REKAPITULASI HARGA

PEKERJAAN APARTEMEN EVINSIO


PEKERJAAN MEKANIKAL

NO. KOMPONEN JUMLAH


A. PEKERJAAN A.

1 Draf.2 Pekerjaan dinding 2,931,637.50

2 Draf.3 Kulit luar 808,054,312.50

3 Darf.6 Lantai 480,398,437.50

4 Draf.8 Cat & waterproofing 2,824,356,562.50

5 Draf.10 Lain-lain 106,122,187.50

Total pekrjaan A 4,221,863,137.50

B. PEKERJAAN PLATFOND B.

1 Draf.2 Pekerjaan dinding 19,068,390.00

2 Draf.5 Platfond 5,040,885,662.50

Sub. Total Rp.


Ppn 10% Rp.
Total Rp.
Grand Total ( Pembulatan )