Anda di halaman 1dari 46

Analisa Harga Satuan Pekerjaan

Pekerjaan :
Lokasi :
Tahun :

Harga Satuan (Rp)


No Jenis Pekerjaan Sat Indeks
Bahan Upah
I PEKERJAAN PERSIAPAN
6.8 A. Pembersihan Lahan (m²)
SNI 03-2835-2002 Tenaga
Pekerja Oh 0.100 85,000.00
Mandor Oh 0.050 120,000.00
Sub Total
Overhead & Profit 15%
Harga Satuan Pekerjaan
6.1 B. Pemasangan Pagar Sementara dari Kayu tinggi 2 m (m¹)
SNI 03-2835-2002 Bahan
Dolken Kayu Ø 8-10/400 cm Btg 1.250 8,000.00
Semen Portland Kg 2.500 1,560.00
Pasir Beton M³ 0.005 150,000.00
Koral Beton M³ 0.009 250,000.00
Kayu 5/7 M³ 0.072 1,200,000.00
Paku Biasa 2"-5" Kg 0.060 20,000.00
Residu Lt 0.400 10,000.00
Tenaga
Tukang Kayu Oh 0.200 100,000.00
Pekerja Oh 0.400 85,000.00
Kepala Tukang Oh 0.020 120,000.00
Mandor Oh 0.020 120,000.00
Sub Total
6.4 C. Memasang Bouwplank (m¹)
A.2.2.1.4. Bahan
Kayu Bakar M³ 0.120 1,200,000.00
Paku Biasa 2"-5" Kg 0.020 20,000.00
Kayu Bakar M³ 0.007 1,200,000.00
Tenaga
Tukang Kayu Oh 0.100 100,000.00
Pekerja Oh 0.100 85,000.00
Kepala Tukang Oh 0.010 120,000.00
Mandor Oh 0.005 120,000.00
Sub Total
Overhead & Profit 15%
Harga Satuan Pekerjaan
ALS D. Memasang Papan Nama Proyek 80x120 cm (Bh)
Bahan
Kayu Meranti Btg 0.035 126,000.00
Paku Biasa 2"-5" Kg 0.600 20,000.00
Seng Lembaran 90 cm M¹ 1.400 27,000.00
Cat kayu Kg 1.500 38,000.00
Semen Portland Kg 16.800 1,560.00
Pasir Beton M³ 0.027 150,000.00
Koral Beton M³ 0.041 250,000.00
Tenaga
Tukang Kayu Oh 1.000 100,000.00
Tukang Batu Oh 0.018 100,000.00
Tukang Cat Oh 1.000 100,000.00
Pekerja Oh 2.100 120,000.00
Mandor Oh 1.005 120,000.00
Sub Total
6.5 E. Membuat direksi keet & Gudang Sementara (m²)
SNI 03-2835-2002 Bahan
Dolken Kayu Ø 8-10/400 cm Btg 1.250 8,000.00
Kayu 5/7 M³ 0.180 1,200,000.00
Paku Biasa 2"-5" Kg 0.850 20,000.00
Besi Strip Kg 1.100 11,000.00
Semen Portland Kg 35.000 1,560.00
Pasir Pasang M³ 0.150 115,000.00
Pasir Beton M³ 0.100 150,000.00
Koral Beton M³ 0.150 250,000.00
Bata Merah Bh 30.000 600.00
Seng Plat Lbr 0.250 27,000.00
Jendela Nako Bh 2.0000 12,500.00
Kaca Polos 3 mm M² 0.080 13,200.00
Kunci Tanam Bh 0.150 65,000.00
Plywood 4 mm Lbr 0.060 57,000.00
Tenaga
Tukang Kayu Oh 2.000 47,500.00
Tukang Batu Oh 1.000 42,500.00
Pekerja Oh 2.000 36,000.00
Kepala Tukang Oh 0.800 45,000.00
Mandor Oh 0.050 40,000.00
Sub Total

II PEKERJAAN TANAH
6.1 A. Galian Tanah Biasa sedalam 1 m (m³)
SNI 03-2835-2002 Tenaga
Pekerja Oh 0.400 85,000.00
Mandor Oh 0.040 120,000.00
Sub Total
Overhead & Profit 15%
Harga Satuan Pekerjaan
6.9 B. Urugan Kembali (m³)
SNI 03-2835-2002 Tenaga
Pekerja Oh 0.192 85,000.00
Mandor Oh 0.019 120,000.00
Sub Total
Overhead & Profit 15%
Harga Satuan Pekerjaan
6.11 C. Urugan Pasir Bawah Pondasi (m³)
SNI 03-2835-2002 Bahan
Pasir Urug M³ 1.200 115,000.00
Tenaga
Pekerja Oh 0.300 85,000.00
Mandor Oh 0.010 120,000.00
Sub Total
Overhead & Profit 15%
Harga Satuan Pekerjaan

III PEKERJAAN PONDASI


6.6 D. Pasangan Pondasi Batu Kali 1 Pc: 5 Ps (m³)
SNI 03-2835-2002 Bahan
Batu Belah 15/20 cm M³ 1.100 130,000.00
Semen Portland Kg 136.000 1,560.00
Pasir Pasang M³ 0.544 115,000.00
Tenaga
Pekerja Oh 1.500 85,000.00
Tukang Batu Oh 0.600 100,000.00
Kepala Tukang Oh 0.060 120,000.00
Mandor Oh 0.075 120,000.00
Sub Total
Overhead & Profit 15%
Harga Satuan Pekerjaan
IV PEKERJAAN DINDING
6.11 A. Pasangan Tembok ½ Bata 1Pc:4Ps (Trasraam) (m²)
SNI 03-2835-2002 Bahan
Bata Merah 5 X 11 X 22 cm Bh 70.000 600.00
Semen Portland Kg 11.500 1,560.00
Pasir Pasang M³ 0.043 115,000.00
Tenaga
Pekerja Oh 0.320 85,000.00
Tukang Batu Oh 0.100 100,000.00
Kepala Tukang Oh 0.010 120,000.00
Mandor Oh 0.015 120,000.00
Sub Total
Overhead & Profit 15%
Harga Satuan Pekerjaan
6.15 B. Pasangan Tembok ½ Bata 1Pc:3Kp:10Ps (m²)
SNI 03-2835-2002 Bahan
Bata Merah 5 X 11 X 22 cm Bh 70.000 600.00
Semen Portland Kg 4.500 1,560.00
Pasir Pasang M³ 0.050 115,000.00
Kapur Padam M³ 0.015 45,000.00
Tenaga
Pekerja Oh 0.320 85,000.00
Tukang Batu Oh 0.100 100,000.00
Kepala Tukang Oh 0.010 120,000.00
Mandor Oh 0.015 120,000.00
Sub Total
Overhead & Profit 15%
Harga Satuan Pekerjaan

V PEKERJAAN PLESTERAN DINDING


6.14 A. Plesteran Dinding 1Pc:3Ps (m²) tebal 20 mm
SNI 03-2835-2002 Bahan
Semen Portland Kg 10.800 1,560.00
Pasir Pasang M³ 0.026 115,000.00
Tenaga
Pekerja Oh 0.250 85,000.00
Tukang Batu Oh 0.200 100,000.00
Kepala Tukang Oh 0.020 120,000.00
Mandor Oh 0.013 120,000.00
Sub Total
Overhead & Profit 15%
Harga Satuan Pekerjaan
6.9 B. Plesteran Dinding 1Pc:3Kp:10Ps (m²) tebal 15 mm
SNI 03-2835-2002 Bahan
Semen Portland Kg 1.840 1,560.00
Kapur Padam M³ 0.006 45,000.00
Pasir Pasang M³ 0.014 115,000.00
Tenaga
Pekerja Oh 0.200 85,000.00
Tukang Batu Oh 0.150 100,000.00
Kepala Tukang Oh 0.015 120,000.00
Mandor Oh 0.010 120,000.00
Sub Total
Overhead & Profit 15%
Harga Satuan Pekerjaan

VI PEKERJAAN BAJA RINGAN


6.1 A. Pasang Kusen Pintu dan Baja Ringan (m1)
Bahan
Baja ringan canai dingin C75 M1 1.000 18,000.00
Insect Screen M1 1.000 10,000.00
Dynabol dia 12 x 120 mm Bh 1.000 3,000.00
Tenaga
Pekerja Oh 0.200 85,000.00
Tukang Kayu Oh 0.100 100,000.00
Kepala Tukang Oh 0.010 120,000.00
Mandor Oh 0.010 120,000.00
Sub Total
Overhead & Profit 15%
Harga Satuan Pekerjaan
6.7 B. Pasang Pintu Panel Baja ringan (m1)
SNI 03-2835-2002 Bahan
Baja ringan canai dingin C75 M1 1.000 18,000.00
Insect Screen M1 1.000 10,000.00
Sekrup Bh 1.000 1,000.00
Tenaga
Pekerja Oh 0.200 85,000.00
Tukang Kayu Oh 0.100 100,000.00
Kepala Tukang Oh 0.010 120,000.00
Mandor Oh 0.010 120,000.00
Sub Total
Overhead & Profit 15%
Harga Satuan Pekerjaan
ALS C. Pasang Nook, Gording, Murplat, Nook Kayu Bengkirai (m³)
Bahan
Kayu Klas III M³ 1.100 1,200,000.00
Tenaga
Pekerja Oh 2.000 85,000.00
Tukang Kayu Oh 8.000 100,000.00
Kepala Tukang Oh 1.200 120,000.00
Mandor Oh 0.200 120,000.00
Sub Total
6.35 D. Pasang Kaso+Reng Genteng Beton Kayu Borneo (m²)
SNI 03-2835-2002 Bahan
Kayu Klas III M³ 0.014 1,200,000.00
Paku Biasa 2"-5" Kg 0.150 20,000.00
Tenaga
Pekerja Oh 0.100 85,000.00
Tukang Kayu Oh 0.100 100,000.00
Kepala Tukang Oh 0.010 120,000.00
Mandor Oh 0.005 120,000.00
Sub Total
6.53 E. Pasang Listplank, Reuter 2X (2X20) cm, kayu kelas II (m³)
SNI 03-2835-2002 Bahan
Kayu Klas II M³ 0.009 18,000.00
Paku Biasa 2"-5" Kg 0.060 20,000.00
Tenaga
Pekerja Oh 0.100 85,000.00
Tukang Kayu Oh 0.100 100,000.00
Kepala Tukang Oh 0.010 120,000.00
Mandor Oh 0.050 120,000.00
Sub Total
6.40 F. Pasang Rangka Langit-langit 1X1 m Kayu Kelas III (m²)
SNI 03-2835-2002 Bahan
Kayu Klas III M³ 0.012 1,200,000.00
Paku biasa 2"-5" Kg 0.100 20,000.00
Tenaga
Pekerja Oh 0.150 85,000.00
Tukang Kayu Oh 0.250 100,000.00
Kepala Tukang Oh 0.025 120,000.00
Mandor Oh 0.075 120,000.00
Sub Total
VII PEKERJAAN BETON
6.39 A. Membuat Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15 (m³)
SNI 03-2835-2002 Bahan
Kayu Klas III M³ 0.270 1,200,000.00
Paku Biasa 2"-5" Kg 2.000 20,000.00
Minyak Bekisting Lt 0.600 10,000.00
Besi Beton polos Kg 180.000 13,000.00
Kawat Beton Kg 3.000 17,500.00
Semen Portland Kg 323.000 1,560.00
Pasir Beton M³ 0.520 150,000.00
Koral Beton M³ 0.780 250,000.00
Tenaga
Pekerja Oh 4.850 85,000.00
Tukang Batu Oh 0.350 100,000.00
Tukang Kayu Oh 1.560 100,000.00
Tukang Besi Oh 1.400 100,000.00
Kepala Tukang Oh 0.331 120,000.00
Mandor Oh 0.170 120,000.00
Sub Total
Overhead & Profit 15%
Harga Satuan Pekerjaan
6.40 B. Membuat Kolom Beton Tulang 20/20 (140 kg besi + bekisting) 4dia. 12 8-15 (m³)
SNI 03-2835-2002 Bahan
Kayu Klas III, papan M³ 0.400 1,200,000.00
Paku Biasa 2"-5" Kg 4.000 20,000.00
Minyak Bekisting Lt 2.000 10,000.00
Besi Beton polos Kg 140.000 13,000.00
Kawat Beton Kg 1.800 17,500.00
Semen Portland Kg 323.000 1,560.00
Pasir Beton M³ 0.520 150,000.00
Koral Beton M³ 0.780 250,000.00
Kayu Klas III, balok M³ 0.150 1,200,000.00
Plywood 9 mm Lbr 3.500 100,000.00
Dolken Kayu Ø 8-10/400 cm Btg 20.000 8,000.00
Tenaga
Pekerja Oh 7.300 85,000.00
Tukang Batu Oh 0.350 100,000.00
Tukang Kayu Oh 3.300 100,000.00
Tukang Besi Oh 2.100 100,000.00
Kepala Tukang Oh 0.570 120,000.00
Mandor Oh 0.250 120,000.00
Sub Total
Overhead & Profit 15%
Harga Satuan Pekerjaan
6.46 C. Membuat Ring Balok Beton Bertulang (10X15cm) (m1)
SNI 03-2835-2002 Bahan
Kayu Klas III, papan M³ 0.003 1,200,000.00
Paku Biasa 2"-5" Kg 0.020 20,000.00
Besi Beton polos Kg 3.600 13,000.00
Kawat Beton Kg 0.050 17,500.00
Semen Portland Kg 5.500 1,560.00
Pasir Beton M³ 0.009 150,000.00
Koral Beton M³ 0.015 250,000.00
Tenaga
Pekerja Oh 0.100 85,000.00
Tukang Batu Oh 0.033 100,000.00
Tukang Kayu Oh 0.033 100,000.00
Tukang Besi Oh 0.033 100,000.00
Kepala Tukang Oh 0.010 120,000.00
Mandor Oh 0.005 120,000.00
Sub Total
Overhead & Profit 15%
Harga Satuan Pekerjaan
6.46 D. Membuat Kuda-Kuda Beton Bertulang (10X15cm) (m³)
SNI 03-2835-2002 Bahan
Kayu Klas III, papan M³ 0.003 1,200,000.00
Paku Biasa 2"-5" Kg 0.020 20,000.00
Besi Beton polos Lt 3.600 13,000.00
Kawat Beton Kg 0.050 17,500.00
Semen Portland Kg 5.500 1,560.00
Pasir Beton Kg 0.009 150,000.00
Koral Beton M³ 0.015 250,000.00
Tenaga
Pekerja Oh 0.100 85,000.00
Tukang Batu Oh 0.033 100,000.00
Tukang Kayu Oh 0.033 100,000.00
Tukang Besi Oh 0.033 100,000.00
Kepala Tukang Oh 0.010 120,000.00
Mandor Oh 0.005 120,000.00
Sub Total
6.5 E. Membuat Plat Beton 1Pc:2Ps:3Kr (m³)
SNI 03-2835-2002 Bahan
Semen Portland Kg 232.000 1,560.00
Pasir Beton M³ 0.520 150,000.00
Koral Beton M³ 0.780 250,000.00
Tenaga
Pekerja Oh 1.650 85,000.00
Tukang Batu Oh 0.250 100,000.00
Kepala Tukang Oh 0.025 120,000.00
Mandor Oh 0.080 120,000.00
Sub Total
6.25 F. Pembesian Besi Polos dan Ulir plat beton(Kg)
SNI 03-2835-2002 Bahan
Besi Beton (Polos/Ulir) Kg 1.050 13,000.00
Kawat Beton Kg 0.015 17,500.00
Tenaga
Pekerja Oh 0.007 85,000.00
Tukang Besi Oh 0.007 100,000.00
Kepala Tukang Oh 0.001 120,000.00
Mandor Oh 0.0003 120,000.00
Sub Total
6.32 G. Pasang Bekisting untuk Plat Beton (m²)
SNI 03-2835-2002 Bahan
Kayu Klas III, papan M³ 0.040 1,200,000.00
Paku Biasa 2"-5" Kg 0.400 20,000.00
Minyak Bekisting Lt 0.200 10,000.00
Kayu Klas III, balok M³ 0.015 1,200,000.00
Plywood tebal 9 mm Lbr 0.350 100,000.00
Dolken Kayu galam Ø 8-10/4 m Btg 6.000 8,000.00
Tenaga
Pekerja Oh 0.320 85,000.00
Tukang kayu Oh 0.330 100,000.00
Kepala Tukang Oh 0.033 120,000.00
Mandor Oh 0.006 120,000.00
Sub Total

VIII PEKERJAAN PENUTUP ATAP


G. Memasang Rangka Baja Ringan M2
Bahan
Baja ringan canai dingin C75 M1 0.667 18,000.00
reng (Baja Ringan) M1 0.800 11,000.00
Plastik UV bergelombang 0.6 mm (2m x 4m) M2 1.620 36,000.00
Sekrup (Spandek) bh 12 1,000.00
Sekrup (Kaso dan Reng) bh 20 3,000.00
Talang / Jurai Canai Dingin M' 0.124 24,000.00
Tenaga
Pekerja Oh 0.400 85,000.00
Tukang Baja Ringan Oh 0.200 100,000.00
Kepala Tukang Oh 0.020 120,000.00
Mandor Oh 0.002 120,000.00
Sub Total

IX PEKERJAAN PLAFON
6.19 A. Pasang List Langit-langit Kayu Profil (m¹)
SNI 03-2835-2002 Bahan
Kayu Profil M¹ 1.100 6,666.67
Paku plafon Kg 0.010 18,000.00
Tenaga
Pekerja Oh 0.050 85,000.00
Tukang Kayu Oh 0.050 100,000.00
Kepala Tukang Oh 0.005 120,000.00
Mandor Oh 0.003 120,000.00
Sub Total
6.1 B. Langit-langit Asbes (m²)
SNI 03-2835-2002 Bahan
Pelat Asbes tebal 6mm M² 1.100 6,666.67
Paku plafon Kg 0.010 18,000.00
Tenaga
Pekerja Oh 0.030 85,000.00
Tukang Kayu Oh 0.070 100,000.00
Kepala Tukang Oh 0.007 120,000.00
Mandor Oh 0.002 120,000.00
Sub Total

X PEKERJAAN PENUTUP LANTAI DAN DINDING


Pek Tanah 6.11 A. Pekerjaan Urug Pasir Bawah Lantai (m³)
SNI 03-2835-2002 Bahan
Pasir Urug M³ 1.200 115,000.00
Tenaga
Pekerja Oh 0.300 85,000.00
Tukang Gali Oh 0.000 100,000.00
Kepala Tukang Oh 0.000 120,000.00
Mandor Oh 0.010 120,000.00
Sub Total
6.47 B. Pekerjaan Lantai (m²)
SNI 03-2835-2002 Bahan
Semen Portland Kg 11.380 1,560.00
Pasir Pasang M³ 0.042 115,000.00
Tenaga
Pekerja Oh 0.620 85,000.00
Tukang Batu Oh 0.350 100,000.00
Kepala Tukang Oh 0.035 120,000.00
Mandor Oh 0.030 120,000.00
Sub Total
6.42 C. Pasang Lantai Keramik 10X20 cm (m²)
SNI 03-2835-2002 Bahan
Ubin Keramik Artistik 10X20 cm Bh 720.00
Semen Portland Kg 11.380 1,560.00
Pasir Pasang M³ 0.042 115,000.00
Semen Warna Kg 0.000 13,000.00
Tenaga
Pekerja Oh 0.620 85,000.00
Tukang Batu Oh 0.350 100,000.00
Kepala Tukang Oh 0.035 120,000.00
Mandor Oh 0.030 120,000.00
Sub Total
6.3 D. Pasang Lantai Ubin Pc Abu-Abu 20X20 cm (m²)
SNI 03-2835-2002 Bahan
Ubin Abu-Abu 20X20 cm Bh 26.500 3,888.89
Semen Portland Kg 10.400 1,560.00
Pasir Pasang M³ 0.014 115,000.00
Tenaga
Pekerja Oh 0.270 85,000.00
Tukang Batu Oh 0.130 100,000.00
Kepala Tukang Oh 0.013 120,000.00
Mandor Oh 0.014 120,000.00
Sub Total
6.17 E. Pasang plint ubin pc abu-abu ukuran 10x30 cm (m²)
SNI 03-2835-2002 Bahan
Plint Ubin 10x30 cm Bh 3.530 2,700.00
Semen Portland Kg 1.560 1,560.00
Pasir Pasang M³ 0.003 115,000.00
Tenaga
Pekerja Oh 0.060 85,000.00
Tukang Batu Oh 0.030 100,000.00
Kepala Tukang Oh 0.003 120,000.00
Mandor Oh 0.003 120,000.00
Sub Total

XI PEKERJAAN KUNCI DAN KACA


6.2 A. Pasang Kunci Tanam Biasa dan Engsel
SNI 03-2835-2002 Bahan
Kunci Tanam Bh 1.000 65,000.00
Engsel Pintu Bh 1.000 12,000.00
Door holder Bh 1.000 27,000.00
Tenaga
Pekerja Oh 0.010 85,000.00
Tukang Kayu Oh 0.500 100,000.00
Kepala Tukang Oh 0.010 120,000.00
Mandor Oh 0.005 120,000.00
Sub Total
6.5 B. Pasang Engsel pintu (Bh)
SNI 03-2835-2002 Bahan
Engsel Pintu Bh 1.000 14,400.00
Tenaga
Pekerja Oh 0.005 85,000.00
Tukang Kayu Oh 0.500 100,000.00
Kepala Tukang Oh 0.005 120,000.00
Mandor Oh 0.000 120,000.00
Sub Total
6.6 C. Pasang Engsel Jendela Kupu-kupu (Bh)
SNI 03-2835-2002 Bahan
Engsel Jendela Bh 1.000 12,000.00
Tenaga
Pekerja Oh 0.010 85,000.00
Tukang Kayu Oh 0.100 100,000.00
Kepala Tukang Oh 0.010 120,000.00
Mandor Oh 0.001 120,000.00
Sub Total
6.12 D. Pasang Pegangan Pintu/Door holder (Bh)
SNI 03-2835-2002 Bahan
Door holder Bh 1.000 10,000.00
Tenaga
Pekerja Oh 0.050 85,000.00
Tukang Kayu Oh 0.500 100,000.00
Kepala Tukang Oh 0.050 120,000.00
Mandor Oh 0.003 120,000.00
Sub Total
6.16 E. Pasang Kaca tebal 3 mm (m²)
SNI 03-2835-2002 Bahan
Kaca tebal 3 mm M² 1.100 13,200.00
Tenaga
Pekerja Oh 0.015 85,000.00
Tukang Kayu Oh 0.150 100,000.00
Kepala Tukang Oh 0.015 120,000.00
Mandor Oh 0.001 120,000.00
Sub Total
6.23 F. Pasang Kaca wireglass tebal 5 mm (m²)
SNI 03-2835-2002 Bahan
Kaca Wireglass 5 mm M² 1.100 90,000.00
Tenaga
Pekerja Oh 0.015 85,000.00
Tukang Kayu Oh 0.150 100,000.00
Kepala Tukang Oh 0.015 120,000.00
Mandor Oh 0.001 120,000.00
Sub Total

XII PEKERJAAN PENGECATAN


ALS A. Pengecatan Kayu (m²)
Bahan
Cat Meni Kg 0.200 66,000.00
Kertas Gosok Lbr 0.400 10,000.00
Plamir Kg 0.150 13,000.00
Cat dasar Kg 0.170 12,000.00
Cat penutup 2 kali Kg 0.260 38,000.00
Minyak Cat Ltr 0.150 12,000.00
Kuas 3" Bh 0.050 12,000.00
Tenaga
Pekerja Oh 0.070 85,000.00
Tukang Cat Oh 0.009 100,000.00
Kepala Tukang Oh 0.006 120,000.00
Mandor Oh 0.003 120,000.00
Sub Total
ALS B. Pengecatan Tembok Baru (m²)
Bahan
Plamir Kg 0.100 13,000.00
Kertas gosok LBR 1.000 3,000.00
Cat Dasar Kg 0.100 12,000.00
Cat Penutup 2x Kg 0.260 38,000.00
Tenaga
Pekerja Oh 0.020 85,000.00
Tukang Cat Oh 0.063 100,000.00
Kepala Tukang Oh 0.006 120,000.00
Mandor Oh 0.003 120,000.00
Sub Total

XIII PEKERJAAN INSTALASI LISTRIK


ALS A. Penyambungan Listrik PLN 1300 watt (LS)
Penyambungan PLN LS 1.000 1,300,000.00
ALS B. Pemasangan Lampu SL 25 Watt (Bh)
Lampu SL 25 Watt Bh 1.000 25,000.00
ALS C. Pemasangan Sekering Group (Bh)
Sekering Group Bh 1.000 17,500.00
ALS D. Pemasangan Stop Kontak (Bh)
Stop kontak Bh 1.000 12,500.00
ALS E. Pemasangan Sakelar Tunggal (Bh)
Sakelar Tunggal Bh 1.000 12,500.00
ALS F. Pemasangan Sakelar Ganda (Bh)
Sakelar Ganda Bh 1.000 12,500.00

XIV PEKERJAAN SANITASI


6.2 A. Memasang Kloset Jongkok Porselen (Bh)
SNI 03-2835-2002 Bahan
Kloset Jongkok Bh 1.000 150,000.00
Semen Portland Kg 6.000 1,560.00
Pasir Pasang M3 0.010 115,000.00
Tenaga
Pekerja Oh 1.000 85,000.00
Tukang Batu Oh 1.500 100,000.00
Kepala Tukang Oh 1.500 120,000.00
Mandor Oh 0.160 120,000.00
Sub Total
6.8 B. Memasang Bak Mandi Bata Bata, Vol 0.3 M³ (Bh)
SNI 03-2835-2002 Bahan
Batu Bata Bh 100.000 600.00
Semen Portland Kg 120.000 1,560.00
Pasir Pasang M3 0.300 115,000.00
Porselen (11x11) Cm Bh 360.000 600.00
Semen Nat Kg 6.000 13,000.00
Tenaga
Pekerja Oh 6.000 85,000.00
Tukang Batu Oh 3.000 100,000.00
Kepala Tukang Oh 0.300 120,000.00
Mandor Oh 0.300 120,000.00
Sub Total
6.35 C. Memasang Kran Air Ø ½" atau ¾" (Bh)
SNI 03-2835-2002 Bahan
Kran Air bh 1.000 15,000.00
Sealm Tape Bh 0.500 3,600.00
Tenaga
Pekerja Oh 0.010 85,000.00
Tukang Batu Oh 0.100 100,000.00
Kepala Tukang Oh 0.010 120,000.00
Mandor Oh 0.005 120,000.00
Sub Total
6.27 D. Memasang pipa PVC tipe AW Ø 1" (m¹)
SNI 03-2835-2002 Bahan
Pipa PVC m¹ 1.200 12,600.00
Perlengkapan 35 % harga pipa 0.350 15,120.00
Tenaga
Pekerja Oh 0.081 85,000.00
Tukang Batu Oh 0.135 100,000.00
Kepala Tukang Oh 0.014 120,000.00
Mandor Oh 0.004 120,000.00
Sub Total
6.32 E. Memasang pipa PVC tipe AW Ø 4" (m¹)
SNI 03-2835-2002 Bahan
Pipa PVC m¹ 1.200 50,000.00
Perlengkapan 35 % harga pipa 0.350 60,000.00
Tenaga
Pekerja Oh 0.081 85,000.00
Tukang Batu Oh 0.135 100,000.00
Kepala Tukang Oh 0.014 120,000.00
Mandor Oh 0.004 120,000.00
Sub Total
6.17 F. Memasang Bak kontrol Pas Batu Bata 45X45 cm (Bh)
SNI 03-2835-2002 Bahan
Batu Bata M3 0.250 600.00
Semen Portland Kg 77.000 1,560.00
Pasir Pasang M3 0.130 115,000.00
Batu Kerikil M3 0.020 165,000.00
Besi Beton Kg 2.600 13,000.00
Pasir Beton M3 0.090 150,000.00
Tenaga
Pekerja Oh 1.420 85,000.00
Tukang Batu Oh 0.473 100,000.00
Kepala Tukang Oh 0.047 120,000.00
Mandor Oh 0.071 120,000.00
Sub Total
Total Harga Satuan
(Rp)

E Overhead & Profit 10% 10% -


8,500.00 F Harga Satuan Pekerjaan (D+E) - -
6,000.00
14,500.00
2,175.00
16,675.00

10,000.00
3,900.00
750.00
2,250.00
86,400.00
1,200.00
4,000.00

20,000.00
34,000.00
2,400.00
2,400.00
167,300.00

144,000.00
400.00
8,400.00

10,000.00
8,500.00
1,200.00
600.00
173,100.00
25,965.00
199,065.00

4,410.00
12,000.00
37,800.00
57,000.00
26,208.00
4,050.00
10,250.00

100,000.00
1,800.00
100,000.00
252,000.00
120,600.00
726,118.00

10,000.00
216,000.00
17,000.00
12,100.00
54,600.00
17,250.00
15,000.00
37,500.00
18,000.00
6,750.00
25,000.00
1,056.00
9,750.00
3,420.00

95,000.00
42,500.00
72,000.00
36,000.00
2,000.00
690,926.00

34,000.00 0.75
4,800.00 0.025
38,800.00
5,820.00
44,620.00

16,320.00 0.25
2,280.00 0.025
18,600.00
2,790.00
21,390.00

138,000.00

25,500.00 0.3
1,200.00 0.01
164,700.00
24,705.00
189,405.00

143,000.00 1.2
212,160.00 136
62,560.00 0.544

127,500.00 1.5
60,000.00 0.75
7,200.00 0.075
9,000.00 0.075
621,420.00
93,213.00
714,633.00
42,000.00
17,940.00
4,945.00

27,200.00
10,000.00
1,200.00
1,800.00
105,085.00
15,762.75
120,847.75

42,000.00
7,020.00
5,750.00
675.00

27,200.00
10,000.00
1,200.00
1,800.00
95,645.00
14,346.75
109,991.75

16,848.00
2,990.00

21,250.00
20,000.00
2,400.00
1,500.00
64,988.00
9,748.20
74,736.20

2,870.40
270.00
1,610.00

17,000.00
15,000.00
1,800.00
1,200.00
39,750.40
5,962.56
45,712.96

0.02
18,000.00
10,000.00 7000
3,000.00

17,000.00 0.4 Dynabol dia 12 x 120 mm


10,000.00 0.2
1,200.00 0.02
1,200.00 0.002
60,400.00
9,060.00
69,460.00
G. Memasang Rangka Baja Ringan M2
Bahan
18,000.00 Kaso (Baja Ringan) M3 0.667 - -
10,000.00 reng (Baja Ringan) Kg 0.800 #REF! #REF!
1,000.00
Spandek Ukuran 0.3 mm (2m x 4m) M3 1.620 #REF! #REF!
17,000.00 Sekrup (Spandek) M3 12.000 #REF! #REF!
10,000.00 Sekrup (Kaso dan Reng) Kg 20.000 #REF! #REF!
1,200.00 Tenaga
1,200.00
58,400.00 Pekerja Oh 0.400 100,000.00 40,000.00
8,760.00 Tukang Baja Ringan Oh 0.200 120,000.00 24,000.00
67,160.00 Kepala Tukang Oh 0.020 120,000.00 2,400.00
Mandor Oh 0.002 - -
Sub Total #REF!
1,320,000.00

170,000.00
800,000.00
144,000.00
24,000.00
2,458,000.00

16,800.00
3,000.00

8,500.00
10,000.00
1,200.00
600.00
40,100.00

158.40
1,200.00

8,500.00
10,000.00
1,200.00
6,000.00
27,058.40

14,400.00
2,000.00

12,750.00
25,000.00
3,000.00
9,000.00
66,150.00
D-17r2 1 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15
- 0 M3 0.2700 - -
- Paku Biasa 2 Kg 2.0000 - -
324,000.00 - Minyak Beki Ltr - -
40,000.00 - 0 Kg 180.0000 - -
6,000.00 - Kawat Beto Kg 3.0000 - -
2,340,000.00 - Semen Portl Kg 323.0000 - -
52,500.00 - Pasir Beton M3 0.5200 - -
503,880.00 - Koral Beton M3 0.7800 - -
78,000.00 - Pekerja Oh 4.8500 - -
195,000.00 - Tukang Bat Oh 0.3500 - -
- Tukang Kay Oh 1.5600 - -
412,250.00 - Tukang Besi Oh 1.4000 - -
35,000.00 - Kepala Tuka Oh 0.3310 - -
156,000.00 - Mandor Oh 0.1700 - -
140,000.00 Jumlah -
39,720.00 Dibulatkan -
20,400.00
4,342,750.00
651,412.50
4,994,162.50
D-18r 1 M3 Kolom Beton Tulang 20/20 (140 kg besi + bekisting) 4dia. 12 8-15
- Kayu papan M3 0.4000 - -
480,000.00 - Paku Biasa 2 Kg 4.0000 - -
80,000.00 - Minyak Beki Ltr - -
20,000.00 - Besi Beton Kg 140.0000 - -
1,820,000.00 - Kawat Beto Kg 1.8000 - -
31,500.00 - Semen Portl Kg 323.0000 - -
503,880.00 - Pasir Beton M3 0.5200 - -
78,000.00 - Koral Beton M3 0.7800 - -
195,000.00 - Kayu Balok M3 0.1500 - -
180,000.00 - 0 Lbr 3.5000 - -
350,000.00 - Dolken Ø-8 Btg 20.0000 - -
160,000.00 - Pekerja Oh 7.3000 - -
- Tukang Bat Oh 0.3500 - -
620,500.00 - Tukang Kay Oh 3.3000 - -
35,000.00 - Tukang Besi Oh 2.1000 - -
330,000.00 - Kepala Tuka Oh 0.5700 - -
210,000.00 - Mandor Oh 0.2500 - -
68,400.00 Jumlah -
30,000.00 Dibulatkan -
5,192,280.00
778,842.00
5,971,122.00
D-36 1 M' Ring Balok Beton Tulang (10x15) cm
- Koral Beton M3 0.0030 - -
3,600.00 - Paku Biasa 2 Kg 0.0200 - -
400.00 - Besi Beton Kg 3.6000 - -
46,800.00 - Kawat Beto Kg 0.0500 - -
875.00 - Semen Portl Kg 5.5000 - -
8,580.00 - Pasir Beton M3 0.0090 - -
1,350.00 - Koral Beton M3 0.0150 - -
3,750.00 - Pekerja Oh 0.1000 - -
- Tukang Bat Oh 0.0330 - -
8,500.00 - Tukang Kay Oh 0.0330 - -
3,300.00 - Tukang Besi Oh 0.0330 - -
3,300.00 - Kepala Tuka Oh 0.0100 - -
3,300.00 - Mandor Oh 0.0050 - -
1,200.00 Jumlah -
600.00 Dibulatkan -
85,555.00
12,833.25
98,388.25

3,600.00
400.00
46,800.00
875.00
8,580.00
1,350.00
3,750.00

8,500.00
3,300.00
3,300.00
3,300.00
1,200.00
600.00
85,555.00
361,920.00
78,000.00
195,000.00

140,250.00
25,000.00
3,000.00
9,600.00
812,770.00

13,650.00 10.5
262.50 0.15

595.00 0.07
700.00 0.07
84.00 0.007
36.00 0.004
15,327.50

48,000.00
8,000.00
2,000.00
18,000.00
35,000.00
48,000.00

27,200.00
33,000.00
3,960.00
720.00
223,880.00

G. Memasang Rangka Baja Ringan M2


Bahan
Kaso (Baja Ringan) M3 0.667 3,600.00 2,401.20
12,006.00 reng (Baja Ringan) Kg 0.800 115,000.00 92,046.00
8,804.40 Spandek Ukuran 0.3 mm (2m x 4m) M3 1.620 18,000.00 29,160.00
58,320.00 Sekrup (Spandek) M3 12.000 85,000.00 1,020,000.00
12,000.00 Sekrup (Kaso dan Reng) Kg 20.000 100,000.00 2,000,000.00
60,000.00 Tenaga
2,976.00
Pekerja Oh 0.400 85,000.00 34,000.00
34,000.00 Tukang Baja Ringan Oh 0.200 100,000.00 20,000.00
20,000.00 Kepala Tukang Oh 0.020 120,000.00 2,400.00
2,400.00 Mandor Oh 0.002 120,000.00 240.00
240.00 Sub Total 3,200,247.20
210,746.40
A.4.2.1.2Pemasangan 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/METAL
No Uraian Kode Satuan Koefisien Harga Satuan (RJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 #N/A #N/A
7,333.33 Tukang BesL.02.05 OH 0.4500 #N/A #N/A
Kepala TukL.03.01 OH 0.0100 #N/A #N/A
Mandor L.04.01 OH 0.0500 #N/A #N/A
4,250.00 JUMLAH TENAGA KERJA #N/A
5,000.00 B BAHAN
600.00 Baja ringan canai ding M' 3.7200 -
360.00 Baut (Srew driver) bh 28.0000 -
17,543.33 Dynabol dia 12 x 120 bh 2.0000 -
Reng Canai Dingin M' 5.4000 -
Talang / Jurai Canai D M' 0.1240 -
7,333.33 JUMLAH HARGA BAHAN -
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000 -
2,550.00 JUMLAH HARGA ALAT -
7,000.00 D Jumlah (A+B+C) - #N/A
840.00 E Overhead & Profit 10% 10% #N/A
180.00 F Harga Satuan Pekerjaan (D+E) - #N/A
17,903.33

138,000.00

25,500.00
-
-
1,200.00
164,700.00

17,752.80
4,830.00

52,700.00
35,000.00
4,200.00
3,600.00
118,082.80

-
17,752.80
4,830.00
-

52,700.00
35,000.00
4,200.00
3,600.00
118,082.80

103,055.56
16,224.00
1,552.50

22,950.00
13,000.00
1,560.00
1,620.00
159,962.06

9,531.00
2,433.60
345.00
5,100.00
3,000.00
360.00
360.00
21,129.60

65,000.00
12,000.00
27,000.00

850.00
50,000.00
1,200.00
600.00
156,650.00

14,400.00

425.00
50,000.00
600.00
30.00
65,455.00

12,000.00

850.00
10,000.00
1,200.00
60.00
24,110.00

10,000.00

4,250.00
50,000.00
6,000.00
300.00
70,550.00

14,520.00

-
-
-
-
14,520.00

99,000.00

1,275.00
15,000.00
1,800.00
90.00
117,165.00

13,200.00
4,000.00
1,950.00
2,040.00
9,880.00
1,800.00
600.00

5,950.00
900.00
720.00
300.00
41,340.00
1,300.00
3,000.00
1,200.00
9,880.00

1,700.00
6,300.00
720.00
300.00
24,400.00

1,300,000.00

25,000.00

17,500.00

12,500.00

12,500.00

12,500.00

150,000.00
9,360.00
1,150.00

85,000.00
150,000.00
180,000.00
19,200.00
594,710.00

60,000.00
187,200.00
34,500.00
216,000.00
78,000.00

510,000.00
300,000.00
36,000.00
36,000.00
1,457,700.00

15,000.00
1,800.00

850.00
10,000.00
1,200.00
600.00
29,450.00

15,120.00
5,292.00

6,885.00
13,500.00
1,620.00
492.00
42,909.00

60,000.00
21,000.00

6,885.00
13,500.00
1,620.00
492.00
103,497.00
150.00
120,120.00
14,950.00
3,300.00
33,800.00
13,500.00

120,700.00
47,300.00
5,640.00
8,520.00
367,980.00
mlah Harga (Rp.)
Rencanana Anggaran Biaya
Pekerjaan :
Lokasi :
Tahun :

Harga Satuan Jumlah Harga


No Jenis Pekerjaan Satuan Volume Total Harga (Rp)
(Rp) (Rp)

A PEKERJAAN PERSIAPAN 4,631,500.00


1 Pembersihan Lahan m² 24.000 16,675.00 400,200.00
3 Memasang Bouwplank m¹ 20.000 199,065.00 3,981,300.00
7 Mob & Demob Alat Ls 1.000 250,000.00 250,000.00

B PEKERJAAN TANAH 314,074.20


1 Galian Tanah Biasa sedalam 1 m m³ 4.800 44,620.00 214,176.00
2 Urugan Kembali m³ 0.420 21,390.00 8,983.80
3 Urugan Pasir Bawah Pondasi m³ 0.480 189,405.00 90,914.40

C PEKERJAAN PONDASI 1,700,826.54


1 Pasangan Pondasi Batu Kali 1 Pc: 5 Ps m³ 2.380 714,633.00 1,700,826.54

D PEKERJAAN DINDING 2,457,098.63


1 Pasangan Tembok ½ Bata 1Pc:4Ps (Trasraam) m² 8.500 120,847.75 1,027,205.88
2 Pasangan Tembok ½ Bata 1Pc:3Kp:10Ps m² 13.000 109,991.75 1,429,892.75

E PEKERJAAN PLESTERAN DINDING 1,229,526.18


1 Plesteran Dinding 1Pc:3Ps tebal 20 mm m² 8.500 74,736.20 635,257.70
2 Plesteran Dinding 1Pc:3Kp:10Ps tebal 15 mm m² 13.000 45,712.96 594,268.48
F PEKERJAAN BAJA RINGAN 7,418,052.00
1 Pasang Kusen Pintu dan Jendela baja ringan m1 95.000 69,460.00 6,598,700.00
2 Pasang Pintu Panel Baja ringan m1 12.200 67,160.00 819,352.00
3

G PEKERJAAN BETON 9,543,942.00


1 Membuat sloof Beton Bertulang (200Kg besi+bekisting) m³ 0.720 4,994,162.50 3,595,797.00
2 Membuat Kolom Beton Bertulang (300Kg besi+bekisting) m³ 0.600 4,994,162.50 2,996,497.50
3 Membuat Ring Balok (200Kg besi+bekisting) m1 30.000 98,388.25 2,951,647.50

H PEKERJAAN PENUTUP ATAP 9,006,256.41


1 Memasang Rangka Baja Ringan M2 m2 42.735 210,746.40 9,006,256.41

J PEKERJAAN PENUTUP LANTAI DAN DINDING 3,031,627.20


1 Pekerjaan Urug Pasir Bawah Lantai m³ 1.200 164,700.00 197,640.00
2 Pekerjaan Lantai (m²) m² 24.000 118,082.80 2,833,987.20

K PEKERJAAN KUNCI DAN KACA 156,650.00


1 Pasang Kunci Tanam Biasa, Door holder dan Engsel Bh 1.000 156,650.00 156,650.00

L PEKERJAAN PENGECATAN 524,600.00


2 Pengecatan Tembok Baru m² 21.500 24,400.00 524,600.00
M PEKERJAAN INSTALASI LISTRIK 62,500.00
1 Pemasangan Lampu SL 25 Watt Bh 2.000 25,000.00 50,000.00
2 Pemasangan Sakelar Tunggal Bh 1.000 12,500.00 12,500.00

N PEKERJAAN SANITASI 230,536.00


3 Memasang Kran Air Ø ½" atau ¾" Bh 2.000 29,450.00 58,900.00
4 Memasang pipa PVC tipe AW Ø 1" m¹ 4.000 42,909.00 171,636.00
Daftar Rekapitulasi Rencanana Anggaran Biaya
Pekerjaan :
Lokasi :
Tahun :

No Jenis Pekerjaan Harga (Rp)


I PEKERJAAN PERSIAPAN Rp 4,631,500.00
II PEKERJAAN TANAH Rp 314,074.20
III PEKERJAAN PONDASI Rp 1,700,826.54
IV PEKERJAAN DINDING Rp 2,457,098.63
V PEKERJAAN PLESTERAN DINDING Rp 1,229,526.18
VI PEKERJAAN BAJA RINGAN Rp 7,418,052.00
VII PEKERJAAN BETON Rp 9,543,942.00
VIII PEKERJAAN PENUTUP ATAP Rp 9,006,256.41
IX PEKERJAAN PLAFON Rp -
X PEKERJAAN PENUTUP LANTAI DAN DINDING Rp 3,031,627.20
XI PEKERJAAN KUNCI DAN KACA Rp 156,650.00
XII PEKERJAAN PENGECATAN Rp 524,600.00
XIII PEKERJAAN INSTALASI LISTRIK Rp 62,500.00
XIV PEKERJAAN SANITASI Rp 230,536.00
TOTAL JUMLAH Rp 40,076,653.16
dibulatkan Rp 40,076,000.00
Rp (4,923,346.84)
Daftar Harga Bahan
Pekerjaan :
Lokasi :
Tahun :

No Bahan Satuan Harga (Rp)


1 Dolken Kayu Ø 8-10/400 cm Btg Rp 8,000.00
2 Semen Portland Kg Rp 1,560.00
3 Pasir Beton M³ Rp 150,000.00
4 Koral Beton M³ Rp 250,000.00
5 Kayu 5/7 M³ Rp 1,200,000.00
6 Paku Biasa 2"-5" Kg Rp 20,000.00
7 Residu Lt Rp 10,000.00
8 Kayu Papan Bengkirai 3/20 M³ Rp 3,000,000.00
9 Besi Strip Kg Rp 11,000.00
10 Pasir Pasang M³ Rp 115,000.00
11 Seng Plat Lbr Rp 27,000.00
12 Jendela Nako 12 kaca/1m Bh Rp 12,500.00
13 Kaca Polos 3 mm M² Rp 13,200.00
14 Kunci Tanam Bh Rp 25,000.00
15 Plywood 4 mm Lbr Rp 57,000.00
16 Pasir Urug M³ Rp 115,000.00
17 Batu Belah 15/20 cm M³ Rp 130,000.00
18 Bata Merah 5 X 11 X 22 cm Bh Rp 600.00
19 Kapur Padam M³ Rp 45,000.00
20 Kayu Klas I, balok M³ Rp 10,000,000.00
21 Kayu Klas I, papan M³ Rp 5,000,000.00
22 Kayu Klas III, balok M³ Rp 1,200,000.00
23 Kayu Klas III, papan M³ Rp 1,200,000.00
24 Baja Ringan Canal C M1 Rp 18,000.00
25 Insect Screen M³ Rp 10,000.00
26 Kayu Bakar Btg Rp 126,000.00
27 Kayu Terentang M³ Rp 1,200,000.00
28 Minyak Bekisting Lt Rp 10,000.00
29 Besi Beton polos Kg Rp 13,000.00
30 Kawat Beton Kg Rp 17,500.00
31 Kayu Albasiah M³ Rp 1,200,000.00
32 Plywood tebal 9 mm Lbr Rp 100,000.00
33 Ubin Abu-Abu 20X20 cm Bh Rp 3,888.89
34 Plint Ubin 10x30 cm Bh Rp 2,700.00
35 Kunci Tanam Biasa Bh Rp 65,000.00
36 Engsel Pintu Bh Rp 14,400.00
37 Engsel Jendela Bh Rp 12,000.00
38 Door holder Bh Rp 10,000.00
39 Kaca Wireglass 5 mm M² Rp 90,000.00
40 Cat Meni Kg Rp 66,000.00
41 Kertas Gosok kayu Lbr Rp 10,000.00
42 Plamir Kg Rp 13,000.00
43 Cat dasar kayu Kg Rp 12,000.00
44 Cat penutup 2 kali Kg Rp 38,000.00
45 Minyak Cat Ltr Rp 12,000.00
46 Kuas 3" Bh Rp 12,000.00
47 Plamir Kg Rp 13,000.00
48 Kertas gosok tembok Lbr Rp 3,000.00
49 Cat Dasar tembok Kg Rp 12,000.00
50 Cat Penutup 2x Kg Rp 38,000.00
51 Kloset Jongkok Porselen Bh Rp 150,000.00
52 Porselen (11x11) Cm Bh Rp 600.00
53 Semen Nat Kg Rp 13,000.00
54 Kran Air bh Rp 15,000.00
55 Sealm Tape Kg Rp -
56 Pipa PVC 1" m¹ Rp 12,600.00
57 Pipa PVC 4" m¹ Rp 50,000.00
58 Batu Kerikil M3 Rp 165,000.00
59 Besi Beton Kg Rp 13,000.00
60 Genteng Bubung Palentong Bh Rp 7,500.00
61 Genteng Beton Bh Rp 5,500.00
62 Kayu Profil M¹ Rp 6,666.67
63 Paku plafon Kg Rp 18,000.00
64 Kaso (Baja Ringan) m¹ Rp 18,000
65 reng (Baja Ringan) m¹ Rp 11,000
66 Spandek Ukuran 0.3 mm (2m x 4m) m2 Rp 36,000.00
67 Sekrup (Spandek) bh Rp 900.00
68 Sekrup (Kaso dan Reng) bh Rp 900.00
69 Pelat Asbes tebal 6mm M² Rp 32,000.00
70 Ubin Keramik 30X30 cm Bh Rp 4,000.00
71 Semen Warna Kg Rp 13,000.00
72 Ubin Keramik Artistik 10X20 cm Bh Rp 720.00
73 Septic tank + Resapan Bh Rp 2,500,000.00

No Tenaga Sat Harga


1 Pekerja Oh Rp 85,000.00
2 Tukang Batu Oh Rp 100,000.00
3 Tukang Kayu Oh Rp 100,000.00
4 Tukang Besi Oh Rp 100,000.00
5 Tukang Gali Oh Rp 100,000.00
6 Tukang Cat Oh Rp 100,000.00
7 Tukang Politur Oh Rp 100,000.00
8 Kepala Tukang Oh Rp 120,000.00
9 Mandor Oh Rp 120,000.00
10 Masinis/operator Oh Rp 100,000.00
11 Kernet Oh Rp 85,000.00
12 Pekerja malam Oh Rp 80,000.00
Stok di pasaran

40kg/holcim 42,000.00

4m 85,000.00 0.024
41.666666667
3,541,666.67

126,000

9bh 35,000.00 3,888.89 B KELOMPOK MATERIAL KAYU


1 Kayu Bekisting Kelas III
2 Kayu Dolken Dia.8-10 Cm Panjang 4 Meter
3 Kayu Kelas II
4 Kayu Listplank
5 Papan 2 x 20 x 400 Cm
6 Lem Kayu
7 Listplank GRC L = 20 cm
8 Triplek 9 mm
9 Triplek 3 mm
10 List Kayu

E KELOMPOK MATERIAL CAT


1 Cat Dasar Kayu
2 Cat Kayu Mengkilat
435.6 3 Cat Menie Kayu
4 Cat Tembok
5 Pernis
bh 3,600.00 6 Plamir
4m 25,000.00 6,250.00 7 Residu/Teer
4m 85,000.00 21,250.00
336000 84000

84 F KELOMPOK MATERIAL PINTU/JENDELA


1 Engsel Kuningan 2"
3m 10,000.00 2 Engsel Kuningan 4"
3 Grendel 2 "
18000 4 Hak Angin
11000 5 Kaca Polos/Bening 5 mm
108000 6 Kunci Tanam Biasa
16000
G KELOMPOK MATERIAL SANITASI
1 Buis Beton 80 cm
9bh 36,000.00 4,000.00 2 Floor Drain
3 Ijuk Saringan
9bh 36,000.00 720.00 4 Isolatif Pipa
5 Kloset Jongkok
6 Kran
7 Pipa Leiding 1 1/2 " Galvanis Tebal 3.2 mm

8 Pipa Leiding 1 1/2 " Galvanis Tebal 3.2 mm

9 Pipa PVC 3" SNI


10 Pipa PVC 3" SNI
11 Pipa PVC 3/4" SNI
12 Pipa PVC 3/4" SNI
13 Pipa PVC 4" SNI
14 Pipa PVC 4" SNI

H KELOMPOK MATERIAL ELEKTRIKAL


1 Box Sekring
2 Pipa Listrik
3 Saklar Ganda
4 Saklar Tunggal
5 Stop Kontak + Instalasi
6 Wayar NYA 1,5 mm
7 Zekering ( Kast Lolak 2 Zekering )
3,000,000.00 M³
Cm Panjang 4 Meter 35,000.00 Batang
3,700,000.00 M³
3,700,000.00 M³
3,700,000.00 M³
25,000.00 Kg
45,000.00 M
160,000.00 Lembar
60,000.00 Lembar
15,000.00 M
10,000.00 Kg
62,500.00 Kg
19,000.00 Kg
43,000.00 Kg
17,000.00 Liter
10,000.00 Kg
3,500.00 Kg

AL PINTU/JENDELA
30,000.00 Bh
40,000.00 Bh
15,000.00 Bh
15,000.00 Bh
105,000.00 M²
100,000.00 Bh

AL SANITASI
285,000.00 Bh
25,000.00 Bh
14,000.00 Kg
7,000.00 Bh
120,000.00 Bh
64,000.00 Bh
alvanis Tebal 3.2 mm 193,000.00 Batang

alvanis Tebal 3.2 mm 32,166.67 M

105,000.00 Batang
17,500.00 M
68,000.00 Batang
11,333.33 M
130,000.00 Batang
21,666.67 M

RIAL ELEKTRIKAL
74,500.00 Bh
23,000.00 Batang
35,000.00 Bh
12,000.00 Bh
35,000.00 Bh
155,000.00 Rol
ak 2 Zekering ) 165,000.00 Bh
kolom 0.1 0.6
sloof 0.03 0.72
ringbalok 0.03 30
kuda2 baja ringan
p 6 7
l 4 5
sudut 35 0.819
volume kuda2 42.73504
atap

95.000 baja ringan untuk dinding dan pintu


12.200 kusen pintu dan pintu
107.200
52.96