Rab Masjid 1 Dayah PDF
Rab Masjid 1 Dayah PDF
Lantai II
1 Pasangan batu bata 1 PC : 4 PS 311.00 m2 SNI DT-91-0009-2007-6.9 150,500.00 46,805,500.00
2 Plasteran 1 PC : 4 PS 622.00 m2 SNI DT-91-0010-2007-6.4 33,100.00 20,588,200.00
Jumlah 238,927,734.00
E. PEK. RANGKA ATAP & PENUTUP ATAP
1 Atap cor plat dag 23.60 m3 Suplemen 13 4,543,400.00 107,224,240.00
2 Kubah GRC 1.00 bh Taksir 80,000,000.00 80,000,000.00
Jumlah 187,224,240.00
F. PEK. KOSEN, PINTU, JENDELA & KUNCI
Lantai I & Lantai II
1 PINTU P 1 = 1 Unit
- Daun pintu kaca 80 x 250 cm' 4.00 m2 Taksir 500,000.00 2,000,000.00
- Kunci tanam 2 slaag 2.00 bh Taksir 300,000.00 600,000.00
- Engsel pintu 4.00 bh Taksir 150,000.00 600,000.00
- Bingkai pintu 1.00 bh Taksir 1,000,000.00 1,000,000.00
2 PINTU P 2 = 4 Unit
- Kayu kosen 6/13 0.36 m3 SNI DT-91-0011-2007-6.1 8,068,900.00 2,912,743.80
- Ventilasi jalusi 0.79 m3 SNI DT-91-0011-2007-6.6 353,500.00 280,537.60
- Daun pintu 80 x 210 cm' 6.72 m2 SNI DT-91-0011-2007-6.5 493,200.00 3,314,304.00
- Kunci tanam 2 slaag 4.00 bh RSNI T-30-200-B.2 167,100.00 668,400.00
- Engsel pintu 8.00 bh RSNI T-30-200-B.5 38,000.00 304,000.00
- Ventilasi kayu sirip 4.00 Unit Taksir 60,000.00 240,000.00
3 PINTU P 4 = 2 Unit
- Kayu kosen 6/13 0.11 m3 SNI DT-91-0011-2007-6.1 8,068,900.00 896,228.86
- Ventilasi jalusi 0.40 m3 SNI DT-91-0011-2007-6.6 353,500.00 140,268.80
- Daun pintu 80 x 210 cm' 3.36 m2 SNI DT-91-0011-2007-6.5 493,200.00 1,657,152.00
- Kunci tanam 2 slaag 2.00 bh RSNI T-30-200-B.2 167,100.00 334,200.00
- Engsel pintu 4.00 bh RSNI T-30-200-B.5 38,000.00 152,000.00
4 JENDELA J 1 = 2 Unit
- Kayu kosen 6/13 0.37 m3 SNI DT-91-0011-2007-6.1 8,068,900.00 2,995,821.19
- Daun jendela 50 x 160 cm' 3.42 m2 SNI DT-91-0011-2007-6.6 353,500.00 1,210,384.00
- Grendel jendela 20.00 bh RSNI T-30-200-B.25 31,100.00 622,000.00
- Engsel jendela 20.00 bh RSNI T-30-200-B.6 28,300.00 566,000.00
- Hak angin 20.00 bh RSNI T-30-200-B.9 29,000.00 580,000.00
- Tarikan jendela 10.00 bh RSNI T-30-200-B.26 29,000.00 290,000.00
- Kaca 5 mm 28.12 m2 RSNI T-30-200-B.17 143,800.00 4,043,656.00
- Ventilasi kayu sirip 10.00 Unit Taksir 60,000.00 600,000.00
5 JENDELA J 2 = 8 Unit
- Kayu kosen 6/13 0.66 m3 SNI DT-91-0011-2007-6.1 8,068,900.00 5,301,848.26
- Daun jendela 50 x 160 cm' 5.48 m2 SNI DT-91-0011-2007-6.6 353,500.00 1,936,614.40
- Grendel jendela 32.00 bh RSNI T-30-200-B.25 31,100.00 995,200.00
- Engsel jendela 32.00 bh RSNI T-30-200-B.6 28,300.00 905,600.00
- Hak angin 32.00 bh RSNI T-30-200-B.9 29,000.00 928,000.00
- Tarikan jendela 16.00 bh RSNI T-30-200-B.26 29,000.00 464,000.00
- Kaca 5 mm 18.00 m2 RSNI T-30-200-B.17 143,800.00 2,587,939.84
- Ventilasi kayu sirip 16.00 Unit Taksir 60,000.00 960,000.00
Lantai II
1 PINTU P 3 = 2 Unit
- Kayu kosen 6/13 0.14 m3 SNI DT-91-0011-2007-6.1 8,068,900.00 1,168,118.52
- Daun pintu 80 x 210 cm' 3.36 m2 SNI DT-91-0011-2007-6.5 493,200.00 1,657,152.00
- Kunci tanam 2 slaag 2.00 bh RSNI T-30-200-B.2 167,100.00 334,200.00
- Engsel pintu 6.00 bh RSNI T-30-200-B.5 38,000.00 228,000.00
- Ventilasi kayu sirip 2.00 Unit Taksir 60,000.00 120,000.00
2 JENDELA J 3 = 2 Unit
- Kayu kosen 6/13 0.08 m3 SNI DT-91-0011-2007-6.1 8,068,900.00 636,926.69
- Daun jendela 60 x 150 cm' 0.79 m2 SNI DT-91-0011-2007-6.6 353,500.00 280,537.60
- Grendel jendela 8.00 bh RSNI T-30-200-B.25 31,100.00 248,800.00
- Engsel jendela 8.00 bh RSNI T-30-200-B.6 28,300.00 226,400.00
- Hak angin 8.00 bh RSNI T-30-200-B.9 29,000.00 232,000.00
- Tarikan jendela 4.00 bh RSNI T-30-200-B.26 29,000.00 116,000.00
- Kaca 5 mm 0.88 m2 RSNI T-30-200-B.17 143,800.00 126,774.08
3 JENDELA V 1 = 12 Unit
- Kayu kosen 6/13 0.37 m3 SNI DT-91-0011-2007-6.1 8,068,900.00 2,945,471.26
- Kaca 5 mm 7.80 m2 RSNI T-30-200-B.17 143,800.00 1,121,640.00
Jumlah 49,528,918.89
G. PEKERJAAN LANTAI
Lantai I
1 Urugan tanah urug bawah lantai 232.00 m3 SNI DT-91-0006-2007-6.16 77,400.00 17,956,800.00
2 Urugan pasir urug bawah lantai 29.60 m3 SNI DT-91-0006-2007-6.11 154,200.00 4,564,320.00
3 Cor beton tebal 7 cm' 20.72 m3 SNI DT-91-0008-2007-6.9 567,400.00 11,756,528.00
4 Keramik uk. 40 x 40 cm 298.50 m2 SNI DT-91-0012-2007-6.64 125,300.00 37,402,050.00
5 Keramik tangga uk. 30 x 30 cm 29.54 m2 SNI DT-91-0012-2007-6.67 125,100.00 3,694,828.50
6 Keramik dinding uk. 40 x 60 cm 74.00 m2 SNI DT-91-0012-2007-6.66 2,569,400.00 190,135,600.00
Lantai II
1 Keramik uk. 40 x 40 cm 237.00 m3 SNI DT-91-0006-2007-6.16 77,400.00 18,343,800.00
Jumlah 283,853,926.50
H. PEKERJAAN LANGIT-LANGIT
Lantai I
1 Plafond Gypsum 6 mm' dengan ranga baja ringan 229.50 m2 SNI DT 91-0013-2007-6.5 87,100.00 19,989,450.00
2 List profil (keliling bidang plafond) 229.50 m2 SNI DT 91-0013-2007-6.9 13,200.00 3,029,400.00
Lantai II
1 Plafond triplex 4 mm' dengan rangka kayu 261.00 m2 SNI DT 91-0013-2007-6.5 87,100.00 22,733,100.00
2 List profil (keliling bidang plafond) 261.00 m2 SNI DT 91-0013-2007-6.9 13,200.00 3,445,200.00
Jumlah 49,197,150.00
I. PEKERJAAN LISTRIK
Lantai I
1 Decoratif
- Lampu hias 1.00 Unit Taksir 2,000,000.00 2,000,000.00
2 Armatur
- Lampu HE 18 watt 38.00 Unit Taksir 45,000.00 1,710,000.00
3 Instalasi titik penerangan, instalasi termasuk kabel
NYA 3 x 2,5 mm dalam pipa PVC fitting lampu dan
kelengkapan instalasi terpasang. 38.00 Ttk Taksir 125,000.00 4,750,000.00
4 Instalasi titik kontak, instalasi termasuk kabel NYA
3 x 2,5 mm dalam pipa PVC, kotak kontak BROCO
dan kelengkapan instalasi terpasang. 10.00 Ttk Taksir 125,000.00 1,250,000.00
5 Saklar lampu
- Saklar tunggal merk BROCO 8.00 Unit Taksir 25,000.00 200,000.00
- Saklar ganda merk BROCO 6.00 Unit Taksir 35,000.00 210,000.00
6 Bok Sekering MCB merk VIVA 4 group lengkap
terpasang 1.00 bh Taksir 550,000.00 550,000.00
7 MCB 6 Amphere 1.00 bh Taksir 1,500,000.00 1,500,000.00
8 Grounding sistem pentanahan termasuk kabel BC 6
mm, pipa galvanis lengkap terpasang dengan
tahanan mencapai 2 ohm 1.00 Unit Taksir 1,000,000.00 1,000,000.00
Lantai II
1 Armatur
- Lampu HE 18 watt 41.00 Unit Taksir 45,000.00 1,845,000.00
2 Instalasi titik penerangan, instalasi termasuk kabel
NYA 3 x 2,5 mm dalam pipa PVC fitting lampu dan
kelengkapan instalasi terpasang. 41.00 Ttk Taksir 125,000.00 5,125,000.00
3 Instalasi titik kontak, instalasi termasuk kabel NYA
3 x 2,5 mm dalam pipa PVC, kotak kontak BROCO
dan kelengkapan instalasi terpasang. 4.00 Ttk Taksir 125,000.00 500,000.00
4 Saklar lampu
- Saklar tunggal merk BROCO 1.00 Unit Taksir 25,000.00 25,000.00
- Saklar ganda merk BROCO 3.00 Unit Taksir 35,000.00 105,000.00
- Saklar triple merk BROCO 2.00 Unit Taksir 45,000.00 90,000.00
Jumlah 18,860,000.00
J. PEKERJAAN PENGECATAN
Lantai I
1 Cat dinding tembok (L/D) 4,598.98 m2 PT. T-38-2000-C-B14 17,800.00 81,861,826.20
2 Cat plafond dan list plafond 229.50 m2 PT. T-38-2000-C-B14 17,800.00 4,085,100.00
3 Cat mengkilat kayu kosen pintu/jendela 73.11 m2 PT. T-38-2000-C-B8 29,100.00 2,127,501.00
4 Cat mengkilat daun pintu/jendela & jalusi 40.35 m2 PT. T-38-2000-C-B8 29,100.00 1,174,056.96
Lantai II
1 Cat dinding tembok (L/D) 1,337.30 m2 PT. T-38-2000-C-B14 17,800.00 23,803,940.00
2 Cat plafond dan list plafond 261.00 m2 PT. T-38-2000-C-B14 17,800.00 4,645,800.00
3 Cat mengkilat kayu kosen pintu/jendela 28.69 m2 PT. T-38-2000-C-B8 29,100.00 834,879.00
4 Cat mengkilat daun pintu/jendela & jalusi 8.31 m2 PT. T-38-2000-C-B8 29,100.00 241,739.52
Jumlah 118,774,842.68
K. PEKERJAAN SANITASI
Lantai I
1 Pemasangan instalasi air hujan 3" 120.00 m' RSNI T-15-2002-B.31 45,700.00 5,484,000.00
Lantai II
1 Floor drain 20.00 Bh RSNI T-15-2002-B.36 30,600.00 612,000.00
2 Pemasangan instalasi air hujan 3" 120.00 m' RSNI T-15-2002-B.31 45,700.00 5,484,000.00
Jumlah 11,580,000.00
L. PEKERJAAN LAIN - LAIN
1 Pembentukan kolom teras depan 1.00 unit Taksir 7,500,000.00 7,500,000.00
(bentuk sesuai gambar)
2 Pembentukan kolom teras samping 2.00 unit Taksir 7,500,000.00 15,000,000.00
(bentuk sesuai gambar)
3 List ban keliling bangunan 150.00 m' Taksir 100,000.00 15,000,000.00
( bentuk sesuai gambar)
4 Pemasangan besi hollow anak tangga 6.72 m2 Taksir 950,000.00 6,384,000.00
(bentuk sesuai gambar)
5 Pemasangan besi hollow bagian teras depan 2.80 m2 Taksir 650,000.00 1,820,000.00
(bentuk sesuai gambar)
6 Pemasangan besi hollow bagian teras samping 8.48 m2 Taksir 650,000.00 5,512,000.00
(bentuk sesuai gambar)
7 Pemasangan besi hollow bagian teras void dalam 20.16 m2 Taksir 650,000.00 13,104,000.00
(bentuk sesuai gambar) -
8 Pembentukan Sudut bangunan ( Relief ) 108.00 m2 Taksir 250,000.00 27,000,000.00
Jumlah 91,320,000.00
REKAPITULASI BIAYA PEKERJAAN PEMBANGUNAN MUSHALLA
Bisri Juniar, ST
Direktur
DAFTAR ANALISA HARGA SATUAN
I PEKERJAAN PERSIAPAN
RSNI T-12-2002-B4
1 m Pengukuran dan pemasangan bouwplank
- Kayu kasau 5/7 0.01 M3 x Rp. 2,600,000.00 = Rp. 31,200.00
- Paku Kayu 2"-5" 0.02 Kg x Rp. 15,000.00 = Rp. 300.00
- Kayu Papan Bouwplank 3/20 0.01 M3 x Rp. 2,600,000.00 = Rp. 18,200.00
- Tukang 0.10 Oh x Rp. 78,700.00 = Rp. 7,870.00
- Pekerja 0.10 Oh x Rp. 49,700.00 = Rp. 4,970.00
- Kepala Tukang 0.01 Oh x Rp. 94,500.00 = Rp. 945.00
- Mandor 0.01 Oh x Rp. 71,600.00 = Rp. 358.00
Jumlah = Rp. 63,843.00
Dibulatkan = Rp. 63,000.00
II PEKERJAAN TANAH
SNI DT-91-0006-2007-6.1
1 M3 Galian tanah biasa
- Pekerja 0.75 Oh x Rp. 49,700.00 = Rp. 37,275.00
- Mandor 0.03 Oh x Rp. 71,600.00 = Rp. 1,790.00
Jumlah = Rp. 39,065.00
Dibulatkan Rp 39,000.00
SNI DT-91-0006-2007-6.9
1 M3 Urugan kembali tanah bekas galian
- Pekerja 0.25 Oh x Rp. 49,700.00 = Rp. 12,425.00
- Mandor 0.01 Oh x Rp. 71,600.00 = Rp. 572.80
Jumlah = Rp. 12,997.80
Dibulatkan Rp 12,900.00
SNI DT-91-0006-2007-6.16
1 M3 Urugan Tanah bawah lantai
- Tanah Timbun/Urug 1.20 M3 x Rp. 51,500.00 Rp 61,800.00
- Pekerja 0.30 Oh x Rp. 49,700.00 Rp 14,910.00
- Mandor 0.01 Oh x Rp. 71,600.00 Rp 716.00
Jumlah Rp 77,426.00
Dibulatkan Rp 77,400.00
SNI DT-91-0006-2007-6.11
1 M3 Urugan pasir
- Pasir urug 1.20 M3 x Rp. 115,500.00 = Rp. 138,600.00
- Pekerja 0.30 Oh x Rp. 49,700.00 = Rp. 14,910.00
- Mandor 0.01 Oh x Rp. 71,600.00 = Rp. 716.00
Jumlah = Rp. 154,226.00
Dibulatkan = Rp. 154,200.00
IV PEKERJAAN BETON
SNI DT-91-0008-2007-6.5
1 M3 Beton mutu f'c = 14,5 Mpa (K175), slump (12 ± 2) cm, w/c = 0,68
- Pasir Beton 760.00 Kg x Rp. 90.00 = Rp. 68,400.00
- Kerikil Beton (Maximum 30 mm) 1,029.00 Kg x Rp. 92.59 = Rp. 95,277.78
- Semen Portland 326.00 Kg x Rp. 1,300.00 = Rp. 423,800.00
- Air 215.00 Liter x Rp. 300.00 = Rp. 64,500.00
- Pekerja 1.65 OH x Rp. 49,700.00 = Rp. 82,005.00
- Tukang 0.28 OH x Rp. 78,700.00 = Rp. 21,642.50
- Kepala Tukang 0.03 OH x Rp. 94,500.00 = Rp. 2,646.00
- Mandor 0.08 OH x Rp. 71,600.00 = Rp. 5,942.80
Jumlah = Rp. 764,214.08
Dibulatkan = Rp. 764,200.00
SNI DT-91-0008-2007-6.8
1 M3 Beton mutu f'c = 12,7 Mpa (K250), slump (12 ± 2) cm, w/c = 0,56
- Pasir Beton 692.00 Kg x Rp. 90.00 = Rp. 62,280.00
- Kerikil Beton (Maximum 30 mm) 1,039.00 Kg x Rp. 92.59 = Rp. 96,203.70
- Semen Portland 384.00 Kg x Rp. 1,300.00 = Rp. 499,200.00
- Air 215.00 Liter x Rp. 300.00 = Rp. 64,500.00
- Pekerja 1.65 OH x Rp. 49,700.00 = Rp. 82,005.00
- Tukang 0.28 OH x Rp. 78,700.00 = Rp. 21,642.50
- Kepala Tukang 0.03 OH x Rp. 94,500.00 = Rp. 2,646.00
- Mandor 0.08 OH x Rp. 71,600.00 = Rp. 5,942.80
Jumlah = Rp. 834,420.00
Dibulatkan = Rp. 834,400.00
SNI DT-91-0008-2007-6.9
1 M³ Membuat beton, 1 Pc : 3 Ps : 6 Kr
- Semen portland 218.00 Kg x Rp. 1,300.00 = Rp. 283,400.00
- Pasir beton 0.52 M³ x Rp. 126,000.00 = Rp. 65,520.00
- Koral beton 2-3 0.87 M³ x Rp. 125,000.00 = Rp. 108,750.00
- Pekerja 1.65 Oh x Rp. 49,700.00 = Rp. 82,005.00
- Tukang 0.25 Oh x Rp. 78,700.00 = Rp. 19,675.00
- Kepala Tukang 0.03 Oh x Rp. 94,500.00 = Rp. 2,362.50
- Mandor 0.08 Oh x Rp. 71,600.00 = Rp. 5,728.00
Jumlah = Rp. 567,440.50
Dibulatkan = Rp. 567,400.00
SNI DT-91-0008-2007-6.17
1 Kg Pembesian dengan besi polos
- Besi beton polos 1.05 Kg x Rp. 12,500.00 = Rp. 13,125.00
- Kawat beton 0.05 Kg x Rp. 18,500.00 = Rp. 925.00
- Pekerja 0.01 Oh x Rp. 49,700.00 = Rp. 347.90
- Tukang 0.01 Oh x Rp. 78,700.00 = Rp. 550.90
- Kepala tukang 0.00 Oh x Rp. 94,500.00 = Rp. 66.15
- Mandor 0.00 Oh x Rp. 71,600.00 = Rp. 28.64
Jumlah = Rp. 15,043.59
Dibulatkan = Rp. 15,000.00
SNI DT-91-0008-2007-6.18
1 Kg Pembesian dengan besi ulir
- Besi beton ulir 1.05 Kg x Rp. 18,000.00 = Rp. 18,900.00
- Kawat beton 0.05 Kg x Rp. 18,500.00 = Rp. 925.00
- Pekerja 0.01 Oh x Rp. 49,700.00 = Rp. 347.90
- Tukang 0.01 Oh x Rp. 78,700.00 = Rp. 550.90
- Kepala tukang 0.00 Oh x Rp. 94,500.00 = Rp. 66.15
- Mandor 0.00 Oh x Rp. 71,600.00 = Rp. 28.64
Jumlah = Rp. 20,818.59
Dibulatkan = Rp. 20,800.00
SNI DT-91-0008-2007-6.20
1 M² Pasang bekisting untuk pondasi
- Kayu Bekisting 0.04 M³ x Rp. 2,600,000.00 = Rp. 104,000.00
- Paku Kayu 0.30 Kg x Rp. 15,000.00 = Rp. 4,500.00
- Minyak bekisting 0.10 Lt x Rp. 5,000.00 = Rp. 500.00
- Pekerja 0.52 Oh x Rp. 49,700.00 = Rp. 25,844.00
- Tukang 0.26 Oh x Rp. 78,700.00 = Rp. 20,462.00
- Kepala tukang 0.03 Oh x Rp. 94,500.00 = Rp. 2,457.00
- Mandor 0.03 Oh x Rp. 71,600.00 = Rp. 1,861.60
Jumlah = Rp. 159,624.60
Digunakan 2 kali pakai 79,812.30
Dibulatkan = Rp. 79,800.00
SNI DT-91-0008-2007-6.21
1 M² Pasang bekisting untuk sloof
- Kayu Bekisting 0.05 M³ x Rp. 2,600,000.00 = Rp. 117,000.00
- Paku Kayu 0.30 Kg x Rp. 15,000.00 = Rp. 4,500.00
- Minyak bekisting 0.10 Lt x Rp. 5,000.00 = Rp. 500.00
- Pekerja 0.52 Oh x Rp. 49,700.00 = Rp. 25,844.00
- Tukang 0.26 Oh x Rp. 78,700.00 = Rp. 20,462.00
- Kepala tukang 0.03 Oh x Rp. 94,500.00 = Rp. 2,457.00
- Mandor 0.03 Oh x Rp. 71,600.00 = Rp. 1,861.60
Jumlah = Rp. 172,624.60
Digunakan 2 kali pakai 86,312.30
Dibulatkan = Rp. 86,300.00
SNI DT-91-0008-2007-6.22
1 M² Pasang bekisting untuk kolom
- Kayu Bekisting 0.06 M³ x Rp. 2,600,000.00 = Rp. 143,000.00
- Paku Kayu 0.40 Kg x Rp. 15,000.00 = Rp. 6,000.00
- Minyak bekisting 0.20 Lt x Rp. 5,000.00 = Rp. 1,000.00
- Multiplek tebal 9 mm 0.35 Lbr x Rp. 154,000.00 = Rp. 53,900.00
- Dolken kayu ø 8 - 10 x 4 m 2.00 Btg x Rp. 40,000.00 = Rp. 80,000.00
- Pekerja 0.66 Oh x Rp. 49,700.00 = Rp. 32,802.00
- Tukang 0.33 Oh x Rp. 78,700.00 = Rp. 25,971.00
- Kepala tukang 0.03 Oh x Rp. 94,500.00 = Rp. 3,118.50
- Mandor 0.03 Oh x Rp. 71,600.00 = Rp. 2,362.80
Jumlah = Rp. 348,154.30
Digunakan 2 kali pakai 174,077.15
Dibulatkan = Rp. 174,000.00
SNI DT-91-0008-2007-6.23
1 M² Pasang bekisting untuk balok
- Kayu bekisting 0.06 M³ x Rp. 2,600,000.00 = Rp. 150,800.00
- Paku Kayu 0.40 Kg x Rp. 15,000.00 = Rp. 6,000.00
- Minyak bekisting 0.20 Lt x Rp. 5,000.00 = Rp. 1,000.00
- Multiplek tebal 9 mm 0.35 Lbr x Rp. 154,000.00 = Rp. 53,900.00
- Dolken kayu ø 8 - 10 x 4 m 2.00 Btg x Rp. 40,000.00 = Rp. 80,000.00
- Pekerja 0.66 Oh x Rp. 49,700.00 = Rp. 32,802.00
- Tukang 0.33 Oh x Rp. 78,700.00 = Rp. 25,971.00
- Kepala tukang 0.03 Oh x Rp. 94,500.00 = Rp. 3,118.50
- Mandor 0.03 Oh x Rp. 71,600.00 = Rp. 2,362.80
Jumlah = Rp. 355,954.30
Digunakan 2 kali pakai 177,977.15
Dibulatkan = Rp. 177,900.00
SNI DT-91-0008-2007-6.24
1 M² Pasang bekisting untuk lantai
- Kayu bekisting 0.06 M³ x Rp. 2,600,000.00 = Rp. 143,000.00
- Paku Kayu 0.40 Kg x Rp. 15,000.00 = Rp. 6,000.00
- Minyak bekisting 0.20 Lt x Rp. 5,000.00 = Rp. 1,000.00
- Multiplek tebal 9 mm 0.35 Lbr x Rp. 154,000.00 = Rp. 53,900.00
- Dolken kayu ø 8 - 10 x 4 m 6.00 Btg x Rp. 40,000.00 = Rp. 240,000.00
- Pekerja 0.66 Oh x Rp. 49,700.00 = Rp. 32,802.00
- Tukang 0.33 Oh x Rp. 78,700.00 = Rp. 25,971.00
- Kepala tukang 0.03 Oh x Rp. 94,500.00 = Rp. 3,118.50
- Mandor 0.03 Oh x Rp. 71,600.00 = Rp. 2,362.80
Jumlah = Rp. 508,154.30
Digunakan 2 kali pakai 254,077.15
Dibulatkan = Rp. 254,000.00
SNI DT-91-0008-2007-6.25
1 M² Pasang bekisting untuk tangga
- Kayu bekisting 0.05 M³ x Rp. 2,600,000.00 = Rp. 117,000.00
- Paku Kayu 0.40 Kg x Rp. 15,000.00 = Rp. 6,000.00
- Minyak bekisting 0.15 Lt x Rp. 5,000.00 = Rp. 750.00
- Multiplek tebal 9 mm 0.35 Lbr x Rp. 154,000.00 = Rp. 53,900.00
- Dolken kayu ø 8 - 10 x 4 m 2.00 Btg x Rp. 40,000.00 = Rp. 80,000.00
- Pekerja 0.66 Oh x Rp. 49,700.00 = Rp. 32,802.00
- Tukang 0.33 Oh x Rp. 78,700.00 = Rp. 25,971.00
- Kepala tukang 0.03 Oh x Rp. 94,500.00 = Rp. 3,118.50
- Mandor 0.03 Oh x Rp. 71,600.00 = Rp. 2,362.80
Jumlah = Rp. 321,904.30
Digunakan 2 kali pakai 160,952.15
Dibulatkan = Rp. 160,900.00
Pekerjaan lain-lain
- Membongkar dan menyiram beton 1.00 Ls x Rp. 49,700.00 = Rp. 49,700.00
Jumlah = Rp. 49,700.00
Dibulatkan = Rp. 49,700.00
Suplemen 3
1 m3 Beton bertulang kolom bulat D45 cm
- SNI DT-91-0008-2007-6.8 1.00 m3 x Rp. 834,400.00 = Rp. 834,400.00
- SNI DT-91-0008-2007-6.17 160.14 kg x Rp. 15,000.00 = Rp. 2,402,100.00
- SNI DT-91-0008-2007-6.22 5.00 m2 x Rp. 174,000.00 = Rp. 870,000.00
- Pekerjaan lain-lain 1.00 ls x Rp. 49,700.00 = Rp. 49,700.00
Jumlah = Rp. 4,156,200.00
Dibulatkan = Rp. 4,156,200.00
Suplemen 4
1 m3 Beton bertulang kolom 35 x 35 cm
- SNI DT-91-0008-2007-6.8 1.00 m3 x Rp. 834,400.00 = Rp. 834,400.00
- SNI DT-91-0008-2007-6.17 174.20 kg x Rp. 15,000.00 = Rp. 2,613,000.00
- SNI DT-91-0008-2007-6.22 5.71 m2 x Rp. 174,000.00 = Rp. 993,540.00
- Pekerjaan lain-lain 1.00 ls x Rp. 49,700.00 = Rp. 49,700.00
Jumlah = Rp. 4,490,640.00
Dibulatkan = Rp. 4,490,600.00
Suplemen 5
1 m3 Beton bertulang kolom 20 x 35 cm
- SNI DT-91-0008-2007-6.8 1.00 m3 x Rp. 834,400.00 = Rp. 834,400.00
- SNI DT-91-0008-2007-6.17 168.35 kg x Rp. 15,000.00 = Rp. 2,525,250.00
- SNI DT-91-0008-2007-6.22 5.71 m2 x Rp. 174,000.00 = Rp. 993,540.00
- Pekerjaan lain-lain 1.00 ls x Rp. 49,700.00 = Rp. 49,700.00
Jumlah = Rp. 4,402,890.00
Dibulatkan = Rp. 4,402,800.00
Suplemen 6
1 m3 Beton bertulang kolom 15 x 30 cm
- SNI DT-91-0008-2007-6.5 1.00 m3 x Rp. 764,200.00 = Rp. 764,200.00
- SNI DT-91-0008-2007-6.17 102.59 kg x Rp. 15,000.00 = Rp. 1,538,850.00
- SNI DT-91-0008-2007-6.22 10.00 m2 x Rp. 174,000.00 = Rp. 1,740,000.00
- Pekerjaan lain-lain 1.00 ls x Rp. 49,700.00 = Rp. 49,700.00
Jumlah = Rp. 4,092,750.00
Dibulatkan = Rp. 4,092,700.00
Suplemen 7
1 m3 Beton bertulang kolom 25 x 25 cm
- SNI DT-91-0008-2007-6.5 1.00 m3 x Rp. 764,200.00 = Rp. 764,200.00
- SNI DT-91-0008-2007-6.17 75.76 kg x Rp. 15,000.00 = Rp. 1,136,400.00
- SNI DT-91-0008-2007-6.22 8.00 m2 x Rp. 174,000.00 = Rp. 1,392,000.00
- Pekerjaan lain-lain 1.00 ls x Rp. 49,700.00 = Rp. 49,700.00
Jumlah = Rp. 3,342,300.00
Dibulatkan = Rp. 3,342,300.00
Suplemen 8
1 m3 Beton bertulang balok 35 x 50 cm
- SNI DT-91-0008-2007-6.8 1.00 m3 x Rp. 834,400.00 = Rp. 834,400.00
- SNI DT-91-0008-2007-6.17 123.73 kg x Rp. 15,000.00 = Rp. 1,855,950.00
- SNI DT-91-0008-2007-6.23 4.86 m2 x Rp. 177,900.00 = Rp. 864,594.00
- Pekerjaan lain-lain 1.00 ls x Rp. 49,700.00 = Rp. 49,700.00
Jumlah = Rp. 3,604,644.00
Dibulatkan = Rp. 3,604,600.00
Suplemen 9
1 m3 Beton bertulang balok/ring balok 25 x 40 cm
- SNI DT-91-0008-2007-6.8 1.00 m3 x Rp. 834,400.00 = Rp. 834,400.00
- SNI DT-91-0008-2007-6.17 143.30 kg x Rp. 15,000.00 = Rp. 2,149,500.00
- SNI DT-91-0008-2007-6.23 6.50 m2 x Rp. 177,900.00 = Rp. 1,156,350.00
- Pekerjaan lain-lain 1.00 ls x Rp. 49,700.00 = Rp. 49,700.00
Jumlah = Rp. 4,189,950.00
Dibulatkan = Rp. 4,189,900.00
Suplemen 10
1 m3 Beton bertulang balok/ring balok 20 x 30 cm
- SNI DT-91-0008-2007-6.8 1.00 m3 x Rp. 834,400.00 = Rp. 834,400.00
- SNI DT-91-0008-2007-6.17 226.21 kg x Rp. 15,000.00 = Rp. 3,393,150.00
- SNI DT-91-0008-2007-6.23 8.33 m2 x Rp. 177,900.00 = Rp. 1,481,907.00
- Pekerjaan lain-lain 1.00 ls x Rp. 49,700.00 = Rp. 49,700.00
Jumlah = Rp. 5,759,157.00
Dibulatkan = Rp. 5,759,100.00
Suplemen 11
1 m3 Beton bertulang balok/ring balok 15 x 25 cm
- SNI DT-91-0008-2007-6.8 1.00 m3 x Rp. 834,400.00 = Rp. 834,400.00
- SNI DT-91-0008-2007-6.17 172.34 kg x Rp. 15,000.00 = Rp. 2,585,100.00
- SNI DT-91-0008-2007-6.23 10.65 m2 x Rp. 177,900.00 = Rp. 1,894,635.00
- Pekerjaan lain-lain 1.00 ls x Rp. 49,700.00 = Rp. 49,700.00
Jumlah = Rp. 5,363,835.00
Dibulatkan = Rp. 5,363,800.00
Suplemen 12
1 m3 Beton bertulang balok latai 13 x 15 cm
- SNI DT-91-0008-2007-6.8 1.00 m3 x Rp. 834,400.00 = Rp. 834,400.00
- SNI DT-91-0008-2007-6.17 216.10 kg x Rp. 15,000.00 = Rp. 3,241,500.00
- SNI DT-91-0008-2007-6.23 14.36 m2 x Rp. 177,900.00 = Rp. 2,554,644.00
- Pekerjaan lain-lain 1.00 ls x Rp. 49,700.00 = Rp. 49,700.00
Jumlah = Rp. 6,680,244.00
Dibulatkan = Rp. 6,680,200.00
Suplemen 13
1 m3 Beton bertulang plat lantai tebal 12 cm
- SNI DT-91-0008-2007-6.8 1.00 m3 x Rp. 834,400.00 = Rp. 834,400.00
- SNI DT-91-0008-2007-6.17 105.10 kg x Rp. 15,000.00 = Rp. 1,576,500.00
- SNI DT-91-0008-2007-6.24 8.20 m2 x Rp. 254,000.00 = Rp. 2,082,800.00
- Pekerjaan lain-lain 1.00 ls x Rp. 49,700.00 = Rp. 49,700.00
Jumlah = Rp. 4,543,400.00
Dibulatkan = Rp. 4,543,400.00
Suplemen 14
1 m3 Beton bertulang anak tangga & bordes
- SNI DT-91-0008-2007-6.8 1.00 m3 x Rp. 834,400.00 = Rp. 834,400.00
- SNI DT-91-0008-2007-6.17 103.50 kg x Rp. 15,000.00 = Rp. 1,552,500.00
- SNI DT-91-0008-2007-6.25 8.10 m2 x Rp. 160,900.00 = Rp. 1,303,290.00
- Pekerjaan lain-lain 1.00 ls x Rp. 49,700.00 = Rp. 49,700.00
Jumlah = Rp. 3,739,890.00
Dibulatkan = Rp. 3,739,800.00
V PEKERJAAN DINDING
SNI DT-91-0009-2007-6.7
1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps
- Batu bata 70.00 Bh x Rp. 650.00 = Rp. 45,500.00
- Semen portland 18.95 Kg x Rp. 1,300.00 = Rp. 24,635.00
- Pasir pasang 0.04 M3 x Rp. 126,000.00 = Rp. 4,788.00
- Pekerja 0.30 Oh x Rp. 49,700.00 = Rp. 14,910.00
- Tukang 0.10 Oh x Rp. 78,700.00 = Rp. 7,870.00
- Kepala Tukang 0.01 Oh x Rp. 94,500.00 = Rp. 945.00
- Mandor 0.02 Oh x Rp. 71,600.00 = Rp. 1,074.00
Jumlah = Rp. 99,722.00
Dibulatkan = Rp. 99,700.00
SNI DT-91-0009-2007-6.8
1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps
- Batu bata 70.00 Bh x Rp. 650.00 = Rp. 45,500.00
- Semen portland 11.50 Kg x Rp. 650.00 = Rp. 7,475.00
- Pasir pasang 0.04 M3 x Rp. 126,000.00 = Rp. 5,418.00
- Pekerja 0.30 Oh x Rp. 49,700.00 = Rp. 14,910.00
- Tukang 0.10 Oh x Rp. 78,700.00 = Rp. 7,870.00
- Kepala Tukang 0.01 Oh x Rp. 94,500.00 = Rp. 945.00
- Mandor 0.02 Oh x Rp. 71,600.00 = Rp. 1,074.00
Jumlah = Rp. 83,192.00
Dibulatkan = Rp. 83,100.00
SNI DT-91-0009-2007-6.9
1 M2 Pasangan bata merah tebal 3/4 bata, 1 Pc : 2 Ps
- Batu bata 105.00 Bh x Rp. 650.00 = Rp. 68,250.00
- Semen portland 28.43 Kg x Rp. 1,300.00 = Rp. 36,952.50
- Pasir pasang 0.06 M3 x Rp. 126,000.00 = Rp. 8,127.00
- Pekerja 0.45 Oh x Rp. 49,700.00 = Rp. 22,365.00
- Tukang 0.15 Oh x Rp. 78,700.00 = Rp. 11,805.00
- Kepala Tukang 0.02 Oh x Rp. 94,500.00 = Rp. 1,417.50
- Mandor 0.02 Oh x Rp. 71,600.00 = Rp. 1,611.00
Jumlah = Rp. 150,528.00
Dibulatkan = Rp. 150,500.00
VI PEKERJAAN PLESTERAN
SNI DT-91-0010-2007-6.2
1 M2 Plesteran 1 Pc : 2 Ps, tebal 15 mm
- Semen portland 8.52 Kg x Rp. 1,300.00 = Rp. 11,076.00
- Pasir pasang 0.02 M3 x Rp. 126,000.00 = Rp. 2,142.00
- Pekerja 0.20 Oh x Rp. 49,700.00 = Rp. 9,940.00
- Tukang 0.15 Oh x Rp. 78,700.00 = Rp. 11,805.00
- Kepala Tukang 0.02 Oh x Rp. 94,500.00 = Rp. 1,417.50
- Mandor 0.01 Oh x Rp. 71,600.00 = Rp. 716.00
Jumlah = Rp. 37,096.50
Dibulatkan = Rp. 37,000.00
SNI DT-91-0010-2007-6.4
1 M2 Plesteran 1 Pc : 4 Ps, tebal 15 mm
- Semen portland 5.20 Kg x Rp. 1,300.00 = Rp. 6,760.00
- Pasir pasang 0.02 M3 x Rp. 126,000.00 = Rp. 2,520.00
- Pekerja 0.20 Oh x Rp. 49,700.00 = Rp. 9,940.00
- Tukang 0.15 Oh x Rp. 78,700.00 = Rp. 11,805.00
- Kepala Tukang 0.02 Oh x Rp. 94,500.00 = Rp. 1,417.50
- Mandor 0.01 Oh x Rp. 71,600.00 = Rp. 716.00
Jumlah = Rp. 33,158.50
Dibulatkan = Rp. 33,100.00
VII PEKERJAAN KAYU
SNI DT-91-0011-2007-6.1
Membuat dan memasang 1 M3 kusen pintu
- Balok kayu kelas I 1.10 M3 x Rp. 5,420,000.00 = Rp. 5,962,000.00
- Lem kayu 1.00 kg x Rp. 5,500.00 = Rp. 5,500.00
- Paku 10 cm 1.25 Kg x Rp. 15,000.00 = Rp. 18,750.00
- Pekerja 6.00 Oh x Rp. 49,700.00 = Rp. 298,200.00
- Tukang 20.00 Oh x Rp. 78,700.00 = Rp. 1,574,000.00
- Kepala tukang 2.00 Oh x Rp. 94,500.00 = Rp. 189,000.00
- Mandor 0.30 Oh x Rp. 71,600.00 = Rp. 21,480.00
Jumlah = Rp. 8,068,930.00
Dibulatkan = Rp. 8,068,900.00
SNI DT-91-0011-2007-6.5
Membuat dan Memasang 1 M2 Daun Pintu Panel kayu kelas I, atau II
- Papan Kayu 0.04 M3 x Rp. 5,420,000.00 = Rp. 216,800.00
- Lem Kayu 0.50 Kg x Rp. 5,500.00 = Rp. 2,750.00
- Pekerja 1.00 OH x Rp. 49,700.00 = Rp. 49,700.00
- Tukang 2.50 OH x Rp. 78,700.00 = Rp. 196,750.00
- Kepala Tukang 0.25 OH x Rp. 94,500.00 = Rp. 23,625.00
- Mandor 0.05 OH x Rp. 71,600.00 = Rp. 3,580.00
Jumlah = Rp. 493,205.00
Dibulatkan = Rp. 493,200.00
SNI DT-91-0011-2007-6.6
Membuat dan memasang 1 m2 pintu dan jendela kaca
- Papan Kayu 0.02 M3 x Rp. 5,420,000.00 = Rp. 130,080.00
- Paku 5 cm - 7 cm 0.30 Kg x Rp. 15,000.00 = Rp. 4,500.00
- Pekerja 0.80 OH x Rp. 49,700.00 = Rp. 39,760.00
- Tukang 2.00 OH x Rp. 78,700.00 = Rp. 157,400.00
- Kepala Tukang 0.20 OH x Rp. 94,500.00 = Rp. 18,900.00
- Mandor 0.04 OH x Rp. 71,600.00 = Rp. 2,864.00
Jumlah = Rp. 353,504.00
Dibulatkan = Rp. 353,500.00
SNI DT-91-0012-2007-6.66
1 M2 Pasang dinding marmer 40 x 60 cm
- Keramik 40 x 60 cm 20.00 bh x Rp. 124,000.00 = Rp. 2,480,000.00
- Semen portland 9.30 Kg x Rp. 1,300.00 = Rp. 12,090.00
- Pasir pasang 0.02 M3 x Rp. 126,000.00 = Rp. 2,268.00
- Semen warna 1.50 Kg x Rp. 2,300.00 = Rp. 3,450.00
- Pekerja 0.60 Oh x Rp. 49,700.00 = Rp. 29,820.00
- Tukang 0.45 Oh x Rp. 78,700.00 = Rp. 35,415.00
- Kepala tukang 0.05 Oh x Rp. 94,500.00 = Rp. 4,252.50
- Mandor 0.03 Oh x Rp. 71,600.00 = Rp. 2,148.00
Jumlah = Rp. 2,569,443.50
Dibulatkan = Rp. 2,569,400.00
SNI DT-91-0012-2007-6.67
Memasang 1 M2 Lantai Keramik 30 x 30 cm unpolished
- Pasir Pasang 0.04 M3 x Rp. 126,000.00 = Rp. 5,292.00
- Keramik 30 x 30 cm unpolished 11.00 Buah x Rp. 3,600.00 = Rp. 39,600.00
- Semen Portland 10.00 Kg x Rp. 1,300.00 = Rp. 13,000.00
- Semen Warna 1.50 Kg x Rp. 2,300.00 = Rp. 3,450.00
- Pekerja 0.62 OH x Rp. 49,700.00 = Rp. 30,814.00
- Tukang 0.35 OH x Rp. 78,700.00 = Rp. 27,545.00
- Kepala Tukang 0.04 OH x Rp. 94,500.00 = Rp. 3,307.50
- Mandor 0.03 OH x Rp. 71,600.00 = Rp. 2,148.00
Jumlah = Rp. 125,156.50
Dibulatkan = Rp. 125,100.00
SNI DT-91-0012-2007-6.64
1 M2 Pasang dinding keramik 40 x 40 cm polished
- Pasir Pasang 0.05 M3 x Rp. 126,000.00 = Rp. 5,670.00
- Keramik 40 x 40 cm polished 6.25 Buah x Rp. 6,300.00 = Rp. 39,375.00
- Semen Portland 10.00 Kg x Rp. 1,300.00 = Rp. 13,000.00
- Semen Warna 1.50 Kg x Rp. 2,300.00 = Rp. 3,450.00
- Pekerja 0.62 OH x Rp. 49,700.00 = Rp. 30,814.00
- Tukang 0.35 OH x Rp. 78,700.00 = Rp. 27,545.00
- Kepala Tukang 0.04 OH x Rp. 94,500.00 = Rp. 3,307.50
- Mandor 0.03 OH x Rp. 71,600.00 = Rp. 2,148.00
Jumlah = Rp. 125,309.50
Dibulatkan = Rp. 125,300.00
SNI DT-91-0012-2007-6.65
Memasang 1 M2 Lantai Keramik 40 x 40 cm unpolished
- Pasir Pasang 0.05 M3 x Rp. 126,000.00 = Rp. 5,670.00
- Keramik 40 x 40 cm unpolished 6.25 Buah x Rp. 7,000.00 = Rp. 43,750.00
- Semen Portland 10.00 Kg x Rp. 1,300.00 = Rp. 13,000.00
- Semen Warna 1.50 Kg x Rp. 2,300.00 = Rp. 3,450.00
- Pekerja 0.62 OH x Rp. 49,700.00 = Rp. 30,814.00
- Tukang 0.35 OH x Rp. 78,700.00 = Rp. 27,545.00
- Kepala Tukang 0.04 OH x Rp. 94,500.00 = Rp. 3,307.50
- Mandor 0.03 OH x Rp. 71,600.00 = Rp. 2,148.00
Jumlah = Rp. 129,684.50
Dibulatkan = Rp. 129,600.00
IX PEKERJAAN LANGIT-LANGIT
SNI DT 91-0013-2007-6.5
Memasang 1 M2 Langit-langit Tripleks + rangka
- Paku tripleks 0.06 Kg x Rp. 12,500.00 = Rp. 750.00
- Rangka kayu/kaso-kaso 0.01 M3 x Rp. 3,750,000.00 = Rp. 45,000.00
- Gipsum 1.2cm 0.38 Lembar x Rp. 73,000.00 = Rp. 27,375.00
- Pekerja 0.10 OH x Rp. 49,700.00 = Rp. 4,970.00
- Tukang 0.10 OH x Rp. 78,700.00 = Rp. 7,870.00
- Kepala Tukang 0.01 OH x Rp. 94,500.00 = Rp. 945.00
- Mandor 0.00 OH x Rp. 71,600.00 = Rp. 286.40
Jumlah = Rp. 87,196.40
Dibulatkan = Rp. 87,100.00
SNI DT 91-0013-2007-6.9
1 M² Pasang List langit-langit kayu profil
- List profil Gipsum 1.05 m' x Rp. 5,700.00 = Rp. 5,985.00
- Paku 0.01 Kg x Rp. 15,000.00 = Rp. 150.00
- Pekerja 0.05 Oh x Rp. 49,700.00 = Rp. 2,485.00
- Tukang kayu 0.05 Oh x Rp. 78,700.00 = Rp. 3,935.00
- Kepala tukang 0.01 Oh x Rp. 94,500.00 = Rp. 472.50
- Mandor 0.00 Oh x Rp. 71,600.00 = Rp. 214.80
Jumlah = Rp. 13,242.30
Dibulatkan = Rp. 13,200.00
X PEKERJAAN BESI
SNI DT 91-0014-2007-6.20
1 M2 Rangka Kuda-kuda Aluzing 55 % Aluminium untuk Metal
- Profil C 75.75 4.26 M' x Rp. 11,500.00 = Rp. 48,990.00
- Reng U 0.5 4.93 M' x Rp. 11,000.00 = Rp. 54,230.00
- Baut Truss 14.00 Buah x Rp. 2,000.00 = Rp. 28,000.00
- Baut Reng 11.00 Buah x Rp. 1,500.00 = Rp. 16,500.00
- Pekerja 0.14 OH x Rp. 49,700.00 = Rp. 6,958.00
- Tukang 0.40 OH x Rp. 78,700.00 = Rp. 31,480.00
- Kepala Tukang 0.04 OH x Rp. 94,500.00 = Rp. 3,780.00
- Mandor 0.07 OH x Rp. 71,600.00 = Rp. 5,012.00
Jumlah = Rp. 194,950.00
Dibulatkan = Rp. 194,900.00
SNI 03-3436-1994-6.2
1 M¹ Pasang Rabung Seng Genteng Metal
- Bubungan Seng Genteng 0.35 1.00 Lbr x Rp. 40,000.00 = Rp. 40,000.00
- Paku Seng 0.20 Kg x Rp. 18,000.00 = Rp. 3,600.00
- Pekerja 0.20 Oh x Rp. 49,700.00 = Rp. 9,940.00
- Tukang 0.10 Oh x Rp. 78,700.00 = Rp. 7,870.00
- Kepala Tukang 0.01 Oh x Rp. 94,500.00 = Rp. 945.00
- Mandor 0.00 Oh x Rp. 71,600.00 = Rp. 71.60
Jumlah = Rp. 62,426.60
Dibulatkan = Rp. 62,400.00
RSNI T-15-2002-B.4
Memasang 1 Buah Urinoir
- Urinoir 1.00 Buah x Rp. 960,000.00 = Rp. 960,000.00
- Perlengkapan dari harga kloset 25.00 % x Rp. 288,000.00 = Rp. 72,000.00
- Pasir Pasang 0.01 M3 x Rp. 126,000.00 = Rp. 1,260.00
- Semen Portland 6.00 Kg x Rp. 1,300.00 = Rp. 7,800.00
- Pekerja 1.00 OH x Rp. 49,700.00 = Rp. 49,700.00
- Tukang 1.00 OH x Rp. 78,700.00 = Rp. 78,700.00
- Kepala Tukang 0.10 OH x Rp. 94,500.00 = Rp. 9,450.00
- Mandor 0.10 OH x Rp. 71,600.00 = Rp. 7,160.00
Jumlah = Rp. 1,186,070.00
Dibulatkan = Rp. 1,186,000.00
RSNI T-15-2002-B.5
Memasang 1 Buah Wastafel
- Wastafel 1.00 Buah x Rp. 470,000.00 = Rp. 470,000.00
- Perlengkapan dari harga Wastafel 10.00 % x Rp. 56,400.00 = Rp. 5,640.00
- Pasir Pasang 0.01 M3 x Rp. 126,000.00 = Rp. 1,260.00
- Semen Portland 6.00 Kg x Rp. 1,300.00 = Rp. 7,800.00
- Pekerja 1.20 OH x Rp. 49,700.00 = Rp. 59,640.00
- Tukang 1.45 OH x Rp. 78,700.00 = Rp. 114,115.00
- Kepala Tukang 0.15 OH x Rp. 94,500.00 = Rp. 14,175.00
- Mandor 0.10 OH x Rp. 71,600.00 = Rp. 7,160.00
Jumlah = Rp. 679,790.00
Dibulatkan = Rp. 679,700.00
RSNI T-15-2002-B.8
1 Buah Bak Mandi Batu Bata 0,3 M3 di Lapisi Keramik
- Batu Bata 200.00 Buah x Rp. 650.00 = Rp. 130,000.00
- Pasir Pasang 0.30 M3 x Rp. 126,000.00 = Rp. 37,800.00
- Semen Portland 120.00 Kg x Rp. 1,300.00 = Rp. 156,000.00
- Keramik uk. 20 x 20 cm' 110.00 Buah x Rp. 124,000.00 = Rp. 13,640,000.00
- Semen Warna 6.00 Kg x Rp. 2,300.00 = Rp. 13,800.00
- Pekerja 6.00 OH x Rp. 49,700.00 = Rp. 298,200.00
- Tukang 3.00 OH x Rp. 78,700.00 = Rp. 236,100.00
- Kepala Tukang 0.30 OH x Rp. 94,500.00 = Rp. 28,350.00
- Mandor 0.30 OH x Rp. 71,600.00 = Rp. 21,480.00
Jumlah = Rp. 14,561,730.00
Dibulatkan = Rp. 14,561,700.00
RSNI T-15-2002-B.26
Memasang 1 M' Pipa PVC tipe AW Ø 3/4"
- Pipa PVC Ø 3/4" 1.10 M' x Rp. 5,000.00 = Rp. 5,500.00
- Harga pipa utk Perlengkapan 25.00 % x Rp. 1,750.00 = Rp. 437.50
- Pekerja 0.04 OH x Rp. 49,700.00 = Rp. 1,789.20
- Tukang 0.06 OH x Rp. 78,700.00 = Rp. 4,722.00
- Kepala Tukang 0.01 OH x Rp. 94,500.00 = Rp. 567.00
- Mandor 0.00 OH x Rp. 71,600.00 = Rp. 128.88
Jumlah = Rp. 13,144.58
Dibulatkan = Rp. 13,100.00
RSNI T-15-2002-B.31
Memasang 1 M' Pipa PVC tipe AW Ø 3"
- Pipa PVC tipe AW Ø 3" 1.20 M' x Rp. 22,666.67 = Rp. 27,200.00
- Harga pipa utk Perlengkapan 30.00 % x Rp. 7,933.33 = Rp. 2,380.00
- Pekerja 0.08 OH x Rp. 49,700.00 = Rp. 4,025.70
- Tukang 0.14 OH x Rp. 78,700.00 = Rp. 10,624.50
- Kepala Tukang 0.01 OH x Rp. 94,500.00 = Rp. 1,275.75
- Mandor 0.00 OH x Rp. 71,600.00 = Rp. 293.56
Jumlah = Rp. 45,799.51
Dibulatkan = Rp. 45,700.00
RSNI T-15-2002-B.32
Memasang 1 M' Pipa PVC tipe AW Ø 4"
- Pipa PVC tipe AW Ø 3" 1.20 M' x Rp. 47,166.67 = Rp. 56,600.00
- Harga pipa utk Perlengkapan 30.00 % x Rp. 16,508.33 = Rp. 4,952.50
- Pekerja 0.09 OH x Rp. 49,700.00 = Rp. 4,522.70
- Tukang 0.15 OH x Rp. 78,700.00 = Rp. 11,411.50
- Kepala Tukang 0.01 OH x Rp. 94,500.00 = Rp. 1,370.25
- Mandor 0.01 OH x Rp. 71,600.00 = Rp. 365.16
Jumlah = Rp. 79,222.11
Dibulatkan = Rp. 79,200.00
RSNI T-15-2002-B.35
Memasang 1 Buah Kran Ø ¾" atau Ø ½"
- Kran Air 1.00 Buah x Rp. 45,000.00 = Rp. 45,000.00
- Seal Tape 0.03 Buah x Rp. 5,000.00 = Rp. 125.00
- Pekerja 0.01 OH x Rp. 49,700.00 = Rp. 497.00
- Tukang 0.10 OH x Rp. 78,700.00 = Rp. 7,870.00
- Kepala Tukang 0.01 OH x Rp. 94,500.00 = Rp. 945.00
- Mandor 0.01 OH x Rp. 71,600.00 = Rp. 358.00
Jumlah = Rp. 54,795.00
Dibulatkan = Rp. 54,700.00
RSNI T-15-2002-B.36
RSNI T-15-2002-B.36
Memasang
Memasang1 Buah Floor
1 Buah Drain
Floor Drain
- Floor Drain 1.00 Buah x Rp. 21,000.00 = Rp. 21,000.00
- Pekerja 0.01 OH x Rp. 49,700.00 = Rp. 497.00
- Tukang 0.10 OH x Rp. 78,700.00 = Rp. 7,870.00
- Kepala Tukang 0.01 OH x Rp. 94,500.00 = Rp. 945.00
- Mandor 0.01 OH x Rp. 71,600.00 = Rp. 358.00
Jumlah = Rp. 30,670.00
Dibulatkan = Rp. 30,600.00
RSNI T-30-200-B.5
1 Buah Engsel Pintu
- Engsel Pintu 1.00 Buah x Rp. 24,000.00 = Rp. 24,000.00
- Pekerja 0.02 OH x Rp. 49,700.00 = Rp. 745.50
- Tukang 0.15 OH x Rp. 78,700.00 = Rp. 11,805.00
- Kepala Tukang 0.02 OH x Rp. 94,500.00 = Rp. 1,417.50
- Mandor 0.00 OH x Rp. 71,600.00 = Rp. 53.70
Jumlah = Rp. 38,021.70
Dibulatkan = Rp. 38,000.00
RSNI T-30-200-B.6
1 Buah Engsel Jendela Kupu - kupu
- Engsel Jendela 1.00 Buah x Rp. 19,000.00 = Rp. 19,000.00
- Pekerja 0.01 OH x Rp. 49,700.00 = Rp. 497.00
- Tukang 0.10 OH x Rp. 78,700.00 = Rp. 7,870.00
- Kepala Tukang 0.01 OH x Rp. 94,500.00 = Rp. 945.00
- Mandor 0.00 OH x Rp. 71,600.00 = Rp. 35.80
Jumlah = Rp. 28,347.80
Dibulatkan = Rp. 28,300.00
RSNI T-30-200-B.9
1 Buah Kait Angin Jendela
- Kait Angin 1.00 Buah x Rp. 15,000.00 = Rp. 15,000.00
- Pekerja 0.02 OH x Rp. 49,700.00 = Rp. 745.50
- Tukang 0.15 OH x Rp. 78,700.00 = Rp. 11,805.00
- Kepala Tukang 0.02 OH x Rp. 94,500.00 = Rp. 1,417.50
- Mandor 0.00 OH x Rp. 71,600.00 = Rp. 53.70
Jumlah = Rp. 29,021.70
Dibulatkan = Rp. 29,000.00
RSNI T-30-200-B.26
1 Buah Hak Tarikan Jendela
- Tarikan Jendela 1.00 Buah x Rp. 15,000.00 = Rp. 15,000.00
- Pekerja 0.02 OH x Rp. 49,700.00 = Rp. 745.50
- Tukang 0.15 OH x Rp. 78,700.00 = Rp. 11,805.00
- Kepala Tukang 0.02 OH x Rp. 94,500.00 = Rp. 1,417.50
- Mandor 0.00 OH x Rp. 71,600.00 = Rp. 53.70
Jumlah = Rp. 29,021.70
Dibulatkan = Rp. 29,000.00
RSNI T-30-200-B.25
1 Buah Pacok Jendela
- Pacok Jendela 1.00 Buah x Rp. 12,500.00 = Rp. 12,500.00
- Pekerja 0.02 OH x Rp. 49,700.00 = Rp. 994.00
- Tukang 0.20 OH x Rp. 78,700.00 = Rp. 15,740.00
- Kepala Tukang 0.02 OH x Rp. 94,500.00 = Rp. 1,890.00
- Mandor 0.00 OH x Rp. 71,600.00 = Rp. 53.70
Jumlah = Rp. 31,177.70
Dibulatkan = Rp. 31,100.00
RSNI T-30-200-B.17
1 M2 Pasang Kaca tebal 5 mm
- Kaca tebal 5 mm 1.10 M2 x Rp. 118,000.00 = Rp. 129,800.00
- Pekerja 0.02 OH x Rp. 49,700.00 = Rp. 745.50
- Tukang 0.15 OH x Rp. 78,700.00 = Rp. 11,805.00
- Kepala Tukang 0.02 OH x Rp. 94,500.00 = Rp. 1,417.50
- Mandor 0.00 OH x Rp. 71,600.00 = Rp. 53.70
Jumlah = Rp. 143,821.70
Dibulatkan = Rp. 143,800.00
PT. T-38-2000-C-B14
1 M2 Pengecatan Tembok Baru
- Plamir 0.10 Kg x Rp. 18,000.00 = Rp. 1,800.00
- Cat Dasar 0.10 Kg x Rp. 26,000.00 = Rp. 2,600.00
- Cat Tembok 0.26 Kg x Rp. 26,000.00 = Rp. 6,760.00
- Pekerja 0.02 OH x Rp. 49,700.00 = Rp. 994.00
- Tukang 0.06 OH x Rp. 78,700.00 = Rp. 4,958.10
- Kepala Tukang 0.01 OH x Rp. 94,500.00 = Rp. 595.35
- Mandor 0.00 OH x Rp. 71,600.00 = Rp. 179.00
Jumlah = Rp. 17,886.45
Dibulatkan = Rp. 17,800.00
Bisri Juniar, ST
Direktur
DAFTAR HARGA UPAH DAN BAHAN
1 2 3 4
B. HARGA BAHAN
3
1 Tanah urug m 51,500.00
2 Pasir urug m3 115,500.00
3
3 Pasir pasang (beton) m 126,000.00
4 Kerikil (beton) m3 125,000.00
3
5 BatuKali/batu belah m 205,000.00
6 Batu bata Bh 650.00
7 Besi Strip tebal 5 mm Kg 25,000.00
8 Semen Kg 1,300.00
9 Semen warna Kg 2,300.00
10 Air Ltr 300.00
11 Keramik dinding marmer 40 x 60 cm Bh 124,000.00
12 Keramik lantai 20 x 20 cm anti slip Bh 1,300.00
13 Keramik 30 x30 cm Bh 3,600.00
14 Keramik 40 x 40 cm Bh 6,300.00
15 Keramik lantai 40 x 40 cm kulit jeruk Bh 7,000.00
16 Bonbon keramik setelah dipasang m1 15,000.00
17 Besi beton polos Kg 12,500.00
18 Besi beton ulir Kg 17,000.00
19 Baut truss Bh 2,000.00
20 Baut reng Bh 1,500.00
21 Kawat beton Kg 18,500.00
22 Profil C 75.75 m' 11,500.00
23 Paku Kg 15,000.00
24 Paku ulir Kg 18,000.00
25 Paku triplek Kg 12,500.00
26 Seng genteng metal Lbr 80,000.00
27 Rabung seng genteng metal Lbr 40,000.00
28 Ring U 0.5 m' 11,000.00
29 Kayu Seumantok/Damar laut m3 5,420,000.00
30 Kayu rangka atap klas II (sejenis sembarang keras) m3 4,080,000.00
31 Kayu rangka plafond (sejenis sembarang keras) m3 3,750,000.00
32 Kayu bekisting m3 2,600,000.00
33 Gipsum 1.2cm Lbr 73,000.00
34 Plywood 9 mm Lbr 154,000.00
35 List profil Gipsum m1 5,700.00
36 Kaca 5 mm m2 118,000.00
37 Cat meni kayu/besi Kg 23,500.00
38 Cat minyak Kg 39,000.00
39 Cat tembok Kg 26,000.00
1 2 3 4
Bisri Juniar, ST
Direktur