REKAPITULASI DAFTAR KUANTITAS DAN HARGA

PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL


SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

JUMLAH HARGA
NO URAIAN
(Rp)

I INFRASTRUKTUR

II BANGUNAN FASILITAS UMUM

III BANGUNAN KOMERSIAL

(A) JUMLAH HARGA


(B) PEMBULATAN (1)
(C) PAJAK PERTAMBAHAN NILAI (PPN) = 10% x (1)
(D) JUMLAH TOTAL HARGA = (B) + (C)
DAN HARGA
PADA JALAN TOL
KARTASURA
019

JUMLAH HARGA
(Rp)

10,452,470,644.99

3,129,594,395.63

1,765,903,386.94

15,347,968,427.56
15,347,968,400.00
1,534,796,840.00
16,882,765,240.00
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe

I INFRASTRUKTUR
BAB 1 UMUM

1.01 Pengukuran dan Pemasangan Bouwplank m' 474.54


1.02 Pembuatan Kantor Sementara / Direksi Keet m2 60.00
1.03 Pembuatan Gudang Semen dan Peralatan m2 40.00
1.04 Pembersihan Lahan dan Perataan m2 6,520.00
1.05 Pemasangan Schafolding / Perancah m2 378.63
1.06 Listrik dan Air Kerja lump sum 1.00
1.07 Dokumen Kontrak dan Laporan lump sum 1.00
1.08 Mobilisasi & Demobilisasi Peralatan Berat dan Ringan lump sum 1.00
Ijin Mendirikan Bangunan (IMB) lump sum 1.00

BAB 2 PEMBERSIHAN TEMPAT KERJA

2.01 Pembersihan Tempat Kerja m2 6,479.08

BAB 3 PEMBONGKARAN

Pembongkaran Lean Concrete tebal 10 cm m2 4,605.28

BAB 6 DRAINASE
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
6.06 (2) Saluran Beton, Tipe DS - 2 m' 481.20
6.06 (3) Saluran Beton, Tipe DS - 3 m' 283.68
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
Selokan Pasangan Batu Mortar (Mortared Rubble), Tipe
6.07 (3) m' 202.80
DS-1
RCP dia 600 m 38.40
Bak Kontrol dari batu kali uk. 800x800 mm unit 24.00
Selokan Pasangan Batu Mortar (Mortared Rubble), Tipe
m' 33.60
DS-1
Galian saluran drainase m3 2,172.16

BAB 7 SUBGRADE

7.01 Persiapan Tanah Dasar di Area Perkerasan m2 4,605.28

BAB 9 PERKERASAN

9.09 (1) Wet Lean Concrete (t = 10 cm) m2 4,605.28


9.09 (2) Sand Bedding (t = 5 cm) m3 299.34
Tipe A Rigid 20 cm Non Wiremesh m2 766.56
Tipe B Rigid 30 cm Non Wiremesh m2 1,841.93
Tipe C Rigid 20 cm Wiremesh m2 714.52
Tipe D Rigid 30 cm Wiremesh m2 1,282.27

BAB 12 PEKERJAAN LAIN-LAIN


REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
12.01 (1) Penanaman Pohon, Jenis Bintaro buah 23.00
12.01 (2) Semak / Perdu m2 658.33
12.05 (1) Guardrail m' 301.00
12.05 (2) End Section Guardrail buah 6.00
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
12.08 (1) Marka Jalan, Tipe 1 m2 1,885.00
12.08 (2) Marka Jalan, Tipe 2 (CHEVRON) m2 440.62
Rambu Petunjuk, Tipe A (Tiang Ganda) buah 1.00
Rambu Petunjuk, Tipe B (Kantilever) buah 11.00
Rambu Petunjuk, Tipe C (Kupu-kupu) buah 1.00
Car Stoper buah 60.00

PENCAHAYAAN LAMPU LALU LINTAS


BAB 13
DAN PEKERJAAN LISTRIK

PENERANGAN JALAN UMUM (PJU)


Lampu Penerangan Jalan, Tinggi 11 m (1 x LED Max 125
13.01(1).1 titik 22.00
Watt super Bright) Lengan Tunggal

Lampu Penerangan Jalan, Tinggi 11 m (2 x LED Max 125


13.01(1).1a titik 5.00
Watt super Bright) Lengan Double
13.01 (3) Pasokan Tenaga Listrik dari PLN lot 1.00

TOTAL HARGA INFRASTRUKTUR


(Pindahkan ke Rekapitulasi)
II BANGUNAN FASILITAS UMUM
BAB 16 PEKERJAAN FASILITAS TOL
16:01 Pekerjaan Tanah
Mushola + Tempat Wudu
16.01 (01).1 Pembersihan Area m2 260.59
16.01 (01).2 Papan Bouwplank m' 86.72
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
16.01 (01).3 Pemadatan dan Perataan Tanah m2 312.71
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
16.01 (01).4 Galian Pondasi m3 159.96
16.01 (01).5 Urugan pondasi m3 76.78

16.01 (01).6 Pengurugan Peninggian Peil pada Lantai (provisional) m3 271.02

Rumah Generator + Gudang


16.02 (1).1 Galian Pondasi m3 51.84
16.02 (1).2 Urugan Pondasi m3 24.88
16.02 (1).3 Pengurugan Peninggian Peil pada Lantai m3 15.24
16.02 (1).4 Pasir Urug m3 3.05
16.01 (01).1 Pembersihan Area m2 30.48
16.01 (01).2 Papan Bouwplank m' 44.00
Toilet + Tempat Sepatu
16.01 (01).1 Pembersihan Area m2 188.52
16.01 (01).2 Papan Bouwplank m' 38.06
16.01 (01).3 Pemadatan dan Perataan Tanah m2 138.62
16.01 (01).4 Galian Pondasi m3 113.36
16.01 (01).5 Urugan pondasi m3 45.34

16.01 (01).6 Pengurugan Peninggian Peil pada Lantai (provisional) m3 123.37

16.01 (01).7 Pasir Urug m3 3.55


Tempat Pengumpulan Sampah
16.01 (01).1 Pembersihan Area m2 13.60
16.01 (01).2 Papan Bouwplank m' 20.00
16.01 (01).3 Pemadatan dan Perataan Tanah m2 13.60
16.01 (01).4 Galian Pondasi m3 9.78
16.01 (01).5 Urugan pondasi m3 3.91
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe

16.01 (01).6 Pengurugan Peninggian Peil pada Lantai (provisional) m3 10.88


REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
16.01 (01).7 Pasir Urug m3 1.59
Pos Jaga
16.01 (01).1 Pembersihan Area m2 12.00
16.01 (01).2 Papan Bouwplank m' 28.00
16.01 (01).3 Pemadatan dan Perataan Tanah m2 12.00
16.01 (01).4 Galian Pondasi m3 28.80
16.01 (01).5 Urugan pondasi m3 11.52

16.01 (01).6 Pengurugan Peninggian Peil pada Lantai (provisional) m3 10.68

16.01 (01).7 Pasir Urug m3 0.90


16.01 (02) Pekerjaan Struktur
Mushola + Tempat Wudu
16.01 (02).6 Beton Kelas E (Lantai Kerja) m3 7.07
16.01 (02).8 Anti Rayap m2 260.59
Membuat Pondasi Pedestal (beton K - 300) m3 7.29
Membuat Pondasi Pedestal (Pembesian) kg 1,312.86
Membuat Pondasi Pedestal (Bekisting) m2 36.56

Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) m3 5.40

Membuat kolom Beton Bertulang (beton K - 300) m3 1.54


Membuat kolom Beton Bertulang (Pembesian) kg 194.77
Membuat kolom Beton Bertulang (Bekisting) m2 52.50
Membuat Balok Beton Bertulang (beton K -300 ) m3 3.35
Membuat Balok Beton Bertulang (Pembesian) kg 586.99
Membuat Balok Beton Bertulang (Bekisting) m2 27.64
Rumah Generator + Gudang
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
16.02 (2).1 Pasangan Batu Kosong m3 5.76
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
16.02 (2).2 Pasangan Batu Kali 1 : 3 m3 19.08
16.02 (2).5 Beton Kelas E (Lantai Kerja) m3 2.88
Pekerjaan Sloof' m3 2.55
Pondasi genset (beton) m3 1.13
Pondasi genset (Pembesian) kg 361.92
Pondasi genset (bekisting) m2 8.40

Membuat kolom Beton Bertulang (beton K - 300) m3 4.20

Membuat kolom Beton Bertulang (Pembesian) kg 143.59


Membuat kolom Beton Bertulang (Bekisting) m2 77.00

Membuat Balok Beton Bertulang (beton K -300 ) m3 2.55

Membuat Balok Beton Bertulang (Pembesian) kg 447.00


Membuat Balok Beton Bertulang (Bekisting) m2 21.05
Toilet + Tempat Sepatu
16.01 (02).6 Beton Kelas E (Lantai Kerja) m2 23.52
16.01 (02).8 Anti Rayap m2 138.62
Pondasi Pedestal (beton K - 300) m3 7.54
Pondasi Pedestal (Pembesian) kg 1,508.00
Pondasi Pedestal (Bekisting) m2 63.24

Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) m3 5.42

Membuat Kolom Beton Bertulang (beton K - 300) m3 4.15


Membuat Kolom Beton Bertulang (Pembesian) kg 149.47
Membuat Kolom Beton Bertulang (Bekisting) m2 88.94
Membuat Balok Beton Bertulang (beton K -300 ) m3 6.27
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
Membuat Balok Beton Bertulang (Pembesian) kg 1,138.54
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
Membuat Balok Beton Bertulang (Bekisting) m2 51.76
Tempat Pengumpulan Sampah
16.01 (02).1 Pasang Batu Kosong Untuk Pondasi m3 2.44
16.01 (02).2 Pasang Batu Kali 1:4 Untuk Pondasi m3 8.10
16.01 (02).8 Anti Rayap m2 13.60

Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) m3 0.92

Membuat Kolom Beton Bertulang (beton K - 300) m3 0.28


Membuat Kolom Beton Bertulang (Pembesian) kg 11.67
Membuat Kolom Beton Bertulang (Bekisting) m2 7.39
Membuat Balok Beton Bertulang (beton K -300 ) m3 0.92
Membuat Balok Beton Bertulang (Pembesian) kg 160.71
Membuat Balok Beton Bertulang (Bekisting) m2 7.57
Pos Jaga
16.01 (02).1 Pasang Batu Kosong Untuk Pondasi m3 3.20
16.01 (02).2 Pasang Batu Kali 1:4 Untuk Pondasi m3 10.60
16.01 (02).8 Anti Rayap m2 12.00

Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) m3 1.20

Membuat Kolom Beton Bertulang (beton K - 300) m3 0.26


Membuat Kolom Beton Bertulang (Pembesian) kg 10.98
Membuat Kolom Beton Bertulang (Bekisting) m2 6.91
Membuat Balok Beton Bertulang (beton K -300 ) m3 1.20
Membuat Balok Beton Bertulang (Pembesian) kg 210.35
Membuat Balok Beton Bertulang (Bekisting) m2 9.91
16.01 (03) Pekerjaan Lantai, Plint dan Nosing Keramik
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
Mushola + Tempat Wudu
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
16.01 (03).1 Pasir Urug Lantai, t = 10 cm m2 260.59
16.01 (03).2 Sub Lantai Beton Kelas E, t = 5 cm m3 130.30
Lantai mushola HT 60 x 60 cm m2 82.72
Plint mushola HT 10 x 60 cm m' 54.49
Lantai Tempat Wudhu HT Unpolished 60 x 60 cm m2 50.04
Lantai Selasar HT polished 60 x 60 cm m2 84.40
Trap Selasar HT polished 60 x 60 cm m2 4.10

Trap Selasar HT polished 60 x 60 cm area depan mushola m2 26.95

Ramp Disabilitas (Pek. Struktur Meliputi Beton,Besi,


m3 1.00
Bekisting)
Finishing Ramp (Termasuk Screed + Grouting) m2 3.23
Rumah Generator + Gudang
16.02 (6).1 Pasir Urug Lantai, t = 10 cm m2 30.48
16.02 (6).5 Pekerjaan Screed aci m2 30.48
Tempat Sepatu + Toilet
16.01 (03).1 Pasir Urug Lantai, t = 10 cm m2 138.62
16.01 (03).2 Sub Lantai Beton Kelas E, t = 5 cm m3 6.93

Lantai HT 60/60 cm, ex Essensa pada tempat sepatu m2 11.12

Plint HT 10/60 cm, ex Essensa pada tempat sepatu m' 10.72

Lantai HT 60/60 cm, ex Essensa pada toilet m2 36.04


Tempat Pengumpulan Sampah
16.01 (03).1 Pasir Urug Lantai, t = 10 cm m2 13.60
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
16.01 (03).2 Sub Lantai Beton Kelas E, t = 5 cm m2 0.68
Screed termasuk acian m2 13.60
Pos Jaga
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
16.01 (03).1 Pasir Urug Lantai, t = 10 cm m2 12.00
16.01 (03).2 Sub Lantai Beton Kelas E, t = 5 cm m3 0.60
Lantai HT 60/60 cm, ex Essensa pada Pos Jaga m2 12.00
Plint HT 10/60 cm, ex Essensa padaPos Jaga m' 20.00
16.01 (04) Pekerjaan Dinding
Mushola + Tempat Wudu
16.01 (04).1 Dinding Batu Bata Spesi 1 : 2 (½ bata) m2 236.43
16.01 (04).17 Plesteran Dinding Spesi 1 : 2 m2 63.00
16.01 (04).18 Plesteran Dinding Spesi 1 : 4 (Lengkap Acian) m2 113.79

Finishing Tempat Wudhu HT Unpolished 80 x 80 cm m2 63.00

Lapis Trasram setinggi 1000 mm m2 76.90


Rumah Generator + Gudang
16.02 (3).1 Dinding Batu Bata Spesi 1 : 3 (½ bata) m2 90.21
16.02 (3).4 Plesteran Dinding Spesi 1 : 4 m2 180.42
Lapis Trasram setinggi 1000 mm m2 30.48
Tempat Sepatu + Toilet
16.01 (04).1 Dinding Batu Bata Spesi 1 : 2 (½ bata) m2 265.25
16.01 (04).17 Plesteran Dinding Spesi 1 : 2 m2 67.64
16.01 (04).18 Plesteran Dinding Spesi 1 : 4 (Lengkap Acian) m2 300.08
Dinding HT 60/60 cm, ex Essensa pada Toilet m2 67.64
Lapis Trasram setinggi 1000 mm m2 72.90
Tempat Pengumpulan Sampah
16.01 (04).1 Dinding Batu Bata Spesi 1 : 2 (½ bata) m2 21.21
16.01 (04).18 Plesteran Dinding Spesi 1 : 4 (Lengkap Acian) m2 42.42
Lapis Trasram setinggi 1000 mm m2 15.28
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
Pos Jaga
16.01 (04).1 Dinding Batu Bata Spesi 1 : 2 (½ bata) m2 59.14
16.01 (04).18 Plesteran Dinding Spesi 1 : 4 (Lengkap Acian) m2 118.28
16.01 (04).21 Lapis Trasram setinggi 1000 mm m2 20.00
16.01 (05) Pekerjaan Kusen, Pintu dan Jendela
Mushola + Tempat Wudu
Pintu dan Jendela Material UPVC
Kusen Type P-1, Pintu dan Jendela Utama Mushola ukuran
unit 1.00
mm

Kusen Type P-2, Pintu pada Mushola ukuran mm unit 1.00

Kusen Type P-3, Pintu pada ukuran mm unit 2.00

Kusen Type J-1, Jendela UPVC pada ukuran mm unit 9.00

Rumah Generator + Gudang


16.02 (5).1 Kusen Pintu Stainless Steel, Pintu Besi buah 1.00
16.02 (5).2 Lubang Radiator buah 1.00

Ventilasi pada R. Genset ukuran 5180 x 800 mm unit 1.00

Ventilasi pada R. Genset ukuran 4300 x 800 mm unit 1.00

Ventilasi pada R. Genset ukuran 3450 x 800 mm unit 1.00

Kusen Type P-, Pintu Gudang ukuran mm unit 1.00


REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe

Ventilasi pada gudang ukuran mm 2600 x 800 mm unit 2.00

Tempat Sepatu + Toilet


REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
Kusen Type P-4, Pintu R. Laktasi ukuran mm unit 1.00

Kusen Type P-5, Pintu pada Toilet Difable ukuran mm unit 1.00

Kusen Type J-2, Jendela pada R. Laktasi ukuran mm unit 1.00

Kusen Type J-3, Jendela pada Toilet Difable ukuran mm unit 1.00

Cubical Toilet Panel Divider unit 13.00


Cubical Toilet Panel Frontal termasuk Pintu unit 15.00
UTILITY (Tempat Sampah,Gudang)
Kusen Type P-, Pintu TPS ukuran mm unit 1.00
Pos Jaga

Kusen Type P-6, Pintu pada Pos Jaga ukuran mm unit 2.00

Kusen Type J-4, Jendela pada Pos Jaga ukuran mm unit 2.00

16.01 (6) Pekerjaan Atap dan Langit-langit


Mushola + Tempat Wudu
16.01 (6).14 Plafon Calsi Board (termasuk rangka) m2 64.88
16.01 (6).16 List Plafon Gypsum m' 70.84
Membuat Plat Beton Bertulang (beton K - 300) m3 25.56
Membuat Plat Beton Bertulang (Pembesian) kg 4,600.45
Membuat Plat Beton Bertulang (Bekisting) m2 226.93
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe

Membuat Ornamen Plat Beton Bertulang (beton K - 300) m3 6.00

Membuat Ornamen Plat Beton Bertulang (Pembesian) kg 1,200.60


REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe

Membuat Ornamen Plat Beton Bertulang (Bekisting) m2 127.93

16.02 (4).3 Water Proofing m2 17.09


Rumah Generator + Gudang
16.02 (4).1 Atap Pelat Beton Kelas C m3 4.39
16.02 (4).2 Pembesian Atap Pelat kg 948.05
16.02 (4).3 Water Proofing m2 36.58
16.02 (4).4 Plafon Beton Expose m2 47.55
16.02 (4).1.a Bekisting Atap Beton pada Gudang m2 3.64
Tempat Sepatu + Toilet

16.01 (6).14 Plafon Calsi Board (termasuk rangka) pada Ruang Laktasi m2 3.66

16.01 (6).16 List Plafon Gypsum pada Ruang Laktasi m' 7.66
Atap Zincalum m2 66.02
Tempat Pengumpulan Sampah
Atap Polycarbonate m2 19.20
Pos Jaga
atap zincalum pada Pos Jaga m2 15.60
16.01 (7) Pekerjaan Pengecatan
Mushola + Tempat Wudu
16.01 (7).1 Cat Dinding Emulsion (Eksterior) m2 307.78
16.01 (7).2 Cat Dinding Acrylic (Interior) m2 264.46
16.01 (7).3 Cat Plafond Beton Exposed m2 15.42
16.01 (7).4 Cat Plafond Gypsum m2 77.86
16.01 (7).5 Cat List Plafond Profil m' 65.39
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
Finishing Cat Weathershield Ornamen Plat Beton
m2 127.93
Bertulang
Rumah Generator + Gudang
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
16.01 (7).3 Cat Plafond Beton Exposed m2 36.58
16.02 (7).1 Cat Dinding Eksterior m2 93.81
Cat Emulsi Dinding Interior m2 108.25
Tempat Sepatu + Toilet
16.01 (7).1 Cat Dinding Emulsion (Eksterior) m2 290.78
16.01 (7).2 Cat Dinding Acrylic (Interior) m2 69.32
16.01 (7).4 Cat Plafond Gypsum pada Ruang Laktasi m2 4.39
16.01 (7).5 Cat List Plafond Profil pada Ruang Laktasi m2 9.19
UTILITY (Tempat Sampah,Gudang)
16.01 (7).1 Cat Dinding Emulsion (Eksterior) m2 76.26
16.01 (7).2 Cat Dinding Acrylic (Interior) m2 80.10
16.01 (7).3 Cat Plafond Beton Exposed m2 33.41
Pos Jaga

16.01 (8) Sanitasi


Mushola + Tempat Wudu
16.01 (8).2 Kran Air, Ex TOTO buah 10.00
16.01 (8).9 Floor Drain, Toto Tipe TX 1B buah 2.00
Tempat Sepatu + Toilet
16.01 (8).1 Kloset Duduk, Ex Toto 420 J buah 6.00
16.01 (8).3 Wastafel, Toto L 529 V1 buah 6.00
16.01 (8).11 Kaca Cermin, t = 5 mm buah 2.00
Kloset Jongkok, Ex Toto buah 5.00
Urinoir, Ex Toto U57M buah 6.00
Wastafel, Ex. Toto (Difable) buah 1.00
Kran Tembok Ex TOTO buah 6.00
Kloset Duduk, Ex Toto (Difable) buah 1.00
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
Grab Bar Ex TOTO T113BP3 buah 1.00
Grab Bar Ex TOTO TX3AI buah 1.00
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
16.01 (10) Pekerjaan Instalasi Listrik
Mushola + Tempat Wudu
Panel Mushollah unit 1.00
Lampu TL 1 x 28 Watt buah 7.00
Lampu Downlight 13 Watt buah 7.00
16.01 (10).9 Saklar Ganda (MK) 250 Volt, 10 Amp buah 2.00
16.01 (10).10 Saklar Tunggal (MK) 250 Volt, 6 Amp buah 3.00
16.01 (10).13 Stop Kontak AC beserta Instalasi buah 2.00
16.01 (10).16 AC Split 2 PK buah 2.00
Instalasi Lampu Penerangan titik 16.00
Kabel NYFGBY 4C - 4 mm2 m' 97.00
Pipa Air Bersih Galvanis Dia. 1 3/4 “ m' 16.00
Pipa diameter 1½ PPR PN 10 m' 4.00
Pipa diameter 3/4 mm PPR PN 10 m' 7.00
Pipa diameter 1/2 mm PPR PN 10 m' 21.00
Gate Valve diameter 1 3/4 PPR PN 10 m' 1.00
Rumah Generator
16.02 (8).1 Generator Set 100 KVA (Silent Type) unit 1.00
16.02 (8).6 Lampu TL 1 x 28 W buah 3.00
16.02 (8).12 Saklar Ganda (Double) buah 1.00
16.02 (8).13 Stop Kontak buah 2.00
16.02 (8).14 Instalasi Stop Kontak titik 1.00
16.02 (8).15 Exhaust Fan Kap. 300 CFM, Tipe Shutter 12” buah 2.00
NYY 4 x 70 mm2 + BC 70 mm2 m 5.00
NYY 4 x 70 mm2 + BC 70 mm2 m 7.00
NYY 4 x 50 mm2 + BC 50 mm2 m 11.00
Rumah Generator
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
NYFgBY 4 x 6 mm2 + BC 6 mm2 m 10.00
Capasasitor Bank 45 kVAR unit 1.00
Panel MDB unit 1.00
Panel DP Pompa unit 1.00
Panel PL R. Genset & Gudang unit 1.00
Panel PL Area Luar unit 1.00
Panel PL Area Komersil unit 1.00
Bak Kontrol Grounding unit 3.00
FASUM (Tempat Sepatu, R. Laktasi dan Toilet, Pos
jaga)
16.01 (10).2 Lampu TL 1 x 28 Watt buah 14.00
Lampu Downlight 13 Watt buah 26.00
16.01 (10).9 Saklar Ganda (MK) 250 Volt, 10 Amp buah 2.00
16.01 (10).10 Saklar Tunggal (MK) 250 Volt, 6 Amp buah 6.00
16.01 (10).17 Instalasi Lampu Penerangan titik 40.00
Ronk Kap. 2 x 5 m3 set 1.00
Pompa Booster kap 2 x 80 lpm set 1.00
Pipa diameter 2'' GIP Medium m 32.00
Pipa diameter 1 3/4'' PPR PN 10 m 37.00
Pipa diameter 1 1/2'' PPR PN 10 m 6.00
Pipa diameter 3/4'' PPR PN 10 m 16.00
Pipa diameter 1/2'' PPR PN 10 m 47.00
Gate Valve diameter 50 mm bh 1.00
Gate Valve diameter 40 mm bh 2.00
Gate Valve diameter 32 mm bh 2.00
16.01 (11).8 Pipa Air Kotor, PVC dia. 4 “ m' 45.00
16.01 (11).10 Clean Out Dia. 4” buah 3.00
Pipa Air Bekas dia 3 '' m' 16.00
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
Fitting Air Bekas dia 3'' bh 4.00
Pipa Air Bekas dia 2 1/2 '' m 14.00
Fitting Air Bekas dia 2 1/2 bh 22.00
Pipa diameter 50 mm m 63.00
Floor Clean Out (FCO) diameter 80 mm bh 1.00
Floor Clean Out (FCO) diameter 65 mm bh 4.00
Fitting Air Kotor PVC dia 4 '' bh 25.00
Biotech kap 20 m3 untuk Toillet buah 1.00
Biotech kap 60 m3 untuk area komersil buah 1.00
Galian Biotech Tiolet m3 76.56
Galian Biotech Komersil m3 129.25
Lean Concrete Biotech Tiolet m3 1.50
Lean Concrete Biotech Komersil m3 2.50
Pasir Urug Concrete Biotech Tiolet m3 0.75
Pasir Urug Concrete Biotech Komersil m3 1.25

PEKERJAAN MENARA AIR DAN SUMUR DANGKAL

Pembuatan Sumur Dalam (Deepwell) ttk 1.00


Pipa Header diameter 3'' GIP Medium m 1.00
Pipa diameter 2 1/2'' GIP Medium m 14.00
Fitting diameter 2 1/2 '' GIP Medium m 2.00
Pipa diameter 2'' GIP Medium m 5.00
Check Valve diameter 2 1/2'' bh 1.00
Strainer Valve diameter 2 1/2'' bh 1.00
Gate Valve diameter 2 1/2'' bh 1.00
Gate Valve diameter 2'' bh 2.00
Pekerjaan Lain - Lain
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
16.03 (1) Bangunan
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe

PEKERJAAN MENARA AIR DAN SUMUR DANGKAL

16.03 (1).1 Menara Air, tinggi 12 meter (termasuk pondasi) ls 1.00


Pompa Subersible Pump, Kap 12 m3/ jam,
set 1.00
sudah termasuk:
Pompa Jet Pump 1000 W, 1F,220V,50Hz
Kabel NYFGBY 2 x 1,5 mm2
Kabel NYFGBY 4 x 2,5 mm2
16:05 RUMAH API
16.05 (1) Rumah Api (Pemadam Kebakaran) unit 1.00
16.05 (2) Fire Extinguiser (termasuk Trolley, tabung dan isinya) unit 1.00
16:06 TIANG BENDERA
16.06 (1) Tiang Bendera unit 1.00
16:07 TEMPAT SAMPAH
16.07 (1) Tempat Sampah unit 20.00
16:09 SELASAR
16.09 (1) Atap Selasar polycarbonate 101.28
Tiang selasar ukuran finish cat titik 16.00
Paving Block Natural (ukuran 21 x 10,5 x 6 cm), untuk
16.04 (2) m2 556.43
Trotoar / Pejalan Kaki
16.04 (3) Pasir Urug m3 55.64
16.04 (4) Kerb tipe 1 m' 152.52
16.04 (4).2 Kerb tipe 2 m' 1,200.00
TOTAL BANGUNAN FASILITAS UMUM
(Pindahkan ke Rekapitulasi)
III BANGUNAN KOMERSIAL
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank m' 64.00
PEKERJAAN STRUKTUR
A PEKERJAAN PONDASI FOOTPLAT
1 Galian Footplat m3 101.92
2 Galian Pondasi Batu Kali m3 81.67
3 Urugan Pasir Bawah Pondasi Lajur m3 7.43
4 Urugan Tanah Kembali m3 33.98
5 Pasangan Aanstamping m3 14.85
6 Pasangan Batu Belah m3 32.67
7 Lantai Kerja FootPlat m3 2.60
Pondasi FootPlat
8 Pembesian kg 1,441.71
9 Pemasangan Bekisiting m2 52.00
10 Beton ready mix K 300 m3 13.00
B PEKERJAAN SLOOF 15/20
1 Pemasangan Bekisting m2 29.70
2 Pembesian tulangan sloof kg 265.58
3 Beton ready mix K 300 slump 12 ± 2, Sloof m3 2.23
D PEKERJAAN KOLOM
1 Pemasangan bekisting m2 248.00
2 Pembesian tulangan kolom kg 2,609.75
3 Beton ready mix K 300 slump 12 ± 2, kolom m3 19.47
E PEKERJAAN BALOK
1 Pemasangan Bekisting m2 649.72
2 Pembesian tulangan balok kg 8,527.13
3 Beton ready mix K 300 slump 12 ± 2, balok m3 60.30
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
F PEKERJAAN TANGGA
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
1 Pekerjaan Pemasangan rangka tangga baja iwf kg 1,382.00
2 pemasangan pijakan tanggga m2 6.00
G PEKERJAAN PLAT LANTAI
1 Pemasangan Bekisting m2 537.80
2 Pembesian tulangan pelat lantai kg 3,826.39
3 Beton ready mix K 300 slump 12 ± 2, plat lantai m3 62.02
PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding Beton K-150
Pemasangan Bekisting m2 86.04
Pembesian tulangan dinding kg 316.45
Beton ready mix K 300 slump 12 ± 2 m3 9.89
2 Pemasangan dinding batu bata m2 442.33
4 conwood plank m2 339.56
5 Plesteran dinding batu bata m2 884.66
6 Acian dinding batu bata m2 884.66
7 Pemasangan lantai keramik roman naturaly 30x30 m2 95.08
8 Pemasangan lantai keramik roman rocktile 30x30 m2 128.80
9 Plesteran lantai 1 m2 304.00
10 Acian lantai 1 m2 304.00
9 Plesteran lantai 2 m2 242.00
10 Acian lantai 2 m2 242.00
11 Pemasangan Plafond Gypsumboard tebal 9mm m2 373.00
12 Finishing cat m2 884.66
13 Pemasangan kusen m 18.00
14 Pemasangan railing rooftop garden m 91.00
15 Pengadaan Pohon bh 1.00
16 rumput sintetis m2 121.00
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
17 meja display unit 7.00
18 meja dapur unit 4.00
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA HARGA
URAIAN SATUAN VOLUME TOTAL
PEMBAYARAN SATUAN

a b c d e f=dxe
PEKERJAAN MEKANIKAL ELEKTRIKAL

1 Pemasangan MCB unit 3.00

Pengadaan + penarikan instalasi penerangan lampu


2 downlight, dengan kabel NYM 3x2,5 sqmm dengan unit 53.00
protector PVC

Pengadaan + penarikan instalasi stop kontak normal (1


3 unit 22.00
gang) kabel NYM 3x2,5 sqmm dengan protector PVC

PEKERJAAN SANITASI DAN PLUMBING


1 Pengadaan + pemasangan Kran air unit 12.00
2 Pengadaan + pemasangan Wastafel unit 12.00
3 Pipa air bekas PVC AW ∅2" m' 101.00
4 Pipa air bekas PVC AW ∅3" m' 30.00
5 Talang m' 104.50
6 Pipa PVC AW ∅1" air bersih m' 70.00
7 Cut / galian tanah saluran drainase m3 2.84
8 Biaya Sumur pantek (kedalaman -100m) m' 15.00
TOTAL BANGUNAN KOMERSIAL
(Pindahkan ke Rekapitulasi)
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c

I INFRASTRUKTUR
BAB 1 UMUM

1.01 Pengukuran dan Pemasangan Bouwplank m'


1.02 Pembuatan Kantor Sementara / Direksi Keet m2
1.03 Pembuatan Gudang Semen dan Peralatan m2
1.04 Pembersihan Lahan dan Perataan m2
1.05 Pemasangan Schafolding / Perancah m2
1.06 Listrik dan Air Kerja lump sum
1.07 Dokumen Kontrak dan Laporan lump sum
1.08 Mobilisasi & Demobilisasi Peralatan Berat dan Ringan lump sum
Ijin Mendirikan Bangunan (IMB) lump sum

BAB 2 PEMBERSIHAN TEMPAT KERJA

2.01 Pembersihan Tempat Kerja m2


REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c

BAB 3 PEMBONGKARAN

3.01.17 Pembongkaran Lean Concrete tebal 10 cm m2

BAB 6 DRAINASE

6.06 (2) Saluran Pasangan Batu Mortar (Mortared Rubble), Tipe DS - 2 m'
6.06 (3) Saluran U-ditch 600 mm m'
6.07 (3) Saluran U-ditch 1000 mm m'
6.05 (22) RCP dia 600 m
6.05 (23) Bak Kontrol dari batu kali uk. 800x800 mm unit
6.05 (24) Selokan Pasangan Batu Mortar (Mortared Rubble), Tipe DS-1 m'
6.05 (25) Galian saluran drainase m3

BAB 7 SUBGRADE
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
7.01 Persiapan Tanah Dasar di Area Perkerasan m2

BAB 9 PERKERASAN

9.09 (1) Wet Lean Concrete (t = 10 cm) m2


9.09 (2) Sand Bedding (t = 5 cm) m3
9.08.(1).d Tipe A Rigid 20 cm Non Wiremesh m2
9.08.(1).e Tipe B Rigid 30 cm Non Wiremesh m2
9.08.(1).f Tipe C Rigid 20 cm Wiremesh m2
9.08.(1).g Tipe D Rigid 30 cm Wiremesh m2

BAB 12 PEKERJAAN LAIN-LAIN

12.01 (1) Penanaman Pohon, Jenis Bintaro buah


12.01 (2) Semak / Perdu m2
12.05 (1) Guardrail m'
12.05 (2) End Section Guardrail buah
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
12.08 (1) Marka Jalan, Tipe 1 m2
12.08 (2) Marka Jalan, Tipe 2 (CHEVRON) m2
12.07.(18) Rambu Petunjuk, Tipe A (Tiang Ganda) buah
12.07.(19) Rambu Petunjuk, Tipe B (Kantilever) buah
12.07.(20) Rambu Petunjuk, Tipe C (Kupu-kupu) buah
12.07.(21) Car Stoper buah

PENCAHAYAAN LAMPU LALU LINTAS


BAB 13
DAN PEKERJAAN LISTRIK

PENERANGAN JALAN UMUM (PJU)


13.01 (1) Lampu (termasuk Grounding), Kabel dan Material Bantu
13.01(1).1 Lampu Penerangan Jalan, Tinggi 11 m (1 x LED Max 125 Watt super Bright) Lengan Tunggal titik
13.01(1).1a Lampu Penerangan Jalan, Tinggi 11 m (2 x LED Max 125 Watt super Bright) Lengan Double titik
13.01 (3) Pasokan Tenaga Listrik dari PLN lot

TOTAL HARGA INFRASTRUKTUR


(Pindahkan ke Rekapitulasi)
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
II BANGUNAN FASILITAS UMUM
BAB 16 PEKERJAAN FASILITAS TOL
16:01 Pekerjaan Tanah
Mushola + Tempat Wudu
16.01 (01).1 Pembersihan Area m2
16.01 (01).2 Papan Bouwplank m'
16.01 (01).3 Pemadatan dan Perataan Tanah m2
16.01 (01).4 Galian Pondasi m3
16.01 (01).5 Urugan pondasi m3
16.01 (01).6 Pengurugan Peninggian Peil pada Lantai (provisional) m3
Rumah Generator + Gudang
16.02 (1).1 Galian Pondasi m3
16.02 (1).2 Urugan Pondasi m3
16.02 (1).3 Pengurugan Peninggian Peil pada Lantai m3
16.02 (1).4 Pasir Urug m3
16.01 (01).1 Pembersihan Area m2
16.01 (01).2 Papan Bouwplank m'
Toilet + Tempat Sepatu
16.01 (01).1 Pembersihan Area m2
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
16.01 (01).2 Papan Bouwplank m'
16.01 (01).3 Pemadatan dan Perataan Tanah m2
16.01 (01).4 Galian Pondasi m3
16.01 (01).5 Urugan pondasi m3
16.01 (01).6 Pengurugan Peninggian Peil pada Lantai (provisional) m3
16.01 (01).7 Pasir Urug m3
Tempat Pengumpulan Sampah
16.01 (01).1 Pembersihan Area m2
16.01 (01).2 Papan Bouwplank m'
16.01 (01).3 Pemadatan dan Perataan Tanah m2
16.01 (01).4 Galian Pondasi m3
16.01 (01).5 Urugan pondasi m3
16.01 (01).6 Pengurugan Peninggian Peil pada Lantai (provisional) m3
16.01 (01).7 Pasir Urug m3
Pos Jaga
16.01 (01).1 Pembersihan Area m2
16.01 (01).2 Papan Bouwplank m'
16.01 (01).3 Pemadatan dan Perataan Tanah m2
16.01 (01).4 Galian Pondasi m3
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
16.01 (01).5 Urugan pondasi m3
16.01 (01).6 Pengurugan Peninggian Peil pada Lantai (provisional) m3
16.01 (01).7 Pasir Urug m3
16.01 (02) Pekerjaan Struktur
Mushola + Tempat Wudu
16.01 (02).6 Beton Kelas E (Lantai Kerja) m3
16.01 (02).8 Anti Rayap m2
16.01 (02).9 Membuat Pondasi Pedestal (beton K - 300) m3
16.01 (02).10 Membuat Pondasi Pedestal (Pembesian) kg
16.01 (02).11 Membuat Pondasi Pedestal (Bekisting) m2
16.01 (02).12 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) m3
16.01 (02).13 Membuat kolom Beton Bertulang (beton K - 300) m3
16.01 (02).14 Membuat kolom Beton Bertulang (Pembesian) kg
16.01 (02).15 Membuat kolom Beton Bertulang (Bekisting) m2
16.01 (02).16 Membuat Balok Beton Bertulang (beton K -300 ) m3
16.01 (02).17 Membuat Balok Beton Bertulang (Pembesian) kg
16.01 (02).18 Membuat Balok Beton Bertulang (Bekisting) m2
Rumah Generator + Gudang
16.02 (2).1 Pasangan Batu Kosong m3
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
16.02 (2).2 Pasangan Batu Kali 1 : 3 m3
16.02 (2).5 Beton Kelas E (Lantai Kerja) m3
16.01 (02).12 Pekerjaan Sloof' m3
16.01 (02).13 Pondasi genset (beton) m3
16.01 (02).14 Pondasi genset (Pembesian) kg
16.01 (02).15 Pondasi genset (bekisting) m2
16.01 (02).16 Membuat kolom Beton Bertulang (beton K - 300) m3
16.01 (02).17 Membuat kolom Beton Bertulang (Pembesian) kg
16.01 (02).18 Membuat kolom Beton Bertulang (Bekisting) m2
16.01 (02).19 Membuat Balok Beton Bertulang (beton K -300 ) m3
16.01 (02).20 Membuat Balok Beton Bertulang (Pembesian) kg
16.01 (02).21 Membuat Balok Beton Bertulang (Bekisting) m2
Toilet + Tempat Sepatu
16.01 (02).6 Beton Kelas E (Lantai Kerja) m2
16.01 (02).8 Anti Rayap m2
16.01 (02).9 Pondasi Pedestal (beton K - 300) m3
16.01 (02).10 Pondasi Pedestal (Pembesian) kg
16.01 (02).11 Pondasi Pedestal (Bekisting) m2
16.01 (02).12 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) m3
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
16.01 (02).13 Membuat Kolom Beton Bertulang (beton K - 300) m3
16.01 (02).14 Membuat Kolom Beton Bertulang (Pembesian) kg
16.01 (02).15 Membuat Kolom Beton Bertulang (Bekisting) m2
16.01 (02).16 Membuat Balok Beton Bertulang (beton K -300 ) m3
16.01 (02).17 Membuat Balok Beton Bertulang (Pembesian) kg
16.01 (02).18 Membuat Balok Beton Bertulang (Bekisting) m2
Tempat Pengumpulan Sampah
16.01 (02).1 Pasang Batu Kosong Untuk Pondasi m3
16.01 (02).2 Pasang Batu Kali 1:4 Untuk Pondasi m3
16.01 (02).8 Anti Rayap m2
16.01 (02).12 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) m3
16.01 (02).13 Membuat Kolom Beton Bertulang (beton K - 300) m3
16.01 (02).14 Membuat Kolom Beton Bertulang (Pembesian) kg
16.01 (02).15 Membuat Kolom Beton Bertulang (Bekisting) m2
16.01 (02).16 Membuat Balok Beton Bertulang (beton K -300 ) m3
16.01 (02).17 Membuat Balok Beton Bertulang (Pembesian) kg
16.01 (02).18 Membuat Balok Beton Bertulang (Bekisting) m2
Pos Jaga
16.01 (02).1 Pasang Batu Kosong Untuk Pondasi m3
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
16.01 (02).2 Pasang Batu Kali 1:4 Untuk Pondasi m3
16.01 (02).8 Anti Rayap m2
16.01 (02).12 Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) m3
16.01 (02).13 Membuat Kolom Beton Bertulang (beton K - 300) m3
16.01 (02).14 Membuat Kolom Beton Bertulang (Pembesian) kg
16.01 (02).15 Membuat Kolom Beton Bertulang (Bekisting) m2
16.01 (02).16 Membuat Balok Beton Bertulang (beton K -300 ) m3
16.01 (02).17 Membuat Balok Beton Bertulang (Pembesian) kg
16.01 (02).18 Membuat Balok Beton Bertulang (Bekisting) m2
16.01 (03) Pekerjaan Lantai, Plint dan Nosing Keramik
Mushola + Tempat Wudu
16.01 (03).1 Pasir Urug Lantai, t = 10 cm m2
16.01 (03).2 Sub Lantai Beton Kelas E, t = 5 cm m3
16.01 (03).9 Lantai mushola HT 60 x 60 cm m2
16.01 (03).10 Plint mushola HT 10 x 60 cm m'
16.01 (03).11 Lantai Tempat Wudhu HT Unpolished 60 x 60 cm m2
16.01 (03).9 Lantai Selasar HT polished 60 x 60 cm m2
16.01 (03).9 Trap Selasar HT polished 60 x 60 cm m2
16.01 (03).9 Trap Selasar HT polished 60 x 60 cm area depan mushola m2
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
16.01 (03).12 Ramp Disabilitas (Pek. Struktur Meliputi Beton,Besi, Bekisting) m3
16.01 (03).13 Finishing Ramp (Termasuk Screed + Grouting) m2
Rumah Generator + Gudang
16.02 (6).1 Pasir Urug Lantai, t = 10 cm m2
16.02 (6).5 Pekerjaan Screed aci m2
Tempat Sepatu + Toilet
16.01 (03).1 Pasir Urug Lantai, t = 10 cm m2
16.01 (03).2 Sub Lantai Beton Kelas E, t = 5 cm m3
16.01 (03).9 Lantai HT 60/60 cm, ex Essensa pada tempat sepatu m2
16.01 (03).10 Plint HT 10/60 cm, ex Essensa pada tempat sepatu m'
16.01 (03).9 Lantai HT 60/60 cm, ex Essensa pada toilet m2
Tempat Pengumpulan Sampah
16.01 (03).1 Pasir Urug Lantai, t = 10 cm m2
16.01 (03).2 Sub Lantai Beton Kelas E, t = 5 cm m2
16.01 (03).14 Screed termasuk acian m2
Pos Jaga
16.01 (03).1 Pasir Urug Lantai, t = 10 cm m2
16.01 (03).2 Sub Lantai Beton Kelas E, t = 5 cm m3
16.01 (03).9 Lantai HT 60/60 cm, ex Essensa pada Pos Jaga m2
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
16.01 (03).10 Plint HT 10/60 cm, ex Essensa padaPos Jaga m'
16.01 (04) Pekerjaan Dinding
Mushola + Tempat Wudu
16.01 (04).1 Dinding Batu Bata Spesi 1 : 2 (½ bata) m2
16.01 (04).17 Plesteran Dinding Spesi 1 : 2 m2
16.01 (04).18 Plesteran Dinding Spesi 1 : 4 (Lengkap Acian) m2
16.01 (04).19 Finishing Tempat Wudhu HT Unpolished 80 x 80 cm m2
16.01 (04).21 Lapis Trasram setinggi 1000 mm m2
Rumah Generator + Gudang
16.02 (3).1 Dinding Batu Bata Spesi 1 : 3 (½ bata) m2
16.02 (3).4 Plesteran Dinding Spesi 1 : 4 m2
16.01 (04).21 Lapis Trasram setinggi 1000 mm m2
Tempat Sepatu + Toilet
16.01 (04).1 Dinding Batu Bata Spesi 1 : 2 (½ bata) m2
16.01 (04).17 Plesteran Dinding Spesi 1 : 2 m2
16.01 (04).18 Plesteran Dinding Spesi 1 : 4 (Lengkap Acian) m2
16.01 (04).20 Dinding HT 60/60 cm, ex Essensa pada Toilet m2
16.01 (04).21 Lapis Trasram setinggi 1000 mm m2
Tempat Pengumpulan Sampah
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
16.01 (04).1 Dinding Batu Bata Spesi 1 : 2 (½ bata) m2
16.01 (04).18 Plesteran Dinding Spesi 1 : 4 (Lengkap Acian) m2
16.01 (04).21 Lapis Trasram setinggi 1000 mm m2
Pos Jaga
16.01 (04).1 Dinding Batu Bata Spesi 1 : 2 (½ bata) m2
16.01 (04).18 Plesteran Dinding Spesi 1 : 4 (Lengkap Acian) m2
16.01 (04).21 Lapis Trasram setinggi 1000 mm m2
16.01 (05) Pekerjaan Kusen, Pintu dan Jendela
Mushola + Tempat Wudu
Pintu dan Jendela Material UPVC
16.1.(5).11 Kusen Type P-1, Pintu dan Jendela Utama Mushola ukuran mm unit
16.1.(5).12 Kusen Type P-2, Pintu pada Mushola ukuran mm unit
16.1.(5).13 Kusen Type P-3, Pintu pada ukuran mm unit
16.1.(5).14 Kusen Type J-1, Jendela UPVC pada ukuran mm unit
Rumah Generator + Gudang
16.02 (5).1 Kusen Pintu Stainless Steel, Pintu Besi buah
16.02 (5).2 Lubang Radiator buah
16.1.(5).15 Ventilasi pada R. Genset ukuran 5180 x 800 mm unit
16.1.(5).16 Ventilasi pada R. Genset ukuran 4300 x 800 mm unit
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
16.1.(5).17 Ventilasi pada R. Genset ukuran 3450 x 800 mm unit
16.1.(5).18 Kusen Type P-, Pintu Gudang ukuran mm unit
16.1.(5).19 Ventilasi pada gudang ukuran mm 2600 x 800 mm unit
Tempat Sepatu + Toilet
16.01 (5).20 Kusen Type P-4, Pintu R. Laktasi ukuran mm unit
16.01 (5).21 Kusen Type P-5, Pintu pada Toilet Difable ukuran mm unit
16.01 (5).22 Kusen Type J-2, Jendela pada R. Laktasi ukuran mm unit
16.01 (5).23 Kusen Type J-3, Jendela pada Toilet Difable ukuran mm unit
16.01 (5).24 Cubical Toilet Panel Divider unit
16.01 (5).25 Cubical Toilet Panel Frontal termasuk Pintu unit
UTILITY (Tempat Sampah,Gudang)
16.01 (5).26 Kusen Type P-, Pintu TPS ukuran mm unit
Pos Jaga
16.01 (5).27 Kusen Type P-6, Pintu pada Pos Jaga ukuran mm unit
16.01 (5).28 Kusen Type J-4, Jendela pada Pos Jaga ukuran mm unit
16.01 (6) Pekerjaan Atap dan Langit-langit
Mushola + Tempat Wudu
16.01 (6).14 Plafon Calsi Board (termasuk rangka) m2
16.01 (6).16 List Plafon Gypsum m'
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
16.01 (6).19 Membuat Plat Beton Bertulang (beton K - 300) m3
16.01 (6).20 Membuat Plat Beton Bertulang (Pembesian) kg
16.01 (6).21 Membuat Plat Beton Bertulang (Bekisting) m2
16.01 (6).22 Membuat Ornamen Plat Beton Bertulang (beton K - 300) m3
16.01 (6).23 Membuat Ornamen Plat Beton Bertulang (Pembesian) kg
16.01 (6).24 Membuat Ornamen Plat Beton Bertulang (Bekisting) m2
16.02 (4).3 Water Proofing m2
Rumah Generator + Gudang
16.02 (4).1 Atap Pelat Beton Kelas C m3
16.02 (4).2 Pembesian Atap Pelat kg
16.02 (4).3 Water Proofing m2
16.02 (4).4 Plafon Beton Expose m2
16.02 (4).1.a Bekisting Atap Beton pada Gudang m2
Tempat Sepatu + Toilet
16.01 (6).14 Plafon Calsi Board (termasuk rangka) pada Ruang Laktasi m2
16.01 (6).16 List Plafon Gypsum pada Ruang Laktasi m'
16.01 (6).17 Atap Zincalum m2
Tempat Pengumpulan Sampah
16.01 (6).24 Atap Polycarbonate m2
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
Pos Jaga
16.01 (6).25 atap zincalum pada Pos Jaga m2
16.01 (7) Pekerjaan Pengecatan
Mushola + Tempat Wudu
16.01 (7).1 Cat Dinding Emulsion (Eksterior) m2
16.01 (7).2 Cat Dinding Acrylic (Interior) m2
16.01 (7).3 Cat Plafond Beton Exposed m2
16.01 (7).4 Cat Plafond Gypsum m2
16.01 (7).5 Cat List Plafond Profil m'
16.01 (6).26 Finishing Cat Weathershield Ornamen Plat Beton Bertulang m2
Rumah Generator + Gudang
16.01 (7).3 Cat Plafond Beton Exposed m2
16.02 (7).1 Cat Dinding Eksterior m2
16.02 (7). Cat Emulsi Dinding Interior m2
Tempat Sepatu + Toilet
16.01 (7).1 Cat Dinding Emulsion (Eksterior) m2
16.01 (7).2 Cat Dinding Acrylic (Interior) m2
16.01 (7).4 Cat Plafond Gypsum pada Ruang Laktasi m2
16.01 (7).5 Cat List Plafond Profil pada Ruang Laktasi m2
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
UTILITY (Tempat Sampah,Gudang)
16.01 (7).1 Cat Dinding Emulsion (Eksterior) m2
16.01 (7).2 Cat Dinding Acrylic (Interior) m2
16.01 (7).3 Cat Plafond Beton Exposed m2
Pos Jaga

16.01 (8) Sanitasi


Mushola + Tempat Wudu
16.01 (8).2 Kran Air, Ex TOTO buah
16.01 (8).9 Floor Drain, Toto Tipe TX 1B buah
Tempat Sepatu + Toilet
16.01 (8).1 Kloset Duduk, Ex Toto 420 J buah
16.01 (8).3 Wastafel, Toto L 529 V1 buah
16.01 (8).11 Kaca Cermin, t = 5 mm buah
16.01 (8).15 Kloset Jongkok, Ex Toto buah
16.01 (8).16 Urinoir, Ex Toto U57M buah
16.01 (8).13 Wastafel, Ex. Toto (Difable) buah
16.01 (8).17 Kran Tembok Ex TOTO buah
16.01 (8).18 Kloset Duduk, Ex Toto (Difable) buah
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
16.01 (8).19 Grab Bar Ex TOTO T113BP3 buah
16.01 (8).20 Grab Bar Ex TOTO TX3AI buah
16.01 (10) Pekerjaan Instalasi Listrik
Mushola + Tempat Wudu
16.01 (10).31 Panel Mushollah unit
16.01 (10).32 Lampu TL 1 x 28 Watt buah
16.01 (10).33 Lampu Downlight 13 Watt buah
16.01 (10).9 Saklar Ganda (MK) 250 Volt, 10 Amp buah
16.01 (10).10 Saklar Tunggal (MK) 250 Volt, 6 Amp buah
16.01 (10).13 Stop Kontak AC beserta Instalasi buah
16.01 (10).16 AC Split 2 PK buah
16.01 (10).17 Instalasi Lampu Penerangan titik
16.01 (10).34 Kabel NYFGBY 4C - 4 mm2 m'
16.01.(11).13 Pipa Air Bersih Galvanis Dia. 1 3/4 “ m'
16.01.(11).14 Pipa diameter 1½ PPR PN 10 m'
16.01.(11).15 Pipa diameter 3/4 mm PPR PN 10 m'
16.01.(11).16 Pipa diameter 1/2 mm PPR PN 10 m'
16.01.(11).17 Gate Valve diameter 1 3/4 PPR PN 10 m'
Rumah Generator
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
16.02 (8).1 Generator Set 100 KVA (Silent Type) unit
16.02 (8).6 Lampu TL 1 x 28 W buah
16.02 (8).12 Saklar Ganda (Double) buah
16.02 (8).13 Stop Kontak buah
16.02 (8).14 Instalasi Stop Kontak titik
16.02 (8).15 Exhaust Fan Kap. 300 CFM, Tipe Shutter 12” buah
16.01 (10).35 NYY 4 x 70 mm2 + BC 70 mm2 m
16.01 (10).36 NYY 4 x 70 mm2 + BC 70 mm2 m
16.01 (10).37 NYY 4 x 50 mm2 + BC 50 mm2 m
16.01 (10).38 NYFgBY 4 x 6 mm2 + BC 6 mm2 m
16.01 (10).39 Capasasitor Bank 45 kVAR unit
16.01 (10).40 Panel MDB unit
16.01 (10).41 Panel DP Pompa unit
16.01 (10).42 Panel PL R. Genset & Gudang unit
16.01 (10).43 Panel PL Area Luar unit
16.01 (10).44 Panel PL Area Komersil unit
16.01 (10).45 Bak Kontrol Grounding unit
FASUM (Tempat Sepatu, R. Laktasi dan Toilet, Pos jaga)
16.01 (10).2 Lampu TL 1 x 28 Watt buah
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
16.01 (10).33 Lampu Downlight 13 Watt buah
16.01 (10).9 Saklar Ganda (MK) 250 Volt, 10 Amp buah
16.01 (10).10 Saklar Tunggal (MK) 250 Volt, 6 Amp buah
16.01 (10).17 Instalasi Lampu Penerangan titik
16.01 (10).46 Ronk Kap. 2 x 5 m3 set
16.01 (10).47 Pompa Booster kap 2 x 80 lpm set
16.01 (11).18 Pipa diameter 2'' GIP Medium m
16.01 (11).19 Pipa diameter 1 3/4'' PPR PN 10 m
16.01 (11).14 Pipa diameter 1 1/2'' PPR PN 10 m
16.01 (11).15 Pipa diameter 3/4'' PPR PN 10 m
16.01 (11).16 Pipa diameter 1/2'' PPR PN 10 m
16.01 (11).20 Gate Valve diameter 50 mm bh
16.01 (11).21 Gate Valve diameter 40 mm bh
16.01 (11).22 Gate Valve diameter 32 mm bh
16.01 (11).8 Pipa Air Kotor, PVC dia. 4 “ m'
16.01 (11).10 Clean Out Dia. 4” buah
16.01 (11).23 Pipa Air Bekas dia 3 '' m'
16.01 (11).24 Fitting Air Bekas dia 3'' bh
16.01 (11).25 Pipa Air Bekas dia 2 1/2 '' m
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
16.01 (11).26 Fitting Air Bekas dia 2 1/2 bh
16.01 (11).27 Pipa diameter 50 mm m
16.01 (11).28 Floor Clean Out (FCO) diameter 80 mm bh
16.01 (11).29 Floor Clean Out (FCO) diameter 65 mm bh
16.01 (11).30 Fitting Air Kotor PVC dia 4 '' bh
16.01 (11).31 Biotech kap 20 m3 untuk Toillet buah
16.01 (11).32 Biotech kap 60 m3 untuk area komersil buah
16.01 (11).33 Galian Biotech Tiolet m3
16.01 (11).34 Galian Biotech Komersil m3
16.01 (11).35 Lean Concrete Biotech Tiolet m3
16.01 (11).36 Lean Concrete Biotech Komersil m3
16.01 (11).37 Pasir Urug Concrete Biotech Tiolet m3
16.01 (11).38 Pasir Urug Concrete Biotech Komersil m3
PEKERJAAN MENARA AIR DAN SUMUR DANGKAL
16.01 (11).39 Pembuatan Sumur Dalam (Deepwell) ttk
16.01 (11).40 Pipa Header diameter 3'' GIP Medium m
16.01 (11).41 Pipa diameter 2 1/2'' GIP Medium m
16.01 (11).42 Fitting diameter 2 1/2 '' GIP Medium m
16.01 (11).18 Pipa diameter 2'' GIP Medium m
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
16.01 (11).43 Check Valve diameter 2 1/2'' bh
16.01 (11).44 Strainer Valve diameter 2 1/2'' bh
16.01 (11).45 Gate Valve diameter 2 1/2'' bh
16.01 (11).46 Gate Valve diameter 2'' bh
Pekerjaan Lain - Lain
16.03 (1) Bangunan
PEKERJAAN MENARA AIR DAN SUMUR DANGKAL
16.03 (1).1 Menara Air, tinggi 12 meter (termasuk pondasi) ls
Pompa Subersible Pump, Kap 12 m3/ jam,
16.03 (2).5 set
sudah termasuk:
16.03 (2).1 Pompa Jet Pump 1000 W, 1F,220V,50Hz
16.03 (2).2 Kabel NYFGBY 2 x 1,5 mm2
16.03 (2).3 Kabel NYFGBY 4 x 2,5 mm2
16:05 RUMAH API
16.05 (1) Rumah Api (Pemadam Kebakaran) unit
16.05 (2) Fire Extinguiser (termasuk Trolley, tabung dan isinya) unit
16:06 TIANG BENDERA
16.06 (1) Tiang Bendera unit
16:07 TEMPAT SAMPAH
16.07 (1) Tempat Sampah unit
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
16:09 SELASAR
16.09 (1) Atap Selasar polycarbonate
Tiang selasar ukuran finish cat titik
16.04 (2) Paving Block Natural (ukuran 21 x 10,5 x 6 cm), untuk Trotoar / Pejalan Kaki m2
16.04 (3) Pasir Urug m3
16.04 (4) Kerb tipe 1 m'
16.04 (4).2 Kerb tipe 2 m'
TOTAL BANGUNAN FASILITAS UMUM
(Pindahkan ke Rekapitulasi)
III BANGUNAN KOMERSIAL
PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank m'
PEKERJAAN STRUKTUR
A PEKERJAAN PONDASI FOOTPLAT
1 Galian Footplat m3
16.01 (01).4 Galian Pondasi Batu Kali m3
16.03(5) Urugan Pasir Bawah Pondasi Lajur m3
16.02 (1).4 Urugan Tanah Kembali m3
5 Pasangan Aanstamping m3
6 Pasangan Batu Belah m3
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
7 Lantai Kerja FootPlat m3
Pondasi FootPlat
16.08 (3).7 Pembesian kg
9 Pemasangan Bekisiting m2
10 Beton ready mix K 300 m3
B PEKERJAAN SLOOF 15/20
1 Pemasangan Bekisting m2
2 Pembesian tulangan sloof kg
3 Beton ready mix K 300 slump 12 ± 2, Sloof m3
D PEKERJAAN KOLOM
1 Pemasangan bekisting m2
2 Pembesian tulangan kolom kg
3 Beton ready mix K 300 slump 12 ± 2, kolom m3
E PEKERJAAN BALOK
1 Pemasangan Bekisting m2
2 Pembesian tulangan balok kg
3 Beton ready mix K 300 slump 12 ± 2, balok m3
F PEKERJAAN TANGGA
1 Pekerjaan Pemasangan rangka tangga baja iwf kg
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
2 pemasangan pijakan tanggga m2
G PEKERJAAN PLAT LANTAI
1 Pemasangan Bekisting m2
2 Pembesian tulangan pelat lantai kg
3 Beton ready mix K 300 slump 12 ± 2, plat lantai m3
PEKERJAAN ARSITEKTUR
1 Pekerjaan Dinding Beton K-150
2 Pemasangan Bekisting m2
3 Pembesian tulangan dinding kg
4 Beton ready mix K 300 slump 12 ± 2 m3
5 Pemasangan dinding batu bata m2
6 conwood plank m2
7 Plesteran dinding batu bata m2
8 Acian dinding batu bata m2
16.01 (3).4 Pemasangan lantai keramik roman naturaly 30x30 m2
16.01 (3).6 Pemasangan lantai keramik roman rocktile 30x30 m2
11 Plesteran lantai 1 m2
12 Acian lantai 1 m2
13 Plesteran lantai 2 m2
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
14 Acian lantai 2 m2
15 Pemasangan Plafond Gypsumboard tebal 9mm m2
16 Finishing cat m2
17 Pemasangan kusen m
18 Pemasangan railing rooftop garden m
19 Pengadaan Pohon bh
20 rumput sintetis m2
21 meja display unit
22 meja dapur unit
PEKERJAAN MEKANIKAL ELEKTRIKAL
1 Pemasangan MCB unit
2 Pengadaan + penarikan instalasi penerangan lampu downlight, dengan kabel NYM 3x2,5 sqmm dengan pr unit
3 Pengadaan + penarikan instalasi stop kontak normal (1 gang) kabel NYM 3x2,5 sqmm dengan protector P unit
PEKERJAAN SANITASI DAN PLUMBING
16.01 (8).2 Pengadaan + pemasangan Kran air unit
16.01 (8).3 Pengadaan + pemasangan Wastafel unit
16.01 (11).25 Pipa air bekas PVC AW ∅2" m'
16.01 (11).23 Pipa air bekas PVC AW ∅3" m'
16.02 (6).3 Talang m'
REKAPITULASI KUANTITAS PEKERJAAN
PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG-SOLO RUAS BOYOLALI – KARTASURA
PAKET 1 KM 487 A TAHUN 2019

MATA PEMBAYARAN URAIAN SATUAN

a b c
16.01.(11).13 Pipa PVC AW ∅1" air bersih m'
6.05 (25) Cut / galian tanah saluran drainase m3
8 Biaya Sumur pantek (kedalaman -100m) m'
TOTAL BANGUNAN KOMERSIAL
(Pindahkan ke Rekapitulasi)
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe

474.54 52,219.13 24,780,067.85


60.00 1,400,123.51 84,007,410.30
40.00 745,570.87 29,822,834.80
6,520.00 18,298.86 119,308,573.99
378.63 359,151.76 135,985,630.89
1.00 5,500,000.00 5,500,000.00
1.00 11,000,000.00 11,000,000.00
1.00 16,500,000.00 16,500,000.00
1.00 110,000,000.00 110,000,000.00

6,479.08 18,298.86 118,559,784.60


HARGA
VOLUME TOTAL
SATUAN

d e f=dxe

4,605.28 224,866.56 1,035,573,451.84

481.20 1,112,006.15 535,097,357.88


283.68 821,942.02 233,168,511.14
202.80 2,340,546.42 474,662,813.06
38.40 184,286.68 7,076,608.62
24.00 1,057,202.80 25,372,867.16
33.60 988,514.23 33,214,078.10
2,172.16 122,950.47 267,068,098.34
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
4,605.28 130,930.59 602,972,010.19

4,605.28 119,027.81 548,156,372.90


299.34 412,471.12 123,469,103.92
766.56 802,480.20 615,149,219.66
1,841.93 910,627.91 1,677,312,874.78
714.52 1,033,796.91 738,668,569.64
1,282.27 1,141,944.63 1,464,281,340.61

23.00 226,370.40 5,206,519.10


658.33 299,285.75 197,028,786.23
301.00 2,178,000.00 655,578,000.00
6.00 467,500.00 2,805,000.00
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
1,885.00 170,105.03 320,647,981.16
440.62 170,105.03 74,951,678.23
1.00 2,129,600.00 2,129,600.00
11.00 4,658,500.00 51,243,500.00
1.00 5,324,000.00 5,324,000.00
60.00 58,300.00 3,498,000.00

22.00 3,300,000.00 72,600,000.00


5.00 3,850,000.00 19,250,000.00
1.00 5,500,000.00 5,500,000.00

10,452,470,644.99
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe

260.59 15,583.89 4,061,005.94


86.72 55,645.63 4,825,589.38
312.71 64,724.00 20,239,842.04
159.96 168,648.31 26,976,983.64
76.78 395,567.69 30,371,687.52
271.02 395,567.69 107,206,756.34

51.84 168,648.31 8,742,728.38


24.88 395,567.69 9,841,724.22
15.24 395,567.69 6,028,451.65
3.05 530,815.73 1,618,987.97
30.48 15,583.89 474,996.97
44.00 55,645.63 2,448,407.90

188.52 15,583.89 2,937,874.97


HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
38.06 55,645.63 2,117,872.83
138.62 64,724.00 8,972,040.88
113.36 168,648.31 19,117,972.40
45.34 395,567.69 17,935,039.23
123.37 395,567.69 48,801,186.37
3.55 530,815.73 1,884,395.84

13.60 15,583.89 211,940.91


20.00 55,645.63 1,112,912.68
13.60 64,724.00 880,246.40
9.78 168,648.31 1,649,380.47
3.91 395,567.69 1,546,669.68
10.88 395,567.69 4,303,776.51
1.59 530,815.73 843,997.01

12.00 15,583.89 187,006.68


28.00 55,645.63 1,558,077.75
12.00 64,724.00 776,688.00
28.80 168,648.31 4,857,071.32
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
11.52 395,567.69 4,556,939.83
10.68 395,567.69 4,224,662.97
0.90 530,815.73 477,734.16

7.07 853,820.51 6,036,511.03


260.59 28,050.00 7,309,549.50
7.29 1,080,822.01 7,879,192.48
1,312.86 32,232.49 42,316,748.55
36.56 131,820.38 4,819,352.93
5.40 3,205,322.08 17,308,739.21
1.54 1,080,822.01 1,664,465.90
194.77 32,232.49 6,277,922.33
52.50 218,745.46 11,484,136.70
3.35 1,080,822.01 3,620,753.75
586.99 32,232.49 18,920,150.08
27.64 222,416.71 6,147,597.89

5.76 553,145.01 3,186,115.26


HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
19.08 935,796.40 17,854,995.31
2.88 853,820.51 2,459,003.08
2.55 3,205,322.08 8,173,571.29
1.13 1,080,822.01 1,221,328.88
361.92 32,232.49 11,665,583.26
8.40 131,820.38 1,107,291.15
4.20 1,080,822.01 4,539,452.46
143.59 32,232.49 4,628,263.43
77.00 218,745.46 16,843,400.50
2.55 1,080,822.01 2,756,096.14
447.00 32,232.49 14,407,923.62
21.05 222,416.71 4,681,871.77

23.52 853,820.51 20,081,858.49


138.62 28,050.00 3,888,291.00
7.54 1,080,822.01 8,149,397.99
1,508.00 32,232.49 48,606,596.90
63.24 131,820.38 8,336,320.55
5.42 3,205,322.08 17,372,845.65
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
4.15 1,080,822.01 4,485,411.36
149.47 32,232.49 4,817,790.48
88.94 218,745.46 19,455,221.30
6.27 1,080,822.01 6,776,754.03
1,138.54 32,232.49 36,697,980.66
51.76 222,416.71 11,512,288.96

2.44 553,145.01 1,349,673.82


8.10 901,717.41 7,303,911.02
13.60 28,050.00 381,480.00
0.92 3,205,322.08 2,948,896.31
0.28 1,080,822.01 302,630.16
11.67 32,232.49 376,153.17
7.39 218,745.46 1,616,528.96
0.92 1,080,822.01 994,356.25
160.71 32,232.49 5,180,083.68
7.57 222,416.71 1,683,694.50

3.20 553,145.01 1,770,064.03


HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
10.60 901,717.41 9,558,204.55
12.00 28,050.00 336,600.00
1.20 3,205,322.08 3,846,386.49
0.26 1,080,822.01 281,013.72
10.98 32,232.49 353,912.75
6.91 218,745.46 1,511,531.14
1.20 1,080,822.01 1,296,986.42
210.35 32,232.49 6,780,104.55
9.91 222,416.71 2,204,149.61

260.59 530,815.73 138,325,270.74


130.30 853,820.51 111,252,812.97
82.72 457,738.44 37,864,123.89
54.49 178,518.02 9,727,446.96
50.04 367,180.94 18,373,734.32
84.40 457,738.44 38,633,124.47
4.10 457,738.44 1,876,727.61
26.95 457,738.44 12,336,051.00
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
1.00 1,370,959.97 1,370,959.97
3.23 103,832.70 335,379.61

30.48 530,815.73 16,179,263.41


30.48 103,832.70 3,164,820.57

138.62 530,815.73 73,581,676.31


6.93 853,820.51 5,916,976.16
11.12 457,738.44 5,090,051.47
10.72 178,518.02 1,913,713.19
36.04 367,180.94 13,233,201.14

13.60 530,815.73 7,219,093.91


0.68 853,820.51 580,597.95
13.60 103,832.70 1,412,124.67

12.00 530,815.73 6,369,788.74


0.60 853,820.51 512,292.31
12.00 457,738.44 5,492,861.30
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
20.00 457,738.44 9,154,768.83

236.43 131,278.66 31,038,214.53


63.00 62,876.21 3,961,201.17
113.79 59,517.65 6,772,513.58
63.00 738,711.44 46,538,820.82
76.90 131,278.66 10,095,329.26

90.21 126,660.92 11,426,081.30


180.42 59,517.65 10,738,174.70
30.48 131,278.66 4,001,373.68

265.25 131,278.66 34,821,665.63


67.64 62,876.21 4,252,946.78
300.08 59,517.65 17,860,056.89
67.64 457,738.44 30,961,428.19
72.90 131,278.66 9,570,214.61
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
21.21 131,278.66 2,784,420.46
42.42 59,517.65 2,524,738.78
15.28 131,278.66 2,005,937.99

59.14 131,278.66 7,763,820.19


118.28 59,517.65 7,039,747.83
20.00 131,278.66 2,625,573.28

1.00 1,155,000.00 1,155,000.00


1.00 825,000.00 825,000.00
2.00 825,000.00 1,650,000.00
9.00 990,000.00 8,910,000.00

1.00 8,382,000.00 8,382,000.00


1.00 1,973,400.00 1,973,400.00
1.00 1,973,400.00 1,973,400.00
1.00 1,683,000.00 1,683,000.00
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
1.00 1,402,500.00 1,402,500.00
1.00 1,155,000.00 1,155,000.00
2.00 1,122,000.00 2,244,000.00

1.00 841,500.00 841,500.00


1.00 858,000.00 858,000.00
1.00 422,400.00 422,400.00
1.00 422,400.00 422,400.00
13.00 3,958,350.00 51,458,550.00
15.00 3,958,350.00 59,375,250.00

1.00 1,155,000.00 1,155,000.00

2.00 858,000.00 1,716,000.00


2.00 841,500.00 1,683,000.00

64.88 115,345.97 7,483,646.70


70.84 -
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
25.56 1,080,822.01 27,625,810.68
4,600.45 32,232.49 148,283,964.67
226.93 257,905.46 58,526,486.26
6.00 1,080,822.01 6,484,932.08
1,200.60 32,232.49 38,698,329.07
127.93 257,905.46 32,993,845.63
17.09 47,555.20 812,718.37

4.39 1,061,046.21 4,657,992.88


948.05 32,232.49 30,558,013.39
36.58 47,555.20 1,739,569.22
47.55 21,100.50 1,003,328.82
3.64 257,905.46 938,775.88

3.66 115,345.97 422,166.26


7.66 115,345.97 883,550.15
66.02 110,908.79 7,322,198.12

19.20 28,411.98 545,509.95


HARGA
VOLUME TOTAL
SATUAN

d e f=dxe

15.60 110,908.79 1,730,177.08

307.78 33,562.81 10,329,962.73


264.46 33,562.81 8,876,021.65
15.42 21,100.50 325,369.72
77.86 21,100.50 1,642,885.00
65.39 21,100.50 1,379,761.76
127.93 42,055.54 5,380,165.30

36.58 21,100.50 771,856.33


93.81 33,562.81 3,148,527.53
108.25 33,562.81 3,633,174.56

290.78 33,562.81 9,759,394.90


69.32 33,562.81 2,326,574.23
4.39 21,100.50 92,631.20
9.19 21,100.50 193,913.60
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe

76.26 33,562.81 2,559,500.15


80.10 33,562.81 2,688,381.36
33.41 21,100.50 704,967.74

10.00 244,200.00 2,442,000.00


2.00 370,700.00 741,400.00

6.00 2,291,300.00 13,747,800.00


6.00 598,400.00 3,590,400.00
2.00 302,500.00 605,000.00
5.00 289,850.00 1,449,250.00
6.00 2,517,900.00 15,107,400.00
1.00 598,400.00 598,400.00
6.00 244,200.00 1,465,200.00
1.00 2,291,300.00 2,291,300.00
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
1.00 3,025,000.00 3,025,000.00
1.00 507,100.00 507,100.00

1.00 5,500,000.00 5,500,000.00


7.00 115,500.00 808,500.00
7.00 16,500.00 115,500.00
2.00 17,875.00 35,750.00
3.00 12,612.60 37,837.80
2.00 76,560.00 153,120.00
2.00 9,589,250.00 19,178,500.00
16.00 138,600.00 2,217,600.00
97.00 59,180.00 5,740,460.00
16.00 98,645.25 1,578,324.00
4.00 62,315.00 249,260.00
7.00 15,760.25 110,321.75
21.00 12,039.50 252,829.50
1.00 240,900.00 240,900.00
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
1.00 145,569,600.00 145,569,600.00
3.00 115,500.00 346,500.00
1.00 17,875.00 17,875.00
2.00 38,390.00 76,780.00
1.00 46,068.00 46,068.00
2.00 708,100.80 1,416,201.60
5.00 552,970.00 2,764,850.00
7.00 552,970.00 3,870,790.00
11.00 382,030.00 4,202,330.00
10.00 59,180.00 591,800.00
1.00 3,670,040.00 3,670,040.00
1.00 7,700,000.00 7,700,000.00
1.00 6,600,000.00 6,600,000.00
1.00 4,950,000.00 4,950,000.00
1.00 4,950,000.00 4,950,000.00
1.00 4,950,000.00 4,950,000.00
3.00 2,750,000.00 8,250,000.00

14.00 115,500.00 1,617,000.00


HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
26.00 16,500.00 429,000.00
2.00 17,875.00 35,750.00
6.00 12,612.60 75,675.60
40.00 138,600.00 5,544,000.00
1.00 181,500.00 181,500.00
1.00 968,000.00 968,000.00
32.00 98,645.25 3,156,648.00
37.00 78,075.25 2,888,784.25
6.00 62,315.00 373,890.00
16.00 15,760.25 252,164.00
47.00 12,039.50 565,856.50
1.00 746,900.00 746,900.00
2.00 482,900.00 965,800.00
2.00 240,900.00 481,800.00
45.00 89,127.50 4,010,737.50
3.00 26,950.00 80,850.00
16.00 53,790.00 860,640.00
4.00 31,350.00 125,400.00
14.00 58,437.50 818,125.00
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
22.00 21,780.00 479,160.00
63.00 42,707.50 2,690,572.50
1.00 185,900.00 185,900.00
4.00 149,600.00 598,400.00
25.00 62,150.00 1,553,750.00
1.00 27,500,000.00 27,500,000.00
1.00 71,500,000.00 71,500,000.00
76.56 168,648.31 12,911,714.60
129.25 168,648.31 21,797,794.04
1.50 119,027.81 178,541.71
2.50 119,027.81 297,569.51
0.75 530,815.73 398,111.80
1.25 530,815.73 663,519.66

1.00 - -
1.00 53,790.00 53,790.00
14.00 38,197.50 534,765.00
2.00 21,780.00 43,560.00
5.00 26,180.00 130,900.00
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
1.00 530,200.00 530,200.00
1.00 1,568,600.00 1,568,600.00
1.00 482,900.00 482,900.00
2.00 240,900.00 481,800.00

1.00 -
1.00 -

1.00 -
1.00 -

1.00 -

20.00 -
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe

101.28 -
16.00 -
556.43 183,406.74 102,053,012.34
55.64 530,815.73 29,534,587.15
152.52 155,428.37 23,705,935.44
1,200.00 303,260.33 363,912,395.43
3,129,594,395.63

64.00 55,645.63 3,561,320.58

101.92 168,648.31 17,188,635.74


81.67 168,648.31 13,773,507.46
7.43 55,645.63 413,447.06
33.98 395,567.69 13,441,390.23
14.85 553,145.01 8,213,097.11
32.67 935,796.40 30,568,350.88
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
2.60 853,820.51 2,219,933.34

1,441.71 32,232.49 46,469,767.10


52.00 131,820.38 6,854,659.53
13.00 1,080,822.01 14,050,686.18

29.70 137,939.13 4,096,240.27


265.58 32,232.49 8,560,305.04
2.23 1,080,822.01 2,407,206.79

248.00 218,745.46 54,248,874.33


2,609.75 32,232.49 84,118,615.09
19.47 1,080,822.01 21,041,442.97

649.72 222,416.71 144,508,585.47


8,527.13 32,232.49 274,850,614.02
60.30 1,080,822.01 65,173,567.44

1,382.00 35,750.00 49,406,500.00


HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
6.00 203,767.36 1,222,604.17

537.80 257,905.46 138,701,556.93


3,826.39 32,232.49 123,333,992.19
62.02 1,080,822.01 67,028,258.02

86.04 222,416.71 19,136,733.81


316.45 32,232.49 10,199,971.88
9.89 1,080,822.01 10,688,248.90
442.33 131,278.66 58,068,491.45
339.56 253,000.00 85,908,680.00
884.66 62,876.21 55,624,067.05
884.66 33,977.13 30,058,207.83
95.08 239,155.84 22,738,937.27
128.80 239,155.84 30,803,272.19
304.00 62,876.21 19,114,367.54
304.00 33,977.13 10,329,047.52
242.00 62,876.21 15,216,042.58
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
242.00 33,977.13 8,222,465.46
373.00 115,345.97 43,024,047.74
884.66 44,000.00 38,925,040.00
18.00 77,825.00 1,400,850.00
91.00 800,177.40 72,816,143.40
1.00 226,370.40 226,370.40
121.00 132,000.00 15,972,000.00
7.00 2,090,000.00 14,630,000.00
4.00 2,640,000.00 10,560,000.00

3.00 -
53.00 -
22.00 -

12.00 -
12.00 -
101.00 -
30.00 -
104.50 -
HARGA
VOLUME TOTAL
SATUAN

d e f=dxe
70.00 -
2.84 122,950.47 348,564.59
15.00 -
1,765,903,386.94
ANALISA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

1 M' Pengukuran & Pemasangan Bouwplank


Kaso kelas III 0.0070 M3
Paku 0.0200 Kg
Papan kelas III 0.0070 M3
Pekerja Harian 0.1000 Oh
Tukang Kayu 0.1000 Oh
Kepala Tukang Kayu 0.0100 Oh
Mandor 0.0050 Oh

1 M2 Direksi Keet Lantai Plester


Dolken Kayu Dia. 8-10/400 cm 1.2500 Btg
Kayu 0.1800 M3
Paku 0.8500 Kg
Semen Portland 0.7000 Zak
Pasir Pasang 0.1500 M3
Pasir Beton 0.1000 M3
Koral Beton 0.1500 M3
Bata Merah 30.0000 Bh
Seng Plat 0.2500 Lbr
Jendela Nako 10.0000 Daun
Kaca Polos 3 mm 0.0800 M2
Kunci Tanam 0.1500 Bh
Plywood 4 mm 0.0600 Lbr
Pekerja Harian 1.0000 Oh
Tukang Kayu 1.5000 Oh
Tukang Batu 1.0000 Oh
Kepala Tukang Kayu 0.3000 Oh
Mandor 0.0500 Oh

1 M2 Gudang Bahan & Alat


ANALISA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Dolken Kayu Dia. 8-10/400 cm 1.2000 Btg


Kayu 0.1400 M3
Paku 0.3000 Kg
Semen Portland 0.2100 Zak
Pasir Beton 0.0300 M3
Koral Beton 0.0500 M3
Seng Gelombang Bjls 25 1.0000 Lbr
Pekerja Harian 1.0000 Oh
Tukang Kayu 1.2000 Oh
Kepala Tukang Kayu 0.1200 Oh
Mandor 0.0500 Oh

1 M2 Pembersihan Lahan & Perataan


Pekerja Harian 0.0233 Oh
Mandor 0.0047 Oh
Dump Truck 0.0246 Jam
Alat Bantu 1.0000 Ls
ANALISA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

1 M2 Pemasangan Perancah
Sewa Scaffolding 1.0000 Set
Pekerja 0.2500 Oh
Tukang Kayu 0.6000 Oh
Kepala Tukang Kayu 0.0600 Oh
Mandor 0.0120 Oh

1 M2 Pembongkaran Lean Concrete


Pekerja Harian 0.3333 Oh
Mandor 0.0556 Oh
Jack Hammer 0.4016 Jam
Compressor 0.4016 Jam
Dump Truck 0.3860 Jam

1 M' Saluran Beton, U-ditch 600x600


- Pasangan Uditch 600
Saluran Beton Bertulang Uditch 600 1.0000 M'
Tamper 0.6024 Jam
Truck Crane 0.1235 Jam
Alat Bantu 1.0000 Ls
Pekerja Harian 0.2670 Oh
Mandor 0.0330 Oh
- Beton Ready Mix K-250
Pekerja Harian 0.0107 Oh
Tukang 0.0107 Oh
Mandor 0.0015 Oh
Beton Ready Mix K-250 0.0480 M3
Kayu Perancah 0.0096 M3
Paku 0.0768 Kg
Concrete Vibrator 0.0032 Jam
ANALISA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Water Tanker 0.0018 Jam


Alat Bantu 1.0000 Ls
- Urugan Pasir
Pasir Urug 0.0960 M3
Pekerja Harian 0.0288 Oh
Mandor 0.0010 Oh

1 M' Saluran Beton, Tipe DS-2


- Pasangan Batu Kali
Batu Kali 1.1100 M3
Semen Portland 4.3336 Zak
Pasir Pasang 0.5000 M3
Pekerja Harian 1.6650 Oh
Tukang Batu 0.8325 Oh
Kepala Tukang Batu 0.0833 Oh
Mandor 0.0833 Oh
- Beton Ready Mix K-250
Pekerja Harian 0.0258 Oh
Tukang 0.0258 Oh
ANALISA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Mandor 0.0037 Oh
Beton Ready Mix K-250 0.1164 M3
Kayu Perancah 0.0233 M3
Paku 0.1862 Kg
Concrete Vibrator 0.0078 Jam
Water Tanker 0.0044 Jam
Alat Bantu 1.0000 Ls

1 M' Saluran Beton, Tipe DS-3


- Pasangan Batu Kali
Batu Kali 0.9960 M3
Semen Portland 4.0238 Zak
Pasir Pasang 0.4831 M3
Pekerja Harian 1.4940 Oh
Tukang Batu 0.7470 Oh
Kepala Tukang Batu 0.0747 Oh
Mandor 0.0747 Oh
- Beton K-250
Pekerja Harian 0.0186 Oh
Tukang 0.0186 Oh
Mandor 0.0027 Oh
Beton Ready Mix K-250 0.0840 M3
Kayu Perancah 0.0168 M3
Paku 0.1344 Kg
Concrete Vibrator 0.0056 Jam
Water Tanker 0.0032 Jam
Alat Bantu 1.0000 Ls

1 M' Saluran Beton, Tipe DS-4


- Pasangan Uditch 1000
ANALISA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Saluran Beton Bertulang Uditch 1000 1.0000 M'


Plat Decker 1.0000 M'
Tamper 0.6024 Jam
Truck Crane 0.1235 Jam
Alat Bantu 1.0000 Ls
Pekerja Harian 0.2670 Oh
Mandor 0.0330 Oh
- Beton Ready Mix K-250
Pekerja Harian 0.0192 Oh
Tukang 0.0192 Oh
Mandor 0.0027 Oh
Beton Ready Mix K-250 0.0864 M3
Kayu Perancah 0.0173 M3
Paku 0.1382 Kg
Concrete Vibrator 0.0058 Jam
Water Tanker 0.0033 Jam
Alat Bantu 1.0000 Ls
- Urugan Pasir
Pasir Urug 0.1728 M3
Pekerja Harian 0.0518 Oh
Mandor 0.0017 Oh

1 Unit Bak Kontrol 800x800


- Pasangan Batu Kali
Batu Kali 1.0560 M3
Semen Portland 4.2662 Zak
Pasir Pasang 0.5122 M3
Pekerja Harian 1.5840 Oh
Tukang Batu 0.7920 Oh
Kepala Tukang Batu 0.0792 Oh
Mandor 0.0792 Oh
- Beton K-250
Pekerja Harian 0.0213 Oh
ANALISA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Tukang 0.0213 Oh
Mandor 0.0030 Oh
Beton Ready Mix K-250 0.0960 M3
Kayu Perancah 0.0192 M3
Paku 0.1536 Kg
Concrete Vibrator 0.0064 Jam
Water Tanker 0.0037 Jam
Alat Bantu 1.0000 Ls

1 M3 Galian Saluran
Pekerja Harian 0.3683 Oh
Mandor 0.0921 Oh
Excavator 0.0120 Jam
Dump Truck 0.2762 Jam
Alat Bantu 1.0000 Ls

1 M2 Wet Lean Concrete (t=10 cm)


Pekerja Harian 0.0023 Oh
Tukang 0.0080 Oh
Mandor 0.0012 Oh
Beton Ready Mix K-100 0.1200 M3
Kayu Perancah 0.0120 M3
Paku 0.0960 Kg
Concrete Vibrator 0.0080 Jam
Water Tanker 0.0046 Jam
Alat Bantu 1.0000 Ls
ANALISA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

1 M3 Urugan Pasir
Pekerja Harian 0.5818 Oh
Mandor 0.1455 Oh
Pasir Urug 1.0500 M3
Dump Truck 0.4364 Jam
Tamper 0.2410 Jam
Water Tanker 0.0070 Jam
Alat Bantu 1.0000 Ls

1 M2 Tipe A, Rigid 20 cm Non Wiremesh


- Beton Ready Mix K-450
Pekerja Harian 0.2187 Oh
Tukang 0.0729 Oh
Mandor 0.0182 Oh
Beton ready Mix K-450 0.2400 M3
Baja Tulangan Polos 4.6244 Kg
Joint Sealent 0.1140 Kg
Cat Anti Karat 0.0375 Kg
Expansion Cap 0.4800 M'
Polytene 125 mikron 0.1236 M2
Curing Compound 0.1764 L
Multipleks 12 mm 0.0875 Lbr
Kayu Acuan 0.0032 M3
Paku 0.4800 Kg
Concrete Vibrator 0.0048 Jam
Water Tanker 0.1013 Jam
Concrete Paver 0.0018 Jam
Alat Bantu 1.0000 Ls
- Beton Ready Mix K-100
Pekerja Harian 0.0023 Oh
Tukang 0.0080 Oh
Mandor 0.0012 Oh
Beton Ready Mix K-100 0.1200 M3
ANALISA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Kayu Perancah 0.0120 M3


Paku 0.0960 Kg
Concrete Vibrator 0.0080 Jam
Water Tanker 0.0046 Jam
Alat Bantu 1.0000 Ls
- Baja Tulangan U24 Polos
Pekerja Harian 0.1026 Oh
Tukang 0.0342 Oh
Mandor 0.0342 Oh
Baja Tulangan U24 Polos 6.8422 Kg
Kawat Beton 0.1368 Kg
Alat Bantu 1.0000 Ls
- Baja Tulangan D40 Ulir
Pekerja Harian 0.0150 Oh
Tukang 0.0050 Oh
Mandor 0.0050 Oh
Baja Tulangan D40 Ulir 1.0500 Kg
Kawat Beton 0.0200 Kg
Alat Bantu 1.0000 Ls
- Wiremesh
Pekerja Harian 1.1445 Oh
Tukang 0.3815 Oh
Mandor 0.1908 Oh
Wiremesh 5.4500 Kg
Kawat Beton 0.1090 Kg
Alat Bantu 1.0000 Ls

1 M2 Tipe B, Rigid 30 cm Non Wiremesh


- Beton Ready Mix K-450
Pekerja Harian 0.3280 Oh
Tukang 0.1093 Oh
Mandor 0.0273 Oh
Beton ready Mix K-450 0.3600 M3
ANALISA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Baja Tulangan Polos 6.9367 Kg


Joint Sealent 0.1711 Kg
Cat Anti Karat 0.0562 Kg
Expansion Cap 0.7200 M'
Polytene 125 mikron 0.1854 M2
Curing Compound 0.2646 L
Multipleks 12 mm 0.1313 Lbr
Kayu Acuan 0.0049 M3
Paku 0.7200 Kg
Concrete Vibrator 0.0072 Jam
Water Tanker 0.1519 Jam
Concrete Paver 0.0027 Jam
Alat Bantu 1.0000 Ls
- Beton Ready Mix K-100
Pekerja Harian 0.0011 Oh
Tukang 0.0040 Oh
Mandor 0.0006 Oh
Beton Ready Mix K-100 0.0600 M3
Kayu Perancah 0.0060 M3
Paku 0.0480 Kg
Concrete Vibrator 0.0040 Jam
Water Tanker 0.0023 Jam
Alat Bantu 1.0000 Ls
- Baja Tulangan U24
Pekerja Harian 0.1026 Oh
Tukang 0.0342 Oh
Mandor 0.0342 Oh
Baja Tulangan U24 Polos 6.8422 Kg
Kawat Beton 0.1368 Kg
Alat Bantu 1.0000 Ls
- Baja Tulangan D40 Ulir
Pekerja Harian 0.0150 Oh
Tukang 0.0050 Oh
Mandor 0.0050 Oh
Baja Tulangan D40 Ulir 1.0500 Kg
Kawat Beton 0.0200 Kg
ANALISA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Alat Bantu 1.0000 Ls


- Wiremesh
Pekerja Harian 1.1445 Oh
Tukang 0.3815 Oh
Mandor 0.1908 Oh
Wiremesh 5.4500 Kg
Kawat Beton 0.1090 Kg
Alat Bantu 1.0000 Ls

1 M2 Tipe C, Rigid 20 cm Wiremesh


- Beton Ready Mix K-450
Pekerja Harian 0.2187 Oh
Tukang 0.0729 Oh
Mandor 0.0182 Oh
Beton ready Mix K-450 0.2400 M3
Baja Tulangan Polos 4.6244 Kg
Joint Sealent 0.1140 Kg
Cat Anti Karat 0.0375 Kg
Expansion Cap 0.4800 M'
Polytene 125 mikron 0.1236 M2
Curing Compound 0.1764 L
Multipleks 12 mm 0.0875 Lbr
Kayu Acuan 0.0032 M3
Paku 0.4800 Kg
Concrete Vibrator 0.0048 Jam
Water Tanker 0.1013 Jam
Concrete Paver 0.0018 Jam
Alat Bantu 1.0000 Ls
- Beton Ready Mix K-100
Pekerja Harian 0.0023 Oh
Tukang 0.0080 Oh
Mandor 0.0012 Oh
Beton Ready Mix K-100 0.1200 M3
ANALISA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Kayu Perancah 0.0120 M3


Paku 0.0960 Kg
Concrete Vibrator 0.0080 Jam
Water Tanker 0.0046 Jam
Alat Bantu 1.0000 Ls
- Baja Tulangan U24
Pekerja Harian 0.1026 Oh
Tukang 0.0342 Oh
Mandor 0.0342 Oh
Baja Tulangan U24 Polos 6.8422 Kg
Kawat Beton 0.1368 Kg
Alat Bantu 1.0000 Ls
- Baja Tulangan D40 Ulir
Pekerja Harian 0.0150 Oh
Tukang 0.0050 Oh
Mandor 0.0050 Oh
Baja Tulangan D40 Ulir 1.0500 Kg
Kawat Beton 0.0200 Kg
Alat Bantu 1.0000 Ls
- Wiremesh
Pekerja Harian 2.2890 Oh
Tukang 0.7630 Oh
Mandor 0.3815 Oh
Wiremesh 10.9000 Kg
Kawat Beton 0.2180 Kg
Alat Bantu 1.0000 Ls

1 M2 Tipe D, Rigid 30 cm Wiremesh


- Beton Ready Mix K-450
Pekerja Harian 0.3280 Oh
Tukang 0.1093 Oh
Mandor 0.0273 Oh
Beton ready Mix K-450 0.3600 M3
ANALISA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Baja Tulangan Polos 6.9367 Kg


Joint Sealent 0.1711 Kg
Cat Anti Karat 0.0562 Kg
Expansion Cap 0.7200 M'
Polytene 125 mikron 0.1854 M2
Curing Compound 0.2646 L
Multipleks 12 mm 0.1313 Lbr
Kayu Acuan 0.0049 M3
Paku 0.7200 Kg
Concrete Vibrator 0.0072 Jam
Water Tanker 0.1519 Jam
Concrete Paver 0.0027 Jam
Alat Bantu 1.0000 Ls
- Beton Ready Mix K-100
Pekerja Harian 0.0011 Oh
Tukang 0.0040 Oh
Mandor 0.0006 Oh
Beton Ready Mix K-100 0.0600 M3
Kayu Perancah 0.0060 M3
Paku 0.0480 Kg
Concrete Vibrator 0.0040 Jam
Water Tanker 0.0023 Jam
Alat Bantu 1.0000 Ls
- Baja Tulangan U24
Pekerja Harian 0.1026 Oh
Tukang 0.0342 Oh
Mandor 0.0342 Oh
Baja Tulangan U24 Polos 6.8422 Kg
Kawat Beton 0.1368 Kg
Alat Bantu 1.0000 Ls
- Baja Tulangan D40 Ulir
Pekerja Harian 0.0150 Oh
Tukang 0.0050 Oh
Mandor 0.0050 Oh
Baja Tulangan D40 Ulir 1.0500 Kg
Kawat Beton 0.0200 Kg
ANALISA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Alat Bantu 1.0000 Ls


- Wiremesh
Pekerja Harian 2.2890 Oh
Tukang 0.7630 Oh
Mandor 0.3815 Oh
Wiremesh 10.9000 Kg
Kawat Beton 0.2180 Kg
Alat Bantu 1.0000 Ls

1 Buah Penanaman Pohon Bintaro


Pekerja Harian 0.2800 Oh
Mandor 0.0467 Oh
Pohon Bintaro 1.0000 Bh
Pupuk Kandang 0.0917 Kg
Alat Bantu 1.0000 Ls

1 M2 Semak/Perdu
Pekerja Harian 0.1400 Oh
Mandor 0.0233 Oh
Semak/Perdu 1.1000 M2
Tanah Humus 0.2200 M3
Pupuk Kandang 0.2500 Kg
Planter Box 1.0000 M2
Alat Bantu 1.0000 Ls

1 M2 Marka Jalan Termoplastik


Pekerja Biasa 0.2667 Oh
ANALISA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Tukang 0.0667 Oh
Mandor 0.0333 Oh
Cat Marka Termoplastik 1.9695 Kg
Thinner 1.0605 L
Glass Bead 0.4500 Kg
Compressor 0.1000 Jam
Dump Truck 0.1000 Jam
Alat Bantu 1.0000 Ls

1 M2 Marka Jalan Non Termoplastik


Pekerja Biasa 0.2667 Oh
Tukang 0.0667 Oh
Mandor 0.0333 Oh
Cat Marka Non Termoplastik 1.9500 Kg
Thinner 1.0500 L
Glass Bead 0.4500 Kg
Compressor 0.1000 Jam
Dump Truck 0.1000 Jam
Alat Bantu 1.0000 Ls

1 M' RCP Dia. 600


- Pasangan RCP Dia.600
Reinforced Concrete Pipe Dia. 600 mm 1.0000 M'
Tamper 0.6024 Jam
Truck Crane 0.1235 Jam
Alat Bantu 1.0000 Ls
Pekerja Harian 0.2670 Oh
Mandor 0.0330 Oh
- Beton Ready Mix K-250
Pekerja Harian 0.0107 Oh
ANALISA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Tukang 0.0107 Oh
Mandor 0.0015 Oh
Beton Ready Mix K-250 0.0480 M3
Kayu Perancah 0.0096 M3
Paku 0.0768 Kg
Concrete Vibrator 0.0032 Jam
Water Tanker 0.0018 Jam
Alat Bantu 1.0000 Ls
- Urugan Pasir
Pasir Urug 0.0960 M3
Pekerja Harian 0.0288 Oh
Mandor 0.0010 Oh
SA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
AAN PEMBANGUNAN REST AREA PADA JALAN TOL
MARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

2,225,000.00 15,575.00
15,397.00 307.94
1,780,000.00 12,460.00
79,200.00 7,920.00
96,800.00 9,680.00
104,500.00 1,045.00
96,800.00 484.00
Jumlah..Rp 47,471.94
Overhead & Profit..Rp 4,747.19
Jumlah Dibulatkan..Rp 52,219.13

17,800.00 22,250.00
2,225,000.00 400,500.00
15,397.00 13,087.45
51,620.00 36,134.00
265,220.00 39,783.00
282,130.00 28,213.00
282,130.00 42,319.50
768.07 23,042.10
106,800.00 26,700.00
26,700.00 267,000.00
80,100.00 6,408.00
48,950.00 7,342.50
44,500.00 2,670.00
79,200.00 79,200.00
96,800.00 145,200.00
96,800.00 96,800.00
104,500.00 31,350.00
96,800.00 4,840.00
Jumlah..Rp 1,272,839.55
Overhead & Profit..Rp 127,283.96
Jumlah Dibulatkan..Rp 1,400,123.51
SA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
AAN PEMBANGUNAN REST AREA PADA JALAN TOL
MARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

17,800.00 21,360.00
2,225,000.00 311,500.00
15,397.00 4,619.10
51,620.00 10,840.20
282,130.00 8,463.90
282,130.00 14,106.50
94,162.00 94,162.00
79,200.00 79,200.00
96,800.00 116,160.00
104,500.00 12,540.00
96,800.00 4,840.00
Jumlah..Rp 677,791.70
Overhead & Profit..Rp 67,779.17
Jumlah Dibulatkan..Rp 745,570.87

118,625.00 2,767.92
140,744.00 656.81
496,366.11 12,210.61
1,000.00 1,000.00
Jumlah..Rp 16,635.33
Overhead & Profit..Rp 1,663.53
Jumlah Dibulatkan..Rp 18,298.86
SA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
AAN PEMBANGUNAN REST AREA PADA JALAN TOL
MARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

241,190.00 241,190.00
79,200.00 19,800.00
96,800.00 58,080.00
104,500.00 6,270.00
96,800.00 1,161.60
Jumlah..Rp 326,501.60
Overhead & Profit..Rp 32,650.16
Jumlah Dibulatkan..Rp 359,151.76

79,200.00 26,400.00
96,800.00 5,378.85
17,385.48 6,982.01
183,527.26 73,704.55
238,235.05 91,958.73
Jumlah..Rp 204,424.14
Overhead & Profit..Rp 20,442.41
Jumlah Dibulatkan..Rp 224,866.56

579,686.67 579,686.67
51,444.25 30,990.01
245,284.14 30,292.59
1,000.00 1,000.00
79,200.00 21,146.40
96,800.00 3,194.40

79,200.00 843.58
96,800.00 1,031.04
96,800.00 147.29
685,300.00 32,894.40
2,225,000.00 21,360.00
15,397.00 1,182.49
28,540.97 91.38
SA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
AAN PEMBANGUNAN REST AREA PADA JALAN TOL
MARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

182,529.43 334.69
1,000.00 1,000.00

204,700.00 19,651.20
79,200.00 2,280.96
96,800.00 92.93
Jumlah..Rp 747,220.01
Overhead & Profit..Rp 74,722.00
Jumlah Dibulatkan..Rp 821,942.02

255,875.00 284,021.25
51,620.00 223,700.43
265,220.00 132,610.00
79,200.00 131,868.00
96,800.00 80,586.00
104,500.00 8,699.63
96,800.00 8,058.60

79,200.00 2,045.67
96,800.00 2,500.26
SA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
AAN PEMBANGUNAN REST AREA PADA JALAN TOL
MARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

96,800.00 357.18
685,300.00 79,768.92
2,225,000.00 51,798.00
15,397.00 2,867.54
28,540.97 221.59
182,529.43 811.61
1,000.00 1,000.00
Jumlah..Rp 1,010,914.68
Overhead & Profit..Rp 101,091.47
Jumlah Dibulatkan..Rp 1,112,006.15

255,875.00 254,851.50
51,620.00 207,710.62
265,220.00 128,117.17
79,200.00 118,324.80
96,800.00 72,309.60
104,500.00 7,806.15
96,800.00 7,230.96

79,200.00 1,476.26
96,800.00 1,804.31
96,800.00 257.76
685,300.00 57,565.20
2,225,000.00 37,380.00
15,397.00 2,069.36
28,540.97 159.91
182,529.43 585.70
1,000.00 1,000.00
Jumlah..Rp 898,649.30
Overhead & Profit..Rp 89,864.93
Jumlah Dibulatkan..Rp 988,514.23
SA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
AAN PEMBANGUNAN REST AREA PADA JALAN TOL
MARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

1,344,434.00 1,344,434.00
551,874.17 551,874.17
51,444.25 30,990.01
245,284.14 30,292.59
1,000.00 1,000.00
79,200.00 21,146.40
96,800.00 3,194.40

79,200.00 1,518.44
96,800.00 1,855.87
96,800.00 265.12
685,300.00 59,209.92
2,225,000.00 38,448.00
15,397.00 2,128.48
28,540.97 164.48
182,529.43 602.43
1,000.00 1,000.00

204,700.00 35,372.16
79,200.00 4,105.73
96,800.00 167.27
Jumlah..Rp 2,127,769.47
Overhead & Profit..Rp 212,776.95
Jumlah Dibulatkan..Rp 2,340,546.42

255,875.00 270,204.00
51,620.00 220,223.31
265,220.00 135,835.08
79,200.00 125,452.80
96,800.00 76,665.60
104,500.00 8,276.40
96,800.00 7,666.56

79,200.00 1,687.15
SA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
AAN PEMBANGUNAN REST AREA PADA JALAN TOL
MARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

96,800.00 2,062.07
96,800.00 294.58
685,300.00 65,788.80
2,225,000.00 42,720.00
15,397.00 2,364.98
28,540.97 182.75
182,529.43 669.37
1,000.00 1,000.00
Jumlah..Rp 961,093.45
Overhead & Profit..Rp 96,109.35
Jumlah Dibulatkan..Rp 1,057,202.80

79,200.00 29,166.72
96,800.00 8,912.05
574,488.46 6,893.86
238,235.05 65,800.52
1,000.00 1,000.00
Jumlah..Rp 111,773.16
Overhead & Profit..Rp 11,177.32
Jumlah Dibulatkan..Rp 122,950.47

79,200.00 181.53
96,800.00 774.79
96,800.00 111.51
640,800.00 76,896.00
2,225,000.00 26,700.00
15,397.00 1,478.11
28,540.97 228.44
182,529.43 836.71
1,000.00 1,000.00
Jumlah..Rp 108,207.10
Overhead & Profit..Rp 10,820.71
Jumlah Dibulatkan..Rp 119,027.81
SA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
AAN PEMBANGUNAN REST AREA PADA JALAN TOL
MARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

118,625.00 69,019.98
140,744.00 20,473.56
50,000.00 52,500.00
496,366.11 216,614.17
57,802.53 13,930.41
205,089.25 1,435.62
1,000.00 1,000.00
Jumlah..Rp 374,973.74
Overhead & Profit..Rp 37,497.37
Jumlah Dibulatkan..Rp 412,471.12

79,200.00 17,320.72
96,800.00 7,056.33
96,800.00 1,764.08
796,550.00 191,172.00
6,132.10 28,357.53
55,019.80 6,274.90
31,150.00 1,167.00
6,461.40 3,101.47
4,450.00 550.02
14,507.00 2,559.03
129,050.00 11,292.39
2,225,000.00 7,209.00
15,397.00 7,390.56
28,540.97 137.68
182,529.43 18,486.58
-
1,000.00 1,000.00

79,200.00 181.53
96,800.00 774.79
96,800.00 111.51
640,800.00 76,896.00
SA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
AAN PEMBANGUNAN REST AREA PADA JALAN TOL
MARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

2,225,000.00 26,700.00
15,397.00 1,478.11
28,540.97 228.44
182,529.43 836.71
1,000.00 1,000.00

79,200.00 8,128.53
96,800.00 3,311.62
96,800.00 3,311.62
10,617.04 72,643.92
15,397.00 2,106.99
1,000.00 1,000.00

79,200.00 1,188.00
96,800.00 484.00
96,800.00 484.00
10,691.90 11,226.49
15,397.00 307.94
1,000.00 1,000.00

79,200.00 90,644.40
96,800.00 36,929.20
96,800.00 18,464.60
11,481.00 62,571.45
15,397.00 1,678.27
1,000.00 1,000.00
Jumlah..Rp 729,527.45
Overhead & Profit..Rp 72,952.75
Jumlah Dibulatkan..Rp 802,480.20

79,200.00 25,981.08
96,800.00 10,584.50
96,800.00 2,646.12
796,550.00 286,758.00
SA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
AAN PEMBANGUNAN REST AREA PADA JALAN TOL
MARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

6,132.10 42,536.29
55,019.80 9,412.35
31,150.00 1,750.51
6,461.40 4,652.21
4,450.00 825.03
14,507.00 3,838.55
129,050.00 16,938.59
2,225,000.00 10,813.50
15,397.00 11,085.84
28,540.97 206.52
182,529.43 27,729.87
-
1,000.00 1,000.00

79,200.00 90.76
96,800.00 387.39
96,800.00 55.76
640,800.00 38,448.00
2,225,000.00 13,350.00
15,397.00 739.06
28,540.97 114.22
182,529.43 418.36
1,000.00 1,000.00

79,200.00 8,128.53
96,800.00 3,311.62
96,800.00 3,311.62
10,617.04 72,643.92
15,397.00 2,106.99
1,000.00 1,000.00

79,200.00 1,188.00
96,800.00 484.00
96,800.00 484.00
10,691.90 11,226.49
15,397.00 307.94
SA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
AAN PEMBANGUNAN REST AREA PADA JALAN TOL
MARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

1,000.00 1,000.00

79,200.00 90,644.40
96,800.00 36,929.20
96,800.00 18,464.60
11,481.00 62,571.45
15,397.00 1,678.27
1,000.00 1,000.00
Jumlah..Rp 827,843.56
Overhead & Profit..Rp 82,784.36
Jumlah Dibulatkan..Rp 910,627.91

79,200.00 17,320.72
96,800.00 7,056.33
96,800.00 1,764.08
796,550.00 191,172.00
6,132.10 28,357.53
55,019.80 6,274.90
31,150.00 1,167.00
6,461.40 3,101.47
4,450.00 550.02
14,507.00 2,559.03
129,050.00 11,292.39
2,225,000.00 7,209.00
15,397.00 7,390.56
28,540.97 137.68
182,529.43 18,486.58
-
1,000.00 1,000.00

79,200.00 181.53
96,800.00 774.79
96,800.00 111.51
640,800.00 76,896.00
SA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
AAN PEMBANGUNAN REST AREA PADA JALAN TOL
MARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

2,225,000.00 26,700.00
15,397.00 1,478.11
28,540.97 228.44
182,529.43 836.71
1,000.00 1,000.00

79,200.00 8,128.53
96,800.00 3,311.62
96,800.00 3,311.62
10,617.04 72,643.92
15,397.00 2,106.99
1,000.00 1,000.00

79,200.00 1,188.00
96,800.00 484.00
96,800.00 484.00
10,691.90 11,226.49
15,397.00 307.94
1,000.00 1,000.00

79,200.00 181,288.80
96,800.00 73,858.40
96,800.00 36,929.20
11,481.00 125,142.90
15,397.00 3,356.55
1,000.00 1,000.00
Jumlah..Rp 939,815.37
Overhead & Profit..Rp 93,981.54
Jumlah Dibulatkan..Rp 1,033,796.91

79,200.00 25,981.08
96,800.00 10,584.50
96,800.00 2,646.12
796,550.00 286,758.00
SA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
AAN PEMBANGUNAN REST AREA PADA JALAN TOL
MARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

6,132.10 42,536.29
55,019.80 9,412.35
31,150.00 1,750.51
6,461.40 4,652.21
4,450.00 825.03
14,507.00 3,838.55
129,050.00 16,938.59
2,225,000.00 10,813.50
15,397.00 11,085.84
28,540.97 206.52
182,529.43 27,729.87
-
1,000.00 1,000.00

79,200.00 90.76
96,800.00 387.39
96,800.00 55.76
640,800.00 38,448.00
2,225,000.00 13,350.00
15,397.00 739.06
28,540.97 114.22
182,529.43 418.36
1,000.00 1,000.00

79,200.00 8,128.53
96,800.00 3,311.62
96,800.00 3,311.62
10,617.04 72,643.92
15,397.00 2,106.99
1,000.00 1,000.00

79,200.00 1,188.00
96,800.00 484.00
96,800.00 484.00
10,691.90 11,226.49
15,397.00 307.94
SA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
AAN PEMBANGUNAN REST AREA PADA JALAN TOL
MARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

1,000.00 1,000.00
-
79,200.00 181,288.80
96,800.00 73,858.40
96,800.00 36,929.20
11,481.00 125,142.90
15,397.00 3,356.55
1,000.00 1,000.00
Jumlah..Rp 1,038,131.48
Overhead & Profit..Rp 103,813.15
Jumlah Dibulatkan..Rp 1,141,944.63

79,200.00 22,176.00
96,800.00 4,517.33
178,000.00 178,000.00
1,068.00 97.94
1,000.00 1,000.00
Jumlah..Rp 205,791.27
Overhead & Profit..Rp 20,579.13
Jumlah Dibulatkan..Rp 226,370.40

79,200.00 11,088.00
96,800.00 2,258.67
8,900.00 9,790.00
114,428.57 25,174.29
1,068.00 267.00
222,500.00 222,500.00
1,000.00 1,000.00
Jumlah..Rp 272,077.95
Overhead & Profit..Rp 27,207.80
Jumlah Dibulatkan..Rp 299,285.75

79,200.00 21,120.00
SA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
AAN PEMBANGUNAN REST AREA PADA JALAN TOL
MARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

96,800.00 6,453.33
96,800.00 3,226.67
23,496.00 46,275.37
23,496.00 24,917.51
21,048.50 9,471.83
183,527.26 18,352.73
238,235.05 23,823.51
1,000.00 1,000.00
Jumlah..Rp 154,640.94
Overhead & Profit..Rp 15,464.09
Jumlah Dibulatkan..Rp 170,105.03

79,200.00 21,120.00
96,800.00 6,453.33
96,800.00 3,226.67
26,433.00 51,544.35
23,496.00 24,670.80
21,048.50 9,471.83
183,527.26 18,352.73
238,235.05 23,823.51
1,000.00 1,000.00
Jumlah..Rp 159,663.21
Overhead & Profit..Rp 15,966.32
Jumlah Dibulatkan..Rp 175,629.53

-
51,444.25 30,990.01
245,284.14 30,292.59
1,000.00 1,000.00
79,200.00 21,146.40
96,800.00 3,194.40

79,200.00 843.58
SA HARGA SATUAN PEKERJAAN INFRASTRUKTUR
AAN PEMBANGUNAN REST AREA PADA JALAN TOL
MARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

96,800.00 1,031.04
96,800.00 147.29
685,300.00 32,894.40
2,225,000.00 21,360.00
15,397.00 1,182.49
28,540.97 91.38
182,529.43 334.69
1,000.00 1,000.00

204,700.00 19,651.20
79,200.00 2,280.96
96,800.00 92.93
Jumlah..Rp 167,533.35
Overhead & Profit..Rp 16,753.33
Jumlah Dibulatkan..Rp 184,286.68
ANALISA HARGA SATUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

1 M2 Pembersihan Lahan & Perataan


Pekerja Harian 0.0233 Oh
Mandor 0.0047 Oh
Dump Truck 0.0246 Jam
Alat Bantu 1.0000 Ls

1 M' Pengukuran & Pemasangan Bouwplank


Kaso kelas III 0.0070 M3
Paku 0.0200 Kg
Papan kelas III 0.0070 M3
Pekerja Harian 0.1000 Oh
Tukang Kayu 0.1000 Oh
Kepala Tukang Kayu 0.0100 Oh
Mandor 0.0050 Oh

1 M2 Pemadatan & Perataan Lahan


Pekerja Harian 0.5000 Oh
Mandor 0.0500 Oh
Pemadat Timbunan (Stamper) 1.2000 Jam

1 M3 Galian Tanah Biasa


Pekerja Harian 0.1841 Oh
Mandor 0.0921 Oh
Excavator 0.0120 Jam
Dump Truck 0.2760 Jam
Alat Bantu 1.0000 Ls
ANALISA HARGA SATUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

1 M3 Urugan Tanah Kembali


Pekerja Harian 0.1555 Oh
Mandor 0.6220 Oh
Tanah Urug 1.1000 M3
Wheel Loader 0.0085 Jam
Dump Truck 0.4665 Jam
Motor Grader 0.0040 Jam
Tandem 0.0161 Jam
Water Tanker 0.0070 Jam
Alat Bantu 1.0000 Ls

1 M3 Urugan Pasir
Pekerja Harian 0.5818 Oh
Mandor 0.1455 Oh
Pasir Urug 1.0500 M3
Dump Truck 0.4364 Jam
Tamper 0.2410 Jam
Water Tanker 0.0070 Jam
Alat Bantu 1.0000 Ls

1 M3 Lantai Kerja
Semen Portland 4.6000 Zak
Pasir Beton 0.6379 M3
Koral Beton 0.7608 M3
Air 0.2150 M3
ANALISA HARGA SATUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Pekerja 1.6500 Oh
Tukang Batu 0.2750 Oh
Kepala Tukang Batu 0.0280 Oh
Mandor 0.0830 Oh

1 M3 Beton K-125
Pekerja Harian 0.0191 Oh
Tukang 0.0667 Oh
Mandor 0.0096 Oh
Beton Ready Mix K-125 1.0100 M3
Kayu Perancah 0.1000 M3
Paku 0.8000 Kg
Concrete Vibrator 0.0667 Jam
Water Tanker 0.0382 Jam
Alat Bantu 1.0000 Ls

1 M3 Beton K-150
Pekerja Harian 0.2219 Oh
Tukang 0.2219 Oh
Mandor 0.0317 Oh
Beton Ready Mix K-150 1.0100 M3
Kayu Perancah 0.2000 M3
Paku 1.6000 Kg
Concrete Vibrator 0.0667 Jam
Water Tanker 0.0382 Jam
Alat Bantu 1.0000 Ls
ANALISA HARGA SATUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

1 M3 Beton K-250
Pekerja Harian 0.2219 Oh
Tukang 0.2219 Oh
Mandor 0.0317 Oh
Beton Ready Mix K-250 1.0100 M3
Kayu Perancah 0.2000 M3
Paku 1.6000 Kg
Concrete Vibrator 0.0667 Jam
Water Tanker 0.0382 Jam
Alat Bantu 1.0000 Ls

1 M3 Beton K-300
Pekerja Biasa 0.2219 Oh
Tukang 0.2219 Oh
Mandor 0.0317 Oh
Beton Ready Mix K-300 1.0100 M3
Kayu Perancah 0.2000 M3
Paku 1.6000 Kg
Concrete Vibrator 0.0667 Jam
Water Tanker 0.0382 Jam
Alat Bantu 1.0000 Ls

1 M3 Sloof Beton Bertulang (200 Kg Besi+Bekisting)


Kayu Kelas III 0.2700 M3
Paku 2.0000 Kg
Minyak Bekisting 0.6000 Ltr
Besi Beton Polos 210.0000 Kg
Kawat Beton 3.0000 Kg
ANALISA HARGA SATUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Beton Ready Mix K-300 1.0100 M3


Pekerja Harian 5.6500 Oh
Tukang Batu 0.2750 Oh
Tukang Kayu 1.5600 Oh
Tukang Besi 1.4000 Oh
Kepala Tukang 0.3230 Oh
Mandor 0.2830 Oh

1 Kg Pembesian
- Baja Tulangan U24 Polos
Pekerja Harian 0.0150 Oh
Tukang 0.0050 Oh
Mandor 0.0050 Oh
Baja Tulangan U24 Polos 1.0500 Kg
Kawat Beton 0.0200 Kg
Alat Bantu 1.0000 Ls
- Baja Tulangan D40 Ulir
Pekerja Harian 0.0150 Oh
Tukang 0.0050 Oh
Mandor 0.0050 Oh
Baja Tulangan D40 Ulir 1.0500 Kg
Kawat Beton 0.0200 Kg
Alat Bantu 1.0000 Ls

1 M2 Lantai 60x60 (Unpolished)


Ubin Granit 1.0000 M2
Semen Portland 0.1638 Zak
Pasir Pasang 0.0500 M3
Semen Warna 0.6500 Kg
ANALISA HARGA SATUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Pekerja 0.7000 Oh
Tukang Batu 0.3500 Oh
Kepala Tukang Batu 0.0400 Oh
Mandor 0.0400 Oh

1 M2 Lantai 60x60 (Polished)


Ubin Granit 1.0000 M2
Semen Portland 0.1638 Zak
Pasir Pasang 0.0500 M3
Semen Warna 0.6500 Kg
Pekerja 0.7000 Oh
Tukang Batu 0.3500 Oh
Kepala Tukang Batu 0.0400 Oh
Mandor 0.0400 Oh

1 M' Plint Lantai 10x60


Plint Granit 1.7000 Bh
Semen Portland 1.1400 Kg
Pasir Pasang 0.0030 M3
Semen Warna 0.1000 Kg
Pekerja Harian 0.0900 Oh
Tukang Batu 0.0900 Oh
Kepala Tukang Batu 0.0090 Oh
Mandor 0.0050 Oh

1 M3 Pasangan Batu Kosong


ANALISA HARGA SATUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Batu Belah 15/20 cm 1.2000 M3


Pasir Urug 0.4320 M3
Pekerja Harian 0.7800 Oh
Tukang Batu 0.3900 Oh
Kepala Tukang Batu 0.0390 Oh
Mandor 0.0390 Oh

1 M3 Pasangan Batu Kali 1:3


Batu Belah 15/20 cm 1.2000 M3
Semen Portand 4.0400 Zak
Pasir Pasang 0.4850 M3
Pekerja Harian 1.5000 Oh
Tukang Batu 0.7500 Oh
Kepala Tukang Batu 0.0750 Oh
Mandor 0.0750 Oh

1 M3 Pasangan Batu Kali 1:4


Batu Belah 15/20 cm 1.2000 M3
Semen Portand 3.2600 Zak
Pasir Pasang 0.5200 M3
Pekerja Harian 1.5000 Oh
Tukang Batu 0.7500 Oh
Kepala Tukang Batu 0.0750 Oh
Mandor 0.0750 Oh

1 M2 Pas. Dinding 1/2 Bata 1:2


ANALISA HARGA SATUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Batu Bata 70.0000 Bh


Semen Portland 0.3790 Zak
Pasir Pasang 0.0380 M3
Pekerja Harian 0.3000 Oh
Tukang Batu 0.1000 Oh
Kepala Tukang Batu 0.0100 Oh
Mandor 0.0150 Oh

1 M2 Pas. Dinding 1/2 Bata 1:3


Batu Bata 70.0000 Bh
Semen Portland 0.2874 Zak
Pasir Pasang 0.0400 M3
Pekerja Harian 0.3000 Oh
Tukang Batu 0.1000 Oh
Kepala Tukang Batu 0.0100 Oh
Mandor 0.0150 Oh

1 M2 Plesteran Dinding 1:2


Semen Portland 0.2045 Zak
Pasir Pasang 0.0200 M3
Pekerja Harian 0.3000 Oh
Tukang Batu 0.1500 Oh
Kepala Tukang Batu 0.0150 Oh
Mandor 0.0150 Oh

1 M2 Plesteran Dinding 1:4


ANALISA HARGA SATUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Semen Portland 0.1248 Zak


Pasir Pasang 0.0240 M3
Pekerja Harian 0.3000 Oh
Tukang Batu 0.1500 Oh
Kepala Tukang Batu 0.0150 Oh
Mandor 0.0150 Oh

1 M2 Acian Dinding
Semen Portland 0.0650 Zak
Pekerja Harian 0.2000 Oh
Tukang Batu 0.1000 Oh
Kepala Tukang Batu 0.0100 Oh
Mandor 0.0100 Oh

1 M2 Plafond Gypsum Board (termasuk rangka)


Gypsum 0.3600 Lbr
Paku 0.1100 Kg
Hollow Galvanis 1.0000 Btg
Dempul Gypsum 0.1500 Kg
Pekerja Harian 0.1000 Oh
Tukang Kayu 0.0500 Oh
Kepala Tukang Kayu 0.0100 Oh
Mandor 0.0100 Oh

1 M2 Waterproofing
Waterproofing 0.6000 Kg
ANALISA HARGA SATUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Pekerja Harian 0.1000 Oh


Tukang Batu 0.0800 Oh
Mandor 0.0200 Oh

1 M2 Atap Polycarbonate
Twinlite 0.0404 Lbr
Paku 0.0500 Kg
Pekerja Harian 0.1400 Oh
Tukang Kayu 0.0670 Oh
Kepala Tukang Kayu 0.0070 Oh
Mandor 0.0070 Oh

1 M2 Atap Zincalum
Atap Spandex 1.4290 M2
Paku Spandex 0.0200 Kg
Pekerja Harian 0.2000 Oh
Tukang Kayu 0.1000 Oh
Kepala Tukang Kayu 0.0100 Oh
Mandor 0.0100 Oh

1 M2 Cat Dinding Acrylic Emulsion


Plamir Tembok 0.1000 kg
Cat dasar emulsion 0.1000 ltr
Cat akhir emulsion 0.2600 ltr
Amplas kayu / besi 0.2000 lbr
Pekerja harian 0.0200 org
ANALISA HARGA SATUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Tukang cat 0.0630 org


Kepala tukang 0.0630 org
Mandor 0.0025 org

1 M2 Cat Dinding Weathershield


Plamir Tembok 0.1000 kg
Cat dasar emulsion 0.1000 ltr
Cat akhir wheathersield 0.2600 kg
Amplas kayu / besi 0.2000 lbr
Pekerja harian 0.0200 org
Tukang cat 0.0630 org
Kepala tukang 0.0630 org
Mandor 0.0025 org

1 M2 Cat Plafond
Plamir 0.1000 Kg
Amplas 0.1500 Lbr
Cat Dasar 0.1000 Kg
Cat Penutup 0.0560 Galon
Rol Cat 0.0100 Bh
Pekerja Harian 0.0300 Oh
Tukang Cat 0.0750 Oh
Kepala Tukang Cat 0.0075 Oh
Mandor 0.0030 Oh

1 M2 Wet Lean Concrete (t=10 cm)


ANALISA HARGA SATUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Pekerja Harian 0.0023 Oh


Tukang 0.0080 Oh
Mandor 0.0012 Oh
Beton Ready Mix K-100 0.1200 M3
Kayu Perancah 0.0120 M3
Paku 0.0960 Kg
Concrete Vibrator 0.0080 Jam
Water Tanker 0.0046 Jam
Alat Bantu 1.0000 Ls

1 M2 Bekisting Sloof
Kayu Kelas III 0.0225 M3
Paku 0.1500 Kg
Minyak Bekisting 0.0500 L
Pekerja 0.5200 Oh
Tukang Kayu 0.2600 Oh
Kepala Tukang 0.0260 Oh
Mandor 0.0260 Oh

1 M2 Bekisting Plat Lantai & Atap


Kayu Kelas III 0.0200 M3
Paku 0.2000 Kg
Minyak Bekisting 0.1000 L
Balok Kayu Kelas IIII 0.0075 M3
Plywood 9 mm 0.1750 Lbr
Dolken Kayu Dia. 8-10/400 cm 3.0000 Btg
Pekerja 0.6600 Oh
Tukang Kayu 0.3300 Oh
Kepala Tukang 0.0330 Oh
ANALISA HARGA SATUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Mandor 0.0330 Oh

1 M2 Bekisting Balok
Kayu Kelas III 0.0200 M3
Paku 0.2000 Kg
Minyak Bekisting 0.1000 L
Balok Kayu Kelas IIII 0.0090 M3
Plywood 9 mm 0.1750 Lbr
Dolken Kayu Dia. 8-10/400 cm 1.0000 Btg
Pekerja 0.6600 Oh
Tukang Kayu 0.3300 Oh
Kepala Tukang 0.0330 Oh
Mandor 0.0330 Oh

1 M2 Bekisting Kolom
Kayu Kelas III 0.0200 M3
Paku 0.2000 Kg
Minyak Bekisting 0.1000 L
Balok Kayu Kelas IIII 0.0075 M3
Plywood 9 mm 0.1750 Lbr
Dolken Kayu Dia. 8-10/400 cm 1.0000 Btg
Pekerja 0.6600 Oh
Tukang Kayu 0.3300 Oh
Kepala Tukang 0.0330 Oh
Mandor 0.0330 Oh
ANALISA HARGA SATUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

1 M2 Bekisting Pondasi
Kayu Kelas III 0.0200 M3
Paku 0.1500 Kg
Minyak Bekisting 0.0500 L
Pekerja 0.5200 Oh
Tukang Kayu 0.2600 Oh
Kepala Tukang 0.0260 Oh
Mandor 0.0260 Oh

1 M2 Bekisting Dinding
Kayu Kelas III 0.0150 M3
Paku 0.2000 Kg
Minyak Bekisting 0.1000 L
Balok Kayu Kelas IIII 0.0100 M3
Plywood 9 mm 0.1750 Lbr
Dolken Kayu Dia. 8-10/400 cm 1.5000 Btg
Pekerja 0.6600 Oh
Tukang Kayu 0.3300 Oh
Kepala Tukang 0.0330 Oh
Mandor 0.0330 Oh

1 M' Sandaran (Railing)


Pekerja Harian 0.2400 Oh
Tukang 0.0800 Oh
Mandor 0.0400 Oh
Pipa Galvanised 2.0000 M
Dudukan, Mur, Baut dll 1.5000 Set
Alat Bantu 1.0000 Ls
ANALISA HARGA SATUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

1 M2 Pasangan Lantai Keramik 30x30


Ubin Keramik 30x30 1.0000 M2
Semen Portland 0.2000 Zak
Pasir Pasang 0.0450 M3
Semen Warna 1.5000 Kg
Pekerja Harian 0.7000 Oh
Tukang Batu 0.3500 Oh
Kepala Tukang Batu 0.0350 Oh
Mandor 0.0350 Oh

1 M2 Lantai 80x80 (Unpolished)


Ubin Granit 1.0000 M2
Semen Portland 0.1638 Zak
Pasir Pasang 0.0500 M3
Semen Warna 0.6500 Kg
Pekerja 0.7000 Oh
Tukang Batu 0.3500 Oh
Kepala Tukang Batu 0.0400 Oh
Mandor 0.0400 Oh

1 M' Kerb Tipe 1


Pekerja Harian 0.3333 Oh
Tukang 0.1333 Oh
Mandor 0.0333 Oh
Kerb Tipe 1 1.6667 M'
Semen 0.3544 Kg
ANALISA HARGA SATUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Pasir 0.0063 M3
Flat Bed Truck 0.0230 Jam
Alat Bantu 1.0000 Ls

1 M' Kerb Tipe 2


Pekerja Harian 0.3333 Oh
Tukang 0.1333 Oh
Mandor 0.0333 Oh
Kerb Tipe 1 1.6667 M'
Semen 0.3544 Kg
Pasir 0.0063 M3
Flat Bed Truck 0.0230 Jam
Alat Bantu 1.0000 Ls

1 M' List Gypsum


List Gypsum 1.1000 M'
Lem 0.1600 Kg
Pekerja Harian 0.0500 Oh
Tukang Kayu 0.0500 Oh
Kepala Tukang 0.0050 Oh
Mandor 0.0030 Oh

1 M2 Pasangan Screed
Semen Portland 0.4330 Zak
Pasir Pasang 0.0700 M3
Pekerja 0.3000 Oh
ANALISA HARGA SATUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
PEKERJAAN PEMBANGUNAN REST AREA PADA JALAN TOL
SEMARANG - SOLO RUAS BOYOLALI - KARTASURA
PAKET 1 KM 487 A TAHUN 2019

No. Uraian Pekerjaan Koef. Sat.

Tukang Batu 0.2500 Oh


Kepala Tukang Batu 0.0250 Oh
Mandor 0.0300 Oh

1 M2 Paving Blok Natural


Paving Blok Natural 1.0100 M2
Pasir Beton 0.1000 M3
Pekerja 0.2500 Oh
Tukang Batu 0.5000 Oh
Kepala Tukang 0.0250 Oh
Mandor 0.0030 Oh
TUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
MBANGUNAN REST AREA PADA JALAN TOL
- SOLO RUAS BOYOLALI - KARTASURA
KET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

79,200.00 1,848.00
96,800.00 451.73
441,765.83 10,867.44
1,000.00 1,000.00
Jumlah..Rp 14,167.17
Overhead & Profit..Rp 1,416.72
Jumlah Dibulatkan..Rp 15,583.89

2,225,000.00 15,575.00
15,397.00 307.94
2,225,000.00 15,575.00
79,200.00 7,920.00
96,800.00 9,680.00
104,500.00 1,045.00
96,800.00 484.00
Jumlah..Rp 50,586.94
Overhead & Profit..Rp 5,058.69
Jumlah Dibulatkan..Rp 55,645.63

79,200.00 39,600.00
96,800.00 4,840.00
12,000.00 14,400.00
Jumlah..Rp 58,840.00
Overhead & Profit..Rp 5,884.00
Jumlah Dibulatkan..Rp 64,724.00

79,200.00 14,583.36
96,800.00 8,912.05
574,488.46 6,893.86
441,765.83 121,927.37
1,000.00 1,000.00
TUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
MBANGUNAN REST AREA PADA JALAN TOL
- SOLO RUAS BOYOLALI - KARTASURA
KET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

Jumlah..Rp 153,316.65
Overhead & Profit..Rp 15,331.66
Jumlah Dibulatkan..Rp 168,648.31

79,200.00 12,315.60
96,800.00 60,209.60
61,410.00 67,551.00
462,495.99 3,931.22
441,765.83 206,083.76
689,645.05 2,758.58
278,231.69 4,479.53
182,529.43 1,277.71
1,000.00 1,000.00
Jumlah..Rp 359,606.99
Overhead & Profit..Rp 35,960.70
Jumlah Dibulatkan..Rp 395,567.69

79,200.00 46,081.20
96,800.00 14,081.17
204,700.00 214,935.00
441,765.83 192,786.61
51,444.25 12,398.06
182,529.43 1,277.71
1,000.00 1,000.00
Jumlah..Rp 482,559.75
Overhead & Profit..Rp 48,255.98
Jumlah Dibulatkan..Rp 530,815.73

51,620.00 237,452.00
282,130.00 179,970.73
282,130.00 214,644.50
1,000.00 215.00
TUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
MBANGUNAN REST AREA PADA JALAN TOL
- SOLO RUAS BOYOLALI - KARTASURA
KET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

79,200.00 130,680.00
96,800.00 26,620.00
104,500.00 2,926.00
96,800.00 8,034.40
Jumlah..Rp 800,542.63
Overhead & Profit..Rp 80,054.26
Jumlah Dibulatkan..Rp 880,596.89

79,200.00 1,512.72
96,800.00 6,456.56
96,800.00 929.28
640,800.00 647,208.00
979,000.00 97,900.00
15,397.00 12,317.60
28,540.97 1,903.68
182,529.43 6,972.62
1,000.00 1,000.00
Jumlah..Rp 776,200.47
Overhead & Profit..Rp 77,620.05
Jumlah Dibulatkan..Rp 853,820.51

79,200.00 17,574.48
96,800.00 21,479.92
96,800.00 3,068.56
658,600.00 665,186.00
979,000.00 195,800.00
15,397.00 24,635.20
28,540.97 1,903.68
182,529.43 6,972.62
1,000.00 1,000.00
Jumlah..Rp 937,620.47
Overhead & Profit..Rp 93,762.05
Jumlah Dibulatkan..Rp 1,031,382.51
TUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
MBANGUNAN REST AREA PADA JALAN TOL
- SOLO RUAS BOYOLALI - KARTASURA
KET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

79,200.00 17,574.48
96,800.00 21,479.92
96,800.00 3,068.56
685,300.00 692,153.00
979,000.00 195,800.00
15,397.00 24,635.20
28,540.97 1,903.68
182,529.43 6,972.62
1,000.00 1,000.00
Jumlah..Rp 964,587.47
Overhead & Profit..Rp 96,458.75
Jumlah Dibulatkan..Rp 1,061,046.21

79,200.00 17,574.48
96,800.00 21,479.92
96,800.00 3,068.56
703,100.00 710,131.00
979,000.00 195,800.00
15,397.00 24,635.20
28,540.97 1,903.68
182,529.43 6,972.62
1,000.00 1,000.00
Jumlah..Rp 982,565.47
Overhead & Profit..Rp 98,256.55
Jumlah Dibulatkan..Rp 1,080,822.01

-
15,397.00 30,794.00
28,827.10 17,296.26
6,132.10 1,287,741.00
15,397.00 46,191.00
TUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
MBANGUNAN REST AREA PADA JALAN TOL
- SOLO RUAS BOYOLALI - KARTASURA
KET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

703,100.00 710,131.00
79,200.00 447,480.00
96,800.00 26,620.00
96,800.00 151,008.00
96,800.00 135,520.00
104,500.00 33,753.50
96,800.00 27,394.40
Jumlah..Rp 2,913,929.16
Overhead & Profit..Rp 291,392.92
Jumlah Dibulatkan..Rp 3,205,322.08

79,200.00 1,188.00
96,800.00 484.00
96,800.00 484.00
10,617.04 11,147.89
15,397.00 307.94
1,000.00 1,000.00

79,200.00 1,188.00
96,800.00 484.00
96,800.00 484.00
10,691.90 11,226.49
15,397.00 307.94
1,000.00 1,000.00
Jumlah..Rp 29,302.26
Overhead & Profit..Rp 2,930.23
Jumlah Dibulatkan..Rp 32,232.49

206,035.00 206,035.00
51,620.00 8,455.36
265,220.00 13,261.00
13,350.00 8,677.50
TUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
MBANGUNAN REST AREA PADA JALAN TOL
- SOLO RUAS BOYOLALI - KARTASURA
KET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

79,200.00 55,440.00
96,800.00 33,880.00
104,500.00 4,180.00
96,800.00 3,872.00
Jumlah..Rp 333,800.86
Overhead & Profit..Rp 33,380.09
Jumlah Dibulatkan..Rp 367,180.94

288,360.00 288,360.00
51,620.00 8,455.36
265,220.00 13,261.00
13,350.00 8,677.50
79,200.00 55,440.00
96,800.00 33,880.00
104,500.00 4,180.00
96,800.00 3,872.00
Jumlah..Rp 416,125.86
Overhead & Profit..Rp 41,612.59
Jumlah Dibulatkan..Rp 457,738.44

49,439.50 84,047.15
51,620.00 58,846.80
265,220.00 795.66
13,350.00 1,335.00
79,200.00 7,128.00
96,800.00 8,712.00
104,500.00 940.50
96,800.00 484.00
Jumlah..Rp 162,289.11
Overhead & Profit..Rp 16,228.91
Jumlah Dibulatkan..Rp 178,518.02
TUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
MBANGUNAN REST AREA PADA JALAN TOL
- SOLO RUAS BOYOLALI - KARTASURA
KET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

255,875.00 307,050.00
204,700.00 88,430.40
79,200.00 61,776.00
96,800.00 37,752.00
104,500.00 4,075.50
96,800.00 3,775.20
Jumlah..Rp 502,859.10
Overhead & Profit..Rp 50,285.91
Jumlah Dibulatkan..Rp 553,145.01

255,875.00 307,050.00
51,620.00 208,544.80
265,220.00 128,631.70
79,200.00 118,800.00
96,800.00 72,600.00
104,500.00 7,837.50
96,800.00 7,260.00
Jumlah..Rp 850,724.00
Overhead & Profit..Rp 85,072.40
Jumlah Dibulatkan..Rp 935,796.40

255,875.00 307,050.00
51,620.00 168,281.20
265,220.00 137,914.40
79,200.00 118,800.00
96,800.00 72,600.00
104,500.00 7,837.50
96,800.00 7,260.00
Jumlah..Rp 819,743.10
Overhead & Profit..Rp 81,974.31
Jumlah Dibulatkan..Rp 901,717.41
TUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
MBANGUNAN REST AREA PADA JALAN TOL
- SOLO RUAS BOYOLALI - KARTASURA
KET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

768.07 53,764.90
51,620.00 19,563.98
265,220.00 10,078.36
79,200.00 23,760.00
96,800.00 9,680.00
104,500.00 1,045.00
96,800.00 1,452.00
Jumlah..Rp 119,344.24
Overhead & Profit..Rp 11,934.42
Jumlah Dibulatkan..Rp 131,278.66

768.07 53,764.90
51,620.00 14,835.59
265,220.00 10,608.80
79,200.00 23,760.00
96,800.00 9,680.00
104,500.00 1,045.00
96,800.00 1,452.00
Jumlah..Rp 115,146.29
Overhead & Profit..Rp 11,514.63
Jumlah Dibulatkan..Rp 126,660.92

51,620.00 10,556.29
265,220.00 5,304.40
79,200.00 23,760.00
96,800.00 14,520.00
104,500.00 1,567.50
96,800.00 1,452.00
Jumlah..Rp 57,160.19
Overhead & Profit..Rp 5,716.02
Jumlah Dibulatkan..Rp 62,876.21
TUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
MBANGUNAN REST AREA PADA JALAN TOL
- SOLO RUAS BOYOLALI - KARTASURA
KET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

51,620.00 6,442.18
265,220.00 6,365.28
79,200.00 23,760.00
96,800.00 14,520.00
104,500.00 1,567.50
96,800.00 1,452.00
Jumlah..Rp 54,106.96
Overhead & Profit..Rp 5,410.70
Jumlah Dibulatkan..Rp 59,517.65

51,620.00 3,355.30
79,200.00 15,840.00
96,800.00 9,680.00
104,500.00 1,045.00
96,800.00 968.00
Jumlah..Rp 30,888.30
Overhead & Profit..Rp 3,088.83
Jumlah Dibulatkan..Rp 33,977.13

54,290.00 19,544.40
40,000.00 4,400.00
65,788.80 65,788.80
2,358.50 353.78
79,200.00 7,920.00
96,800.00 4,840.00
104,500.00 1,045.00
96,800.00 968.00
Jumlah..Rp 104,859.98
Overhead & Profit..Rp 10,486.00
Jumlah Dibulatkan..Rp 115,345.97

42,720.00 25,632.00
TUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
MBANGUNAN REST AREA PADA JALAN TOL
- SOLO RUAS BOYOLALI - KARTASURA
KET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

79,200.00 7,920.00
96,800.00 7,744.00
96,800.00 1,936.00
Jumlah..Rp 43,232.00
Overhead & Profit..Rp 4,323.20
Jumlah Dibulatkan..Rp 47,555.20

119,959.64 4,846.37
40,000.00 2,000.00
79,200.00 11,088.00
96,800.00 6,485.60
104,500.00 731.50
96,800.00 677.60
Jumlah..Rp 25,829.07
Overhead & Profit..Rp 2,582.91
Jumlah Dibulatkan..Rp 28,411.98

50,730.00 72,493.17
40,000.00 800.00
79,200.00 15,840.00
96,800.00 9,680.00
104,500.00 1,045.00
96,800.00 968.00
Jumlah..Rp 100,826.17
Overhead & Profit..Rp 10,082.62
Jumlah Dibulatkan..Rp 110,908.79

22,250.00 2,225.00
33,241.50 3,324.15
36,565.65 9,507.07
4,737.65 947.53
79,200.00 1,584.00
TUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
MBANGUNAN REST AREA PADA JALAN TOL
- SOLO RUAS BOYOLALI - KARTASURA
KET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

96,800.00 6,098.40
104,500.00 6,583.50
96,800.00 242.00
Jumlah..Rp 30,511.65
Overhead & Profit..Rp 3,051.16
Jumlah Dibulatkan..Rp 33,562.81

22,250.00 2,225.00
33,241.50 3,324.15
66,260.50 17,227.73
4,737.65 947.53
79,200.00 1,584.00
96,800.00 6,098.40
104,500.00 6,583.50
96,800.00 242.00
Jumlah..Rp 38,232.31
Overhead & Profit..Rp 3,823.23
Jumlah Dibulatkan..Rp 42,055.54

22,250.00 2,225.00
4,737.65 710.65
33,241.50 3,324.15
36,565.65 2,047.68
16,465.00 164.65
79,200.00 2,376.00
96,800.00 7,260.00
104,500.00 783.75
96,800.00 290.40
Jumlah..Rp 19,182.27
Overhead & Profit..Rp 1,918.23
Jumlah Dibulatkan..Rp 21,100.50
TUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
MBANGUNAN REST AREA PADA JALAN TOL
- SOLO RUAS BOYOLALI - KARTASURA
KET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

79,200.00 181.53
96,800.00 774.79
96,800.00 111.51
640,800.00 76,896.00
2,225,000.00 26,700.00
15,397.00 1,478.11
28,540.97 228.44
182,529.43 836.71
1,000.00 1,000.00
Jumlah..Rp 108,207.10
Overhead & Profit..Rp 10,820.71
Jumlah Dibulatkan..Rp 119,027.81

2,225,000.00 50,062.50
15,397.00 2,309.55
28,827.10 1,441.36
79,200.00 41,184.00
96,800.00 25,168.00
104,500.00 2,717.00
96,800.00 2,516.80
Jumlah..Rp 125,399.21
Overhead & Profit..Rp 12,539.92
Jumlah Dibulatkan..Rp 137,939.13

2,225,000.00 44,500.00
15,397.00 3,079.40
28,827.10 2,882.71
2,225,000.00 16,687.50
131,720.00 23,051.00
17,800.00 53,400.00
79,200.00 52,272.00
96,800.00 31,944.00
104,500.00 3,448.50
TUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
MBANGUNAN REST AREA PADA JALAN TOL
- SOLO RUAS BOYOLALI - KARTASURA
KET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

96,800.00 3,194.40
Jumlah..Rp 234,459.51
Overhead & Profit..Rp 23,445.95
Jumlah Dibulatkan..Rp 257,905.46

2,225,000.00 44,500.00
15,397.00 3,079.40
28,827.10 2,882.71
2,225,000.00 20,025.00
131,720.00 23,051.00
17,800.00 17,800.00
79,200.00 52,272.00
96,800.00 31,944.00
104,500.00 3,448.50
96,800.00 3,194.40
Jumlah..Rp 202,197.01
Overhead & Profit..Rp 20,219.70
Jumlah Dibulatkan..Rp 222,416.71

2,225,000.00 44,500.00
15,397.00 3,079.40
28,827.10 2,882.71
2,225,000.00 16,687.50
131,720.00 23,051.00
17,800.00 17,800.00
79,200.00 52,272.00
96,800.00 31,944.00
104,500.00 3,448.50
96,800.00 3,194.40
Jumlah..Rp 198,859.51
Overhead & Profit..Rp 19,885.95
Jumlah Dibulatkan..Rp 218,745.46
TUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
MBANGUNAN REST AREA PADA JALAN TOL
- SOLO RUAS BOYOLALI - KARTASURA
KET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

2,225,000.00 44,500.00
15,397.00 2,309.55
28,827.10 1,441.36
79,200.00 41,184.00
96,800.00 25,168.00
104,500.00 2,717.00
96,800.00 2,516.80
Jumlah..Rp 119,836.71
Overhead & Profit..Rp 11,983.67
Jumlah Dibulatkan..Rp 131,820.38

2,225,000.00 33,375.00
15,397.00 3,079.40
28,827.10 2,882.71
2,225,000.00 22,250.00
131,720.00 23,051.00
17,800.00 26,700.00
79,200.00 52,272.00
96,800.00 31,944.00
104,500.00 3,448.50
96,800.00 3,194.40
Jumlah..Rp 202,197.01
Overhead & Profit..Rp 20,219.70
Jumlah Dibulatkan..Rp 222,416.71

79,200.00 19,008.00
96,800.00 7,744.00
96,800.00 3,872.00
235,405.00 470,810.00
150,000.00 225,000.00
1,000.00 1,000.00
Jumlah..Rp 727,434.00
TUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
MBANGUNAN REST AREA PADA JALAN TOL
- SOLO RUAS BOYOLALI - KARTASURA
KET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

Overhead & Profit..Rp 72,743.40


Jumlah Dibulatkan..Rp 800,177.40

78,765.00 78,765.00
51,620.00 10,324.00
265,220.00 11,934.90
13,350.00 20,025.00
79,200.00 55,440.00
96,800.00 33,880.00
104,500.00 3,657.50
96,800.00 3,388.00
Jumlah..Rp 217,414.40
Overhead & Profit..Rp 21,741.44
Jumlah Dibulatkan..Rp 239,155.84

543,790.00 543,790.00
51,620.00 8,455.36
265,220.00 13,261.00
13,350.00 8,677.50
79,200.00 55,440.00
96,800.00 33,880.00
104,500.00 4,180.00
96,800.00 3,872.00
Jumlah..Rp 671,555.86
Overhead & Profit..Rp 67,155.59
Jumlah Dibulatkan..Rp 738,711.44

79,200.00 26,400.00
96,800.00 12,906.67
96,800.00 3,226.67
52,866.00 88,111.76
1,032.40 365.88
TUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
MBANGUNAN REST AREA PADA JALAN TOL
- SOLO RUAS BOYOLALI - KARTASURA
KET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

265,220.00 1,670.89
331,158.99 7,616.66
1,000.00 1,000.00
Jumlah..Rp 141,298.52
Overhead & Profit..Rp 14,129.85
Jumlah Dibulatkan..Rp 155,428.37

79,200.00 26,400.00
96,800.00 12,906.67
96,800.00 3,226.67
133,500.00 222,504.45
1,032.40 365.88
265,220.00 1,670.89
331,158.99 7,616.66
1,000.00 1,000.00
Jumlah..Rp 275,691.21
Overhead & Profit..Rp 27,569.12
Jumlah Dibulatkan..Rp 303,260.33

53,400.00 58,740.00
24,030.00 3,844.80
79,200.00 3,960.00
96,800.00 4,840.00
104,500.00 522.50
96,800.00 290.40
Jumlah..Rp 72,197.70
Overhead & Profit..Rp 7,219.77
Jumlah Dibulatkan..Rp 79,417.47

51,620.00 22,351.46
265,220.00 18,565.40
79,200.00 23,760.00
TUAN PEKERJAAN FASILITAS UMUM & KOMERSIL
MBANGUNAN REST AREA PADA JALAN TOL
- SOLO RUAS BOYOLALI - KARTASURA
KET 1 KM 487 A TAHUN 2019

Harga Satuan Jumlah

96,800.00 24,200.00
104,500.00 2,612.50
96,800.00 2,904.00
Jumlah..Rp 94,393.36
Overhead & Profit..Rp 9,439.34
Jumlah Dibulatkan..Rp 103,832.70

66,750.00 67,417.50
282,130.00 28,213.00
79,200.00 19,800.00
96,800.00 48,400.00
104,500.00 2,612.50
96,800.00 290.40
Jumlah..Rp 166,733.40
Overhead & Profit..Rp 16,673.34
Jumlah Dibulatkan..Rp 183,406.74
HARGA DASAR SATUAN UPAH
TAHUN DASAR 2019

No Uraian Sat. Harga Satuan Keterangan

1 Pekerja OH 79,200.00
2 Tukang OH 96,800.00
3 Mandor OH 96,800.00
4 Operator OH 104,500.00
5 Pembantu Operator OH 93,500.00
6 Sopir OH 115,500.00
7 Pembantu Sopir / Driver OH 93,500.00
8 Mekanik OH 115,500.00
9 Pembantu Mekanik OH 93,500.00
10 Kepala Tukang OH 104,500.00
11 Flag Man OH 79,200.00
HARGA DASAR SATUAN BAHAN
TAHUN DASAR 2019

No Uraian Sat. Harga Satuan

Pasir Pasang (Sedang) M3 265,220.00


Pasir Beton (Kasar) M3 282,130.00
Pasir Halus (untuk HRS) M3 265,220.00
Pasir Urug (ada unsur lempung) M3 204,700.00
Batu Kali M3 255,875.00
Timbunan Pilihan (Tanah Merah) M3 61,410.00
Timbunan Pilihan (Lime Stone) M3 61,410.00
Batu Belah / Kerakal M3 119,527.00
Bahan Tanah Timbunan M3 14,462.50
Agregat Pecah Mesin 0-5 mm M3 124,600.00
Agregat Pecah Mesin 5-10 & 10-20 mm M3 142,400.00
Agregat Pecah Mesin 20-30 mm M3 169,100.00
Batu pecah 3 - 5 cm M' 256,320.00
Batu pecah 2 - 3 cm M3 282,130.00
Batu pecah 1 - 2 cm M3 282,130.00
Batu pecah 0.5 - 1 cm M3 307,050.00
Abu batu M3 93,450.00
Semen / PC (50kg) Zak 51,620.00
Semen / PC (kg) Kg 1,032.40
Semen Khusus Kg 11,089.40
Cat Marka (Non Thermoplas) Kg 10,252.80
Cat Marka (Thermoplastic) Kg 13,812.80
Paku Kg 15,397.00
Kayu Perancah M3 979,000.00
Kayu Acuan M3 979,000.00
Kerosen / Minyak Tanah L 7,558.77
Bensin L 6,727.51
Solar L 7,756.35
Minyak Pelumas / Olie L 28,827.10
Plastik Filter M2 4,450.00
Besi Beton Polos Kg 6,132.10
Baja Tulangan (Polos) U24 Kg 10,617.04
Baja Tulangan (Polos) U32 Kg 10,641.93
Baja Tulangan (Ulir) D32 Kg 10,641.93
HARGA DASAR SATUAN BAHAN
TAHUN DASAR 2019

No Uraian Sat. Harga Satuan


Baja Tulangan (Ulir) D39 Kg 10,666.89
Baja Tulangan (Ulir) D40 Kg 10,691.90
Baja Tulangan (Ulir) D48 Kg 10,716.97
Kawat Beton Kg 15,397.00
Beton K100 (Ready Mix) m3 640,800.00
Beton K125 (Ready Mix) m3 640,800.00
Beton K150 (Ready Mix) m3 658,600.00
Beton K250 (Ready Mix) m3 685,300.00
Beton K300 (Ready Mix) m3 703,100.00
Beton K350 (Ready Mix) m3 729,800.00
Beton K400 (Ready Mix) m3 769,850.00
Beton K450 (Ready Mix) m3 796,550.00
Beton K500 (Ready Mix) m3 823,250.00
Beton K600 (Ready Mix) m3 903,350.00
Joint Sealent Kg 55,019.80
Cat Anti Karat Kg 31,150.00
Expansion Cap M' 6,461.40
Polytene 125 mikron M' 4,450.00
Curing Compound liter 14,507.00
Additive liter 48,950.00
Casing M2 10,573.20
Alat Bantu Set/Ls 11,442.86
U-ditch beton 60 x 60 cm M' 579,686.67
U-ditch beton 60 x 80 cm M' 719,194.17
U-ditch beton 80 x 80 cm M' 871,421.25
U-ditch beton 80 x 100 cm M' 1,028,802.92
U-ditch beton 100 x 100 cm M' 1,344,434.00
U-ditch beton 120 x 120 cm M' 2,208,794.58
Kwas bh 14,240.00
Amplas Lbr 4,895.00
Menie besi Kg 40,050.00
Bekisting plat untuk jalan (sewa) M2 68,138.40
Kerb - Precast Jenis 1, t = 30 cm bh 52,866.00
Kerb - Precast Type C. (Mutu K 300) bh 51,353.00
Kerb - Precast Type Jenis 6, t = 30 cm (untuk tali air) bh 52,866.00
HARGA DASAR SATUAN BAHAN
TAHUN DASAR 2019

No Uraian Sat. Harga Satuan


Kerb - Precast Jenis 2, t = 30 cm bh 133,500.00
Kerb - Precast Jenis 3, t = 15 cm bh 48,950.00
Kerb - Precast Jenis 4, t = 20 cm bh 137,950.00
Kerb - Precast Jenis 5, t = 30 cm bh 158,420.00
Kerb - Precast Jenis 7, t = 18 cm bh 51,353.00
Kerb - Precast Jenis E, t = 30 cm bh 95,052.00
Kerb - Precast Jenis E, dengan bukaan t = 30 cm bh 95,052.00
Bata merah bh 768.07
Cover U Ditch 120 x 120 M' 641,022.50
Cover U Ditch 100 x 100 M' 551,874.17
Cover U Ditch 80 x 80 M' 360,820.83
Cat Besi Kg 42,809.00
Wiremesh Kg 11,481.00
Pupuk Kg 1,068.00
Kaso kelas III M3 2,225,000.00
Balok kelas III M3 2,225,000.00
Papan kelas III M3 1,780,000.00
Papan albasiah 2,5 cm M3 1,068,000.00
Dolken dia 5 s/d 7 cm p. 4 m Btg 17,800.00
Tripleks t = 3 mm, uk.1,2 x 2,4 m lbr 44,500.00
Multipleks t = 9 mm, uk.1,2 x 2,4 m lbr 131,720.00
Seng plat BJLS 0,30 m2 106,800.00
Seng gelombang BJLS 0,3 lbr 94,162.00
Asbes gelombang kecil t = 5mm lbr 66,572.00
Thinner ltr 23,496.00
Cat dasar emulsion ltr 33,241.50
Cat akhir emulsion ltr 36,565.65
Cat akhir wheathersield ltr 66,260.50
Plamir tembok kg 22,250.00
Finish Duco m2 75,650.00
Amplas kayu / besi lbr 4,737.65
Kwas cat rata-rata bh 16,465.00
Metalic floor hardener non metalic kg 13,350.00
Waterproofing coating tipe brushbond flexible ltr 42,720.00
Concure ltr 14,818.50
HARGA DASAR SATUAN BAHAN
TAHUN DASAR 2019

No Uraian Sat. Harga Satuan


Waterproofing admix integral molekuler kg 41,607.50
Besi siku rata-rata kg 6,199.31
Besi WF Rata-rata kg 16,020.00
Besi UNP rata-rata kg 16,020.00
Plate baja rata-rata kg 16,020.00
Ubin Granit 60x60 (Unpolished) M2 206,035.00
Ubin Granit 60x60 (Polished) M2 288,360.00
Plint Ubin Granit 10x60 M2 49,439.50
Gypsum Lbr 54,290.00
Hollow 4x4 Btg 65,788.80
Dempul Gypsum Kg 2,358.50
Twinite M2 119,959.64
Spandex M2 50,730.00
Multipleks t = 12 mm, uk.1,2 x 2,4 m Lbr 129,050.00
Tanah Humus M3 114,428.57
Bibit Pohon Bintaro Bh 178,000.00
Semak/Perdu M2 8,900.00
Cat Marka (Non Thermoplas) Kg 26,433.00
Cat Marka (Thermoplastic) Kg 23,496.00
Keramik 30x30 M2 78,765.00
Planter Box M2 222,500.00
Semen Warna Kg 13,350.00
Ubin Granit 80x80 (Unpolished) M2 543,790.00
Glass Beads Kg 21,048.50
List Gypsum M' 53,400.00
Paving Blok Natural M2 66,750.00
Pipa Galvanised M' 235,405.00
Lem Kg 24,030.00
Jendela Nako Daun 26,700.00
Kaca Polos 3 mm M2 80,100.00
Kunci Tanam Bh 48,950.00
ARGA DASAR SATUAN BAHAN
TAHUN DASAR 2019

Keterangan
ARGA DASAR SATUAN BAHAN
TAHUN DASAR 2019

Keterangan
ARGA DASAR SATUAN BAHAN
TAHUN DASAR 2019

Keterangan
ARGA DASAR SATUAN BAHAN
TAHUN DASAR 2019

Keterangan
HARGA DASAR SATUAN ALAT
TAHUN DASAR 2019

Harga Sewa
No Uraian HP Kap. Alat/Jam (di Keterangan
luar PPN)

1 BULLDOZER 100-150 HP 294 60 T/Jam 969,186.38


2 COMPRESSOR 4000-6500 L\M 60 5000 CPM/(L/m) 183,527.26
3 CONCRETE MIXER 0.3-0.6 M3 20 500 Liter 73,911.40
4 CRANE 10-15 TON 138 15 Ton 245,284.14
5 DUMP TRUCK 3.5 TON 100 3.5 Ton 238,235.05
6 DUMP TRUCK 10 TON 190 10 Ton 441,765.83
7 EXCAVATOR 80-140 HP 133 0.93 M3 574,488.46
8 FLAT BED TRUCK 3-4 M3 190 10 ton 331,158.99
9 GENERATOR SET 180 135 KVA 314,644.57
10 MOTOR GRADER >100 HP 135 10800 - 689,645.05
11 WHEEL LOADER 1.0-1.6 M3 96 1.5 M3 462,495.99
12 TANDEM ROLLER 6-8 T. 82 8.1 Ton 278,231.69
13 TIRE ROLLER 8-10 T. 101 9 Ton 459,595.78
14 VIBRATORY ROLLER 5-8 T. 82 7.05 Ton 361,850.48
15 CONCRETE VIBRATOR 5.5 25 - 28,540.97
16 WATER TANKER 3000-4500 L. 100 4000 Liter 182,529.43
17 TAMPER 4.7 121 Ton 51,444.25
18 JACK HAMMER 0 1330 - 17,385.48
19 CONCRETE PUMP 100 8 M3 182,529.43
20 CONCRETE PAN MIXER 134 60 M3 5,193,357.73
21 CONCRETE BREAKER 290 20 m3/jam 525,742.60
22 BAR BENDER 3 00 20,304.49
23 BAR CUTTER 3 00 20,304.49
24 MESIN LAS 3 0.17 Ton 28,680.31
25 SCAFFOLDING 1 Set 241,190.00
26 FLAT BED TRUCK 3-4 M3 190 10 ton 331,158.99
27