NOTES:
1. FOR GENERAL INSTRUCTIONS ON TESTING REFER TO
SAUDI ARAMCO ENGINEERING STANDARDS SAES-A-004,
GAS
6"-RL-2144-1CA2P1 SAES-A-007 & SAES-L-150.
HA-014534 SHT.022
2. PERFORM X-RAY/RADIOGRAPHY ON TIE-IN WELDS
TO FLARE SYSTEM
THAT ARE NOT HYDROTESTED. REQUEST FOR
0F2 100% X-RAY/RADIOGRAPHY SHALL BE APPROVED
x4"
BY MANAGER OF OPERATIONS AND CHIEF
ET INSPECTION ENGINEER.
6"
4"-RL-3493-1CA3P02
HA-014534 SHT.019
3. REMOVE OR LIFT FLAPPERS OF CHECK VALVES
-P-2103-1CA2P1
-RL-2149-1CA2P1
TO COLD RELIEF HEADER BEFORE TESTING & REINSTALL AFTER COMPLETION
10-01601-0002 OF TEST.
PCV H44077B
4. ALL VALVES AND SPECTACLE PLATES SHALL BE
0389 A
3CA2P1
REINSTATED TO ITS NORMAL OPERATING STATUS
1CA2P1
AFTER COMPLETION OF TEST.
6"
3CA3P02 1638
I/P PIPE SIZE (NPS) 2 INCHES AND BELOW ARE EXEMPTED
4"
4" 6" FROM FIELD TESTING PRIOR TO INSTALLATION AS
#2 PER SAES-L-108.
3" RF M
CL300 4" 6. FOR UNDERGROUND INSTALLATIONS TEST DURATION
1" V
PCV SHALL BE 24 HOURS IF PIPING WELDS AND JOINTS
-P-2259-3CA3P02
CSO
0389 A 3" CL900 CAN NOT BE LEFT EXPOSED DURING TESTING.
ET
3" 8. CONTRACTOR TO PROVIDE ADDITIONAL VENTS AND
ET
3CA3P02 9CS3P02 #5 DRAINS IF REQUIRED. THESE VENTS AND DRAINS
CL300 RF 1" D
-P-2136-3CA2P1
#2 #2 #5 SHALL BE PLUGGED AND SEAL WELDED AFTER
3CA2P1 1CA2P1 1" V
1" V THE COMPLETION OF TEST.
#2
4"x3" 4"x3" 4"
4"-P-2136-3CA2P1 4"-RL-2148-3CA2P1
9. ALL TEMPORARY FITTINGS AND VALVES FOR VENTS,
3"
CSO 3"
CL300 HA-014534 SHT.021 PLUGS, BLIND FLANGES AND GASKETS USED FOR
CSO
2136 2148 AFO HYDROTEST SHALL BE REMOVED AND REPLACED WITH
3CA2P1 1CA3P02 FROM FUEL GAS
3CA3P02
3CA3P02
3CA2P1 BATH HEATER PERMANENT ALLOCATED MATERIALS AFTER THE
4"-P-2263-3CA3P02 COMPLETION OF TEST BY THE CONTRACTOR.
3"
CSO
HA-014534 SHT.015 10-01601-0002 10-01601-0002
4"
#2 #6
TO PROPANE CHILLER REVALIDATION 10. THE STRENGTH TEST DURATION SHALL BE AS
H44 034 H44077A
(NOTE-14,15)
THIS DRAW ING AND THE INFORM ATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAM CO.NO REPRODUCTION IN FULL,OR IN PART,SHALL BE OBTAINED FROM
UNIT H44-U-0105 #2 #2 GAS PER SAES-L-150 PARA 7.2
3" 3"-P-2084-3CA2P1 3"
100% RADIOGRAPHIC
DA-863406 SHT.018 11. CONTRACTOR SHALL PROVIDE ALL INLINE MATERIAL
#6 100% RADIOGRAPHIC REVALIDATION TEST REQUIRED
0F2 TEST REQUIRED (NOTE-14,15) 3"-P-2379-3CA3P02 TCV #2 TO FG SYSTEM WHICH ARE NECESSARY FOR HYDROTEST.
3" 10-01601-0002 0510A 10-01601-0002 #2 REVALIDATION
10-01601-0002 3CA2P1 12. TEST PRESSURE INDICATED BASED ON EXISTING
(NOTE-14,15)
3"
CSO
H44 035 H44 036
H44 003 3CA3P02 3"-P-2378-3CA3P02 GAS ARAMCO LDT HOWEVER CONSTRUCTION CONTRACTOR
1-1/2"
100% RADIOGRAPHIC
ZV #2 100% RADIOGRAPHIC
3CA3P02
I/P
DA-863406 SHT.018 SHALL RECALCULATE HYDROSTATIC TEST PRESSURE
3CS2P1
TEST REQUIRED
H44 033 TEST REQUIRED 3" GLB VLV
#2 TO FG SYSTEM
CL300 SITE PRIOR TO HYDROTEST.
CL 300 RF
-P-2258-3CA3P02
#4 4"-P-2264-3CA3P02 4"-P-2377-3CA3P02 1-1/2"
4"-P-2053-3CS2P1 3"3X1•" 3X1•" 3"
-P-2319-3CA3P02
13. REMOVE ORIFICE PLATE BEFORE HYDROTEST.
LIQUID / GAS 6"x4"
#2 FE 14. AS PER PARA, 7.6 OF SAES-L-150, ACTUAL WALL
DA-863406 SHT. 056 #2 #2
-P-2397-3CA3P02
10-01601-0002
1CA3P02
I/P
0F2 #4 3CA3P02 CL 300 RF M
6"
3"
CL300 TEST LIMIT PRIOR HYDROTEST.
3"
REVALIDATION #2 #3
3"x1-•" 1-•"
LIQUID / GAS #4 (NOTE-14,15) 3" 3"x1-•" 3"
6"-P-2267-3CA3P02 3"-P-2345-9CS3P02
HA-014534 SHT.015 HA-014534 SHT.021 LEGEND
10-01601-0002
4"
2"-P-2063-3CS2P1 2"-P-2385-3CS3P02 LC #2 #2 #1
REFIRIGERATION UNIT H44 031 BATH HEATER
#6 #4 #2 #2
TEST LIMIT
CSO
8"x6"
4"
#4 MIN.
4" 3CA3P02 9CS3P02
3CA3P02
CSO
0F2 2063 3CS3P02 * DENOTES TEMPORARY FITTING FOR HYDROTEST
10-01601-0002
#4 10-01601-0002 TI
4"
0561
THREADED VALVE WITH PLUG
HHLL=67.0 "
I/P H44-D-0230
MW CHECK VALVE (FLANGED TYPE)
HLL=55.0 " M1
#4 ƒ" 24"
4"-300#
MINIMUM FLOW NLL=38.4 " GATE VALVE (OPEN) FLANGED TYPE
4"-P-2314-3CS3P02
HA-014534 SHT.020
LLL=22.5 " BALL VALVE (OPEN) FLANGED TYPE
FROM NGL
#4 #4
PRODUCT PUMPS LLLL=0 ft 10.8 in V. VENT
N13C N14C N3
VA. VALVE
CSO
6"
#1
GCC-M- HT- H44 -157 3CA2P1
FW
NOTE 6 3CA3P02 FIELD WELD
EXISTING NEW
10-01601-0002 ZV
RELIEF 4"-RL-2484-3CA3P02 1116
H44007A
HA-014534 SHT.020 - - BI-NUMBER
FROM PZV-0240/41
8"x6" TIE-IN NUMBER
M
0F2 N17B N16B
PLANT NUMBER
8" NGL
8"-P-2268-3CA3P02
HA-014534 SHT.023 REFERENCE DRAWINGS
CSO TO NGL PRODUCT
#1 DWG. CONTROL FOR 10-01601-0002 HD-015220
BOOSTER PUMPS
P&ID DA-863406 SHT.061
6" 10-01601-0002
MATERIAL TAKEOFF SEE NOTE-11
3CA3P02 H44007B
3CA2P1 TIE-IN INDEX HB-014533
#1 HA-015117
TIE-IN LIST
10-01601-0002
H44 052
SCALE: NTS
REVISION VALIDATION
HYDROSTATIC TEST DATA
THIS REVISION NO. 0F2 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
STRENGTH TEST REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
TEST
TEST PRESSURE RELIEF VALVE SETTING LIMITED BY DURATION MEDIUM 10-01601-0002-025
NO.
PSIG KPa PSIG KPa DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
2 1125 7757 1181 8144 FLANGE 30 min(MIN) NOTE:10 WATER REV.NO. DATE REVISION DESCRIPTION
3 3350 23097 3518 24252 FLANGE 30 min(MIN) NOTE:10 WATER JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-01601-0002 CONSTRUCTION UNTIL CERTIFIED AND DATED
GCC-M-HT-H44-151
GCC-M-HT-H44-156
GCC-M-HT-H44-157
GCC-M-HT-H44-155
GCC-M-HT-H44-153
GCC-HT-H44-152