Rencana Invoice Termin 8 (Oktober - Desember 2019) Fix
Rencana Invoice Termin 8 (Oktober - Desember 2019) Fix
I. BIAYA REMUNERASI
a. Tenaga Ahli
NILAI KONTRAK NILAI ADDENDUM KONTRAK NILAI ADDENDUM II KONTRAK JUMLAH ANGSURAN RENCANA ANGSURAN PEMBAYARAN
No JABATAN JUMLAH JUMLAH JUMLAH PEMBAYARAN BULAN / JUMLAH
BULAN / HARGA SATUAN HARGA SATUAN BULAN / HARGA SATUAN HARGA SATUAN BULAN / HARGA SATUAN HARGA SATUAN S/D BULAN LALU ORANG BIAYA
ORANG (Rp.) (Rp.) ORANG (Rp.) (Rp.) ORANG (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5=3*4 6 7 8=6*7 9 10 11 = 9 * 10 11 12 13 = 4 * 12
1 Team Leader 28.00 25,000,000 700,000,000 33.00 25,000,000 825,000,000 36.00 25,000,000 900,000,000 825,000,000 3.00 75,000,000
2 Port Engineer 20.00 18,000,000 360,000,000 20.00 18,000,000 360,000,000 20.00 18,000,000 360,000,000 360,000,000 - 0
3 Struktur Engineer 12.00 18,000,000 216,000,000 10.00 18,000,000 180,000,000 10.00 18,000,000 180,000,000 180,000,000 - 0
4 Geotechnical Engineer 22.00 18,000,000 396,000,000 33.00 18,000,000 594,000,000 36.00 18,000,000 648,000,000 594,000,000 3.00 54,000,000
5 Pavement Engineer 12.00 18,000,000 216,000,000 12.00 18,000,000 216,000,000 12.00 18,000,000 216,000,000 216,000,000 - 0
1 Ass. Port Engineer 20.00 16,000,000 320,000,000 20.00 16,000,000 320,000,000 20.00 16,000,000 320,000,000 320,000,000 - 0
2 Ass. Structural Engineer 12.00 16,000,000 192,000,000 10.00 16,000,000 160,000,000 10.00 16,000,000 160,000,000 160,000,000 - 0
3 Ass. Geotechnical Engineer 22.00 16,000,000 352,000,000 33.00 16,000,000 528,000,000 36.00 16,000,000 576,000,000 528,000,000 3.00 48,000,000
4 Ass. Pavement Engineer 12.00 16,000,000 192,000,000 12.00 16,000,000 192,000,000 12.00 16,000,000 192,000,000 192,000,000 - 0
c. Tenaga Penunjang
NILAI KONTRAK NILAI ADDENDUM KONTRAK NILAI ADDENDUM II KONTRAK JUMLAH ANGSURAN RENCANA ANGSURAN PEMBAYARAN
No JABATAN JUMLAH JUMLAH JUMLAH PEMBAYARAN BULAN / JUMLAH
BULAN / HARGA SATUAN HARGA SATUAN BULAN / HARGA SATUAN HARGA SATUAN BULAN / HARGA SATUAN HARGA SATUAN S/D BULAN LALU ORANG BIAYA
ORANG (Rp.) (Rp.) ORANG (Rp.) (Rp.) ORANG (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5=3*4 6 7 8=6*7 9 10 11 = 9 * 10 11 12 13 = 4 * 12
1 Inspector Port 20.00 8,000,000 160,000,000 20.00 8,000,000 160,000,000 20.00 8,000,000 160,000,000 160,000,000 - 0
2 Inspector Structure 12.00 8,000,000 96,000,000 10.00 8,000,000 80,000,000 10.00 8,000,000 80,000,000 80,000,000 - 0
3 Inspector Geotechnic 22.00 8,000,000 176,000,000 33.00 8,000,000 264,000,000 36.00 8,000,000 288,000,000 264,000,000 3.00 24,000,000
4 Inspector Pavement 12.00 8,000,000 96,000,000 12.00 8,000,000 96,000,000 12.00 8,000,000 96,000,000 96,000,000 - 0
4 Staf Administrasi 28.00 7,000,000 196,000,000 33.00 7,000,000 231,000,000 36.00 7,000,000 252,000,000 231,000,000 3.00 21,000,000
NILAI KONTRAK NILAI ADDENDUM KONTRAK NILAI ADDENDUM II KONTRAK JUMLAH RENCANA ANGSURAN PEMBAYARAN
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH PEMBAYARAN VOLUME JUMLAH
No URAIAN SAT VOLUME SATUAN HARGA SAT VOLUME SATUAN HARGA SAT VOLUME SATUAN HARGA S/D BULAN LALU HARGA
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5=3*4 6 7 8=6*7 9 10 11 = 9 * 10 11 12 13 = 4 * 12
1 Alat Tulis Kantor (ATK) dan Foto Copy bln 28.00 2,000,000 56,000,000 bln 33.00 2,000,000 66,000,000 bln 36.00 2,000,000 72,000,000 66,000,000 3.00 6,000,000
2 Komunikasi (Telepon, Fax, Internet) bln 28.00 3,000,000 84,000,000 bln 33.00 3,000,000 99,000,000 bln 36.00 3,000,000 108,000,000 99,000,000 3.00 9,000,000
Jumlah Biaya Fasilitas Kantor & Operasional 140,000,000 165,000,000 180,000,000 165,000,000 15,000,000
BIAYA PELAPORAN
NILAI KONTRAK NILAI ADDENDUM KONTRAK NILAI ADDENDUM KONTRAK JUMLAH ANGSURAN RENCANA ANGSURAN PEMBAYARAN
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH PEMBAYARAN VOLUME JUMLAH
No URAIAN SAT VOLUME SATUAN HARGA SAT VOLUME SATUAN HARGA SAT VOLUME SATUAN HARGA S/D BULAN LALU HARGA
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5=3*4 6 7 8=6*7 9 10 11 = 9 * 10 11 12 13 = 4 * 12
1 Pembuatan Laporan : Ls 1.00 42,000,000 42,000,000 Ls 1.00 42,000,000 42,000,000 Ls 1.00 42,000,000 42,000,000 39,000,000 0.07 3,000,000
- Laporan Pendahuluan
- Laporan Bulanan
- Laporan Akhir
900,000,000 0
360,000,000 0
180,000,000 0
648,000,000 0
216,000,000 0
2,304,000,000 0
320,000,000 0
160,000,000 0
576,000,000 0
192,000,000 0
1,248,000,000 0
160,000,000 0
80,000,000 0
288,000,000 0
96,000,000 0
252,000,000 0
876,000,000 0
4,428,000,000 0
SILITAS KANTOR DAN OPERASIONAL
72,000,000 0
108,000,000 0
180,000,000 0
42,000,000 0
42,000,000 0
KONTRAK NO. & TANGGAL : 8/HK.301/10/PI-IV-2016 dan Nomor 35/YK-MKS/KON/IV/2016 TANGGAL 29 DESEMBER 2016
ADD KONTRAK NO. & TANGGAL : 8/HK.301/7/PI-IV-2019 dan Nomor 120/YK-MKS/KON/IV/2019 TANGGAL 30 APRIL 2019
ADD II KONTRAK NO. & TANGGAL : 10/HK.301/13/PI-IV-2019 dan Nomor 395/YK-MKS/KON/III/2019 TANGGAL 30 SEPTEMBER 2019
TAGIHAN BULAN / No. : Oktober 2019 - Desember 2019
TANGGAL : 29 Desember 2016 - 31 Desember 2019
JENIS PEKERJAAN : JASA KONSULTAN SUPERVISI UNTUK PEKERJAAN PENGAWASAN PEMBANGUNAN MAKASSAR NEW PORT PAKET - B DAN PAKET - C
PROVINSI : SULAWESI SELATAN
JASA KONSULTAN SUPERVISI UNTUK PEKERJAAN PENGAWASAN PEMBANGUNAN MAKASSAR NEW PORT PAKET - B DAN PAKET - C
BULAN OKTOBER 2019 SAMPAI DENGAN BULAN DESEMBER 2019
NILAI NILAI NILAI JUMLAH RENCANA ANGSURAN JUMLAH ANGSURAN
NO. URAIAN KONTRAK ADDENDUM ADDENDUM II PEMBAYARAN PEMBAYARAN PEMBAYARAN
KONTRAK KONTRAK S/D BULAN LALU BULAN INI S/D BULAN INI
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
1 2 3 4 5 6 7 8=6+7
II. BIAYA FASILITAS KANTOR & OPERASIONAL 140,000,000 165,000,000 180,000,000 165,000,000 15,000,000 180,000,000
a. Alat Tulis Kantor (ATK) dan Foto Copy 56,000,000 66,000,000 72,000,000 66,000,000 6,000,000 72,000,000
b. Komunikasi (Telepon, Fax, Internet) 84,000,000 99,000,000 108,000,000 99,000,000 9,000,000 108,000,000
K O N S U LTAN
PT. YODYA KARYA (Persero)
WILAYAH II MAKASSAR
AGUNG WIHARTANTO, ST
Kepala Wilayah
H ANGSURAN SISA ANGSURAN
BAYARAN YANG BELUM
BULAN INI DIBAYARKAN
(Rp.) (Rp.)
=6+7 9=5-8
0
0
0
0
0
0
0
0
0
O N S U LTAN
ODYA KARYA (Persero)
YAH II MAKASSAR
G WIHARTANTO, ST
Kepala Wilayah
KONTRAK NO. & TANGGAL : 8/HK.301/10/PI-IV-2016 dan Nomor 35/YK-MKS/KON/IV/2016 TANGGAL 29 DESEMBER 2016
ADD KONTRAK NO. & TANGGAL : 8/HK.301/7/PI-IV-2019 dan Nomor 120/YK-MKS/KON/IV/2019 TANGGAL 30 APRIL 2019
ADD II KONTRAK NO. & TANGGAL : 10/HK.301/13/PI-IV-2019 dan Nomor 395/YK-MKS/KON/III/2019 TANGGAL 30 SEPTEMBER 201
TAGIHAN BULAN / No. : Oktober 2019 - Desember 2019
TANGGAL : 29 Desember 2016 - 31 Desember 2019
JENIS PEKERJAAN : JASA KONSULTAN SUPERVISI UNTUK PEKERJAAN PENGAWASAN
PEMBANGUNAN MAKASSAR NEW PORT PAKET - B DAN PAKET - C
PROVINSI : SULAWESI SELATAN
REKAPITULASI
I. BIAYA REMUNERASI
BIAYA PEKERJAAN
PPN 10 %
TOTAL
DIBULATKAN
Total pembayaran kepada PT. YODYA KARYA (Persero) Wilayah II Makassar pada saat ini sebesar Rp.
Terbilang : Dua Ratus Enam Puluh Lima Juta Enam Ratus Lima Puluh Ribu Rupiah
Mohon tagihan Pembayaran ke-8 (ke-delapan) untuk bulan Oktober 2019 sampai dengan bulan Desember 2019
dapat di transfer ke rekening kami atas nama PT. YODYA KARYA (Persero)
Pada Bank BRI Kantor Cabang Hayam Wuruk Rekening No. 0332-01-000586-30-4
KONSULTAN
PT. YODYA KARYA (Persero)
WILAYAH II MAKASSAR
Agung Wihartanto, ST
Kepala Wilayah
TANGGAL 29 DESEMBER 2016
TANGGAL 30 APRIL 2019
19 TANGGAL 30 SEPTEMBER 2019
JUMLAH
(Rp.)
222,000,000.00
15,000,000.00
3,000,000.00
240,000,000
24,000,000
264,000,000
264,000,000
264,000,000
KONSULTAN
T. YODYA KARYA (Persero)
WILAYAH II MAKASSAR
Agung Wihartanto, ST
Kepala Wilayah