Dinding Penahan Tanah

Borelog 1
data
ϕ = 18
γ = 16.677 kN/m3
c = 0
q = 14.0096 kN/m
γbeton = 24 kN/m3
μ = 1
γ' = 6.583
Perhitungan
Ka = 0.527864045
Ha1 = L. Persegi
= 14.7903282497
Ha2 = L.Segitiga
= 17.6063773569

1) Terhadap Guling
No. Luas (m2) Weight (kN/m') Jarak ke titik Pusat
1 0.68 16.32 1.3
2 1.8 43.2 1.5
3 3.2 53.3664 2.2
112.8864

Mb = 203.42208
Mo = 26.5279131543
Cek Guling
7.6682278 > 3 Oke

2) Terhadap geser

F = 32.3967056066
Ha = 112.8864
Cek Geser
3.4845024 > 3 Oke

3) Terhadap Tekanan Danah Dasar


a) Jarak Resultan gaya dari titik O adalah
x= 1.5670104357 m

e= -0.0670104357 m

cek kontrol e < B/6


oke
maka,
Rv 1+
L -

D 2
γ dibawah dpt 21.7782
c dibawah dpt 0
ϕ = 18
maka
Nc = 15.78
Nq = 6.2
Ny = 4

q 43.5564 kN/m2
B' 3.1340208713 m

Fqd = 1.0215987655
Fcd = 1.0227264966
Fγd = 1
Pv = 17.6063773569
ϕ (cari) = 8.8647430898
Fst = 0.8127073968
Fγt = 0.2575707371

cNcFsdFst = 0
qNqFqdFst = 72.1160609257
0,5BYNyFydFyt = 26.9244183

Qu 99.0404792509
Qa 39.6161917004

qtoe = -32.5857554362 kN/m2


qwheel = -42.6718445638 kN/m2

qtoe = 32.5857554362 kN/m2


qwheel = 42.6718445638 kN/m2
Cek Kontrol Qa/qtoe >3
3.0393795671 > 3
Aman
Dinding Penahan Tanah

Dimensi H tot = 4
H didalam tanah = 2
d = 0.2
x2 = 1.6
x1 = 1.2
x3 = 0.6
b = 3

Hatanah = 1.55 H
H air = 0.45
Sigma Momen = 26.5279131543

0.5

Momen
21.216
64.8
117.40608
203.42208

1.1
6e
L

kN/m3

Terzaghi

< Qa(2 meter)


< Qa (2 meter)
d

1/2 H

x3

x1 x2

Berat Pelat= 3.532 kN/m2


Adl = 1.756 kN/m2
Beban Mati 5.288
Beban Hidup 4.79

14.0096
Penulangan

1) Desain Penulangan Lentur pada bagian dinding


a. Tulangan Lentur
titik kritis adalah pertemuan antara toe dan heel, dengan H = 2-0,5 = 1,5
fc' = 30 Mpa
fy = 420 Mpa

H kritis = 1.4

Ha1 = 16.5651676396
Ha2 = 13.8033998478

Mu = 18.0372039434 kN.m

tebal dinding = 0.2 m


200 mm
b = 5000 mm
d = 115.5 mm

Rn = 0.3004641999
Rho perlu = 0.0007196561
As perlu = 415.601369338 mm2
As min = 912.45 mm2

digunakan
asumsi jarak = 150
1890.19157991
Aman

b. Tulangan Horizontal sebagai tulangan susut dan suhu


yang diperlukan pada dasar dinding
tebal dasar dinding = 200
SNI pasal 14,3,4
Asmin 2000 mm2

sebenarnya dalam sni pasal 14.3.4


apabila tebal dinding > 250 mm maka membutuhkan tulangan hrizontal dengan faktor peng
Asmin (2) = 1000 mm2

maka dipasang asumsi tulangan =


asumsi jarak = 125 mm
1608.49543864
Aman

c. Desain titik kritis terhadap Kondisi geser


d = 115.5 mm
letak dari tepi atas dinding = 1.2845 m

Ha1 = 15.1985413094 kN
Ha2 = 11.6197882632 kN

Vu = 26.8183295725 kN
φVn = 403294.965623 N
403.294965623 kN

Aman

2) Desain Bagian tumit (heel)


Vu = 89.432748234 kN
φVc = 403294.965623 N
403.294965623 kN

aman

Mu = 76.0178359989 kN.m
Rn = 1.2663070365
rho Perlu = 0.0030938439
As perlu = 1786.69486382 mm2
As miin = 1925 mm2

digunakan
asumsi jarak = 100
3801.32711084
Aman

3) Desain Toe
q di d 38.83
jarak toe ke d 1084.5 m
1.0845 mm
Vu = 74.6149108329
φVc = 403294.965623 N
403.294965623 kN
Aman

q deket d 38.4

Mu = 19.2739369063 kN.m
Rn = 0.3210657289
Rho perlu = 0.0007693162
As Perlu = 444.280134315 mm2
As min = 1925 mm2

maka dipasang asumsi tulangan =


asumsi jarak = 100 mm
3801.32711084
Aman
2-0,5 = 1,5

h/2 = 0.7
h/3 = 0.4666667

diameter tulangan = 19 Asumsi


= 9.5
selimut = 75

n hrizontal dengan faktor pengali 1/2 dan 2/3 dari Asmin

16 mm
diameter tulangan Dalam arah tegak lurus memakai
22 D 16 - 125
22 mm
Dalam arah tegak lurus memakai
D 16 - 125
0.0033333
x2 x3
Jenis Borelog d (m) x1 (m) b (m) Kondisi Guling ≥ 3
(m) (m)

Borelog 1 0.2 1.2 1.6 3 0.6 7.6682277576


Borelog 2 0.2 0.7 1.1 2 0.6 5.1706502376
Kondisi keruntuhan Tanah
Kontrol
Kontrol Kondisi Geser ≥ 3 Kontrol
qtoe Qu Qu/qtoe ≥ 3

Aman 3.4845024482 Aman 32.5857554362 99.0404792509 Aman


Aman 3.536249251 Aman 51.3676573626 173.9144559303 Aman
Dinding Penahan Tanah

Borelog 2
data
ϕ = 27
γ = 21.7782 kN/m3
c = 0
q = 14.0096 kN/m
γbeton = 24 kN/m3
μ = 1
γ' = 6.7789
Perhitungan
Ka = 0.3755248059
Ha1 = L. Persegi
= 10.5219046427
Ha2 = L.Segitiga
= 9.8241280125
Ha3 = L segi empat akibat tanah diatas
= 5.7043323944
Ha4 = L air
= 0.2577465671

1) Terhadap Guling
No. Luas (m2) Weight (kN/m') Jarak ke titik Pusat
1 0.68 16.32 0.8
2 1.2 28.8 1
3 2.2 47.91204 1.45
93.03204

Mb = 111.328458
Mo = 21.5308429084
Cek Guling
5.1706502 > 3 Oke

2) Terhadap geser

F = 26.3081116167
Ha = 93.03204
Cek Geser
3.5362493 > 3 Oke

3) Terhadap Tekanan Danah Dasar


a) Jarak Resultan gaya dari titik O adalah
x= 0.9652332153 m

e= 0.0347667847 m

cek kontrol e < B/6


oke
maka,
Rv 1+
L -

D 2
γ dibawah dpt 6.7789
c dibawah dpt 0
ϕ = 27
maka
Nc = 29.94
Nq = 16.62
Ny = 13.7

q 13.5578 kN/m2
B' 1.9304664305 m

Fqd = 1.0009935495
Fcd = 1.0010019641
Fγd = 1
Pv = 26.3081116167
ϕ (cari) = 15.7901335981
Fct = 0.6798894162
Fγt = 0.1723746293

cNcFsdFst = 0
qNqFqdFst = 158.4624310769
0,5BYNyFydFyt = 15.4520249

Qu 173.9144559303
Qa 69.5657823721

qtoe = -51.3676573626 kN/m2


qwheel = -41.6643826374 kN/m2

qtoe = 51.3676573626 kN/m2


qwheel = 41.6643826374 kN/m2
Cek Kontrol Qa/qtoe >3
3.385680112 > 3
Aman
Dinding Penahan Tanah

Dimensi H tot = 4
H didalam tanah = 2
d = 0.2
x2 = 1.1
x1 = 0.7
x3 = 0.6
b = 2

Hatanah = 1.55 H
H air = 0.45
Sigma Momen = 21.5308429084

0.3333333

Momen
13.056
28.8
69.472458
111.32846

1.1
6e
L

kN/m3

Terzaghi

<
<
d

1/2 H

x3
x3

x1 x2

Berat Pelat= 3.532 kN/m2


Adl = 1.756 kN/m2
Beban Mati 5.288
Beban Hidup 4.79

14.0096
Penulangan

1) Desain Penulangan Lentur pada bagian dinding


a. Tulangan Lentur
titik kritis adalah pertemuan antara toe dan heel, dengan H = 2-0,5 = 1,5
fc' = 30 Mpa
fy = 420 Mpa

H kritis = 1.4

Ha1 = 11.7845331999
Ha2 = 12.8235027876

Mu = 14.2334745408 kN.m

tebal dinding = 0.2 m


200 mm
b = 5000 mm
d = 115.5 mm

Rn = 0.2371015792
Rho perlu = 0.0005671768
As perlu = 327.544588849 mm2
As min = 912.45 mm2

digunakan
asumsi jarak = 150
1890.19157991
Aman

b. Tulangan Horizontal sebagai tulangan susut dan suhu


yang diperlukan pada dasar dinding
tebal dasar dinding = 200
SNI pasal 14,3,4
Asmin 2000 mm2

sebenarnya dalam sni pasal 14.3.4


apabila tebal dinding > 250 mm maka membutuhkan tulangan hrizontal dengan faktor peng
Asmin (2) = 1000 mm2

maka dipasang asumsi tulangan =


asumsi jarak = 125 mm
1608.49543864
Aman

c. Desain titik kritis terhadap Kondisi geser


d = 115.5 mm
letak dari tepi atas dinding = 1.2845 m

Ha1 = 10.8123092109 kN
Ha2 = 10.7949047935 kN

Vu = 21.6072140044 kN
φVn = 403294.965623 N
403.294965623 kN

Aman

2) Desain Bagian tumit (heel)


Vu = 96.5036480279 kN
φVc = 403294.965623 N
403.294965623 kN

aman

Mu = 82.0281008237 kN.m
Rn = 1.3664261801
rho Perlu = 0.0033455721
As perlu = 1932.06788825 mm2
As miin = 1925 mm2

digunakan
asumsi jarak = 100
3801.32711084
Aman

3) Desain Toe
q di d 48.29
jarak toe ke d 584.5 mm
0.5845 m
Vu = 38.1831205828
φVc = 403294.965623 N
403.294965623 kN
Aman

q deket d 47.77

Mu = 26.0356887918 kN.m
Rn = 0.433703163
Rho perlu = 0.0010415606
As Perlu = 601.501261154 mm2
As min = 1925 mm2

maka dipasang asumsi tulangan =


asumsi jarak = 100 mm
3801.32711084
Aman
2-0,5 = 1,5

h/2 = 0.7
h/3 = 0.4666667

diameter tulangan = 19 Asumsi


= 9.5
selimut = 75

n hrizontal dengan faktor pengali 1/2 dan 2/3 dari Asmin

16 mm
diameter tulangan Dalam arah tegak lurus memakai
22 D 16 - 125

6.1056174
22 mm
Dalam arah tegak lurus memakai
D 16 - 125
0.0033333

Anda mungkin juga menyukai