Pekerjaan :
Lokasi :
Tahun :
II PEKERJAAN TANAH
6.1 A. Galian Tanah Biasa sedalam 1 m (m³)
SNI 03-2835-2002 Tenaga
Pekerja Oh 0.400 85,000.00
Mandor Oh 0.040 120,000.00
Sub Total
Overhead & Profit 15%
Harga Satuan Pekerjaan
6.9 B. Urugan Kembali (m³)
SNI 03-2835-2002 Tenaga
Pekerja Oh 0.192 85,000.00
Mandor Oh 0.019 120,000.00
Sub Total
Overhead & Profit 15%
Harga Satuan Pekerjaan
6.11 C. Urugan Pasir Bawah Pondasi (m³)
SNI 03-2835-2002 Bahan
Pasir Urug M³ 1.200 115,000.00
Tenaga
Pekerja Oh 0.300 85,000.00
Mandor Oh 0.010 120,000.00
Sub Total
Overhead & Profit 15%
Harga Satuan Pekerjaan
IX PEKERJAAN PLAFON
6.19 A. Pasang List Langit-langit Kayu Profil (m¹)
SNI 03-2835-2002 Bahan
Kayu Profil M¹ 1.100 6,666.67
Paku plafon Kg 0.010 18,000.00
Tenaga
Pekerja Oh 0.050 85,000.00
Tukang Kayu Oh 0.050 100,000.00
Kepala Tukang Oh 0.005 120,000.00
Mandor Oh 0.003 120,000.00
Sub Total
6.1 B. Langit-langit Asbes (m²)
SNI 03-2835-2002 Bahan
Pelat Asbes tebal 6mm M² 1.100 6,666.67
Paku plafon Kg 0.010 18,000.00
Tenaga
Pekerja Oh 0.030 85,000.00
Tukang Kayu Oh 0.070 100,000.00
Kepala Tukang Oh 0.007 120,000.00
Mandor Oh 0.002 120,000.00
Sub Total
10,000.00
3,900.00
750.00
2,250.00
86,400.00
1,200.00
4,000.00
20,000.00
34,000.00
2,400.00
2,400.00
167,300.00
144,000.00
400.00
8,400.00
10,000.00
8,500.00
1,200.00
600.00
173,100.00
25,965.00
199,065.00
4,410.00
12,000.00
37,800.00
57,000.00
26,208.00
4,050.00
10,250.00
100,000.00
1,800.00
100,000.00
252,000.00
120,600.00
726,118.00
10,000.00
216,000.00
17,000.00
12,100.00
54,600.00
17,250.00
15,000.00
37,500.00
18,000.00
6,750.00
25,000.00
1,056.00
9,750.00
3,420.00
95,000.00
42,500.00
72,000.00
36,000.00
2,000.00
690,926.00
34,000.00 0.75
4,800.00 0.025
38,800.00
5,820.00
44,620.00
16,320.00 0.25
2,280.00 0.025
18,600.00
2,790.00
21,390.00
138,000.00
25,500.00 0.3
1,200.00 0.01
164,700.00
24,705.00
189,405.00
143,000.00 1.2
212,160.00 136
62,560.00 0.544
127,500.00 1.5
60,000.00 0.75
7,200.00 0.075
9,000.00 0.075
621,420.00
93,213.00
714,633.00
42,000.00
17,940.00
4,945.00
27,200.00
10,000.00
1,200.00
1,800.00
105,085.00
15,762.75
120,847.75
42,000.00
7,020.00
5,750.00
675.00
27,200.00
10,000.00
1,200.00
1,800.00
95,645.00
14,346.75
109,991.75
16,848.00
2,990.00
21,250.00
20,000.00
2,400.00
1,500.00
64,988.00
9,748.20
74,736.20
2,870.40
270.00
1,610.00
17,000.00
15,000.00
1,800.00
1,200.00
39,750.40
5,962.56
45,712.96
0.02
18,000.00
10,000.00 7000
3,000.00
170,000.00
800,000.00
144,000.00
24,000.00
2,458,000.00
16,800.00
3,000.00
8,500.00
10,000.00
1,200.00
600.00
40,100.00
158.40
1,200.00
8,500.00
10,000.00
1,200.00
6,000.00
27,058.40
14,400.00
2,000.00
12,750.00
25,000.00
3,000.00
9,000.00
66,150.00
D-17r2 1 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15
- 0 M3 0.2700 - -
- Paku Biasa 2 Kg 2.0000 - -
324,000.00 - Minyak Beki Ltr - -
40,000.00 - 0 Kg 180.0000 - -
6,000.00 - Kawat Beto Kg 3.0000 - -
2,340,000.00 - Semen Portl Kg 323.0000 - -
52,500.00 - Pasir Beton M3 0.5200 - -
503,880.00 - Koral Beton M3 0.7800 - -
78,000.00 - Pekerja Oh 4.8500 - -
195,000.00 - Tukang Bat Oh 0.3500 - -
- Tukang Kay Oh 1.5600 - -
412,250.00 - Tukang Besi Oh 1.4000 - -
35,000.00 - Kepala Tuka Oh 0.3310 - -
156,000.00 - Mandor Oh 0.1700 - -
140,000.00 Jumlah -
39,720.00 Dibulatkan -
20,400.00
4,342,750.00
651,412.50
4,994,162.50
D-18r 1 M3 Kolom Beton Tulang 20/20 (140 kg besi + bekisting) 4dia. 12 8-15
- Kayu papan M3 0.4000 - -
480,000.00 - Paku Biasa 2 Kg 4.0000 - -
80,000.00 - Minyak Beki Ltr - -
20,000.00 - Besi Beton Kg 140.0000 - -
1,820,000.00 - Kawat Beto Kg 1.8000 - -
31,500.00 - Semen Portl Kg 323.0000 - -
503,880.00 - Pasir Beton M3 0.5200 - -
78,000.00 - Koral Beton M3 0.7800 - -
195,000.00 - Kayu Balok M3 0.1500 - -
180,000.00 - 0 Lbr 3.5000 - -
350,000.00 - Dolken Ø-8 Btg 20.0000 - -
160,000.00 - Pekerja Oh 7.3000 - -
- Tukang Bat Oh 0.3500 - -
620,500.00 - Tukang Kay Oh 3.3000 - -
35,000.00 - Tukang Besi Oh 2.1000 - -
330,000.00 - Kepala Tuka Oh 0.5700 - -
210,000.00 - Mandor Oh 0.2500 - -
68,400.00 Jumlah -
30,000.00 Dibulatkan -
5,192,280.00
778,842.00
5,971,122.00
D-36 1 M' Ring Balok Beton Tulang (10x15) cm
- Koral Beton M3 0.0030 - -
3,600.00 - Paku Biasa 2 Kg 0.0200 - -
400.00 - Besi Beton Kg 3.6000 - -
46,800.00 - Kawat Beto Kg 0.0500 - -
875.00 - Semen Portl Kg 5.5000 - -
8,580.00 - Pasir Beton M3 0.0090 - -
1,350.00 - Koral Beton M3 0.0150 - -
3,750.00 - Pekerja Oh 0.1000 - -
- Tukang Bat Oh 0.0330 - -
8,500.00 - Tukang Kay Oh 0.0330 - -
3,300.00 - Tukang Besi Oh 0.0330 - -
3,300.00 - Kepala Tuka Oh 0.0100 - -
3,300.00 - Mandor Oh 0.0050 - -
1,200.00 Jumlah -
600.00 Dibulatkan -
85,555.00
12,833.25
98,388.25
3,600.00
400.00
46,800.00
875.00
8,580.00
1,350.00
3,750.00
8,500.00
3,300.00
3,300.00
3,300.00
1,200.00
600.00
85,555.00
361,920.00
78,000.00
195,000.00
140,250.00
25,000.00
3,000.00
9,600.00
812,770.00
13,650.00 10.5
262.50 0.15
595.00 0.07
700.00 0.07
84.00 0.007
36.00 0.004
15,327.50
48,000.00
8,000.00
2,000.00
18,000.00
35,000.00
48,000.00
27,200.00
33,000.00
3,960.00
720.00
223,880.00
138,000.00
25,500.00
-
-
1,200.00
164,700.00
17,752.80
4,830.00
52,700.00
35,000.00
4,200.00
3,600.00
118,082.80
-
17,752.80
4,830.00
-
52,700.00
35,000.00
4,200.00
3,600.00
118,082.80
103,055.56
16,224.00
1,552.50
22,950.00
13,000.00
1,560.00
1,620.00
159,962.06
9,531.00
2,433.60
345.00
5,100.00
3,000.00
360.00
360.00
21,129.60
65,000.00
12,000.00
27,000.00
850.00
50,000.00
1,200.00
600.00
156,650.00
14,400.00
425.00
50,000.00
600.00
30.00
65,455.00
12,000.00
850.00
10,000.00
1,200.00
60.00
24,110.00
10,000.00
4,250.00
50,000.00
6,000.00
300.00
70,550.00
14,520.00
-
-
-
-
14,520.00
99,000.00
1,275.00
15,000.00
1,800.00
90.00
117,165.00
13,200.00
4,000.00
1,950.00
2,040.00
9,880.00
1,800.00
600.00
5,950.00
900.00
720.00
300.00
41,340.00
1,300.00
3,000.00
1,200.00
9,880.00
1,700.00
6,300.00
720.00
300.00
24,400.00
1,300,000.00
25,000.00
17,500.00
12,500.00
12,500.00
12,500.00
150,000.00
9,360.00
1,150.00
85,000.00
150,000.00
180,000.00
19,200.00
594,710.00
60,000.00
187,200.00
34,500.00
216,000.00
78,000.00
510,000.00
300,000.00
36,000.00
36,000.00
1,457,700.00
15,000.00
1,800.00
850.00
10,000.00
1,200.00
600.00
29,450.00
15,120.00
5,292.00
6,885.00
13,500.00
1,620.00
492.00
42,909.00
60,000.00
21,000.00
6,885.00
13,500.00
1,620.00
492.00
103,497.00
150.00
120,120.00
14,950.00
3,300.00
33,800.00
13,500.00
120,700.00
47,300.00
5,640.00
8,520.00
367,980.00
mlah Harga (Rp.)
Rencanana Anggaran Biaya
Pekerjaan :
Lokasi :
Tahun :
40kg/holcim 42,000.00
4m 85,000.00 0.024
41.666666667
3,541,666.67
126,000
AL PINTU/JENDELA
30,000.00 Bh
40,000.00 Bh
15,000.00 Bh
15,000.00 Bh
105,000.00 M²
100,000.00 Bh
AL SANITASI
285,000.00 Bh
25,000.00 Bh
14,000.00 Kg
7,000.00 Bh
120,000.00 Bh
64,000.00 Bh
alvanis Tebal 3.2 mm 193,000.00 Batang
105,000.00 Batang
17,500.00 M
68,000.00 Batang
11,333.33 M
130,000.00 Batang
21,666.67 M
RIAL ELEKTRIKAL
74,500.00 Bh
23,000.00 Batang
35,000.00 Bh
12,000.00 Bh
35,000.00 Bh
155,000.00 Rol
ak 2 Zekering ) 165,000.00 Bh
kolom 0.1 0.6
sloof 0.03 0.72
ringbalok 0.03 30
kuda2 baja ringan
p 6 7
l 4 5
sudut 35 0.819
volume kuda2 42.73504
atap