Tugas III Operasi dan Kendali Sistem Tenaga
𝑑𝐹𝑖 𝜕𝑃𝑙𝑜𝑠𝑠
= 𝜆 (1 − )
𝑑𝑃𝑖 𝜕𝑃𝑖
2 + 0,24P1 = λ [1-2(0,0001)P1]
5 + P2 = λ [1-2(0,0002)P2]
4 + 1,2P3 = λ [1-2(0,0001)P3]
Iterasi#1
Langkah 1. Tetapkan P1 = 300MW, P2 = 300MW, P3 = 150MW
Langkah 2. Hitung 𝜕Ploss / 𝜕Pi
𝜕𝑃𝑙𝑜𝑠𝑠
= 2(0,0001)300 = 0,06
𝜕𝑃1
𝜕𝑃𝑙𝑜𝑠𝑠
= 2(0,0002)300 = 0,12
𝜕𝑃2
𝜕𝑃𝑙𝑜𝑠𝑠
= 2(0,0001)150 = 0,03
𝜕𝑃3
Langkah 3. Hitung λ dari nilai-nilai asumsi yang ada
2 + 0,24P1 = λ (1-0,06) = λ(0,94)
5 + P2 = λ (1-0,12) = λ(0,88)
4 + 1,2P3 = λ (1-0,03) = λ(0,97)
λ = 142 R/MWh
PLoss = 0,0001(300)2 + 0,0002(300)2 + 0,0001(150)2
PLoss = 29,25
P1+P2+P3 – 750 -29,25 = P1+P2+P3 – 779,25 = 0
Langkah 4. Hitung P1,P2 dan P3
P1 = 547,84 MW
P2 = 119,96 MW
P3 = 111,45 MW
Iterasi#2
Langkah 1. Tetapkan P1 = 547,84MW, P2 = 119,96MW, P3 = 111,45MW
Langkah 2. Hitung 𝜕Ploss / 𝜕Pi
𝜕𝑃𝑙𝑜𝑠𝑠
= 2(0,0001)547,84 = 0,109
𝜕𝑃1
𝜕𝑃𝑙𝑜𝑠𝑠
= 2(0,0002)119,96 = 0,048
𝜕𝑃2
𝜕𝑃𝑙𝑜𝑠𝑠
= 2(0,0001) 111,45 = 0,022
𝜕𝑃3
Langkah 3. Hitung λ dari nilai-nilai asumsi yang ada
2 + 0,24P1 = λ (1-0,109) = λ(0,891)
5 + P2 = λ (1-0,048) = λ(0,952)
4 + 1,2P3 = λ (1-0,022) = λ(0,978)
λ = 142 R/MWh
PLoss = 0,0001(547,84)2 + 0,0002(119,96)2 + 0,0001(111,45)2
PLoss = 34,13
P1+P2+P3 – 750 -24,13 = P1+P2+P3 – 784,13 = 0
Langkah 4. Hitung P1,P2 dan P3
P1 = 534,14 MW
P2 = 134,2 MW
P3 = 115,8 MW
Iterasi#3
Langkah 1. Tetapkan P1 = 534,14 MW, P2 = 134,2 MW, dan P3 = 115,8 MW