,000.00 5,712.00
Mandor L.04 OH 0.0178 115,000.00 2,047.00
7,759.00
B BAHAN
Tanah biasa m3 1.2000 54,000.00 64,800.00
64,800.00
C PERALATAN
whell loader jam 0.0178 192,500.00 3,426.50
dump truck jam 0.2289 71,500.00 16,366.35
motor grader jam 0.0061 250,987.17 1,531.02
vibro roller jam 0.0100 30,200.00 302.00
water tangker jam 0.0070 191,907.17 1,343.35
alat bantu ls 1.0000 1,500.00 1,500.00
24,469.22
D Jumlah A + B + C 97,028.22
E Overhead & Profit 12.5% 12,128.53
F Harga Satuan Pekerjaan (D+E) 109,156.75

15 A.2.3.1.16 Urugan tanah biasa dan dipadatkan dengan buruh


SNI A TENAGA
Pekerja L.01 OH 0.0714 80,000.00 5,712.00
Mandor L.04 OH 0.0178 115,000.00 2,047.00
7,759.00
B BAHAN
Tanah biasa m3 1.2000 54,000.00 64,800.00
64,800.00
C PERALATAN
alat bantu( Stamper) ls 1.0000 18,000.00 18,000.00
18,000.00
D Jumlah A + B + C 90,559.00
E Overhead & Profit 12.5% 11,319.88
F Harga Satuan Pekerjaan (D+E) 101,878.88

16 A.2.3.1.17 Urugan tanah padas dan dipadatkan


SNI A PERALATAN
Pekerja L.01 OH 0.0714 80,000.00 5,712.00
Mandor L.04 OH 0.0178 115,000.00 2,047.00
7,759.00
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
B BAHAN
Tanah padas m3 1.2000 60,600.00 72,720.00
72,720.00
C PERALATAN
whell loader jam 0.0178 192,500.00 3,426.50
dump truck jam 0.2289 71,500.00 16,366.35
motor grader jam 0.0061 250,987.17 1,531.02
vibro roller jam 0.0100 30,200.00 302.00
water tangker jam 0.0070 191,907.17 1,343.35
alat bantu ls 1.0000 1,500.00 1,500.00
24,469.22
D Jumlah A + B + C 104,948.22
E Overhead & Profit 12.5% 13,118.53
F Harga Satuan Pekerjaan (D+E) 118,066.75

17 A.2.3.1.18 Urugan tanah padas dan dipadatkan dengan buruh

SNI A PERALATAN

Pekerja L.01 OH 0.0714 80,000.00 5,712.00

Mandor L.04 OH 0.0178 115,000.00 2,047.00

7,759.00

B BAHAN

Tanah padas m3 1.2000 60,600.00 72,720.00

72,720.00

C PERALATAN

alat bantu( Stamper) ls 1.0000 18,000.00 18,000.00

18,000.00

D Jumlah A + B + C 98,479.00

E Overhead & Profit 12.5% 12,309.88

F Harga Satuan Pekerjaan (D+E) 110,788.88

18 A.2.3.1.19 Pemasangan trucuk bambu Ø 10 cm panjang 6 m

SNI A PERALATAN

Pekerja L.01 OH 0.1250 80,000.00 10,000.00

Mandor L.04 OH 0.0125 115,000.00 1,437.50

11,437.50

B BAHAN

Bambu btg 1.0000 8,000.00 8,000.00

alat pancang jam 0.1000 9,000.00 900.00

alat bantu jam 0.0165 250.00 4.13

8,904.13

C PERALATAN
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
D Jumlah A + B + C 20,341.63

E Overhead & Profit 12.5% 2,542.70

F Harga Satuan Pekerjaan (D+E) 22,884.33


HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI
1 A.3.2.1.1 Pemasangan Pondasi Batu Belah 1SP : 3 PP Lokal
A TENAGA
Pekerja L.01 OH 1.5 80,000.00 120,000.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 110,000.00 8,250.00
Mandor L.04 OH 0.075 115,000.00 8,625.00
211,875.00
B BAHAN
Batu Belah 15/20 m3 1.2 243,720.00 292,464.00
Portland Sement Kg 202 1,450.00 292,900.00
Pasir Pasang m3 0.485 195,750.00 94,938.75
680,302.75
C PERALATAN
D Jumlah A + B + C 892,177.75
E Overhead & Profit 12.5% 111,522.22
F Harga Satuan Pekerjaan (D+E) 1,003,699.97

2 A.3.2.1.1.1Pemasangan Pondasi Batu Belah 1SP : 3 PP Muntilan


A TENAGA
Pekerja L.01 OH 1.5 80,000.00 120,000.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 110,000.00 8,250.00
Mandor L.04 OH 0.075 115,000.00 8,625.00
211,875.00
B BAHAN
Batu Belah 15/20 m3 1.2 243,720.00 292,464.00
Portland Sement Kg 202 1,450.00 292,900.00
Pasir muntilan m3 0.485 450,000.00 218,250.00
803,614.00
C PERALATAN
D Jumlah A + B + C 1,015,489.00
E Overhead & Profit 12.5% 126,936.13
F Harga Satuan Pekerjaan (D+E) 1,142,425.13
Overhead & Profit
3 A.3.2.1.2 Pemasangan Pondasi Batu Belah 1SP : 4 PP lokal
A TENAGA
Pekerja L.01 OH 1.5 80,000.00 120,000.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 110,000.00 8,250.00
Mandor L.04 OH 0.075 115,000.00 8,625.00
211,875.00
B BAHAN
Batu Belah 15/20 m3 1.2 243,720.00 292,464.00
Portland Sement Kg 163 1,450.00 236,350.00
Pasir Pasang m3 0.52 195,750.00 101,790.00
630,604.00
C PERALATAN
D Jumlah A + B + C 842,479.00
E Overhead & Profit 12.5% 105,309.88
F Harga Satuan Pekerjaan (D+E) 947,788.88
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
4 A.3.2.1.2.1Pemasangan Pondasi Batu Belah 1SP : 4 PP Muntilan
A TENAGA
Pekerja L.01 OH 1.5 80,000.00 120,000.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 110,000.00 8,250.00
Mandor L.04 OH 0.075 115,000.00 8,625.00
211,875.00
B BAHAN
Batu Belah 15/20 m3 1.2 243,720.00 292,464.00
Portland Sement Kg 163 1,450.00 236,350.00
Pasir Muntilan m3 0.52 450,000.00 234,000.00
762,814.00
C PERALATAN
D Jumlah A + B + C 974,689.00
E Overhead & Profit 12.5% 121,836.13
F Harga Satuan Pekerjaan (D+E) 1,096,525.13

5 A.3.2.1.3 Pemasangan Pondasi Batu Belah 1SP : 5 PP lokal


A TENAGA
Pekerja L.01 OH 1.5 80,000.00 120,000.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 110,000.00 8,250.00
Mandor L.04 OH 0.075 115,000.00 8,625.00
211,875.00
B BAHAN
Batu Belah 15/20 m3 1.2 243,720.00 292,464.00
Portland Sement Kg 136 1,450.00 197,200.00
Pasir Pasang m3 0.544 195,750.00 106,488.00
596,152.00
C PERALATAN
D Jumlah A + B + C 808,027.00
E Overhead & Profit 12.5% 101,003.38
F Harga Satuan Pekerjaan (D+E) 909,030.38

6 A.3.2.1.3.1Pemasangan Pondasi Batu Belah 1SP : 5 PP muntilan


A TENAGA
Pekerja L.01 OH 1.5 80,000.00 120,000.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 110,000.00 8,250.00
Mandor L.04 OH 0.075 115,000.00 8,625.00
211,875.00
B BAHAN
Batu Belah 15/20 m3 1.2 243,720.00 292,464.00
Portland Sement Kg 136 1,450.00 197,200.00
Pasir muntilan m3 0.544 450,000.00 244,800.00
734,464.00
C PERALATAN
D Jumlah A + B + C 946,339.00
E Overhead & Profit 12.5% 118,292.38
F Harga Satuan Pekerjaan (D+E) 1,064,631.38
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
7 A.3.2.1.4 Pemasangan Pondasi Batu Belah 1SP : 6 PP lokal
A TENAGA
Pekerja L.01 OH 1.5 80,000.00 120,000.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 110,000.00 8,250.00
Mandor L.04 OH 0.075 115,000.00 8,625.00
211,875.00
B BAHAN
Batu Belah 15/20 m3 1.2 243,720.00 292,464.00
Portland Sement Kg 117 1,450.00 169,650.00
Pasir Pasang m3 0.561 195,750.00 109,815.75
571,929.75
C PERALATAN
D Jumlah A + B + C 783,804.75
E Overhead & Profit 12.5% 97,975.59
F Harga Satuan Pekerjaan (D+E) 881,780.34

8 A.3.2.1.4.1Pemasangan Pondasi Batu Belah 1SP : 6 PP muntilan


A TENAGA
Pekerja L.01 OH 1.5 80,000.00 120,000.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 110,000.00 8,250.00
Mandor L.04 OH 0.075 115,000.00 8,625.00
211,875.00
B BAHAN
Batu Belah 15/20 m3 1.2 243,720.00 292,464.00
Portland Sement Kg 117 1,450.00 169,650.00
Pasir Muntilan m3 0.561 450,000.00 252,450.00
714,564.00
C PERALATAN
D Jumlah A + B + C 926,439.00
E Overhead & Profit 12.5% 115,804.88
F Harga Satuan Pekerjaan (D+E) 1,042,243.88

9 A.3.2.1.5 Pemasangan Pondasi Batu Belah 1SP : 8 PP lokal


A Tenaga
Pekerja L.01 OH 1.5 80,000.00 120,000.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 110,000.00 8,250.00
Mandor L.04 OH 0.075 115,000.00 8,625.00
211,875.00
B Bahan
Batu Belah 15/20 m3 1.2 243,720.00 292,464.00
Portland Sement Kg 91 1,450.00 131,950.00
Pasir Pasang m3 0.584 195,750.00 114,318.00
538,732.00
C PERALATAN
D Jumlah A + B + C 750,607.00
E Overhead & Profit 12.5% 93,825.88
F Harga Satuan Pekerjaan (D+E) 844,432.88
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
10 A.3.2.1.5.1Pemasangan Pondasi Batu Belah 1SP : 8 PP muntilan
A Tenaga
Pekerja L.01 OH 1.5 80,000.00 120,000.00
Tukang Batu L.02 OH 0.750 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 110,000.00 8,250.00
Mandor L.04 OH 0.075 115,000.00 8,625.00
211,875.00
B Bahan
Batu Belah 15/20 m3 1.2 243,720.00 292,464.00
Portland Sement Kg 91 1,450.00 131,950.00
Pasir muntilan m3 0.584 450,000.00 262,800.00
687,214.00
C PERALATAN
D Jumlah A + B + C 899,089.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 899,089.00

11 A.3.2.1.9 Pemasang Batu Kosong/Anstamping


A Tenaga
Pekerja L.01 OH 0.78 80,000.00 62,400.00
Tukang Batu L.02 OH 0.39 100,000.00 39,000.00
Kepala Tukang L.03 OH 0.039 110,000.00 4,290.00
Mandor L.04 OH 0.039 115,000.00 4,485.00
110,175.00
B Bahan
Batu Belah 15/20 m3 1.2 243,720.00 292,464.00
Pasir Urug m3 0.432 115,450.00 49,874.40
342,338.40
C PERALATAN
D Jumlah A + B + C 452,513.40
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 452,513.40

12 A.3.2.1.11 Pasang Pondasi Sumuran diameter 100 cm


A Tenaga
Pekerja L.01 OH 2.40 80,000.00 192,000.00
Tukang Batu L.02 OH 0.8 100,000.00 80,000.00
Kepala Tukang L.03 OH 0.08 110,000.00 8,800.00
Mandor L.04 OH 0.119 115,000.00 13,685.00
294,485.00
B Bahan
Batu Belah 15/20 cm m3 0.45 80,000.00 36,000.00
Portland Semen Kg 194 1,450.00 281,300.00
Pasir Beton m3 0.312 450,000.00 140,400.00
Koral Beton m3 0.468 215,900.00 101,041.20
558,741.20
C PERALATAN
D Jumlah A + B + C 853,226.20
E Overhead & Profit 12.5% 106,653.28
F Harga Satuan Pekerjaan (D+E) 959,879.48
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
13 A.3.2.1.12 Pasang Pondasi Rolag Trashraam Bata Merah 1 Pc : 3 Ps
SNI A Tenaga
Pekerja L.01 OH 4.50 80,000.00 360,000.00
Tukang Batu L.02 OH 1.5 100,000.00 150,000.00
Kepala Tukang L.03 OH 0.15 110,000.00 16,500.00
Mandor L.04 OH 0.225 115,000.00 25,875.00
552,375.00
B Bahan
bata merah m3 500.00 560.00 280,000.00
semen / PC Kg 156 1,450.00 226,200.00
pasir beton m3 0.330 450,000.00 148,500.00
654,700.00
C PERALATAN
D Jumlah A + B + C 1,207,075.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 1,207,075.00

14 A.3.2.1.13 Pasang suling-suling


SDA A Tenaga
Pekerja L.01 OH 0.018 80,000.00 1,440.00
Mandor L.04 OH 0.002 115,000.00 230.00
1,670.00
B Bahan
Pipa PVC 2" m' 0.341 14,500.00 4,944.50
4,944.50
C PERALATAN
D Jumlah A + B + C 6,614.50
E Overhead & Profit 12.5% 826.81
F Harga Satuan Pekerjaan (D+E) 7,441.31
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

Rp
IV A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
1 A.4.4.1.2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00

B Bahan
Bata Merah Buah 140 900.00
Portland Semen (PC) Kg 32.95 1,450.00
Pasir Muntilan m3 0.091 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

2 A.4.4.1.3 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00

B Bahan
Bata Merah Buah 140 900.00
Portland Semen (PC) Kg 26.55 1,450.00
Pasir Muntilan m3 0.093 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

3 A.4.4.1.4 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00

B Bahan
Bata Merah Buah 140 900.00
Portland Semen (PC) Kg 22.2 1,450.00
Pasir Muntilan m3 0.102 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

4 A.4.4.1.5 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00

B Bahan
Bata Merah Buah 140 900.00
Portland Semen (PC) Kg 18.5 1,450.00
Pasir Muntilan m3 0.122 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

5 A.4.4.1.8 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 14.37 1,450.00
Pasir Muntilan m3 0.04 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

6 A.4.4.1.9 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 11.50 1,450.00
Pasir Muntilan m3 0.043 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

7 A.4.4.1.10 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 9.68 1,450.00
Pasir Muntilan m3 0.045 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

8 A.4.4.1.11 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 8.32 1,450.00
Pasir Muntilan m3 0.049 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

9 A.4.4.1.12 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 6.50 1,450.00
Pasir Muntilan m3 0.05 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

10 A.4.4.1.23 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Terawang / Roster Buah 30 3,800.00
Portland Semen kg 11 1,450.00
Pasir Muntilan m3 0.035 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

11 A.4.4.1.2.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00

B Bahan
Bata Merah Buah 140 900.00
Portland Semen (PC) Kg 32.95 1,450.00
Pasir Pasang lokal m3 0.091 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

12 A.4.4.1.3.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00

B Bahan
Bata Merah Buah 140 900.00
Portland Semen (PC) Kg 26.55 1,450.00
Pasir Pasang lokal m3 0.093 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

13 A.4.4.1.4.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00

B Bahan
Bata Merah Buah 140 900.00
Portland Semen (PC) Kg 22.2 1,450.00
Pasir Pasang lokal m3 0.102 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

14 A.4.4.1.5.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00

B Bahan
Bata Merah Buah 140 900.00
Portland Semen (PC) Kg 18.5 1,450.00
Pasir Pasang lokal m3 0.122 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

15 A.4.4.1.8.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 14.37 1,450.00
Pasir Pasang lokal m3 0.04 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

16 A.4.4.1.9.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 11.50 1,450.00
Pasir Pasang lokal m3 0.043 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

17A.4.4.1.10.1Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 9.68 1,450.00
Pasir Pasang lokal m3 0.045 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

18A.4.4.1.11.1Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 8.32 1,450.00
Pasir Pasang lokal m3 0.049 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

19A.4.4.1.12.1Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah 5 x 11 x 22 Buah 70 900.00
Portland Semen Kg 6.50 1,450.00
Pasir Pasang lokal m3 0.05 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

20A.4.4.1.23.1Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP


A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Terawang / Roster Buah 30 3,800.00
Portland Semen kg 11 1,450.00
Pasir Pasang lokal m3 0.035 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

21 A.4.4.1.2.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 3PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00

B Bahan
Bata Merah Buah 150 560.00
Portland Semen (PC) Kg 32.95 1,450.00
Pasir Muntilan m3 0.091 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

22 A.4.4.1.3.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00

B Bahan
Bata Merah Buah 150 560.00
Portland Semen (PC) Kg 26.55 1,450.00
Pasir Muntilan m3 0.093 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

23 A.4.4.1.4.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00

B Bahan
Bata Merah Buah 150 560.00
Portland Semen (PC) Kg 22.2 1,450.00
Pasir Muntilan m3 0.102 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

24 A.4.4.1.5.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00

B Bahan
Bata Merah Buah 150 560.00
Portland Semen (PC) Kg 18.5 1,450.00
Pasir Muntilan m3 0.122 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

25 A.4.4.1.8.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 3PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah Buah 75 560.00
Portland Semen Kg 14.37 1,450.00
Pasir Muntilan m3 0.04 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

26 A.4.4.1.9.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah Buah 75 560.00
Portland Semen Kg 11.50 1,450.00
Pasir Muntilan m3 0.043 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

27A.4.4.1.10.2Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah Buah 75 560.00
Portland Semen Kg 9.68 1,450.00
Pasir Muntilan m3 0.045 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

28A.4.4.1.11.2Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah Buah 75 560.00
Portland Semen Kg 8.32 1,450.00
Pasir Muntilan m3 0.049 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

29A.4.4.1.12.2Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 8PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah Buah 75 560.00
Portland Semen Kg 6.50 1,450.00
Pasir Muntilan m3 0.05 450,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 0.0%
F Harga Satuan Pekerjaan (D+E)

30 A.4.4.1.2.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 3PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00

B Bahan
Bata Merah Buah 150 560.00
Portland Semen (PC) Kg 32.95 1,450.00
Pasir Pasang Lokal m3 0.091 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

31 A.4.4.1.3.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00

B Bahan
Bata Merah Buah 150 560.00
Portland Semen (PC) Kg 26.55 1,450.00
Pasir Pasang Lokal m3 0.093 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

32 A.4.4.1.4.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00

B Bahan
Bata Merah Buah 150 560.00
Portland Semen (PC) Kg 22.2 1,450.00
Pasir Pasang Lokal m3 0.102 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

33 A.4.4.1.5.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.6 80,000.00
Tukang Batu L.02 OH 0.2 100,000.00
Kepala Tukang Batu L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.03 115,000.00

B Bahan
Bata Merah Buah 150 560.00
Portland Semen (PC) Kg 18.5 1,450.00
Pasir Pasang Lokal m3 0.122 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

34 A.4.4.1.8.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 3PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah Buah 75 560.00
Portland Semen Kg 14.37 1,450.00
Pasir Pasang Lokal m3 0.04 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

35 A.4.4.1.9.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah Buah 75 560.00
Portland Semen Kg 11.50 1,450.00
Pasir Pasang Lokal m3 0.043 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

36A.4.4.1.10.3Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah Buah 75 560.00
Portland Semen Kg 9.68 1,450.00
Pasir Pasang Lokal m3 0.045 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

37A.4.4.1.11.3Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah Buah 75 560.00
Portland Semen Kg 8.32 1,450.00
Pasir Pasang Lokal m3 0.049 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

38A.4.4.1.12.3Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 8PP
A Tenaga
Pekerja L.01 OH 0.30 80,000.00
Tukang Batu L.02 OH 0.1 100,000.00
Kepala Tukang L.03 OH 0.01 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Merah Buah 75 560.00
Portland Semen Kg 6.50 1,450.00
Pasir Pasang Lokal m3 0.05 195,750.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

39 A.4.4.1.20 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 3PP Muntilan
A Tenaga
Pekerja L.01 OH 0.300 80,000.00
Tukang Batu L.02 OH 0.100 100,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Batako buah 15.000 4,500.00
PC kg 15.160 1,450.00
Pasir Pasang muntilan m3 0.364 450,000.00
Besi Angkur Ø 8 mm kg 0.280 11,500.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

40A.4.4.1.20.1Pemasangan Dinding HB/CB 10, speci camp. 1SP : 3PP Lokal


A Tenaga
Pekerja L.01 OH 0.300 80,000.00
Tukang Batu L.02 OH 0.100 100,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Batako buah 15.000 4,500.00
PC kg 15.160 1,450.00
Pasir Pasang lokal m3 0.364 195,750.00
Besi Angkur Ø 8 mm kg 0.280 11,500.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

41 A.4.4.1.21 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 4PP Muntilan
A Tenaga
Pekerja L.01 OH 0.300 80,000.00
Tukang Batu L.02 OH 0.100 100,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Batako buah 15.000 4,500.00
PC kg 12.130 1,450.00
Pasir Pasang muntilan m3 0.388 450,000.00
Besi Angkur Ø 8 mm kg 0.280 11,500.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

42A.4.4.1.21.1Pemasangan Dinding HB/CB 10, speci camp. 1SP : 4PP Lokal


A Tenaga
Pekerja L.01 OH 0.300 80,000.00
Tukang Batu L.02 OH 0.100 100,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Batako buah 15.000 4,500.00
PC kg 12.130 1,450.00
Pasir Pasang lokal m3 0.388 195,750.00
Besi Angkur Ø 8 mm kg 0.280 11,500.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN

43 A.4.4.1.25 Pemasangan 1m2 Dinding Bata Ringan (60x20x7,5) cm


A Tenaga
Pekerja L.01 OH 0.300 80,000.00
Tukang Batu L.02 OH 0.100 100,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Ringan bh 8.500 10,000.00
Mortar Perekat kg 3.000 2,125.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

44 A.4.4.1.26 Pemasangan 1m2 Dinding Bata Ringan (60x20x10) cm


A Tenaga
Pekerja L.01 OH 0.300 80,000.00
Tukang Batu L.02 OH 0.100 100,000.00
Kepala Tukang L.03 OH 0.010 110,000.00
Mandor L.04 OH 0.015 115,000.00

B Bahan
Bata Ringan bh 8.500 12,000.00
Mortar Perekat kg 4.000 2,125.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA

Rp

Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3PP

48,000.00
20,000.00
2,200.00
3,450.00
73,650.00

126,000.00
47,777.50
40,950.00
214,727.50

288,377.50
36,047.19
324,424.69

Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP

48,000.00
20,000.00
2,200.00
3,450.00
73,650.00

126,000.00
38,497.50
41,850.00
206,347.50

279,997.50
34,999.69
314,997.19
JUMLAH
HARGA

Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 5PP

48,000.00
20,000.00
2,200.00
3,450.00
73,650.00

126,000.00
32,190.00
45,900.00
204,090.00

277,740.00
34,717.50
312,457.50

Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PP

48,000.00
20,000.00
2,200.00
3,450.00
73,650.00

126,000.00
26,825.00
54,900.00
207,725.00

281,375.00
35,171.88
316,546.88
JUMLAH
HARGA

Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

63,000.00
20,836.50
18,000.00
101,836.50

138,661.50
17,332.69
155,994.19

Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

63,000.00
16,675.00
19,350.00
99,025.00

135,850.00
16,981.25
152,831.25
JUMLAH
HARGA

Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

63,000.00
14,036.00
20,250.00
97,286.00

134,111.00
16,763.88
150,874.88

Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

63,000.00
12,064.00
22,050.00
97,114.00

133,939.00
16,742.38
150,681.38
JUMLAH
HARGA

Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8PP

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

63,000.00
9,425.00
22,500.00
94,925.00

131,750.00
16,468.75
148,218.75

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

114,000.00
15,950.00
15,750.00
145,700.00

182,525.00
22,815.63
205,340.63
JUMLAH
HARGA

Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3PP

48,000.00
20,000.00
2,200.00
3,450.00
73,650.00

126,000.00
47,777.50
17,813.25
191,590.75

265,240.75
33,155.09
298,395.84

Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP

48,000.00
20,000.00
2,200.00
3,450.00
73,650.00

126,000.00
38,497.50
18,204.75
182,702.25

256,352.25
32,044.03
288,396.28
JUMLAH
HARGA

Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 5PP

48,000.00
20,000.00
2,200.00
3,450.00
73,650.00

126,000.00
32,190.00
19,966.50
178,156.50

251,806.50
31,475.81
283,282.31

Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PP

48,000.00
20,000.00
2,200.00
3,450.00
73,650.00

126,000.00
26,825.00
23,881.50
176,706.50

250,356.50
31,294.56
281,651.06
JUMLAH
HARGA

Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

63,000.00
20,836.50
7,830.00
91,666.50

128,491.50
16,061.44
144,552.94

Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

63,000.00
16,675.00
8,417.25
88,092.25

124,917.25
15,614.66
140,531.91
JUMLAH
HARGA

Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

63,000.00
14,036.00
8,808.75
85,844.75

122,669.75
15,333.72
138,003.47

Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

63,000.00
12,064.00
9,591.75
84,655.75

121,480.75
15,185.09
136,665.84
JUMLAH
HARGA

Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8PP

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

63,000.00
9,425.00
9,787.50
82,212.50

119,037.50
14,879.69
133,917.19

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

114,000.00
15,950.00
6,851.25
136,801.25

173,626.25
21,703.28
195,329.53
JUMLAH
HARGA

48,000.00
20,000.00
2,200.00
3,450.00
73,650.00

84,000.00
47,777.50
40,950.00
172,727.50

246,377.50
30,797.19
277,174.69

48,000.00
20,000.00
2,200.00
3,450.00
73,650.00

84,000.00
38,497.50
41,850.00
164,347.50

237,997.50
29,749.69
267,747.19
JUMLAH
HARGA

48,000.00
20,000.00
2,200.00
3,450.00
73,650.00

84,000.00
32,190.00
45,900.00
162,090.00

235,740.00
29,467.50
283,740.00

48,000.00
20,000.00
2,200.00
3,450.00
73,650.00

84,000.00
26,825.00
54,900.00
165,725.00

239,375.00
29,921.88
269,296.88
JUMLAH
HARGA

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

42,000.00
20,836.50
18,000.00
80,836.50

117,661.50
14,707.69
132,369.19

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

42,000.00
16,675.00
19,350.00
78,025.00

114,850.00
14,356.25
129,206.25
JUMLAH
HARGA

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

42,000.00
14,036.00
20,250.00
76,286.00

113,111.00
14,138.88
127,249.88

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

42,000.00
12,064.00
22,050.00
76,114.00

112,939.00
14,117.38
127,056.38
JUMLAH
HARGA

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

42,000.00
9,425.00
22,500.00
73,925.00

110,750.00
-
110,750.00

48,000.00
20,000.00
2,200.00
3,450.00
73,650.00

84,000.00
47,777.50
17,813.25
149,590.75

223,240.75
27,905.09
251,145.84
JUMLAH
HARGA

48,000.00
20,000.00
2,200.00
3,450.00
73,650.00

84,000.00
38,497.50
18,204.75
140,702.25

214,352.25
26,794.03
241,146.28

48,000.00
20,000.00
2,200.00
3,450.00
73,650.00

84,000.00
32,190.00
19,966.50
136,156.50

209,806.50
26,225.81
257,806.50
JUMLAH
HARGA

48,000.00
20,000.00
2,200.00
3,450.00
73,650.00

84,000.00
26,825.00
23,881.50
134,706.50

208,356.50
26,044.56
234,401.06

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

42,000.00
20,836.50
7,830.00
70,666.50

107,491.50
13,436.44
120,927.94
JUMLAH
HARGA

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

42,000.00
16,675.00
8,417.25
67,092.25

103,917.25
12,989.66
116,906.91

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

42,000.00
14,036.00
8,808.75
64,844.75

101,669.75
12,708.72
114,378.47
JUMLAH
HARGA

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

42,000.00
12,064.00
9,591.75
63,655.75

100,480.75
12,560.09
113,040.84

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

42,000.00
9,425.00
9,787.50
61,212.50

98,037.50
12,254.69
110,292.19
JUMLAH
HARGA

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

67,500.00
21,982.00
163,800.00
3,220.00
256,502.00

293,327.00
36,665.88
329,992.88

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

67,500.00
21,982.00
71,253.00
3,220.00
163,955.00

200,780.00
25,097.50
225,877.50
JUMLAH
HARGA

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

67,500.00
17,588.50
174,600.00
3,220.00
262,908.50

299,733.50
37,466.69
337,200.19

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

67,500.00
17,588.50
75,951.00
3,220.00
164,259.50

201,084.50
25,135.56
226,220.06
JUMLAH
HARGA

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

85,000.00
6,375.00
91,375.00

128,200.00
16,025.00
144,225.00

24,000.00
10,000.00
1,100.00
1,725.00
36,825.00

102,000.00
8,500.00
110,500.00

147,325.00
18,415.63
165,740.63
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
V A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
1 A.4.4.2.3 Pemasangan Plesteran 1 Pc : 3 Pp muntilan Tebal 15 mm
A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
42,375.00
B Bahan
Portland Semen Kg 7.7760 1,450.00 11,275.20
Pasir Muntilan m3 0.0230 450,000.00 10,350.00
21,625.20
C PERALATAN
D Jumlah A + B + C 64,000.20
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 64,000.20

2 A.4.4.2.3.1 Pemasangan Plesteran 1 Pc : 3 Pp lokal Tebal 15 mm


A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
42,375.00
B Bahan
Portland Semen Kg 7.7760 1,450.00 11,275.20
Pasir lokal m3 0.0230 195,750.00 4,502.25
15,777.45
C PERALATAN
D Jumlah A + B + C 58,152.45
E Overhead & Profit 12.5% 7,269.06
F Harga Satuan Pekerjaan (D+E) 65,421.51

3 A.4.4.2.4 Pemasangan Plesteran 1 Pc : 4 Pp muntilan Tebal 15 mm


A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
42,375.00
B Bahan
Portland Semen Kg 6.2400 1,450.00 9,048.00
Pasir Muntilan m3 0.0240 450,000.00 10,800.00
19,848.00
C PERALATAN
D Jumlah A + B + C 62,223.00
E Overhead & Profit 12.5% 7,777.88
F Harga Satuan Pekerjaan (D+E) 70,000.88
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
4 A.4.4.2.4.1 Pemasangan Plesteran 1 Pc : 4 Pp lokal Tebal 15 mm
A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
42,375.00
B Bahan
Portland Semen Kg 6.2400 1,450.00 9,048.00
Pasir lokal m3 0.0240 195,750.00 4,698.00
13,746.00
C PERALATAN
D Jumlah A + B + C 56,121.00
E Overhead & Profit 12.5% 7,015.13
F Harga Satuan Pekerjaan (D+E) 63,136.13

5 A.4.4.2.5 Pemasangan Plesteran 1 Pc : 5 Pp muntilan Tebal 15 mm


A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
42,375.00
B Bahan
Portland Semen Kg 5.1840 1,450.00 7,516.80
Pasir Muntilan m3 0.0260 450,000.00 11,700.00
19,216.80
C PERALATAN
D Jumlah A + B + C 61,591.80
E Overhead & Profit 12.5% 7,698.98
F Harga Satuan Pekerjaan (D+E) 69,290.78

6 A.4.4.2.5.1 Pemasangan Plesteran 1 Pc : 5 Pp lokal Tebal 15 mm


A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
42,375.00
B Bahan
Portland Semen Kg 5.1840 1,450.00 7,516.80
Pasir lokal m3 0.0260 195,750.00 5,089.50
12,606.30
C PERALATAN
D Jumlah A + B + C 54,981.30
E Overhead & Profit 12.5% 6,872.66
F Harga Satuan Pekerjaan (D+E) 61,853.96
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
7 A.4.4.2.6 Pemasangan Plesteran 1 Pc : 6 Pp Muntilan Tebal 15 mm
A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
42,375.00
B Bahan
Portland Semen Kg 4.4160 1,450.00 6,403.20
Pasir Muntilan m3 0.0270 450,000.00 12,150.00
18,553.20
C PERALATAN
D Jumlah A + B + C 60,928.20
E Overhead & Profit 12.5% 7,616.03
F Harga Satuan Pekerjaan (D+E) 68,544.23

8 A.4.4.2.6.1 Pemasangan Plesteran 1 Pc : 6 Pp lokal Tebal 15 mm


A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
42,375.00
B Bahan
Portland Semen Kg 4.4160 1,450.00 6,403.20
Pasir lokal m3 0.0270 195,750.00 5,285.25
11,688.45
C PERALATAN
D Jumlah A + B + C 54,063.45
E Overhead & Profit 12.5% 6,757.93
F Harga Satuan Pekerjaan (D+E) 60,821.38

9 A.4.4.2.7 Pemasangan Plesteran 1 Pc : 7 Pp muntilan Tebal 15 mm


A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
42,375.00
B Bahan
Portland Semen Kg 3.9360 1,450.00 5,707.20
Pasir Muntilan m3 0.0280 450,000.00 12,600.00
18,307.20
C PERALATAN
D Jumlah A + B + C 60,682.20
E Overhead & Profit 12.5% 7,585.28
F Harga Satuan Pekerjaan (D+E) 68,267.48
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
10 A.4.4.2.7.1 Pemasangan Plesteran 1 Pc : 7 Pp lokal Tebal 15 mm
A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
42,375.00
B Bahan
Portland Semen Kg 3.9360 1,450.00 5,707.20
Pasir lokal m3 0.0280 195,750.00 5,481.00
11,188.20
C PERALATAN
D Jumlah A + B + C 53,563.20
E Overhead & Profit 12.5% 6,695.40
F Harga Satuan Pekerjaan (D+E) 60,258.60

11 A.4.4.2.8 Pemasangan Plesteran 1 Pc : 8 Pp muntilan Tebal 15 mm


A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
42,375.00
B Bahan
Portland Semen Kg 3.4560 1,450.00 5,011.20
Pasir Muntilan m3 0.0290 450,000.00 13,050.00
18,061.20
C PERALATAN
D Jumlah A + B + C 60,436.20
E Overhead & Profit 12.5% 7,554.53
F Harga Satuan Pekerjaan (D+E) 67,990.73

12 A.4.4.2.8.1 Pemasangan Plesteran 1 Pc : 8 Pp lokal Tebal 15 mm


A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
42,375.00
B Bahan
Portland Semen Kg 3.4560 1,450.00 5,011.20
Pasir lokal m3 0.0290 195,750.00 5,676.75
10,687.95
C PERALATAN
D Jumlah A + B + C 53,062.95
E Overhead & Profit 12.5% 6,632.87
F Harga Satuan Pekerjaan (D+E) 59,695.82
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
13 A.4.4.2.19 Pemasangan Berapen 1 Pc : 5Pp muntilan Tebal 15 mm
A Tenaga
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang batu L.02 OH 0.0750 100,000.00 7,500.00
Kepala Tukang L.03 OH 0.0080 110,000.00 880.00
Mandor L.04 OH 0.0080 115,000.00 920.00
21,300.00
B Bahan
Portland Semen Kg 5.1840 1,450.00 7,516.80
Pasir Muntilan m3 0.0260 450,000.00 11,700.00
19,216.80
C PERALATAN
D Jumlah A + B + C 40,516.80
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 40,516.80

14A.4.4.2.19.1Pemasangan Berapen 1 Pc : 5Pp lokal Tebal 15 mm


A Tenaga
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang batu L.02 OH 0.0750 100,000.00 7,500.00
Kepala Tukang L.03 OH 0.0080 110,000.00 880.00
Mandor L.04 OH 0.0080 115,000.00 920.00
21,300.00
B Bahan
Portland Semen Kg 5.1840 1,450.00 7,516.80
Pasir lokal m3 0.0260 195,750.00 5,089.50
12,606.30
C PERALATAN
D Jumlah A + B + C 33,906.30
E Overhead & Profit 12.5% 4,238.29
F Harga Satuan Pekerjaan (D+E) 38,144.59

15 A.4.4.2.20 Pemasangan Plesteran Skoning 1 Pc : 2Pp muntilan


A Tenaga
Pekerja L.01 OH 0.0800 80,000.00 6,400.00
Tukang batu L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0400 110,000.00 4,400.00
Mandor L.04 OH 0.0040 115,000.00 460.00
21,260.00
B Bahan
Portland Semen Kg 0.5000 1,450.00 725.00
Pasir Muntilan m3 0.0130 450,000.00 5,850.00
6,575.00
C PERALATAN
D Jumlah A + B + C 27,835.00
E Overhead & Profit 12.5% 3,479.38
F Harga Satuan Pekerjaan (D+E) 31,314.38
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
16A.4.4.2.20.1Pemasangan Plesteran Skoning 1 Pc : 2Pp lokal
A Tenaga
Pekerja L.01 OH 0.0800 80,000.00 6,400.00
Tukang batu L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0400 110,000.00 4,400.00
Mandor L.04 OH 0.0040 115,000.00 460.00
21,260.00
B Bahan
Portland Semen Kg 0.5000 1,450.00 725.00
Pasir lokal m3 0.0130 195,750.00 2,544.75
3,269.75
C PERALATAN
D Jumlah A + B + C 24,529.75
E Overhead & Profit 12.5% 3,066.22
F Harga Satuan Pekerjaan (D+E) 27,595.97

17 A.4.4.2.23 Pemasangan Plesteran Ciprat 1Pc : 2 Pp Muntilan


A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0100 110,000.00 1,100.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
36,825.00
B Bahan
Portland Semen Kg 4.3200 1,450.00 6,264.00
Pasir Muntilan m3 0.0060 450,000.00 2,700.00
8,964.00
C PERALATAN
D Jumlah A + B + C 45,789.00
E Overhead & Profit 12.5% 5,723.63
F Harga Satuan Pekerjaan (D+E) 51,512.63

18A.4.4.2.23.1Pemasangan Plesteran Ciprat 1Pc : 2 Pp Lokal


A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0100 110,000.00 1,100.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
36,825.00
B Bahan
Portland Semen Kg 4.3200 1,450.00 6,264.00
Pasir Lokal m3 0.0060 195,750.00 1,174.50
7,438.50
C PERALATAN
D Jumlah A + B + C 44,263.50
E Overhead & Profit 12.5% 5,532.94
F Harga Satuan Pekerjaan (D+E) 49,796.44

19 A.4.4.2.24 Pemasangan Finishing Siar Pasangan Dinding Bata Merah (=20 m')
A Tenaga
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang batu L.02 OH 0.0750 100,000.00 7,500.00
Kepala Tukang L.03 OH 0.0080 110,000.00 880.00
Mandor L.04 OH 0.0080 115,000.00 920.00
21,300.00
B Bahan
Portland Semen Kg 3.1080 1,450.00 4,506.60
4,506.60
C PERALATAN
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
D Jumlah A + B + C 25,806.60
E Overhead & Profit 12.5% 3,225.83
F Harga Satuan Pekerjaan (D+E) 29,032.43

20 A.4.4.2.26 Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2PP Muntilan
A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
42,375.00
B Bahan
Pc Kg 6.3400 1,450.00 9,193.00
PP Muntilan m3 0.0120 450,000.00 5,400.00
14,593.00
C PERALATAN
D Jumlah A + B + C 56,968.00
E Overhead & Profit 12.5% 7,121.00
F Harga Satuan Pekerjaan (D+E) 64,089.00

21A.4.4.2.26.1Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2PP Lokal


A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
42,375.00
B Bahan
Pc Kg 6.3400 1,450.00 9,193.00
PP Lokal m3 0.0120 195,750.00 2,349.00
11,542.00
C PERALATAN
D Jumlah A + B + C 53,917.00
E Overhead & Profit 12.5% 6,739.63
F Harga Satuan Pekerjaan (D+E) 60,656.63

22 A.4.4.2.27 Pemasangan Acian


A Tenaga
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang batu L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0100 110,000.00 1,100.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
28,250.00
B Bahan
Portland Semen Kg 3.2500 1,450.00 4,712.50
4,712.50
C PERALATAN
D Jumlah A + B + C 32,962.50
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 32,962.50

23 A.4.4.2.28 Pemasangan Plesteran Mortar


A Tenaga
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang batu L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0100 110,000.00 1,100.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
28,250.00
B Bahan
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
Mortar Plesteran Kg 20.0000 1,380.00 27,600.00
27,600.00
C PERALATAN
D Jumlah A + B + C 55,850.00
E Overhead & Profit 12.5% 6,981.25
F Harga Satuan Pekerjaan (D+E) 62,831.25

24 A.4.4.2.29 Pemasangan Acian Mortar


A Tenaga
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang batu L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0100 110,000.00 1,100.00
Mandor L.04 OH 0.0080 115,000.00 920.00
24,020.00
B Bahan
Mortar Acian Kg 2.0000 2,125.00 4,250.00
4,250.00
C PERALATAN
D Jumlah A + B + C 28,270.00
E Overhead & Profit 12.5% 3,533.75
F Harga Satuan Pekerjaan (D+E) 31,803.75

25 A.4.4.2.30 Pemasangan Plesteran + Acian Mortar


A Tenaga
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
42,375.00
B Bahan
Mortar Plesteran Kg 20.0000 1,380.00 27,600.00
Mortar Acian Kg 2.0000 2,125.00 4,250.00
31,850.00
C PERALATAN
D Jumlah A + B + C 74,225.00
E Overhead & Profit 12.5% 9,278.13
F Harga Satuan Pekerjaan (D+E) 83,503.13
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
VI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U
1 A.4.6.1.1 Pembuatan & Pemasangan 1 m3 Kosen Pintu & Jendela Kayu Bengkirai
A Tenaga
Pekerja L.01 OH 7.0000 80,000.00 560,000.00
Tukang Kayu L.02 OH 21.0000 100,000.00 2,100,000.00
Kepala Tukang L.03 OH 2.1000 110,000.00 231,000.00
Mandor L.04 OH 0.3500 115,000.00 40,250.00
2,931,250.00
B Bahan B
Kayu bengkirai m3 1.1000 9,500,000.00 10,450,000.00
Paku Biasa 2" - 5 " kg 1.2500 12,800.00 16,000.00
Lem Kayu kg 1.0000 12,800.00 12,800.00
###
C PERALATAN
D Jumlah A + B + C ###
E Overhead & Profit 12.5% 1,676,256.25
F Harga Satuan Pekerjaan (D+E) ###

2 A.4.6.1.2 Pembuatan & Pemasangan 1 m3 Kosen Pintu & Jendela Kayu kamfer
A Tenaga
Pekerja L.01 OH 6.0000 80,000.00 480,000.00
Tukang Kayu L.02 OH 18.0000 100,000.00 1,800,000.00
Kepala Tukang L.03 OH 1.8000 110,000.00 198,000.00
Mandor L.04 OH 0.3000 115,000.00 34,500.00
2,512,500.00
B Bahan
Kayu kamfer m3 1.2000 9,000,000.00 10,800,000.00
Paku Biasa 2" - 5 " kg 1.2500 12,800.00 16,000.00
Lem Kayu kg 1.0000 12,800.00 12,800.00
###
C PERALATAN
D Jumlah A + B + C ###
E Overhead & Profit 12.5% 1,667,662.50
F Harga Satuan Pekerjaan (D+E) ###

3 A.4.6.1.5 Pembuatan & Pemasangan 1 m2 Daun Pintu Panel, Kayu Jati


A Tenaga
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang Kayu L.02 OH 3.0000 100,000.00 300,000.00
Kepala Tukang L.03 OH 0.3000 110,000.00 33,000.00
Mandor L.04 OH 0.0500 115,000.00 5,750.00
418,750.00
B Bahan
Kayu jati m3 0.0400 16,875,000.00 675,000.00
Lem Kayu kg 0.0500 12,800.00 640.00
675,640.00
C PERALATAN
D Jumlah A + B + C 1,094,390.00
E Overhead & Profit 12.5% 136,798.75
F Harga Satuan Pekerjaan (D+E) 1,231,188.75
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
4 A.4.6.1.5.1 Pembuatan & Pemasangan 1 m2 Daun Pintu Panel, Kayu Kamfer
A Tenaga
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang Kayu L.02 OH 3.0000 100,000.00 300,000.00
Kepala Tukang L.03 OH 0.3000 110,000.00 33,000.00
Mandor L.04 OH 0.0500 115,000.00 5,750.00
418,750.00
B Bahan
Kayu kamfer m3 0.0400 9,000,000.00 360,000.00
Lem Kayu kg 0.0500 12,800.00 640.00
360,640.00
C PERALATAN
D Jumlah A + B + C 779,390.00
E Overhead & Profit 12.5% 97,423.75
F Harga Satuan Pekerjaan (D+E) 876,813.75

5 A.4.6.1.6 Pembuatan & Pemasangan 1 m2 Pintu & Jendela Kaca Kayu Jati
A Tenaga
Pekerja L.01 OH 0.8000 80,000.00 64,000.00
Tukang Kayu L.02 OH 2.4000 100,000.00 240,000.00
Kepala Tukang L.03 OH 0.2400 110,000.00 26,400.00
Mandor L.04 OH 0.0400 115,000.00 4,600.00
335,000.00
B Bahan
Kayu jati, papan m3 0.0240 16,875,000.00 405,000.00
Lem Kayu kg 0.3000 12,800.00 3,840.00
408,840.00
C PERALATAN
D Jumlah A + B + C 743,840.00
E Overhead & Profit 12.5% 92,980.00
F Harga Satuan Pekerjaan (D+E) 836,820.00

6 A.4.6.1.6.1 Pembuatan & Pemasangan 1 m2 Pintu & Jendela Kaca Kayu kamfer
A Tenaga
Pekerja L.01 OH 0.8000 80,000.00 64,000.00
Tukang Kayu L.02 OH 2.4000 100,000.00 240,000.00
Kepala Tukang L.03 OH 0.2400 110,000.00 26,400.00
Mandor L.04 OH 0.0400 115,000.00 4,600.00
335,000.00
B Bahan
Kayu kamfer m3 0.0240 9,000,000.00 216,000.00
Lem Kayu kg 0.3000 12,800.00 3,840.00
219,840.00
C PERALATAN
D Jumlah A + B + C 554,840.00
E Overhead & Profit 12.5% 69,355.00
F Harga Satuan Pekerjaan (D+E) 624,195.00
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
7 A.4.6.1.8 Pembuatan&Pemasangan 1 m2 Pintu kayu lapis (Plywood) Rangkap rangka Kayu Kamfer
A Tenaga
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Kayu L.02 OH 2.1000 100,000.00 210,000.00
Kepala Tukang L.03 OH 0.2100 110,000.00 23,100.00
Mandor L.04 OH 0.0350 115,000.00 4,025.00
293,125.00
B Bahan
Kayu Kamfer m3 0.0250 9,000,000.00 225,000.00
Paku Biasa 1/2" - 1" Kg 0.0300 12,800.00 384.00
Lem Kayu Ltr 0.5000 12,800.00 6,400.00
Plywood tebal 4 mm uk.90x220cm Lbr 1.0000 80,000.00 80,000.00
311,784.00
C PERALATAN
D Jumlah A + B + C 604,909.00
E Overhead & Profit 12.5% 75,613.63
F Harga Satuan Pekerjaan (D+E) 680,522.63

8 A.4.6.1.9 Pembuatan&Pemasangan 1 m2 Pintu Plywood rangkap, rangka expose kayu kamfer


A Tenaga
Pekerja L.01 OH 0.8000 80,000.00 64,000.00
Tukang Kayu L.02 OH 2.4000 100,000.00 240,000.00
Kepala Tukang L.03 OH 0.2400 110,000.00 26,400.00
Mandor L.04 OH 0.0400 115,000.00 4,600.00
335,000.00
B Bahan
Kayu Kamfer m3 0.0256 9,000,000.00 230,400.00
Paku Biasa 1/2" - 1" Kg 0.0300 12,800.00 384.00
Lem Kayu Ltr 0.5000 12,800.00 6,400.00
Plywood tebal 4 mm uk.90x220cm Lbr 1.0000 80,000.00 80,000.00
317,184.00
C PERALATAN
D Jumlah A + B + C 652,184.00
E Overhead & Profit 12.5% 81,523.00
F Harga Satuan Pekerjaan (D+E) 733,707.00

9 A.4.6.1.10 Pembuatan & Pemasangan 1 m2 Jalusi mati Kosen Kayu bengkirai


A Tenaga
Pekerja L.01 OH 0.6700 80,000.00 53,600.00
Tukang Kayu L.02 OH 2.0000 100,000.00 200,000.00
Kepala Tukang L.03 OH 0.2000 110,000.00 22,000.00
Mandor L.04 OH 0.3350 115,000.00 38,525.00
314,125.00
B Bahan
Kayu Bengkirai m3 0.0600 9,500,000.00 570,000.00
Paku Biasa 1/2" - 1" Kg 0.1500 12,800.00 1,920.00
571,920.00
C PERALATAN
D Jumlah A + B + C 886,045.00
E Overhead & Profit 12.5% 110,755.63
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
F Harga Satuan Pekerjaan (D+E) 996,800.63
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
10 A.4.6.1.11 Pembuatan & Pemasangan 1 m2 Pintu Teakwood Rangkap, Rangka Expose Kayu Bengkirai
A Tenaga
Pekerja L.01 OH 0.8000 80,000.00 64,000.00
Tukang Kayu L.02 OH 2.4000 100,000.00 240,000.00
Kepala Tukang L.03 OH 0.2400 110,000.00 26,400.00
Mandor L.04 OH 0.0400 115,000.00 4,600.00
335,000.00
B Bahan
Kayu Bengkirai m3 0.0250 9,500,000.00 237,500.00
Paku Biasa 1/2" - 1" Kg 0.0300 12,800.00 384.00
Lem Kayu kg 0.3000 12,800.00 3,840.00
Teakwood (90 x 220) cm x 4 mm Lbr 1.0000 80,000.00 80,000.00
321,724.00
C PERALATAN
D Jumlah A + B + C 656,724.00
E Overhead & Profit 12.5% 82,090.50
F Harga Satuan Pekerjaan (D+E) 738,814.50

11 A.4.6.1.12 Pembuatan&Pemasangan 1 m2 Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Kam
A Tenaga
Pekerja L.01 OH 0.8500 80,000.00 68,000.00
Tukang Kayu L.02 OH 2.5500 100,000.00 255,000.00
Kepala Tukang L.03 OH 0.2550 110,000.00 28,050.00
Mandor L.04 OH 0.0430 115,000.00 4,945.00
355,995.00
B Bahan
Kayu Kamfer m3 0.0250 9,000,000.00 225,000.00
Paku Biasa 1/2" - 1" Kg 0.0300 12,800.00 384.00
Lem Kayu kg 0.0800 12,800.00 1,024.00
Teakwood (90 x 220) cm x 4 mm Lbr 1.0000 80,000.00 80,000.00
Formika Lbr 0.5000 58,000.00 29,000.00
335,408.00
C PERALATAN
D Jumlah A + B + C 691,403.00
E Overhead & Profit 12.5% 86,425.38
F Harga Satuan Pekerjaan (D+E) 777,828.38
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
12 A.4.6.1.13 Pembuatan&Memasang 1 m3 Konstruksi Kuda-kuda Konvensional Kayu Bengkirai
A Tenaga
Pekerja L.01 OH 4.0000 80,000.00 320,000.00
Tukang Kayu L.02 OH 12.0000 100,000.00 1,200,000.00
Kepala Tukang L.03 OH 1.2000 110,000.00 132,000.00
Mandor L.04 OH 0.2000 115,000.00 23,000.00
1,675,000.00
B Bahan
Kayu Bengkirai m3 1.1000 9,500,000.00 10,450,000.00
Besi Strip Kg 15.0000 20,200.00 303,000.00
Paku Biasa 2" - 5" Kg 5.6000 12,800.00 71,680.00
###
C PERALATAN
D Jumlah A + B + C ###
E Overhead & Profit 12.5% 1,562,460.00
F Harga Satuan Pekerjaan (D+E) ###

13 A.4.6.1.13.1Pembuatan&Memasang 1 m3 Konstruksi Kuda-kuda Konvensional Kayu Kruing


A Tenaga
Pekerja L.01 OH 4.0000 80,000.00 320,000.00
Tukang Kayu L.02 OH 12.0000 100,000.00 1,200,000.00
Kepala Tukang L.03 OH 1.2000 110,000.00 132,000.00
Mandor L.04 OH 0.2000 115,000.00 23,000.00
1,675,000.00
B Bahan
Kayu Kruing m3 1.1000 6,750,000.00 7,425,000.00
Besi Strip Kg 15.0000 20,200.00 303,000.00
Paku Biasa 2" - 5" Kg 5.6000 12,800.00 71,680.00
7,799,680.00
C PERALATAN
D Jumlah A + B + C 9,474,680.00
E Overhead & Profit 12.5% 1,184,335.00
F Harga Satuan Pekerjaan (D+E) ###

14 A.4.6.1.15 Pemasangan konstruksi 1 m3 Gording, Kayu bengkirai


A Tenaga
Pekerja L.01 OH 2.4000 80,000.00 192,000.00
Tukang Kayu L.02 OH 7.2000 100,000.00 720,000.00
Kepala Tukang L.03 OH 0.7200 110,000.00 79,200.00
Mandor L.04 OH 0.1200 115,000.00 13,800.00
1,005,000.00
B Bahan
Kayu Bengkirai m3 1.1000 9,500,000.00 10,450,000.00
Besi Strip Kg 15.0000 20,200.00 303,000.00
Paku Biasa 2" - 5" Kg 3.0000 12,800.00 38,400.00
###
C PERALATAN
D Jumlah A + B + C ###
E Overhead & Profit 12.5% 1,474,550.00
F Harga Satuan Pekerjaan (D+E) ###
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
15 A.4.6.1.15.1Pemasangan konstruksi 1 m3 Gording, Kayu Kruing
A Tenaga
Pekerja L.01 OH 2.4000 80,000.00 192,000.00
Tukang Kayu L.02 OH 7.2000 100,000.00 720,000.00
Kepala Tukang L.03 OH 0.7200 110,000.00 79,200.00
Mandor L.04 OH 0.1200 115,000.00 13,800.00
1,005,000.00
B Bahan
Kayu Kruing m3 1.1000 6,750,000.00 7,425,000.00
Besi Strip Kg 15.0000 20,200.00 303,000.00
Paku Biasa 2" - 5" Kg 3.0000 12,800.00 38,400.00
7,766,400.00
C PERALATAN
D Jumlah A + B + C 8,771,400.00
E Overhead & Profit 12.5% 1,096,425.00
F Harga Satuan Pekerjaan (D+E) 9,867,825.00

16 A.4.6.1.16 Pemasangan 1 m2 Rangka Atap Genteng Keramik, Kayu Bengkirai


A Tenaga
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang Kayu L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0100 110,000.00 1,100.00
Mandor L.04 OH 0.0050 115,000.00 575.00
19,675.00
B Bahan
Kayu Bengkirai, Kaso-kaso (5x7) cm m3 0.0140 9,500,000.00 133,000.00
Reng (2x3) cm bengkirai m3 0.0036 9,500,000.00 34,200.00
Paku Biasa 2" - 5" Kg 0.2500 12,800.00 3,200.00
170,400.00
C PERALATAN
D Jumlah A + B + C 190,075.00
E Overhead & Profit 12.5% 23,759.38
F Harga Satuan Pekerjaan (D+E) 213,834.38

17 A.4.6.1.17 Pemasangan 1 m2 Rangka Atap Genteng Beton, Kayu Bengkirai


A Tenaga
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang Kayu L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0100 110,000.00 1,100.00
Mandor L.04 OH 0.0050 115,000.00 575.00
19,675.00
B Bahan
Kayu Bengkirai, Kaso-kaso (5x7) cm m3 0.0140 9,500,000.00 133,000.00
Reng (2x3) cm bengkirai m3 0.0072 9,500,000.00 68,400.00
Paku Biasa 2" - 5" Kg 0.2500 12,800.00 3,200.00
204,600.00
C PERALATAN
D Jumlah A + B + C 224,275.00
E Overhead & Profit 12.5% 28,034.38
F Harga Satuan Pekerjaan (D+E) 252,309.38
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp

18 A.4.6.1.19 Pemasangan 1 m2 Rangka Langit-langit (50x1,00) m, kayu Kruing


A Tenaga
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Kayu L.02 OH 0.3000 100,000.00 30,000.00
Kepala Tukang L.03 OH 0.0300 110,000.00 3,300.00
Mandor L.04 OH 0.0750 115,000.00 8,625.00
53,925.00
B Bahan
Kayu Kruing m3 0.0154 6,750,000.00 103,950.00
Paku Biasa 2" - 5" Kg 0.2000 12,800.00 2,560.00
106,510.00
C PERALATAN
D Jumlah A + B + C 160,435.00
E Overhead & Profit 12.5% 20,054.38
F Harga Satuan Pekerjaan (D+E) 180,489.38

19 A.4.6.1.19.1Pemasangan 1 m2 Rangka Langit-langit (50x1,00) m, kayu Sengon


A Tenaga
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Kayu L.02 OH 0.3000 100,000.00 30,000.00
Kepala Tukang L.03 OH 0.0300 110,000.00 3,300.00
Mandor L.04 OH 0.0750 115,000.00 8,625.00
53,925.00
B Bahan
Kayu Sengon m3 0.0154 2,850,000.00 43,890.00
Paku Biasa 2" - 5" Kg 0.2000 12,800.00 2,560.00
46,450.00
C PERALATAN
D Jumlah A + B + C 100,375.00
E Overhead & Profit 12.5% 12,546.88
F Harga Satuan Pekerjaan (D+E) 112,921.88

20 A.4.6.1.20 Pemasangan 1 m2 Rangka Langit-langit (60x60) cm, kayu Kruing


A Tenaga
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang Kayu L.02 OH 0.3000 100,000.00 30,000.00
Kepala Tukang L.03 OH 0.0300 110,000.00 3,300.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
50,450.00
B Bahan
Kayu Kruing m3 0.0163 6,750,000.00 110,025.00
Paku Biasa 2" - 5" Kg 0.2500 12,800.00 3,200.00
113,225.00
C PERALATAN
D Jumlah A + B + C 163,675.00
E Overhead & Profit 12.5% 20,459.38
F Harga Satuan Pekerjaan (D+E) 184,134.38
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
21 A.4.6.1.20.1Pemasangan 1 m2 Rangka Langit-langit (60x60) cm, kayu Sengon
A Tenaga
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang Kayu L.02 OH 0.3000 100,000.00 30,000.00
Kepala Tukang L.03 OH 0.0300 110,000.00 3,300.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
50,450.00
B Bahan
Kayu Sengon m3 0.0163 2,850,000.00 46,455.00
Paku Biasa 2" - 5" Kg 0.2500 12,800.00 3,200.00
49,655.00
C PERALATAN
D Jumlah A + B + C 100,105.00
E Overhead & Profit 12.5% 12,513.13
F Harga Satuan Pekerjaan (D+E) 112,618.13

22 A.4.6.1.21 Pemasangan 1 m' Listplank Uk. (3x20)cm Kayu Bengkirai


A Tenaga
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang Kayu L.02 OH 0.2000 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.0200 110,000.00 2,200.00
Mandor L.04 OH 0.0050 115,000.00 575.00
30,775.00
B Bahan
Kayu Bengkirai m3 0.0108 9,500,000.00 102,600.00
Paku Biasa 2" - 5" Kg 0.1000 12,800.00 1,280.00
103,880.00
C PERALATAN
D Jumlah A + B + C 134,655.00
E Overhead & Profit 12.5% 16,831.88
F Harga Satuan Pekerjaan (D+E) 151,486.88

23 A.4.6.1.22 Pemasangan 1 m' Listplank Uk. (3x30)cm Kayu Bengkirai


A Tenaga
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang Kayu L.02 OH 0.2000 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.0200 110,000.00 2,200.00
Mandor L.04 OH 0.0050 115,000.00 575.00
30,775.00
B Bahan
Kayu Bengkirai m3 0.0110 9,500,000.00 104,500.00
Paku Biasa 2" - 5" Kg 0.0500 12,800.00 640.00
105,140.00
C PERALATAN
D Jumlah A + B + C 135,915.00
E Overhead & Profit 12.5% 16,989.38
F Harga Satuan Pekerjaan (D+E) 152,904.38
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
24 A.4.6.1.23 Pemasangan 1 m2 Rangka Dinding Pemisah (60x120) cm Kayu Kruing
A Tenaga
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Kayu L.02 OH 0.4500 100,000.00 45,000.00
Kepala Tukang L.03 OH 0.0450 110,000.00 4,950.00
Mandor L.04 OH 0.0080 115,000.00 920.00
62,870.00
B Bahan
Kayu Kruing m3 0.0280 6,750,000.00 189,000.00
Paku Biasa 2" - 5" Kg 0.1500 12,800.00 1,920.00
190,920.00
C PERALATAN
D Jumlah A + B + C 253,790.00
E Overhead & Profit 12.5% 31,723.75
F Harga Satuan Pekerjaan (D+E) 285,513.75

25 A.4.6.1.24 Pemasangan 1 m2 Dinding Pemisah Teakwood Rangkap Rangka Kayu Kruing


A Tenaga
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Kayu L.02 OH 0.4500 100,000.00 45,000.00
Kepala Tukang L.03 OH 0.0450 110,000.00 4,950.00
Mandor L.04 OH 0.0080 115,000.00 920.00
62,870.00
B Bahan
Kayu Kruing m3 0.0280 6,750,000.00 189,000.00
Paku Biasa 2" - 5" Kg 0.1500 12,800.00 1,920.00
Teakwood 120 x 240 cm tebal 4mm Lbr 0.8600 80,000.00 68,800.00
Lem Ltr 0.5600 12,800.00 7,168.00
266,888.00
C PERALATAN
D Jumlah A + B + C 329,758.00
E Overhead & Profit 12.5% 41,219.75
F Harga Satuan Pekerjaan (D+E) 370,977.75

26 A.4.6.1.25 Pemasangan 1 m2 Dinding Pemisah Plywood Rangkap Rangka Kayu Kruing


A Tenaga
Pekerja L.01 OH 0.0200 80,000.00 1,600.00
Tukang Kayu L.02 OH 0.6000 100,000.00 60,000.00
Kepala Tukang L.03 OH 0.0600 110,000.00 6,600.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
69,350.00
B Bahan
Kayu Kruing m3 0.0280 6,750,000.00 189,000.00
Paku Biasa 2" - 5" Kg 0.1500 12,800.00 1,920.00
Plywood 120 x 240 cm tebal 4mm Lbr 0.8600 80,000.00 68,800.00
Lem Ltr 0.5600 12,800.00 7,168.00
266,888.00
C PERALATAN
D Jumlah A + B + C 336,238.00
E Overhead & Profit 12.5% 42,029.75
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
F Harga Satuan Pekerjaan (D+E) 378,267.75

27 A.4.6.1.26 Pemasangan 1 m2 Dinding Lambriziring dari Papan kayu jati


A Tenaga
Pekerja L.01 OH 0.6000 80,000.00 48,000.00
Tukang Kayu L.02 OH 1.8000 100,000.00 180,000.00
Kepala Tukang L.03 OH 0.1800 110,000.00 19,800.00
Mandor L.04 OH 0.0300 115,000.00 3,450.00
251,250.00
B Bahan
Kayu Jati m3 0.0070 16,875,000.00 118,125.00
Paku Biasa 2" - 5" Kg 0.1000 12,800.00 1,280.00
Paku Sekrup 3,5" Kg 0.1500 13,000.00 1,950.00
121,355.00
C PERALATAN
D Jumlah A + B + C 372,605.00
E Overhead & Profit 12.5% 46,575.63
F Harga Satuan Pekerjaan (D+E) 419,180.63

28 A.4.6.1.29 Pasang Kasau & Reng Kayu Bengkirai


A Tenaga
SNI Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang Kayu L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0100 110,000.00 1,100.00
Mandor L.04 OH 0.0050 115,000.00 575.00
19,675.00
B Bahan
Kayu Bengkirai m3 0.0120 9,500,000.00 114,000.00
Paku Biasa 2" - 5" Kg 0.1500 12,800.00 1,920.00
115,920.00
C PERALATAN
D Jumlah A + B + C 135,595.00
E Overhead & Profit 12.5% 16,949.38
F Harga Satuan Pekerjaan (D+E) 152,544.38

29 A.4.6.1.30 Pasang Kasau & Reng Kayu Kruing


A Tenaga
SNI Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang Kayu L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0100 110,000.00 1,100.00
Mandor L.04 OH 0.0050 115,000.00 575.00
19,675.00
B Bahan
Kayu Kruing m3 0.0120 6,750,000.00 81,000.00
Paku Biasa 2" - 5" Kg 0.1500 12,800.00 1,920.00
82,920.00
C PERALATAN
D Jumlah A + B + C 102,595.00
E Overhead & Profit 12.5% 12,824.38
F Harga Satuan Pekerjaan (D+E) 115,419.38
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
30 A.4.6.1.31 Pasang Papan sirip
A Tenaga
SNI Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang Kayu L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0100 110,000.00 1,100.00
Mandor L.04 OH 0.0500 115,000.00 5,750.00
24,850.00
B Bahan
Kayu Kruing m3 0.0050 6,750,000.00 33,750.00
Paku Biasa 2" - 5" Kg 0.0500 12,800.00 640.00
34,390.00
C PERALATAN
D Jumlah A + B + C 59,240.00
E Overhead & Profit 12.5% 7,405.00
F Harga Satuan Pekerjaan (D+E) 66,645.00
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp

VII A.4.1.1 HARGA SATUAN PEKERJAAN BETON


1 A.4.1.1.1 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87
A Tenaga
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
Mandor L.04 OH 0.083 115,000.00 9,545.00
172,125.00
B Bahan
Portland Semen Kg 247.000 1,450.00 358,150.00
Pasir Beton Kg 869.000 321.43 279,321.43
Kerikil (maksimum 30 mm) Kg 999.000 159.93 159,766.00
Air ltr 215.000 20.00 4,300.00
801,537.43
C PERALATAN
D Jumlah A + B + C 973,662.43
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 973,662.43
Overhead & Profit 12.5%
2 A.4.1.1.2 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78
A Tenaga
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
Mandor L.04 OH 0.083 115,000.00 9,545.00
172,125.00
B Bahan
Portland Semen Kg 276.000 1,450.00 400,200.00
Pasir Beton kg 828.000 321.43 266,142.86
Kerikil (maksimum 30 mm) kg 1012.000 159.93 161,845.04
Air ltr 215.000 20.00 4,300.00
832,487.89
C PERALATAN
D Jumlah A + B + C 1,004,612.89
E Overhead & Profit 12.5% 125,576.61
F Harga Satuan Pekerjaan (D+E) 1,130,189.51
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp
3 A.4.1.1.3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72
A Tenaga
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
Mandor L.04 OH 0.083 115,000.00 9,545.00
172,125.00
B Bahan
Portland Semen Kg 299.000 1,450.00 433,550.00
Pasir Beton kg 799.000 321.43 256,821.43
Kerikil (maksimum 30 mm) kg 1017.000 159.93 162,644.67
Air ltr 215.000 20.00 4,300.00
857,316.10
C PERALATAN
D Jumlah A + B + C 1,029,441.10
E Overhead & Profit 12.5% 128,680.14
F Harga Satuan Pekerjaan (D+E) 1,158,121.23

4 A.4.1.1.5 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
A Tenaga
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
Mandor L.04 OH 0.083 115,000.00 9,545.00
172,125.00
B Bahan
Portland Semen Kg 326.000 1,450.00 472,700.00
Pasir Beton Kg 760.000 321.43 244,285.71
Kerikil (maksimum 30 mm) Kg 1029.000 159.93 164,563.78
Air ltr 215.000 20.00 4,300.00
885,849.49
C PERALATAN
D Jumlah A + B + C 1,057,974.49
E Overhead & Profit 12.5% 132,246.81
F Harga Satuan Pekerjaan (D+E) 1,190,221.30
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp
5 A.4.1.1.6 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61
A Tenaga
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
Mandor L.04 OH 0.083 115,000.00 9,545.00
172,125.00
B Bahan
Portland Semen Kg 352.000 1,450.00 510,400.00
Pasir Beton Kg 731.000 321.43 234,964.29
Kerikil (maksimum 30 mm) Kg 1031.000 159.93 164,883.63
Air ltr 215.000 20.00 4,300.00
914,547.92
C PERALATAN
D Jumlah A + B + C 1,086,672.92
E Overhead & Profit 12.5% 135,834.11
F Harga Satuan Pekerjaan (D+E) 1,222,507.03

6 A.4.1.1.7 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
A Tenaga
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
Mandor L.04 OH 0.083 115,000.00 9,545.00
172,125.00
B Bahan
Portland Semen Kg 371.000 1,450.00 537,950.00
Pasir Beton Kg 698.000 321.43 224,357.14
Kerikil (maksimum 30 mm) Kg 1047.000 159.93 167,442.44
Air ltr 215.000 20.00 4,300.00
934,049.59
C PERALATAN
D Jumlah A + B + C 1,106,174.59
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 1,106,174.59
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp
7 A.4.1.1.8 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
A Tenaga
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
Mandor L.04 OH 0.083 115,000.00 9,545.00
172,125.00
B Bahan
Portland Semen Kg 384.000 1,450.00 556,800.00
Pasir Beton Kg 692.000 321.43 222,428.57
Kerikil (maksimum 30 mm) Kg 1039.000 159.93 166,163.04
Air ltr 215.000 20.00 4,300.00
949,691.61
C PERALATAN
D Jumlah A + B + C 1,121,816.61
E Overhead & Profit 12.5% 140,227.08
F Harga Satuan Pekerjaan (D+E) 1,262,043.68

8 A.4.1.1.9 Membuat Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53
A Tenaga
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
Mandor L.04 OH 0.083 115,000.00 9,545.00
172,125.00
B Bahan
Portland Semen Kg 406.000 1,450.00 588,700.00
Pasir Beton kg 684.000 321.43 219,857.14
Kerikil (maksimum 30 mm) kg 1026.000 159.93 164,084.00
Air ltr 215.000 20.00 4,300.00
976,941.14
C PERALATAN
D Jumlah A + B + C 1,149,066.14
E Overhead & Profit 12.5% 143,633.27
F Harga Satuan Pekerjaan (D+E) 1,292,699.41
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp
9 A.4.1.1.10 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52
A Tenaga
Pekerja L.01 OH 1.650 80,000.00 132,000.00
Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
Mandor L.04 OH 0.083 115,000.00 9,545.00
172,125.00
B Bahan
Portland Semen Kg 413.000 1,450.00 598,850.00
Pasir Beton Kg 681.000 321.43 218,892.86
Kerikil (maksimum 30 mm) Kg 1021.000 159.93 163,284.37
Air ltr 215.000 20.00 4,300.00
985,327.23
C PERALATAN
D Jumlah A + B + C 1,157,452.23
E Overhead & Profit 12.5% 144,681.53
F Harga Satuan Pekerjaan (D+E) 1,302,133.76

10 A.4.1.1.17 Pembesian 10 kg dg Besi Polos atau Besi Ulir


A Tenaga
Pekerja L.01 OH 0.070 80,000.00 5,600.00
Tukang Besi L.02 OH 0.070 100,000.00 7,000.00
Kepala Tukang L.03 OH 0.007 110,000.00 770.00
Mandor L.04 OH 0.004 115,000.00 460.00
13,830.00
B Bahan
Besi Beton (polos/ulir) Kg 10.500 11,500.00 120,750.00
Kawat Beton Kg 0.150 15,000.00 2,250.00
123,000.00
C PERALATAN
D Jumlah A + B + C 136,830.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 136,830.00
Jadi untuk pembesian 1 kg dibagi 10 13,683.00

11 A.4.1.1.19 Jaring Kawat baja/Wire Mesh / 10 kg


A Tenaga
Pekerja L.01 OH 0.025 80,000.00 2,000.00
Tukang Besi L.02 OH 0.025 100,000.00 2,500.00
Kepala Tukang L.03 OH 0.002 110,000.00 220.00
Mandor L.04 OH 0.001 115,000.00 115.00
4,835.00
B Bahan
Jaring Kawat Baja dilas/wiremesh Kg 10.200 17,000.00 173,400.00
Kawat Beton Kg 0.050 15,000.00 750.00
174,150.00
C PERALATAN
D Jumlah A + B + C 178,985.00
E Overhead & Profit 12.5% 22,373.13
F Harga Satuan Pekerjaan (D+E) 201,358.13
Jadi untuk pembesian 1 kg dibagi 10 20,135.81
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp

12 A.4.1.1.20 Memasang Bekisting untuk Pondasi


A Tenaga
Pekerja L.01 OH 0.520 80,000.00 41,600.00
Tukang Kayu L.02 OH 0.260 100,000.00 26,000.00
Kepala Tukang L.03 OH 0.026 110,000.00 2,860.00
Mandor L.04 OH 0.026 115,000.00 2,990.00
73,450.00
B Bahan
Kayu Klas III (Randu) m3 0.040 1,000,000.00 40,000.00
Paku Biasa 2" - 5" Kg 0.300 12,800.00 3,840.00
Minyak Bekisting Ltr 0.100 -
43,840.00
C PERALATAN
D Jumlah A + B + C 117,290.00
E Overhead & Profit 12.5% 14,661.25
F Harga Satuan Pekerjaan (D+E) 131,951.25

13 A.4.1.1.21 Memasang Bekisting untuk Sloof


A Tenaga
Pekerja L.01 OH 0.520 80,000.00 41,600.00
Tukang Kayu L.02 OH 0.260 100,000.00 26,000.00
Kepala Tukang L.03 OH 0.026 110,000.00 2,860.00
Mandor L.04 OH 0.026 115,000.00 2,990.00
73,450.00
B Bahan
Kayu Klas III (Randu) m3 0.045 1,000,000.00 45,000.00
Paku Biasa 2" - 5" Kg 0.300 12,800.00 3,840.00
Minyak Bekisting Ltr 0.100 0.00 -
48,840.00
C PERALATAN
D Jumlah A + B + C 122,290.00
E Overhead & Profit 12.5% 15,286.25
F Harga Satuan Pekerjaan (D+E) 137,576.25
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp
14 A.4.1.1.22 Memasang Bekisting untuk Kolom
A Tenaga
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.330 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.033 110,000.00 3,630.00
Mandor L.04 OH 0.033 115,000.00 3,795.00
93,225.00
B Bahan
Kayu Klas III (Randu) m3 0.040 1,000,000.00 40,000.00
Paku Biasa 2" - 5" Kg 0.400 12,800.00 5,120.00
Minyak Bekisting Ltr 0.200 0.00 -
Balok Kayu m3 0.015 1,000,000.00 15,000.00
Plywood tebal 9mm Lbr 0.350 102,000.00 35,700.00
Bambu Btg 2.000 8,000.00 16,000.00
111,820.00
C PERALATAN
D Jumlah A + B + C 205,045.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 205,045.00

15 A.4.1.1.23 Memasang Bekisting untuk Balok


A Tenaga
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.330 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.033 110,000.00 3,630.00
Mandor L.04 OH 0.033 115,000.00 3,795.00
93,225.00
B Bahan
Kayu Klas III (Randu) m3 0.040 1,000,000.00 40,000.00
Paku Biasa 2" - 5" Kg 0.400 12,800.00 5,120.00
Minyak Bekisting Ltr 0.200 0.00 -
Balok Kayu m3 0.018 1,000,000.00 18,000.00
Plywood tebal 9mm Lbr 0.350 102,000.00 35,700.00
Bambu Btg 2.000 8,000.00 16,000.00
114,820.00
C PERALATAN
D Jumlah A + B + C 208,045.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 208,045.00
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp
16 A.4.1.1.24 Memasang Bekisting untuk Lantai
A Tenaga
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.330 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.033 110,000.00 3,630.00
Mandor L.04 OH 0.033 115,000.00 3,795.00
93,225.00
B Bahan
Kayu Klas III (Randu) m3 0.040 1,000,000.00 40,000.00
Paku Biasa 2" - 5" Kg 0.400 12,800.00 5,120.00
Minyak Bekisting Ltr 0.200 0.00 -
Balok Kayu m3 0.015 1,000,000.00 15,000.00
Triplek 4 mm Lbr 0.350 58,000.00 20,300.00
Bambu Btg 4.000 8,000.00 32,000.00
112,420.00
C PERALATAN
D Jumlah A + B + C 205,645.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 205,645.00

17 A.4.1.1.25 Pemasangan 1 m2 bekisting untuk dinding


A TENAGA
Pekerja L.01 OH 0.66 80,000.00 52,800.00
Tukang kayu L.02 OH 0.33 100,000.00 33,000.00
Kepala tukang L.03 OH 0.03 110,000.00 3,630.00
Mandor L.04 OH 0.03 115,000.00 3,795.00
93,225.00
B BAHAN
Kayu kelas III m3 0.03 ### 30,000.00
Paku 5 cm – 12 cm kg 0.40 12,800.00 5,120.00
Minyak bekisting Liter 0.20 - -
Balok kayu kelas II m3 0.02 ### 20,000.00
Triplek 4 mm Lbr 0.35 58,000.00 20,300.00
Bambu Batang 3.00 8,000.00 24,000.00
99,420.00
C PERALATAN

D Jumlah A + B + C 192,645.00
E Overhead & Profit 12.5% 24,080.63
F Harga Satuan Pekerjaan (D+E) 216,725.63
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp
19 A.4.1.1.26 Memasang Bekisting untuk Tangga
A Tenaga
Pekerja L.01 OH 0.660 80,000.00 52,800.00
Tukang Kayu L.02 OH 0.330 100,000.00 33,000.00
Kepala Tukang L.03 OH 0.033 110,000.00 3,630.00
Mandor L.04 OH 0.033 115,000.00 3,795.00
93,225.00
B Bahan
Kayu Klas III (Randu) m3 0.030 1,000,000.00 30,000.00
Paku Biasa 2" - 5" Kg 0.400 12,800.00 5,120.00
Minyak Bekisting Ltr 0.150 0.00 -
Balok Kayu m3 0.015 1,000,000.00 15,000.00
Triplek 4 mm Lbr 0.350 58,000.00 20,300.00
Bambu Btg 2.000 8,000.00 16,000.00
86,420.00
C PERALATAN
D Jumlah A + B + C 179,645.00
E Overhead & Profit 12.5% 22,455.63
F Harga Satuan Pekerjaan (D+E) 202,100.63

20 A.4.1.1.35 Membuat Kolom Praktis Beton Bertulang (11 x 11) cm


A Tenaga
Pekerja L.01 OH 0.180 80,000.00 14,400.00
Tukang batu L.02 OH 0.020 100,000.00 2,000.00
Tukang Kayu L.02 OH 0.020 100,000.00 2,000.00
Tukang Besi L.02 OH 0.020 100,000.00 2,000.00
Kepala Tukang L.03 OH 0.006 110,000.00 660.00
Mandor L.04 OH 0.009 115,000.00 1,035.00
22,095.00
B Bahan
Kayu Klas III (Randu) m3 0.002 1,000,000.00 2,000.00
Paku Biasa 2" - 5" Kg 0.010 12,800.00 128.00
Besi Beton Polos Kg 3.000 11,500.00 34,500.00
Kawat Beton Kg 0.045 15,000.00 675.00
Portland Semen Kg 4.000 1,450.00 5,800.00
Pasir Beton m3 0.006 450,000.00 2,700.00
Kerikil Beton m3 0.009 215,900.00 1,943.10
47,746.10
C PERALATAN
D Jumlah A + B + C 69,841.10
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 69,841.10
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF JUMLAH HARGA
SATUAN
Rp Rp
21 A.4.1.1.36 Membuat Ring Balok Beton Bertulang (10 x 15) cm
A Tenaga
Pekerja L.01 OH 0.297 80,000.00 23,760.00
Tukang batu L.02 OH 0.033 100,000.00 3,300.00
Tukang Kayu L.02 OH 0.033 100,000.00 3,300.00
Tukang Besi L.02 OH 0.033 100,000.00 3,300.00
Kepala Tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.015 115,000.00 1,725.00
36,485.00
B Bahan
Kayu Klas III (Randu) m3 0.003 1,000,000.00 3,000.00
Paku Biasa 2" - 5" Kg 0.020 12,800.00 256.00
Besi Beton Polos Kg 3.600 11,500.00 41,400.00
Kawat Beton Kg 0.050 15,000.00 750.00
Portland Semen Kg 5.500 1,450.00 7,975.00
Pasir Beton m3 0.009 450,000.00 4,050.00
Kerikil Beton m3 0.015 215,900.00 3,238.50
60,669.50
C PERALATAN
D Jumlah A + B + C 97,154.50
E Overhead & Profit 12.5% 12,144.31
F Harga Satuan Pekerjaan (D+E) 109,298.81

22 A.4.1.1.37 1 m² bekisting untuk permukaan beton biasa dengan kayu randu tebal 2 cm
A Tenaga
Pekerja L.01 OH 0.200 80,000.00 16,000.00
Tukang Kayu L.02 OH 0.500 100,000.00 50,000.00
Kepala Tukang L.03 OH 0.050 110,000.00 5,500.00
Mandor L.04 OH 0.010 115,000.00 1,150.00
72,650.00
B Bahan
kayu randu tebal 2 cm m3 0.022 1,000,000.00 22,000.00
Paku Biasa 2" - 5" Kg 0.400 12,800.00 5,120.00
27,120.00
C PERALATAN
D Jumlah A + B + C 99,770.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 99,770.00
HARGA JUMLAH
SATUAN HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp

VIII A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1 Pemasangan Atap Genteng Plentong Kecil
A Tenaga
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Kayu L.02 OH 0.0750 100,000.00 7,500.00
Kepala Tukang L.03 OH 0.0075 110,000.00 825.00
Mandor L.04 OH 0.0080 115,000.00 920.00
21,245.00
B Bahan
Genteng Plentong Buah 25.0000 3,000.00 75,000.00
75,000.00
C PERALATAN
D Jumlah A + B + C 96,245.00
E Overhead & Profit 12.5% 12,030.63
F Harga Satuan Pekerjaan (D+E) 108,275.63

Overhead & Profit


2 A.4.5.2.2 Pemasangan Atap Genteng Kodok / Glasur
A Tenaga
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Kayu L.02 OH 0.0750 100,000.00 7,500.00
Kepala Tukang L.03 OH 0.0080 110,000.00 880.00
Mandor L.04 OH 0.0080 115,000.00 920.00
21,300.00
B Bahan
Genteng Kodok / Glasur Buah 25.0000 1,300.00 32,500.00
32,500.00
C PERALATAN
D Jumlah A + B + C 53,800.00
E Overhead & Profit 12.5% 6,725.00
F Harga Satuan Pekerjaan (D+E) 60,525.00
HARGA JUMLAH
SATUAN HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp

3 A.4.5.2.3 Pemasangan Atap Genteng Plentong Super / Besar


A Tenaga
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Kayu L.02 OH 0.0750 100,000.00 7,500.00
Kepala Tukang L.03 OH 0.0080 110,000.00 880.00
Mandor L.04 OH 0.0080 115,000.00 920.00
21,300.00
B Bahan
Genteng Plentong Super / Besar Buah 18.0000 6,000.00 108,000.00
108,000.00
C PERALATAN
D Jumlah A + B + C 129,300.00
E Overhead & Profit 12.5% 16,162.50
F Harga Satuan Pekerjaan (D+E) 145,462.50

4 A.4.5.2.4 Pemasangan Genteng Bubung Plentong


A Tenaga
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Kayu L.02 OH 0.2000 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.0200 110,000.00 2,200.00
Mandor L.04 OH 0.0020 115,000.00 230.00
54,430.00
B Bahan
Genteng Bubung Plentong Buah 5.0000 10,000.00 50,000.00
Portland Semen Kg 8.0000 1,450.00 11,600.00
Pasir Pasang m3 0.0320 195,750.00 6,264.00
67,864.00
C PERALATAN
D Jumlah A + B + C 122,294.00
E Overhead & Profit 12.5% 15,286.75
F Harga Satuan Pekerjaan (D+E) 137,580.75
HARGA JUMLAH
SATUAN HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp

5 A.4.5.2.5 Pemasangan Genteng Bubung Kodok / Glasur


A Tenaga
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Kayu L.02 OH 0.2000 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.0200 110,000.00 2,200.00
Mandor L.04 OH 0.0020 115,000.00 230.00
54,430.00
B Bahan
Genteng Bubung Kodok / Glasur Buah 5.0000 10,000.00 50,000.00
Portland Semen Kg 8.0000 1,450.00 11,600.00
Pasir Pasang m3 0.0320 195,750.00 6,264.00
67,864.00
C PERALATAN
D Jumlah A + B + C 122,294.00
E Overhead & Profit 12.5% 15,286.75
F Harga Satuan Pekerjaan (D+E) 137,580.75

6 A.4.5.2.6 Pemasangan Genteng Bubung Plentong Besar


A Tenaga
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Kayu L.02 OH 0.2000 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.0200 110,000.00 2,200.00
Mandor L.04 OH 0.0020 115,000.00 230.00
54,430.00
B Bahan
Genteng Bubung Plentong Besar Buah 4.0000 10,000.00 40,000.00
Portland Semen Kg 8.0000 1,450.00 11,600.00
Pasir Pasang m3 0.0320 195,750.00 6,264.00
57,864.00
C PERALATAN
D Jumlah A + B + C 112,294.00
E Overhead & Profit 12.5% 14,036.75
F Harga Satuan Pekerjaan (D+E) 126,330.75
HARGA JUMLAH
SATUAN HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
7 A.4.5.2.7 Pemasangan 1 m2 roof light fibreglass 90 x 182
A TENAGA
Pekerja L.01 OH 0.14 80,000.00 11,200.00
Tukang kayu L.03 OH 0.067 100,000.00 6,700.00
Kepala tukang L.11 OH 0.007 110,000.00 770.00
Mandor L.15 OH 0.007 115,000.00 805.00
19,475.00
B BAHAN
Rooflight m2 1 29,800.00 29,800.00
Paku biasa ½”-1” Kg 0.05 12,800.00 640.00
30,440.00
C PERALATAN

D Jumlah A + B + C 49,915.00
E Overhead & Profit 12.5% 6,239.38
F Harga Satuan Pekerjaan (D+E) 56,154.38

8 A Pemasangan Atap Asbes Gelombang Besar


Pekerja L.01 OH 0.1400 80,000.00 11,200.00
Tukang Kayu L.02 OH 0.0750 100,000.00 7,500.00
Kepala Tukang L.03 OH 0.0080 110,000.00 880.00
Mandor L.04 OH 0.0080 115,000.00 920.00
20,500.00
B Bahan
Asbes Gelombang Lbr 0.6000 83,000.00 49,800.00
Paku Pancing 60 x 230 Kg 0.1200 7,500.00 900.00
50,700.00
C PERALATAN
D Jumlah A + B + C 71,200.00
E Overhead & Profit 12.5% 8,900.00
F Harga Satuan Pekerjaan (D+E) 80,100.00
HARGA JUMLAH
SATUAN HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp

9 A.4.5.2.12 Pemasangan Atap Asbes Gelombang Kecil


A Tenaga
Pekerja L.01 OH 0.1400 80,000.00 11,200.00
Tukang Kayu L.02 OH 0.0700 100,000.00 7,000.00
Kepala Tukang L.03 OH 0.0070 110,000.00 770.00
Mandor L.04 OH 0.0070 115,000.00 805.00
19,775.00
B Bahan
Asbes Gelombang Lbr 0.3500 36,200.00 12,670.00
Paku Pancing 60 x 230 Kg 0.1200 7,500.00 900.00
13,570.00
C PERALATAN
D Jumlah A + B + C 33,345.00
E Overhead & Profit 12.5% 4,168.13
F Harga Satuan Pekerjaan (D+E) 37,513.13

10 A.4.5.2.22 Pemasangan 1 m’ bubung stel gelombang


A Tenaga
Pekerja L.01 OH 0.0840 80,000.00 6,720.00
Tukang Kayu L.02 OH 0.1250 100,000.00 12,500.00
Kepala Tukang L.03 OH 0.0130 110,000.00 1,430.00
Mandor L.04 OH 0.0040 115,000.00 460.00
21,110.00
B Bahan
Bubung stel gelombang Lbr 1.0000 30,000.00 30,000.00
Paku skrup 3,5” bj 4.0000 1,600.00 6,400.00
36,400.00
C PERALATAN
D Jumlah A + B + C 57,510.00
E Overhead & Profit 12.5% 7,188.75
F Harga Satuan Pekerjaan (D+E) 64,698.75
HARGA JUMLAH
SATUAN HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp

11 A.4.5.2.30 Pemasangan Atap Genteng Beton


A Tenaga
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang Kayu L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0100 110,000.00 1,100.00
Mandor L.04 OH 0.0100 115,000.00 1,150.00
28,250.00
B Bahan
Genteng Beton Standrad Lbr 11.0000 5,700.00 62,700.00
Paku Biasa 2" - 5" Kg 0.0300 12,800.00 384.00
63,084.00
C PERALATAN
D Jumlah A + B + C 91,334.00
E Overhead & Profit 12.5% 11,416.75
F Harga Satuan Pekerjaan (D+E) 102,750.75

12 A.4.5.2.32 Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap pelana


A TENAGA
Pekerja L.01 OH 0.20 80,000.00 16,000.00
Tukang kayu L.03 OH 0.10 100,000.00 10,000.00
Kepala tukang L.11 OH 0.01 110,000.00 1,100.00
Mandor L.15 OH 0.01 115,000.00 1,150.00
28,250.00
B BAHAN
Genteng metal buah 1.30 80,000.00 104,000.00
Paku biasa ½”-1” Kg 0.20 12,800.00 2,560.00
106,560.00
C PERALATAN

D Jumlah A + B + C 134,810.00
E Overhead & Profit 12.5% 16,851.25
F Harga Satuan Pekerjaan (D+E) 151,661.25
HARGA JUMLAH
SATUAN HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
13 A.4.5.2.33 Pemasangan 1 m2 genteng metal ukuran 80 x 100 atap jurai
A TENAGA
Pekerja L.01 OH 0.20 80,000.00 16,000.00
Tukang kayu L.03 OH 0.10 100,000.00 10,000.00
Kepala tukang L.11 OH 0.01 110,000.00 1,100.00
Mandor L.15 OH 0.01 115,000.00 1,150.00
28,250.00
B BAHAN
Genteng metal buah 2.00 80,000.00 160,000.00
Paku biasa ½”-1” Kg 0.20 12,800.00 2,560.00
162,560.00
C PERALATAN

D Jumlah A + B + C 190,810.00
E Overhead & Profit 12.5% 23,851.25
F Harga Satuan Pekerjaan (D+E) 214,661.25

14 A.4.5.2.34Pemasangan 1 m2 atap sirap kayu


A TENAGA
Pekerja L.01 OH 0.17 80,000.00 13,280.00
Tukang kayu L.03 OH 0.25 100,000.00 25,000.00
Kepala tukang L.11 OH 0.03 110,000.00 2,750.00
Mandor L.15 OH 0.01 115,000.00 920.00
41,950.00
B BAHAN
Sirap kayu buah 60.00 2,700.00 162,000.00
Paku biasa ½”-1” Kg 0.20 12,800.00 2,560.00
164,560.00
C PERALATAN

D Jumlah A + B + C 206,510.00
E Overhead & Profit 12.5% 25,813.75
F Harga Satuan Pekerjaan (D+E) 232,323.75
HARGA JUMLAH
SATUAN HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
15 A.4.5.2.34 Pemasangan Nok Genteng Beton
A Tenaga
Pekerja L.01 OH 0.4000 80,000.00 32,000.00
Tukang Kayu L.02 OH 0.2000 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.0200 110,000.00 2,200.00
Mandor L.04 OH 0.0200 115,000.00 2,300.00
56,500.00
B Bahan
Nok Genteng Beton Buah 3.5000 13,500.00 47,250.00
Paku Biasa 2" - 5" Kg 0.0500 12,800.00 640.00
Portland Semen Kg 10.8000 1,450.00 15,660.00
Pasir Pasang m3 0.0320 195,750.00 6,264.00
Semen Warna Kg 1.0000 12,000.00 12,000.00
81,814.00
C PERALATAN
D Jumlah A + B + C 138,314.00
E Overhead & Profit 12.5% 17,289.25
F Harga Satuan Pekerjaan (D+E) 155,603.25

16 A.4.5.2.37 Pemasangan 1 m’ nok genteng metal


A TENAGA
Pekerja L.01 OH 0.25 80,000.00 20,000.00
Tukang kayu L.03 OH 0.15 100,000.00 15,000.00
Kepala tukang L.11 OH 0.02 110,000.00 1,650.00
Mandor L.15 OH 0.01 115,000.00 1,495.00
38,145.00
B BAHAN
Nok genteng metal buah 1.10 35,000.00 38,500.00
Paku biasa ½”-1” Kg 0.05 12,800.00 640.00
39,140.00
C PERALATAN

D Jumlah (A+B+C) 77,285.00


E Overhead & Profit 12.5% 9,660.63
F Harga Satuan Pekerjaan (D+E) 86,945.63
HARGA JUMLAH
SATUAN HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
17 A.4.5.2.38 Pemasangan 1 m’ nok sirap
A TENAGA
Pekerja L.01 OH 0.13 80,000.00 10,000.00
Tukang kayu L.03 OH 0.25 100,000.00 25,000.00
Kepala tukang L.11 OH 0.03 110,000.00 2,750.00
Mandor L.15 OH 0.01 115,000.00 690.00
38,440.00
B BAHAN
Seng pelat 3" x 6” Lbr 0.40 40,700.00 16,280.00
Paku biasa ½”-1” Kg 0.05 12,800.00 640.00
Paku biasa 2” – 5” Kg 0.05 12,800.00 640.00
17,560.00
C PERALATAN

D Jumlah (A+B+C) 56,000.00


E Overhead & Profit 12.5% 7,000.00
F Harga Satuan Pekerjaan (D+E) 63,000.00

18 A.4.5.2.38 Pemasangan Atap Seng Gelombang


A Tenaga
Pekerja L.01 OH 0.1200 80,000.00 9,600.00
Tukang Kayu L.02 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00 660.00
Mandor L.04 OH 0.0060 115,000.00 690.00
16,950.00
B Bahan
Seng Gelombang 3" x 6" BJLS 28 Lbr 0.7000 40,700.00 28,490.00
Paku Pancing Kg 0.0200 7,500.00 150.00
28,640.00
C PERALATAN
D Jumlah A + B + C 45,590.00
E Overhead & Profit 12.5% 5,698.75
F Harga Satuan Pekerjaan (D+E) 51,288.75
HARGA JUMLAH
SATUAN HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp

19 A.4.5.2.39 Pemasangan Atap Nok Seng


A Tenaga
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Kayu L.02 OH 0.0700 100,000.00 7,000.00
Kepala Tukang L.03 OH 0.0070 110,000.00 770.00
Mandor L.04 OH 0.0060 115,000.00 690.00
20,460.00
B Bahan
Seng Plaat 3" x 6" BJLS 28 Lbr 0.3000 20,300.00 6,090.00
Paku Biasa 1/2" - 1" Kg 0.0400 12,800.00 512.00
6,602.00
C PERALATAN
D Jumlah A + B + C 27,062.00
E Overhead & Profit 12.5% 3,382.75
F Harga Satuan Pekerjaan (D+E) 30,444.75

20 A.4.5.2.40 Pemasangan 1 m2 alumunium foil/sisalation


A Tenaga
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Kayu L.02 OH 0.0500 80,000.00 4,000.00
Kepala Tukang L.03 OH 0.0050 100,000.00 500.00
Mandor L.04 OH 0.0080 110,000.00 880.00
17,380.00
B Bahan
Alumunium Foil tb 4 mm m2 1.0500 15,800.00 16,590.00
16,590.00
C PERALATAN
D Jumlah A + B + C 33,970.00
E Overhead & Profit 12.5% 4,246.25
F Harga Satuan Pekerjaan (D+E) 38,216.25
HARGA JUMLAH
SATUAN HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp

21 A.4.5.2.41 Pemasangan 1 m2 onduline ukuran 95 x 200


A TENAGA
Pekerja L.01 OH 0.20 80,000.00 16,000.00
Tukang kayu L.03 OH 0.10 80,000.00 8,000.00
Kepala tukang L.11 OH 0.01 100,000.00 1,000.00
Mandor L.15 OH 0.01 110,000.00 1,100.00
26,100.00
B BAHAN
Onduline 95 x 200 m2 1.10 81,600.00 89,760.00
Screw buah 15.00 1,000.00 15,000.00
104,760.00
C PERALATAN

D Jumlah A + B + C 130,860.00
E Overhead & Profit 12.5% 16,357.50
F Harga Satuan Pekerjaan (D+E) 147,217.50

22 A.4.5.2.42 Pemasangan 1 m2 onduvila ukuran 40 x 105


A TENAGA
Pekerja L.01 OH 0.20 80,000.00 16,000.00
Tukang kayu L.03 OH 0.10 80,000.00 8,000.00
Kepala tukang L.11 OH 0.01 100,000.00 1,000.00
Mandor L.15 OH 0.01 110,000.00 1,100.00
26,100.00
B BAHAN
Onduvila 40 x 105 m2 1.10 131,000.00 144,100.00
Screw buah 15.00 1,000.00 15,000.00
159,100.00
C PERALATAN

D Jumlah A + B + C 185,200.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 185,200.00
HARGA JUMLAH
SATUAN HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp

23 A.4.5.2.43 Pemasangan 1 m2 Metalroof Berpasir ukuran 40 x 100


A TENAGA
Pekerja L.01 OH 0.20 80,000.00 16,000.00
Tukang kayu L.03 OH 0.10 80,000.00 8,000.00
Kepala tukang L.11 OH 0.01 100,000.00 1,000.00
Mandor L.15 OH 0.01 110,000.00 1,100.00
26,100.00
B BAHAN
Metalroof Berpasir 40 x 100 m2 1.10 100,000.00 110,000.00
Screw buah 15.00 1,000.00 15,000.00
125,000.00
C PERALATAN

D Jumlah A + B + C 151,100.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 151,100.00
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp

IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


1 A.4.5.1.1 Pemasangan Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm
A Tenaga
Pekerja L.01 OH 0.030 80,000.00 2,400.00
Tukang Kayu L.02 OH 0.070 100,000.00 7,000.00
Kepala Tukang L.03 OH 0.007 110,000.00 770.00
Mandor L.04 OH 0.004 115,000.00 460.00
10,630.00
B Bahan
Plat Asbes Lbr 1.100 25,700.00 28,270.00
Paku Kg 0.010 12,800.00 128.00
28,398.00
C PERALATAN
D Jumlah A + B + C 39,028.00
E Overhead & Profit 12.5% 4,878.50
F Harga Satuan Pekerjaan (D+E) 43,906.50
Overhead & Profit (contoh 12.5%)
2 A.4.5.1.5 Memasang Langit-langit Tripleks Uk (120x240) cm, T 4 mm
A Tenaga
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang Kayu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.005 115,000.00 575.00
19,675.00
B Bahan
Tripleks (4 mm) Lbr 0.375 58,000.00 21,750.00
Paku Tripleks Kg 0.030 12,800.00 384.00
22,134.00
C PERALATAN
D Jumlah A + B + C 41,809.00
E Overhead & Profit 12.5% 5,226.13
F Harga Satuan Pekerjaan (D+E) 47,035.13
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
3 A.4.5.1.6 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm
A Tenaga
Pekerja L.01 OH 0.800 80,000.00 64,000.00
Tukang Kayu L.02 OH 0.800 100,000.00 80,000.00
Kepala Tukang L.03 OH 0.080 110,000.00 8,800.00
Mandor L.04 OH 0.040 115,000.00 4,600.00
157,400.00
B Bahan
Kayu Jati,Papan m3 0.015 16,875,000.00 253,125.00
Paku Kg 0.010 12,800.00 128.00
253,253.00
C PERALATAN
D Jumlah A + B + C 410,653.00
E Overhead & Profit 12.5% 51,331.63
F Harga Satuan Pekerjaan (D+E) 461,984.63

4 A.4.5.1.7 Memasang Langit-langit Gypsum Board, Uk (120x240) tebal 9 mm


A Tenaga
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang Kayu L.02 OH 0.050 100,000.00 5,000.00
Kepala Tukang L.03 OH 0.005 110,000.00 550.00
Mandor L.04 OH 0.005 115,000.00 575.00
14,125.00
B Bahan
Gypsum Board Lbr 0.364 65,000.00 23,660.00
Paku Sekrup Kg 0.110 13,000.00 1,430.00
25,090.00
C PERALATAN
D Jumlah A + B + C 39,215.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 39,215.00
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
5 A.4.5.1.8 Memasang Langit-langit Kalsiboard, Uk (120x240) tebal 3,5 mm
A Tenaga
Pekerja L.01 OH 0.100 80,000.00 8,000.00
Tukang Kayu L.02 OH 0.050 100,000.00 5,000.00
Kepala Tukang L.03 OH 0.005 110,000.00 550.00
Mandor L.04 OH 0.005 115,000.00 575.00
14,125.00
B Bahan
Kalsiboard Lbr 0.364 48,000.00 17,472.00
Paku Sekrup Kg 0.110 13,000.00 1,430.00
18,902.00
C PERALATAN
D Jumlah A + B + C 33,027.00
E Overhead & Profit 12.5% 4,128.38
F Harga Satuan Pekerjaan (D+E) 37,155.38

6 A.4.5.1.10 List Langit-Langit Kayu Profil


A Tenaga
Pekerja L.01 OH 0.050 80,000.00 4,000.00
Tukang Kayu L.02 OH 0.050 100,000.00 5,000.00
Kepala Tukang L.03 OH 0.005 110,000.00 550.00
Mandor L.04 OH 0.003 115,000.00 345.00
9,895.00
B Bahan
List Kayu Profil m1 1.050 10,000.00 10,500.00
Paku Kg 0.010 12,800.00 128.00
10,628.00
C PERALATAN
D Jumlah A + B + C 20,523.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 20,523.00
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp

X A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.1 Memasang Closet Duduk / Mono Blok
A Tenaga
Pekerja L.01 OH 3.3000 80,000.00 264,000.00
Tukang Batu L.02 OH 1.1000 100,000.00 110,000.00
Kepala Tukang L.03 OH 0.0100 110,000.00 1,100.00
Mandor L.04 OH 0.1600 115,000.00 18,400.00
393,500.00
B Bahan
Kloset Duduk / Monoblok Buah 1.0000 1,192,800.00 1,192,800.00
Kelengkapan 6% dari harga Kloset 0.0600 1,192,800.00 71,568.00
1,264,368.00
C PERALATAN
D Jumlah A + B + C 1,657,868.00
E Overhead & Profit 12.5% 207,233.50
F Harga Satuan Pekerjaan (D+E) 1,865,101.50
Overhead & Profit (contoh 12.5%)
2 A.5.1.1.2 Memasang Closet Jongkok Porselen
A Tenaga
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang Batu L.02 OH 1.5000 100,000.00 150,000.00
Kepala Tukang L.03 OH 0.1500 110,000.00 16,500.00
Mandor L.04 OH 0.1600 115,000.00 18,400.00
264,900.00
B Bahan
Kloset Jongkok Buah 1.0000 137,600.00 137,600.00
Portland Semen Kg 6.0000 1,450.00 8,700.00
Pasir Pasang m3 0.0100 195,750.00 1,957.50
148,257.50
C PERALATAN
D Jumlah A + B + C 413,157.50
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 413,157.50
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
3 A.5.1.1.4 Memasang Urinoir
A Tenaga
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang Batu L.02 OH 1.0000 100,000.00 100,000.00
Kepala Tukang L.03 OH 0.1000 110,000.00 11,000.00
Mandor L.04 OH 0.0500 115,000.00 5,750.00
196,750.00
B Bahan
Urinoir Buah 1.0000 367,500.00 367,500.00
Perlengkapan 30% Harga Urinoir Ls 0.3000 367,500.00 110,250.00
Portland Semen Kg 6.0000 1,450.00 8,700.00
Pasir Pasang m3 0.0100 195,750.00 1,957.50
488,407.50
C PERALATAN
D Jumlah A + B + C 685,157.50
E Overhead & Profit 12.5% 85,644.69
F Harga Satuan Pekerjaan (D+E) 770,802.19

4 A.5.1.1.5 Memasang Wastafel


A Tenaga
Pekerja L.01 OH 1.2000 80,000.00 96,000.00
Tukang Batu L.02 OH 0.1450 100,000.00 14,500.00
Kepala Tukang L.03 OH 0.1500 110,000.00 16,500.00
Mandor L.04 OH 0.0600 115,000.00 6,900.00
133,900.00
B Bahan
Wastafel Buah 1.0000 355,700.00 355,700.00
Perlengkapan 12% Harga Wastafel Ls 0.1200 355,700.00 42,684.00
Portland Semen Kg 6.0000 1,450.00 8,700.00
Pasir Pasang m3 0.0100 195,750.00 1,957.50
409,041.50
C PERALATAN
D Jumlah A + B + C 542,941.50
E Overhead & Profit 12.5% 67,867.69
F Harga Satuan Pekerjaan (D+E) 610,809.19
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
5 A.5.1.1.7 Pemasangan Bak Fibreglass vol.1 m3
A Tenaga
Pekerja L.01 OH 3.0000 80,000.00 240,000.00
Tukang Batu L.02 OH 4.5000 100,000.00 450,000.00
Kepala Tukang L.03 OH 0.0500 110,000.00 5,500.00
Mandor L.04 OH 0.9000 115,000.00 103,500.00
799,000.00
B Bahan
Bak Fibreglass Buah 1.0000 280,000.00 280,000.00
Perlengkapan 12% Bak Fibreglass Ls 0.1200 280,000.00 33,600.00
313,600.00
C PERALATAN
D Jumlah A + B + C 1,112,600.00
E Overhead & Profit 12.5% 139,075.00
F Harga Satuan Pekerjaan (D+E) 1,251,675.00

6 A.5.1.1.7.1 Pemasangan Bak Fibreglass vol.0,3 m3


A Tenaga
Pekerja L.01 OH 1.8000 80,000.00 144,000.00
Tukang Batu L.02 OH 2.7000 100,000.00 270,000.00
Kepala Tukang L.03 OH 0.0500 110,000.00 5,500.00
Mandor L.04 OH 0.1100 115,000.00 12,650.00
432,150.00
B Bahan
Bak Fibreglass Buah 1.0000 280,000.00 280,000.00
Perlengkapan 12% Bak Fibreglass Ls 0.1200 280,000.00 33,600.00
313,600.00
C PERALATAN
D Jumlah A + B + C 745,750.00
E Overhead & Profit 12.5% 93,218.75
F Harga Satuan Pekerjaan (D+E) 838,968.75
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
7 A.5.1.1.8 Memasang Bak Mandi Batu Bata Vol. 0,30 m3
A Tenaga
Pekerja L.01 OH 6.0000 80,000.00 480,000.00
Tukang Batu L.02 OH 3.0000 100,000.00 300,000.00
Kepala Tukang L.03 OH 0.3000 110,000.00 33,000.00
Mandor L.04 OH 0.0300 115,000.00 3,450.00
816,450.00
B Bahan
Batu Bata bh 150.00 900.00 135,000.00
Portland Semen Kg 120.00 1,450.00 174,000.00
Pasir Pasang m3 0.3000 195,750.00 58,725.00
Keramik 20 x 20 buah 111.00 2,000.00 222,000.00
Semen Nat Kg 6.0000 12,000.00 72,000.00
661,725.00
C PERALATAN
D Jumlah A + B + C 1,478,175.00
E Overhead & Profit 12.5% 184,771.88
F Harga Satuan Pekerjaan (D+E) 1,662,946.88

8 A.5.1.1.12 Pemasangan Bak Cuci Piring Stainless stell


A Tenaga
Pekerja L.01 OH 0.0300 80,000.00 2,400.00
Tukang Batu L.02 OH 0.3000 100,000.00 30,000.00
Kepala Tukang L.03 OH 0.0300 110,000.00 3,300.00
Mandor L.04 OH 0.0150 115,000.00 1,725.00
37,425.00
B Bahan
Bak Cuci Piring unit 1.0000 176,100.00 176,100.00
Water drain bh 1.0000 60,000.00 60,000.00
236,100.00
C PERALATAN
D Jumlah A + B + C 273,525.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 273,525.00
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
9 A.5.1.1.14 Pemasangan Floor Drain
A Tenaga
Pekerja L.01 OH 0.0100 80,000.00 800.00
Tukang Batu L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0100 110,000.00 1,100.00
Mandor L.04 OH 0.0050 115,000.00 575.00
12,475.00
B Bahan
Floor Drain bh 1.0000 23,100.00 23,100.00
23,100.00
C PERALATAN
D Jumlah A + B + C 35,575.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 35,575.00

10 A.5.1.1.15 Pemasangan Bak Kontrol Pas.Batu Bata 30x30 tinggi 35 cm


A Tenaga
Pekerja L.01 OH 2.1600 80,000.00 172,800.00
Tukang Batu L.02 OH 0.7200 100,000.00 72,000.00
Kepala Tukang L.03 OH 0.0720 110,000.00 7,920.00
Mandor L.04 OH 0.0110 115,000.00 1,265.00
253,985.00
B Bahan
Batu Bata bh 40.0000 900.00 36,000.00
Semen Portland kg 44.0000 1,450.00 63,800.00
Pasir Pasang m3 0.0700 195,750.00 13,702.50
Pasir Beton m3 0.0600 450,000.00 27,000.00
Kerikil m3 0.0700 215,900.00 15,113.00
Baja Tulangan kg 1.6000 11,500.00 18,400.00
174,015.50
C PERALATAN
D Jumlah A + B + C 428,000.50
E Overhead & Profit 12.5% 53,500.06
F Harga Satuan Pekerjaan (D+E) 481,500.56
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
11 A.5.1.1.16 Pemasangan Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm
A Tenaga
Pekerja L.01 OH 3.2000 80,000.00 256,000.00
Tukang Batu L.02 OH 1.1500 100,000.00 115,000.00
Kepala Tukang L.03 OH 0.0110 110,000.00 1,210.00
Mandor L.04 OH 0.0160 115,000.00 1,840.00
374,050.00
B Bahan
Batu Bata bh 70.0000 900.00 63,000.00
Semen Portland kg 77.0000 1,450.00 111,650.00
Pasir Pasang m3 0.1300 195,750.00 25,447.50
Pasir Beton m3 0.0900 450,000.00 40,500.00
Kerikil m3 0.0200 215,900.00 4,318.00
Baja Tulangan kg 2.6000 11,500.00 29,900.00
274,815.50
C PERALATAN
D Jumlah A + B + C 648,865.50
E Overhead & Profit 12.5% 81,108.19
F Harga Satuan Pekerjaan (D+E) 729,973.69

12 A.5.1.1.17 Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm


A Tenaga
Pekerja L.01 OH 3.2000 80,000.00 256,000.00
Tukang Batu L.02 OH 1.1500 100,000.00 115,000.00
Kepala Tukang L.03 OH 0.0110 110,000.00 1,210.00
Mandor L.04 OH 0.0160 115,000.00 1,840.00
374,050.00
B Bahan
Batu Bata bh 123.0000 900.00 110,700.00
Semen Portland kg 114.0000 1,450.00 165,300.00
Pasir Pasang m3 0.1840 195,750.00 36,018.00
Pasir Beton m3 0.1200 450,000.00 54,000.00
Kerikil m3 0.0330 215,900.00 7,124.70
Baja Tulangan kg 4.8500 11,500.00 55,775.00
428,917.70
C PERALATAN
D Jumlah A + B + C 802,967.70
E Overhead & Profit 12.5% 100,370.96
F Harga Satuan Pekerjaan (D+E) 903,338.66
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
13 A.5.1.1.18 Pemasangan Pipa Galvanis Ø ½"
A Tenaga
Pekerja L.01 OH 0.0540 80,000.00 4,320.00
Tukang Batu L.02 OH 0.0900 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.0090 110,000.00 990.00
Mandor L.04 OH 0.0270 115,000.00 3,105.00
17,415.00
B Bahan
Pipa Galvanis Ø ½" m' 1.2000 19,900.00 23,880.00
Perlengkapan 35% x pipa Ls 0.3500 19,900.00 6,965.00
30,845.00
C PERALATAN
D Jumlah A + B + C 48,260.00
E Overhead & Profit 12.5% 6,032.50
F Harga Satuan Pekerjaan (D+E) 54,292.50

14 A.5.1.1.19 Pemasangan Kran Ø ½" atau Ø ¾"


A Tenaga
Pekerja L.01 OH 0.0100 80,000.00 800.00
Tukang Batu L.02 OH 0.4000 100,000.00 40,000.00
Kepala Tukang L.03 OH 0.0400 110,000.00 4,400.00
Mandor L.04 OH 0.0050 115,000.00 575.00
45,775.00
B Bahan
Kran Air bh 1.0000 25,700.00 25,700.00
Sealtape bh 0.0250 4,100.00 102.50
25,802.50
C PERALATAN
D Jumlah A + B + C 71,577.50
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 71,577.50

15 A.5.1.1.20 Pemasangan Pipa Galvanis Ø ¾"


A Tenaga
Pekerja L.01 OH 0.0540 80,000.00 4,320.00
Tukang Batu L.02 OH 0.0900 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.0090 110,000.00 990.00
Mandor L.04 OH 0.0270 115,000.00 3,105.00
17,415.00
B Bahan
Pipa Galvanis Ø ¾" m' 1.2000 26,000.00 31,200.00
Perlengkapan 35% x pipa Ls 0.3500 26,000.00 9,100.00
40,300.00
C PERALATAN
D Jumlah A + B + C 57,715.00
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
E Overhead & Profit 12.5% 7,214.38
F Harga Satuan Pekerjaan (D+E) 64,929.38
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp

16 A.5.1.1.21 Pemasangan Pipa Galvanis Ø 1"


A Tenaga
Pekerja L.01 OH 0.0540 80,000.00 4,320.00
Tukang Batu L.02 OH 0.0900 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.0090 110,000.00 990.00
Mandor L.04 OH 0.0270 115,000.00 3,105.00
17,415.00
B Bahan
Pipa Galvanis Ø 1" m' 1.2000 40,000.00 48,000.00
Perlengkapan 35% x pipa Ls 0.3500 40,000.00 14,000.00
62,000.00
C PERALATAN
D Jumlah A + B + C 79,415.00
E Overhead & Profit 12.5% 9,926.88
F Harga Satuan Pekerjaan (D+E) 89,341.88

17 A.5.1.1.22 Pemasangan Pipa Galvanis Ø 1½ "


A Tenaga
Pekerja L.01 OH 0.1080 80,000.00 8,640.00
Tukang Batu L.02 OH 0.1800 100,000.00 18,000.00
Kepala Tukang L.03 OH 0.0180 110,000.00 1,980.00
Mandor L.04 OH 0.0050 115,000.00 575.00
29,195.00
B Bahan
Pipa Galvanis Ø 1½" m' 1.2000 60,100.00 72,120.00
Perlengkapan 35% x pipa Ls 0.3500 60,100.00 21,035.00
93,155.00
C PERALATAN
D Jumlah A + B + C 122,350.00
E Overhead & Profit 12.5% 15,293.75
F Harga Satuan Pekerjaan (D+E) 137,643.75
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
18 A.5.1.1.23 Pemasangan Pipa Galvanis Ø 3"
A Tenaga
Pekerja L.01 OH 0.1350 80,000.00 10,800.00
Tukang Batu L.02 OH 0.2250 100,000.00 22,500.00
Kepala Tukang L.03 OH 0.0230 110,000.00 2,530.00
Mandor L.04 OH 0.0070 115,000.00 805.00
36,635.00
B Bahan
Pipa Galvanis Ø 3" m' 1.2000 280,000.00 336,000.00
Perlengkapan 35% x pipa Ls 0.3500 280,000.00 98,000.00
434,000.00
C PERALATAN
D Jumlah A + B + C 470,635.00
E Overhead & Profit 12.5% 58,829.38
F Harga Satuan Pekerjaan (D+E) 529,464.38

19 A.5.1.1.24 Pemasangan Pipa Galvanis Ø 4"


A Tenaga
Pekerja L.01 OH 0.1350 80,000.00 10,800.00
Tukang Batu L.02 OH 0.2250 100,000.00 22,500.00
Kepala Tukang L.03 OH 0.0230 110,000.00 2,530.00
Mandor L.04 OH 0.0070 115,000.00 805.00
36,635.00
B Bahan
Pipa Galvanis Ø 4" m' 1.2000 297,200.00 356,640.00
Perlengkapan 35% x pipa Ls 0.3500 297,200.00 104,020.00
460,660.00
C PERALATAN
D Jumlah A + B + C 497,295.00
E Overhead & Profit 12.5% 62,161.88
F Harga Satuan Pekerjaan (D+E) 559,456.88

20 A.5.1.1.25 Pemasangan Pipa PVC tipe AW Ø ½"


A Tenaga
Pekerja L.01 OH 0.0360 80,000.00 2,880.00
Tukang Batu L.02 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00 660.00
Mandor L.04 OH 0.0020 115,000.00 230.00
9,770.00
B Bahan
Pipa PVC Ø ½" m' 1.2000 3,600.00 4,320.00
Perlengkapan 35% x pipa Ls 0.3500 3,600.00 1,260.00
5,580.00
C PERALATAN
D Jumlah A + B + C 15,350.00
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
E Overhead & Profit 12.5% 1,918.75
F Harga Satuan Pekerjaan (D+E) 17,268.75

21 A.5.1.1.26 Pemasangan Pipa PVC tipe AW Ø ¾"


A Tenaga
Pekerja L.01 OH 0.0360 80,000.00 2,880.00
Tukang Batu L.02 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00 660.00
Mandor L.04 OH 0.0020 115,000.00 230.00
9,770.00
B Bahan
Pipa PVC Ø ¾" m' 1.2000 4,800.00 5,760.00
Perlengkapan 35% x pipa Ls 0.3500 4,800.00 1,680.00
7,440.00
C PERALATAN
D Jumlah A + B + C 17,210.00
E Overhead & Profit 12.5% 2,151.25
F Harga Satuan Pekerjaan (D+E) 19,361.25

22 A.5.1.1.27 Pemasangan Pipa PVC tipe AW Ø 1"


A Tenaga
Pekerja L.01 OH 0.0360 80,000.00 2,880.00
Tukang Batu L.02 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00 660.00
Mandor L.04 OH 0.0020 115,000.00 230.00
9,770.00
B Bahan
Pipa PVC Ø 1" m' 1.2000 6,600.00 7,920.00
Perlengkapan 35% x pipa Ls 0.3500 6,600.00 2,310.00
10,230.00
C PERALATAN
D Jumlah A + B + C 20,000.00
E Overhead & Profit 12.5% 2,500.00
F Harga Satuan Pekerjaan (D+E) 22,500.00
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
23 A.5.1.1.28 Pemasangan Pipa PVC tipe AW Ø 1½"
A Tenaga
Pekerja L.01 OH 0.0540 80,000.00 4,320.00
Tukang Batu L.02 OH 0.0900 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.0090 110,000.00 990.00
Mandor L.04 OH 0.0030 115,000.00 345.00
14,655.00
B Bahan
Pipa PVC Ø 1½" m' 1.2000 11,300.00 13,560.00
Perlengkapan 35% x pipa Ls 0.3500 11,300.00 3,955.00
17,515.00
C PERALATAN
D Jumlah A + B + C 32,170.00
E Overhead & Profit 12.5% 4,021.25
F Harga Satuan Pekerjaan (D+E) 36,191.25

24 A.5.1.1.29 Pemasangan Pipa PVC tipe AW Ø 2"


A Tenaga
Pekerja L.01 OH 0.0540 80,000.00 4,320.00
Tukang Batu L.02 OH 0.0900 100,000.00 9,000.00
Kepala Tukang L.03 OH 0.0090 110,000.00 990.00
Mandor L.04 OH 0.0030 115,000.00 345.00
14,655.00
B Bahan
Pipa PVC Ø 2" m' 1.2000 14,500.00 17,400.00
Perlengkapan 35% x pipa Ls 0.3500 14,500.00 5,075.00
22,475.00
C PERALATAN
D Jumlah A + B + C 37,130.00
E Overhead & Profit 12.5% 4,641.25
F Harga Satuan Pekerjaan (D+E) 41,771.25

25 A.5.1.1.31 Pemasangan Pipa PVC tipe AW Ø 3"


A Tenaga
Pekerja L.01 OH 0.0810 80,000.00 6,480.00
Tukang Batu L.02 OH 0.1350 100,000.00 13,500.00
Kepala Tukang L.03 OH 0.0135 110,000.00 1,485.00
Mandor L.04 OH 0.0040 115,000.00 460.00
21,925.00
B Bahan
Pipa PVC Ø 3" m' 1.2000 29,700.00 35,640.00
Perlengkapan 35% x pipa Ls 0.3500 29,700.00 10,395.00
46,035.00
C PERALATAN
D Jumlah A + B + C 67,960.00
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 67,960.00

26 A.5.1.1.32 Pemasangan Pipa PVC tipe AW Ø 4"


A Tenaga
Pekerja L.01 OH 0.0810 80,000.00 6,480.00
Tukang Batu L.02 OH 0.1350 100,000.00 13,500.00
Kepala Tukang L.03 OH 0.0135 110,000.00 1,485.00
Mandor L.04 OH 0.0040 115,000.00 460.00
21,925.00
B Bahan
Pipa PVC Ø 4" m' 1.2000 49,100.00 58,920.00
Perlengkapan 35% x pipa Ls 0.3500 49,100.00 17,185.00
76,105.00
C PERALATAN
D Jumlah A + B + C 98,030.00
E Overhead & Profit 12.5% 12,253.75
F Harga Satuan Pekerjaan (D+E) 110,283.75

27 A.5.1.1.33 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 cm


A Tenaga
Pekerja L.01 OH 0.0800 80,000.00 6,400.00
Tukang Batu L.02 OH 0.0400 100,000.00 4,000.00
Kepala Tukang L.03 OH 0.0040 110,000.00 440.00
Mandor L.04 OH 0.0040 115,000.00 460.00
11,300.00
B Bahan
pipa tanah bh 1.6000 183,150.00 293,040.00
Semen Portlan kg 35.0000 1,450.00 50,750.00
Pasir Pasang m3 0.0140 195,750.00 2,740.50
Pasir Urug m3 0.0140 115,450.00 1,616.30
348,146.80
C PERALATAN
D Jumlah A + B + C 359,446.80
E Overhead & Profit 12.5% 44,930.85
F Harga Satuan Pekerjaan (D+E) 404,377.65
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
28 A.5.1.1.34 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 15 cm
A Tenaga
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang Batu L.02 OH 0.0300 100,000.00 3,000.00
Kepala Tukang L.03 OH 0.0030 110,000.00 330.00
Mandor L.04 OH 0.0030 115,000.00 345.00
8,475.00
B Bahan
pipa tanah bh 1.6000 109,150.00 174,640.00
Semen Portlan kg 6.8000 1,450.00 9,860.00
Pasir Pasang m3 0.0130 195,750.00 2,544.75
Pasir Urug m3 0.0110 115,450.00 1,269.95
188,314.70
C PERALATAN
D Jumlah A + B + C 196,789.70
E Overhead & Profit 12.5% 24,598.71
F Harga Satuan Pekerjaan (D+E) 221,388.41

29 A.5.1.1.35 Pemasangan Pipa Beton Ø 20 cm


A Tenaga
Pekerja L.01 OH 0.1400 80,000.00 11,200.00
Tukang Batu L.02 OH 0.0700 100,000.00 7,000.00
Kepala Tukang L.03 OH 0.0070 110,000.00 770.00
Mandor L.04 OH 0.0070 115,000.00 805.00
19,775.00
B Bahan
pipa beton bh 1.1000 78,700.00 86,570.00
Batu Bata m3 0.0270 675,000.00 18,225.00
Semen Portlan kg 3.9200 1,450.00 5,684.00
Pasir Pasang m3 0.0560 195,750.00 10,962.00
Pasir Urug m3 0.0240 115,450.00 2,770.80
124,211.80
C PERALATAN
D Jumlah A + B + C 143,986.80
E Overhead & Profit 12.5% 17,998.35
F Harga Satuan Pekerjaan (D+E) 161,985.15
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
30 A.5.1.1.36 Pemasangan Pipa Beton Ø 100 cm
A Tenaga
Pekerja L.01 OH 0.3800 80,000.00 30,400.00
Tukang Batu L.02 OH 0.1900 100,000.00 19,000.00
Kepala Tukang L.03 OH 0.0190 110,000.00 2,090.00
Mandor L.04 OH 0.0190 115,000.00 2,185.00
53,675.00
B Bahan
pipa beton bh 1.1000 486,700.00 535,370.00
Batu Bata m3 0.5500 675,000.00 371,250.00
Semen Portlan kg 10.3000 1,450.00 14,935.00
Pasir Pasang m3 0.0610 195,750.00 11,940.75
Pasir Urug m3 0.0690 115,450.00 7,966.05
941,461.80
C PERALATAN
D Jumlah A + B + C 995,136.80
E Overhead & Profit 12.5% 124,392.10
F Harga Satuan Pekerjaan (D+E) 1,119,528.90
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp

XI A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


1 A.4.2.1.1 Pemasangan Besi Profil

A Tenaga
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang Besi L.02 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00 660.00

Mandor L.04 OH 0.0030 115,000.00 345.00


11,805.00
B Bahan
Besi Profil Kg 1.1500 18,500.00 21,275.00

Meni Besi Kg 0.0600 30,600.00 1,836.00


23,111.00
C PERALATAN
D Jumlah A + B + C 34,916.00
E Overhead & Profit 12.5% 4,364.50

F Harga Satuan Pekerjaan (D+E) 39,280.50


Overhead & Profit
2 A.4.2.1.2 Pemasangan Rangka Kuda-kuda Baja IWF

A Tenaga
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang Besi L.02 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00 660.00

Mandor L.04 OH 0.0030 115,000.00 345.00


11,805.00

B Bahan
Besi Baja IWF kg 1.1500 18,500.00 21,275.00
21,275.00

C PERALATAN
D Jumlah A + B + C 33,080.00
E Overhead & Profit 12.5% 4,135.00
F Harga Satuan Pekerjaan (D+E) 37,215.00

3 A.4.2.1.4 Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangka baja siku
A TENAGA
Pekerja L.01 OH 1.05 80,000.00 84,000.00
Tukang las biasa L.03 OH 1.05 100,000.00 105,000.00
Kepala tukang L.03 OH 0.11 110,000.00 11,550.00
Mandor L.04 OH 0.05 115,000.00 5,980.00
206,530.00
B BAHAN
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
Besi siku L 30.30.3 Kg 15.00 35,800.00 537,000.00
Besi pelat baja Kg 32.80 20,200.00 662,560.00
Kawat las Kg 0.05 900.00 45.00
1,199,605.00
C PERALATAN

D Jumlah A + B + C 1,406,135.00
E Overhead & Profit 12.5% 175,766.88
F Harga Satuan Pekerjaan (D+E) 1,581,901.88

4 A.4.2.1.5 Pengerjaan 10 cm pengelasan dengan las listrik


A TENAGA
Pekerja L.01 OH 0.04 80,000.00 3,200.00
Tukang besi konstruksi L.03 OH 0.02 100,000.00 2,000.00
Kepala tukang L.03 OH 0.00 110,000.00 220.00
Mandor L.04 OH 0.00 115,000.00 230.00
5,650.00
B BAHAN
Kawat las listrik Kg 0.40 900.00 360.00
Solar Liter 0.30 5,900.00 1,770.00
Minyak pelumas Liter 0.04 10,000.00 400.00
2,530.00
C PERALATAN
Sewa alat Jam 0.17 50,000.00 8,500.00
8,500.00

D Jumlah A + B + C 16,680.00
E Overhead & Profit 12.5% 2,085.00
F Harga Satuan Pekerjaan (D+E) 18,765.00

5 A.4.2.1.7 Pemasangan Pintu Rolling Door Besi


A Tenaga
Pekerja L.01 OH 1.2000 80,000.00 96,000.00

Tukang Besi L.02 OH 1.2000 100,000.00 120,000.00


Kepala Tukang L.03 OH 0.1200 110,000.00 13,200.00
Mandor L.04 OH 0.0060 115,000.00 690.00
229,890.00

B Bahan
Pintu Gulung Besi m2 1.0000 350,000.00 350,000.00
350,000.00
C PERALATAN

D Jumlah A + B + C 579,890.00
E Overhead & Profit 12.5% 72,486.25
F Harga Satuan Pekerjaan (D+E) 652,376.25
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp

6 A.4.2.1.8 Pemasangan Pintu Lipat (Folding Door)


A Tenaga
Pekerja L.01 OH 0.4400 80,000.00 35,200.00
Tukang Besi L.02 OH 0.4400 100,000.00 44,000.00

Kepala Tukang L.03 OH 0.0440 110,000.00 4,840.00


Mandor L.04 OH 0.0220 115,000.00 2,530.00
86,570.00
B Bahan
Pintu Lipat m2 1.0000 434,000.00 434,000.00
434,000.00
C PERALATAN
D Jumlah A + B + C 520,570.00

E Overhead & Profit 12.5% 65,071.25


F Harga Satuan Pekerjaan (D+E) 585,641.25

7 A.4.2.1.10 Pemasangan Rolling Door Allumunium

A Tenaga
Pekerja L.01 OH 1.0000 80,000.00 80,000.00

Tukang Besi L.02 OH 1.0000 100,000.00 100,000.00


Kepala Tukang L.03 OH 0.1000 110,000.00 11,000.00
Mandor L.04 OH 0.0500 115,000.00 5,750.00
196,750.00

B Bahan
Rolling Allumunium m2 1.0000 364,000.00 364,000.00
364,000.00
C PERALATAN
D Jumlah A + B + C 560,750.00
E Overhead & Profit 12.5% 70,093.75
F Harga Satuan Pekerjaan (D+E) 630,843.75

8 A.4.2.1.11 Pemasangan Kusen Pintu Allumunium


A Tenaga
Pekerja L.01 OH 0.0430 80,000.00 3,440.00
Tukang Besi L.02 OH 0.0430 100,000.00 4,300.00

Kepala Tukang L.03 OH 0.0043 110,000.00 473.00


Mandor L.04 OH 0.0021 115,000.00 241.50
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
8,454.50

B Bahan
Profil Allumunium m' 1.1000 103,200.00 113,520.00
Skrup Fixer buah 2.0000 1,600.00 3,200.00
Sealant Tube 0.0600 22,500.00 1,350.00

118,070.00
C PERALATAN
D Jumlah A + B + C 126,524.50
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 126,524.50
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp

9 A.4.2.1.12 Pemasangan Pintu Allumunium Strip Lebar 8 cm


A Tenaga
Pekerja L.01 OH 0.0850 80,000.00 6,800.00
Tukang Besi L.02 OH 0.0850 100,000.00 8,500.00

Kepala Tukang L.03 OH 0.0085 110,000.00 935.00


Mandor L.04 OH 0.0042 115,000.00 483.00
16,718.00
B Bahan
Profil Allumunium m' 4.4000 103,200.00 454,080.00
Allumunium Strip m' ### 34,300.00 500,780.00
954,860.00
C PERALATAN

D Jumlah A + B + C 971,578.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 971,578.00

10 A.4.2.1.13 Pemasangan Pintu Kaca Rangka Allumunium


A Tenaga

Pekerja L.01 OH 0.0850 80,000.00 6,800.00


Tukang Besi L.02 OH 0.0850 100,000.00 8,500.00
Kepala Tukang L.03 OH 0.0090 110,000.00 990.00
Mandor L.04 OH 0.0050 115,000.00 575.00

16,865.00
B Bahan
Pintu Allumunium m' 4.4000 103,200.00 454,080.00
Sealant tube 0.2700 22,500.00 6,075.00
460,155.00
C PERALATAN
D Jumlah A + B + C 477,020.00
E Overhead & Profit -

F Harga Satuan Pekerjaan (D+E) 477,020.00

11 A.4.2.1.15 Pemasangan 1 m2 terali besi strip (2 x 3) mm


A TENAGA
Pekerja L.01 OH 1.67 80,000.00 133,600.00
Tukang las L.03 OH 1.67 100,000.00 167,000.00
Kepala tukang L.03 OH 0.17 110,000.00 18,370.00
Mandor L.04 OH 0.08 115,000.00 9,545.00
328,515.00
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
B BAHAN
Besi strip kg 6.18 20,200.00 124,775.40
Pengelasan cm 27.08 1,876.50 50,815.62
175,591.02
C PERALATAN

D Jumlah (A+B+C) 504,106.02


E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 504,106.02
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
12 A.4.2.1.18 Pemasangan Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm

A Tenaga
Pekerja L.01 OH 0.2000 80,000.00 16,000.00
Tukang Kayu L.02 OH 0.2000 100,000.00 20,000.00
Kepala Tukang L.03 OH 0.0200 110,000.00 2,200.00

Mandor L.04 OH 0.0010 115,000.00 115.00


38,315.00
B Bahan
Seng Plaat Lbr 1.0500 20,300.00 21,315.00
Paku Biasa 1 - 2,5 cm Kg 0.0150 12,800.00 192.00
Kayu Papan Klas II atau III m3 0.0190 6,750,000.00 128,250.00
149,757.00
C PERALATAN

D Jumlah A + B + C 188,072.00
E Overhead & Profit 12.5% 23,509.00
F Harga Satuan Pekerjaan (D+E) 211,581.00
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp

13 A.4.2.1.19 Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm
A Tenaga
Pekerja L.01 OH 0.1500 80,000.00 12,000.00
Tukang Kayu L.02 OH 0.3000 100,000.00 30,000.00

Kepala Tukang L.03 OH 0.0300 110,000.00 3,300.00


Mandor L.04 OH 0.0080 115,000.00 920.00
46,220.00
B Bahan
Seng Plaat Lbr 1.0500 20,300.00 21,315.00
Paku Biasa 1 - 2,5 cm Kg 0.0100 12,800.00 128.00
Besi strip Kg 0.5000 20,200.00 10,100.00
31,543.00

C PERALATAN
D Jumlah A + B + C 77,763.00
E Overhead & Profit 12.5% 9,720.38
F Harga Satuan Pekerjaan (D+E) 87,483.38

14 A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 1x40.40.0,6 mm, modul 60 x 120 cm, untuk partisi
A TENAGA
Pekerja L.01 OH 0.25 80,000.00 20,000.00
Tukang besi L.02 OH 0.25 100,000.00 25,000.00
Kepala tukang L.03 OH 0.03 110,000.00 2,750.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
49,245.00
B BAHAN
hollow 40.40.2 mm M1 3.50 11,300.00 39,550.00
Assesoris
(perkuatan, las dll) Ls 1.00 11,300.00 11,300.00

50,850.00
C PERALATAN

D Jumlah A + B + C 100,095.00
E Overhead & Profit 12.5% 12,511.88
F Harga Satuan Pekerjaan (D+E) 112,606.88

15 A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.0,6 mm, modul 60 x 60 cm, plafon
A Tenaga
Pekerja L.01 OH 0.3500 80,000.00 28,000.00

Tukang Kayu L.02 OH 0.3500 100,000.00 35,000.00


Kepala Tukang L.03 OH 0.0350 110,000.00 3,850.00
Mandor L.04 OH 0.0180 115,000.00 2,070.00
68,920.00

B Bahan
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
Rangka metal hollow 40.40.0.6 mm M1 4.0000 11,300.00 45,200.00

Assesoris (perkuatan, las dll) Ls 0.5000 5,650.00 2,825.00


48,025.00
C PERALATAN
D Jumlah A + B + C 116,945.00

E Overhead & Profit 0.0% -


F Harga Satuan Pekerjaan (D+E) 116,945.00
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp

XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 A.4.6.2.2 Pemasangan Kunci Tanam Biasa
A Tenaga
Pekerja L.01 OH 0.0100 80,000.00
Tukang Kayu L.02 OH 0.5000 100,000.00
Kepala Tukang L.03 OH 0.0500 110,000.00
Mandor L.04 OH 0.0050 115,000.00

B Bahan
Kunci Tanam Biasa Buah 1.0000 77,200.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Overhead & Profit
2 A.4.6.2.3 Pemasangan Kunci Kamar Mandi
A Tenaga
Pekerja L.01 OH 0.0050 80,000.00
Tukang Kayu L.02 OH 0.5000 100,000.00
Kepala Tukang L.03 OH 0.0500 110,000.00
Mandor L.04 OH 0.0025 115,000.00

B Bahan
Kunci Tanam Kamar Mandi Buah 1.0000 46,400.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
3 A.4.6.2.4 Pemasangan Kunci Selinder
A Tenaga
Pekerja L.01 OH 0.0050 80,000.00
Tukang Kayu L.02 OH 0.5000 100,000.00
Kepala Tukang L.03 OH 0.0500 110,000.00
Mandor L.04 OH 0.0025 115,000.00

B Bahan
Kunci Selinder Buah 1.0000 77,200.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

4 A.4.6.2.5 Pemasangan Engsel Pintu


A Tenaga
Pekerja L.01 OH 0.0150 80,000.00
Tukang Kayu L.02 OH 0.1500 100,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00
Mandor L.04 OH 0.0008 115,000.00

B Bahan
Engsel pintu Buah 1.0000 26,100.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
5 A.4.6.2.6 Pemasangan Engsel Jendela Kupu-kupu
A Tenaga
Pekerja L.01 OH 0.0100 80,000.00
Tukang Kayu L.02 OH 0.1000 100,000.00
Kepala Tukang L.03 OH 0.0100 110,000.00
Mandor L.04 OH 0.0005 115,000.00

B Bahan
Engsel Jendela Buah 1.0000 18,500.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

6 A.4.6.2.7 Pemasangan Engsel Angin


A Tenaga
Pekerja L.01 OH 0.1000 80,000.00
Tukang Kayu L.02 OH 0.2000 100,000.00
Kepala Tukang L.03 OH 0.0200 110,000.00
Mandor L.04 OH 0.0005 115,000.00

B Bahan
Engsel Angin Buah 1.0000 19,800.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
7 A.4.6.2.9 Pemasangan Kait Angin
A Tenaga
Pekerja L.01 OH 0.0150 80,000.00
Tukang Kayu L.02 OH 0.1500 100,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00
Mandor L.04 OH 0.0080 115,000.00

B Bahan
Kait Angin Buah 1.0000 6,900.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

8 A.4.6.2.10 Pasang Door Closer


A Tenaga
Pekerja L.01 OH 0.0500 80,000.00
Tukang Kayu L.02 OH 0.5000 100,000.00
Kepala Tukang L.03 OH 0.0500 110,000.00
Mandor L.04 OH 0.0025 115,000.00

B Bahan
Door Closer Buah 1.0000 118,400.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
9 A.4.6.2.11 Pemasangan Kunci Selot
A Tenaga
Pekerja L.01 OH 0.0200 80,000.00
Tukang Kayu L.02 OH 0.2000 100,000.00
Kepala Tukang L.03 OH 0.0200 110,000.00
Mandor L.04 OH 0.0010 115,000.00

B Bahan
Kunci Selot Buah 1.0000 8,900.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

10 A.4.6.2.13 Pemasangan Door Stop


A Tenaga
Pekerja L.01 OH 0.0100 80,000.00
Tukang Kayu L.02 OH 0.1000 100,000.00
Kepala Tukang L.03 OH 0.0100 110,000.00
Mandor L.04 OH 0.0005 115,000.00

B Bahan
Door Stop Buah 1.0000 35,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
11 A.4.6.2.14 Pemasangan Rel Pintu Dorong
A Tenaga
Pekerja L.01 OH 0.0600 80,000.00
Tukang Kayu L.02 OH 0.6000 100,000.00
Kepala Tukang L.03 OH 0.0600 110,000.00
Mandor L.04 OH 0.0030 115,000.00

B Bahan
Rel Pintu Dorong Buah 1.0000 216,200.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

12 A.4.6.2.16 Pemasangan Kaca tebal 3 mm


A Tenaga
Pekerja L.01 OH 0.0150 80,000.00
Tukang Kayu L.02 OH 0.1500 100,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00
Mandor L.04 OH 0.0008 115,000.00

B Bahan
Kaca tebal 3mm m2 1.1000 85,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
13 A.4.6.2.17 Pemasangan Kaca tebal 5 mm
A Tenaga
Pekerja L.01 OH 0.0150 80,000.00
Tukang Kayu L.02 OH 0.1500 100,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00
Mandor L.04 OH 0.0008 115,000.00

B Bahan
Kaca tebal 5mm m2 1.1000 120,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)

14 A.4.6.2.18 Pemasangan Kaca Cermin tebal 5 mm


A Tenaga
Pekerja L.01 OH 0.0150 80,000.00
Tukang Kayu L.02 OH 0.1500 100,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00
Mandor L.04 OH 0.0008 115,000.00

B Bahan
Kaca Cermin m2 1.1000 170,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
15 A.4.6.2.22 Pemasangan 1 m2 kaca wireglassed tebal 5 mm
A TENAGA
Pekerja L.01 OH 0.02 80,000.00
Tukang kayu L.02 OH 0.15 100,000.00
Kepala tukang L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.01 115,000.00

B BAHAN
Kaca wireglassed 5
mm m2 1.10 900,000.00

C PERALATAN

D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

16 A.4.6.2.23 Pemasangan 1 m2 kaca patri tebal 3 mm


A TENAGA
Pekerja L.01 OH 0.08 80,000.00
Tukang kayu L.02 OH 0.15 100,000.00
Kepala tukang L.03 OH 0.02 110,000.00
Mandor L.04 OH 0.00 115,000.00

B BAHAN
Kaca patri 5mm m2 1.10 ###
Sealant Kg 0.05 22,500.00

C PERALATAN

D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA
Rp

800.00
50,000.00
5,500.00
575.00
56,875.00

77,200.00
77,200.00

134,075.00
-
134,075.00

400.00
50,000.00
5,500.00
287.50
56,187.50

46,400.00
46,400.00

102,587.50
-
102,587.50
JUMLAH
HARGA
Rp

400.00
50,000.00
5,500.00
287.50
56,187.50

77,200.00
77,200.00

133,387.50
-
133,387.50

1,200.00
15,000.00
1,650.00
92.00
17,942.00

26,100.00
26,100.00

44,042.00
-
44,042.00
JUMLAH
HARGA
Rp

800.00
10,000.00
1,100.00
57.50
11,957.50

18,500.00
18,500.00

30,457.50
-
30,457.50

8,000.00
20,000.00
2,200.00
57.50
30,257.50

19,800.00
19,800.00

50,057.50
6,257.19
56,314.69
JUMLAH
HARGA
Rp

1,200.00
15,000.00
1,650.00
920.00
18,770.00

6,900.00
6,900.00

25,670.00
-
25,670.00

4,000.00
50,000.00
5,500.00
287.50
59,787.50

118,400.00
118,400.00

178,187.50
22,273.44
200,460.94
JUMLAH
HARGA
Rp

1,600.00
20,000.00
2,200.00
115.00
23,915.00

8,900.00
8,900.00

32,815.00
4,101.88
36,916.88

800.00
10,000.00
1,100.00
57.50
11,957.50

35,000.00
35,000.00

46,957.50
5,869.69
52,827.19
JUMLAH
HARGA
Rp

4,800.00
60,000.00
6,600.00
345.00
71,745.00

216,200.00
216,200.00

287,945.00
35,993.13
323,938.13

1,200.00
15,000.00
1,650.00
86.25
17,936.25

93,500.00
93,500.00

111,436.25
13,929.53
125,365.78
JUMLAH
HARGA
Rp

1,200.00
15,000.00
1,650.00
86.25
17,936.25

132,000.00
132,000.00

149,936.25
-
149,936.25

1,200.00
15,000.00
1,650.00
86.25
17,936.25

187,000.00
187,000.00

204,936.25
25,617.03
230,553.28
JUMLAH
HARGA
Rp

1,200.00
15,000.00
1,650.00
920.00
18,770.00

990,000.00
1,008,770.00

1,027,540.00
128,442.50
1,155,982.50

6,000.00
15,000.00
1,650.00
460.00
23,110.00

1,573,000.00
1,125.00
1,574,125.00

1,597,235.00
199,654.38
1,796,889.38
JUMLAH
HARGA
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp

XIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING


1 A.4.4.3.1 Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 40cm x 40 cm
A TENAGA
Pekerja L.01 OH 0.25 80,000.00 20,000.00
Tukang batu L.02 OH 0.13 100,000.00 12,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
35,425.00
B BAHAN
Ubin abu-abu buah 6.63 2,950.00 19,558.50
Semen Portland kg 9.80 1,450.00 14,210.00
Pasir Beton/Muntilan M3 0.05 450,000.00 20,250.00
54,018.50
C PERALATAN

D Jumlah A + B + C 89,443.50
E Overhead & Profit 12.5% 11,180.44
F Harga Satuan Pekerjaan (D+E) 100,623.94

2 A.4.4.3.2 Pemasangan lantai Ubin PC Abu-abu Uk. 30 x 30 cm


A Tenaga
Pekerja L.01 OH 0.2500 80,000.00 20,000.00
Tukang Batu L.02 OH 0.1250 100,000.00 12,500.00
Kepala Tukang L.03 OH 0.0130 110,000.00 1,430.00
Mandor L.04 OH 0.0130 115,000.00 1,495.00
35,425.00
B Bahan
Ubin Abu-abu 30x30 cm Buah 11.8700 2,950.00 35,016.50
Portland Semen Kg 10.0000 1,450.00 14,500.00
Pasir Beton/Muntilan m3 0.0450 450,000.00 20,250.00
69,766.50
C PERALATAN
D Jumlah A + B + C 105,191.50
E Overhead & Profit 12.5% 13,148.94
F Harga Satuan Pekerjaan (D+E) 118,340.44
JUMLAH
HARGA
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp

3 A.4.4.3.3 Pemasangan lantai Ubin PC Abu-abu Uk. 20 x 20 cm


A Tenaga
Pekerja L.01 OH 0.2700 80,000.00 21,600.00
Tukang Batu L.02 OH 0.1350 100,000.00 13,500.00
Kepala Tukang L.03 OH 0.0140 110,000.00 1,540.00
Mandor L.04 OH 0.0140 115,000.00 1,610.00
38,250.00
B Bahan
Ubin Abu-abu 20x20 cm Buah 26.5000 2,950.00 78,175.00
Portland Semen Kg 10.4000 1,450.00 15,080.00
Pasir Beton/Muntilan m3 0.0450 450,000.00 20,250.00
113,505.00
C PERALATAN
D Jumlah A + B + C 151,755.00
E Overhead & Profit 12.5% 18,969.38
F Harga Satuan Pekerjaan (D+E) 170,724.38

4 A.4.4.3.4 Pemasangan 1 m2 lantai ubin warna ukuran 40 cm x 40 cm


A TENAGA
Pekerja L.01 OH 0.25 80,000.00 20,000.00
Tukang batu L.02 OH 0.13 100,000.00 12,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
35,425.00
B BAHAN
Ubin warna Bh 6.63 6,750.00 44,752.50
Semen Portland kg 9.80 1,450.00 14,210.00
Semen warna Kg 0.60 1,450.00 870.00
Pasir Beton/Muntilan M3 0.05 450,000.00 20,250.00
80,082.50
C PERALATAN

D Jumlah A + B + C 115,507.50
E Overhead & Profit 12.5% 14,438.44
F Harga Satuan Pekerjaan (D+E) 129,945.94
JUMLAH
HARGA
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp

5 A.4.4.3.5 Pemasangan lantai Ubin PC Warna Uk. 30 x 30 cm


A Tenaga
Pekerja L.01 OH 0.2600 80,000.00 20,800.00
Tukang Batu L.02 OH 0.1300 100,000.00 13,000.00
Kepala Tukang L.03 OH 0.0130 110,000.00 1,430.00
Mandor L.04 OH 0.0130 115,000.00 1,495.00
36,725.00
B Bahan
Ubin Warna 30x30 cm Buah 11.8700 6,750.00 80,122.50
Portland Semen Kg 10.0000 1,450.00 14,500.00
Semen warna Kg 1.5000 12,000.00 18,000.00
Pasir Beton/Muntilan m3 0.0450 450,000.00 20,250.00
132,872.50
C PERALATAN
D Jumlah A + B + C 169,597.50
E Overhead & Profit 12.5% 21,199.69
F Harga Satuan Pekerjaan (D+E) 190,797.19

6 A.4.4.3.6 Pemasangan lantai Ubin PC Warna Uk. 20 x 20 cm


A Tenaga
Pekerja L.01 OH 0.2700 80,000.00 21,600.00
Tukang Batu L.02 OH 0.1350 100,000.00 13,500.00
Kepala Tukang L.03 OH 0.0140 110,000.00 1,540.00
Mandor L.04 OH 0.0140 115,000.00 1,610.00
38,250.00
B Bahan
Ubin Warna 20x20 cm Buah 26.5000 6,750.00 178,875.00
Portland Semen Kg 10.4000 1,450.00 15,080.00
Semen warna Kg 1.6200 12,000.00 19,440.00
Pasir Beton/Muntilan m3 0.0450 450,000.00 20,250.00
233,645.00
C PERALATAN
D Jumlah A + B + C 271,895.00
E Overhead & Profit 12.5% 33,986.88
F Harga Satuan Pekerjaan (D+E) 305,881.88
JUMLAH
HARGA
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp

7 A.4.4.3.7 Pemasangan 1 m2 lantai ubin teraso ukuran 40 cm x 40 cm


A TENAGA
Pekerja L.01 OH 0.25 80,000.00 20,000.00
Tukang batu L.02 OH 0.13 100,000.00 12,500.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
35,425.00
B BAHAN
Ubin teraso Bh 6.63 9,000.00 59,670.00
Semen Portland kg 9.80 1,450.00 14,210.00
Semen warna Kg 1.30 12,000.00 15,600.00
Pasir Beton/Muntilan M3 0.05 450,000.00 20,250.00
109,730.00
C PERALATAN

D Jumlah A + B + C 145,155.00
E Overhead & Profit 12.5% 18,144.38
F Harga Satuan Pekerjaan (D+E) 163,299.38

8 A.4.4.3.8 Pemasangan 1 m2 lantai ubin teraso ukuran 30 cm x 30 cm


A TENAGA
Pekerja L.01 OH 0.26 80,000.00 20,800.00
Tukang batu L.02 OH 0.13 100,000.00 13,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,430.00
Mandor L.04 OH 0.01 115,000.00 1,495.00
36,725.00
B BAHAN
Ubin teraso Bh 11.87 9,000.00 106,830.00
Semen Portland kg 10.00 1,450.00 14,500.00
Semen warna Kg 1.50 12,000.00 18,000.00
Pasir Beton/Muntilan M3 0.05 450,000.00 20,250.00
159,580.00
C PERALATAN

D Jumlah A + B + C 196,305.00
E Overhead & Profit 12.5% 24,538.13
F Harga Satuan Pekerjaan (D+E) 220,843.13
JUMLAH
HARGA
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp

9 A.4.4.3.9 Pemasangan lantai Ubin Granitile Uk. 40 x 40 cm


A Tenaga
Pekerja L.01 OH 0.2500 80,000.00 20,000.00
Tukang Batu L.02 OH 0.1250 100,000.00 12,500.00
Kepala Tukang L.03 OH 0.0130 110,000.00 1,430.00
Mandor L.04 OH 0.0130 115,000.00 1,495.00
35,425.00
B Bahan
Ubin Granitile 40x40 cm Buah 6.6300 32,800.00 217,464.00
Portland Semen Kg 9.8000 1,450.00 14,210.00
Semen warna Kg 1.3000 12,000.00 15,600.00
Pasir Beton/Muntilan m3 0.0450 450,000.00 20,250.00
267,524.00
C PERALATAN
D Jumlah A + B + C 302,949.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 302,949.00

10 A.4.4.3.35 Pemasangan Lantai Keramik 30 x 30 cm warna


A Tenaga
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.0350 110,000.00 3,850.00
Mandor L.04 OH 0.0350 115,000.00 4,025.00
98,875.00
B Bahan
Ubin Keramik 30 x 30 cm warna Buah 11.8700 4,200.00 49,854.00
Portland Semen Kg 10.0000 1,450.00 14,500.00
Pasir Beton/Muntilan m3 0.0450 450,000.00 20,250.00
Semen Warna Kg 1.5000 12,000.00 18,000.00
102,604.00
C PERALATAN
D Jumlah A + B + C 201,479.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 201,479.00
JUMLAH
HARGA
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp

11 A.4.4.3.35.1Pemasangan Lantai Keramik 30 x 30 cm putih


A Tenaga
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.0350 110,000.00 3,850.00
Mandor L.04 OH 0.0350 115,000.00 4,025.00
98,875.00
B Bahan
Ubin Keramik 30 x 30 cm putih Buah 11.8700 4,000.00 47,480.00
Portland Semen Kg 10.0000 1,450.00 14,500.00
Pasir Beton/Muntilan m3 0.0450 450,000.00 20,250.00
Semen Warna Kg 1.5000 12,000.00 18,000.00
100,230.00
C PERALATAN
D Jumlah A + B + C 199,105.00
E Overhead & Profit 12.5% 24,888.13
F Harga Satuan Pekerjaan (D+E) 223,993.13

12 A.4.4.3.35.2Pemasangan Lantai Keramik 40 x 40 cm warna


SNI A Tenaga
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.0350 110,000.00 3,850.00
Mandor L.04 OH 0.0350 115,000.00 4,025.00
98,875.00
B Bahan
Ubin Keramik 40 x 40 cm Buah 6.6300 9,500.00 62,985.00
Portland Semen Kg 9.8000 1,450.00 14,210.00
Semen Warna Kg 1.3000 12,000.00 15,600.00
Pasir Beton/Muntilan m3 0.0450 450,000.00 20,250.00
113,045.00
C PERALATAN
D Jumlah A + B + C 211,920.00
E Overhead & Profit 12.5% 26,490.00
F Harga Satuan Pekerjaan (D+E) 238,410.00
JUMLAH
HARGA
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp

13 A.4.4.3.35.3Pemasangan Lantai Keramik 40 x 40 cm putih

SNI A Tenaga
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.0350 110,000.00 3,850.00
Mandor L.04 OH 0.0350 115,000.00 4,025.00
98,875.00
B Bahan
Ubin Keramik 40 x 40 cm putih Buah 6.6300 9,000.00 59,670.00
Portland Semen Kg 9.8000 1,450.00 14,210.00
Semen Warna Kg 1.3000 12,000.00 15,600.00
Pasir Beton/Muntilan m3 0.0450 450,000.00 20,250.00
109,730.00
C PERALATAN
D Jumlah A + B + C 208,605.00
E Overhead & Profit 12.5% 26,075.63
F Harga Satuan Pekerjaan (D+E) 234,680.63

14 A.4.4.3.36 Pemasangan Lantai Keramik 20 x 20 cm


A Tenaga
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.0350 110,000.00 3,850.00
Mandor L.04 OH 0.0350 115,000.00 4,025.00
98,875.00
B Bahan
Ubin Keramik 20 x 20 cm Buah 26.5000 2,000.00 53,000.00
Portland Semen Kg 10.4000 1,450.00 15,080.00
Semen Warna Kg 1.6200 12,000.00 19,440.00
Pasir Beton/Muntilan m3 0.0450 450,000.00 20,250.00
107,770.00
C PERALATAN
D Jumlah A + B + C 206,645.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 206,645.00
JUMLAH
HARGA
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp

15 A.4.4.3.44 Pemasangan 1 m2 lantai karpet


A TENAGA
Pekerja L.01 OH 0.17 80,000.00 13,600.00

Tukang kayu L.02 OH 0.17 100,000.00 17,000.00

Kepala tukang L.03 OH 0.017 110,000.00 1,870.00

Mandor L.04 OH 0.009 115,000.00 1,035.00

33,505.00
B BAHAN
Karpet tb 6 mm ex.Atrium m2 1.05 150,000.00 157,500.00

Lem Kg 0.35 45,000.00 15,750.00

173,250.00
C PERALATAN

D Jumlah A + B + C 206,755.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 206,755.00

16 A.4.4.3.45 Pemasangan 1 m2 underlayer (pelapis bawah karpet)


A TENAGA
Pekerja L.01 OH 0.12 80,000.00 9,600.00

Tukang kayu L.02 OH 0.12 100,000.00 12,000.00

Kepala tukang L.03 OH 0.01 110,000.00 1,320.00

Mandor L.04 OH 0.01 115,000.00 690.00

23,610.00
B BAHAN
Underlayer m2 1.05 6,000.00 6,300.00

Lem Kg 0.35 45,000.00 15,750.00

22,050.00
C PERALATAN

D Jumlah A + B + C 45,660.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 45,660.00
JUMLAH
HARGA
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp

17 A.4.4.3.46 Pemasangan Lantai Parquet Jati


A Tenaga
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.0350 110,000.00 3,850.00
Mandor L.04 OH 0.0350 115,000.00 4,025.00
98,875.00
B Bahan
Parquet Jati m2 1.0500 210,000.00 220,500.00
Lem Vynil Kg 0.6000 35,000.00 21,000.00
241,500.00
C PERALATAN
D Jumlah A + B + C 340,375.00
E Overhead & Profit 12.5% 42,546.88
F Harga Satuan Pekerjaan (D+E) 382,921.88

18 A.4.4.3.53 Pemasangan Dinding Keramik 10x20 cm,


A Tenaga
Pekerja L.01 OH 0.9000 80,000.00 72,000.00
Tukang Batu L.02 OH 0.4500 100,000.00 45,000.00
Kepala Tukang L.03 OH 0.0450 110,000.00 4,950.00
Mandor L.04 OH 0.0450 115,000.00 5,175.00
127,125.00
B Bahan
Keramik Buah 53.0000 1,000.00 53,000.00
Portland Semen Kg 9.3000 1,450.00 13,485.00
Pasir Beton/Muntilan m3 0.0180 450,000.00 8,100.00
Semen Warna Kg 2.7500 12,000.00 33,000.00
107,585.00
C PERALATAN
D Jumlah A + B + C 234,710.00
E Overhead & Profit 12.5% 29,338.75
F Harga Satuan Pekerjaan (D+E) 264,048.75
JUMLAH
HARGA
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp

19 A.4.4.3.54 Pemasangan Dinding Keramik 20x20 cm,


A Tenaga
Pekerja L.01 OH 0.9000 80,000.00 72,000.00
Tukang Batu L.02 OH 0.4500 100,000.00 45,000.00
Kepala Tukang L.03 OH 0.0450 110,000.00 4,950.00
Mandor L.04 OH 0.0450 115,000.00 5,175.00
127,125.00
B Bahan
Keramik Buah 26.5000 2,000.00 53,000.00
Portland Semen Kg 9.3000 1,450.00 13,485.00
Pasir Beton/Muntilan m3 0.0180 450,000.00 8,100.00
Semen Warna Kg 1.9400 12,000.00 23,280.00
97,865.00
C PERALATAN
D Jumlah A + B + C 224,990.00
E Overhead & Profit 12.5% 28,123.75
F Harga Satuan Pekerjaan (D+E) 253,113.75

20 A.4.4.3.55 Pemasangan Dinding Keramik 20x25 cm,


A Tenaga
Pekerja L.01 OH 0.9000 80,000.00 72,000.00
Tukang Batu L.02 OH 0.4500 100,000.00 45,000.00
Kepala Tukang L.03 OH 0.0450 110,000.00 4,950.00
Mandor L.04 OH 0.0450 115,000.00 5,175.00
127,125.00
B Bahan
Keramik Buah 20.0000 2,700.00 54,000.00
Portland Semen Kg 9.3000 1,450.00 13,485.00
Pasir Beton/Muntilan m3 0.0180 450,000.00 8,100.00
Semen Warna Kg 1.9400 12,000.00 23,280.00
98,865.00
C PERALATAN
D Jumlah A + B + C 225,990.00
E Overhead & Profit 0.0% -
F Harga Satuan Pekerjaan (D+E) 225,990.00
JUMLAH
HARGA
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp

21 A.4.4.3.58 Pemasangan Dinding Batu Paras / Batu Tempel Hitam


A Tenaga
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.0350 110,000.00 3,850.00
Mandor L.04 OH 0.0350 115,000.00 4,025.00
98,875.00
B Bahan
Batu Paras/batu tempel m2 1.1000 105,000.00 115,500.00
Portland Semen Kg 11.7500 1,450.00 17,037.50
Pasir Beton/Muntilan m3 0.0350 450,000.00 15,750.00
148,287.50
C PERALATAN
D Jumlah A + B + C 247,162.50
E Overhead & Profit 12.5% 30,895.31
F Harga Satuan Pekerjaan (D+E) 278,057.81

22 A.4.4.3.63 Pemasangan Plint Kayu Klas II Ukuran 2x10 cm


A Tenaga
Pekerja L.01 OH 0.1200 80,000.00 9,600.00
Tukang Batu L.02 OH 0.1200 100,000.00 12,000.00
Kepala Tukang L.03 OH 0.0120 110,000.00 1,320.00
Mandor L.04 OH 0.0060 115,000.00 690.00
23,610.00
B Bahan
Papan Kayu Klas II m3 0.0030 6,750,000.00 20,250.00
Paku Sekrup 5 cm kg 0.0500 13,000.00 650.00
20,900.00
C PERALATAN
D Jumlah A + B + C 44,510.00
E Overhead & Profit 12.5% 5,563.75
F Harga Satuan Pekerjaan (D+E) 50,073.75
JUMLAH
HARGA
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
23 A.4.4.3.59 Pemasangan 1 m2 lantai vynil ukuran 30 cm x 30 cm
A TENAGA
Pekerja L.01 OH 0.15 80,000.00 12,000.00
Tukang batu L.02 OH 0.15 100,000.00 15,000.00
Kepala tukang L.03 OH 0.02 110,000.00 1,650.00
Mandor L.04 OH 0.01 115,000.00 920.00
29,570.00
B BAHAN
Vynil buah 11.87 6,500.00 77,155.00
Lem Kg 0.35 45,000.00 15,750.00
92,905.00
C PERALATAN

D Jumlah (A+B+C) 122,475.00


E Overhead & Profit 13% 15,309.38
F Harga Satuan Pekerjaan (D+E) 137,784.38

24 A.4.4.3.61 Pemasangan 1m2 floor harderner


A TENAGA
Pekerja L.01 OH 0.12 80,000.00 9,600.00
Tukang batu L.02 OH 0.12 100,000.00 12,000.00
Kepala tukang L.03 OH 0.01 110,000.00 1,320.00
Mandor L.04 OH 0.01 115,000.00 690.00
23,610.00
B BAHAN
Floor harderner Kg 5.00 45,000.00 225,000.00
225,000.00
C PERALATAN

D Jumlah (A+B+C) 248,610.00


E Overhead & Profit 13% 31,076.25
F Harga Satuan Pekerjaan (D+E) 279,686.25

25 A.4.4.3.62 Pemasangan 1 m’ plint vynil 15cm x 30cm


A TENAGA
Pekerja L.01 OH 0.08 80,000.00 6,400.00
Tukang batu L.02 OH 0.08 100,000.00 8,000.00
Kepala tukang L.03 OH 0.01 110,000.00 880.00
Mandor L.04 OH 0.00 115,000.00 460.00
15,740.00
B BAHAN
Vynil buah 1.76 6,500.00 11,440.00
Lem Kg 0.08 45,000.00 3,600.00
15,040.00
C PERALATAN

D Jumlah (A+B+C) 30,780.00


E Overhead & Profit 13% 3,847.50
F Harga Satuan Pekerjaan (D+E) 34,627.50
JUMLAH
HARGA
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp

26 A.4.4.3.64 Pasang blok pafing tebal 6 cm K.125


SNI A Tenaga
Pekerja L.01 OH 0.5000 80,000.00 40,000.00
Tukang Batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0250 115,000.00 2,875.00
59,525.00
B Bahan
pasir muntilan utk nat m3 0.0050 450,000.00 2,250.00
paving m2 1.0000 55,300.00 55,300.00
57,550.00
C PERALATAN
D Jumlah A + B + C 117,075.00
E Overhead & Profit 12.5% 14,634.38
F Harga Satuan Pekerjaan (D+E) 131,709.38

27 A.4.4.3.65 Blok paving tebal 6 cm dengan paving mutu K 225


SNI A Tenaga
Pekerja L.01 OH 0.5000 80,000.00 40,000.00
Tukang Batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0250 115,000.00 2,875.00
59,525.00
B Bahan
pasir muntilan utk nat m3 0.0050 450,000.00 2,250.00
paving m2 1.0000 90,000.00 90,000.00
92,250.00
C PERALATAN
D Jumlah A + B + C 151,775.00
E Overhead & Profit 12.5% 18,971.88
F Harga Satuan Pekerjaan (D+E) 170,746.88
JUMLAH
HARGA
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp

28 A.4.4.3.66 Blok paving tebal 8 cm dengan paving mutu K 300


SNI A Tenaga
Pekerja L.01 OH 0.5000 80,000.00 40,000.00
Tukang Batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0250 115,000.00 2,875.00
59,525.00
B Bahan
pasir muntilan utk nat m3 0.0050 450,000.00 2,250.00
paving m2 1.0000 140,000.00 140,000.00
142,250.00
C PERALATAN
D Jumlah A + B + C 201,775.00
E Overhead & Profit 12.5% 25,221.88
F Harga Satuan Pekerjaan (D+E) 226,996.88

29 A.4.4.3.67 Blok paving tebal 8 cm dengan paving mutu K 400


SNI A Tenaga
Pekerja L.01 OH 0.5000 80,000.00 40,000.00
Tukang Batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0250 115,000.00 2,875.00
59,525.00
B Bahan
pasir muntilan utk nat m3 0.0050 450,000.00 2,250.00
paving m2 1.0000 155,000.00 155,000.00
157,250.00
C PERALATAN
D Jumlah A + B + C 216,775.00
E Overhead & Profit 12.5% 27,096.88
F Harga Satuan Pekerjaan (D+E) 243,871.88
JUMLAH
HARGA
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp

30 A.4.4.3.68 Blok paving warna tebal 6 cm K.125


SNI A Tenaga
Pekerja L.01 OH 0.5000 80,000.00 40,000.00
Tukang Batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0250 115,000.00 2,875.00
59,525.00
B Bahan
pasir muntilan utk nat m3 0.0050 450,000.00 2,250.00
paving m2 1.0000 51,000.00 51,000.00
53,250.00
C PERALATAN
D Jumlah A + B + C 112,775.00
E Overhead & Profit 12.5% 14,096.88
F Harga Satuan Pekerjaan (D+E) 126,871.88

31 A.4.4.3.69 Blok paving warna tebal 8 cm K.125


SNI A Tenaga
Pekerja L.01 OH 0.5000 80,000.00 40,000.00
Tukang Batu L.02 OH 0.1500 100,000.00 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000.00 1,650.00
Mandor L.04 OH 0.0250 115,000.00 2,875.00
59,525.00
B Bahan
pasir muntilan utk nat m3 0.0050 450,000.00 2,250.00
paving m2 1.0000 57,500.00 57,500.00
59,750.00
C PERALATAN
D Jumlah A + B + C 119,275.00
E Overhead & Profit 12.5% 14,909.38
F Harga Satuan Pekerjaan (D+E) 134,184.38
JUMLAH
HARGA
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp

32 A.4.4.3.70 pasang saluran U-20 cm


SNI A Tenaga
B Bahan
Buis beton U-20 cm m' 1.0000 46,200.00 46,200.00
Pasang 1/2 batu bata 1:4 m2 0.8000 135,850.00 108,680.00
Plesteran 1:3 m2 0.7400 64,000.20 47,360.15
Acian m2 0.7400 32,962.50 24,392.25
Hurugan pasir m3 0.0200 163,690.00 3,273.80
Ongkos pasang Buis U-20 1.0000 5,000.00 5,000.00
234,906.20
C PERALATAN
D Jumlah A + B + C 234,906.20
E Overhead & Profit 12.5% 29,363.27
F Harga Satuan Pekerjaan (D+E) 264,269.47

33 A.4.4.3.71 pasang saluran U-30 cm


SNI A Tenaga
B Bahan
Buis beton U-30 cm m' 1.0000 76,200.00 76,200.00
Pasang 1/2 batu bata 1:4 m2 0.8000 135,850.00 108,680.00
Plesteran 1:3 m2 0.7400 64,000.20 47,360.15
Acian m2 0.7400 32,962.50 24,392.25
Hurugan pasir m3 0.0200 163,690.00 3,273.80
Ongkos pasang Buis U-30 1.0000 5,000.00 5,000.00
264,906.20
C PERALATAN
D Jumlah A + B + C 264,906.20
E Overhead & Profit 12.5% 33,113.27
F Harga Satuan Pekerjaan (D+E) 298,019.47
JUMLAH
HARGA
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp

34 A.4.4.3.9.1 Pemasangan lantai Ubin Granitile Uk. 60 x 60 cm


A Tenaga
Pekerja L.01 OH 0.2500 80,000.00 20,000.00
Tukang Batu L.02 OH 0.1250 100,000.00 12,500.00
Kepala Tukang L.03 OH 0.0130 110,000.00 1,430.00
Mandor L.04 OH 0.0130 115,000.00 1,495.00
35,425.00
B Bahan
Ubin Granitile 60x60 cm Buah 4.0000 55,800.00 223,200.00
Portland Semen Kg 9.8000 1,450.00 14,210.00
Semen warna Kg 1.3000 12,000.00 15,600.00
Pasir Beton/Muntilan m3 0.0450 450,000.00 20,250.00
273,260.00
C PERALATAN
D Jumlah A + B + C 308,685.00
E Overhead & Profit 12.5% 38,585.63
F Harga Satuan Pekerjaan (D+E) 347,270.63

35 A.4.4.3.35.4Pemasangan Lantai Keramik 60 x 60 cm warna


SNI A Tenaga
Pekerja L.01 OH 0.7000 80,000.00 56,000.00
Tukang Batu L.02 OH 0.3500 100,000.00 35,000.00
Kepala Tukang L.03 OH 0.0350 110,000.00 3,850.00
Mandor L.04 OH 0.0350 115,000.00 4,025.00
98,875.00
B Bahan
Ubin Keramik 60 x 60 cm Buah 4.0000 21,250.00 85,000.00
Portland Semen Kg 9.8000 1,450.00 14,210.00
Semen Warna Kg 1.3000 12,000.00 15,600.00
Pasir Beton/Muntilan m3 0.0450 450,000.00 20,250.00
135,060.00
C PERALATAN
D Jumlah A + B + C 233,935.00
E Overhead & Profit 12.5% 29,241.88
F Harga Satuan Pekerjaan (D+E) 263,176.88
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
XIV A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

1 A.4.7.1.1 Pengikisan / pengerokan Permukaan Cat Tembok Lama

A Tenaga
Pekerja L.01 OH 0.1500 80,000.00

Mandor L.04 OH 0.0030 115,000.00

B Bahan

Soda Api Kg 0.0500 23,200.00

C PERALATAN

D Jumlah A + B + C

E Overhead & Profit 12.5%

F Harga Satuan Pekerjaan (D+E)

2 A.4.7.1.2 Pencucian Bidang Permukaan Tembok yang Pernah dicat

A Tenaga

Pekerja L.01 OH 0.1500 80,000.00


Mandor L.04 OH 0.0030 115,000.00

B Bahan

Sabun Kg 0.0500 8,000.00

C PERALATAN
D Jumlah A + B + C

E Overhead & Profit 12.5%

F Harga Satuan Pekerjaan (D+E)

3 A.4.7.1.3 Pengerokan Karat Cat Lama permukaan Baja dg cara manual


A Tenaga
Pekerja L.01 OH 0.1500 80,000.00
Mandor L.04 OH 0.0080 115,000.00

B Bahan
Sabun Kg 0.0500 8,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
4 A.4.7.1.4 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup)
A Tenaga
Pekerja L.01 OH 0.0700 80,000.00
Tukang Cat L.02 OH 0.0090 100,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00
Mandor L.04 OH 0.0030 115,000.00

B Bahan
Cat Menie kg 0.2000 35,000.00
Plamuur kg 0.1500 32,800.00
Cat Dasar kg 0.1700 33,500.00
Cat Penutup kg 0.2600 52,500.00
Kuas bh 0.0100 13,200.00
Pengencer kg 0.0300 20,000.00
Amplas lbr 0.2000 6,500.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

5 A.4.7.1.5 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Penutup)
A Tenaga
Pekerja L.01 OH 0.0700 80,000.00
Tukang Cat L.02 OH 0.1050 100,000.00
Kepala Tukang L.03 OH 0.0040 110,000.00
Mandor L.04 OH 0.0030 115,000.00

B Bahan
Cat Menie kg 0.2000 35,000.00
Plamuur kg 0.1500 32,800.00
Cat Dasar kg 0.1700 33,500.00
Cat Penutup kg 0.3500 52,500.00
Kuas bh 0.0100 13,200.00
Pengencer kg 0.0300 20,000.00
Amplas lbr 0.2000 6,500.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
6 A.4.7.1.6 Pelaburan Bidang Kayu dg Teak Oil
A Tenaga
Pekerja L.01 OH 0.0400 80,000.00
Tukang Cat L.02 OH 0.0630 100,000.00
Kepala Tukang L.03 OH 0.0630 110,000.00
Mandor L.04 OH 0.0030 115,000.00

B Bahan
Teak Oil Ltr 0.3600 42,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

7 A.4.7.1.7 Pelaburan Bidang Kayu dg Politur


A Tenaga
Pekerja L.01 OH 0.0400 80,000.00
Tukang Cat L.02 OH 0.0600 100,000.00
Kepala Tukang L.03 OH 0.0160 110,000.00
Mandor L.04 OH 0.0030 115,000.00

B Bahan
Politur Ltr 0.1500 16,900.00
Spiritus Ltr 0.3720 12,000.00
Ampelas Lbr 2.0000 6,500.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
8 A.4.7.1.8 Pelaburan Bidang Kayu dg Cat Residu & Ter
A Tenaga
Pekerja L.01 OH 0.1000 80,000.00
Mandor L.04 OH 0.0060 115,000.00

B Bahan
Residu atau Ter Ltr 0.3500 3,400.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

9 A.4.7.1.9 Pelaburan Bidang Kayu dg Vernis


A Tenaga
Pekerja L.01 OH 0.1600 80,000.00
Tukang Cat L.02 OH 0.1600 100,000.00
Kepala Tukang L.03 OH 0.0160 110,000.00
Mandor L.04 OH 0.0030 115,000.00

B Bahan
Vernis Ltr 0.1500 27,900.00
Dempul Ltr 0.0500 32,800.00
Ampelas Lbr 0.1000 6,500.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
10 A.4.7.1.10 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Decolite
A Tenaga
Pekerja L.01 OH 0.0200 80,000.00
Tukang Cat L.02 OH 0.0630 100,000.00
Kepala Tukang L.03 OH 0.0063 110,000.00
Mandor L.04 OH 0.0030 115,000.00

B Bahan
Plamir Kg 0.1000 16,000.00
Cat Dasar Kg 0.1000 19,000.00
Cat Penutup 2 kali Kg 0.2600 48,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

11 A.4.7.1.10.1Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Mowilex da
A Tenaga
Pekerja L.01 OH 0.0200 80,000.00
Tukang Cat L.02 OH 0.0630 100,000.00
Kepala Tukang L.03 OH 0.0063 110,000.00
Mandor L.04 OH 0.0030 115,000.00

B Bahan
Plamir Kg 0.1000 16,000.00
Cat Dasar Kg 0.1000 19,000.00
Cat Penutup 2 kali Kg 0.2600 56,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
12 A.4.7.1.10.2Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Mowilex lua
A Tenaga
Pekerja L.01 OH 0.0200 80,000.00
Tukang Cat L.02 OH 0.0630 100,000.00
Kepala Tukang L.03 OH 0.0063 110,000.00
Mandor L.04 OH 0.0030 115,000.00

B Bahan
Plamir Kg 0.1000 16,000.00
Cat Dasar Kg 0.1000 19,000.00
Cat Penutup 2 kali Kg 0.2600 96,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

13 A.4.7.1.11 Pengecatan Tembok Lama dengan Decolite


A Tenaga
Pekerja L.01 OH 0.0280 80,000.00
Tukang Cat L.02 OH 0.0420 100,000.00
Kepala Tukang L.03 OH 0.0042 110,000.00
Mandor L.04 OH 0.0030 115,000.00

B Bahan
Cat Dasar Kg 0.1200 19,000.00
Cat Penutup 2 kali Kg 0.1800 48,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
14A.4.7.1.11.1Pengecatan Tembok Lama dengan Mowilex dalam ruangan
A Tenaga
Pekerja L.01 OH 0.0280 80,000.00
Tukang Cat L.02 OH 0.0420 100,000.00
Kepala Tukang L.03 OH 0.0042 110,000.00
Mandor L.04 OH 0.0030 115,000.00

B Bahan
Cat Dasar Kg 0.1200 19,000.00
Cat Penutup 2 kali Kg 0.1800 56,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

15A.4.7.1.11.2Pengecatan Tembok Lama dengan Mowilex luar ruangan


A Tenaga
Pekerja L.01 OH 0.0280 80,000.00
Tukang Cat L.02 OH 0.0420 100,000.00
Kepala Tukang L.03 OH 0.0042 110,000.00
Mandor L.04 OH 0.0030 115,000.00

B Bahan
Cat Dasar Kg 0.1200 19,000.00
Cat Penutup 2 kali Kg 0.1800 96,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
16 A.4.7.1.15 Pemasangan 1 m2 wallpaper
A TENAGA
Pekerja L.01 OH 0.02 80,000.00

Tukang cat L.02 OH 0.20 100,000.00

Kepala tukang L.03 OH 0.02 110,000.00

Mandor L.04 OH 0.00 115,000.00

B BAHAN
Wall paper m2 1.20 70,000.00

Lem Kg 0.20 45,000.00

C PERALATAN

D Jumlah A + B + C
E Overhead & Profit 0.0%
F Harga Satuan Pekerjaan (D+E)

17 A.4.7.1.16 Pengecatan Permukaan Baja dg Meni Besi


A Tenaga
Pekerja L.01 OH 0.0200 80,000.00
Tukang Cat L.02 OH 0.2000 100,000.00
Kepala Tukang L.03 OH 0.0200 110,000.00
Mandor L.04 OH 0.0025 115,000.00

B Bahan
Meni Besi Kg 0.1000 30,600.00
Perekat / Lem Kg 0.0100 35,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)
HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp
18 A.4.7.1.22 Pengecatan 1 m2 permukaan Besi 3x
SNI A Tenaga
Pekerja L.01 OH 0.0500 80,000.00
Tukang Cat L.02 OH 0.0750 100,000.00
Kepala Tukang L.03 OH 0.0075 110,000.00
Mandor L.04 OH 0.0025 115,000.00

B Bahan
Cat Kg 0.2600 65,000.00
Pengencer L 0.1740 20,000.00
Meni Kg 0.0750 30,600.00
Amplas Bh 0.2000 6,500.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

19 A.4.7.1.23 Pengecatan 1 m2 permukaan Trotoir 3x


SNI A Tenaga
Pekerja L.01 OH 0.0500 80,000.00
Tukang Cat L.02 OH 0.0750 100,000.00
Kepala Tukang L.03 OH 0.0075 110,000.00
Mandor L.04 OH 0.0025 115,000.00

B Bahan
Cat Kg 0.2600 65,000.00
Pengencer L 0.1740 20,000.00
Amplas Bh 0.2000 6,500.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit 12.5%
F Harga Satuan Pekerjaan (D+E)

20 A.4.7.1.24 Pengecat 1m2 Waterproof untuk atap dag beton


A Tenaga
Pekerja L.01 OH 0.0200 80,000.00
Tukang Cat L.02 OH 0.0630 100,000.00
Kepala Tukang L.03 OH 0.0063 110,000.00
Mandor L.04 OH 0.0030 115,000.00

B Bahan
Cat Waterproof sekualitas No Drop Kg 0.3500 50,000.00

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
JUMLAH
HARGA
Rp

12,000.00

345.00

12,345.00

1,160.00
1,160.00

13,505.00

1,688.13

15,193.13

12,000.00
345.00

12,345.00

400.00

400.00

12,745.00

1,593.13

14,338.13

12,000.00
920.00
12,920.00

400.00
400.00

13,320.00
1,665.00
14,985.00
JUMLAH
HARGA
Rp
ayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup)

5,600.00
900.00
660.00
345.00
7,505.00

7,000.00
4,920.00
5,695.00
13,650.00
132.00
600.00
1,300.00
33,297.00

40,802.00
5,100.25
45,902.25

ayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Penutup)

5,600.00
10,500.00
440.00
345.00
16,885.00

7,000.00
4,920.00
5,695.00
18,375.00
132.00
600.00
1,300.00
38,022.00

54,907.00
6,863.38
61,770.38
JUMLAH
HARGA
Rp

3,200.00
6,300.00
6,930.00
345.00
16,775.00

15,120.00
15,120.00

31,895.00
3,986.88
35,881.88

3,200.00
6,000.00
1,760.00
345.00
11,305.00

2,535.00
4,464.00
13,000.00
19,999.00

31,304.00
3,913.00
35,217.00
JUMLAH
HARGA
Rp

8,000.00
690.00
8,690.00

1,190.00
1,190.00

9,880.00
1,235.00
11,115.00

12,800.00
16,000.00
1,760.00
345.00
30,905.00

4,185.00
1,640.00
650.00
6,475.00

37,380.00
4,672.50
42,052.50
JUMLAH
HARGA
Rp
u (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Decolite

1,600.00
6,300.00
693.00
345.00
8,938.00

1,600.00
1,900.00
12,480.00
15,980.00

24,918.00
3,114.75
28,032.75

u (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Mowilex dalam ruangan

1,600.00
6,300.00
693.00
345.00
8,938.00

1,600.00
1,900.00
14,560.00
18,060.00

26,998.00
-
26,998.00
JUMLAH
HARGA
Rp
u (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Mowilex luar ruangan

1,600.00
6,300.00
693.00
345.00
8,938.00

1,600.00
1,900.00
24,960.00
28,460.00

37,398.00
4,674.75
42,072.75

2,240.00
4,200.00
462.00
345.00
7,247.00

2,280.00
8,640.00
10,920.00

18,167.00
2,270.88
20,437.88
JUMLAH
HARGA
Rp

2,240.00
4,200.00
462.00
345.00
7,247.00

2,280.00
10,080.00
12,360.00

19,607.00
2,450.88
22,057.88

2,240.00
4,200.00
462.00
345.00
7,247.00

2,280.00
17,280.00
19,560.00

26,807.00
-
26,807.00
JUMLAH
HARGA
Rp

1,600.00
20,000.00
2,200.00
287.50
24,087.50

84,000.00
9,000.00
93,000.00

117,087.50
-
117,087.50

1,600.00
20,000.00
2,200.00
287.50
24,087.50

3,060.00
350.00
3,410.00

27,497.50
3,437.19
30,934.69
JUMLAH
HARGA
Rp

4,000.00
7,500.00
825.00
287.50
12,612.50

16,900.00
3,480.00
2,295.00
1,300.00
23,975.00

36,587.50
4,573.44
41,160.94

4,000.00
7,500.00
825.00
287.50
12,612.50

16,900.00
3,480.00
1,300.00
21,680.00

34,292.50
4,286.56
38,579.06

1,600.00
6,300.00
693.00
345.00
8,938.00

17,500.00
17,500.00

26,438.00
-
26,438.00
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
XV A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA
1 A.8.4.1.1 Pemasangan 1 m pipa PVC Ø 50 mm (2")
A TENAGA
Pekerja L.01 OH 0.081 75,000.00 6,075.00
Tukang pipa L.02 OH 0.041 100,000.00 4,100.00
Mandor L.04 OH 0.008 110,000.00 880.00
11,055.00
B BAHAN
Pipa PVC Ø 50 mm m 1.000 58,200.00 58,200.00
58,200.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.006 -
-
D Jumlah A + B + C 69,255.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 69,255.00

2 A.8.4.1.1.1 Pemasangan 1 m pipa PVC Ø 25 mm (1")


A TENAGA
Pekerja L.01 OH 0.067 75,000.00 5,020.66
Tukang pipa L.02 OH 0.034 100,000.00 3,388.43
Mandor L.04 OH 0.007 110,000.00 727.27
9,136.36
B BAHAN
Pipa PVC Ø 25 mm m 1.000 22,500.00 22,500.00
22,500.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.006 -
-
D Jumlah A + B + C 31,636.36
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 31,636.36

3 A.8.4.1.1.2 Pemasangan 1 m pipa PVC Ø 40 mm (1½")


A TENAGA
Pekerja L.01 OH 0.074 75,000.00 5,522.73
Tukang pipa L.02 OH 0.037 100,000.00 3,727.27
Mandor L.04 OH 0.007 110,000.00 800.00
10,050.00
B BAHAN
Pipa PVC Ø 40 mm m 1.000 29,200.00 29,200.00
29,200.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.006 -
-
D Jumlah A + B + C 39,250.00
E Overhead & Profit 12.5% 4,906.25
F Harga Satuan Pekerjaan (D+E) 44,156.25
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
4 A.8.4.1.2 Pemasangan 1 m pipa PVC Ø 75 mm (3")
A TENAGA
Pekerja L.01 OH 0.094 75,000.00 7,050.00
Tukang pipa L.02 OH 0.047 100,000.00 4,700.00
Mandor L.04 OH 0.009 110,000.00 990.00
12,740.00
B BAHAN
Pipa PVC Ø 75 mm m 1.000 51,400.00 51,400.00
51,400.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.009 -
-
D Jumlah A + B + C 64,140.00
E Overhead & Profit 12.5% 8,017.50
F Harga Satuan Pekerjaan (D+E) 72,157.50

5 A.8.4.1.3 Pemasangan 1 m pipa PVC Ø 90 mm (4")


A TENAGA
Pekerja L.01 OH 0.105 75,000.00 7,875.00
Tukang pipa L.02 OH 0.053 100,000.00 5,300.00
Mandor L.04 OH 0.011 110,000.00 1,210.00
14,385.00
B BAHAN
Pipa PVC Ø 90 mm m 1.000 75,950.00 75,950.00
75,950.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.009 -
-
D Jumlah A + B + C 90,335.00
E Overhead & Profit -
F Harga Satuan Pekerjaan (D+E) 90,335.00

6 A.8.4.1.17 Pemasangan 1 m pipa HDPE OD 63 mm


A TENAGA
Pekerja L.01 OH 0.035 75,000.00 2,625.00
Tukang pipa L.02 OH 0.017 100,000.00 1,700.00
Mandor L.04 OH 0.003 110,000.00 330.00
4,655.00
B BAHAN
Pipa HDPE OD 63 mm m 1.000 50,050.00 50,050.00
50,050.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.019 -
-
D Jumlah A + B + C 54,705.00
E Overhead & Profit 12.5% 6,838.13
F Harga Satuan Pekerjaan (D+E) 61,543.13
Overhead & Profit
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
7 A.8.4.1.17.1Pemasangan 1 m pipa HDPE OD 75 mm
A TENAGA
Pekerja L.01 OH 0.039 75,000.00 2,887.50
Tukang pipa L.02 OH 0.019 100,000.00 1,870.00
Mandor L.04 OH 0.003 110,000.00 363.00
5,120.50
B BAHAN
Pipa HDPE OD 75 mm m 1.000 69,900.00 69,900.00
69,900.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.019 -
-
D Jumlah A + B + C 75,020.50
E Overhead & Profit 12.5% 9,377.56
F Harga Satuan Pekerjaan (D+E) 84,398.06

8 A.8.4.1.17.2Pemasangan 1 m pipa HDPE OD 90 mm


A TENAGA
Pekerja L.01 OH 0.040 75,000.00 3,000.00
Tukang pipa L.02 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.004 110,000.00 440.00
5,440.00
B BAHAN
Pipa HDPE OD 90 mm m 1.000 101,300.00 101,300.00
101,300.00
C PERALATAN
Sewa Tripot/Tackel & handle crane 2 T hari 0.019 -
-
D Jumlah A + B + C 106,740.00
E Overhead & Profit 12.5% 13,342.50
F Harga Satuan Pekerjaan (D+E) 120,082.50

9 A.8.4.1.80 Biaya 1 m' pemasangan pipa PVC Ø 25 mm (galian 0,25m x 0,3m + Bahan)
Galian tanah keras m3 0.075 94,140.00 7,060.50
Urugan tanah kembali m3 0.065 15,250.00 991.25
Buangan sisa galian m3 0.010 30,993.75 309.94
Pemasangan Pipa 1.000 31,636.36 31,636.36
Harga Satuan Pekerjaan 39,998.05

10 A.8.4.1.81 Biaya 1 m' pemasangan pipa PVC Ø 40 mm (galian 0,25m x 0,4m + Bahan)
Galian tanah keras m3 0.100 94,140.00 9,414.00
Urugan tanah kembali m3 0.080 15,250.00 1,220.00
Buangan sisa galian m3 0.020 30,993.75 619.88
Pemasangan Pipa 1.000 44,156.25 44,156.25
Harga Satuan Pekerjaan 55,410.13

11 A.8.4.1.82 Biaya 1 m' pemasangan pipa PVC Ø 50 mm (galian 0,25m x 0,5m + Bahan)
Galian tanah keras m3 0.125 94,140.00 11,767.50
Urugan tanah kembali m3 0.095 15,250.00 1,448.75
Buangan sisa galian m3 0.030 30,993.75 929.81
Pemasangan Pipa 1.000 69,255.00 69,255.00
Harga Satuan Pekerjaan 83,401.06

12 A.8.4.1.83 Biaya 1 m' pemasangan pipa PVC Ø 75 mm (galian 0,25m x 0,6m + Bahan)
Galian tanah keras m3 0.150 94,140.00 14,121.00
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
Urugan tanah kembali m3 0.120 15,250.00 1,830.00
Buangan sisa galian m3 0.030 30,993.75 929.81
Pemasangan Pipa 1.000 72,157.50 72,157.50
Harga Satuan Pekerjaan 89,038.31

13 A.8.4.1.84 Biaya 1 m' pemasangan pipa PVC Ø 100 mm (galian 0,30m x 1,00m + Bahan)
Galian tanah keras m3 0.300 94,140.00 28,242.00
Urugan tanah kembali m3 0.265 15,250.00 4,041.25
Buangan sisa galian m3 0.035 30,993.75 1,084.78
Pemasangan Pipa 1.000 90,335.00 90,335.00
Harga Satuan Pekerjaan 123,703.03

14 A.8.4.1.85 Biaya 1 m' pemasangan pipa HDPE OD 63 mm (galian 0,25m x 0,5m + Bahan)
Galian tanah keras m3 0.125 94,140.00 11,767.50
Urugan tanah kembali m3 0.095 15,250.00 1,448.75
Buangan sisa galian m3 0.030 30,993.75 929.81
Pemasangan Pipa 1.000 61,543.13 61,543.13
Harga Satuan Pekerjaan 75,689.19

15 A.8.4.1.86 Biaya 1 m' pemasangan pipa HDPE OD 75 mm (galian 0,25m x 0,6m + Bahan)
Galian tanah keras m3 0.150 94,140.00 14,121.00
Urugan tanah kembali m3 0.120 15,250.00 1,830.00
Buangan sisa galian m3 0.030 30,993.75 929.81
Pemasangan Pipa 1.000 84,398.06 84,398.06
Harga Satuan Pekerjaan 101,278.88

16 A.8.4.1.87 Biaya 1 m' pemasangan pipa HDPE OD 90 mm (galian 0,25m x 0,70m + Bahan)
Galian tanah keras m3 0.175 94,140.00 16,474.50
Urugan tanah kembali m3 0.140 15,250.00 2,135.00
Buangan sisa galian m3 0.035 30,993.75 1,084.78
Pemasangan Pipa 1.000 120,082.50 120,082.50
Harga Satuan Pekerjaan 139,776.78

XVI A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA

1 A.8.4.5.1 Pengetesan 1 m pipa Ø 50 mm


A TENAGA
Pekerja L.01 OH 0.0080 75,000.00 600.00
Mandor L.04 OH 0.0008 115,000.00 92.00
692.00
B BAHAN
Air test (air bersih) m3 0.002 20,000.00 40.00
Bahan bakar liter 0.060 5,900.00 354.00
Oli liter 0.002 35,300.00 70.60
464.60
C PERALATAN
D Jumlah A + B + C 1,156.60
E Overhead & Profit 12.5% 144.58
F Harga Satuan Pekerjaan (D+E) 1,301.18
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
2 A.8.4.5.2 Pengetesan 1 m pipa Ø 75 mm
A TENAGA
Pekerja L.01 OH 0.0080 75,000.00 600.00
Mandor L.04 OH 0.0008 115,000.00 92.00
692.00
B BAHAN
Air test (air bersih) m3 0.004 20,000.00 80.00
Bahan bakar liter 0.060 5,900.00 354.00
Oli liter 0.002 35,300.00 70.60
504.60
C PERALATAN
D Jumlah A + B + C 1,196.60
E Overhead & Profit 12.5% 149.58
F Harga Satuan Pekerjaan (D+E) 1,346.18

3 A.8.4.5.3 Pengetesan 1 m pipa Ø 100 mm


A TENAGA
Pekerja L.01 OH 0.0080 75,000.00 600.00
Mandor L.04 OH 0.0008 115,000.00 92.00
692.00
B BAHAN
Air test (air bersih) m3 0.008 20,000.00 160.00
Bahan bakar liter 0.060 5,900.00 354.00
Oli liter 0.002 35,300.00 70.60
584.60
C PERALATAN
D Jumlah A + B + C 1,276.60
E Overhead & Profit 12.5% 159.58
F Harga Satuan Pekerjaan (D+E) 1,436.18

4 A.8.4.5.4 Pengetesan 1 m pipa Ø 150 mm


A TENAGA
Pekerja L.01 OH 0.0080 75,000.00 600.00
Mandor L.04 OH 0.0008 115,000.00 92.00
692.00
B BAHAN
Air test (air bersih) m3 0.018 20,000.00 360.00
Bahan bakar liter 0.060 5,900.00 354.00
Oli liter 0.002 35,300.00 70.60
784.60
C PERALATAN
D Jumlah A + B + C 1,476.60
E Overhead & Profit 12.5% 184.58
F Harga Satuan Pekerjaan (D+E) 1,661.18
HARGA JUMLAH
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN HARGA
Rp Rp
5 A.8.4.5.5 Pengetesan 1 m pipa Ø 200 mm
A TENAGA
Pekerja L.01 OH 0.0080 75,000.00 600.00
Mandor L.04 OH 0.0008 115,000.00 92.00
692.00
B BAHAN
Air test (air bersih) m3 0.031 20,000.00 620.00
Bahan bakar liter 0.060 5,900.00 354.00
Oli liter 0.002 35,300.00 70.60
1,044.60
C PERALATAN
D Jumlah A + B + C 1,736.60
E Overhead & Profit 12.5% 217.08
F Harga Satuan Pekerjaan (D+E) 1,953.68
PEKERJAAN : PEMBUATAN SUMUR PRODUKSI

An.1 Jenis pekerjaan : Mobilisasi/demobilisasi driling rig & peralatan pe

NO URAIAN SATUAN KUANTITAS HARGA SAT.

I UPAH
1
Site manager Hari 1.00 x 1.00 75,000.00
2
Operator pemboran Hari 1.00 x 1.00 50,000.00
3
Crew pengeboran Hari 4.00 x 1.00 50,000.00
4
Pengemudi Hari 2.00 x 2.00 40,000.00
II. PERALATAN
1 Sewa kendaraan Hari 2.00 x 2.00 250,000.00
angkut ( truk )

JUMLAH

An.2 Jenis pekerjaan :Pemboran pilot hole diameter 6", 0 -- 50 m

NO URAIAN SATUAN KUANTITAS HARGA SAT.

I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Geologist Hari 1.00 x 1.00 60,000.00
3 Keuangan Hari 1.00 x 1.00 50,000.00
4 Logistik Hari 1.00 x 1.00 50,000.00
5 Operator pemboran Hari 1.00 x 1.00 50,000.00
6 Mekanik Hari 1.00 x 1.00 60,000.00
7 Crew pengeboran Hari 2.00 x 1.00 50,000.00
8 Buruh lokal Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 70.00 x 1.00 5,900.00
2 Olie mesin Ltr 5.00 x 1.00 35,300.00
3 Veet Kg 2.00 x 1.00 33,100.00
4 Bentonite Kg 40.00 x 1.00 11,400.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 400,000.00

JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER
An.3 Jenis pekerjaan :Pemboran pilot hole diameter 6", 50 -- 100 m

NO URAIAN SATUAN KUANTITAS HARGA SAT.

I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Geologist Hari 1.00 x 1.00 60,000.00
3 Keuangan Hari 1.00 x 1.00 50,000.00
4 Logistik Hari 1.00 x 1.00 50,000.00
5 Operator pemboran Hari 1.00 x 1.00 50,000.00
6 Mekanik Hari 1.00 x 1.00 60,000.00
7 Crew pengeboran Hari 2.00 x 1.00 50,000.00
8 Buruh lokal Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 75.00 x 1.00 5,900.00
2 Olie mesin Ltr 5.00 x 1.00 35,300.00
3 Veet Kg 2.00 x 1.00 33,100.00
4 Bentonite Kg 50.00 x 1.00 11,400.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00

JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER

An.4 Jenis pekerjaan :Pemboran pilot hole diameter 6", 100 -- 150 m

NO URAIAN SATUAN KUANTITAS HARGA SAT.

I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Geologist Hari 1.00 x 1.00 60,000.00
3 Keuangan Hari 1.00 x 1.00 50,000.00
4 Logistik Hari 1.00 x 1.00 50,000.00
5 Operator pemboran Hari 1.00 x 1.00 50,000.00
6 Mekanik Hari 1.00 x 1.00 60,000.00
7 Crew pengeboran Hari 2.00 x 1.00 50,000.00
8 Buruh lokal Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 85.00 x 1.00 5,900.00
2 Olie mesin Ltr 6.00 x 1.00 35,300.00
3 Veet Kg 3.00 x 1.00 33,100.00
4 Bentonite Kg 60.00 x 1.00 11,400.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00

JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER
An.5 Jenis pekerjaan : Pekerjaan reaming, 0 -- 65 m

NO URAIAN SATUAN KUANTITAS HARGA SAT.

I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Geologist Hari 1.00 x 1.00 60,000.00
3 Keuangan Hari 1.00 x 1.00 50,000.00
4 Logistik Hari 1.00 x 1.00 50,000.00
5 Operator pemboran Hari 1.00 x 1.00 50,000.00
6 Mekanik Hari 1.00 x 1.00 60,000.00
7 Crew pengeboran Hari 2.00 x 1.00 50,000.00
8 Buruh lokal Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 60.00 x 1.00 5,900.00
2 Olie mesin Ltr 4.00 x 1.00 35,300.00
3 Veet Kg 2.00 x 1.00 33,100.00
4 Bentonite Kg 40.00 x 1.00 11,400.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00

JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER

An.6 Jenis pekerjaan : Pekerjaan reaming ,65 -- 130 m

NO URAIAN SATUAN KUANTITAS HARGA SAT.

I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Geologist Hari 1.00 x 1.00 60,000.00
3 Keuangan Hari 1.00 x 1.00 50,000.00
4 Logistik Hari 1.00 x 1.00 50,000.00
5 Operator pemboran Hari 1.00 x 1.00 50,000.00
6 Mekanik Hari 1.00 x 1.00 60,000.00
7 Crew pengeboran Hari 2.00 x 1.00 50,000.00
8 Buruh lokal Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 75.00 x 1.00 5,900.00
2 Olie mesin Ltr 6.00 x 1.00 35,300.00
3 Veet Kg 3.00 x 1.00 33,100.00
4 Bentonite Kg 55.00 x 1.00 11,400.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00

JUMLAH
1 HARI RATA-RATA 10 M' ----> JADI PER METER
An.7 Jenis pekerjaan : Electric logging

NO URAIAN SATUAN KUANTITAS HARGA SAT.

I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Geologist Hari 1.00 x 1.00 60,000.00
3 Operator pemboran Hari 1.00 x 1.00 50,000.00
4 Crew pengeboran Hari 2.00 x 1.00 50,000.00
II. PERALATAN
1 Recorder paper Unit 1.00 x 1.00 20,000.00
2 Alat tulis Unit 1.00 x 1.00 15,000.00
III. PERALATAN
Mesin peralatan logging Unit 1.00 x 1.00 700,000.00
Tranportasi peralatan logging Unit 1.00 x 1.00 150,000.00

JUMLAH
1 HARI RATA-RATA 50 M' ----> JADI PER METER

An.8 Jenis pekerjaan : Pengadaan dan pemasangan pipa jambang diam

NO URAIAN SATUAN KUANTITAS HARGA SAT.

I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00
3 Mekanik Hari 1.00 x 1.00 60,000.00
4 Crew pengeboran Hari 3.00 x 1.00 50,000.00
5 Penjaga malam Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 120.00 x 1.00 5,900.00
2 Olie mesin Ltr 3.00 x 1.00 35,300.00
3 Veet Kg 2.00 x 1.00 33,100.00
4 Kawat las Btg 120.00 x 1.00 900.00
Pipa jambang diameter 8" Mtr 60.00 x 440,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00
Sewa mesin las Unit 1.00 x 1.00 50,000.00

JUMLAH
1 HARI RATA-RATA 60 M' ----> JADI PER METER
DIBULATKAN
An.9 Jenis pekerjaan : Pengadaan dan pemasangan pipa buta diametr 6

NO URAIAN SATUAN KUANTITAS HARGA SAT.

I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00
3 Mekanik Hari 1.00 x 1.00 60,000.00
4 Crew pengeboran Hari 3.00 x 1.00 50,000.00
5 Penjaga malam Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 40.00 x 5,900.00
2 Olie mesin Ltr 1.00 x 35,300.00
3 Veet Kg 0.60 x 33,100.00
4 Kawat las Btg 60.00 x 900.00
5 Pipa buta diameter 6" Mtr 30.00 x 310,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00
Sewa mesin las Unit 1.00 x 1.00 50,000.00

JUMLAH
1 HARI RATA-RATA 30 M' ----> JADI PER METER
DIBULATKAN

An.10 Jenis pekerjaan : Pengad. dan pemasangan screen stainless steel

NO URAIAN SATUAN KUANTITAS HARGA SAT.

I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00
3 Mekanik Hari 1.00 x 1.00 60,000.00
4 Crew pengeboran Hari 3.00 x 1.00 50,000.00
5 Penjaga malam Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 40.00 x 5,900.00
2 Olie mesin Ltr 1.00 x 35,300.00
3 Veet Kg 0.60 x 33,100.00
4 Kawat las Btg 60.00 x 900.00
5 Screen stainless steel dia 6 : Mtr 30.00 x 1,955,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00
Sewa mesin las Unit 1.00 x 1.00 50,000.00

JUMLAH
1 HARI RATA-RATA 30 M' ----> JADI PER METER
DIBULATKAN
An.8' Jenis pekerjaan : Pengadaan dan pemasangan pipa jambang diam

NO URAIAN SATUAN KUANTITAS HARGA SAT.

I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00
3 Mekanik Hari 1.00 x 1.00 60,000.00
4 Crew pengeboran Hari 3.00 x 1.00 50,000.00
5 Penjaga malam Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 120.00 x 1.00 5,900.00
2 Olie mesin Ltr 3.00 x 1.00 35,300.00
3 Veet Kg 2.00 x 1.00 33,100.00
4 Kawat las Btg 120.00 x 1.00 900.00
5 Pipa jambang diameter 6" Mtr 60.00 x 302,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00
Sewa mesin las Unit 1.00 x 1.00 50,000.00

JUMLAH
1 HARI RATA-RATA 60 M' ----> JADI PER METER
DIBULATKAN

An.9' Jenis pekerjaan : Pengadaan dan pemasangan pipa buta diametr 4

NO URAIAN SATUAN KUANTITAS HARGA SAT.

I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00
3 Mekanik Hari 1.00 x 1.00 60,000.00
4 Crew pengeboran Hari 3.00 x 1.00 50,000.00
5 Penjaga malam Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 40.00 x 5,900.00
2 Olie mesin Ltr 1.00 x 35,300.00
3 Veet Kg 0.60 x 33,100.00
4 Kawat las Btg 60.00 x 900.00
5 Pipa buta diameter 4" Mtr 30.00 x 198,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00
Sewa mesin las Unit 1.00 x 1.00 50,000.00

JUMLAH
1 HARI RATA-RATA 30 M' ----> JADI PER METER
DIBULATKAN
An.10' Jenis pekerjaan : Pengad. dan pemasangan screen stainless steel

NO URAIAN SATUAN KUANTITAS HARGA SAT.

I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00
3 Mekanik Hari 1.00 x 1.00 60,000.00
4 Crew pengeboran Hari 3.00 x 1.00 50,000.00
5 Penjaga malam Hari 2.00 x 1.00 40,000.00
II. PERALATAN
1 Solar Ltr 40.00 x 5,900.00
2 Olie mesin Ltr 1.00 x 35,300.00
3 Veet Kg 0.60 x 33,100.00
4 Kawat las Btg 60.00 x 900.00
5 Screen stainless steel dia 4" : Mtr 30.00 x 1,335,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00
Sewa mesin las Unit 1.00 x 1.00 50,000.00

JUMLAH
1 HARI RATA-RATA 30 M' ----> JADI PER METER
DIBULATKAN
EMBUATAN SUMUR PRODUKSI

Mobilisasi/demobilisasi driling rig & peralatan pemboran

JUML. HARGA

75,000.00
50,000.00
200,000.00
160,000.00

1,000,000.00

1,485,000.00

emboran pilot hole diameter 6", 0 -- 50 m

JUML. HARGA

75,000.00
60,000.00
50,000.00
50,000.00
50,000.00
60,000.00
100,000.00
80,000.00

413,000.00
176,500.00
66,200.00
456,000.00

400,000.00

2,036,700.00
203,670.00
emboran pilot hole diameter 6", 50 -- 100 m

JUML. HARGA

75,000.00
60,000.00
50,000.00
50,000.00
50,000.00
60,000.00
100,000.00
80,000.00

442,500.00
176,500.00
66,200.00
570,000.00

375,000.00

2,155,200.00
215,520.00

emboran pilot hole diameter 6", 100 -- 150 m

JUML. HARGA

75,000.00
60,000.00
50,000.00
50,000.00
50,000.00
60,000.00
100,000.00
80,000.00

501,500.00
211,800.00
99,300.00
684,000.00

375,000.00

2,396,600.00
239,660.00
JUML. HARGA

75,000.00
60,000.00
50,000.00
50,000.00
50,000.00
60,000.00
100,000.00
80,000.00

354,000.00
141,200.00
66,200.00
456,000.00

375,000.00

1,917,400.00
191,740.00

JUML. HARGA

75,000.00
60,000.00
50,000.00
50,000.00
50,000.00
60,000.00
100,000.00
80,000.00

442,500.00
211,800.00
99,300.00
627,000.00

375,000.00

2,280,600.00
228,060.00
JUML. HARGA

75,000.00
60,000.00
50,000.00
100,000.00

20,000.00
15,000.00

700,000.00
150,000.00

1,170,000.00
23,400.00

Pengadaan dan pemasangan pipa jambang diametr 8"

JUML. HARGA

75,000.00
50,000.00
60,000.00
150,000.00
80,000.00

708,000.00
105,900.00
66,200.00
108,000.00
26,400,000.00

375,000.00
50,000.00

28,228,100.00
470,468.33
470,000.00
Pengadaan dan pemasangan pipa buta diametr 6"

JUML. HARGA

75,000.00
50,000.00
60,000.00
150,000.00
80,000.00

236,000.00
35,300.00
19,860.00
54,000.00
9,300,000.00

375,000.00
50,000.00

10,485,160.00
349,505.33
349,000.00

Pengad. dan pemasangan screen stainless steel diametr 6"

JUML. HARGA

75,000.00
50,000.00
60,000.00
150,000.00
80,000.00

236,000.00
35,300.00
19,860.00
54,000.00
58,650,000.00

375,000.00
50,000.00

59,835,160.00
1,994,505.33
1,994,000.00
Pengadaan dan pemasangan pipa jambang diametr 6" (GIP)

JUML. HARGA

75,000.00
50,000.00
60,000.00
150,000.00
80,000.00

708,000.00
105,900.00
66,200.00
108,000.00
18,120,000.00

375,000.00
50,000.00

19,948,100.00
332,468.33
332,000.00

Pengadaan dan pemasangan pipa buta diametr 4" (GIP)

JUML. HARGA

75,000.00
50,000.00
60,000.00
150,000.00
80,000.00

236,000.00
35,300.00
19,860.00
54,000.00
5,940,000.00

375,000.00
50,000.00

7,125,160.00
237,505.33
237,000.00
Pengad. dan pemasangan screen stainless steel diametr 4"

JUML. HARGA

75,000.00
50,000.00
60,000.00
150,000.00
80,000.00

236,000.00
35,300.00
19,860.00
54,000.00
40,050,000.00

375,000.00
50,000.00

41,235,160.00
1,374,505.33
1,374,000.00
Analisa EI-421

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA KEGIATAN : 0
NAMA PEKERJAAN : 0
VOLUME : 0
LOKASI : 0
ITEM PEMBAYARAN N: 4.2.(1)
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas A PERKIRAAN VOL. PEK. 1.00
SATUAN PEMBAYAR : M3 TOTAL HARGA (Rp.) 625,093.21
% THD. BIAYA PROYEK 0.38

PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0595 9,410.7143 559.62


2. Mandor (L03) Jam 0.0085 12,982.1429 110.29

JUMLAH HARGA TENAGA 669.91

B. BAHAN

1. Agregat A (M26) M3 1.2586 191,665.6828 241,232.21

JUMLAH HARGA BAHAN 241,232.21

C. PERALATAN

1 Wheel Loader E15 Jam 0.0085 580,949.9995 4,935.30


2 Dump Truck E08 Jam 1.1117 252,961.9405 281,207.00
3 Motor Grader E13 Jam 0.0094 751,146.0249 7,038.85
4 Tandem Roller E17 Jam 0.0119 461,149.7912 5,465.48
5 Water Tanker E23 Jam 0.0141 214,180.5997 3,010.57
6 Alat Bantu Ls 1.0000 - 0.00

JUMLAH HARGA PERALATAN 301,657.20

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 543,559.31


E. OVERHEAD & PROFIT 15.0 % x D 81,533.90
F. HARGA SATUAN PEKERJAAN ( D + E ) 625,093.21
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-422a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA KEGIATAN : 0
NAMA PEKERJAAN : 0
VOLUME : 0
LOKASI : 0
ITEM PEMBAYARAN NO. : 4.2.(2a) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas B TOTAL HARGA (Rp.) : 346,299.96
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.38

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0000 0.00 0.00


2. Mandor (L03) Jam 0.0000 0.00 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. Agregat B (M27) M3 0.0000 185,898.14 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1 Wheel Loader E15 Jam 0.0085 580,950.00 4,935.30


2 Dump Truck E08 Jam 1.1117 252,961.94 281,207.00
3 Motor Grader E13 Jam 0.0094 751,146.02 7,038.85
4 Tandem Roller E17 Jam 0.0107 461,149.79 4,938.69
5 Water Tanker E23 Jam 0.0141 214,180.60 3,010.57
6 Alat Bantu Ls 1.0000 - 0.00

JUMLAH HARGA PERALATAN 301,130.40

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 301,130.40


E. OVERHEAD & PROFIT 15.0 % x D 45,169.56
F. HARGA SATUAN PEKERJAAN ( D + E ) 346,299.96
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-425

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. 4.2.(5) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN Agregat Penutup BURTU TOTAL HARGA (Rp.) : 7,373.98
SATUAN PEMBAYARAN M2 % THD. BIAYA PROYEK : 0.01

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0024 9,410.71 23.01


2. Mandor (L02) Jam 0.0001 12,982.14 1.59

JUMLAH HARGA TENAGA 24.60

B. BAHAN

1. Chipping (M41) Kg 33.0000 79.56 2,625.58

JUMLAH HARGA BAHAN 2,625.58

C. PERALATAN

1. Wheel Loader E15 Jam 0.0001 309,210.46 37.80


2. Dump Truck E08 Jam 0.0201 179,907.17 3,607.48
3. P. Tyre Roller E18 Jam 0.0006 180,691.17 116.69
4. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 3,761.98


D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 6,412.16
E. OVERHEAD & PROFIT 12.5 % x D 961.82
F. HARGA SATUAN PEKERJAAN ( D + E ) 7,373.98
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-422b

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA KEGIATAN : 0
NAMA PEKERJAAN : 0
VOLUME : 0
LOKASI : 0
ITEM PEMBAYARAN NO. : 4.2.(2b)
JENIS PEKERJAAN : Lapis Pondasi Agregat Kelas S PERKIRAAN VOL. PEK. : 1.00
SATUAN PEMBAYARAN : M3 TOTAL HARGA : 327,356.21
% THD. BIAYA PROYEK : 0.37

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0000 0.00 0.00


2. Mandor (L03) jam 0.0000 0.00 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. Aggregat S M27 M3 0.0000 187,428.09 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Wheel Loader (E15) jam 0.0085 580,950.00 4,935.30


2. Dump Truck (E08) jam 1.0715 252,961.94 271,042.89
3. Motor Grader (E13) jam 0.0043 751,146.02 3,199.48
4. Tandem Roller (E17) jam 0.0054 461,149.79 2,469.34
5. Water Tanker (E23) jam 0.0141 214,180.60 3,010.57
6. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 284,657.58

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 284,657.58


E. OVERHEAD & PROFIT 15.0 % x D 42,698.64
F. HARGA SATUAN PEKERJAAN ( D + E ) 327,356.21
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-635a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

0 : #REF!
0 : #REF!
0 : #REF!
0 : #REF!
ITEM PEMBAYARAN NO. : 0
JENIS PEKERJAAN : 0 PERKIRAAN VOL. PEK. :
SATUAN PEMBAYARAN : 0 TOTAL HARGA (Rp.) :
% THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2008


2. Mandor (L03) Jam 0.0201

JUMLAH HARGA TENAGA

B. BAHAN

1. Lolos screen2 ukuran ( 9.5 - 19,0 M3 0.2978


2. Lolos screen2 ukuran ( 0 - 5) M3 0.3523
3 Semen (M05) Kg 9.8700
4 Aspal (M10) Kg 62.8300

JUMLAH HARGA BAHAN

C. PERALATAN
1. Wheel Loader E15 Jam 0.0096
2. AMP E01 Jam 0.0201
3. Genset E12 Jam 0.0201
4. Dump Truck E08 Jam 0.7054
5. Asp. Finisher E02 Jam 0.0137
6. Tandem Roller E17 Jam 0.0135
7 P. Tyre Roller E18 Jam 0.0058
8 Alat Bantu Ls 1.0000

JUMLAH HARGA PERALATAN

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


E. OVERHEAD & PROFIT % x D
F. HARGA SATUAN PEKERJAAN ( D + E )
0 0
0
0 0
0
0
0 0
0 0
0
Jepara, ………………... 2017
Penyedia Jasa
PT./CV. ……………

Nama Terang
Jabatan
Analisa EI-633a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA KEGIATAN : 0
NAMA PEKERJAAN : 0
VOLUME : 0
LOKASI : 0
ITEM PEMBAYARAN NO. : 6.3(3a)
JENIS PEKERJAAN : Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang)
SATUAN PEMBAYARAN : Ton PERKIRAAN VOL. PEK. : 1.00
TOTAL HARGA (Rp.) : 1,532,654.81
% THD. BIAYA PROYEK : 1.09

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.1293 9,410.7143 1,217.20


2. Mandor (L03) Jam 0.0185 12,982.1429 239.88

JUMLAH HARGA TENAGA 1,457.08

B. BAHAN

1. Agr 5-10 & 10-15 M3 0.2440 169,946.94 41,469.45


2. Lolos screen2 ukuran ( 0 - 5) M3 0.1538 192,420.41 29,598.43
3 Pasir Halus (M01c) M3 0.2481 450,000.00 111,652.40
4 Filler / Semen (M05) Kg 23.1000 1,450.00 33,495.00
5 Aspal (M10) Kg 75.1900 10,000.00 751,900.00

JUMLAH HARGA BAHAN 968,115.27

C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 580,949.9995 5,560.49
2. AMP E01 Jam 0.0201 7,030,434.9213 141,173.39
3. Genset E12 Jam 0.0201 370,057.9099 7,430.88
4. Dump Truck E08 Jam 0.7054 252,961.9405 178,428.51
5. Asphalt Finisher E02 Jam 0.0185 1,158,786.1739 21,411.36
6. Tandem Roller E17 Jam 0.0152 461,149.7912 6,997.48
7 P. Tyre Roller E18 Jam 0.0042 519,195.3015 2,168.84
8 Alat Bantu Ls 1.0000 0.0000 0.00

JUMLAH HARGA PERALATAN 363,170.97

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,332,743.31


E. OVERHEAD & PROFIT 15.0 % x D 199,911.50
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,532,654.81
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-635a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

0 : 0
0 : 0
0 : 0
0 : 0
ITEM PEMBAYARAN NO. : 0
JENIS PEKERJAAN : 0 PERKIRAAN VOL. PEK. : 0.00
SATUAN PEMBAYARAN : 0 TOTAL HARGA (Rp.) : 0.00
% THD. BIAYA PROYEK : 0.00

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.2008 9,410.7143 1,889.70


2. Mandor (L03) Jam 0.0201 12,982.1429 260.69

JUMLAH HARGA TENAGA 2,150.39

B. BAHAN

1. Lolos screen2 ukuran ( 9.5 - 19,0 M3 0.2978 169,946.9374 50,617.86


2. Lolos screen2 ukuran ( 0 - 5) M3 0.3523 192,420.4061 67,793.26
3 Semen (M05) Kg 9.8700 1,450.0000 14,311.50
4 Aspal (M10) Kg 62.8300 10,000.0000 628,300.00

JUMLAH HARGA BAHAN 761,022.62

C. PERALATAN
1. Wheel Loader E15 Jam 0.0096 580,949.9995 5,560.49
2. AMP E01 Jam 0.0201 7,030,434.9213 141,173.39
3. Genset E12 Jam 0.0201 370,057.9099 7,430.88
4. Dump Truck E08 Jam 0.7054 252,961.9405 178,428.51
5. Asp. Finisher E02 Jam 0.0137 1,158,786.1739 15,920.09
6. Tandem Roller E17 Jam 0.0135 461,149.7912 6,236.55
7 P. Tyre Roller E18 Jam 0.0058 519,195.3015 3,012.60
8 Alat Bantu Ls 1.0000 0.0000 0.00

JUMLAH HARGA PERALATAN 357,762.52

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,120,935.53


E. OVERHEAD & PROFIT 0.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,120,935.53
0 0
0
0 0
0
0
0 0
0 0
0
Analisa EI-815

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA KEGIATAN : 0
NAMA PEKERJAAN : 0
VOLUME : 0
LOKASI : 0
ITEM PEMBAYARAN NO. : 8.1 (5).b
JENIS PEKERJAAN : Camp. Aspal Panas Lapis Aus Latasir Semi Mekanik PERKIRAAN VOL. PEK. :
Utk.Pek.Minor TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 71.0769 9,410.71 668,884.62


2. Tukang (L03) Jam 20.3077 12,267.86 249,131.87
3. Mandor (L03) Jam 10.1538 12,982.14 131,818.68

JUMLAH HARGA TENAGA 1,049,835.16

B. BAHAN

1. Agregat Ukuran 5 - 9.5 mm M3 0.8536 169,946.94 145,071.83


2. Pasir Beton M3 0.6216 450,000.00 279,708.90
3. Fraksi Filler (Abu batu) M3 0.0497 192,420.41 9,568.30
4. Aspal (M10) Kg 184.8000 10,000.00 1,848,000.00
5. Kayu Bakar M3 2.1000 234,500.00 492,450.00

JUMLAH HARGA BAHAN 2,774,799.03

C. PERALATAN
1 Dump Truck E09 Jam 0.7157 321,027.17 229,747.15
2 Pedestrian Roller E24 Jam 0.2008 36,905.57 7,410.76
6. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 237,157.91

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 4,061,792.11


E. OVERHEAD & PROFIT 15.0 % x D 609,268.82
F. HARGA SATUAN PEKERJAAN ( D + E ) 4,671,060.92
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-817

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA KEGIATAN : 0
NAMA PEKERJAAN : 0
VOLUME : 0
LOKASI : 0
ITEM PEMBAYARAN NO. : 8.1 (7) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Penetrasi Macadam Utk. Pek. Minor TOTAL HARGA :
SATUAN PEMBAYARAN : M3 (Perata) % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.170 9,410.71 1,600.69


2. Mandor (L03) Jam 0.017 12,982.14 220.82

JUMLAH HARGA TENAGA 1,821.50

B. BAHAN

1. Agregat Kasar (M03) M3 1.756 169,946.94 298,351.29


2. Agregat Halus (M04) M3 - 192,420.41 0.00
3 Aspal (M10) Kg 99.273 10,000.00 992,727.27

JUMLAH HARGA BAHAN 1,291,078.56

C. PERALATAN

1. Wheel Loader E15 Jam 0.0085 580,949.999 4,940.75


2. Dump Truck E09 Jam 0.4527 473,713.216 214,429.20
3. 3-Wheel Roller E16 Jam 0.0118 225,327.502 2,653.75
4. Asp. Sprayer E03 Jam 0.0359 111,736.890 4,009.71
5. Alat bantu Ls 1.0000 - 0.00

JUMLAH HARGA PERALATAN 226,033.42

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 1,518,933.48


E. OVERHEAD & PROFIT 15.0 % x D 227,840.02
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,746,773.51
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-815

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA KEGIATAN : 0
NAMA PEKERJAAN : 0
VOLUME : 0
LOKASI : 0
ITEM PEMBAYARAN NO. : 8.1 (5) PERKIRAAN VOL. PEK. : 1.00
JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Minor TOTAL HARGA (Rp.) : 3,047,499.57
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 2.16

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 1.1084 9,410.71 10,431.15


2. Mandor (L03) Jam 0.1108 12,982.14 1,438.98

JUMLAH HARGA TENAGA 11,870.14

B. BAHAN

1. Agregat Kasar (M03) M3 0.7731 169,946.94 131,378.42


2. Agregat Halus (M04) M3 0.5271 192,420.41 101,421.59
3 Filler (M05) Kg 25.3000 1,450.00 36,685.00
4 Aspal (M10) Kg 156.9750 10,000.00 1,569,750.00

JUMLAH HARGA BAHAN 1,839,235.01

C. PERALATAN
1. Wheel Loader E15 Jam 0.0301 580,950.00 17,512.22
2. AMP E01 Jam 0.0554 7,030,434.92 389,638.56
3. Genset E12 Jam 0.0554 370,057.91 20,509.23
4. Dump Truck E09 Jam 0.7482 473,713.22 354,428.80
5. Pedestrian Roller E24 Jam 0.1975 85,087.04 16,805.66
6. Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 798,894.47

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,649,999.62


E. OVERHEAD & PROFIT 15.0 % x D 397,499.94
F. HARGA SATUAN PEKERJAAN ( D + E ) 3,047,499.57
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-814

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA KEGIATAN : 0
NAMA PEKERJAAN : 0
VOLUME : 0
LOKASI : 0
ITEM PEMBAYARAN NO. : 8.1 (4) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Waterbound Macadam Utk. Pek. Minor TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja Biasa (L01) Jam 0.1631 9,410.71 1,534.96


2. Mandor (L03) Jam 0.0102 12,982.14 132.34

JUMLAH HARGA TENAGA 1,667.31

B. BAHAN

1. Agregat Kasar (M03) (M03) M3 0.9350 169,946.94 158,900.39


2. Agregat Halus (M04) (M04) M3 0.1650 140,551.85 23,191.06

JUMLAH HARGA BAHAN 182,091.44

C. PERALATAN

1. Wheel Loader E15 Jam 0.0102 580,950.00 5,922.36


2. Dump Truck E09 Jam 0.1508 473,713.22 71,453.23
3. 3-Wheel Roller E16 Jam 0.0268 225,327.50 6,032.86
4. Alat BAntu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 83,408.45

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 267,167.20


E. OVERHEAD & PROFIT 15.0 % x D 40,075.08
F. HARGA SATUAN PEKERJAAN ( D + E ) 307,242.28
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-862

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA KEGIATAN :
NAMA PEKERJAAN :
VOLUME :
LOKASI :
ITEM PEMBAYARAN NO. : 0
JENIS PEKERJAAN : Saluran U - ditch ukuran 60 * 70
SATUAN PEMBAYARAN : M' PERKIRAAN VOL. PEK. :
TOTAL HARGA (Rp.) :
% THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0000 0.00 0.00


2. Tukang (L02) jam 0.0000 0.00 0.00
3. Mandor (L03) jam 0.0000 0.00 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. U - ditch 60 * 70 * 120 m' 1.0000 892,700.00 892,700.00

JUMLAH HARGA BAHAN 892,700.00

C. PERALATAN

1. Flat Bed Truck E29 jam 0.1878 297,507.16 55,865.23


2. Crane E07 jam 0.0013 239,491.17 301.19
4 Alat Bantu Ls 1.0000 0.00 0.00

JUMLAH HARGA PERALATAN 56,166.43

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 948,866.43


E. OVERHEAD & PROFIT 15.0 % x D 142,329.96
F. HARGA SATUAN PEKERJAAN ( D + E ) 1,091,196.39
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-863

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA KEGIATAN :
NAMA PEKERJAAN :
VOLUME :
LOKASI :
ITEM PEMBAYARAN NO. : 0
JENIS PEKERJAAN : Saluran U - ditch ukuran 60 * 80
SATUAN PEMBAYARAN : M' PERKIRAAN VOL. PEK. :
TOTAL HARGA (Rp.) :
% THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0000 0.00 0.00


2. Tukang (L02) jam 0.0000 0.00 0.00
3. Mandor (L03) jam 0.0000 0.00 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. U - ditch 60 * 70 * 120 m' 0.0000 0.00 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Flat Bed Truck E29 jam 0.0000 0.00 0.00


2. Crane E07 jam 0.0000 0.00 0.00
4 Alat Bantu Ls 0.0000 0.00 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 15.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-864

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA KEGIATAN :
NAMA PEKERJAAN :
VOLUME :
LOKASI :
ITEM PEMBAYARAN NO. : 0
JENIS PEKERJAAN : Saluran U - ditch ukuran 80 * 100
SATUAN PEMBAYARAN : M' PERKIRAAN VOL. PEK. :
TOTAL HARGA (Rp.) :
% THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0000 0.00 0.00


2. Tukang (L02) jam 0.0000 0.00 0.00
3. Mandor (L03) jam 0.0000 0.00 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. U - ditch 80 * 100 * 120 m' 0.0000 0.00 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Flat Bed Truck E29 jam 0.0000 0.00 0.00


2. Crane E07 jam 0.0000 0.00 0.00
4 Alat Bantu Ls 0.0000 0.00 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 15.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-865

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA KEGIATAN :
NAMA PEKERJAAN :
VOLUME :
LOKASI :
ITEM PEMBAYARAN NO. : 0
JENIS PEKERJAAN : Saluran U - ditch ukuran 100 * 100
SATUAN PEMBAYARAN : M' PERKIRAAN VOL. PEK. :
TOTAL HARGA (Rp.) :
% THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0000 0.00 0.00


2. Tukang (L02) jam 0.0000 0.00 0.00
3. Mandor (L03) jam 0.0000 0.00 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. U - ditch 100 * 100 * 120 m' 0.0000 0.00 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Flat Bed Truck E29 jam 0.0000 0.00 0.00


2. Crane E07 jam 0.0000 0.00 0.00
4 Alat Bantu Ls 0.0000 0.00 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 15.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-861

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA KEGIATAN :
NAMA PEKERJAAN :
VOLUME :
LOKASI :
ITEM PEMBAYARAN NO. : 0
JENIS PEKERJAAN : Saluran U - ditch ukuran 60 * 60
SATUAN PEMBAYARAN : M' PERKIRAAN VOL. PEK. :
TOTAL HARGA (Rp.) :
% THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0000 0.00 0.00


2. Tukang (L02) jam 0.0000 0.00 0.00
3. Mandor (L03) jam 0.0000 0.00 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. U - ditch 60 * 60 * 120 m' 0.0000 0.00 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Flat Bed Truck E29 jam 0.0000 0.00 0.00


2. Crane E07 jam 0.0000 0.00 0.00
4 Alat Bantu Ls 0.0000 0.00 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 15.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
Analisa EI-866

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

NAMA KEGIATAN :
NAMA PEKERJAAN :
VOLUME :
LOKASI :
ITEM PEMBAYARAN NO. : 8.6.(6)
JENIS PEKERJAAN : Cover Saluran U - ditch ukuran 80
SATUAN PEMBAYARAN : M' PERKIRAAN VOL. PEK. :
TOTAL HARGA (Rp.) :
% THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.0000 0.00 0.00


2. Tukang (L02) jam 0.0000 0.00 0.00
3. Mandor (L03) jam 0.0000 0.00 0.00

JUMLAH HARGA TENAGA 0.00

B. BAHAN

1. Cover U - ditch 80 bh 0.0000 0.00 0.00

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Flat Bed Truck E29 jam 0.0000 0.00 0.00


2. Crane E07 jam 0.0000 0.00 0.00
4 Alat Bantu Ls 0.0000 0.00 0.00

JUMLAH HARGA PERALATAN 0.00

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00


E. OVERHEAD & PROFIT 15.0 % x D 0.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 0.00
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN