RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : REKAP TOTAL PEMAKAIAN1BAHAN & UPAH PROYEK Biaya Upah 366,002,485
Unit Item : ALL Biaya Alat 61,083,409
Waktu Mulai (Start) : Monday, February 4, 2019 Biaya Bahan 559,910,457
Waktu Selesai (Finish) : Monday, August 5, 2019 TOTAL BIAYA 986,996,350
% dari RAB 100.00%
Total OH 2,583
Monday, February 4, 2019
Range Termin
123 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

ALL REKAP TOTAL PEMAKAIAN BAHAN & UPAH PROYEK 2/4/2019 8/5/2019
1 Pekerja L.1 1478.7 oh 120,136 177,650,639 -
2 Tukang Atap L.6 9.9 oh 160,181 1,585,796 -
3 Tukang batu L.7 386.7 oh 160,181 61,947,409 -
4 Tukang Besi L.8 183.3 oh 160,181 29,356,435 -
5 Tukang cat L.10 117.3 oh 160,181 18,783,280 -
6 Tukang Kayu L.16 211.5 oh 160,181 33,870,386 -
7 Tukang Listrik L.19 5.0 oh 160,181 796,422 -
8 Tukang Pipa L.20 0.7 oh 160,181 114,530 -
9 Mandor L.35 96.9 oh 217,389 21,066,181 -
10 Kepala Tukang L.36 88.4 oh 183,064 16,186,059 -
11 Operator crane L.39 0.2 oh 137,298 25,826 -
12 Pembantu operator crane L.43 0.2 oh 114,415 21,522 -
13 Alat Rangka Atap Baja Canai Dingin A.2 16.7 Ls 450,000 7,533,900 -
14 Assesoris (perkuatan, las dll) A.3 220.2 Ls 158,000 34,794,760 -
15 Bahan Kerja Paving Blok A.4 2.5 Ls 210,000 531,300 -
16 Perlengkapan A.12 64.6 Ls 250,000 16,149,650 -
17 Sewa crane A.24 0.2 unit hari 1,232,000 231,739 -
18 Rol Cat A.32 2.0 hari 25,000 49,060 -
19 Air M.1 14504.9 Ltr 650 9,428,169 -
20 Bata merah M.7 41069.1 Bh 850 34,908,693 -
21 Batu belah M.13 62.0 m3 275,000 17,039,220 -
22 Batu paras Dinding M.16 4.8 Bh 80,000 387,200 -
23 Kerikil (kg) M.25 70899.4 kg 150 10,634,912 -
24 Koral beton M.26 0.7 m3 216,500 154,798 -
25 Pasir beton M.28 1.7 m3 289,000 502,282 -
26 Pasir Beton (kg) M.29 48876.2 kg 250 12,219,039 -
27 Pasir pasang M.30 84.3 m3 206,100 17,379,784 -
28 Pasir urug M.32 15.4 M3 237,000 3,658,977 -
29 Semen M.33 45929.8 Kg 1,450 66,598,271 -
30 Semen Warna M.36 398.3 Kg 2,100 836,414 -
31 Dolken kayu Ø 8-10/400 cm M.42 982.5 btg 25,000 24,561,350 -
32 Balok kayu kelas II M.78 4.1 m3 3,500,000 14,182,938 -
33 Kayu balok 5/7 Kelas II M.82 1.5 m3 2,300,000 3,400,320 -
34 Kayu papan 3/20 M.100 1.2 m3 3,500,000 4,104,100 -
35 Papan kayu 3/20 Kelas II M.105 0.2 m3 3,250,000 750,750 -
36 Papan kayu 3/20 Kelas III M.106 14.0 m3 1,800,000 25,154,316 -
37 Baja Ringan- Reng Truss M.124 904.1 M' 7,000 6,328,476 -
38 Baja Ringan-C Truss M.125 622.8 m1 15,000 9,342,036 -
39 Baja strip (0,2 x 2) cm M.128 21.3 Kg 12,500 266,750 -
40 Baut (Srew driver) M.129 4687.8 bh 450 2,109,492 -
41 Baut Ramset / Dina Bolt M.130 334.8 bh 4,650 1,557,006 -
42 Besi beton M.132 7931.4 Kg 10,500 83,279,543 -
43 Hollow 4/4 M.141 770.8 M1 10,000 7,707,700 -
44 Kawat beton M.143 113.3 Kg 23,500 2,662,679 -
45 Paku 5 - 10 cm M.155 25.2 kg 23,500 593,102 -
46 Paku Biasa ½" - 1" M.157 33.5 Kg 23,500 786,874 -
47 Paku Biasa 2" - 5" M.158 114.7 Kg 25,000 2,866,820 -
48 Paku sekrup M.165 23.5 bh 750 17,606 -
49 Screw M.182 1630.2 bh 500 815,100 -
50 Floor drain M.189 4.4 Unit 60,000 264,000 -
51 Kloset duduk / monoblock M.191 1.1 Unit 2,500,000 2,750,000 -
52 Kloset jongkok teraso M.193 2.2 Unit 250,000 550,000 -
53 Kran air M.194 6.6 M 25,000 165,000 -
54 Wastafel M.201 1.3 Unit 1,450,000 1,914,000 -
55 Pipa PVC 1/2" M.203 29.0 M 4,000 116,160 -
56 Pipa PVC 3/4" M.204 47.5 M 5,500 261,360 -
57 Pipa PVC 3” M.210 47.5 M 8,500 403,920 -
58 Pipa PVC 4" M.211 37.0 M 9,000 332,640 -

www.mitra-arsitek.com 1/2
Software RAB Exarch xPro

59 Gypsum board 9 mm M.353 77.7 lbr 87,000 6,757,951 -


60 List PVC (setara Shunda Plafon,LS 301-1 Min.Silver
M.357
Metalic) 285.3 M' 34,000 9,699,690 -
61 Plywood 120x240 tbl. 4 mm M.365 0.3 Lbr 72,000 19,008 -
62 Plywood 120x240 tbl. 9 mm M.367 90.6 Lbr 120,000 10,867,164 -
63 Seng Gelombang 3" x 6" BJLS 28 M.368 37.7 Lbr 50,000 1,883,750 -
64 Cat dasar Kayu M.380 0.8 Kg 31,000 26,087 -
65 Cat dasar Tembok M.381 97.1 Kg 65,000 6,310,590 -
66 Cat kayu M.385 1.3 kg 49,900 64,221 -
67 Cat meni M.386 1.0 Kg 16,300 16,137 -
68 Cat Penutup Tembok M.387 252.4 Kg 35,000 8,834,826 -
69 Kuas M.390 0.2 Bh 17,000 3,366 -
70 Menie besi M.396 1.5 Kg 27,000 40,095 -
71 Pengencer M.398 0.1 Kg 35,000 5,198 -
72 Plamir M.399 154.0 Kg 56,300 8,672,368 -
73 keramik Dinding 20cm x 20cm M.409 32.7 m2 62,500 2,041,875 -
74 plint ubin teralux marmer ukuran 10cm x 60cm M.440 162.7 Bh 17,000 2,765,730 -
75 ubin teralux marmer ukuran 60cm x60cm M.470 552.4 Bh 45,000 24,858,900 -
76 ubin warna ukuran 20cm x20cm M.475 107.9 Bh 11,500 1,240,333 -
77 ubin warna ukuran 40cm x40 cm M.477 266.2 Bh 14,500 3,859,820 -
78 Genteng metal M.493 217.6 Bh 35,000 7,617,610 -
79 nok genteng metal M.501 41.1 Bh 83,000 3,414,620 -
80 Talang / Jurai Canai Dingin M.511 20.8 M' 45,000 934,204 -
81 Fitting Lampu M.512 23.1 bh 25,000 577,500 -
82 Kaca polos M.524 0.4 m2 110,000 38,720 -
83 Paving block 6 cm M.542 25.6 M2 135,000 3,449,655 -
84 Teraso cor di tempat, tebal 3cm M.546 1.8 M3 4,500 8,126 -
85 Amplas M.548 380.2 Lbr 6,500 2,471,040 -
86 Minyak bekisting M.556 60.0 Ltr 5,750 344,852 -
87 Solar M.563 18.8 L 8,500 159,633 -
88 Jendela naco M.576 0.9 Bh 24,500 21,560 -
89 Kunci tanam biasa M.583 0.7 Bh 130,000 85,800 -
90 Sealtape M.599 0.2 bh 3,500 578 -
91 Upah Kerja Mobiliasasi/Demobilisasi L.IV.a.1 2.2 oh/Ls 900,000 1,980,000 -
92 Alat Kerja Mobilisasi/Demobilisasi A.IV.a.1 2.2 Ls 450,000 990,000 -
93 Bahan Kerja Mobilisasi/Demobilisasi M.IV.a.1 2.2 Ls 250,000 550,000 -
94 Upah Kerja Pembuatan Septik Tank L.IV.a.2 1.1 oh/m3 1,500,000 1,650,000 -
95 Alat Kerja Pembuatan Septik Tank A.IV.a.2 1.1 Ls 450,000 495,000 -
96 Bahan Kerja Pembuatan Septik Tank M.IV.a.1 1.1 Ls 6,500,000 7,150,000 -
97 Upah Kerja Pembuatan Sumur Resapan Limbah L.IV.a.3 0.9 oh/m3 1,100,000 968,000 -
98 Alat Kerja Pembuatan Sumur Resapan Limbah A.IV.a.3 0.9 Ls 350,000 308,000 -
99 Bahan Kerja Pembuatan Sumur Resapan Limbah M.IV.a.2 0.9 Ls 4,500,000 3,960,000 -
100 Biaya Pengurusan Daya Listrik PLN M.IV.a.3 1.1 Ls 5,500,000 6,050,000 -
101 Biaya Pengurusan Instalasai PDAM M.IV.a.4 1.1 Ls 2,500,000 2,750,000 -
102 Shower Mandi M.608 2.2 Unit 135,000 297,000 -
103 Tangki Air M.609 1.1 Unit 1,250,000 1,375,000 -
104 Pompa Air M.610 1.1 Unit 600,000 660,000 -
105 Pintu Utama (Kusen+Panel) Type P1 M.611 3.3 set 2,100,000 6,930,000 -
106 Pintu Utama (Kusen+Panel) Type P2 M.612 6.6 set 1,600,000 10,560,000 -
107 Pintu Utama (Kusen+Panel) Type P3 M.613 3.3 set 1,100,000 3,630,000 -
108 Jendela Type J1 M.614 8.8 set 980,000 8,624,000 -
109 Jendela Type J2 M.615 5.5 set 600,000 3,300,000 -
110 Lubang Angin M.617 40.7 Unit 25,500 1,037,850 -
111 MCB + Box M.618 1.1 Unit 350,000 385,000 -
112 Tembaga dia.1/2"-1.5m M.619 1.1 btg 650,000 715,000 -
113 Kabel NYM 3x2,5 mm2-SNI M.620 151.3 m1 12,000 1,815,000 -
114 Kabel NYM 2x1,5 mm2-SNI M.621 181.5 m1 10,000 1,815,000 -
115 Saklar Listrik M.622 15.4 unit 25,000 385,000 -
116 Lampu 5W M.623 3.3 unit 24,000 79,200 -
117 Lampu 15W M.624 11.0 unit 35,000 385,000 -
118 Lampu 20W M.625 8.8 unit 45,000 396,000 -
119 Receiptackle M.626 11.0 unit 30,000 330,000 -
120 Air Conditioner M.627 2.2 unit 3,200,000 7,040,000 -
121 Exhaust Fan M.628 12.1 unit 750,000 9,075,000 -
122 Cat Anti Bocor+Waterproofing M.629 19.6 kg 17,000 333,608 -
123 Pohon Perdu M.630 4.4 unit 500,000 2,200,000 -
.. . . . - . . .

www.mitra-arsitek.com 2/2
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN LANTAI 1 2 Biaya Upah 148,145,361
Unit Item : ALL Biaya Alat 1,221,739
Waktu Mulai (Start) : Monday, February 4, 2019 Biaya Bahan 184,013,480
Waktu Selesai (Finish) : Monday, August 5, 2019 TOTAL BIAYA 333,380,580
% dari RAB 33.78%
Total OH 1,069
Monday, February 4, 2019
Range Termin
41 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

LT-1 PEKERJAAN LANTAI 1 2/4/2019 8/5/2019


1 Pekerja L.1 691.7 oh 120,136 83,099,987 -
2 Tukang batu L.7 207.0 oh 160,181 33,164,108 -
3 Tukang Besi L.8 24.0 oh 160,181 3,841,292 -
4 Tukang Kayu L.16 73.2 oh 160,181 11,731,368 -
5 Mandor L.35 40.1 oh 217,389 8,715,419 -
6 Kepala Tukang L.36 30.4 oh 183,064 5,565,840 -
7 Operator crane L.39 0.2 oh 137,298 25,826 -
8 Pembantu operator crane L.43 0.2 oh 114,415 21,522 -
9 Sewa crane A.24 0.2 unit hari 1,232,000 231,739 -
10 Air M.1 6603.1 Ltr 650 4,292,002 -
11 Bata merah M.7 27112.8 Bh 850 23,045,880 -
12 Batu belah M.13 57.7 m3 275,000 15,863,100 -
13 Kerikil (kg) M.25 32155.5 kg 150 4,823,320 -
14 Koral beton M.26 0.7 m3 216,500 154,798 -
15 Pasir beton M.28 0.5 m3 289,000 136,697 -
16 Pasir Beton (kg) M.29 21437.0 kg 250 5,359,244 -
17 Pasir pasang M.30 52.5 m3 206,100 10,813,863 -
18 Pasir urug M.32 15.2 M3 237,000 3,596,409 -
19 Semen M.33 26136.4 Kg 1,450 37,897,848 -
20 Dolken kayu Ø 8-10/400 cm M.42 239.5 btg 25,000 5,987,850 -
21 Balok kayu kelas II M.78 1.7 m3 3,500,000 5,978,973 -
22 Kayu balok 5/7 Kelas II M.82 1.5 m3 2,300,000 3,400,320 -
23 Kayu papan 3/20 M.100 0.4 m3 3,500,000 1,401,400 -
24 Papan kayu 3/20 Kelas II M.105 0.2 m3 3,250,000 750,750 -
25 Papan kayu 3/20 Kelas III M.106 7.8 m3 1,800,000 14,080,572 -
26 Baja strip (0,2 x 2) cm M.128 4.8 Kg 12,500 60,500 -
27 Besi beton M.132 3597.1 Kg 10,500 37,769,886 -
28 Kawat beton M.143 51.4 Kg 23,500 1,207,609 -
29 Paku 5 - 10 cm M.155 24.4 kg 23,500 572,629 -
30 Paku Biasa 2" - 5" M.158 44.7 Kg 25,000 1,118,370 -
31 Plywood 120x240 tbl. 4 mm M.365 0.3 Lbr 72,000 19,008 -
32 Plywood 120x240 tbl. 9 mm M.367 37.5 Lbr 120,000 4,505,424 -
33 Seng Gelombang 3" x 6" BJLS 28 M.368 3.0 Lbr 50,000 151,250 -
34 Kaca polos M.524 0.4 m2 110,000 38,720 -
35 Minyak bekisting M.556 29.6 Ltr 5,750 170,067 -
36 Solar M.563 18.8 L 8,500 159,633 -
37 Jendela naco M.576 0.9 Bh 24,500 21,560 -
38 Kunci tanam biasa M.583 0.7 Bh 130,000 85,800 -
39 Upah Kerja Mobiliasasi/Demobilisasi L.IV.a.1 2.2 oh/Ls 900,000 1,980,000 -
40 Alat Kerja Mobilisasi/Demobilisasi A.IV.a.1 2.2 Ls 450,000 990,000 -
41 Bahan Kerja Mobilisasi/Demobilisasi M.IV.a.1 2.2 Ls 250,000 550,000 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN LANTAI 2 3 Biaya Upah 71,897,733
Unit Item : ALL Biaya Alat -
Waktu Mulai (Start) : Monday, February 4, 2019 Biaya Bahan 133,677,995
Waktu Selesai (Finish) : Monday, August 5, 2019 TOTAL BIAYA 205,575,728
% dari RAB 20.83%
Total OH 524
Monday, February 4, 2019
Range Termin
20 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

LT-2 PEKERJAAN LANTAI 2 2/4/2019 8/5/2019


1 Pekerja L.1 335.2 oh 120,136 40,269,774 -
2 Tukang batu L.7 82.4 oh 160,181 13,194,925 -
3 Tukang Besi L.8 25.8 oh 160,181 4,139,280 -
4 Tukang Kayu L.16 48.3 oh 160,181 7,739,214 -
5 Mandor L.35 17.0 oh 217,389 3,686,526 -
6 Kepala Tukang L.36 15.7 oh 183,064 2,868,014 -
7 Air M.1 5825.0 Ltr 650 3,786,247 -
8 Bata merah M.7 12724.3 Bh 850 10,815,613 -
9 Kerikil (kg) M.25 28336.6 kg 150 4,250,494 -
10 Pasir Beton (kg) M.29 18972.3 kg 250 4,743,065 -
11 Pasir pasang M.30 17.2 m3 206,100 3,547,331 -
12 Semen M.33 13760.0 Kg 1,450 19,952,039 -
13 Dolken kayu Ø 8-10/400 cm M.42 732.8 btg 25,000 18,320,500 -
14 Balok kayu kelas II M.78 2.3 m3 3,500,000 7,938,315 -
15 Papan kayu 3/20 Kelas III M.106 5.9 m3 1,800,000 10,541,520 -
16 Besi beton M.132 3876.2 Kg 10,500 40,699,890 -
17 Kawat beton M.143 55.4 Kg 23,500 1,301,289 -
18 Paku Biasa 2" - 5" M.158 58.6 Kg 25,000 1,464,100 -
19 Plywood 120x240 tbl. 9 mm M.367 51.2 Lbr 120,000 6,149,220 -
20 Minyak bekisting M.556 29.3 Ltr 5,750 168,372 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN FINISHING 1 4 Biaya Upah 128,142,863
Unit Item : ALL Biaya Alat 58,119,435
Waktu Mulai (Start) : Monday, February 4, 2019 Biaya Bahan 194,035,698
Waktu Selesai (Finish) : Monday, August 5, 2019 TOTAL BIAYA 380,297,996
% dari RAB 38.53%
Total OH 860
Monday, February 4, 2019
Range Termin
89 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

FN-1 PEKERJAAN FINISHING 1 2/4/2019 8/5/2019


1 Pekerja L.1 369.2 oh 120,136 44,348,376 -
2 Tukang Atap L.6 9.9 oh 160,181 1,585,796 -
3 Tukang batu L.7 78.8 oh 160,181 12,621,087 -
4 Tukang Besi L.8 128.7 oh 160,181 20,613,588 -
5 Tukang cat L.10 114.8 oh 160,181 18,381,439 -
6 Tukang Kayu L.16 81.1 oh 160,181 12,998,243 -
7 Tukang Listrik L.19 4.7 oh 160,181 750,610 -
8 Tukang Pipa L.20 0.7 oh 160,181 114,530 -
9 Mandor L.35 35.1 oh 217,389 7,626,019 -
10 Kepala Tukang L.36 35.4 oh 183,064 6,485,175 -
11 Alat Rangka Atap Baja Canai Dingin A.2 16.7 Ls 450,000 7,533,900 -
12 Assesoris (perkuatan, las dll) A.3 213.4 Ls 158,000 33,717,200 -
13 Perlengkapan A.12 64.1 Ls 250,000 16,016,275 -
14 Rol Cat A.32 2.0 hari 25,000 49,060 -
15 Air M.1 1320.0 Ltr 650 858,000 -
16 Kerikil (kg) M.25 6778.2 kg 150 1,016,730 -
17 Pasir Beton (kg) M.29 5893.8 kg 250 1,473,450 -
18 Pasir pasang M.30 9.9 m3 206,100 2,050,252 -
19 Semen M.33 3870.2 Kg 1,450 5,611,784 -
20 Semen Warna M.36 370.5 Kg 2,100 777,948 -
21 Kayu papan 3/20 M.100 0.8 m3 3,500,000 2,702,700 -
22 Baja Ringan- Reng Truss M.124 904.1 M' 7,000 6,328,476 -
23 Baja Ringan-C Truss M.125 622.8 m1 15,000 9,342,036 -
24 Baja strip (0,2 x 2) cm M.128 16.5 Kg 12,500 206,250 -
25 Baut (Srew driver) M.129 4687.8 bh 450 2,109,492 -
26 Baut Ramset / Dina Bolt M.130 334.8 bh 4,650 1,557,006 -
27 Hollow 4/4 M.141 746.9 M1 10,000 7,469,000 -
28 Paku Biasa ½" - 1" M.157 33.5 Kg 23,500 786,874 -
29 Paku Biasa 2" - 5" M.158 9.4 Kg 25,000 233,750 -
30 Paku sekrup M.165 23.5 bh 750 17,606 -
31 Screw M.182 1630.2 bh 500 815,100 -
32 Floor drain M.189 4.4 Unit 60,000 264,000 -
33 Kloset duduk / monoblock M.191 1.1 Unit 2,500,000 2,750,000 -
34 Kloset jongkok teraso M.193 2.2 Unit 250,000 550,000 -
35 Kran air M.194 6.6 M 25,000 165,000 -
36 Wastafel M.201 1.3 Unit 1,450,000 1,914,000 -
37 Pipa PVC 1/2" M.203 29.0 M 4,000 116,160 -
38 Pipa PVC 3/4" M.204 47.5 M 5,500 261,360 -
39 Pipa PVC 3” M.210 47.5 M 8,500 403,920 -
40 Pipa PVC 4" M.211 37.0 M 9,000 332,640 -
41 Gypsum board 9 mm M.353 77.7 lbr 87,000 6,757,951 -
42 List PVC (setara Shunda Plafon,LS 301-1 Min.Silver
M.357
Metalic) 285.3 M' 34,000 9,699,690 -
43 Seng Gelombang 3" x 6" BJLS 28 M.368 34.7 Lbr 50,000 1,732,500 -
44 Cat dasar Kayu M.380 0.8 Kg 31,000 26,087 -
45 Cat dasar Tembok M.381 96.4 Kg 65,000 6,266,260 -
46 Cat kayu M.385 1.3 kg 49,900 64,221 -
47 Cat meni M.386 1.0 Kg 16,300 16,137 -
48 Cat Penutup Tembok M.387 250.7 Kg 35,000 8,772,764 -
49 Kuas M.390 0.1 Bh 17,000 2,057 -
50 Menie besi M.396 0.7 Kg 27,000 19,305 -
51 Pengencer M.398 0.1 Kg 35,000 5,198 -
52 Plamir M.399 152.6 Kg 56,300 8,590,620 -
53 keramik Dinding 20cm x 20cm M.409 32.7 m2 62,500 2,041,875 -
54 plint ubin teralux marmer ukuran 10cm x 60cm M.440 162.7 Bh 17,000 2,765,730 -
55 ubin teralux marmer ukuran 60cm x60cm M.470 552.4 Bh 45,000 24,858,900 -
56 ubin warna ukuran 20cm x20cm M.475 107.9 Bh 11,500 1,240,333 -
57 ubin warna ukuran 40cm x40 cm M.477 131.3 Bh 14,500 1,903,473 -
58 Genteng metal M.493 217.6 Bh 35,000 7,617,610 -

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN FINSIHING 2 5 Biaya Upah 14,550,958
Unit Item : ALL Biaya Alat 1,652,860
Waktu Mulai (Start) : Monday, February 4, 2019 Biaya Bahan 23,268,284
Waktu Selesai (Finish) : Monday, August 5, 2019 TOTAL BIAYA 39,472,102
% dari RAB 4.00%
Total OH 105
Monday, February 4, 2019
Range Termin
41 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

FN-2 PEKERJAAN FINSIHING 2 2/4/2019 8/5/2019


1 Pekerja L.1 64.5 oh 120,136 7,745,954 -
2 Tukang batu L.7 18.5 oh 160,181 2,967,289 -
3 Tukang Besi L.8 4.8 oh 160,181 762,275 -
4 Tukang cat L.10 2.5 oh 160,181 401,841 -
5 Tukang Kayu L.16 8.7 oh 160,181 1,401,562 -
6 Mandor L.35 3.0 oh 217,389 649,395 -
7 Kepala Tukang L.36 3.4 oh 183,064 622,643 -
8 Assesoris (perkuatan, las dll) A.3 6.8 Ls 158,000 1,077,560 -
9 Bahan Kerja Paving Blok A.4 2.5 Ls 210,000 531,300 -
10 Perlengkapan A.12 0.2 Ls 250,000 44,000 -
11 Air M.1 756.8 Ltr 650 491,920 -
12 Bata merah M.7 1232.0 Bh 850 1,047,200 -
13 Batu belah M.13 4.3 m3 275,000 1,176,120 -
14 Batu paras Dinding M.16 4.8 Bh 80,000 387,200 -
15 Kerikil (kg) M.25 3629.1 kg 150 544,368 -
16 Pasir beton M.28 1.3 m3 289,000 365,585 -
17 Pasir Beton (kg) M.29 2573.1 kg 250 643,280 -
18 Pasir pasang M.30 4.7 m3 206,100 968,337 -
19 Pasir urug M.32 0.3 M3 237,000 62,568 -
20 Semen M.33 2163.2 Kg 1,450 3,136,599 -
21 Semen Warna M.36 27.8 Kg 2,100 58,466 -
22 Dolken kayu Ø 8-10/400 cm M.42 10.1 btg 25,000 253,000 -
23 Balok kayu kelas II M.78 0.1 m3 3,500,000 265,650 -
24 Papan kayu 3/20 Kelas III M.106 0.3 m3 1,800,000 532,224 -
25 Besi beton M.132 458.1 Kg 10,500 4,809,767 -
26 Hollow 4/4 M.141 23.9 M1 10,000 238,700 -
27 Kawat beton M.143 6.5 Kg 23,500 153,782 -
28 Paku 5 - 10 cm M.155 0.9 kg 23,500 20,473 -
29 Paku Biasa 2" - 5" M.158 2.0 Kg 25,000 50,600 -
30 Plywood 120x240 tbl. 9 mm M.367 1.8 Lbr 120,000 212,520 -
31 Cat dasar Tembok M.381 0.7 Kg 65,000 44,330 -
32 Cat Penutup Tembok M.387 1.8 Kg 35,000 62,062 -
33 Kuas M.390 0.1 Bh 17,000 1,309 -
34 Menie besi M.396 0.8 Kg 27,000 20,790 -
35 Plamir M.399 1.5 Kg 56,300 81,748 -
36 ubin warna ukuran 40cm x40 cm M.477 134.9 Bh 14,500 1,956,347 -
37 Paving block 6 cm M.542 25.6 M2 135,000 3,449,655 -
38 Teraso cor di tempat, tebal 3cm M.546 0.5 M3 4,500 2,245 -
39 Amplas M.548 3.9 Lbr 6,500 25,025 -
40 Minyak bekisting M.556 1.1 Ltr 5,750 6,414 -
41 Pohon Perdu M.630 4.4 unit 500,000 2,200,000 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN PERSIAPAN &
14PENDAHULUAN Biaya Upah 10,768,709
Unit Item : ALL Biaya Alat 990,000
Waktu Mulai (Start) : Monday, February 4, 2019 Biaya Bahan 7,488,976
Waktu Selesai (Finish) : Tuesday, February 12, 2019 TOTAL BIAYA 19,247,685
% dari RAB 1.95%
Total OH 61
Monday, February 4, 2019
Range Termin
24 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

A PEKERJAAN PERSIAPAN & PENDAHULUAN 2/4/2019 2/12/2019


1 Pekerja L.1 28.8 oh 120,136 3,462,322 -
2 Tukang batu L.7 4.4 oh 160,181 704,798 -
3 Tukang Kayu L.16 16.7 oh 160,181 2,678,234 -
4 Mandor L.35 7.2 oh 217,389 1,556,723 -
5 Kepala Tukang L.36 2.1 oh 183,064 386,632 -
6 Bata merah M.7 132.0 Bh 850 112,200 -
7 Koral beton M.26 0.7 m3 216,500 154,798 -
8 Pasir beton M.28 0.5 m3 289,000 136,697 -
9 Pasir pasang M.30 0.7 m3 206,100 136,026 -
10 Semen M.33 165.6 Kg 1,450 240,048 -
11 Dolken kayu Ø 8-10/400 cm M.42 7.4 btg 25,000 184,250 -
12 Kayu balok 5/7 Kelas II M.82 1.5 m3 2,300,000 3,400,320 -
13 Kayu papan 3/20 M.100 0.4 m3 3,500,000 1,401,400 -
14 Papan kayu 3/20 Kelas II M.105 0.2 m3 3,250,000 750,750 -
15 Baja strip (0,2 x 2) cm M.128 4.8 Kg 12,500 60,500 -
16 Paku Biasa 2" - 5" M.158 1.8 Kg 25,000 45,650 -
17 Plywood 120x240 tbl. 4 mm M.365 0.3 Lbr 72,000 19,008 -
18 Seng Gelombang 3" x 6" BJLS 28 M.368 3.0 Lbr 50,000 151,250 -
19 Kaca polos M.524 0.4 m2 110,000 38,720 -
20 Jendela naco M.576 0.9 Bh 24,500 21,560 -
21 Kunci tanam biasa M.583 0.7 Bh 130,000 85,800 -
22 Upah Kerja Mobiliasasi/Demobilisasi L.IV.a.1 2.2 oh/Ls 900,000 1,980,000 -
23 Alat Kerja Mobilisasi/Demobilisasi A.IV.a.1 2.2 Ls 450,000 990,000 -
24 Bahan Kerja Mobilisasi/Demobilisasi M.IV.a.1 2.2 Ls 250,000 550,000 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN PONDASI 15 Biaya Upah 26,549,572
Unit Item : ALL Biaya Alat 231,739
Waktu Mulai (Start) : Saturday, February 9, 2019 Biaya Bahan 55,915,533
Waktu Selesai (Finish) : Sunday, February 17, 2019 TOTAL BIAYA 82,696,844
% dari RAB 8.38%
Total OH 198
Monday, February 4, 2019
Range Termin
22 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

B PEKERJAAN PONDASI 2/9/2019 2/17/2019


1 Pekerja L.1 139.1 oh 120,136 16,715,851 -
2 Tukang batu L.7 33.2 oh 160,181 5,323,870 -
3 Tukang Besi L.8 7.5 oh 160,181 1,207,496 -
4 Tukang Kayu L.16 6.4 oh 160,181 1,028,019 -
5 Mandor L.35 6.3 oh 217,389 1,369,084 -
6 Kepala Tukang L.36 4.7 oh 183,064 857,905 -
7 Operator crane L.39 0.2 oh 137,298 25,826 -
8 Pembantu operator crane L.43 0.2 oh 114,415 21,522 -
9 Sewa crane A.24 0.2 unit hari 1,232,000 231,739 -
10 Air M.1 2024.4 Ltr 650 1,315,886 -
11 Batu belah M.13 57.7 m3 275,000 15,863,100 -
12 Kerikil (kg) M.25 9858.6 kg 150 1,478,783 -
13 Pasir Beton (kg) M.29 6572.4 kg 250 1,643,092 -
14 Pasir pasang M.30 15.5 m3 206,100 3,199,672 -
15 Pasir urug M.32 15.2 M3 237,000 3,596,409 -
16 Semen M.33 9959.4 Kg 1,450 14,441,066 -
17 Papan kayu 3/20 Kelas III M.106 1.0 m3 1,800,000 1,777,248 -
18 Besi beton M.132 1130.7 Kg 10,500 11,872,823 -
19 Kawat beton M.143 16.2 Kg 23,500 379,607 -
20 Paku 5 - 10 cm M.155 7.4 kg 23,500 174,022 -
21 Minyak bekisting M.556 2.5 Ltr 5,750 14,193 -
22 Solar M.563 18.8 L 8,500 159,633 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN SLOOF 16 Biaya Upah 9,963,815
Unit Item : ALL Biaya Alat -
Waktu Mulai (Start) : Monday, February 18, 2019 Biaya Bahan 20,574,873
Waktu Selesai (Finish) : Saturday, February 23, 2019 TOTAL BIAYA 30,538,688
% dari RAB 3.09%
Total OH 73
Monday, February 4, 2019
Range Termin
15 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

C PEKERJAAN SLOOF 2/18/2019 2/23/2019


1 Pekerja L.1 46.2 oh 120,136 5,554,185 -
2 Tukang batu L.7 1.9 oh 160,181 310,596 -
3 Tukang Besi L.8 5.2 oh 160,181 832,543 -
4 Tukang Kayu L.16 14.7 oh 160,181 2,354,731 -
5 Mandor L.35 2.4 oh 217,389 511,358 -
6 Kepala Tukang L.36 2.2 oh 183,064 400,402 -
7 Air M.1 1516.0 Ltr 650 985,377 -
8 Kerikil (kg) M.25 7382.4 kg 150 1,107,360 -
9 Pasir Beton (kg) M.29 4921.6 kg 250 1,230,400 -
10 Semen M.33 2615.9 Kg 1,450 3,793,085 -
11 Papan kayu 3/20 Kelas III M.106 2.5 m3 1,800,000 4,579,740 -
12 Besi beton M.132 779.6 Kg 10,500 8,186,063 -
13 Kawat beton M.143 11.1 Kg 23,500 261,731 -
14 Paku 5 - 10 cm M.155 17.0 kg 23,500 398,607 -
15 Minyak bekisting M.556 5.7 Ltr 5,750 32,511 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN TIMBUNAN, 17
PENINGGIAN DAN PEMADATAN Biaya Upah 898,530
Unit Item : ALL Biaya Alat -
Waktu Mulai (Start) : Sunday, February 24, 2019 Biaya Bahan -
Waktu Selesai (Finish) : Tuesday, February 26, 2019 TOTAL BIAYA 898,530
% dari RAB 0.09%
Total OH 7
Monday, February 4, 2019
Range Termin
2 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

D PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN 2/24/2019 2/26/2019


1 Pekerja L.1 6.3 oh 120,136 760,852 -
2 Mandor L.35 0.6 oh 217,389 137,678 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN KOLOM 18 Biaya Upah 17,845,062
Unit Item : ALL Biaya Alat -
Waktu Mulai (Start) : Wednesday, February 27, 2019 Biaya Bahan 45,032,841
Waktu Selesai (Finish) : Thursday, May 16, 2019 TOTAL BIAYA 62,877,903
% dari RAB 6.37%
Total OH 130
Monday, February 4, 2019
Range Termin
18 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

E PEKERJAAN KOLOM 2/27/2019 5/16/2019


1 Pekerja L.1 82.6 oh 120,136 9,917,913 -
2 Tukang batu L.7 3.2 oh 160,181 516,529 -
3 Tukang Besi L.8 8.9 oh 160,181 1,430,741 -
4 Tukang Kayu L.16 27.1 oh 160,181 4,346,984 -
5 Mandor L.35 4.2 oh 217,389 912,479 -
6 Kepala Tukang L.36 3.9 oh 183,064 720,417 -
7 Air M.1 2521.1 Ltr 650 1,638,709 -
8 Kerikil (kg) M.25 12247.4 kg 150 1,837,107 -
9 Pasir Beton (kg) M.29 8246.1 kg 250 2,061,524 -
10 Semen M.33 4315.0 Kg 1,450 6,256,786 -
11 Dolken kayu Ø 8-10/400 cm M.42 164.5 btg 25,000 4,111,800 -
12 Balok kayu kelas II M.78 1.2 m3 3,500,000 4,317,390 -
13 Papan kayu 3/20 Kelas III M.106 3.3 m3 1,800,000 5,920,992 -
14 Besi beton M.132 1339.8 Kg 10,500 14,067,900 -
15 Kawat beton M.143 19.1 Kg 23,500 449,790 -
16 Paku Biasa 2" - 5" M.158 32.9 Kg 25,000 822,360 -
17 Plywood 120x240 tbl. 9 mm M.367 28.8 Lbr 120,000 3,453,912 -
18 Minyak bekisting M.556 16.4 Ltr 5,750 94,571 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN RINGBALOK 19
(BALOK) Biaya Upah 14,496,854
Unit Item : ALL Biaya Alat -
Waktu Mulai (Start) : Saturday, March 9, 2019 Biaya Bahan 41,509,487
Waktu Selesai (Finish) : Thursday, June 6, 2019 TOTAL BIAYA 56,006,341
% dari RAB 5.67%
Total OH 106
Monday, February 4, 2019
Range Termin
18 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

F PEKERJAAN RINGBALOK (BALOK) 3/9/2019 6/6/2019


1 Pekerja L.1 67.1 oh 120,136 8,058,540 -
2 Tukang batu L.7 3.3 oh 160,181 524,282 -
3 Tukang Besi L.8 9.8 oh 160,181 1,568,141 -
4 Tukang Kayu L.16 18.8 oh 160,181 3,015,444 -
5 Mandor L.35 3.4 oh 217,389 745,601 -
6 Kepala Tukang L.36 3.2 oh 183,064 584,846 -
7 Air M.1 2558.9 Ltr 650 1,663,305 -
8 Kerikil (kg) M.25 12461.4 kg 150 1,869,209 -
9 Pasir Beton (kg) M.29 8307.6 kg 250 2,076,899 -
10 Semen M.33 4415.6 Kg 1,450 6,402,681 -
11 Dolken kayu Ø 8-10/400 cm M.42 114.1 btg 25,000 2,852,300 -
12 Balok kayu kelas II M.78 1.0 m3 3,500,000 3,593,898 -
13 Papan kayu 3/20 Kelas III M.106 2.3 m3 1,800,000 4,107,312 -
14 Besi beton M.132 1468.5 Kg 10,500 15,418,904 -
15 Kawat beton M.143 21.0 Kg 23,500 492,985 -
16 Paku Biasa 2" - 5" M.158 22.8 Kg 25,000 570,460 -
17 Plywood 120x240 tbl. 9 mm M.367 20.0 Lbr 120,000 2,395,932 -
18 Minyak bekisting M.556 11.4 Ltr 5,750 65,603 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN COR PLATE BETON
20 (DAK BETON) Biaya Upah 27,042,928
Unit Item : ALL Biaya Alat -
Waktu Mulai (Start) : Wednesday, March 27, 2019 Biaya Bahan 85,205,849
Waktu Selesai (Finish) : Sunday, April 7, 2019 TOTAL BIAYA 112,248,777
% dari RAB 11.37%
Total OH 196
Monday, February 4, 2019
Range Termin
18 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

G PEKERJAAN COR PLATE BETON (DAK BETON) 3/27/2019 4/7/2019


1 Pekerja L.1 123.1 oh 120,136 14,787,549 -
2 Tukang batu L.7 4.9 oh 160,181 780,124 -
3 Tukang Besi L.8 18.4 oh 160,181 2,941,652 -
4 Tukang Kayu L.16 37.8 oh 160,181 6,047,169 -
5 Mandor L.35 6.3 oh 217,389 1,368,362 -
6 Kepala Tukang L.36 6.1 oh 183,064 1,118,072 -
7 Air M.1 3807.7 Ltr 650 2,474,973 -
8 Kerikil (kg) M.25 18542.4 kg 150 2,781,356 -
9 Pasir Beton (kg) M.29 12361.6 kg 250 3,090,395 -
10 Semen M.33 6570.4 Kg 1,450 9,527,095 -
11 Dolken kayu Ø 8-10/400 cm M.42 686.4 btg 25,000 17,160,000 -
12 Balok kayu kelas II M.78 1.7 m3 3,500,000 6,006,000 -
13 Papan kayu 3/20 Kelas III M.106 4.6 m3 1,800,000 8,236,800 -
14 Besi beton M.132 2754.7 Kg 10,500 28,924,088 -
15 Kawat beton M.143 39.4 Kg 23,500 924,784 -
16 Paku Biasa 2" - 5" M.158 45.8 Kg 25,000 1,144,000 -
17 Plywood 120x240 tbl. 9 mm M.367 40.0 Lbr 120,000 4,804,800 -
18 Minyak bekisting M.556 22.9 Ltr 5,750 131,560 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN DINDING 21 Biaya Upah 112,477,624
Unit Item : ALL Biaya Alat -
Waktu Mulai (Start) : Monday, June 10, 2019 Biaya Bahan 61,963,916
Waktu Selesai (Finish) : Monday, July 15, 2019 TOTAL BIAYA 174,441,540
% dari RAB 17.67%
Total OH 823
Monday, February 4, 2019
Range Termin
7 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

H PEKERJAAN DINDING 6/10/2019 7/15/2019


1 Pekerja L.1 533.7 oh 120,136 64,112,550 -
2 Tukang batu L.7 238.5 oh 160,181 38,198,834 -
3 Mandor L.35 26.7 oh 217,389 5,800,659 -
4 Kepala Tukang L.36 23.8 oh 183,064 4,365,581 -
5 Bata merah M.7 39705.1 Bh 850 33,749,293 -
6 Pasir pasang M.30 53.5 m3 206,100 11,025,497 -
7 Semen M.33 11854.6 Kg 1,450 17,189,127 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN ATAP 22 Biaya Upah 33,402,516
Unit Item : ALL Biaya Alat 7,533,900
Waktu Mulai (Start) : Wednesday, June 12, 2019 Biaya Bahan 36,965,518
Waktu Selesai (Finish) : Sunday, June 23, 2019 TOTAL BIAYA 77,901,933
% dari RAB 7.89%
Total OH 226
Monday, February 4, 2019
Range Termin
19 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

I PEKERJAAN ATAP 6/12/2019 6/23/2019


1 Pekerja L.1 88.4 oh 120,136 10,622,191 -
2 Tukang Atap L.6 9.9 oh 160,181 1,585,796 -
3 Tukang Besi L.8 75.3 oh 160,181 12,067,909 -
4 Tukang Kayu L.16 36.7 oh 160,181 5,870,970 -
5 Mandor L.35 9.6 oh 217,389 2,096,961 -
6 Kepala Tukang L.36 6.3 oh 183,064 1,158,688 -
7 Alat Rangka Atap Baja Canai Dingin A.2 16.7 Ls 450,000 7,533,900 -
8 Kayu papan 3/20 M.100 0.8 m3 3,500,000 2,702,700 -
9 Baja Ringan- Reng Truss M.124 904.1 M' 7,000 6,328,476 -
10 Baja Ringan-C Truss M.125 622.8 m1 15,000 9,342,036 -
11 Baja strip (0,2 x 2) cm M.128 16.5 Kg 12,500 206,250 -
12 Baut (Srew driver) M.129 4687.8 bh 450 2,109,492 -
13 Baut Ramset / Dina Bolt M.130 334.8 bh 4,650 1,557,006 -
14 Paku Biasa ½" - 1" M.157 33.5 Kg 23,500 786,874 -
15 Paku Biasa 2" - 5" M.158 9.4 Kg 25,000 233,750 -
16 Seng Gelombang 3" x 6" BJLS 28 M.368 34.7 Lbr 50,000 1,732,500 -
17 Genteng metal M.493 217.6 Bh 35,000 7,617,610 -
18 nok genteng metal M.501 41.1 Bh 83,000 3,414,620 -
19 Talang / Jurai Canai Dingin M.511 20.8 M' 45,000 934,204 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN KUSEN, PINTU,
23 JENDELA DAN ACCESORIS Biaya Upah 5,612,145
Unit Item : ALL Biaya Alat 2,411,750
Waktu Mulai (Start) : Sunday, June 30, 2019 Biaya Bahan 34,081,850
Waktu Selesai (Finish) : Saturday, July 13, 2019 TOTAL BIAYA 42,105,745
% dari RAB 4.27%
Total OH 37
Monday, February 4, 2019
Range Termin
11 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

J PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESORIS 6/30/2019 7/13/2019


1 Pekerja L.1 12.4 oh 120,136 1,489,327 -
2 Tukang batu L.7 2.0 oh 160,181 325,969 -
3 Tukang Kayu L.16 20.2 oh 160,181 3,242,072 -
4 Mandor L.35 2.6 oh 217,389 554,777 -
5 Perlengkapan A.12 9.6 Ls 250,000 2,411,750 -
6 Pintu Utama (Kusen+Panel) Type P1 M.611 3.3 set 2,100,000 6,930,000 -
7 Pintu Utama (Kusen+Panel) Type P2 M.612 6.6 set 1,600,000 10,560,000 -
8 Pintu Utama (Kusen+Panel) Type P3 M.613 3.3 set 1,100,000 3,630,000 -
9 Jendela Type J1 M.614 8.8 set 980,000 8,624,000 -
10 Jendela Type J2 M.615 5.5 set 600,000 3,300,000 -
11 Lubang Angin M.617 40.7 Unit 25,500 1,037,850 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN INST. PIPA AIR
24 BERSIH, LIMBAH DAN SANITASI Biaya Upah 8,990,144
Unit Item : ALL Biaya Alat 12,925,000
Waktu Mulai (Start) : Wednesday, April 10, 2019 Biaya Bahan 20,235,169
Waktu Selesai (Finish) : Friday, June 28, 2019 TOTAL BIAYA 42,150,313
% dari RAB 4.27%
Total OH 45
Monday, February 4, 2019
Range Termin
27 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

K PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI 4/10/2019 6/28/2019
1 Pekerja L.1 16.7 oh 120,136 2,004,975 -
2 Tukang batu L.7 22.5 oh 160,181 3,606,805 -
3 Tukang Pipa L.20 0.7 oh 160,181 114,530 -
4 Mandor L.35 1.2 oh 217,389 252,758 -
5 Kepala Tukang L.36 2.1 oh 183,064 393,076 -
6 Perlengkapan A.12 48.5 Ls 250,000 12,122,000 -
7 Pasir pasang M.30 0.0 m3 206,100 6,801 -
8 Semen M.33 19.8 Kg 1,450 28,710 -
9 Floor drain M.189 4.4 Unit 60,000 264,000 -
10 Kloset duduk / monoblock M.191 1.1 Unit 2,500,000 2,750,000 -
11 Kloset jongkok teraso M.193 2.2 Unit 250,000 550,000 -
12 Kran air M.194 6.6 M 25,000 165,000 -
13 Wastafel M.201 1.3 Unit 1,450,000 1,914,000 -
14 Pipa PVC 1/2" M.203 29.0 M 4,000 116,160 -
15 Pipa PVC 3/4" M.204 47.5 M 5,500 261,360 -
16 Pipa PVC 3” M.210 47.5 M 8,500 403,920 -
17 Pipa PVC 4" M.211 37.0 M 9,000 332,640 -
18 Sealtape M.599 0.2 bh 3,500 578 -
19 Upah Kerja Pembuatan Septik Tank L.IV.a.2 1.1 oh/m3 1,500,000 1,650,000 -
20 Alat Kerja Pembuatan Septik Tank A.IV.a.2 1.1 Ls 450,000 495,000 -
21 Bahan Kerja Pembuatan Septik Tank M.IV.a.1 1.1 Ls 6,500,000 7,150,000 -
22 Upah Kerja Pembuatan Sumur Resapan Limbah L.IV.a.3 0.9 oh/m3 1,100,000 968,000 -
23 Alat Kerja Pembuatan Sumur Resapan Limbah A.IV.a.3 0.9 Ls 350,000 308,000 -
24 Bahan Kerja Pembuatan Sumur Resapan Limbah M.IV.a.2 0.9 Ls 4,500,000 3,960,000 -
25 Shower Mandi M.608 2.2 Unit 135,000 297,000 -
26 Tangki Air M.609 1.1 Unit 1,250,000 1,375,000 -
27 Pompa Air M.610 1.1 Unit 600,000 660,000 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN INST. LISTRIK
25DAN PENERANGAN Biaya Upah 2,102,300
Unit Item : ALL Biaya Alat 1,482,525
Waktu Mulai (Start) : Saturday, June 29, 2019 Biaya Bahan 6,882,700
Waktu Selesai (Finish) : Wednesday, July 17, 2019 TOTAL BIAYA 10,467,525
% dari RAB 1.06%
Total OH 15
Monday, February 4, 2019
Range Termin
14 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

L PEKERJAAN INST. LISTRIK DAN PENERANGAN 6/29/2019 7/17/2019


1 Pekerja L.1 9.9 oh 120,136 1,184,061 -
2 Tukang Listrik L.19 4.7 oh 160,181 750,610 -
3 Mandor L.35 0.8 oh 217,389 167,629 -
4 Perlengkapan A.12 5.9 Ls 250,000 1,482,525 -
5 Fitting Lampu M.512 23.1 bh 25,000 577,500 -
6 MCB + Box M.618 1.1 Unit 350,000 385,000 -
7 Tembaga dia.1/2"-1.5m M.619 1.1 btg 650,000 715,000 -
8 Kabel NYM 3x2,5 mm2-SNI M.620 151.3 m1 12,000 1,815,000 -
9 Kabel NYM 2x1,5 mm2-SNI M.621 181.5 m1 10,000 1,815,000 -
10 Saklar Listrik M.622 15.4 unit 25,000 385,000 -
11 Lampu 5W M.623 3.3 unit 24,000 79,200 -
12 Lampu 15W M.624 11.0 unit 35,000 385,000 -
13 Lampu 20W M.625 8.8 unit 45,000 396,000 -
14 Receiptackle M.626 11.0 unit 30,000 330,000 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN KERAMIK LANTAI
26 DAN DINDING Biaya Upah 23,471,400
Unit Item : ALL Biaya Alat -
Waktu Mulai (Start) : Thursday, June 27, 2019 Biaya Bahan 44,568,844
Waktu Selesai (Finish) : Sunday, July 14, 2019 TOTAL BIAYA 68,040,244
% dari RAB 6.89%
Total OH 170
Monday, February 4, 2019
Range Termin
16 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

M PEKERJAAN KERAMIK LANTAI DAN DINDING 6/27/2019 7/14/2019


1 Pekerja L.1 105.1 oh 120,136 12,632,056 -
2 Tukang batu L.7 54.2 oh 160,181 8,688,313 -
3 Mandor L.35 5.3 oh 217,389 1,155,897 -
4 Kepala Tukang L.36 5.4 oh 183,064 995,135 -
5 Air M.1 1320.0 Ltr 650 858,000 -
6 Kerikil (kg) M.25 6778.2 kg 150 1,016,730 -
7 Pasir Beton (kg) M.29 5893.8 kg 250 1,473,450 -
8 Pasir pasang M.30 9.9 m3 206,100 2,043,451 -
9 Semen M.33 3850.4 Kg 1,450 5,583,074 -
10 Semen Warna M.36 370.5 Kg 2,100 777,948 -
11 keramik Dinding 20cm x 20cm M.409 32.7 m2 62,500 2,041,875 -
12 plint ubin teralux marmer ukuran 10cm x 60cm M.440 162.7 Bh 17,000 2,765,730 -
13 ubin teralux marmer ukuran 60cm x60cm M.470 552.4 Bh 45,000 24,858,900 -
14 ubin warna ukuran 20cm x20cm M.475 107.9 Bh 11,500 1,240,333 -
15 ubin warna ukuran 40cm x40 cm M.477 131.3 Bh 14,500 1,903,473 -
16 Teraso cor di tempat, tebal 3cm M.546 1.3 M3 4,500 5,881 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN LANGIT-LANGIT
27 (PLAFON) Biaya Upah 27,218,970
Unit Item : ALL Biaya Alat 33,717,200
Waktu Mulai (Start) : Tuesday, July 9, 2019 Biaya Bahan 24,759,347
Waktu Selesai (Finish) : Thursday, July 18, 2019 TOTAL BIAYA 85,695,517
% dari RAB 8.68%
Total OH 192
Monday, February 4, 2019
Range Termin
11 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

N PEKERJAAN LANGIT-LANGIT (PLAFON) 7/9/2019 7/18/2019


1 Pekerja L.1 101.9 oh 120,136 12,237,060 -
2 Tukang Besi L.8 53.4 oh 160,181 8,545,679 -
3 Tukang Kayu L.16 24.3 oh 160,181 3,885,201 -
4 Mandor L.35 5.2 oh 217,389 1,130,358 -
5 Kepala Tukang L.36 7.8 oh 183,064 1,420,672 -
6 Assesoris (perkuatan, las dll) A.3 213.4 Ls 158,000 33,717,200 -
7 Hollow 4/4 M.141 746.9 M1 10,000 7,469,000 -
8 Paku sekrup M.165 23.5 bh 750 17,606 -
9 Screw M.182 1630.2 bh 500 815,100 -
10 Gypsum board 9 mm M.353 77.7 lbr 87,000 6,757,951 -
11 List PVC (setara Shunda Plafon,LS 301-1 Min.Silver
M.357
Metalic) 285.3 M' 34,000 9,699,690 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN PENGECATAN
28DAN WATERPROFING Biaya Upah 27,345,387
Unit Item : ALL Biaya Alat 49,060
Waktu Mulai (Start) : Saturday, July 20, 2019 Biaya Bahan 26,542,271
Waktu Selesai (Finish) : Monday, July 29, 2019 TOTAL BIAYA 53,936,718
% dari RAB 5.46%
Total OH 174
Monday, February 4, 2019
Range Termin
16 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

O PEKERJAAN PENGECATAN DAN WATERPROFING 7/20/2019 7/29/2019


1 Pekerja L.1 34.8 oh 120,136 4,178,705 -
2 Tukang cat L.10 114.8 oh 160,181 18,381,439 -
3 Mandor L.35 10.4 oh 217,389 2,267,639 -
4 Kepala Tukang L.36 13.8 oh 183,064 2,517,604 -
5 Rol Cat A.32 2.0 hari 25,000 49,060 -
6 Cat dasar Kayu M.380 0.8 Kg 31,000 26,087 -
7 Cat dasar Tembok M.381 96.4 Kg 65,000 6,266,260 -
8 Cat kayu M.385 1.3 kg 49,900 64,221 -
9 Cat meni M.386 1.0 Kg 16,300 16,137 -
10 Cat Penutup Tembok M.387 250.7 Kg 35,000 8,772,764 -
11 Kuas M.390 0.1 Bh 17,000 2,057 -
12 Menie besi M.396 0.7 Kg 27,000 19,305 -
13 Pengencer M.398 0.1 Kg 35,000 5,198 -
14 Plamir M.399 152.6 Kg 56,300 8,590,620 -
15 Amplas M.548 376.3 Lbr 6,500 2,446,015 -
16 Cat Anti Bocor+Waterproofing M.629 19.6 kg 17,000 333,608 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN TANGGA 29 Biaya Upah 6,246,859
Unit Item : ALL Biaya Alat 1,077,560
Waktu Mulai (Start) : Tuesday, February 12, 2019 Biaya Bahan 10,853,800
Waktu Selesai (Finish) : Thursday, April 18, 2019 TOTAL BIAYA 18,178,219
% dari RAB 1.84%
Total OH 45
Monday, February 4, 2019
Range Termin
32 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

P PEKERJAAN TANGGA 2/12/2019 4/18/2019


1 Pekerja L.1 27.1 oh 120,136 3,253,922 -
2 Tukang batu L.7 7.5 oh 160,181 1,196,395 -
3 Tukang Besi L.8 4.0 oh 160,181 647,569 -
4 Tukang cat L.10 2.1 oh 160,181 333,017 -
5 Tukang Kayu L.16 1.4 oh 160,181 222,434 -
6 Mandor L.35 1.4 oh 217,389 312,952 -
7 Kepala Tukang L.36 1.5 oh 183,064 280,570 -
8 Assesoris (perkuatan, las dll) A.3 6.8 Ls 158,000 1,077,560 -
9 Air M.1 610.2 Ltr 650 396,611 -
10 Batu belah M.13 0.8 m3 275,000 217,800 -
11 Kerikil (kg) M.25 2926.0 kg 150 438,897 -
12 Pasir Beton (kg) M.29 2074.6 kg 250 518,645 -
13 Pasir pasang M.30 1.5 m3 206,100 305,492 -
14 Pasir urug M.32 0.3 M3 237,000 62,568 -
15 Semen M.33 1332.6 Kg 1,450 1,932,266 -
16 Semen Warna M.36 27.8 Kg 2,100 58,466 -
17 Dolken kayu Ø 8-10/400 cm M.42 7.5 btg 25,000 187,000 -
18 Balok kayu kelas II M.78 0.1 m3 3,500,000 196,350 -
19 Papan kayu 3/20 Kelas III M.106 0.1 m3 1,800,000 250,074 -
20 Besi beton M.132 350.7 Kg 10,500 3,681,909 -
21 Hollow 4/4 M.141 23.9 M1 10,000 238,700 -
22 Kawat beton M.143 5.0 Kg 23,500 117,721 -
23 Paku 5 - 10 cm M.155 0.2 kg 23,500 4,188 -
24 Paku Biasa 2" - 5" M.158 1.5 Kg 25,000 37,400 -
25 Plywood 120x240 tbl. 9 mm M.367 1.3 Lbr 120,000 157,080 -
26 Kuas M.390 0.1 Bh 17,000 1,309 -
27 Menie besi M.396 0.8 Kg 27,000 20,790 -
28 Plamir M.399 0.8 Kg 56,300 43,351 -
29 ubin warna ukuran 40cm x40 cm M.477 134.9 Bh 14,500 1,956,347 -
30 Teraso cor di tempat, tebal 3cm M.546 0.5 M3 4,500 2,245 -
31 Amplas M.548 3.9 Lbr 6,500 25,025 -
32 Minyak bekisting M.556 0.6 Ltr 5,750 3,567 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN PAGAR DAN 30
TAMAN/HALAMAN Biaya Upah 8,304,099
Unit Item : ALL Biaya Alat 575,300
Waktu Mulai (Start) : Tuesday, April 9, 2019 Biaya Bahan 12,414,484
Waktu Selesai (Finish) : Wednesday, May 1, 2019 TOTAL BIAYA 21,293,883
% dari RAB 2.16%
Total OH 60
Monday, February 4, 2019
Range Termin
32 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

Q PEKERJAAN PAGAR DAN TAMAN/HALAMAN 4/9/2019 5/1/2019


1 Pekerja L.1 37.4 oh 120,136 4,492,032 -
2 Tukang batu L.7 11.1 oh 160,181 1,770,894 -
3 Tukang Besi L.8 0.7 oh 160,181 114,706 -
4 Tukang cat L.10 0.4 oh 160,181 68,824 -
5 Tukang Kayu L.16 7.4 oh 160,181 1,179,128 -
6 Mandor L.35 1.5 oh 217,389 336,444 -
7 Kepala Tukang L.36 1.9 oh 183,064 342,073 -
8 Bahan Kerja Paving Blok A.4 2.5 Ls 210,000 531,300 -
9 Perlengkapan A.12 0.2 Ls 250,000 44,000 -
10 Air M.1 146.6 Ltr 650 95,310 -
11 Bata merah M.7 1232.0 Bh 850 1,047,200 -
12 Batu belah M.13 3.5 m3 275,000 958,320 -
13 Batu paras Dinding M.16 4.8 Bh 80,000 387,200 -
14 Kerikil (kg) M.25 703.1 kg 150 105,471 -
15 Pasir beton M.28 1.3 m3 289,000 365,585 -
16 Pasir Beton (kg) M.29 498.5 kg 250 124,636 -
17 Pasir pasang M.30 3.2 m3 206,100 662,846 -
18 Semen M.33 830.6 Kg 1,450 1,204,333 -
19 Dolken kayu Ø 8-10/400 cm M.42 2.6 btg 25,000 66,000 -
20 Balok kayu kelas II M.78 0.0 m3 3,500,000 69,300 -
21 Papan kayu 3/20 Kelas III M.106 0.2 m3 1,800,000 282,150 -
22 Besi beton M.132 107.4 Kg 10,500 1,127,858 -
23 Kawat beton M.143 1.5 Kg 23,500 36,061 -
24 Paku 5 - 10 cm M.155 0.7 kg 23,500 16,286 -
25 Paku Biasa 2" - 5" M.158 0.5 Kg 25,000 13,200 -
26 Plywood 120x240 tbl. 9 mm M.367 0.5 Lbr 120,000 55,440 -
27 Cat dasar Tembok M.381 0.7 Kg 65,000 44,330 -
28 Cat Penutup Tembok M.387 1.8 Kg 35,000 62,062 -
29 Plamir M.399 0.7 Kg 56,300 38,397 -
30 Paving block 6 cm M.542 25.6 M2 135,000 3,449,655 -
31 Minyak bekisting M.556 0.5 Ltr 5,750 2,846 -
32 Pohon Perdu M.630 4.4 unit 500,000 2,200,000 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .

www.mitra-arsitek.com 1/1
Software RAB Exarch xPro

RENCANA ANGGARAN BIAYA


BILL OF ITEM
A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 220
Nama Pekerjaan : PEKERJAAN TAMBAHAN DAN
31 LAINNYA Biaya Upah 3,265,570
Unit Item : ALL Biaya Alat 89,375
Waktu Mulai (Start) : Tuesday, July 30, 2019 Biaya Bahan 24,915,000
Waktu Selesai (Finish) : Monday, August 5, 2019 TOTAL BIAYA 28,269,945
% dari RAB 2.86%
Total OH 24
Monday, February 4, 2019
Range Termin
9 Monday, August 5, 2019

Harga
ID Nama Elemen Bahan dan Upah Kode Qty Unit Total Harga Spesifikasi Teknis
Satuan

R PEKERJAAN TAMBAHAN DAN LAINNYA 7/30/2019 8/5/2019


1 Pekerja L.1 18.2 oh 120,136 2,186,549 -
2 Tukang Listrik L.19 0.3 oh 160,181 45,812 -
3 Mandor L.35 1.8 oh 217,389 388,822 -
4 Kepala Tukang L.36 3.5 oh 183,064 644,387 -
5 Perlengkapan A.12 0.4 Ls 250,000 89,375 -
6 Biaya Pengurusan Daya Listrik PLN M.IV.a.3 1.1 Ls 5,500,000 6,050,000 -
7 Biaya Pengurusan Instalasai PDAM M.IV.a.4 1.1 Ls 2,500,000 2,750,000 -
8 Air Conditioner M.627 2.2 unit 3,200,000 7,040,000 -
9 Exhaust Fan M.628 12.1 unit 750,000 9,075,000 -
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .
.. . . . - . . .